DETAILS OF PROJECT

Name of Project

Nadathara GP Annual Plan 2015-16 : Panchayath offfice maintenance in Nadathara Gram

Location

in Nadathara Grama Pachayath

Year of Project

2015-16

to

Name & Address of Contractor/Convenor

Project No
No & Date of DPC approval

TIN NO

Outlay of the project

Rs.

% fo VAT

PAC

Rs. 699000

PAN NO

Period of Completion of Work

Details of Measurment Book

Date of Submission of Tender

Serial No of Bill

Date of issue of Selection Notice

No. and date of previous bill for the work

Last Date for Signing Agreement


Wheather Tender Excess/ Below/Estimate Rate (Specify % & Above or Below)
Estimate Rate
If not Estimate Rate
Beneficiary Contribution

Date of actual completion of work

0.000% Below

Amount allotted before this request for the


same purpose (REQUSITION) Rs.

0.000% Above

TR 59 Allocation received for current year

0.000%
Details of Agreement

Requisition

Agreement No & Date

xxxx

Allotment

Date of Agreement

xxxx

Proceedings

Date Of Site Hand Over

xxxx

Bill

Name of Overseer

Mahin.T.A

Date of Encashment

Designation

Overseer Grade III

DETAILS OF OFFICE
Name of LSGI

Nadathara Grama Panchayath

Name of Engineer

T.P.Sanukuttan

Name of Office

Office of Assistant Engineer


LSGD Section
Nadathara Grama Panchayath

Station

Nadathara Grama Panchayath

Designation

Assistant Engineer
LSGD Section
Nadathara Grama Panchayath

DDO Code

1406

520

094

LSGI Code

G 080503

LSGI CODE

TAN No.

TAN No.

CHNO 00927D

Sub Division

The Assistant Executive Engineer

0 8 0 5 0 3
H N O

0 0 9 2 7 D

LSGD Sub Division


Ollukkara Block Panchayath
Division

The Executive Engineer


LSGD Division

Thrissur District Panchayath


Type of Treasury

Sub Treasury

Treasury

Sub Treasury,Chembukkavu,Thrissur.

Treasury Officer

Sub Treasury Officer

SDO Code

64863

TDS Circle

Thrissur

Proceeding of the Assistant Engineer LSGD Nadathara Grama Panchayath (DDO)


(Present Smt. Leeza.V.A)
Head of Account of VPF to Retention:

8448

00

109

98 VPF 453

ROJECT

offfice maintenance in Nadathara Grama Panchayath (Project No. xx/16)

DEDUCTIONS & RETENTIONS


VAT of Cement Bag

me & Address of Contractor/Convenor

VAT of Empty Barrel


0

N NO

No Empty Bags @ Rs

xxxxxxx

0 No Empty Barrels @ Rs

o VAT

3.03%

N NO

CHNO01155A

Details of Measurment Book


Serial No of Bill

o. and date of previous bill for the work : NIL

te of actual completion of work

Retention
Other Deductions Specify Deductions and Amount
Deductions for
Deductions for
Releasing Retention of Previous Bills

mount allotted before this request for the


NIL
me purpose (REQUSITION) Rs.

R 59 Allocation received for current year XXXX


XX/11-12

XX/XX/XXXX

XX/11-12

XX/XX/XXXX

XX/11-12

XX/XX/XXXX

XX/11-12

XX/XX/XXXX

XX/11-12

XX/XX/XXXX

Date of Encashment

Retention to VPF

XXXX
First & Final Bill

Kg Balance Bitumin

XX/XX/XXXX

NTIONS
VAT of Cement Bag

12.63%

VAT of Empty Barrel

12.63%

1.00 /Each

150.00 /Each

20620 /Tonne

Retention to VPF in %

0.00%

Retention in %

0.00%

pecify Deductions and Amount

eleasing Retention of Previous Bills

Amount
0
0
0

SITE PLAN
Name of work

Nadathara GP Annual Plan 2015-16 : Panchayath offfice


maintenance in Nadathara Grama Panchayath (Project No. xx/16)

Nadathara GP Annual Plan 2015-16 : Panchayath offfice maintenance in Nadathara


Grama Panchayath (Project No. xx/16)

Name of work :Code

15.56

Sl
No.

Description of work

Qty

Rate

Unit

Amount

Dismantling old plaster or skirting raking out joints


and cleaning the surface for plaster including
1 disposal of rubbish to the dumping ground within 50
metres lead.
under roof

1.5

1.2

9.00

12

1.5

1.2

21.60

1.8

1.2

8.64

Total

39.24

M2

27.31

M2

1,071.00

1 M2

29,069.00

2 18 mm cement plaster in two coats under layer 12 mm

13.12

thick cement plaster 1:5 (1 cement : 5 coarse sand) and


a top layer 6 mm thick cement plaster 1:3 (1 cement : 3
coarse sand) finished rough with sponge.

Rectification of
fallen plaster
under slab
Total

1.5

1.2

9.00

12
24

1.5
1.8

1.2
1.2

21.60
51.84

Say

82.44 M2

352.60

15.7.4

3 Demolishing brick work manually / by mechanical means


including stacking of serviceable material and disposal of
unserviceable material within 50 metres lead as per
direction of Engineer-in-Charge. In cement mortar

O-17(b)

15.12.
1

existing bath
room in FF

2.50

0.2

2.4

1.20

1.30

0.2

2.4

1.25

Total
Dismantling
doors, windows and clerestory windows
(steel or wood) shutter including chowkhats,
4 architrave,
Solid block holdfasts
masonry etc.
usingcomplete
pre cast and
solidstacking
blocks
within
50
metres
lead:Of
area
3
sq.
and
(Factory made) of size 30x20x15cm metres
or nearest
below
available size confirming to IS 2185 part I of 1979
5
for super structure up to floor two level with
thickness 15cm in: CM 1:6 (1 cement : 6
coarse
for toiletsand) etc3 complete
1.5
0.15
1.5

2.45 M3
3.00

1.01

0.15

1.80

3.2

0.15

2.88

1.3

0.15

0.3

0.06

deduct - D

-2

0.75

0.15

2.1

-0.47

Ovening

-1

1.1

0.15

2.1

-0.35

Ventilator

-3

0.6

0.15

0.45

-0.12

Page 8 of 153

nos

1027.01

1 M3

192.37 1 No

2,514.00
577.00

Code

Sl
No.

Description of work

Qty

O-17(a)

Say
Solid block masonry using pre cast solid blocks
(Factory made) of size 30x20x15cm or nearest
5a available size confirming to IS 2185 part I of 1979
for foundation and plinth with thickness 15cm in:
CM 1:6 (1 cement : 6 coarse sand) etc complete
partition walls to
2
3.2
0.1
2.1
toilet
1

1.2

0.1

2.1

Total

5.22.6

4.90

Amount

M3

6454.70

1 M3

31,628.00

6822.59

1 M3

10,889.00

9231.23

1 M3

8,440.00

92.75 1 kg

6,307.00

1.34
0.25
1.60

M3

Reinforced cement concrete work in beams,


suspended floors, roofs having slope up to 15
landings, balconies, shelves, chajjas, lintels, bands,
plain window sills, staircases and spiral stair cases
6
up to floor five level excluding the cost of centering,
shuttering, finishing and reinforcement, with 1:2:4
(1cement : 2 coarse sand : 4 graded stone
aggregate 20 mm nominal size).
rack slabs at AE
12
office

2.00

0.50

0.05

0.60

M3

RCC beam

3.55

0.15

0.20

0.21

M3

Lintel

1.50

0.15

0.15

0.10

M3

0.91

M3

Total
Steel reinforcement for R.C.C. work including
7 straightening, cutting, bending, placing in position
.Thermo-Mechanically Treated bars
0.91M3 @ 0.75Qtl/M3
13.4.1

Unit

4.81

Total

5.3

Rate

68 kg

12 mm cement plaster of mix:1:4 (1 cement : 4


coarse sand)
toilets

9.00

3.00

54.00

8.60

3.00

25.80

1.30

3.00

7.80

4.00

3.00

12.00

deduct door

.5X2

0.75

2.10

-1.58

deduct door

2X.5

1.10

2.10

-2.31

partition

Page 9 of 153

Code

Sl
No.

Description of work
patch window

1.50

Qty

1.50

Rate

Unit

Amount

6.75

Total

102.46 M2

234.66 1 M2

24,043.00

area vide item 8


102.46 M2
Renewing glass panes, with putty and nails
14.5.1 10 wherever necessary including racking out the old
putty :Float glass panes of thickness 4 mm
Providing
of 1.2
doors, windows,
for repairs wood work
5.40 M2
15 in frames
0.3
clerestory windows and other frames, wrought
framed and fixed in position with hold fast lugs or
O-30 11
with dash fasteners of required dia & length ( hold
fast lugs or dash fastener shall be paid for
0.07
0.0221
separately). using4x3
good0.75
quality 0.035
Pincoda wood

30.29 1 M2

3,104.00

940.66 1 M2

5,080.00

110177.22 1 M3

6,594.00

3572.57 1 M3

2,822.00

3155.86 1 No

9,468.00

1231.77 1 M3

35,795.00

13.43.
1

9 White cement washing two coats for new surface

4x2 0.75

0.09

0.07

0.0378

Providing
and fixing glazed shutters for doors, 0.0599 M3
Total
windows and clerestory windows using 4 mm thick
float glass panes including ISI marked M.S. pressed
O-45 11a
butt hinges bright finished of required size with
necessary screws. Using Pincoda wood 30mm thick
0.79 M2
4x2
0.3
0.33
shutters
Supplying and fixing 20mm thick ready made PVC
O-292 12 door (75*200cm) with frame 50*42 mm including
conveyance,cost of fitting , labour for fixing etc.

11.38

3 nos

Providing and laying Ceramic glazed floor tiles of


size 300x300 mm (thickness to be specified by the
manufacturer), of 1st quality conforming to IS :
15622, of approved make, in all colours, shades,
13 except White, Ivory, Grey, Fume Red Brown, laid on
20 mm thick bed of cement mortar 1:4 (1 Cement :
4 Coarse sand), including pointing the joints with
white cement and matching pigments etc.,
complete.

racks

1.80

1.20

4.32

1.00

1.20

2.40

3.10

1.40

4.34

12

2.00

0.50

12.00

1.50

0.50

6.00

Total

29.06 M2

Page 10 of 153

Code

Sl
No.

11.36

Providing and fixing 1st quality ceramic glazed wall


tiles conforming to IS : 15622 (thickness to be
specified by the manufacturer), of approved make,
in all colours, shades except burgundy, bottle green,
black of any size as approved by Engineer-in14
Charge, in skirting, risers of steps and dados, over
12 mm thick bed of cement mortar 1:3 (1 cement : 3
coarse sand) and jointing with grey cement slurry @
3.3 kg per sqm, including pointing in white cement
mixed with pigment of matching shade complete.

Description of work

toilets

Qty

6.00

1.80

21.60

4.00

1.80

14.40

9.00

1.80

16.20

Rate

Unit

Amount

52.20 M2

1139.43 1 M3

59,478.00

120 M2

57.81 1 M3

6,937.00

66.05 1 M3

13,210.00

Painting with aluminium paint of approved brand


14.55.
15 and manufacture to give an even shade:One or
1
more coats on old work
to doors and windows and
truss work
Painting with synthetic enamel paint of approved
14.54.
15a brand and manufacture of required colour to give an
1
even shade:
One or more coats on old work
for doors

12x2.
25

1.2

2.1

68.04 M2

windows

28x2

1.5

1.35

113.4 M2

2.5

1.5

11.25 M2

grills

192.69 M2
say

200 M2

Wall painting with plastic emulsion paint of


14.53.
16 approved brand and manufacture to give an even
1
shade:One or more coats on old work
alround building

76.00

6.00

456 M2

inside building

42.00

3.00

126 M2

18.00

3.00

54 M2

16.00

3.00

48 M2

Page 11 of 153

Code

Sl
No.

Description of work

Qty

conference hall

47.40

3.00

142.2 M2

varandah

12.00

3.00

36 M2

ceiling

28.00

11.00

616 M2

deduct -doors

-12

1.20

2.10

-30.24 M2

windows

-28

1.50

1.35

-56.7 M2

grills

-3

2.50

1.50

-11.25 M2

Rate

Unit

Amount

1380 M2

71.50 1 M3

98,671.00

Providing and fixing water closet squatting pan


(Indian type W.C. pan) with 100 mm Sand Cast Iron
P or S trap, 10 litre low level white P.V.C. flushing
cistern, including flush pipe, manually controlled
17.1.1 17
device (handle lever) conforming to IS : 7231, with
all fittings and fixtures complete, including cutting
and making good the walls and floors wherever
required:

2 no

4620.65 1 M3

9,241.00

Providing and fixing P.V.C. waste pipe for sink or


17.28.
18 wash basin including PVC. waste fittings
1.1
complete.Semi rigid pipe: 32 mm dia

4M

104.53 1 M

418.00

Providing and fixing 100 mm sand cast Iron grating


for gully trap.

3 no

29.50 1 M

89.00

Providing and fixing PVC pipes, fittings including


fixing the pipe with clamps at 1.00 m spacing. This
includes jointing of pipes & fittings with one step
O-114 20 PVC solvent cement and testing of joints
complete as per direction of Engineer-in-Charge
50mm dia10Kgf/cm2
- Internal work - Exposed
on wall

50 M

104.53 1 M

5,227.00

Providing and fixing PVC pipes, fittings including


fixing the pipe with clamps at 1.00 m spacing. This
includes jointing of pipes with one step PVC solvent
O-133 20a cement and testing of joints complete as per
direction of Engineer-in-Charge. Concealed work,
including cutting chases and making good the wall
etc. 110mm pipe 6kgf/cm2

20 M

509.48 1 M

10,190.00

Providing and fixing PVC pipes, fittings including


fixing the pipe with clamps at 1.00 m spacing. This
includes jointing of pipes & fittings with one step
O-107 21 PVC solvent cement and testing of joints
complete as per direction of Engineer-in-Charge
20mm dia 10Kgf/cm2- Internal work - Exposed on
wall

20 M

139.79 1 M

2,796.00

say

17.29

19

Page 12 of 153

Code

Sl
No.

17.7.2 22

Description of work

Qty

White Vitreous China Wash basin size 630x450 mm


with a single 15 mm C.P. brass pillar tap

4 no

Rate

Unit

2737.90 1 n

Amount
10,952.00

Roofing with G.I hard colour powder coated traffod


sheets 0.35 mm thick or nearest available thickness
O-258 23 with overlaps of 150 mm at ends and GI hook or
crank C.I. bolts and nuts including plain washers
and bitumen washers etc complete
first floor
office room

of

7.50

5.00

37.5

1
1

7.80
11.00

5.50
9.60

42.9
105.6

4.30

3.90

Total
say
Dismantling roofing including ridges, hips, valleys
15.28.
23a and gutters etc., and stacking the material within 50
1
metres lead of: G.S.sheet
Ridge capinging with pre painted galvenised steel
sheets 0.5 mm thick 60 cm wide including all cost
and materials, conveyance, labour charges etc.
O-259 23b
complete.

16.77
202.77
203 M2

599.99 1 M2

121,798.00

200 M2

85.83 1 M2

17,166.00

15 M

442.24 1 M

6,634.00

In stringers, treads, landings etc. of stair cases,


including use of chequered plate wherever required,
all complete

150 kg

102.55 1 kg

15,383.00

Supplying and fixing 200mm dia PVC half cut


section with brackets at the end of sheet or tiled
O-280 25 roof for rain water collection including all cost and
materials, conveyance, labour charges etc.
complete.

20 M

473.40 1 M

9,468.00

Providing and fixing PVC pipes including fixing the


pipe with clamps/ clips at 1.00 m spacing. This
includes jointing of pipes with one step PVC solvent
O-168 26
cement and testing of joints complete as per
direction of Engineer-in-Charge 75mm dia
6Kgf/cm2 -External work - Exposed on wall

15 M

218.02 1 M

3,270.00

Steel work welded in built up sections / framed


10.25.
work, including cutting, hoisting, fixing in position
24
and applying a priming coat of approved steel
1
primer using structural steel etc. as required.

14.43

Removing white or colour wash by scrapping and


sand papering and preparing the surface smooth
27
including necessary repairs to scratches etc.
complete.

Page 13 of 153

600 M2

10.35 1 M2

6,210.00

Sl
Description of work
No. Providing and fixing 12 mm thick prelaminated
particle board flat pressed three layer or graded
wood particle board conforming to IS: 12823 Grade
I Type II, in panelling fixed in aluminum doors,
21.2.1 28
windows shutters and partition frames with C.P.
brass / stainless steel screws etc. complete as per
architectural drawings and directions of Engineer-inPre-laminated particle board with decorative
Charge.
lamination on one side and balancing lamination on
other side
Code

for rack doors

12

0.5

Qty

Rate

Unit

Amount

24 M2

1417.67 1 M2

34,024.00

35 kg

552.79 1 Kg

19,348.00

10

520.43 1 No

5,204.00

Providing and fixing aluminium work for doors,


windows, ventilators and partitions with extruded
built up standard tubular sections/ appropriate Z
sections and other sections of approved make
conforming to IS: 733 and IS: 1285, fixing with dash
fasteners of required dia and size, including
necessary filling up the gaps at junctions, i.e. at top,
21.1.2.
bottom and sides with required EPDM rubber/
29
neoprene gasket etc. Aluminium sections shall be
13
smooth, rust free, straight, mitred and jointed
mechanically wherever required including cleat
angle, Aluminium snap beading for glazing /
paneling, C.P. brass / stainless steel screws, all
complete as per architectural drawings and the
directions of Engineer-in-charge. (Glazing, paneling
and dash fasteners to be paid for separately) :
For shutters of doors, windows & ventilators
including providing and fixing hinges / pivots and
making provision for fixing of fittings wherever
required including the cost of EPDM rubber /
neoprene gasket required (Fittings shall be paid for
separately).
Anodised aluminium (anodised transparent or dyed
to required shade according to IS: 1868, Minimum
anodic coating of grade AC 15)
30

O-93

Engage man labour for dismatling damaged false


ceiling

Providing and fixing false ceiling with 7.5mm thick


PVC plain panel board ceiling of approved qualityin
aluminium frame work with necessary screws
21
etc complete(aluminium frame work shall be paid
separately).
conference hall

deduct-wooden
grains false
ceiling area
Total

8.8

8.6

75.68 M2

3.1

3.3

10.23 M2

-1

5.00

5.00

-25 M2
60.91 M2

Page 14 of 153

Code

Sl
No.

Description of work
say

O-94

32

Rate

Unit

Amount

61 M2

656.00 1 M2

40,016.00

25 M2

768.00 1 M2

19,200.00

Providing and fixing false ceiling with 7.5mm thick


PVC wooden grains panel board ceiling of
approved quality in aluminium frame work with
necessary screws etc complete (aluminium frame
work shall be paid separately).
1

33

Qty

5.00

5.00

Unforseen
items

2,669.00
Total

695,000.00

AMOUNT RUPEES THREE LAKHS ONLY

Page 15 of 153

Nadathara GP Annual Plan 2015-16 : Panchayath offfice maintenance in Nadathara Grama


Panchayath (Project No. xx/16)

Name of work :Code

Sl
No.

Description of work

Qty

Rate

Unit

REVISED ESTIMATE
15.56

Dismantling old plaster or skirting raking out joints


and cleaning the surface for plaster including
1 disposal of rubbish to the dumping ground within 50
metres lead.
5

0.7

3.50

0.9

2.70

0.6

0.6

1.80

Compound wall

0.6

0.7

1.68

floor

0.3

0.3

0.27

ceiling

Total

9.95

M2

26.35

M2

340.27

M2

2 18 mm cement plaster in two coats under layer 12 mm

thick cement plaster 1:5 (1 cement : 5 coarse sand) and


a top layer 6 mm thick cement plaster 1:3 (1 cement : 3
coarse sand) finished rough with sponge.

13.12

ceiling

0.7

3.50

0.9

2.70

0.6

0.6

1.80

Total

8.00

Say

16.00

1 M2

15.7.4

3 Demolishing brick work manually / by mechanical means


including stacking of serviceable material and disposal of
unserviceable material within 50 metres lead as per
direction of Engineer-in-Charge. In cement mortar

15.12.1

Total

Not done

0.00 M3

Demolishing cement concrete manually / by


mechanical means including disposal of material
4
wih in 50 meters lead as per direction of engineer in charge. Nominal cencrete 1:3:6 or richer mix

Page 16 of 153

Note
done

nos

991.11

1 M3

185.64 1 No

4.1.3

O-17(b)

Code

Sl
No.

Description of work

Qty

Solid block masonry using pre cast solid blocks


(Factory made) of size 30x20x15cm or nearest
available size confirming to IS 2185 part I of 1979
5
for super structure up to floor two level with
thickness 15cm in: CM 1:6 (1 cement : 6
coarse sand) etc complete

0.00

Say

0.00

5.22.6

Steel reinforcement for R.C.C. work including


7 straightening, cutting, bending, placing in position
.Thermo-Mechanically Treated bars

13.4.1

5948.93

1 M3

M3

7184.36

1 M3

89.50

1 M3

Note
done
0.00

Total

M3

Note
done

0.00

Total

Unit

Note
done

Total

Providing and laying in position cement concrete of


specified grade excluding the cost of centering and
shuttering all work upto plinth level1:2:4 (1 cement :
6
2 coarse sand : 4 graded stone aggregate 20 mm
nominal size)

Rate

M3

12 mm cement plaster of mix:1:4 (1 cement : 4


coarse sand)
Compound wall 4

0.60

0.70

1.68

floor

0.30

0.30

0.27

patch work 5
president office

1.00

0.70

3.50

0.90

1.00

2.70

0.60

0.60

1.80

Total
Applying one coat of thinnable cement primer of
13.43.
9 approved brand and manufacture on wall surface
1
water thinneable cement primer
area vide item 8
Renewing glass panes, with putty and nails
14.5.1 10 wherever necessary including racking out the old
putty :Float glass panes of thickness 4 mm
for repairs
15
0.3
1.2

Page 17 of 153

9.95 M2

226.45 1 M2

9.95 M2

47.12 1 M2

M2

907.79 1 M2

Code

Sl
No.

Description of work

Qty

Rate

Unit

Providing and fixing glazing in aluminium door,


window, ventilator shutters and partitions etc. with
EPDM rubber / neoprene gasket etc. complete as
21.3.1 11 per the architectural drawings and the directions of
Engineerin-Charge. (Cost of aluminium snap
beading shall be paid in basic item):
With float glass panes of 4.0 mm thickness
4x3 0.75

0.035

0.07

0.0221

4x2 0.75

0.09

0.07

0.0378

Total

M3

1089.23 1 M3

M2

153.64 1 M3

nos

3820.21 1 No

Providing and fixing M.S. grills of required pattern in


frames of windows etc. with M.S. flats, square or
round bars etc. including priming coat with
9.48.2 12
approved steel primer all complete. 9.48.2 Fixed to
openings/ wooden frames with rawl plugs screws
etc
4x2

0.3

0.33

Providing and fixing 1 mm thick M.S. sheet door


with frame of 40x40x6 mm angle iron and 3 mm
M.S. gusset plates at the junctions and corners, all
10.5.2 13 necessary fittings complete, including applying a
priming coat of approved steel primer. Using flats
30x6 mm for diagonal braces and central cross
piece

11.38

Providing and laying Ceramic glazed floor tiles of


size 300x300 mm (thickness to be specified by the
manufacturer), of 1st quality conforming to IS :
15622, of approved make, in all colours, shades,
14 except White, Ivory, Grey, Fume Red Brown, laid on
20 mm thick bed of cement mortar 1:4 (1 Cement :
4 Coarse sand), including pointing the joints with
white cement and matching pigments etc.,
complete.
toilet floor

2.40

1.90

Total

4.56
4.60 M2

Page 18 of 153

1188.72 1 M3

Code

Sl
No.

11.36

Providing and fixing 1st quality ceramic glazed wall


tiles conforming to IS : 15622 (thickness to be
specified by the manufacturer), of approved make,
in all colours, shades except burgundy, bottle green,
black of any size as approved by Engineer-in15
Charge, in skirting, risers of steps and dados, over
12 mm thick bed of cement mortar 1:3 (1 cement : 3
coarse sand) and jointing with grey cement slurry @
3.3 kg per sqm, including pointing in white cement
mixed with pigment of matching shade complete.

Description of work

toilets

Qty

6.00

1.80

10.80

4.00

1.80

14.40

9.00

1.80

16.20

Rate

Unit

M2

1099.61 1 M3

M2

55.79 1 M3

Painting with aluminium paint of approved brand


14.55.
16 and manufacture to give an even shade:One or
1
more coats on old work
to doors and windows and
truss work
Finishing walls with water proofing cement paint of
14.64.
17 required shade: Old work (one or more coats @
2
2.20 kg/ 10 sqm) complete
One or more coats on old work
for doors

12x2.
25

1.2

2.1

68.04 M2

windows

28x2

1.5

1.35

113.4 M2

2.5

1.5

11.25 M2

grills

192.69 M2
say
Providing and fixing water closet squatting pan
(Indian type W.C. pan) with 100 mm Sand Cast Iron
P or S trap, 10 litre low level white P.V.C. flushing
cistern, including flush pipe, manually controlled
17.1.1 18
device (handle lever) conforming to IS : 7231, with
all fittings and fixtures complete, including cutting
and making good the walls and floors wherever
required:

Page 19 of 153

M2

48.56 1 M3

no

4489.16 1 M3

Code

Sl
No.

Description of work

Qty

Rate

Unit

Providing and fixing white vitreous china flat back or


wall corner type lipped front urinal basin of
430x260x350 mm and 340x410x265 mm sizes
respectively with automatic flushing cistern with
standard flush pipe and C.P. brass spreaders with
17.4.1 19
brass unions and G.I clamps complete, including
painting of fittings and brackets, cutting and making
good the walls and floors wherever required: 17.4.1
One urinal basin with 5 litre white P.V.C. automatic
flushing cistern

no

4371.49 1 M3

Providing and fixing P.V.C. waste pipe for sink or


17.28.
20 wash basin including PVC. waste fittings
1.1
complete.Semi rigid pipe: 32 mm dia

108.56 1 M

Providing and fixing 100 mm sand cast Iron grating


for gully trap.

no

38.77 1 M

42.3 M

277.48 1 M

1.6 M

501.63 1 M

135.59 1 M

17.29

21

Providing and fixing PVC pipes, fittings including


fixing the pipe with clamps at 1.00 m spacing. This
includes jointing of pipes & fittings with one step
O-114 22 PVC solvent cement and testing of joints
complete as per direction of Engineer-in-Charge
50mm dia10Kgf/cm2
- Internal work - Exposed
on wall
down pipe
east overall

7.00

14

11.00

11

side roof -new

2.00

front

9.30

9.3

6.00

Total
Providing and fixing PVC pipes, fittings including
fixing the pipe with clamps at 1.00 m spacing. This
includes jointing of pipes with one step PVC solvent
O-133 23 cement and testing of joints complete as per
direction of Engineer-in-Charge. Concealed work,
including cutting chases and making good the wall
etc. 110mm pipe 6kgf/cm2
1

1.6

Providing and fixing PVC pipes, fittings including


fixing the pipe with clamps at 1.00 m spacing. This
includes jointing of pipes & fittings with one step
O-107 24 PVC solvent cement and testing of joints
complete as per direction of Engineer-in-Charge
20mm dia 10Kgf/cm2- Internal work - Exposed on
wall
Page 20 of 153

Code

Sl
No.

17.7.2 25

Description of work

Qty

White Vitreous China Wash basin size 630x450 mm


with a single 15 mm C.P. brass pillar tap

Rate
no

Unit

2642.20 1 n

Roofing with G.I hard colour powder coated traffod


sheets 0.35 mm thick or nearest available thickness
O-258 26 with overlaps of 150 mm at ends and GI hook or
crank C.I. bolts and nuts including plain washers
and bitumen washers etc complete
replacing
old
sheet
-above 1
main office

13.40

9.75

130.65

-1

5.50

3.00

-16.5

10.80

9.65

104.22

-1

3.75

3.60

-13.5

2.60

1.50

3.9

for new truss


work over AE 1
office

12.47

5.52

68.834

4.62

5.27

24.347

5.70

7.20

41.04

East side

10.10

1.70

17.17

over generator

6.40

2.00

12.8

3.90

1.70

6.63

9.10

0.80

7.28

deduct

deduct

front extension
Total

386.87 M2

Providing and fixing G.I.Pipes complete with G.I.


Ofittings and clamps, i/c cutting and making good the
27
walls etc. internal work for truss (B class) 50mm dia
221(f)
nominal bore
replacing
old
sheet
-above 1
main office
deduct

deduct

13.40

9.75

130.65

-1

5.50

3.00

-16.5

10.80

9.65

104.22

-1

3.75

3.60

-13.5

Page 21 of 153

592.29 1 M2

Code

Sl
No.

Description of work

Qty

2.60

1.50

3.9

for new truss


work over AE 1
office

12.47

5.52

68.834

4.62

5.27

24.347

5.70

7.20

41.04

East side

10.10

1.70

17.17

over generator

6.40

2.00

12.8

3.90

1.70

6.63

9.10

0.80

7.28

front extension
Total

387 M2

Providing and fixing GI pipes complete with GI


Ofittings and clamps, i/c cutting and making good
28
thewalls etc. internal work - for truss (B class)
221(d)
32mm dia nominal bore
replacing
old
sheet
-above 1
main office

13.40

9.75

130.65

-1

5.50

3.00

-16.5

10.80

9.65

104.22

-1

3.75

3.60

-13.5

2.60

1.50

3.9

for new truss


work over AE 1
office

12.47

5.52

68.834

4.62

5.27

24.347

5.70

7.20

41.04

East side

10.10

1.70

17.17

over generator

6.40

2.00

12.8

3.90

1.70

6.63

9.10

0.80

7.28

deduct

front extension

Unit

386.87

say

deduct

Rate

Total

386.87
Page 22 of 153

458.74 1 M2

Code

Sl
No.

Description of work

Qty

say

387 M2

Rate

Unit

303.11 1 M2

Providing and fixing GI pipes complete with GI


Ofittings and clamps, i/c cutting and making good
28
thewalls etc. internal work - for truss (B class)
221(c)
32mm dia nominal bore
replacing
old
sheet
-above 1
main office

13.40

9.75

130.65

-1

5.50

3.00

-16.5

10.80

9.65

104.22

-1

3.75

3.60

-13.5

2.60

1.50

3.9

for new truss


work over AE 1
office

12.47

5.52

68.834

4.62

5.27

24.347

5.70

7.20

41.04

East side

10.10

1.70

17.17

over generator

6.40

2.00

12.8

3.90

1.70

6.63

9.10

0.80

7.28

deduct

deduct

front extension
Total

386.87

say

387 M2

Providing and fixing GI pipes complete with GI


Ofittings and clamps, i/c cutting and making good
28
thewalls etc. internal work - for truss (B class)
221(b)
20mm dia nominal bore
replacing
old
sheet
-above 1
main office
deduct

deduct

13.40

9.75

130.65

-1

5.50

3.00

-16.5

10.80

9.65

104.22

-1

3.75

3.60

-13.5

2.60

1.50

3.9

Page 23 of 153

271.86 1 M2

Code

Sl
No.

Description of work

Qty

for new truss


work over AE 1
office

12.47

5.52

68.834

4.62

5.27

24.347

5.70

7.20

41.04

East side

10.10

1.70

17.17

over generator

6.40

2.00

12.8

3.90

1.70

6.63

9.10

0.80

7.28

front extension
Total

Rate

Unit

386.87

say

387 M2

209.67 1 M2

EXTRA ITEMS

15.28.
1

Dismantling roofing including ridges, hips, valleys


1 and gutters etc., and stacking the material within
50metres lead of: G.S. Sheet
Main building

10.40

9.75

101.40

4.25

3.00

12.75

3.75

6.00

22.50

7.05

9.65

68.03

2.60

1.50

3.90

Total

15.57

208.58 M2

Dismantling aluminium / Gypsum partitions, doors,


windows, fixed glazing and false ceiling including
2 disposal of unserviceable surplus material and
stacking of serviceable material with in 50 meters
lead as directed by Engineer-in-Charge.
Main building

10.40

9.75

101.40

4.25

3.00

12.75

Page 24 of 153

82.52 1 M2

Code

O-259

Sl
No.

Description of work

Qty

3.75

6.00

22.50

7.05

9.65

68.03

2.60

1.50

3.90

Total
208.58 M2
Ridge capinging with pre painted galvenised steel
sheets 0.5 mm thick 60 cm wide including all cost
and materials, conveyance, labour charges etc.
3
complete.

13.4

13.4

12.5

12.5

Total

O-169

25.9 M

Unit

28.71 1 M2

442.24 1 M

Providing and fixing PVC pipes including fixing the


pipe with clamps/ clips at 1.00 m spacing. This
includes jointing of pipes with one step PVC solvent
4
cement and testing of joints complete as per
direction of Engineer-in-Charge 75mm dia
4Kgf/cm2 -External work - Exposed on wall
rain water down
4
pipe

28

5.5

5.5

9.5

9.5
43 M

O-165

Rate

Providing and fixing PVC pipes, fittings including


fixing the pipe with clamps at 1.00 mspacing. This
includes jointing of pipes & fittings with one step
5 PVC solvent cement and testing of joints
complete as per direction of Engineer-in-Charge
50mm dia 6Kgf/cm2
-External work - Exposed
on wall
rain water down
2
pipe east side

14

11

11

side roof

front

9.3

9.3
6
Page 25 of 153

177.62 1 M

Code

Sl
No.

Description of work

Qty

Total

42.3 M

Wall painting with plastic emulsion paint of


15.64.
21 approved brand and manufacture to give an even
2
shade:One or more coats on old work
rooms inside conferance hal

8.80

3.30

58.08 M2

8.70

3.30

57.42 M2

3.25

3.30

21.45 M2

filler projections

12

0.23

3.30

9.108 M2

kudumba sree
office - ceiling

7.60

4.90

37.24 M2

wall

7.60

3.30

25.08 M2

Page 26 of 153

Rate

Unit

253.50 1 M

Code

Sl
No.

Description of work

Qty

4.90

3.30

32.34 M2

3.75

3.30

12.375 M2

projections

0.23

3.30

3.036 M2

wall - common
area

4.75

3.00

28.5 M2

6.05

3.00

18.15

1.05

3.00

3.15

projections

0.23

3.00

2.07

ceiling

3.25

0.85

2.7625

13.80

3.00

82.8

4.20

3.00

25.2

projections

0.23

3.00

4.14

ceiling

10.00

0.75

7.5

ceiling

10.00

5.80

58

beam side

5.80

0.30

6.96

wall

10.00

3.60

72

5.80

3.60

41.76

5.80

10.00

58

2x2

5.80

0.30

6.96

5.80

3.60

41.76

10.00

0.60

12

Mini hall
wall

LSGD/Jalanidhi

Ground Floor
main office
bulding - ceiling
beam side
wall

PMGSY- office

opening- jamb
& sil

0.38

2.00

1.52

back portion

9.15

0.70

6.405

Page 27 of 153

Rate

Unit

Code

Sl
No.

Description of work

Qty

2x2

4.05

0.30

4.86

ceiling

9.15

4.05

37.058

wall

9.15

3.60

65.88

4.05

3.60

14.58

2.00

0.90

10.8

0.45

0.90

2.43

Secretary off

6.00

3.35

20.1

wall

6.00

3.03

36.36

3.35

3.05

20.435

corridoor ceiling

7.60

2.00

15.2

wall

7.60

2.00

30.4

2.00

3.05

12.2

Vice presiroom

3.00

4.10

12.3

wall

3.00

3.05

18.3

4.20

0.60

5.04

president
ceiling

3.10

3.00

9.3

wall

3.10

3.05

18.91

3.00

3.05

18.3

VEO ceiling

3.25

3.00

9.75

wall

3.25

3.05

19.825

3.00

3.05

18.3

post off ceiling

5.15

2.75

14.163

wall

5.15

3.05

31.415

2.75

3.05

16.775

5.20

3.10

16.12

3.10

2.10

6.51

beam side

Almarah inside

porch ceiling

Page 28 of 153

Rate

Unit

Code

Sl
No.

Description of work

Qty

5.20

3.05

31.72

3.10

3.05

18.91

0.05

2.20

0.22

ceiling

5.15

6.00

30.9

beam side

5.15

0.30

3.09

wall

5.15

3.05

31.415

6.00

3.05

36.6

5.10

3.20

32.64

1.35

3.20

8.64

6.80

3.30

44.88

3.55

6.75

47.925

2.40

4.60

11.04

compound wall
inside

15.80

1.20

18.96

projections

0.10

1.20

1.08

pillers

0.50

1.15

0.575

1.20

0.95

1.14

1.00

0.95

0.95

porch piller

1.38

1.30

3.588

compound wall

3.55

0.95

3.3725

Deduct opening

-1

1.87

1.27

-2.3749

-1

2.70

1.27

-3.429

6.70

0.25

1.675

7.94

0.25

1.985

1.35

0.25

0.3375

4.57

0.10

0.457

wall

extra parapet
piller
Library

FF varandah

GF varandah wall
stair room

add

Page 29 of 153

Rate

Unit

Code

Sl
No.

Description of work
1

Qty

5.10

1.35

Out side

6.885
0

east

9.37

6.85

64.185

well side

5.45

6.85

37.333

5.45

(0.30+1.10
)/2

1.75

1.85

3.2375

2.60

7.95

20.67

back

8.70

parapet

9.20

1.03

9.476

9.20

0.70

6.44

0.85

2.30

3.91

7.00

1.20

8.4

1.90

0.90

1.71

1.70

0.60

1.02

2.65

0.60

1.59

2.40

0.60

1.44

toilets

2.65

3.30

8.745

Secretary off.
Back side

4.35

3.30

14.355

left side

2.65

1.20

6.36

ceiling

4.35

4.05

17.618

shade
projection

14.30

0.60

8.58

1.70

0.60

1.02

1.50

1.20

1.8

1.40

0.20+1.10/
2

0.91

0.50

1.10

0.55

1.65

3.30

5.445

ceiling

stair (outside)

toilets

(7.95+8.15+
7.40)/3

3.81

68.15

Page 30 of 153

Rate

Unit

Code

Sl
No.

Description of work

Qty

outer

14.30

7.00

100.1

beam side

1.70

3.30

5.61

5.50

0.30

1.65

4.25

4.25

0.50

2.125

9.60

8.20

78.72

0.25

8.20

14.35

shade

10.20

2.10

42.84

east

1.30

8.20

10.66

shade

1.30

8.20

21.32

1.00

2.00

4.24

8.20

34.768

0.25

8.20

4.1

4.54

1.60

7.264

6.19

1.90

11.761

1.45

8.20

11.89

1.30

1.20

1.56

6.50

8.20

53.3

0.23

8.20

5.658

6.50

1.60

10.4

6.50

1.60

10.4

1.30

1.60

2.08

9.90

9.90

1.30

12.87

9.90

0.90

8.91

west side

(7.00+8.00)/
2

31.87

front side

shade

shade

(7.20+8.00)/
2

75.24

Page 31 of 153

Rate

Unit

Code

Sl
No.

Description of work

Qty

2.00

1.00

1.85

8.20

15.17

2x2

1.40

1.20

8.00

9.6

1.20

2.00

4.8

3.80

8.20

31.16

3.80

1.30

4.94

3.00

1.25

3.75

post off/porch

8.90

0.25

2.225

shade

5.60

0.80

4.48

4.50

1.25

5.625

8.90

0.25

2.225

9.50

0.70

6.65

w3 steel

-12x1

1.35

1.35

-21.87

w2 steel

-6x1

0.95

1.35

-7.69

w4 steel

-1

1.80

1.35

-2.43

w3 wood

20x1

1.60

1.40

-44.8

w3 wood

2x1

2.10

1.50

-6.3

w2 wood

-1

1.10

2.00

-2.2

w -fixed glass

-1

2.10

1.35

-1.65

-1

0.90

1.35

-1.23

w1

-1/2

0.70

1.40

-0.49

-12x1

1.20

2.10

-30.24

-1

1.10

2.10

-2.31

president off/
porch

top shade

(0.60+0.10)/
2

1.96

Deductions
windows

Door - D

Page 32 of 153

Rate

Unit

Code

Sl
No.

Description of work

Qty

-2x1

0.90

2.10

-3.78

-1

0.80

2.10

-1.68

-1

1.00

2.10

-2.1

-2

0.80

2.00

-3.2

-1x2

2.70

1.27

-6.85

1x2

1.87

1.27

-4.74

1x2

2.75

1.50

-8.25

-1x2

2.65

1.50

-7.95

-1

1.60

2.00

-3.2

-2x2

2.00

2.10

-16.8

VEO/ library grill -2x2

2.00

2.10

-1.8

rolling shutter
porch

-1x2

2.70

2.20

-11.88

-1x2

3.10

2.20

-13.64

GF front
varandah

-1

1.20

2.10

-2.52

rear side

-1

3.80

2.80

-10.64

D(PVC)

Rate

Unit

openings
FF varandah

GF varandah grill

PMGSY room
corridoor

M2

71.50 1 M3

Providing and fixing water closet squatting pan


(Indian type W.C. pan) with 100 mm Sand Cast Iron
P or S trap, 10 litre low level white P.V.C. flushing
cistern, including flush pipe, manually controlled
17.1.1 21
device (handle lever) conforming to IS : 7231, with
all fittings and fixtures complete, including cutting
and making good the walls and floors wherever
required:

no

44559.16 1 M3

Providing and fixing 100 mm sand cast Iron grating


for gully trap.

no

29.50 1 M

shutter

17.29

23

Dismantling roofing including ridges, hips, valleys


15.28.
23a and gutters etc., and stacking the material within 50
1
metres lead of: G.S.sheet
Main building

10.40

9.75

Page 33 of 153

101.40

Code

Sl
No.

Description of work

Qty

4.25

3.00

12.75

3.75

6.00

22.50

7.05

9.65

68.03

2.60

1.50

3.90

Total

Rate

Unit

208.58 M2

85.83 1 M2

kg

102.55 1 kg

90.75 M

473.40 1 M

Steel work welded in built up sections / framed


10.25.
work, including cutting, hoisting, fixing in position
24
and applying a priming coat of approved steel
1
primer using structural steel etc. as required.
In stringers, treads, landings etc. of stair cases,
including use of chequered plate wherever required,
all complete
Supplying and fixing 200mm dia PVC half cut
section with brackets at the end of sheet or tiled
O-280 25 roof for rain water collection including all cost and
materials, conveyance, labour charges etc.
complete.
1

7.5

7.50

back over roof

15.9

15.90

front extension

9.25

9.25

back over roof

1.35

1.35

east roof

10.75

10.75

side shed

10.25

10.25

front

12.6

12.60

7.5

7.50

5.35

5.35

10.3

10.30

Total
Providing and fixing PVC pipes including fixing the
pipe with clamps/ clips at 1.00 m spacing. This
includes jointing of pipes with one step PVC solvent
O-168 26
cement and testing of joints complete as per
direction of Engineer-in-Charge 75mm dia
6Kgf/cm2 -External work - Exposed on wall
4

28.00

Page 34 of 153

Code

Sl
No.

Description of work

Qty

5.5

5.50

9.5

9.50

Total

14.43

Rate

179.75 M

Removing white or colour wash by scrapping and


sand papering and preparing the surface smooth
27
including necessary repairs to scratches etc.
complete.
Providing and fixing 12 mm thick prelaminated

Unit

218.02 1 M

M2

10.35 1 M2

M2

1417.67 1 M2

kg

552.79 1 Kg

particle board flat pressed three layer or graded


wood particle board conforming to IS: 12823 Grade
I Type II, in panelling fixed in aluminum doors,
21.2.1 28
windows shutters and partition frames with C.P.
brass / stainless steel screws etc. complete as per
architectural drawings and directions of Engineer-inPre-laminated particle board with decorative
Charge.
lamination on one side and balancing lamination on
other side
for rack doors

12

0.5

Providing and fixing aluminium work for doors,


windows, ventilators and partitions with extruded
built up standard tubular sections/ appropriate Z
sections and other sections of approved make
conforming to IS: 733 and IS: 1285, fixing with dash
fasteners of required dia and size, including
necessary filling up the gaps at junctions, i.e. at top,
21.1.2.
bottom and sides with required EPDM rubber/
29
neoprene gasket etc. Aluminium sections shall be
13
smooth, rust free, straight, mitred and jointed
mechanically wherever required including cleat
angle, Aluminium snap beading for glazing /
paneling, C.P. brass / stainless steel screws, all
complete as per architectural drawings and the
directions of Engineer-in-charge. (Glazing, paneling
and dash fasteners to be paid for separately) :
For shutters of doors, windows & ventilators
including providing and fixing hinges / pivots and
making provision for fixing of fittings wherever
required including the cost of EPDM rubber /
neoprene gasket required (Fittings shall be paid for
separately).
Anodised aluminium (anodised transparent or dyed
to required shade according to IS: 1868, Minimum
anodic coating of grade AC 15)
30

Engage man labour for dismatling damaged false


ceiling

Page 35 of 153

520.43 1 No

Code

Sl
No.

O-93

Providing and fixing false ceiling with 7.5mm thick


PVC plain panel board ceiling of approved qualityin
aluminium frame work with necessary screws
21
etc complete(aluminium frame work shall be paid
separately).

Description of work

conference hall

deduct-wooden
grains false
ceiling area
Total

Qty

8.8

8.6

75.68 M2

3.1

3.3

10.23 M2

-1

5.00

5.00

-25 M2

32

M2

656.00 1 M2

M2

768.00 1 M2

Providing and fixing false ceiling with 7.5mm thick


PVC wooden grains panel board ceiling of
approved quality in aluminium frame work with
necessary screws etc complete (aluminium frame
work shall be paid separately).
1

33

Unit

60.91 M2

say

O-94

Rate

5.00

5.00

Unforseen
items
Total
AMOUNT RUPEES THREE LAKHS ONLY

REVISED ESTIMATE
15.28.1 1

Dismantling roofing including ridges, hips, valleys


and gutters etc., and stacking the material within
50metres lead of:15.28.1 G.S. Sheet
Main building

40.40

9.75

393.90

4.25

3.00

12.75

3.75

6.00

22.50

7.05

9.65

68.03

2.60

1.50

3.90

Total

501.08 M2
Page 36 of 153

62.80 1 M2

Code

Sl
No.

15.57 2

Description of work

Qty

Rate

Unit

Dismantling aluminium / Gypsum partitions, doors,


windows, fixed glazing and false ceiling including
disposal of unserviceable surplus material and
stacking of serviceable material with in 50 meters
leadas directed by Engineer-in-Charge.
conference hall

kudumbasree

mini hall

8.80

8.70

76.56

3.25

2.60

8.45

7.60

4.90

37.24

6.05

4.75

28.74

13.80

4.20

57.96

Total

208.95 M2

Page 37 of 153

29.76 1 M2

ance in Nadathara Grama

Amount

262.00

5,445.00

0.00

Page 38 of 153

Amount

0.00

0.00

0.00

2,253.00

469.00

0.00

Page 39 of 153

Amount

0.00

0.00

0.00

5,468.00

Page 40 of 153

Amount

0.00

0.00

0.00

0.00

Page 41 of 153

Amount

0.00

0.00

0.00

11,737.00

803.00

0.00

Page 42 of 153

Amount
0.00

229,140.00

Page 43 of 153

Amount

177,532.00

Page 44 of 153

Amount
117,304.00

105,210.00

Page 45 of 153

Amount

81,142.00

17,212.23

Page 46 of 153

Amount

5,988.40

11,454.00

7,638.00

Page 47 of 153

Amount
10,723.00

Page 48 of 153

Amount

Page 49 of 153

Amount

Page 50 of 153

Amount

Page 51 of 153

Amount

Page 52 of 153

Amount

Page 53 of 153

Amount

Page 54 of 153

Amount

0.00

0.00

0.00

Page 55 of 153

Amount

17,903.00

0.00

42,961.00

Page 56 of 153

Amount

39,189.00

0.00

0.00

0.00
0.00

Page 57 of 153

Amount

0.00

0.00

31,468.00
Page 58 of 153

Amount

6,218.00
927,519.63

Page 59 of 153

Nadathara GP Annual Plan 2015-16 : Panchayath offfice maintenance in Nadathara


Grama Panchayath (Project No. xx/16)

Name of work :Code

Sl
No.

Description of work

Qty

Rate

Unit

Amount

REVISED ESTIMATE
15.56

Dismantling old plaster or skirting raking out joints


and cleaning the surface for plaster including
1 disposal of rubbish to the dumping ground within 50
metres lead.
5

0.7

3.50

0.9

2.70

0.6

0.6

1.80

Compound wall

0.6

0.7

1.68

floor

0.3

0.3

0.27

ceiling

Total

9.95

M2

27.31

M2

340.27

M2

272.00

1 M2

0.00

1 M3

0.00

2 18 mm cement plaster in two coats under layer 12 mm

thick cement plaster 1:5 (1 cement : 5 coarse sand) and


a top layer 6 mm thick cement plaster 1:3 (1 cement : 3
coarse sand) finished rough with sponge.

13.12

ceiling

0.7

3.50

0.9

2.70

0.6

0.6

1.80
8.00

Total
Say

O-17(b)

15.12.
1

15.7.4

Demolishing brick work manually / by mechanical means


including stacking of serviceable material and disposal of
unserviceable material within 50 metres lead as per
direction of Engineer-in-Charge. In cement mortar

Total
Dismantling
doors, windows and clerestory windows
(steel or wood) shutter including chowkhats,
4 architrave,
Solid block holdfasts
masonry etc.
usingcomplete
pre cast and
solidstacking
blocks
within
50
metres
lead:Of
area
3
sq.
and
(Factory made) of size 30x20x15cm metres
or nearest
below
available size confirming to IS 2185 part I of 1979
5
for super structure up to floor two level with
thickness 15cm in: CM 1:6 (1 cement : 6
coarse
Total sand) etc complete

Not done

0.00 M3
Note
done

Page 60 of 153

192.37 1 No

Note
done
0.00
0.00

Say

nos

991.11

M3

6454.70

1 M3

0.00

Sl
No.

Rate

Unit

6822.59

1 M3

0.00

9231.23

1 M3

0.00

92.75 1 kg

0.00

M2

234.66 1 M2

0.00

area vide item 8


0.00 M2
Renewing glass panes, with putty and nails
14.5.1 10 wherever necessary including racking out the old
putty :Float glass panes of thickness 4 mm
Providing
of 1.2
doors, windows,
for repairs wood work
15 in frames
0.3
M2
clerestory windows and other frames, wrought
framed and fixed in position with hold fast lugs or
O-30 11
with dash fasteners of required dia & length ( hold
fast lugs or dash fastener shall be paid for
0.07
0.0221
separately). using4x3
good0.75
quality 0.035
Pincoda wood

30.29 1 M2

0.00

940.66 1 M2

0.00

M3

110177.22 1 M3

0.00

M2

3572.57 1 M3

0.00

O-17(a)

Code

5.3

Description of work
Solid block masonry using pre cast solid blocks
(Factory made) of size 30x20x15cm or nearest
5a available size confirming to IS 2185 part I of 1979
for foundation and plinth with thickness 15cm in:
CM 1:6 (1 cement : 6 coarse sand) etc complete
Total

Note
done

Reinforced cement concrete work in beams,


suspended floors, roofs having slope up to 15
landings, balconies, shelves, chajjas, lintels, bands,
plain window sills, staircases and spiral stair cases
6
up to floor five level excluding the cost of centering,
shuttering, finishing and reinforcement, with 1:2:4
(1cement : 2 coarse sand : 4 graded stone
aggregate 20 mm nominal size).

Note
done

0.00

M3

0.00

Total
5.22.6

Qty

M3

Steel reinforcement for R.C.C. work including


Note
7 straightening, cutting, bending, placing in position
done
.Thermo-Mechanically Treated bars
0 kg

13.4.1

12 mm cement plaster of mix:1:4 (1 cement : 4


coarse sand)
Compound wall 4

0.60

0.70

1.68

floor

0.30

0.30

0.27

Total
13.43.
1

Amount

9 White cement washing two coats for new surface

4x2 0.75

0.09

0.07

Providing
and fixing glazed shutters for doors,
Total
windows and clerestory windows using 4 mm thick
float glass panes including ISI marked M.S. pressed
O-45 11a
butt hinges bright finished of required size with
necessary screws. Using Pincoda wood 30mm thick
4x2
0.3
0.33
shutters

Page 61 of 153

0.0378

Code

Sl
No.

Description of work

Qty

Supplying and fixing 20mm thick ready made PVC


O-292 12 door (75*200cm) with frame 50*42 mm including
conveyance,cost of fitting , labour for fixing etc.

11.38

Unit

Amount

nos

3155.86 1 No

0.00

M2

1231.77 1 M3

0.00

M2

1139.43 1 M3

0.00

M2

57.81 1 M3

0.00

Providing and laying Ceramic glazed floor tiles of


size 300x300 mm (thickness to be specified by the
manufacturer), of 1st quality conforming to IS :
15622, of approved make, in all colours, shades,
13 except White, Ivory, Grey, Fume Red Brown, laid on
20 mm thick bed of cement mortar 1:4 (1 Cement :
4 Coarse sand), including pointing the joints with
white cement and matching pigments etc.,
complete.

racks

1.80

1.20

4.32

1.00

1.20

2.40

3.10

1.40

4.34

12

2.00

0.50

12.00

1.50

0.50

6.00

Total

11.36

Rate

Providing and fixing 1st quality ceramic glazed wall


tiles conforming to IS : 15622 (thickness to be
specified by the manufacturer), of approved make,
in all colours, shades except burgundy, bottle green,
black of any size as approved by Engineer-in14
Charge, in skirting, risers of steps and dados, over
12 mm thick bed of cement mortar 1:3 (1 cement : 3
coarse sand) and jointing with grey cement slurry @
3.3 kg per sqm, including pointing in white cement
mixed with pigment of matching shade complete.
toilets

6.00

1.80

21.60

4.00

1.80

14.40

9.00

1.80

16.20

Painting with aluminium paint of approved brand


14.55.
15 and manufacture to give an even shade:One or
1
more coats on old work
to doors and windows and
truss work

Page 62 of 153

Code

Sl
No.

Description of work

Qty

Rate

Unit

Amount

Painting with synthetic enamel paint of approved


14.54.
15a brand and manufacture of required colour to give an
1
even shade:
One or more coats on old work
for doors

12x2.
25

1.2

2.1

68.04 M2

windows

28x2

1.5

1.35

113.4 M2

2.5

1.5

11.25 M2

grills

192.69 M2
say

M2

Wall painting with plastic emulsion paint of


14.53.
16 approved brand and manufacture to give an even
1
shade:One or more coats on old work
rooms inside conferance hal

8.80

3.30

58.08 M2

8.70

3.30

57.42 M2

3.25

3.30

21.45 M2

filler projections

12

0.23

3.30

9.108 M2

kudumba sree
office - ceiling

7.60

4.90

37.24 M2

wall

7.60

3.30

25.08 M2

4.90

3.30

32.34 M2

3.75

3.30

12.375 M2

projections

0.23

3.30

3.036 M2

wall - common
area

4.75

3.00

28.5 M2

6.05

3.00

18.15

1.05

3.00

3.15

projections

0.23

3.00

2.07

ceiling

3.25

0.85

2.7625

13.80

3.00

82.8

4.20

3.00

25.2

Mini hall
wall

Page 63 of 153

66.05 1 M3

0.00

Code

Sl
No.

Description of work

Qty

projections

0.23

3.00

4.14

ceiling

10.00

0.75

7.5

ceiling

10.00

5.80

58

beam side

5.80

0.30

6.96

wall

10.00

3.60

72

5.80

3.60

41.76

5.80

10.00

58

2x2

5.80

0.30

6.96

5.80

3.60

41.76

10.00

0.60

12

LSGD/Jalanidhi

Ground Floor
main office
bulding - ceiling
beam side
wall

PMGSY- office

opening- jamb
& sil

0.38

2.00

1.52

back portion

9.15

0.70

6.405

2x2

4.05

0.30

4.86

ceiling

9.15

4.05

37.058

wall

9.15

3.60

65.88

4.05

3.60

14.58

2.00

0.90

10.8

0.45

0.90

2.43

Secretary off

6.00

3.35

20.1

wall

6.00

3.03

36.36

3.35

3.05

20.435

corridoor ceiling

7.60

2.00

15.2

wall

7.60

2.00

30.4

beam side

Almarah inside

Page 64 of 153

Rate

Unit

Amount

Code

Sl
No.

Description of work

Qty

2.00

3.05

12.2

Vice presiroom

3.00

4.10

12.3

wall

3.00

3.05

18.3

4.20

0.60

5.04

president
ceiling

3.10

3.00

9.3

wall

3.10

3.05

18.91

3.00

3.05

18.3

VEO ceiling

3.25

3.00

9.75

wall

3.25

3.05

19.825

3.00

3.05

18.3

post off ceiling

5.15

2.75

14.163

wall

5.15

3.05

31.415

2.75

3.05

16.775

5.20

3.10

16.12

3.10

2.10

6.51

5.20

3.05

31.72

3.10

3.05

18.91

0.05

2.20

0.22

ceiling

5.15

6.00

30.9

beam side

5.15

0.30

3.09

wall

5.15

3.05

31.415

6.00

3.05

36.6

5.10

3.20

32.64

1.35

3.20

8.64

6.80

3.30

44.88

porch ceiling

wall

extra parapet
piller
Library

FF varandah

GF varandah wall

Page 65 of 153

Rate

Unit

Amount

Code

Sl
No.

Description of work

Qty

3.55

6.75

47.925

2.40

4.60

11.04

compound wall
inside

15.80

1.20

18.96

projections

0.10

1.20

1.08

pillers

0.50

1.15

0.575

1.20

0.95

1.14

1.00

0.95

0.95

porch piller

1.38

1.30

3.588

compound wall

3.55

0.95

3.3725

Deduct opening

-1

1.87

1.27

-2.3749

-1

2.70

1.27

-3.429

6.70

0.25

1.675

7.94

0.25

1.985

1.35

0.25

0.3375

4.57

0.10

0.457

5.10

1.35

6.885

stair room

add

Out side

east

9.37

6.85

64.185

well side

5.45

6.85

37.333

5.45

(0.30+1.10
)/2

1.75

1.85

3.2375

2.60

7.95

20.67

back

8.70

parapet

9.20

1.03

9.476

9.20

0.70

6.44

0.85

2.30

3.91

(7.95+8.15+
7.40)/3

3.81

68.15

Page 66 of 153

Rate

Unit

Amount

Code

Sl
No.

Description of work

Qty

7.00

1.20

8.4

1.90

0.90

1.71

1.70

0.60

1.02

2.65

0.60

1.59

2.40

0.60

1.44

toilets

2.65

3.30

8.745

Secretary off.
Back side

4.35

3.30

14.355

left side

2.65

1.20

6.36

ceiling

4.35

4.05

17.618

shade
projection

14.30

0.60

8.58

1.70

0.60

1.02

1.50

1.20

1.8

1.40

0.20+1.10/
2

0.91

0.50

1.10

0.55

toilets

1.65

3.30

5.445

outer

14.30

7.00

100.1

beam side

1.70

3.30

5.61

5.50

0.30

1.65

4.25

4.25

0.50

2.125

9.60

8.20

78.72

0.25

8.20

14.35

shade

10.20

2.10

42.84

east

1.30

8.20

10.66

shade

1.30

8.20

21.32

1.00

2.00

ceiling

stair (outside)

west side

(7.00+8.00)/
2

31.87

Page 67 of 153

Rate

Unit

Amount

Code

Sl
No.

Description of work

Qty

front side
1

4.24

8.20

34.768

0.25

8.20

4.1

4.54

1.60

7.264

6.19

1.90

11.761

1.45

8.20

11.89

1.30

1.20

1.56

6.50

8.20

53.3

0.23

8.20

5.658

6.50

1.60

10.4

6.50

1.60

10.4

1.30

1.60

2.08

9.90

9.90

1.30

12.87

9.90

0.90

8.91

2.00

1.00

1.85

8.20

15.17

2x2

1.40

1.20

8.00

9.6

1.20

2.00

4.8

3.80

8.20

31.16

3.80

1.30

4.94

3.00

1.25

3.75

post off/porch

8.90

0.25

2.225

shade

5.60

0.80

4.48

4.50

1.25

5.625

shade

shade

president off/
porch

(7.20+8.00)/
2

75.24

(0.60+0.10)/
2

1.96

Page 68 of 153

Rate

Unit

Amount

Code

Sl
No.

Description of work

Qty

8.90

0.25

2.225

9.50

0.70

6.65

w3 steel

-12x1

1.35

1.35

-21.87

w2 steel

-6x1

0.95

1.35

-7.69

w4 steel

-1

1.80

1.35

-2.43

w3 wood

20x1

1.60

1.40

-44.8

w3 wood

2x1

2.10

1.50

-6.3

w2 wood

-1

1.10

2.00

-2.2

w -fixed glass

-1

2.10

1.35

-1.65

-1

0.90

1.35

-1.23

w1

-1/2

0.70

1.40

-0.49

-12x1

1.20

2.10

-30.24

-1

1.10

2.10

-2.31

-2x1

0.90

2.10

-3.78

-1

0.80

2.10

-1.68

-1

1.00

2.10

-2.1

-2

0.80

2.00

-3.2

-1x2

2.70

1.27

-6.85

1x2

1.87

1.27

-4.74

1x2

2.75

1.50

-8.25

-1x2

2.65

1.50

-7.95

-1

1.60

2.00

-3.2

-2x2

2.00

2.10

-16.8

top shade

Deductions
windows

Door - D

D(PVC)
openings
FF varandah

GF varandah grill

PMGSY room
corridoor

Page 69 of 153

Rate

Unit

Amount

Code

Sl
No.

Description of work

Qty

VEO/ library grill -2x2

2.00

2.10

-1.8

rolling shutter
porch

-1x2

2.70

2.20

-11.88

-1x2

3.10

2.20

-13.64

GF front
varandah

-1

1.20

2.10

-2.52

rear side

-1

3.80

2.80

-10.64

Rate

Unit

Amount

M2

71.50 1 M3

0.00

Providing and fixing water closet squatting pan


(Indian type W.C. pan) with 100 mm Sand Cast Iron
P or S trap, 10 litre low level white P.V.C. flushing
cistern, including flush pipe, manually controlled
17.1.1 17
device (handle lever) conforming to IS : 7231, with
all fittings and fixtures complete, including cutting
and making good the walls and floors wherever
required:

no

4620.65 1 M3

0.00

Providing and fixing P.V.C. waste pipe for sink or


17.28.
18 wash basin including PVC. waste fittings
1.1
complete.Semi rigid pipe: 32 mm dia

104.53 1 M

0.00

Providing and fixing 100 mm sand cast Iron grating


for gully trap.

no

29.50 1 M

0.00

42.3 M

104.53 1 M

4,422.00

1.6 M

509.48 1 M

815.00

shutter

17.29

19

Providing and fixing PVC pipes, fittings including


fixing the pipe with clamps at 1.00 m spacing. This
includes jointing of pipes & fittings with one step
O-114 20 PVC solvent cement and testing of joints
complete as per direction of Engineer-in-Charge
50mm dia10Kgf/cm2
- Internal work - Exposed
on wall
down pipe
east overall
side roof -new
front

7.00

14

11.00

11

1
1
1

2.00
9.30
6.00

2
9.3
6

Total
Providing and fixing PVC pipes, fittings including
fixing the pipe with clamps at 1.00 m spacing. This
includes jointing of pipes with one step PVC solvent
O-133 20a cement and testing of joints complete as per
direction of Engineer-in-Charge. Concealed work,
including cutting chases and making good the wall
etc. 110mm pipe 6kgf/cm2
1

1.6
Page 70 of 153

Code

Sl
No.

Description of work

Qty

Rate

Unit

Amount

Providing and fixing PVC pipes, fittings including


fixing the pipe with clamps at 1.00 m spacing. This
includes jointing of pipes & fittings with one step
O-107 21 PVC solvent cement and testing of joints
complete as per direction of Engineer-in-Charge
20mm dia 10Kgf/cm2- Internal work - Exposed on
wall

139.79 1 M

0.00

White Vitreous China Wash basin size 630x450 mm


with a single 15 mm C.P. brass pillar tap

no

2737.90 1 n

0.00

17.7.2 22

Roofing with G.I hard colour powder coated traffod


sheets 0.35 mm thick or nearest available thickness
O-258 23 with overlaps of 150 mm at ends and GI hook or
crank C.I. bolts and nuts including plain washers
and bitumen washers etc complete
replacing
old
sheet
-above 1
main office

13.40

9.75

130.65

deduct

-1

5.50

3.00

-16.5

deduct

1
-1
1

10.80
3.75
2.60

9.65
3.60
1.50

104.22
-13.5
3.9

for new truss


work over AE 1
office

12.47

5.52

68.834

1
1
1

4.62
5.70
10.10

5.27
7.20
1.70

24.347
41.04
17.17

1
1
1

6.40
3.90
9.10

2.00
1.70
0.80

12.8
6.63
7.28

East side
over generator
front extension
Total
say

386.87
387 M2

599.99 1 M2

232,196.00

85.83 1 M2

17,903.00

Dismantling roofing including ridges, hips, valleys


15.28.
23a and gutters etc., and stacking the material within 50
1
metres lead of: G.S.sheet
Main building

10.40

9.75

101.40

4.25

3.00

12.75

1
1

3.75
7.05

6.00
9.65

22.50
68.03

2.60

1.50

Total

Page 71 of 153

3.90
208.58 M2

Code

Sl
No.

Description of work

Qty

Rate

Unit

Amount

Ridge capinging with pre painted galvenised steel


sheets 0.5 mm thick 60 cm wide including all cost
and materials, conveyance, labour charges etc.
O-259 23b
complete.
1
1

13.4
12.5

Total

13.4
12.5
25.9 M

442.24 1 M

11,454.00

kg

102.55 1 kg

0.00

473.40 1 M

42,961.00

218.02 1 M

39,189.00

Steel work welded in built up sections / framed


10.25.
work, including cutting, hoisting, fixing in position
24
and applying a priming coat of approved steel
1
primer using structural steel etc. as required.
In stringers, treads, landings etc. of stair cases,
including use of chequered plate wherever required,
all complete
Supplying and fixing 200mm dia PVC half cut
section with brackets at the end of sheet or tiled
O-280 25 roof for rain water collection including all cost and
materials, conveyance, labour charges etc.
complete.
back over roof
front extension

1
1
1

7.5
15.9
9.25

7.50
15.90
9.25

back over roof


east roof
side shed

1
1
1

1.35
10.75
10.25

1.35
10.75
10.25

front

1
1
1

12.6
7.5
5.35

12.60
7.50
5.35

10.3

10.30
90.75 M

Total
Providing and fixing PVC pipes including fixing the
pipe with clamps/ clips at 1.00 m spacing. This
includes jointing of pipes with one step PVC solvent
O-168 26
cement and testing of joints complete as per
direction of Engineer-in-Charge 75mm dia
6Kgf/cm2 -External work - Exposed on wall
4

1
1

5.5
9.5

28.00
5.50
9.50
179.75 M

Total

14.43

Removing white or colour wash by scrapping and


sand papering and preparing the surface smooth
27
including necessary repairs to scratches etc.
complete.

Page 72 of 153

M2

10.35 1 M2

0.00

Sl
Description of work
No. Providing and fixing 12 mm thick prelaminated
particle board flat pressed three layer or graded
wood particle board conforming to IS: 12823 Grade
I Type II, in panelling fixed in aluminum doors,
21.2.1 28
windows shutters and partition frames with C.P.
brass / stainless steel screws etc. complete as per
architectural drawings and directions of Engineer-inPre-laminated particle board with decorative
Charge.
lamination on one side and balancing lamination on
other side
Code

for rack doors

12

0.5

Qty

Rate

Unit

Amount

M2

1417.67 1 M2

0.00

kg

552.79 1 Kg

0.00

520.43 1 No

0.00

Providing and fixing aluminium work for doors,


windows, ventilators and partitions with extruded
built up standard tubular sections/ appropriate Z
sections and other sections of approved make
conforming to IS: 733 and IS: 1285, fixing with dash
fasteners of required dia and size, including
necessary filling up the gaps at junctions, i.e. at top,
21.1.2.
bottom and sides with required EPDM rubber/
29
neoprene gasket etc. Aluminium sections shall be
13
smooth, rust free, straight, mitred and jointed
mechanically wherever required including cleat
angle, Aluminium snap beading for glazing /
paneling, C.P. brass / stainless steel screws, all
complete as per architectural drawings and the
directions of Engineer-in-charge. (Glazing, paneling
and dash fasteners to be paid for separately) :
For shutters of doors, windows & ventilators
including providing and fixing hinges / pivots and
making provision for fixing of fittings wherever
required including the cost of EPDM rubber /
neoprene gasket required (Fittings shall be paid for
separately).
Anodised aluminium (anodised transparent or dyed
to required shade according to IS: 1868, Minimum
anodic coating of grade AC 15)
30

O-93

Engage man labour for dismatling damaged false


ceiling

Providing and fixing false ceiling with 7.5mm thick


PVC plain panel board ceiling of approved qualityin
aluminium frame work with necessary screws
21
etc complete(aluminium frame work shall be paid
separately).
conference hall

deduct-wooden
grains false
ceiling area
Total

8.8

8.6

75.68 M2

3.1

3.3

10.23 M2

-1

5.00

5.00

-25 M2
60.91 M2

Page 73 of 153

Code

Sl
No.

Description of work

Qty

say

O-94

32

Unit

Amount

M2

656.00 1 M2

0.00

M2

768.00 1 M2

0.00

Providing and fixing false ceiling with 7.5mm thick


PVC wooden grains panel board ceiling of
approved quality in aluminium frame work with
necessary screws etc complete (aluminium frame
work shall be paid separately).
1

33

Rate

5.00

5.00

Unforseen
items
Total

349,212.00

AMOUNT RUPEES THREE LAKHS ONLY

REVISED ESTIMATE
15.28.1 1

Dismantling roofing including ridges, hips, valleys


and gutters etc., and stacking the material within
50metres lead of:15.28.1 G.S. Sheet
Main building

40.40

9.75

393.90

4.25

3.00

12.75

3.75

6.00

22.50

1
1

7.05
2.60

9.65
1.50

68.03
3.90

Total
15.57 2

501.08 M2

62.80 1 M2

31,468.00

29.76 1 M2

6,218.00

Dismantling aluminium / Gypsum partitions, doors,


windows, fixed glazing and false ceiling including
disposal of unserviceable surplus material and
stacking of serviceable material with in 50 meters
leadas directed by Engineer-in-Charge.
conference hall
kudumbasree
mini hall

8.80

8.70

76.56

3.25

2.60

8.45

1
1
1

7.60
6.05
13.80

4.90
4.75
4.20

37.24
28.74
57.96
208.95 M2

Total

Page 74 of 153

Code

Sl
No.

Description of work

Qty

Page 75 of 153

Rate

Unit

Amount

Estimate Report

Name of work

Estimate
Amount

Nadathara GP Annual Plan 2015-16 : Panchayath offfice maintenance in Nadathara


Grama Panchayath (Project No. xx/16)

Rs:

3.00

Lakhs

The propasal is to construct retaining walls to protect Asserikkad Nalukettu road which
road surface is about 3m above ground level. Cement concrete drain also proposed to
avoid the run off rainwater.

The CPWD rate having 31.43% cost index on DSR is taken for the data rates.
with 15 % CP and Over Head charges. 1% water charge is also added to the rates.The
total cost of estimate is comes to Rs: 3.00 lakhs. The fund for the same is proposed in
the 2015-16 year project of Nadathara Grama Panhayath with its Plan fund.

DATA

Name of work:- Ollukkara Block Panchayath 2011 - 2012 (MP LAD) Construction of Meeting hall a
Library over Panchayath Office Building
Item No.

Sl. No.

Quantity

132(b)

Description

Unit

From work for reinforced cement


concrete in lintles and beams
including wooden planks, joists,
bamboo posts and labour for taking
down after completion of work (hire
and labour charges only)

10sq.m

Rate for slab


Add 20% For Columns
Total
RCC 1:1.5:3, using 20mm broken
stone including watering, curing, etc.
complete for columns in Ground floor
8
133.00

Main Data
10.00 dm

0.14 M2

Cement concrete 1:1:3

10.00

Form work
Total
Add 10% C.P.
Total

10.00

Say Rs146.00/10dm3

132(a)

From work for reinforced cement


concrete in lintles and beams
including wooden planks, joists,
bamboo posts and labour for taking
down after completion of work (hire
and labour charges only)

10sq.m

Rate for slab


Add 10% For Lintles and beams
Total
RCC 1:1.5:3, using 20mm broken
stone including watering, curing, etc.
complete for lintles, beams and
sunshades in Ground floor

133
10 dm

0.124 M

Main Data
Cement concrete 1:1:3

10

Form work

10

Total

Add 10% C.P.


Total
Say Rs133.00/10dm3
132

From work for reinforced cement


concrete in lintles and beams
including wooden planks, joists,
bamboo posts and labour for taking
down after completion of work (hire
and labour charges only)

10sq.m

Rate for slab


RCC 1:1.5:3, using 20mm broken
stone including watering, curing, etc.
complete for slabs in first floor

12

133
10 dm3
0.083 M2

Main Data
Cement concrete 1:1:3

10

Form work

10

Total
Add 10% C.P.
Total
Say Rs109.00/10dm3

RCC 1:2:4, using 20mm broken stone


including formwork watering curing
etc, complete
132 form work for slab

5381.6300

take 1/3 for form work of plinth beam,


well parapet,

1794

qty of form work for plinth beam

2.00

for beams of well cover slab

4.00
2

qty of well parapet


Total
Total amount for form work

20.82

Qty of concrete
1
for plinth beam
1
well covering beam
1
well parapet
Total
1719
Say
Net toal
Add 10% CP and 5% over head
charges
Say
There fore for 10 dm3
107/10dm3
Say

D) Construction of Meeting hall and

Unit

Rate

Amount

10sq.m

4226.98
845.40
5072.38

dm3
M2

63.55

63.55

5072.38

69.49
133.04
13.30
146.35

10sq.m

4226.98
422.70
4649.68

dm3
M

63.55

63.55

4649.68

57.66
121.21

12.12
133.33

10sq.m

4226.98

dm3
M2

63.55

63.55

4226.98

35.22
98.77
9.88
108.65

16.70

0.30

10.02

3.00
3.00

0.30
1.20

3.60
7.20
20.82

1794 /10m2

16.70
3.00
3.00
@

0.23
0.23
0.10

0.30
0.30
1.20

71.44 /10m3

3735

1.15
0.21
0.36
1.719
12283
16018
2403
18420
107.16

TE NDE R S CHE DULE

Name of Work

Nadathara GP Annual Plan 2015-16 : Panchayath offfice maintenance in


Nadathara Grama Panchayath
(Project No. xx/16)
in Nadathara Grama Pachayath

Sl.
No.

Probable
Quantity

Description of work

Unit

Rate in
Figures

Words

9.95 M2

Dismantling old plaster or skirting raking


out joints and cleaning the surface for
plaster including disposal of rubbish to the
dumping ground within 50 metres lead.

1 M2

27.31

Rupees two hundred and


seven only

0.00 M2

18 mm cement plaster in two coats under


layer 12 mm thick cement plaster 1:5 (1
cement : 5 coarse sand) and a top layer 6
mm thick cement plaster 1:3 (1 cement : 3
coarse sand) finished rough with sponge.

1 M2

340.27

Rupees two thousand


four hundred and eighty
three and thirty eight
only

0.00 M3

Demolishing brick work manually / by 1 M3


mechanical means including stacking of
serviceable material and disposal of
unserviceable material within 50 metres
lead as per direction of Engineer-in-Charge.
In cement mortar

991.11

Rupees seven thousand


one hundred and eighty
four and thirty six paise
only

nos Dismantling doors, windows and clerestory 1 nos


windows (steel or wood) shutter including
chowkhats, architrave, holdfasts etc.
complete and stacking within 50 metres
lead:Of area 3 sq. metres and below

192.37

Rupees five thousand six


hundred and fifty three
only

Note
done

0.00 M3

Solid block masonry using pre cast solid


blocks (Factory made) of size 30x20x15cm
or nearest available size confirming to IS
2185 part I of 1979 for super structure up to
floor two level with thickness 15cm in:
CM 1:6 (1 cement : 6 coarse sand) etc
complete

1 M3

6,454.70

Rupees six thoudnad two


hundred and thirty five
and twenty paise only

5a

0.00 M3

Solid block masonry using pre cast solid


blocks (Factory made) of size 30x20x15cm
or nearest available size confirming to IS
2185 part I of 1979 for foundation and
plinth with thickness 15cm in: CM 1:6 (1
cement : 6 coarse sand) etc complete

1 M3

6,822.59

Rupees two hundred and


fifty eight and ninteen
paise only

Page 82 of 153

0.00 M3

Reinforced cement concrete work in beams,


suspended floors, roofs having slope up to
15 landings, balconies, shelves, chajjas,
lintels, bands, plain window sills, staircases
and spiral stair cases up to floor five level
excluding the cost of centering, shuttering,
finishing and reinforcement, with 1:2:4
(1cement : 2 coarse sand : 4 graded stone
aggregate 20 mm nominal size).

1 M3

9,231.23

0.00 Kg

92.75

0.00 M2

Steel reinforcement for R.C.C. work 1 Kg


including straightening, cutting, bending,
placing in position .Thermo-Mechanically
Treated bars
12 mm cement plaster of mix:1:4 (1 cement 1 M2
: 4 coarse sand)

0.00 M2

10

0.00 M2

11

11a

12

13

14

15

15a

16

234.66

White cement washing two coats for new


surface

1 M2

30.29

Renewing glass panes, with putty and nails


wherever necessary including racking out
the old putty :Float glass panes of thickness
4 mm
0.00 M3 Providing wood work in frames of doors,
windows, clerestory windows and other
frames, wrought framed and fixed in
position with hold fast lugs or with dash
0.00 M2 Providing
fixing
shutters
for
fasteners ofand
required
diaglazed
& length
( hold fast
doors,
and clerestory
lugs orwindows
dash fastener
shall be windows
paid for
using
4 mm
thick
glassPincoda
panes
separately).
using
goodfloat
quality
including
ISI marked M.S. pressed butt
wood
0.00 nos Supplying
andfinished
fixing of20mm
thick
hinges bright
required
sizeready
with
made
PVC screws.
door (75*200cm)
with frame
necessary
Using Pincoda
wood
50*42
mm shutters
including conveyance,cost of
30mm thick
fitting , labour for fixing etc.
0.00 M2 Providing and laying Ceramic glazed floor
tiles of size 300x300 mm (thickness to be
specified by the manufacturer), of 1st
quality conforming to IS : 15622, of
0.00 M2 Providing
and fixing
1st colours,
quality ceramic
approved make,
in all
shades,
glazed
tiles Ivory,
conforming
IS : 15622
except wall
White,
Grey,to Fume
Red
(thickness
to 20bemm specified
the
Brown, laid on
thick bed ofbycement
manufacturer),
of approved
make, sand),
in all
mortar 1:4 (1 Cement
: 4 Coarse
0.00 M2 Painting
aluminium
paint
of
approved
colours,
shades
except
burgundy,
bottle
includingwith
pointing
the joints
with
white
brand
give
an even
green,
black
ofmatching
any sizetoas
approved
by
cementand
andmanufacture
pigments
etc.,
shade:One
old work
Engineer-in-Charge,
in on
skirting,
risers of
complete. or more coats
steps and dados, over 12 mm thick bed of
0.00 M2 Painting
with synthetic
enamel : 3paint
of
cement mortar
1:3 (1 cement
coarse
approved
brand with
and grey
manufacture
of
sand) and jointing
cement slurry
required
colour
giveincluding
an even shade:
@ 3.3 kg
per to
sqm,
pointing in
white cement mixed with pigment of
0.00 M2 Wall
painting
with
plastic emulsion paint of
matching
shade
complete.
approved brand and manufacture to give an
even shade:One or more coats on old work

1 M2

940.66

1 M3

###

1 M2

3,572.57

1 nos

3,155.86

1 M2

1,231.77

1 M2

1,139.43

1 M2

57.81

1 M2

66.05

1 M2

71.50

Page 83 of 153

Rupees one hundred and


seventy seven and four
paise only

Rupees eighty nine and


fifty paise only

17

18

19

20

20a

21

22

23

23a

0.00 nos Providing and fixing water closet squatting


pan (Indian type W.C. pan) with 100 mm
Sand Cast Iron P or S trap, 10 litre low level
white P.V.C. flushing cistern, including
0.00 M Providing
fixing P.V.C.
waste pipe
for
flush pipe,andmanually
controlled
device
sink
or lever)
wash conforming
basin including
(handle
to IS PVC.
: 7231,waste
with
fittings
complete.Semi
rigid pipe:including
32 mm
all fittings
and fixtures complete,
dia
cutting and making good the walls and
0.00 M Providing
and fixing
100 mm sand cast Iron
floors wherever
required:
grating for gully trap.

1 nos

0.00 M

Providing and fixing PVC pipes, fittings


including fixing the pipe with clamps at
1.00 m spacing. This includes jointing of
pipes & fittings with one step PVC solvent
0.00 M Providing
fixing
fittings
cement andand
testing
of PVC
joints pipes,
complete
as
including
fixing of
the pipe
with clamps at
per direction
Engineer-in-Charge
1.00
spacing. This includes
jointing
50mmm dia10Kgf/cm2
- Internal
workofpipes
with
Exposed
on one
wall step PVC solvent cement
0.00 M Providing
pipes, as
fittings
and testingandoffixing
jointsPVC
complete
per
including
the pipe with Concealed
clamps at
direction offixing
Engineer-in-Charge.
1.00
spacing. cutting
This includes
jointing
of
work,mincluding
chases and
making
pipes
& fittings
one pipe
step PVC
solvent
good the
wall etc.with
110mm
6kgf/cm2
0.00 nos White
Vitreous
Washcomplete
basin size
cement and
testingChina
of joints
as
630x450
mm with
single 15 mm C.P.
per direction
of a Engineer-in-Charge
brass
20mmpillar
diatap10Kgf/cm2- Internal work Exposed on wall
387.00 M2 Roofing with G.I hard colour powder coated
traffod sheets 0.35 mm thick or nearest
available thickness with overlaps of 150
mm at ends and GI hook or crank C.I. bolts
and nuts including plain washers and
0.00 M2 Dismantling
roofing
including ridges, hips,
bitumen washers
etc complete
valleys and gutters etc., and stacking the
material within 50 metres lead of: G.S.sheet

23b

0.00 M

24

0.00 kg

25

0.00 M

26

0.00 M

27

0.00 M2

Ridge capinging with


pre painted
galvenised steel sheets 0.5 mm thick 60 cm
wide including all cost and materials,
conveyance, labour charges etc. complete.
Steel work welded in built up sections /
framed work, including cutting, hoisting,
fixing in position and applying a priming
coat of approved steel primer using
Supplying
and fixing
dia PVC
half
structural steel
etc. as200mm
required.In
stringers,
cut
section
with etc.
brackets
at the
endincluding
of sheet
treads,
landings
of stair
cases,
or
roof forplate
rainwherever
water collection
use tiled
of chequered
required,
including
cost
and
materials,
all complete all
Providing
and
fixing
PVC etc.
pipes
including
conveyance,
labour
charges
complete.
fixing the pipe with clamps/ clips at 1.00 m
spacing. This includes jointing of pipes with
one step PVC solvent cement and testing of
Removing
white asor per
colour
wash ofby
joints complete
direction
scrapping
and sand papering
and 6Kgf/cm2
preparing
Engineer-in-Charge
75mm dia
the
surface
including
-External
worksmooth
- Exposed
on wall necessary
repairs to scratches etc. complete.

4,620.65

1 M

104.53

1 M

29.50

1 M

0.00

1 M

0.00

1 M

139.79

1 nos

2,737.90

1 M2

599.99

1 M2

0.00

1 M

0.00

1 kg

102.55

1 M

0.00

1 M

0.00

1 M2

10.35

Page 84 of 153

28

0.00 M2

Providing and fixing 12 mm thick 1 M2


1,417.67
prelaminated particle board flat pressed
three layer or graded wood particle board
conforming to IS: 12823 Grade I Type II, in
panelling fixed in aluminum doors,
windows shutters and partition frames with
C.P. brass / stainless steel screws etc.
29
0.00 kg Providing
aluminium
work and
for 1 kg
552.79
complete asand
perfixing
architectural
drawings
doors,
windows,
ventilators
and
partitions
directions
of
Engineer-in-Charge.Prewith
extruded
builtboard
up standard
tubular
laminated
particle
with decorative
sections/
appropriate
Z
sections
and
other
lamination on one side and balancing
30
0.00 nos Engage
man
labour
for
dismatling
damaged
520.43
sections
of
approved
make
conforming
to 1 nos
lamination on other side
false
ceiling
IS: 733
and IS: 1285, fixing with dash
fasteners ofand
required
dia false
and size,
including
31
0.00 M2 Providing
fixing
ceiling
with 1 M2
656.00
necessary
filling
up
the
gaps
at
junctions,
7.5mm thick PVC plain panel board ceiling
i.e.
at top, bottom
and sides
with required
of approved
qualityin
aluminium
frame
EPDM
rubber/
neoprene
gasket etc
etc.
work with necessary screws
Aluminium and
sections
bework
smooth,
rust
32
0.00 M2 Providing
fixingshall
false
ceiling
768.00
complete(aluminium
frame
shallwith
be 1 M2
free, separately).
straight,
7.5mm
thick PVCmitred
wooden and
grainsjointed
panel
paid
mechanically
required
including
board ceiling wherever
of approved
quality
in
cleat
angle,
Aluminium
snap
beading
for
aluminium frame work with necessary
glazing
/
paneling,
C.P.
brass
/
stainless
screws
etc complete
(aluminium
frame
Rupees Two lakh ninty
eight thousand
six hundred
and fourty
Total Probable Amount of Contract
steeleight
screws,
complete as per
work
shall
be paid
separately).
only
onlyall
architectural drawings and the directions of
Engineer-in-charge.
(Glazing,
andrate or . % above / below estimate
I / We agree
to execute the above
workpaneling
at estimate
dash fasteners
to beif paid
for separately)
rate less cost of departmental
materials,
any supplied.
:For shutters of doors, windows &
ventilators including providing and fixing
hinges / pivots and making provision for
ASSISTANT ENGINEER
fixing of fittings wherever required
CONTRACTOR
LSGD SECTION, NADATHARA.G.P
including
the cost of EPDM rubber /
neoprene gasket required (Fittings shall be
paid for separately). Anodised aluminium
(anodised transparent or dyed to required
shade according to IS: 1868, Minimum
anodic coating of grade AC 15)

Page 85 of 153

maintenance in
/16)

Amount
272.00

0.00

0.00

#VALUE!

0.00

0.00

Page 86 of 153

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 87 of 153

0.00

0.00

0.00

0.00

0.00

0.00

0.00

232,196.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 88 of 153

0.00

0.00

0.00
0.00

0.00

#VALUE!

above / below estimate

NEER
THARA.G.P

Page 89 of 153

ske t\mokv
(IcmdpImc\v sS kzoIcnpsImv Abp Iv)
0

\
t{]nX,

Assistant Engineer
LSGD Section
Nadathara Grama Panchayath
kzoImhv,
0
0
0
k,

Nadathara GP Annual Plan 2015-16 : Panchayath offfice


maintenance in Nadathara Grama Panchayath (Project
hnjbw:-
No. xx/16)
kqNnI:XmfpsS.
12/30/1899 mw XnbXnbnse sS

ta]d {]]rnv Xm
12/30/1899 XnbXnbn
kan sS Fm km[\fpsSbpw hnebpw ISv Iqenbpw hmSIbpw
bt{m]IcWfpsS hnebpw ISv Iqenbpw bt{m]IcWfpsS
Fm ]Wnqenbpw DssS Fntans
iXam\w
0.01% Below
\ncn AwKoIcnncnpp.
Xm Cu t\mokv e`nv Hcmgvpn, AXmbXv 11/10/2011
mw XnbXnp apv 100 cq]bpsS ap{Z Isemkpw \vnX cq]nep
Icm DSSn _ppw
kwJyp Pmaym\nt]n\mbp
0
t]mkvtm^okv nc \nt] kn^ntm {Sjdn tkhnwKvkv sUtmkntm, NSC sbm
t]cn ]WbsSpnbXv, hmv dPnkvt{Sj kn^nv (t^mdw \ 4),
hmv tImuv sNphm\p A\phmZw Dsn (t^mdw \ 4 Un),
]m ImUv FnhbpsS HdnPn\epw t^mtmtImnbpw klnXw Icm DSSn
HphbvpXn\mbn Cu Hm^okn lmPcmtXmWv.
Icm DSSn Hp hv Hcmgvpn {]hn \Sp ew
GphmtXpw, {]hn F\vPn\obdpsS \nti{]Imcw Bcw`ntXpamWv.
CXn hogvN hcpnbm XmfpsS \jvtSmchmZn asmcp
GPknsbsmv \SnpXmWv

XnbXn

11/7/2011

Assistant Engineer
LSGD Section

Nadathara Grama Panchayath

Nadathara Grama Panchayath

SELECTION NOTICE
Office of Assistant Engineer
LSGD Section
Nadathara Grama Panchayath
Dated
30/12/1899
No

To
Sri.

0
0
0
Sub: Nadathara GP Annual Plan 2015-16 : Panchayath offfice maintenance in Nadathara Grama
Panchayath (Project No. xx/16)
Ref: Your Tender dated
###

With reference to the above contractor


0
0
is hereby informed that his tender for the above work been accepted at the percentage rate
Estimate Rate
quoted by him less cost of departmental materials and hire charges of departmental
machineries which are mentioned overleaf. He is directed to a ttend this office on or
before
with the required stamp paper and receipt for the security mentioned below and execute
12/30/1899
an agreement and start work with in a week after getting necessary instructions from this office.
1 Before executing the agreement on stamp paper the contractor should deposit in the approved Bank
Saving Bank National saving certificate in the name of Assistant Engineer, security of Rs
0
for the fulfillment of the contract.
2 Any failure in this direction will be liable to result in forfeiture for his earnest money and the cancellation of the
proposed contact and the contractor shall be liable to pay the Government the entire loss that may be caused
to Government by the tender or rearrangement of work of otherwise consequent on the contractors failure to
execute the agreement of execute the work as provided for in clause 13 of the Notice inviting tenders and all
such loss shall be recovered from his under the provision of the Revenue Recovery Act of otherwise.
0

3 The Contractor should bring the original and photocopies VAT Registration (Form No 4), Permission to Pay
Compound Tax U/S 8 (Form No 4 D) if compouded rate is applicable.
4 It must be understood that on no account will percentage rate one fixed be increased
5 The work should be completed within
###
6 All terms and conditions of the notice inviting tenders and tender shall be binding on the contractor.

Assistant Engineer
LSGD Section
Nadathara Grama Panchayath

Acc:- Schedule of accepted rates

Copy with copy accepted schedule forwarded to.


1 The Assistant Executive Engineer
Ollukkara Block Panchayath
2 Secretary / President
Nadathara Grama Panchayath
3 Copy to Agreement

APPENDIX XVI (a)


Acknowledgement form of Handing Over the site to the contractor
1 Name of work

2 Estimate amount

Nadathara GP Annual Plan 2015-16 : Panchayath offfice


maintenance in Nadathara Grama Panchayath (Project No.
xx/16)
in Nadathara Grama Pachayath
: 699000

3 Agreement No & Date xxxx


I have this day

xxxx

taken over the site for the above work

subject to the conditions in the notes below.

Taken over

Assistant Engineer
LSGD Section
Nadathara Grama Panchayath

Contractor
0
0
0

Submitted to the Executive / Assistance Executive Engineer, L.S. G. D


NOTE:
1 Handing over the site in this contract would imply making available the site for
contractor and his agents workmen etc to enter the site and carry out the work
entrusted to him.
2 This does not mean occupancy right in the normally accepted sense of words.
3

In respect of maintenance works and works of a additions and alterations to existing


Structure, the contractors right of entry to the sight and carrying on the work should be
exercised and not to cause hindrance or disturbance to the existing structure or
occupants thereof.
The contractor should vacate the sight and clear it off all debris etc, on completion of
the work or when the contract terminated.

AG R E E M E NT S C H E D U LE
Name of Work
Sl.
No.

Nadathara GP

Probable
Quantity

#REF! M

Annual Plan 2015-16 : Panchayath offfice maintenance in Nadathara


xx/16)
Description of work

Unit

Rate
Figures

#REF!

10 M

#REF!

#REF! M2

#REF!

10 M2

#REF!

#REF! M

#REF!

1 M

#REF!

#REF! M3

#REF!

1 M3

#REF!

#REF! M2

#REF!

10 M2

#REF!

Rupees Two lakh ninty eight thousand six hundred and fourty eight only only

Total Proba

I / We agree to execute the above work at estimate rate or . % above / below estimate rate less cost o

CONTRACTOR

ASSISTA
LSGD SECTIO

AG R E E M E NT S C H E D U LE

: Panchayath offfice maintenance in Nadathara Grama Panchayath


xx/16)
Rate in
Words

(Project No.
Amount

Rupees two thouasand three hundred


and sixty three only

#REF!

Rupees four hundred and sixty three


only
Rupees five hundred and nine only

#REF!

Rupees eight hundred and ninety one


only

#REF!

Rupees seven hundred and thirty seven


only

#REF!

Total Probable Amount of Contract

#REF!

#REF!

. % above / below estimate rate less cost of departmental materials, if any supplied.

ASSISTANT ENGINEER
LSGD SECTION, NADATHARA.G.P

I (Name & Address)


do hereby agree to undertake the work at

Assistant Engineer
LSGD Section
Nadathara Grama Panchayath

0.000
Estimate Rate
Signature of Contractor
0
0
0

K.P.W. FORM 23

GOVERNMENT OF KERALA LOCAL SELF GOVERNMENT DEPARTMENT


Division

: Thrissur District Panchayath

Sub Division : Ollukkara Block Panchayath


Section

Bill Register No.

: Nadathara Grama Panchayath

RUNNING ACCOUNT BILL


(For Contractor :-This form Provides for (1) secured Advance and payment for Measured Work)
Cash Book Voucher No.

Name of Contractor:

0
0
0

Name of work and Head of Account

Serial No. of ths bill :

Nadathara GP Annual Plan 2015-16 : Panchayath offfice


maintenance in Nadathara Grama Panchayath (Project
No. xx/16)
in Nadathara Grama Pachayath

First & Final Bill

No. and date of previous bill for the work :

NIL

Reference to Agreement

xxxx

Date of Written order to commencement of work

Date of actual completion of work

NA

xxxx

ENT DEPARTMENT

t for Measured Work)

2015-16 : Panchayath offfice


rama Panchayath (Project

ath

Part I - Amount of work Executed


As per agreement No
Rate
Number

Reference to
Measurement

Quantity or

Quantity or

Description of work done or

weight

weight

supplies made

Rs. Ps

Rs.

Ps

Unit

Quantities of work
or supplies made

of work done or supplies made

Book
Book No.

Page Up to date

Since last
bill

First & Final Bill


1

Value at
agreement rate

10

0.000

XXXX

0.000

XXXX

0.000

XXXX

0.000

XXXX

0.000

XXXX

Up to date

Since last bill

Rs. Ps

Rs Ps

II

I2

Remarks

Item No.

Estimate
Rate
Number

13

0.000

XXXX

0.000

XXXX

0.000

XXXX

0.000

XXXX

0.000

XXXX

10

0.000

XXXX

11

0.000

XXXX

12

0.000

XXXX

13

0.000

XXXX

14

0.000

XXXX

15

0.000

XXXX

16

0.000

XXXX

17

0.000

XXXX

18

0.000

XXXX

19

0.000

XXXX

20

0.000

XXXX

21

0.000

XXXX

22

0.000

XXXX

23

0.000

XXXX

24

0.000

XXXX

25

0.000

XXXX

26

0.000

XXXX

27

0.000

XXXX

28

0.000

XXXX

29

0.000

XXXX

30

0.000

XXXX

31

0.000

XXXX

32

0.000

XXXX

33

0.000

XXXX

34

0.000

XXXX

35

0.000

XXXX

36

0.000

XXXX

37

0.000

XXXX

38

0.000

XXXX

39

0.000

XXXX

40

0.000

XXXX

41

0.000

XXXX

42

0.000

XXXX

43

0.000

XXXX

44

0.000

XXXX

45

0.000

XXXX

46

0.000

XXXX

47

0.000

XXXX

48

0.000

XXXX

49

Total
Deduct cost of materials
Net
Add/ deduct tender excess /below
or esimate rate

0.00

0.00%

0.00

0.00

Net
and cost of materials

0.00

0.00

0.00

0.00

Total
Add / deduct for rounding
Net Total
GrandTotal of the value of the work done or supplies made to data (A)
Deduct value of work or Supplies shown in previous bills

Assistant Engineer

Net value of work or supplies since the previous bill (B)

LSGD Section

Figures(F) in words..

Nadathara Grama Panchayath

Part II - Certificate and Signature


A. BILL PREPARATION SECTION
Certified that the measurments were made by me on
and are recorded on Pages
1
to 15 of Measurment Book No.
XXXX
and that the work has been executed satisfactorily and that the bills claimed above represents a correct
Account of Contractor's claims and liabilities.
Dated Signature of officer preparing the bill

Assistant Engineer
LSGD Section
Nadathara Grama Panchayath

B. REMARKS BY CHECK MEASURING OFFICER

Sub Divisional Officer

Divisional Officer

C. AUDIT SECTION

Checked again the calculation and verified the rate against the contract schedule, quantities against
estimate Provision and receipt and issues against scantioned data.

Accountant

Accountant

Head Clerk

Divisional Accountant

Figures for
works
abstract

Part III- Memmorandum of Payments

Rs

Ps Rs.

1.Total value of work done as per Part I,Column II Entry (A)


Rs.

P.s.

Ps. 2.Deduct amount withheld(a) From previous bill

(b) From this bill

Total Amount

3.Balance,i.e., up-to-date payment(Item 1-2K)


4.Total amount of payments already made as per entry (K)
of last Running Account bill No..
forwarded with accounts for
5.Payments now to be made as detailed below:
(a)By recovery of amounts creditable to this work
(I) Value of departmental materials or stock supplied
and as per column

of

Part IV-materials accountof this bill


(ii)
Total of item 2 and 5 (a)(G)

RECOVERIES

(b)By recovery of amounts creditable to other works

VAT

head of accounts etc.

3.03%

0 0.00%

0 0.00%

0
0

(I)Hire on accounts of special tools and plant issued to the

IT

2.24%

KCWWF

1%

0.00

contractor XXXXIX-Civil Work-Miscellaneous

0.00 0

0.00 0

00

(ii) recovery on account of Sales Tax - XII other taxes

0.00

and duties

By Cheque

Total 5 (b)and .(H)


The total up -to-date value of work is admitted for rupees

TOTAL

0 and after deducting

the previous Payments and including the amount withhold the bill is passed for Rs

Certified that the Bill as Passed above


Officer authorising
has been ledgered
Payment

Head Accountant
Paid in cheque

0
Dated Signature
Rank Assistant Engineer
LSGD Section
Nadathara Grama Panchayath
Divisional Officer..

0
Divisional Officer

Paid in cash
0
Received rupees (in words) #VALUE!
on account of this work(as a final payment in settlement of all demands
Left hand thumb impression)
Date..
Rupees 0
..
Full Signature of contractor
Witness
.

STAMP

Balance in hand

Total
issue

10

11

With
With
Departmental
Contractor
Agencies

12

13

0
0
0
Note:- Col.4 If materials not provided for in the agreement are issued vide paragraph 359 recovery will have to be made at the issue issue rate or market rate at the time of
supply whichever May be greater and should include storage charges vide paragraph 350 of K. P. W. D. Code.
Col.2 Vide paragraph 358 of the K.P.W.A.code.
Verified.
... Accountant
Audit Section.

Officer measuring

Signature

the work and

Assistant Engineer

preparing the bill

LSGD Section
Rank Nadathara Grama Panchayath

Signature of the Contractor at


the time of payment
date.

Total

14

Remarks

Unit

Since Issues
Transferred to
other works as per
W.B.O

Description of Materials

Divisional
or as per
Since receipt
General Store Issue
Note and Cash
Quantity
book Voucher No.
Total in
Rate as in in hand
hand upto As per
Agreement as per
This bill
date
this bill
last c.c.
W.B.O. Issue note
Issue
W. B. O.No.
note No.
4
5
6
7
8
9

Value as per rate


in column4

Serial no.

PART IV-MATERIALS ACCOUNT

15

Office of Assistant Engineer


LSGD Section
Nadathara Grama Panchayath
Dated
Project No 0
From
Assistant Engineer
LSGD Section
Nadathara Grama Panchayath

To
The Assistant Executive Engineer
LSGD Sub Division
Ollukkara Block Panchayath
Nadathara GP Annual Plan 2015-16 : Panchayath offfice maintenance in
Sub: Nadathara Grama Panchayath (Project No. xx/16)
in Nadathara Grama Pachayath
Ref:
Agreement No & Date xxxx

With reference to the above I am herewith submitting work bill. The relevant details
of the work bill are given below.
Serial No of Work Bill
Name of Contractor

First & Final Bill


0
0
0

Amount of Bill

Rs.

Date of actual completion of work

NA

Outlay of the project

Rs. 150000

This is submitted for further necessary action.


Yours faithfully

Assistant Engineer
LSGD Section
Nadathara Grama Panchayath

Enclosures
MB No. XXXX
Bill Copy in Triplicate

WORK SLIP

Abstract of Original Estimate and Executed Quantities with Explanations of

Sl
No

Name of Work: Nadathara GP Annual Plan 2015-16 : Panchayath offfice main


As per Original Estimate
Details of work
Quantity
Rate
Amount

LS
Total
0
0

0
-

0
0

=
=

0
0

SLIP

uantities with Explanations of Difference in Quantities and Rates

Panchayath offfice maintenance in Nadathara Gin Nadathara Grama Pachayath


As per Execution
Savings Excess
Remarks
Quantity
Rate
Amount
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0
0 As per Actuals
0

COMPARATIVE STATEMENT

FORM NO. 16 B. A - Comparative statement (


Abstract of Original and Revised Estimate with Explanations of Differ

Sl
No

Name of Work: Nadathara GP Annual Plan 2015-16 : Panchayath offfice main


As per Original Estimate
Details of work
Quantity
Rate
Amount

LS
Total
0
0

0
-

0
0

=
=

0
0

STATEMENT

A - Comparative statement (Large)


te with Explanations of Difference in Quantities and Rates

Panchayath offfice maintenance in Nadathara Gin Nadathara Grama Pachayath


As per Revised Estimate
Savings Excess
Remarks
Quantity
Rate
Amount
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0.000 0.000
0 #
0
0
0 As per Actuals
0
0 As per Actuals
0

ANNEXURE C - III
(See Para 7.1 of G. O.(P) No. 177/ 2006 / Fin. Dated, 12.04.2006)

REQUSITION FOR RELEASE OF FUNDS TO IMPLEMENTING OFFICER


Requisition No

: XX/11-12

Name of LSGI

: Nadathara Grama Panchayath

Code of LSGI

: G 080503

Name of Implementing Officer

: T.P.Sanukuttan

Designation of officer

: Assistant Engineer

Amount Requested Rs.

:0
Nadathara GP
Annual Plan 2015-16 :
: Panchayath offfice maintenance in Nadathara
Grama Panchayath
(Project No. xx/16)
0

Project Name & No.

Date:

Project Cost:

:0

Category of Funds A / B / C / D

: Category C

Sector

: Generalb / SCP / TSP

DPC Approval No. and Date

Purpose in brief

: First & Final Bill

XX/XX/XXXX

(PLAN)

Amount allotted before this request for the same purpose / project Rs.

Signature of Implementing Officer


Assistant Engineer
LSGD Section
Nadathara Grama Panchayath

NIL

ANNEXURE C-VII
(See.Para 5.2 of G.O.(P) No. 117 / 2006 / Fin. Dated 12.04.2006)
Proceeding of the Assistant Engineer LSGD Nadathara Grama Panchayath (DDO)
(Present Smt. Leeza.V.A)
Sub: Withdrawal form Consolidated Fund / Public Account-Sanctioned-Orders issused
Ref: 1)
2)

G.O.(P) no 117/2006/Fin. Dated 12/04/2006


Allotment No

XX/11-12 dated

XX/XX/XXXXof the Secretary

Nadathara Grama Panchayath


Order No

XX/11-12 dated

XX/XX/XXXX

Sanction is hereby accorded for the drawal of Rs


(

0 /-

###

from the

Sub Treasury

for the purpose relating to

Nadathara GP Annual Plan 2015-16 :


from VPF/MF/MCF/DP Account No 8448-00-109-94-(03)
VPFA
III
Panchayath offfice
maintenance
in
Nadathara Grama Panchayath (Project
No. xx/16)
(Name and project /Scheme)

has been obtained (only for project) vide DPC No


Project No

0 The total amount of Bill is Rs

SCHEME

0 /-

PROJECT

CATEGORY Aa
GENb

CATEGORY B
SCP

TSP

CATEGORY C

OTHERS

MG ( R )

MG ( NR )

Signature of DDO
Name:

T.P.Sanukuttan
Assistant Engineer
LSGD Section
Nadathara Grama Panchayath

To
The Sub Treassury Officer
Sub Treasury,Chembukkavu,Thrissur.

Copy to
1 The Secretary Nadathara Grama Panchayath
2 Bill Section
3 Office Copy
4 Stock File

TAN No.
Below Rs

GLb

#VALUE!

SCP

TSP

ANNEXURE C-VI
(See Para 5.2 of the G.O. (P) No. 177/2006/Fin. Dated, 12.04.2006
TR 59B
[See Rule 187 (c ) (e ) of KTC Vol.1]
BILL FOR DRAWAL OF MONEY FROM PUBLIC ACCOUNT BY LOCAL SELF GOVERNMENT INSTITUTIONS
Name of Treasury
Sub Treasury,Chembukkavu,Thrissur.
Computer Sequence No. / Token No

Date

Scroll No..
LSGI Code

DDO Code

1406

520

094

Name of LSGI
Nadathara Grama Panchayath
Bill No
XX/11-12
Dated
XX/XX/XXXX
Head of account as per State Budget:

Serial No of Appropriation Control Register


of LSGI

DPC Approval No. & Date

No and Date of
Sanction

Details of numbers of
Sub Vouchers

1
XX/11-12
2 dated XX/XX/XXXX
3
4
5

1 Work Bill

Name& Address of payee (PAN/GIR or VAT


Reg.No)
Assistant Engineer

VPFA III

Project No. & Year

0
Sl.
No

2015-16
Amount
Rs.

T.P.Sanukuttan
VAT
Income Tax

0
0
0

. .
Total
Amount in Rs.

#VALUE!
Received contents:
Allocation received for current year

XXXX

Expenditure excluding this bill

#VALUE!

Expenditure including this bill

XXXX

Amount of bills to be paid by book


Transfer Annexed
Bvalance available

#VALUE!

Serial No of allotment
XX/11-12
Station:
Nadathara Grama Panchayath
T.P.Sanukuttan

Date:

XX/XX/XXXX

(seal)

Assistant Engineer
LSGD Section
Nadathara Grama Panchayath
Name and Signature of Drawing Officer with Designation
SPACE FOR ENDORSEMENT

Please pay the amount to Sri/Smt.


whose signature is attested below

Contents received
Assistant Engineer
LSGD Section
Nadathara Grama Panchayath

Signature of the messenger

Signature of the Drawing Officer

Signature of the messenger

FOR TREASURY USE ONLY


Pay Rs ...(Rupees..........only)
in cash ,Rs ....(Rupees ....only )
RBR and Rs ..(Rupees ........only) by TC.
PCO No..Date
..//..

Accountant

Pay order cheque issued by

Received Pay Order Cheque


Signature of Recipient

Accountant

CERTIFICATES
Certified that:(1) The expenditure charged in this bill could not , with due regard to the interest of public service , be avoided.
(2) To the best of my knowledge and belief, the payment entered in this bill have been made based on actual requirement and will be paid on
receipt of the money drawn in this bill.

(3) I have obtained vouchers for all the items clamed in this bill, duly defaced and the duplicate copies kept in my office for audit purpose.

(4) The material and stores billed for above have been brought on the respective inventories and that all materials and stores are
being duly accounted for and verified in the manner laid down in articles 149 - 161 of Kerala Financial code , Vol. 1

(5) The articles or materials billed for have been purchased on the tender system prescribed in Articles 126 - 139 of Kerala Financial Code and

have been received in good order , that their quantities are correct their quality good, that the rates paid are not in excess of the accepted
and the market rates and that suitable notes of payment have been recorded against the original indents and invoices concerned to prevent
double payment.

(6) The amount drawn in the bill is used only for the purpose approved by the DPC and LSGI.
(7) The amount as per this bill is drawn after obtaining administrative section and technical sanction where ever necessary.
(8) In respect of amount drawn on account of rents, rates and taxes in this bill, (I) no portion of the building for which the expenditure was

incurred was utilized for residential or other purpose duing the period for which the charges were paid (ii) the expenditure in respect of the
portion of the building used for residential or other puposes doing the period for which the charges were paid has been recovered from the
Government servants from whom it was due.

(9) The monetary or quantitative limits prescribed by Government in respect of the items of contingencies included in the bill have not been
exceeded.

Assistant Engineer
LSGD Section

Station:

Nadathara Grama Panchayath

Nadathara Grama Panchayath

Date :

XX/XX/XXXX

Signature and Designation of the Drawing officer

(seal)

FOR THE USE OF AG'S OFFICE


Head of account

Object in full pending receipt


of detailed contingent bill and objected to
RSon the following grounds

Auditor

Note:-

SO/AAO

Branch officer

The progress of expenditure should be recroded under each such head of appropriation and, if so, directed by a
controlling authority under each detailed account head.

TAN No.

CHNO 00927D

TAN No.

CHNO 00927D

GOVERNMENT OF KERALA

TAN No.

CHNO 00927D

GOVERNMENT OF KERALA

CHALAN

ORIGINAL

GOVERNMENT OF KERALA

CHALAN

FORM T. R.12

DUPLICATE

CHALAN

FORM T. R.12

TRIPLICATE

FORM T. R.12

[See Rules 102 ( C ) & 124 Of Kerala Treasury Code ]

[See Rules 102 ( C ) & 124 Of Kerala Treasury Code ]

[See Rules 102 ( C ) & 124 Of Kerala Treasury Code ]

Chalan for Payment of Money into the District Treasury /

Chalan for Payment of Money into the District Treasury /

Chalan for Payment of Money into the District Treasury /

Sub Treasury / State Bank of India / State Bank of Travancore

Sub Treasury / State Bank of India / State Bank of Travancore

Sub Treasury / State Bank of India / State Bank of Travancore

at Sub Treasury,Chembukkavu,Thrissur.
Computer seq. No .
Head of Account :
*DDO Code: (Dept.)
*SDO Code
By whom paid and
Name and adress of
the person on whose
behalf money is paid

Date :
8658

00

112

MAJ

SMJ

MIN

1406

520

at Sub Treasury,Chembukkavu,Thrissur.

OBJ

SOBJ

Computer seq. No .
Head of Account :

SUB

DET

(DDO)

094

64863

*DDO Code: (Dept.)


*SDO Code

Purpose of
remittance &
authority, if any

Amount in
Rs.

Order to the
Bank

By whom paid and


Name and adress of
the person on whose
behalf money is paid

Date :
8658

00

112

MAJ

SMJ

MIN

1406

520

Nadathara Grama
Panchayath
Signature &
Designation of the
Department Officer
countersigning the
remittance
Total in words

Remittance of
Income tax

Receive and
grant receipt

Treassury
officer

Total

Received Rs

Assistant Engineer
LSGD Section
Nadathara Grama
Panchayath
Signature &
Designation of the
Department Officer
countersigning the
remittance
Total in words

Signature of Remitter

OBJ

SOBJ

DET

(DDO)

094

64863
Purpose of
remittance &
authority, if any

Computer seq. No .

Amount in
Rs.

Order to the
Bank

*DDO Code: (Dept.)

8658

00

112

MAJ

SMJ

MIN

1406

520

SUB

DET

*SDO Code

64863

By whom paid and Name


and adress of the person
on whose behalf money is
paid

Purpose of
remittance &
authority, if any

Remittance of
Income tax

Receive and
grant receipt

Treassury
officer

Total

Assistant Engineer
LSGD Section

Remittance of
Income tax

Nadathara Grama
Panchayath

Amount in
Rs.

Treassury
officer

Total

#VALUE!

Signature of Remitter
Assistant Engineer

Assistant Engineer

LSGD Section

LSGD Section

LSGD Section

Nadathara Grama Panchayath

Nadathara Grama Panchayath


Received Rs

Order to the
Bank

Receive and
grant receipt

Signature & Designation


of the Department Officer
countersigning the
remittance
Total in words

Signature of Remitter

SOBJ

094

CORRECT

#VALUE!

OBJ

(DDO)

Assistant Engineer

0 /-

Date :

CORRECT

#VALUE!

Head of Account :
SUB

CORRECT

Assistant Engineer
LSGD Section

at Sub Treasury,Chembukkavu,Thrissur.

Nadathara Grama Panchayath

0 /-

Received Rs

0 /-

(Rupees

(Rupees

(Rupees

..only)

..only)

..only)

Date
Signature of Treasurer/Cashier

Seal

Treasury Officer/Bank Manager

Date
Signature of Treasurer/Cashier

Seal

Treasury Officer/Bank Manager

Date
Signature of Treasurer/Cashier

Seal

Treasury Officer/Bank Manager

Note:

Note:

Note:

1. The seal /stamp of the Treasury/bank of Collection shall be affixed.

1. The seal /stamp of the Treasury/bank of Collection shall be affixed.

1. The seal /stamp of the Treasury/bank of Collection shall be affixed.

2. if remittance is of official capacity (*SDO/DDO), write corresponding code


in the column provided.

2. if remittance is of official capacity (*SDO/DDO), write corresponding code


in the column provided.

2. if remittance is of official capacity (*SDO/DDO), write corresponding code in


the column provided.

3. If loan repayment of SDO, write instament number in purpose column.

3. If loan repayment of SDO, write instament number in purpose column.

3. If loan repayment of SDO, write instament number in purpose column.

Daily Labour Report for the day.


Name of the work
: Nadathara GP Annual Plan 2015-16 : Panchayath offfice maintenance in Nadathara Gr
Locality
: in Nadathara Grama Pachayath
No of Labour employed
:
:

Nature of work
Out turn

:
:

Mahin.T.A
Overseer Grade III
LSGD Section
Nadathara Grama Panchayath
Copy submitted to The Asst.Engineer,
Nadathara Grama Panchayath
Copy submitted to The Asst.Executive Engineer
Ollukkara Block Panchayath

Daily Labour Report for the day.


Name of the work
: Nadathara GP Annual Plan 2015-16 : Panchayath offfice maintenance in Nadathara Gr
Locality
: in Nadathara Grama Pachayath
No of Labour employed
:
:

Nature of work
Out turn

:
:

Mahin.T.A
Overseer Grade III
LSGD Section
Nadathara Grama Panchayath
Copy submitted to The Asst.Engineer,
Nadathara Grama Panchayath
Copy submitted to The Asst.Executive Engineer
Ollukkara Block Panchayath

Daily Labour Report for the day.


Name of the work
: Nadathara GP Annual Plan 2015-16 : Panchayath offfice maintenance in Nadathara Gr
Locality
: in Nadathara Grama Pachayath
No of Labour employed
:
:

Nature of work
Out turn

:
:

Mahin.T.A
Overseer Grade III
LSGD Section
Nadathara Grama Panchayath
Copy submitted to The Asst.Engineer,
Nadathara Grama Panchayath
Copy submitted to The Asst.Executive Engineer
Ollukkara Block Panchayath

chayath offfice maintenance in Nadathara Grama Panchayath (Project No. xx/16)

chayath offfice maintenance in Nadathara Grama Panchayath (Project No. xx/16)

chayath offfice maintenance in Nadathara Grama Panchayath (Project No. xx/16)

Daily Labour Report for the day.


Name of work :
Locality :

Nadathara GP Annual Plan 2015-16 : Panchayath offfice maintenance in Nadathara Grama Panchayath
in Nadathara Grama Pachayath

Nature and out turn of work done


Bailing out water with 5 H.P Motor and pump set including all hire charges and Conveying to site ,
Erecting, cost of fuel , lubricating oil , pay of staff and all other incidental charges etc. complete.

Out turn:
Submitting to the Assistant Executive Engineer ,

Ollukkara Block Panchayath

through Assistant Engineeer, LSGD Section,

Nadathara Grama Panchayath

Mahin.T.A
Overseer Grade III
LSGD Section
Nadathara Grama Panchayath

T.P.Sanukuttan
Assistant Engineer
LSGD Section
Nadathara Grama Panchayath

Daily Labour Report for the day.


Name of work :
Locality :

Nadathara GP Annual Plan 2015-16 : Panchayath offfice maintenance in Nadathara Grama Panchayath
in Nadathara Grama Pachayath

Nature and out turn of work done


Bailing out water with 5 H.P Motor and pump set including all hire charges and Conveying to site ,
Erecting, cost of fuel , lubricating oil , pay of staff and all other incidental charges etc. complete.

Out turn:
Submitting to the Assistant Executive Engineer ,

Ollukkara Block Panchayath

through Assistant Engineeer, LSGD Section,

Nadathara Grama Panchayath

Mahin.T.A
Overseer Grade III
LSGD Section
Nadathara Grama Panchayath

T.P.Sanukuttan
Assistant Engineer
LSGD Section
Nadathara Grama Panchayath

Daily Labour Report for the day.


Name of work :
Locality :

Nadathara GP Annual Plan 2015-16 : Panchayath offfice maintenance in Nadathara Grama Panchayath
in Nadathara Grama Pachayath

Nature and out turn of work done


Bailing out water with 5 H.P Motor and pump set including all hire charges and Conveying to site ,
Erecting, cost of fuel , lubricating oil , pay of staff and all other incidental charges etc. complete.

Out turn:
Submitting to the Assistant Executive Engineer ,

Ollukkara Block Panchayath

through Assistant Engineeer, LSGD Section,

Nadathara Grama Panchayath

Mahin.T.A
Overseer Grade III
LSGD Section
Nadathara Grama Panchayath

T.P.Sanukuttan
Assistant Engineer
LSGD Section
Nadathara Grama Panchayath

h offfice maintenance in Nadathara Grama Panchayath (Project No. xx/16)

h offfice maintenance in Nadathara Grama Panchayath (Project No. xx/16)

h offfice maintenance in Nadathara Grama Panchayath (Project No. xx/16)

GOVERNMENT OF KERALA

GOVERNMENT OF KERALA

CHALAN

ORIGINAL

CHALAN

FORM T. R.12

DUPLICATE

FORM T. R.12

[See Rules 102 ( C ) & 124 Of Kerala Treasury Code ]

[See Rules 102 ( C ) & 124 Of Kerala Treasury Code ]

Chalan for Payment of Money into the District Treasury /

Chalan for Payment of Money into the District Treasury /

Sub Treasury / State Bank of India / State Bank of Travancore

Sub Treasury / State Bank of India / State Bank of Travancore

at Sub Treasury,Chembukkavu,Thrissur.
Computer seq. No .
Head of Account :
*DDO Code: (Dept.)
*SDO Code
By whom paid and
Name and adress of
the person on whose
behalf money is paid

at Sub Treasury,Chembukkavu,Thrissur.

Date :

Computer seq. No .

8448

00

109

98

VPF

453

MAJ

SMJ

MIN

SUB

DET

OBJ

SOBJ

1406

520

(DDO)

094

64863

Head of Account :
*DDO Code: (Dept.)
*SDO Code

Purpose of
remittance &
authority, if any

Amount in
Rs.

Order to the
Bank

By whom paid and


Name and adress of
the person on whose
behalf money is paid

Date :
8448

00

109

98

VPF

453

MAJ

SMJ

MIN

SUB

DET

OBJ

SOBJ

1406

520

(DDO)

094

64863
Purpose of
remittance &
authority, if any

Amount in
Rs.

CORRECT

Assistant Engineer
LSGD Section
Nadathara Grama
Panchayath
Signature &
Designation of the
Department Officer
countersigning the
remittance
Total in words

Remittance of
Retention to VPF

Receive and
grant receipt

Treassury
officer

Total

Assistant Engineer
LSGD Section
Nadathara Grama
Panchayath
Signature &
Designation of the
Department Officer
countersigning the
remittance
Total in words

Signature of Remitter

Remittance of
Retention to VPF

Receive and
grant receipt

Treassury
officer

Total

#VALUE!

Signature of Remitter
Assistant Engineer

Assistant Engineer

LSGD Section

LSGD Section

Nadathara Grama Panchayath


Received Rs

Order to the
Bank
CORRECT

#VALUE!

Nadathara Grama Panchayath

0 /-

Received Rs

0 /-

(Rupees

(Rupees

..only)

..only)

Date
Signature of Treasurer/Cashier

Seal

Treasury Officer/Bank Manager

Date
Signature of Treasurer/Cashier

Seal

Treasury Officer/Bank Manager

Note:

Note:

1. The seal /stamp of the Treasury/bank of Collection shall be affixed.

1. The seal /stamp of the Treasury/bank of Collection shall be affixed.

2. if remittance is of official capacity (*SDO/DDO), write corresponding code


in the column provided.

2. if remittance is of official capacity (*SDO/DDO), write corresponding code


in the column provided.

3. If loan repayment of SDO, write instament number in purpose column.

3. If loan repayment of SDO, write instament number in purpose column.

GOVERNMENT OF KERALA
CHALAN

TRIPLICATE

FORM T. R.12
[See Rules 102 ( C ) & 124 Of Kerala Treasury Code ]
Chalan for Payment of Money into the District Treasury /
Sub Treasury / State Bank of India / State Bank of Travancore
at Sub Treasury,Chembukkavu,Thrissur.
Computer seq. No .
Head of Account :
*DDO Code: (Dept.)

Date :

8448

00

109

98

VPF

453

MAJ

SMJ

MIN

SUB

DET

OBJ

SOBJ

1406

520

(DDO)

*SDO Code

64863

By whom paid and Name


and adress of the person
on whose behalf money is
paid

Purpose of
remittance &
authority, if any

094

Amount in
Rs.

Order to the
Bank
CORRECT

Assistant Engineer
LSGD Section
Nadathara Grama
Panchayath

Remittance of
Retention to VPF

Receive and
grant receipt

Treassury
officer

Signature & Designation


of the Department Officer
countersigning the
remittance
Total
Total in words

#VALUE!

Signature of Remitter
Assistant Engineer
LSGD Section
Nadathara Grama Panchayath
Received Rs

0 /-

(Rupees
..only)
Date
Signature of Treasurer/Cashier

Seal

Treasury Officer/Bank Manager

Note:
1. The seal /stamp of the Treasury/bank of Collection shall be affixed.
2. if remittance is of official capacity (*SDO/DDO), write corresponding code in
the column provided.
3. If loan repayment of SDO, write instament number in purpose column.

ANNEXURE - B- V
(See Para 26.6 of G. O.)

PROJECT REGISTER
1 Name of LSGI

: Nadathara Grama Panchayath

2 Year

: 2015-16

3 Name of Project

Nadathara GP Annual Plan 201516 : Panchayath offfice


0
maintenance in Nadathara Grama
Panchayath (Project No. xx/16)

4 No & Date of DPC approval

5 Outlay of the project

6 Weather spill over or new

: New

7 Mode of Implementation

: Contractor

Name & Details of agency


implementing the project

9 Sector of the project


10 Micro sector of the project
Sources of fund

Rs. 0

: Assistant Engineer
: Development Fund Plan General
:

Amount provided
(Rs)

Total payments at the source at the end of the year


(Rs.)

Category C

Total

Date
Bill No./ Cheque No.
XX/XX/XXXX
XX/11-12

Particulars
Amout (Rs.)
First & Final Bill
Releasing retention
Other Deductions
Total
VAT
IT
KB&OCWWF
Retention
To Contractor

Source of fund
0
Category C
0
0
0
0
0
0
0
0
0

Assistant Engineer
LSGD Section
Nadathara Grama Panchayath

Category A Plan
Category C Maintainence

FORM NO. 20 F
CERTIFICATE
[TO BE ISSUES BY AWARDER TO CONTRACTOR]
{See Rule 42(A) }
THIS IS TO CERTIFY THAT I/ WE T.P.Sanukuttan
Assistant Engineer

LSGD Section

Nadathara Grama Panchayath

(Name and address of the awarder) HAVE AWARDED WORK TO M/S


0

0
TIN NO.

xxxxxxx

(Name and address of the contractor with TIN) AND EFFECTED PAYMENTS AS PER PARTICULARS
FURNISHED BELOW
1. WORK ORDER NO. & DATE.

xxxx

Nadathara GP Annual Plan 2015-16 : Panchayath offfice maintenance i

2. PLACE & NAME OF WORK

in Nadathara Grama Pachayath

3. GROSS AMOUNT OF CONTRACT.

699000

4. PARTIAL / FULL AMOUNT PAID /PAYABLE

5. VALUE ADDED TAX / COMPOUNDED TAX / PRESUMPTIVE TAX APPLICABLE

VAT Rs 0

CT Rs.

PT Rs.

6. TAX PAID & PARTICULARS OF PAYMENT

7. BALANCE TAX PAYABLE

NIL

8. REASONS FOR NON-PAYMENT, IF ANY

NIL

Challan dated

Sub
Treasury,Chembukkavu,Thri
XX/XX/XXXX ssur.

T.P.Sanukuttan
SEAL

Assistant Engineer
LSGD Section
Nadathara Grama Panchayath
SIGNATURE NAME & STATUS OF THE AUTHORISED SIGNATORY

FORM NO. 16 A
(See Rule 31 (1) (b))
CERTIFICATE OF DEDUCTION OF TAX AT SOURCE UNDER SECTION 203 OF THE
INCOME TAX ACT, 1961.

For Interest on Securities; Dividends, Interest other than "Interest on securities"; winnings from lottery or crossword puzzle;
winnings from horse race; payments to contractors and sub contractors; Insurance commission; payments to non resident
sportsmen/ sport association; payments in respect of deposits under National Savings Scheme; payments on account of
repurchase of units of Mutual fund or Unit Trust of India; commission; renumeration or prize on scale of lottery tickets; rent; fees
for profesional or techinical services; Income in respect ; other sums under section 195; income of forigen companies reffered to
in section 196 A(2); income from foreign curency bonds or share of an Indian company reffered to in section 196 C; Income of
ForeignInstitutional investers frome securites referred to in section 196 D.
TDS circle where annual
Name and Address of the person to
Name and address of the person
return under Section 206 is
whom payment made or in whose
deducting tax
to be delivered
account is credited
0
T.P.Sanukuttan
Thrissur
0
Assistant Engineer
0
LSGD Section
Nadathara Grama Panchayath
Tax deduction A/C No of the deductor

PAN/GIR NO OF THE PAYEE

Nature of payment

CHNO01155A
FOR THE PERIOD
From
30/12/1899

PAN/GIR NO OF THE DEDUCTOR


CHNO 00927D

To

30/12/1899

DETAILS OF PAYMENTS, TAX DEDUCTIONAND DEPOSSSSSIT OF TAX IN TO CENT GOVT


Date of
payment/Credit

XX/XX/XXXX

Total

Amount
paid/credited
(Rs)

Rate at
Amount of income
which
tax deducted
Deducted

2.24%

Date & Challan No of deposit of tax


Central govt A/C

Challan dated

XX/XX/XXXX

Sub
Treasury,Chembu
kkavu,Thrissur.

0
Certified that a sum of Rs.

0 (in words)

#VALUE!
has been deducted at source and paid to the credit of the central Government as per details given above.
Signature of person responsible for Deduction of tax
Place
Date

Name of Bank &


Branch where tax
deposited

Nadathara Grama Panchayath


Full Name

T.P.Sanukuttan

Designation

Assistant Engineer
LSGD Section
Nadathara Grama Panchayath

ANNEXURE C - VIII
PROJECT WISE STATEMENT OF EXPENDITURE FOR THE YEAR 2015-16
Funds Alottment

No and Date of
Allotment Letter

dathara GP Annual Plan 2015-16 :0Panchayath offfice maintenance in Nadathara Grama Panchayath
0 XX/11-12
(Project
XX/XX/XXXX
No. xx/16)

Amount
Rs

No and Date of
Allotment Letter

Own Fund

Amount
Rs

Cheque No and Date


of Cheque

Expenditure

Amount
Rs

Rs C

Rs

Own
Rs

Rs

C Fund

Wheather the
amount
refunded was
drawn during
the current
year

A Fund

Amount

Total
project
cost

Project No &
name

Project No and Name

Challan No &
date

Sl No

Details of refund of excess drawn / Un


utilised amount

Total
Total for the Current Year
Percentage Progress

1500000

1500000

1500000

1500000

1500000

1500000

1500000

0%

0%

0%

0%

0%

0%

0%

Remarks
First & Final Bill

LOCAL SELF GOVERNMENT DEPARTMENT


UNSTAMPED RECEIPT
Dated:
For stores supplied from LSGD
Nadathara Grama Panchayath
Name of work and agreement No Nadathara GP Annual Plan 2015-16 : Panchayath offfice maintenance in
Nadathara Grama Panchayath (Project No. xx/16)
Agreement No & Date

xxxx

Indent No.Issue Note No.


Division LSGD Division
Thrissur District Panchayath

S.No

Description of materials

Unit

Bitumin

Kg

Quantity

Amount

Remarks

Received correct

Note:-1 Amount to be filled by the Asst. Engineer/Executive


Engineer in charges of works.

2 Contractor's signature to be obtained by the Engineer in

Signature of contractor

charge of works if any person other than the contractor is


authorized to receive the materials from the stores/

0
0
0

Signature of Assistant Engineer


LSGD Section
Nadathara Grama Panchayath
Enclosed in contractors account

The Assistant Executive Engineer


LSGD Sub Division
Ollukkara Block Panchayath

1104
96720
14959
12000
23200
97214
47300
34320