Cost Estimate for proposed Bhadbhut Barrage across Narmada River near

Bhadbhut , Dist. Bharuch.


ABSTRACT
PART - I
Sr.No
.

- Construction of Bhadbhut Barrage


Description

Barrage Floor and Protection Works

2
3

Pile Foundation for Floor, Abutment, Wing Walls, Training Walls and
Key Walls.
RCC Diaphragm Wall as Cut Off

4
5

Earthen Coffer Dam


Bridge over Barrage and Gantry Bridge )1663 m)

Vertical Lift Gates with Hoisting and Electrification

7
8

Road Bridge on Left Bank (2110 m)


Left Bank Road Approach Embankment (Earthwork)

Right Bank Road Approach Embankment (Earthwork)

10 Road Work on Left and Right Approach Embankments


11 Engaging Independent Engineers and Financial Expert Services.
12 Survey and Investigation including preparing Detail Design and
Construction Drawing.
Total of Part-I Rs (Crore)
Part-II -Construction of Flood Embankment
13 Left Bank Flood Protection Embankment with Earthwork and Road at
Top
14 Right Bank Flood Protection Embankment (Earthwork)
15 Excavation/Dredging of River Channel from Barrage to Golden
Bridge
Total of Part-II Rs (Crore)

PART-III
16
17
18
19

LAQ and Misc.Works (Department Budgetary)

Land Acquisition for Approach Road Embankment


Land Acquisition for Left Side and Right Side Flood Protection
Embankments
Hauling Road for Construction Facility on Right Side (Kesrol-ManadRiver Bank-Barrage Site)
Modernisation, Widening and Diversion of Storm Water Drainage for
Low Lying Areas on Left Bank

20

Inspection Bungalow, Site Office Building and Store etc.


21

Modernisation and Widening of Old Narmada Channel (Kantiajal)


22

Miscellaneous Works like inauguration ceremony, models and


exhibitions, publicity, publications, photography, pamphlets,
cinematography, visits of dignitaries etc. (Lump sum)
Total of Part-III Rs (Crore)

Total (PART-I+II+III) Rs. (Crore)


Contigency for(Part-III) at 2%
Total (Crore)
Total Cost of the project
Say Total Cost of the project Rs. In Crore

Deputy Executive Engineer


Project Implementation Unit-2
Vadodara

Superintending Engineer
Project Implementation Unit-2
Vadodara

hadbhut Barrage across Narmada River near Village


hadbhut , Dist. Bharuch.
ABSTRACT

Bhadbhut Barrage
Cost Rs. in Crore
642.40
315.20
121.30
65.80
267.00
234.60
69.30
91.80
22.10
85.50
36.00
43.00
1994.00

od Embankment
1096.00
560.00
148.90
1804.90

rks (Department Budgetary)


30.84
163.71
22.51
18.39
1.09
7.99

1.21

245.73

4044.63
4.91
4049.55
4049.55
4050.00

Executive Engineer
Project Impl.Unit-2
Vadodara