Professional Documents
Culture Documents
(cm)=
(cm)=
(cm)=
(cm)=
(cm)=
HR1=
HR2=
HR3=
HT1 (cm)=
HT2 (cm)=
Claro (m)=
A (cm2)=
Yi=
Losa (cm)
No
1
2
3
4
5
6
7
=
115
18
79
56
40
18
79
18
20
9
18
3,629.00
51.17
20
Area (cm2)
720.00
49.50
49.50
1,422.00
190.00
190.00
1,008.00
3,629.00
40 cm
18 cm
Figura 2 y 3: Triangulo 1 y 2.
Base=
H=
11
9
Figura 4: Rectangulo
B=
H=
18
79
y (cm)
106.00
94.00
94.00
57.40
24.67
24.67
9.00
Ay (cm3)
76,320.00
4,653.00
4,653.00
81,622.80
4,687.30
4,687.30
9,072.00
185,695.40
Figura 5: Triangulo 5 y 6.
B=
H=
19
20
Figura 7: Rectangulo 3.
B=
H=
56
18
250 kg/cm2
350 kg/cm2
Losa=
Claro=
Base de la losa=
Losa
Trabe
0.2 m
18 m
(L/4) =
4.5 m
Donde :
L= Longitud del claro en m
Aplicacin de la formula.
2) 12 t + b =
2.58 m
1.4 m
Se escoje el menor.
breal=
=((^ )/
(^ ))
b=
1.18 m
118.32
Area (cm2)
y (cm)
Ay (cm3)
1
2
=
2,366.43
3,629.00
5,995.43
129.00
51.21
305,269.72
185,841.09
491,110.81
Losa
b=
h=
118.32 cm
20 cm
5,255,850.05
2.4 t/m3
1 m2
18 m
M=
0.87096 Ton/m
35.27
=/2
V=
7.84
Peso losa.
Espesor losa:
Long=
No trabes=
20 cm
6m
4
W=
M=
0.72
=(^2)/
8
29.16
=/2
V=
L=
L1=
L2=
L3=
L4=
L5=
L6=
H=
h1=
H2=
H3=
H4=
H5=
Ad=
w'c=
Propiedades.
122 cm
11 cm
100 cm
11 cm
19 cm
84 cm
19 cm
115 cm
18 cm
9 cm
50 cm
20 cm
18 cm
0.3 m
2.4 t/m3
6.48
No elementos=
No de trabes=
b=
h=
area 1=
Base mayor=
Base menor=
Altura=
area 2=
b=
h=
area 3=
3
4
Figura 2: trapezio
100 cm
122 cm
9 cm
999 cm2
Base mayor=
Base menor=
Altura=
area 4=
Figura 4: trapezio
122 cm
84 cm
20 cm
2060 cm2
5.2 m
0.1 m
2.2 ton/m3
4
Wa=
1.144 Ton/m
=()(w^ c)()
Wao=
0.286 ton/m
5.2 m
0.1 m
2.2 ton/m3
4
Wa=
1.144 Ton/m
0.286 ton/m
Carga muerta adicional : Parapeto
Datos.
Ancho=
Espesor=
W'A=
No de trabes=
5.2 m
0.1 m
2.2 ton/m3
4
Wa=
1.144 Ton/m
0.286 ton/m
MCV=
Impacto=
Eventualidad =
Long claro=
141.09
1.27
1
18
I=
0.27
27%
1.27
100%
100%
90%
1
1
0.9
0.4
0.61
1.83
0.16
1.925
6
1.925
Ancho total
e=( )/2 - e
e=
e=
1.08
Factor de concentracin.
P=
n=
e=
s=
i=
1
4
1.08
1.4
1
=/ [1+6((+12)/
(^21))(/)]
Fc=
P= Numero de carril
n= Numero de trabes
i= Trabe mas desfaborable
s= Separecin entre trabes
e= excentricidad
75.77
Gi=
=/
=/
428.39 ton/m2
343.42 ton/m2
Losa
Gs=
Gi=
=/
=/
68.90 ton/m2
170.58 ton/m2
Diafragma
Gs=
=/
5.59 ton/m2
=/
Gi=
13.85 ton/m2
=/
#DIV/0! ton/m2
=/
Gi=
#DIV/0! ton/m2
Carga viva
Gs=
Gi=
=/
=/
#DIV/0! ton/m2
Sumatoria de esfuerzos.
Carga
Gs (ton/m2)
Gi (ton/m2)
Po.po
430
losa
77
diafragma
7
Carga adicional
68
Carga viva impacto
227
809
-344
-178
-16
-156
-526
-1220
ton/m2
19000 kg/m2
0.987 m2
0.6 F'y
= ^
T=
T=
T=
11251.8 kg
11.2518 Ton
168.78 Ton
Determinar la exentricidad
yi=
C=
e=
e=
51.21 cm
5
=
44.54
c=
10
5
15
C=
6.667
5
10
50
50
100
Comprobacin
=[1/+/]
Formula de la escuadria
=[1//]
-866.51
=[1/+/]
Sin torones.
Gs=
Gi=
778.43
Con torones
809 Gs=
-1220 Gi=
-866.51
778.43
Datos a ingresar
Datos formula
Y = yi - y
54.83
42.83
42.83
6.23
26.50
26.50
42.17
AY
2,164,568.34
90,803.86
90,803.86
55,194.53
133,426.03
133,426.03
1,792,522.96
4,460,745.60
Io
19,440.00
222.75
222.75
739,558.50
4,222.22
4,222.22
27,216.00
795,104.44
Y = yi - y
AY2
Ix (cm4)
47.09
30.70
5,246,558.77
3,421,224.61
8,667,783.38
81.91
cm
33.09
cm
nsversal.
78,881.06
5,255,850.05
5,334,731.11
Modulo de seccin.
Si=
170,941.31 cm3
Ss=
423,217.82 cm3
S's=
263,771.21 cm3
ton/m
ton/m
Ton/m
Ton
Sumatoria de areas.
A=
A=
10959 cm2
1.0959 m2
2.37 ton/m
adicional.
adicional.
EVENTUALIDAD
* Eventualidad.
0.42
1675.51 Pasa
-1998.43 Pasa
No
1
2
3
4
56-
115
8.6
3.4
7
96
200
85
38
128
108
10
10
108
10
10
40.000
15.00
15.00
15.00
68
20
18
6
5.2
250
350
4200
2.4
2.2
4
Area (cm2)
1,720.00
557.60
826.00
9,264.00
880.00
5,214.00
d1=
-------------b4=128----------e1=10
-----------b5=108---------
hj2= 15
y (cm)
110.00
104.83
99.58
49.90
99.79 63.73 -
Ay (cm3)
189,200.00
58,453.21
82,253.08
462,273.60
87,815.20
332,288.22
7=
825.00
5,448.60
Parte masisa
Figura 1: Rectangulo superior.
B=
H=
Figura 2: Trapecio 1
B mayor=
Base menor
h=
Figura 3: Trapecio 2
B mayor=
Base menor
h=
Figura 4: Trapecio 3
B mayor=
Base menor
h=
23.18 -
19,123.50
352,952.97
200 cm
8.6 cm
200 cm
128 cm
3.4 cm
128
108 cm
7 cm
108 cm
85 cm
96 cm
Parte hueca
Figura 5: Trapecio 4
B mayor=
Base menor
h=
Figura 6: Trapecio 5
B mayor=
Base menor
h=
Figura 7: Trapecio 6
B mayor=
Base menor
h=
108 cm
68 cm
10 cm
88 cm
70.000 cm
66.00 cm
70.000 cm
40.000 cm
15.00 cm
1720 kg/cm2
557.6 kg/cm2
0.2 m
18 m
1.28
Losa
Trabe
(L/4) =
4.5 m
Donde :
L= Longitud del claro en m
Aplicacin de la formula.
2) 12 t + b =
3.68 m
1.4 m
Se escoje el menor.
breal=
_=((^ )/
(^ ))
b=
2.46 m
245.88
Area (cm2)
4,917.69
108.00
5,025.69
Losa
base=
h=
245.88 cm
20 cm
y (cm)
129.00
51.21
Ay (cm3)
634,381.61
5,530.68
639,912.29
46,644,520.35
9264 t/m3
1 m2
- m
100.05120 Ton/m
V=
=(^2)/
8
0.00
=/2
0.00
Peso losa.
Espesor losa:
Long=
No trabes=
0 cm
0m
-5214
Altura
Ancho del carril
Numero de trabes
=( )()(/( ))
W=
M=
V=
0
=(^2)/
8
=/2
122 cm
11 cm
100 cm
11 cm
19 cm
84 cm
19 cm
115 cm
18 cm
9 cm
50 cm
20 cm
18 cm
0.3 m
9264 t/m3
No elementos=
No de trabes=
Claro=
b=
h=
area 1=
3
-5214
0
Base mayor=
Base menor=
Altura=
area 2=
b=
h=
area 3=
100 cm
122 cm
9 cm
999 cm2
=()(w^ c)() (
Base mayor=
Base menor=
Altura=
area 4=
122 cm
84 cm
20 cm
2060 cm2
Area (cm2)
m
0.1 m
-880 ton/m3
-5214
#VALUE! Ton/m
Ancho de calzada
Analisis por un metro cuadrado
Pero volumetrico del asfalfto
Numero de trabes
Wao=
#VALUE! ton/m
0.36 Ton/m
2
-5214
= o
Determinacin de la guarnicin.
Wg=
0.72
-0.0001380898 ton/m
Carga muerta adicional : Parapeto
Datos.
Area=
No de lados
Numero de trabes
0.33 Ton/m
2
-5214
= o
Determinacin de la guarnicin.
Wp=
0.66
-0.0001265823 ton/m
#VALUE! ton/m
-0.0001380898 ton/m
-0.0001265823 ton/m
0m
=++
=
#VALUE!
M=
V=
=(^2
)/8
=/2
#VALUE!
#VALUE!
MCV=
Impacto=
Eventualidad =
Long claro=
141.09
1.40
1
0
Determinacion del impacto.
Impacto =
=15.24/
(+38.1)
I=
0.40
40%
1.40
100%
100%
90%
1
1
0.9
0.4
0.61
1.83
0.16
1.925
6
1.93
1=++(/2)
Ancho total
e=( )/2 e
e=
e=
1.08
Excentricidad
Factor de concentracin.
P=
n=
e=
s=
i=
1
4
1.08
1.4
1
=/ [1+6((+12)/(^21))
(/)]
Fc=
Donde:
P= Numero de carril
n= Numero de trabes
i= Trabe mas desfaborable
s= Separecin entre trabes
e= excentricidad
141.09
1.40
0.42
1
83.42
Momento =
S.s=
S.i=
Gs=
Gi=
0.00
-
=/
#DIV/0! ton/m2
=/
#DIV/0! ton/m2
Carga de la losa.
Momento =
S.s= S.i=
Gs=
Gi=
0.00
0.531
0.37
=/
=/
ton/m2
ton/m2
Gs=
Gi=
-7.89
0.531
0.37
=/
14.85 ton/m2
=/
21.16 ton/m2
=/
#VALUE!
0.531
0.37
#VALUE! ton/m2
Gi=
=/
#VALUE! ton/m2
Carga viva
Momento =
S.s= S.i=
Gs=
Gi=
86.00
0.531
0.37
=/
=/
161.91 ton/m2
230.78 ton/m2
Sumatoria de esfuerzos.
Carga
Gs (ton/m2)
Gi (ton/m2)
Po.po
#DIV/0!
#DIV/0!
losa
diafragma
14.85
21.16
Carga adicional
#VALUE!
#VALUE!
Carga viva impacto
161.91 230.78
Sumatoria de esfuerzos.
#DIV/0!
#DIV/0!
19000 kg/m2
0.987 m2
0.6 F'y
= ^
T=
T=
11251.8 kg
11.2518 Ton
15
= 0.6 ^
T=
T=
168,777.00 kg
168.78 ton
Determinar la exentricidad
yi=
c=
cm
5
=c
e=
e=
-6.67
c=
10
5
15
Cc=
5
10
50
50
100
6.667
0.0108
-0.067
1
168.78
=[1//]
Formula de la escuadria
=[1/+/]
#DIV/0!
=[1/+/]
#DIV/0!
Sin torones.
Gs=
Gi=
Con torones
#DIV/0! Gs=
#DIV/0! Gi=
#DIV/0!
#DIV/0!
Carga
Gs (ton/m2)
Parcial
Acomulado
430
#DIV/0!
77
60
7
67
68
135
227
362
Po.Po
Preesfuerzo
Losa
Diafragma
CM. Adicional
CV+1
Gi (ton/m2)
Parcial
-344
1198
-178
-16
-156
-526
350 kg/cm2
140 kg/cm2
Gi=
504 kg/cm2
=135<0.4 ^
350 kg/cm2
140 kg/cm2
Gi=
-22 kg/cm2
430 t/m2
344 t/m2
447 t/m2
1198 t/m2
Se comparan esfuerzos.
Gs inicial =
Gs=
-128.75
GI inicial =
Gi=
Comparativa de esfuerzos.
f'c=
f'c=
350 kg/cm2
192.25 kg/cm2
2100
1153.5
Calculo de perdidas.
Primera perdida por contraccin de fraguado.
Se aplicara de acuerdo a la humedad relativa del ambiente.
Se usara CC=350 kg/cm2
Segunda perdida por escurrimiento elastico del concreto.
Altura=
Excentricidad=
Diferencia=
Gs=
Gi=
115 cm
6.6 cm
108.4 cm
128.7
1153
Sumatoria de esfuerzos
Gs+Gi=
Altura de la trabe.
Excentricidad en la base inferior del la tr
1281.7
AE=
AE=
7fc
1281.7
1208.14
128.7
7556.09 t/m2
755.61 Kg/cm2
Tercera perdida.
1079.44
Altura=
Excentricidad=
Diferencia=
Gs=
Gi=
115 cm
6.6 cm
108.4 cm
135
504
Sumatoria de esfuerzos
Gs+Gi=
369
Crc=
Crc=
16fc
1400
0.125
350
755.61
772.52
Aplicacin de la formula
=[14000.125[(^ ++)]]4
CRSP=
291.31 kg/cm2
Perdidas totales por preesfuerzo.
F'c=
AE=
Crc=
CRSP=
Aplicacin de la formula
135
7725.16 t/m2
772.52 Kg/cm2
369
347.82
350 kg/cm2
755.61
772.52
291.31
482.82
=^ +++
FS=
2169.43 kg/cm2
60%
19000 kg/cm2
=60%^
P=
11400 kg/cm2
13569.43 kg/cm2
11400 kg/cm2
13569.43 kg/cm2
%=1/100
%FS=
16
16%
Longitudes de desadherencia
No torones=
Torones desadheridos=
15
0.33
Se utilizaran 15 torones
Se propone dejar 1/3 de torones desadhe
56.25
Determinacin de la excentricidad
4
1
5
C=
5
10
20
10
30
6 cm
=
e=
0.452
0.0108
0.452
1
56.25
=[1//]
=[1/+/]
Formula de la escuadria
=[1/+/]
#DIV/0!
<
0.8(^ )
#DIV/0!
<
0.4^
18 m
0.139
1
1.25
=1((/21.25)/
(/2))
k=
0.139
#DIV/0!
#DIV/0!
0.139
GS=
#DIV/0! T/m2
Gi=
#DIV/0! T/m2
-153 T/m2
402.86 T/m2
A la derecha 7 torones
No de torones a la derech
Tensin=
7
11.25
78.75
Determinacin de la excentricidad
4
1
2
7
C=
5
10
5
20
10
10
40
5.71 cm
=
e=
0.45
0.0108
Formula de la escuadria
excentricidad=
Ss=
Si=
Factor de correccin=
T=
0.455
1
78.75
=[1//]
=[1/+/]
=[1/+/]
#DIV/0!
<
0.8(^ )
#DIV/0!
<
0.4^
112.45 ton/m2
153.55
Gi=
-169.58 ton/m2
402.86
GS=
112.45 ton/m2
217.74
Gi=
-169.58 ton/m2
566.23
Datos a ingresar
Datos formula
i=
o=
-------------b4=128----------hd1=10
=d2
e1=1
0
=S
-----------b5=108--------j= j1
hj1==
hj2= 15
Y = yi - y
95.00
89.83
84.58
34.90
84.79 48.73 -
AY
15,523,000.00
4,499,513.55
5,909,019.31
11,283,644.64
6,326,622.81
12,381,231.66
Io
10,600.93
11,650,844.44
11,650,844.44
2,829,888.00
838,444.44
838,444.44
8.18 -
55,202.73
18,452,120.30
373,333.33
28,192,400.04
cm
Y = yi - y
1.67
76.12
AY2
13,742.48
625,751.92
639,494.40
Ix (cm4)
163,922.90
46,644,520.35
46,808,443.24
127.33
cm
el concreto
cm
nsversal.
-89.33
IT=2+Ix
IT=
cm4
IT=
47,447,937.64 cm4
Modulo de seccin.
Si=
372,642.44 cm3
Ss= 531,163.41 cm3
S's= 684,394.70 cm3
100.00 cm
10,000.00 Cm2
1.00
1.00
ton/m
ton/m
de trabes
Ton/m
Ton
e los diafragmas
umetrico del concreto
Sumatoria de areas.
A=
A=
10959 cm2
1.0959 m2
9137.18 ton/m
=/2
w=
-7.886
w=
-0.876
adicional.
Ton/m
Ton
ACTO
CIN X EVENTUALIDAD
e correccin en la formula
de trabes
n entre trabes
as desfavorable
0.42
cin * Eventualidad.
ula de la escuadria
#DIV/0! Pasa OK
Pasa OK
Gi (ton/m2)
Acomulado
854
676
660
504
-22
210 kg/m2
2100 t/m2
210 kg/m2
2100 t/m2
t/m2
t/m2
e la trabe.
cidad en la base inferior del la trabe.
F'c
F'cd
inicial de gateo
on que se tensan los cables.
aran 15 torones
ne dejar 1/3 de torones desadheridos
ula de la escuadria
0.8(^ )
0.4^
14.97 kg/cm2
149.7 Ton/m2
140.00 kg/cm2
1400.0 Ton/m2
ula de la escuadria
0.8(^ )
0.4^
14.97 kg/cm2
149.7 Ton/m2
140.00 kg/cm2
1400.0 Ton/m2
ton/m2
-41.1
<
ton/m2
233.28
<
ton/m2
-105.29
<
ton/m2
396.65
<
0.8(^ )
0.4^
0.8(^ )
0.4^
14.97
140.00
14.97
140.00
m
m2
kg/cm2
kg/cm2
kg/cm2
kg/cm2
No
1
2
3
4
5
6
7
=
Figura 1: Rectangulo superior.
B2=
115
18
79
56
40
18
79
18
20
9
18
3,629.00
51.17
20
18
6
5.2
250
350
4200
2.4
2.2
4
Area (cm2)
720.00
49.50
49.50
1,422.00
190.00
190.00
1,008.00
3,629.00
40 cm
y (cm)
106.00
94.00
94.00
57.40
24.67
24.67
9.00
Ay (cm3)
76,320.00
4,653.00
4,653.00
81,622.80
4,687.30
4,687.30
9,072.00
185,695.40
H=
18 cm
Figura 2 y 3: Triangulo 1 y 2.
Base=
H=
11
9
Figura 4: Rectangulo
B=
H=
18
79
Figura 5: Triangulo 5 y 6.
B=
H=
19
20
Figura 7: Rectangulo 3.
B=
H=
56
18
250 kg/cm2
350 kg/cm2
Losa=
Claro=
Espesor del alma=
Base de la losa=
Losa
Trabe
0.2 m
18 m
0.18
(L/4) =
4.5 m
Donde :
L= Longitud del claro en m
Aplicacin de la formula.
2) 12 t + b =
Donde: L= Longitud del claro
t=Espersor de la losa
b= Espesor del alma
2.58 m
1.4 m
Se escoje el menor.
breal=
_=((^ )/
(^ ))
b=
1.18 m
118.32
Area (cm2)
2,366.43
3,629.00
5,995.43
y (cm)
129.00
51.21
Losa
base=
h=
118.32 cm
20 cm
5,255,850.05
Ay (cm3)
305,269.72
185,841.09
491,110.81
2.4 t/m3
1 m2
18.00 m
0.87096 Ton/m
V=
=(^2)/
8
35.27
=/2
7.84
Peso losa.
Espesor losa:
Long=
No trabes=
20 cm
6m
4
Altura
Ancho del carril
Numero de trabes
=( )()(/( ))
W=
M=
V=
0.72
=(^2)/
8
=/2
29.16
6.48
b=
h=
area 1=
0.3 m
2.4 t/m3
3
4
18
Base mayor=
Base menor=
Altura=
area 2=
Figura 2: trapezio
100 cm
122 cm
9 cm
999 cm2
=()(w^ c)(
b=
h=
area 3=
Base mayor=
Base menor=
Altura=
area 4=
122 cm
50 cm
6100 cm2
Figura 4: trapezio
122 cm
84 cm
20 cm
2060 cm2
5.2 m
0.1 m
2.2 ton/m3
4
Ancho de calzada
Analisis por un metro cuadrado
Pero volumetrico del asfalfto
Numero de trabes
1.144 Ton/m
0.286 ton/m
0.36 Ton/m
2
4
= o
Determinacin de la guarnicin.
Wg=
Dividido entre el numero de trabes.
0.72
Wgo=
0.18 ton/m
Carga muerta adicional : Parapeto
Datos.
Area=
No de lados
Numero de trabes
0.33 Ton/m
2
4
= o
Determinacin de la guarnicin.
Wp=
0.66
0.165 ton/m
0.286 ton/m
0.18 ton/m
0.165 ton/m
18 m
=++
=
0.631
M=
V=
=(^2
)/8
=/2
25.56
5.68
Impacto=
Eventualidad =
Long claro=
1.27
1
18
Determinacion del impacto.
Impacto =
=15.24/
(+38.1)
I=
0.27
27%
1.27
100%
100%
90%
1
1
0.9
0.4
0.61
1.83
0.16
1.925
6
1.93
1=++(/2)
Ancho total
e=
e=
e=( )/2 e
1.08
Excentricidad
Factor de concentracin.
P=
n=
e=
s=
i=
4
1.08
1.4
1
Numero de trabes
Excentricidad
Separacin entre trabes
Trabe mas desfavorable
=/ [1+6((+12)/(^21))
(/)]
Fc=
Donde:
P= Numero de carril
n= Numero de trabes
i= Trabe mas desfaborable
s= Separecin entre trabes
e= excentricidad
141.09
1.27
0.42
1
75.77
Gi=
35.27
0.082
0.10
=/
428.39 ton/m2
=/
343.42 ton/m2
Carga de la losa.
Momento =
S.s=
S.i=
29.16
0.423
0.17
Gs=
Gi=
=/
68.90 ton/m2
=/
170.58 ton/m2
Gs=
Gi=
2.66
0.423
0.17
=/
6.29 ton/m2
=/
15.58 ton/m2
Gi=
25.56
0.423
0.17
=/
60.38 ton/m2
=/
149.50 ton/m2
Carga viva
Momento =
S.s=
S.i=
Gs=
Gi=
=/
=/
86.00
0.423
0.17
203.21 ton/m2
503.10 ton/m2
Sumatoria de esfuerzos.
Carga
Gs (ton/m2)
Gi (ton/m2)
Po.po
428.39 losa
68.90 diafragma
6.29 Carga adicional
60.38 Carga viva impacto
203.21 Sumatoria de esfuerzos.
767.17
343.42
170.58
15.58
149.50
503.10
-1182.18
19000 kg/m2
0.987 m2
0.6 F'y
= ^
T=
T=
T=
11251.8 kg
11.2518 Ton
15
= 0.6 ^
T=
T=
168,777.00 kg
168.78 ton
Determinar la exentricidad
yi=
c=
e=
e=
c=
Cc=
51.17 cm
5
=c
44.50
10
5
15
6.667
5
10
50
50
100
0.3629
0.445
0.0823
0.1027
1
168.78
Formula de la escuadria
=[1/+/]
=[1//]
-447.12
=[1/+/]
1196.34
Sin torones.
Gs=
Gi=
Con torones
767.17 Gs=
-1182.18 Gi=
-447.12
1196.34
Gs (ton/m2)
Parcial
Acomulado
430
-447.12
14.17
77
60
7
67
68
135
227
362
Gi (ton/m2)
Parcial
-344
1198
-178
-16
-156
-526
350 kg/cm2
=135<0.4 ^
Gs=
140 kg/cm2
Gi=
504 kg/cm2
350 kg/cm2
140 kg/cm2
Gi=
-22 kg/cm2
430 t/m2
344 t/m2
447 t/m2
1198 t/m2
Se comparan esfuerzos.
Gs inicial =
Gs=
GI inicial =
Gi=
Comparativa de esfuerzos.
f'c=
f'c=
350 kg/cm2
192.25 kg/cm2
Calculo de perdidas.
Primera perdida por contraccin de fraguado.
2100
1153.5
115 cm
6.6 cm
108.4 cm
128.7
1153
Sumatoria de esfuerzos
Gs+Gi=
Altura de la trabe.
Excentricidad en la base inferior d
1281.7
AE=
AE=
7fc
1281.7
1208.14
128.7
1079.44
7556.09 t/m2
755.61 Kg/cm2
Tercera perdida.
Altura=
Excentricidad=
Diferencia=
Gs=
Gi=
Sumatoria de esfuerzos
Gs+Gi=
115 cm
6.6 cm
108.4 cm
135
504
369
369
347.82
135
482.82
Crc=
Crc=
16fc
7725.16 t/m2
772.52 Kg/cm2
1400
0.125
350
755.61
772.52
Aplicacin de la formula
=[14000.125[(^ ++)]]4
CRSP=
291.31 kg/cm2
Perdidas totales por preesfuerzo.
F'c=
AE=
Crc=
CRSP=
350 kg/cm2
755.61
772.52
291.31
Aplicacin de la formula
=^ +++
FS=
2169.43 kg/cm2
60%
19000 kg/cm2
=60%^
P=
11400 kg/cm2
PT=
13569.43 kg/cm2
11400 kg/cm2
13569.43 kg/cm2
%=1/100
%FS=
16
16%
Longitudes de desadherencia
No torones=
Torones desadheridos=
15
0.33
Se utilizaran 15 torones
Se propone dejar 1/3 de torones d
Propuesta de armado.
2
4
2
2
torones
torones
torones
torones
No
No
No
No
1
2
3
4
a
a
a
a
56.25
Determinacin de la excentricidad
4
1
5
C=
5
10
6 cm
20
10
30
=
e=
0.452
0.3629
0.452
0.0823
0.1027
1
56.25
Formula de la escuadria
=[1/+/]
=[1//]
=[1/+/]
-153.77
<
0.8(^ )
402.53
<
0.4^
18 m
0.139
1
1.25
=1((/21.25)/
(/2))
k=
767.17
-1182.18
0.139
GS=
106.551211378 T/m2
Gi=
-164.19138545 T/m2
0.139
Gs=
Gi=
-153 T/m2
402.86 T/m2
A la derecha 7 torones
No de torones a la derecha
Tensin=
7
11.25
78.75
Determinacin de la excentricidad
4
1
2
7
5
10
5
C=
20
10
10
40
5.71 cm
=
e=
0.45
0.3629
0.455
0.0823
0.1027
1
78.75
=[1//]
=[1/+/]
Formula de la escuadria
=[1/+/]
-218.02
<
0.8(^ )
565.74
<
0.4^
112.45 ton/m2
153.55
Gi=
-169.58 ton/m2
402.86
112.45 ton/m2
217.74
Gi=
-169.58 ton/m2
566.23
Datos a ingresar
Datos formula
Y = yi - y
54.83
42.83
42.83
6.23
26.50
26.50
42.17
AY
2,164,568.34
90,803.86
90,803.86
55,194.53
133,426.03
133,426.03
1,792,522.96
4,460,745.60
Io
19,440.00
222.75
222.75
739,558.50
4,222.22
4,222.22
27,216.00
795,104.44
cm
Y = yi - y
47.09
30.70
AY2
5,246,558.77
3,421,224.61
8,667,783.38
Ix (cm4)
78,881.06
5,255,850.05
5,334,731.11
81.91
cm
33.09
cm
es simples y compuestas.
ccin compuesta
5,995.43
14,002,514.50
170,941.31
423,217.82
81.91
33.09
ersal.
ton/m
ton/m
100.00 cm
10,000.00 Cm2
1.00
1.00
Ton/m
Ton
los diafragmas
metrico del concreto
e elementos a lo largo del claro
Sumatoria de areas.
A=
A=
10959 cm2
1.0959 m2
2.37 ton/m
=/4
=/2
or un metro cuadrado
metrico del asfalfto
w=
2.663
w=
0.296
icional.
Ton/m
Ton
O
EVENTUALIDAD
correccin en la formula
n entre trabes
s desfavorable
0.42
* Eventualidad.
ula de la escuadria
320.05 Pasa OK
14.17 Pasa OK
Gi (ton/m2)
Acomulado
a del concreto
854
676
660
504
-22
a del concreto
210 kg/m2
2100 t/m2
210 kg/m2
2100 t/m2
t/m2
t/m2
F'c
F'cd
nicial de gateo
n que se tensan los cables.
an 15 torones
e dejar 1/3 de torones desadheridos
se obtiene el numero de torones adheridos.
ula de la escuadria
0.8(^ )
0.4^
14.97 kg/cm2
149.7 Ton/m2
140.00 kg/cm2
1400.0 Ton/m2
ula de la escuadria
0.8(^ )
0.4^
ton/m2
14.97 kg/cm2
149.7 Ton/m2
140.00 kg/cm2
1400.0 Ton/m2
-41.1
<
0.8(^ )
14.97
ton/m2
233.28
<
ton/m2
-105.29
<
ton/m2
396.65
<
0.4^
0.8(^ )
0.4^
140.00
14.97
140.00
m
m2
kg/cm2
kg/cm2
kg/cm2
kg/cm2
No
1
2
3
4
567-
173
5
8.5
8.5
151
200
80
36.5
10
9
107
10
15
37.000
15.00
15.00
15.00
69
121
20
40
11
9
250
350
4200
2.4
2.2
4
Area (cm2)
1,000.00
1,389.75
994.50
14,118.50
1,185.00
9,438.00
780.00
y (cm)
170.50
164.07
160.37
87.63
151.68 101.84 23.22 -
Ay (cm3)
170,500.00
228,011.08
159,489.04
1,237,256.25
179,745.00
961,203.83
18,112.50
6,099.75
Parte masisa
Figura 1: Rectangulo superior.
B=
H=
Figura 2: Trapecio 1
B mayor=
Base menor
h=
Figura 3: Trapecio 2
B mayor=
Base menor
h=
Figura 4: Trapecio 3
B mayor=
Base menor
h=
636,195.04
Centroide
200 cm
5 cm
2.5
200 cm
127 cm
8.5 cm
3.93
127
107 cm
8.5 cm
4.13
107 cm
80 cm
151 cm
71.87
Parte hueca
Figura 5: Trapecio 4
B mayor=
Base menor
h=
Figura 6: Trapecio 5
B mayor=
Base menor
h=
Figura 7: Trapecio 6
B mayor=
Base menor
h=
89 cm
69 cm
15 cm
7.82
89 cm
67.000 cm
121.00 cm
57.66
67.000 cm
37.000 cm
15.00 cm
6.78
250 kg/cm2
350 kg/cm2
0.2 m
40 m
4
1.07 m
Losa
Trabe
(L/5) =
10 m
Donde :
L= Longitud del claro en m
Aplicacin de la formula.
2) 12 t + b =
3.47 m
1.4 m
Se escoje el menor.
breal=
_=((^ )/
(^ ))
b=
1.18 m
118.32
Area (cm2)
2,366.43
6,099.75
8,466.18
y (cm)
183.00
104.30
Losa
base=
h=
Ay (cm3)
433,057.04
636,195.04
1,069,252.08
Centroide
118.32 cm
20 cm
10.00
I=
35,518,163.12
2.4 t/m3
1 m2
40.00 m
1.46394 Ton/m
M=
V=
=(^2)/
8
292.79
=/2
29.28
Peso losa.
Espesor losa:
Long=
No trabes=
20 cm
11 m
4
Altura
Ancho del carril
Numero de trabes
=( )()(/( ))
W=
M=
V=
1.32
=(^2)/
8
=/2
264
26.4
122 cm
11 cm
100 cm
11 cm
19 cm
84 cm
19 cm
115 cm
18 cm
9 cm
50 cm
20 cm
18 cm
0.3 m
2.4 t/m3
3
4
40 m
b=
h=
area 1=
Base mayor=
Base menor=
Altura=
area 2=
b=
h=
area 3=
100 cm
122 cm
9 cm
999 cm2
=()(w^ c)()
Base mayor=
Base menor=
Altura=
area 4=
122 cm
84 cm
20 cm
2060 cm2
9m
0.1 m
2.2 ton/m3
4
1.98 Ton/m
0.495 ton/m
Ancho de calzada
Analisis por un metro cuadrado
Pero volumetrico del asfalfto
Numero de trabes
0.36 Ton/m
2
4
= o
Determinacin de la guarnicin.
Wg=
0.72
0.18 ton/m
0.33 Ton/m
2
4
= o
Determinacin de la guarnicin.
Wp=
0.66
0.165 ton/m
0.495 ton/m
0.18 ton/m
0.165 ton/m
40 m
0.84
M=
V=
=(^2
)/8
=/2
34.02
16.80
MCV (T3-S2-R4)=
Impacto=
Eventualidad =
Long claro=
288.51
=15.24/
(+38.1)
I=
0.20
20%
1.20
100%
100%
90%
1
1
0.9
0.25
0.75
1
0.61
1.83
1.06
3.525
11
3.53
Ancho total
e=
e=
1.98
a (parapeto) (m)=
a'1 (Banqueta) (m)=
a'2 (acotamiento) (m)
b (Sepracin) (m)=
c= (Dis de ejes) (m)
d=
e (Excentricidad) =
g (Ancho de corona) (m)=
0.25
0.75
1
0.9
1.8
0.8
3.8
11
Excentricidad
3.80
Ancho total
e=
e=
1.70
Excentricidad
=/ [1+6((+12)/(^21))
(/)]
1
4
1.98
1.4
1
=/ [1+6((+12)/(^21))
(/)]
Fc=
Donde:
P= Numero de carril
n= Numero de trabes
i= Trabe mas desfaborable
s= Separecin entre trabes
e= excentricidad
Factor de concentracin HS-20.
P=
n=
e=
s=
i=
1
4
1.70
1.4
1
=/ [1+6((+12)/(^21))
(/)]
Fc=
Donde:
P= Numero de carril
n= Numero de trabes
i= Trabe mas desfaborable
s= Separecin entre trabes
e= excentricidad
489.92
1.20
0.78
1
454.30 Ton/m
288.51
1.20
Factor de concentracin=
Eventualidad=
Mommaxreal (HS-20)=
0.67
1
230.28
684.58 ton/m
Gi=
292.79
0.517
0.34
=/
566.33 ton/m2
=/
859.77 ton/m2
Carga de la losa.
Momento =
S.s=
S.i=
Gs=
Gi=
264.00
0.988
0.37
=/
267.12 ton/m2
=/
722.36 ton/m2
9.20
0.988
0.3655
Gs=
Gi=
=/
9.31 ton/m2
=/
25.18 ton/m2
Gi=
34.02
0.988
0.3655
=/
34.42 ton/m2
=/
93.09 ton/m2
Carga viva
Momento =
S.s=
S.i=
Gs=
Gi=
=/
684.58
0.988
0.37
692.68 ton/m2
=/
1,873.17 ton/m2
Sumatoria de esfuerzos.
Carga
Gs (ton/m2)
Gi (ton/m2)
Po.po
566.33 859.77
losa
267.12 722.36
diafragma
9.31 25.18
Carga adicional
34.42 93.09
Carga viva impacto
692.68 1,873.17
Sumatoria de esfuerzos.
1569.86
-3573.56
F'y=
Area nominal
Tensados a
19000 kg/m2
0.987 m2
0.6 F'y
= ^
T=
T=
T=
11251.8 kg
11.2518 Ton
16
= 0.6 ^
T=
T=
180,028.80 kg
180.03 ton
Determinar la exentricidad
yi=
c=
e=
e=
104.30 cm
5
=c
98.36 cm
c=
13
3
16
Cc=
5
10
65
30
95
5.938
0.6100
0.984
0.5170
0.3405
1
180.03
Formula de la escuadria
=[1/+/]
-47.37
=[1/+/]
815.13
Sin torones.
s=
i=
Con torones
1569.86 s=
-3573.56 i=
-47.37
815.13
Gs (ton/m2)
Parcial
Acomulado
430
-47.37
-2758.44
77
60
7
67
68
135
227
362
Po.Po
Preesfuerzo
Losa
Diafragma
CM. Adicional
CV+1
Gi (ton/m2)
Parcial
-344
1198
-178
-16
-156
-526
350 kg/cm2
=135<0.4 ^
140 kg/cm2
Gi=
504 kg/cm2
350 kg/cm2
=362<0.4 ^
140 kg/cm2
Gi=
-22 kg/cm2
430 t/m2
344 t/m2
447 t/m2
1198 t/m2
Se comparan esfuerzos.
Gs inicial =
Gs=
GI inicial =
Gi=
Comparativa de esfuerzos.
f'c=
f'c=
350 kg/cm2
192.25 kg/cm2
2100
1153.5
Calculo de perdidas.
Primera perdida por contraccin de fraguado.
Se aplicara de acuerdo a la humedad relativa del ambiente.
Se usara CC=350 kg/cm2
Segunda perdida por escurrimiento elastico del concreto.
Altura=
Excentricidad=
Diferencia=
Gs=
Gi=
Sumatoria de esfuerzos
115 cm
6.6 cm
108.4 cm
128.7
1153
Altura de la trabe.
Excentricidad en la base inferior del l
Gs+Gi=
1281.7
AE=
AE=
7fc
1281.7
1208.14
128.7
1079.44
7556.09 t/m2
755.61 Kg/cm2
Tercera perdida.
Altura=
Excentricidad=
Diferencia=
Gs=
Gi=
115 cm
6.6 cm
108.4 cm
135
504
Sumatoria de esfuerzos
Gs+Gi=
369
Crc=
Crc=
16fc
135
7725.16 t/m2
772.52 Kg/cm2
369
347.82
1400
0.125
350
755.61
772.52
482.82
Aplicacin de la formula
=[14000.125[(^ ++)]]4
CRSP=
291.31 kg/cm2
Perdidas totales por preesfuerzo.
F'c=
AE=
Crc=
CRSP=
350 kg/cm2
755.61
772.52
291.31
Aplicacin de la formula
=^ +++
FS=
2169.43 kg/cm2
60%
19000 kg/cm2
=60%^
P=
11400 kg/cm2
13569.43 kg/cm2
11400 kg/cm2
13569.43 kg/cm2
%=1/100
%FS=
16
16%
Longitudes de desadherencia
No torones=
Torones desadheridos=
15
0.33
Se utilizaran 15 torones
Se propone dejar 1/3 de torones desa
Propuesta de armado.
2
4
2
2
torones
torones
torones
torones
No
No
No
No
1
2
3
4
a
a
a
a
56.25
Determinacin de la excentricidad
4
1
5
C=
5
10
20
10
30
6 cm
=
e=
0.452
0.0107
0.452
0.5170
0.3405
1
56.25
Formula de la escuadria
=[1/+/]
=[1//]
=[1/+/]
5207.83
<
0.8(^ )
5331.67
<
0.4^
18 m
0.139
1
1.25
=1((/21.25)/
(/2))
k=
1569.86
-3573.56
0.139
GS=
218.0361519022 T/m2
Gi=
-496.3283280616 T/m2
-153 T/m2
402.86 T/m2
A la derecha 7 torones
No de torones a la derecha=
Tensin=
7
11.25
78.75
0.139
4
1
2
7
5
10
5
C=
5.71 cm
e=
0.45
20
10
10
40
0.0107
0.455
0.5170
0.3405
1
78.75
=[1//]
=[1/+/]
Formula de la escuadria
=[1/+/]
7290.53
<
0.8(^ )
7465.00
<
0.4^
112.45 ton/m2
153.55
Gi=
-169.58 ton/m2
402.86
GS=
112.45 ton/m2
217.74
Gi=
-169.58 ton/m2
566.23
Datos a ingresar
Datos formula
Y = yi - y
66.20
59.77
56.07
16.66
47.39 2.45 81.08 -
AY
4,382,632.82
4,964,436.86
3,126,836.91
3,920,952.44
2,660,725.87
56,861.12
5,127,363.65
Io
2,083.33
11,379,905.56
11,379,905.56
2,436,441.75
743,552.97
743,552.97
282,812.58
8,549,908.40
Centro de gravedad de la figura
yi=
104.30 cm
Momento de inercia de la figura.
I=
35,518,163.12 cm4
Centro superior de gravedad
ys=
68.70 cm
Modulo de seccion
Si=
340543.2317155 cm3
Ss=
516992.87045862 cm3
26,968,254.72
cm
Y = yi - y
56.70
22.00
AY2
7,608,664.43
2,951,823.65
10,560,488.09
Ix (cm4)
78,881.06
35,518,163.12
35,597,044.18
126.30
cm
46.70
cm
sversal.
el concreto
IT=2+Ix
IT=
cm4
IT=
46,157,532.27 cm4
Modulo de seccin.
Si=
365,468.60 cm3
Ss=
988,317.26 cm3
S's=
691,984.26 cm3
100.00 cm
10,000.00 Cm2
1.00
1.00
ton/m
ton/m
de trabes
Ton/m
Ton
e los diafragmas
umetrico del concreto
de elementos a lo largo del claro
de trabes
Sumatoria de areas.
A=
A=
Area total=
10959 cm2
1.0959 m2
1.70 m2
Area 1=
Area 2=
Area 3=
=
3.68 ton/m
=/2
w=
9.204
w=
0.460
301.75
695.086
16047.18
17044.016
adicional.
Ton/m
Ton
CTO
CIN X EVENTUALIDAD
^ 2+(/2)
^ 2+(/2)
e correccin en la formula
de trabes
n entre trabes
as desfavorable
0.78
e correccin en la formula
de trabes
n entre trabes
as desfavorable
0.67
n * Eventualidad.
T3-S2-R4
n * Eventualidad.
HS-20
ula de la escuadria
1522.49 Pasa OK
-2758.44 Pasa OK
Gi (ton/m2)
Acomulado
854
676
660
504
-22
210 kg/m2
2100 t/m2
210 kg/m2
2100 t/m2
t/m2
t/m2
e la trabe.
cidad en la base inferior del la trabe.
F'c
F'cd
inicial de gateo
on que se tensan los cables.
aran 15 torones
ne dejar 1/3 de torones desadheridos
ula de la escuadria
0.8(^ )
0.4^
14.97 kg/cm2
149.7 Ton/m2
140.00 kg/cm2
1400.0 Ton/m2
ula de la escuadria
0.8(^ )
0.4^
14.97 kg/cm2
149.7 Ton/m2
140.00 kg/cm2
1400.0 Ton/m2
ton/m2
-41.1
<
ton/m2
233.28
<
ton/m2
-105.29
<
ton/m2
396.65
<
0.8(^ )
0.4^
0.8(^ )
0.4^
14.97
140.00
14.97
140.00
m
m2
cm2
cm2
cm2
cm2
kg/cm2
kg/cm2
kg/cm2
kg/cm2
Fuerza (ton)
7.2
7.2
7.2
7.2
7.2
7.2
7.2
7.2
4.5
1
2
3
4
5
6
7
8
9
Distancia (m)
0
1.2
5.45
6.65
9.85
11.05
15.3
16.5
20
0
1.2
4.25
1.2
3.2
1.2
4.25
1.2
3.5
62.1
Determinacin de la resultante.
=/
X=
9.10 m
Determinacin del momento mximo.
9.10
9.85
6.65
9.10
0.3743
Determinacin de las reacciones
A=
B=
L=
P=
RA=/
19.62
20.38
40.00
62.10
RB=/
RA=
RB=
31.64
30.46
Momento mximo=
456.7 ton/m
2.45
0.75
Momento (Ton/m)
0
8.64
39.24
47.88
70.92
79.56
110.16
118.8
90
565.2
332.94
29.32
73.27
12.05
9.08
5.23
49.13
22.512
90.86
288.67