You are on page 1of 7

WORK BREAKDOWN STRUCTURE - LEVEL 1, 2, 3 & 4

WBS Elements Level:

Description

Tank Replacement
T11

Tank Replacement
1
Project Management / Engineering Management
1.1
EPC Project and Construction Management
1.1.1
Project Management

1.2

1.1.2

Engineering Management

1.1.3

Construction Management

EPC Project Controls


1.2.1
Cost Controls
1.2.2

1.3

Planning & Scheduling

Procurement & Contract Administration


1.3.1
Buyer / Expeditor

Detailed |Engineering
2.2
Structural / Concrete & Steel
2.2.1
Tank Foundation Design & Detail
2.2.1.1 Foundation Drawings
2.2.1.2 Foundation Loads

2.4

2.2.2

Pipe Supports Foundation

2.2.3

Pipe Supports

Mechanical / Tank & Floating Roof


2.4.1
Tank Design & Detail
2.4.1.1 Advance Bills
2.4.1.2 GA Drawings
2.4.1.3 Calculations
2.4.1.4 Bottom Plate Piece Details
2.4.1.5 Bottom Installation Drawings
2.4.1.6 Shell Orientation Drawings
2.4.1.7 Shell Plate / Installation Drawings
2.4.1.8 Shell Nozzle / Manhole Installation Drawings
2.4.1.9 Windgirder Piece Details
2.4.1.10 Windgirder Installation Drawings

2.4.2

Floating Roof / Roof Accesory Design & Details


2.4.2.1 FR Orientation Drawings
2.4.2.2 FR Deck Plate Piece Details
2.4.2.3 FR Deck Plate Installation Drawings
2.4.2.4 FR Pontoon Plate Piece Details
2.4.2.5 FR Pontoon Plate Installation Drawings

WBS Elements Level:

Description

Tank Replacement

2.5

2.9

2.4.3

Spiral Stairs, Walkway & Platform Design & Details


2.4.3.1 Stairway Assembly / Installation Drawings
2.4.3.2 Gager's Platform Assembly / Installation Drawings
2.4.3.3 Rolling Ladder Drawings
2.4.3.4 Miscellaneous Drawings (incl. Grating drwgs.)

2.4.4

Internal Cathodic Protection Specification Design & Details


2.4.4.1 Cathodic Protection - Design
2.4.4.2 Cathodic Protection - Method Statement

Piping
2.5.2

Paint, Insulation and Fireproofing


2.9.1
Internal Coatings
2.9.2

2.10

External Coatings

Miscellaneous : Services / Expenses


2.10.1 Welding and NDE
2.10.2

Small Diameter Piping

Document Controls

Construction Directs
3.1
Civil and Site
3.1.2
Underground Facilities
3.1.2.1 Trench / Backfilling for U/G Pipes
3.1.2.2 Underground Piping on Site (Carbon Steel)
3.1.2.3 Sewers (Carbon Steel)

3.2

Structural / Concrete & Steel


3.2.1
Tank Foundation
3.2.1.1 Excavation
3.2.1.2 Lean Concrete
3.2.1.3 Reinforcement
3.2.1.4 Formworks
3.2.1.5 Concrete Pouring
3.2.1.6 Formwork Stripping / External Backfilling
3.2.1.7 Internal Backfilling

3.2.2

Pipe Supports Foundation

WBS Elements Level:

Tank Replacement

Description

WBS Elements Level:

Description

Tank Replacement
3.2.3

3.4

Pipe Supports
3.2.3.1 Supports Fabricaton
3.2.3.2 Supports Erection

Mechanical / Tank & Floating Roof


3.4.1
Bottom & Annular Ring
3.4.1.1 Erect & Weld Annular
3.4.1.2 Erect & Weld Bottom
3.4.1.3 NDE

3.4.2

Shell Plate, Shell Nozzles & Wind Girder


3.4.2.1 Erect & Weld Shell Plates
3.4.2.2 Erect & Weld Shell Nozzles
3.4.2.3 Erect & Weld Wind Girder / Top Angle

3.4.3

Floating Roof, Seals & Drains


3.4.3.1 Erect & Weld Lower Deck Plates
3.4.3.2 Erect & Weld Upper Deck Plates
3.4.3.3 Erect & Weld Outer Rim Plates
3.4.3.4 Erect & Weld Inner Rim Plates
3.4.3.5 Erect & Weld Bulkheads
3.4.3.6 Install Seals

WBS Elements Level:

Description

Tank Replacement

3.5

3.9

3.4.4

Stairway, Gauger's Platform & Rolling Ladder


3.4.4.1 Install Stairway
3.4.4.2 Install Gauger's Platform
3.4.4.3 Install Rolling Ladder

3.4.5

Hydro-testing
3.4.5.1 Fill Water & Check for Leaks
3.4.5.2 Empty & Dry

Piping
3.5.2

Small Diameter Piping


3.5.2.1 Prefabrication
3.5.2.2 Erection
3.5.2.3 Alignment / Welding
3.5.2.4 Auxiliary Supports on Pipe
3.5.2.5 NDE / PWHT
3.5.2.6 Hydrotest

Paint, Insulation and Fireproofing


3.9.1
Internal Coatings
3.9.1.1 Wire Brushing / Shot Blasting
3.9.1.2 Primer Coat
3.9.1.3 Final Coat

3.9.2

External Coatings
3.9.2.1 Wire Brushing / Shot Blasting
3.9.2.2 Primer Coat
3.9.2.3 Final Coat
3.9.2.4 Numbering / Labelling

WORK BREAKDOWN STRUCTURE - LEVEL 1, 2, 3 & 4


WBS Elements Level:

Description

Tank Dismantling
T11

Tank Replacement
1
Project Management / Engineering Management
1.1
EPC Project and Construction Management
1.1.1
Project Management

1.2

1.1.2

Engineering Management

1.1.3

Construction Management

EPC Project Controls


1.2.1
Cost Controls
1.2.2

1.3

Planning & Scheduling

Procurement & Contract Administration


1.3.1
Buyer / Expeditor

Detailed |Engineering
2.4
Mechanical / Tank & Floating Roof
2.4.1
Tank Design & Detail
2.4.1.1 Method Statement for Dismantling of Associated Piping, etc.
2.4.1.2 Method Statement for Degassing of Tank
2.4.1.3 Method Statement for Tank Dismantling

Construction Directs
3.4
Mechanical / Tank & Floating Roof
3.4.1
Bottom / Annular / Shell / Roof
3.4.1.1 Blinding/Purging/Cleaning/Degassing
3.4.1.2 Dismantling of Tank Associated Facilities
3.4.1.3 Tank Dismantling - Shell / Roof
3.4.1.4 Tank Dismantling - Bottom
3.4.1.5 Demolish Complete Foundation
3.4.1.3 Tank Dismantling - Clean Up (Disposal of Scrap)

WORK BREAKDOWN STRUCTURE - LEVEL 1, 2, 3 & 4


WBS Elements Level:

Description

Construction Camp & Temporary Site Access


T11

Tank Replacement
1
Project Management / Engineering Management
1.1
EPC Project and Construction Management
1.1.1
Project Management

1.2

1.1.2

Engineering Management

1.1.3

Construction Management

EPC Project Controls


1.2.1
Cost Controls
1.2.2

1.3

Procurement & Contract Administration


1.3.1
Buyer / Expeditor

Detailed |Engineering
2.1
Civil and Site
2.1.1
Site Preparation
2.1.3

Planning & Scheduling

Roads

Construction Directs
3.1
Civil and Site
3.1.1
Site Preparation
3.1.1.1 Site Protection (Steel Net Fencing)
3.1.1.2 TSF Utilities Installation
3.1.1.3 Erect Site Offices
3.1.1.4 Erect Material Storage Facilities
3.1.1.5 Erect Camp Facilities
3.1.1.6 Dismantling of TSF

3.1.3

Roads
3.1.3.1
3.1.2.2
3.1.2.3
3.1.2.3

Gravel Finishing
Acid Resistant Lining
Asphalt Roads
Earth Roads