Professional Documents
Culture Documents
Name of Project
Location
Year of Project
2015-16
to
Project No
No & Date of DPC approval
TIN NO
Rs.
% fo VAT
PAC
Rs. 699000
PAN NO
Serial No of Bill
0.000% Below
0.000% Above
0.000%
Details of Agreement
Requisition
xxxx
Allotment
Date of Agreement
xxxx
Proceedings
xxxx
Bill
Name of Overseer
Mahin.T.A
Date of Encashment
Designation
DETAILS OF OFFICE
Name of LSGI
Name of Engineer
T.P.Sanukuttan
Name of Office
Station
Designation
Assistant Engineer
LSGD Section
Nadathara Grama Panchayath
DDO Code
1406
520
094
LSGI Code
G 080503
LSGI CODE
TAN No.
TAN No.
CHNO 00927D
Sub Division
0 8 0 5 0 3
H N O
0 0 9 2 7 D
Sub Treasury
Treasury
Sub Treasury,Chembukkavu,Thrissur.
Treasury Officer
SDO Code
64863
TDS Circle
Thrissur
8448
00
109
98 VPF 453
ROJECT
N NO
No Empty Bags @ Rs
xxxxxxx
0 No Empty Barrels @ Rs
o VAT
3.03%
N NO
CHNO01155A
Retention
Other Deductions Specify Deductions and Amount
Deductions for
Deductions for
Releasing Retention of Previous Bills
XX/XX/XXXX
XX/11-12
XX/XX/XXXX
XX/11-12
XX/XX/XXXX
XX/11-12
XX/XX/XXXX
XX/11-12
XX/XX/XXXX
Date of Encashment
Retention to VPF
XXXX
First & Final Bill
Kg Balance Bitumin
XX/XX/XXXX
NTIONS
VAT of Cement Bag
12.63%
12.63%
1.00 /Each
150.00 /Each
20620 /Tonne
Retention to VPF in %
0.00%
Retention in %
0.00%
Amount
0
0
0
SITE PLAN
Name of work
15.56
Sl
No.
Description of work
Qty
Rate
Unit
Amount
1.5
1.2
9.00
12
1.5
1.2
21.60
1.8
1.2
8.64
Total
39.24
M2
27.31
M2
1,071.00
1 M2
29,069.00
13.12
Rectification of
fallen plaster
under slab
Total
1.5
1.2
9.00
12
24
1.5
1.8
1.2
1.2
21.60
51.84
Say
82.44 M2
352.60
15.7.4
O-17(b)
15.12.
1
existing bath
room in FF
2.50
0.2
2.4
1.20
1.30
0.2
2.4
1.25
Total
Dismantling
doors, windows and clerestory windows
(steel or wood) shutter including chowkhats,
4 architrave,
Solid block holdfasts
masonry etc.
usingcomplete
pre cast and
solidstacking
blocks
within
50
metres
lead:Of
area
3
sq.
and
(Factory made) of size 30x20x15cm metres
or nearest
below
available size confirming to IS 2185 part I of 1979
5
for super structure up to floor two level with
thickness 15cm in: CM 1:6 (1 cement : 6
coarse
for toiletsand) etc3 complete
1.5
0.15
1.5
2.45 M3
3.00
1.01
0.15
1.80
3.2
0.15
2.88
1.3
0.15
0.3
0.06
deduct - D
-2
0.75
0.15
2.1
-0.47
Ovening
-1
1.1
0.15
2.1
-0.35
Ventilator
-3
0.6
0.15
0.45
-0.12
Page 8 of 153
nos
1027.01
1 M3
192.37 1 No
2,514.00
577.00
Code
Sl
No.
Description of work
Qty
O-17(a)
Say
Solid block masonry using pre cast solid blocks
(Factory made) of size 30x20x15cm or nearest
5a available size confirming to IS 2185 part I of 1979
for foundation and plinth with thickness 15cm in:
CM 1:6 (1 cement : 6 coarse sand) etc complete
partition walls to
2
3.2
0.1
2.1
toilet
1
1.2
0.1
2.1
Total
5.22.6
4.90
Amount
M3
6454.70
1 M3
31,628.00
6822.59
1 M3
10,889.00
9231.23
1 M3
8,440.00
92.75 1 kg
6,307.00
1.34
0.25
1.60
M3
2.00
0.50
0.05
0.60
M3
RCC beam
3.55
0.15
0.20
0.21
M3
Lintel
1.50
0.15
0.15
0.10
M3
0.91
M3
Total
Steel reinforcement for R.C.C. work including
7 straightening, cutting, bending, placing in position
.Thermo-Mechanically Treated bars
0.91M3 @ 0.75Qtl/M3
13.4.1
Unit
4.81
Total
5.3
Rate
68 kg
9.00
3.00
54.00
8.60
3.00
25.80
1.30
3.00
7.80
4.00
3.00
12.00
deduct door
.5X2
0.75
2.10
-1.58
deduct door
2X.5
1.10
2.10
-2.31
partition
Page 9 of 153
Code
Sl
No.
Description of work
patch window
1.50
Qty
1.50
Rate
Unit
Amount
6.75
Total
102.46 M2
234.66 1 M2
24,043.00
30.29 1 M2
3,104.00
940.66 1 M2
5,080.00
110177.22 1 M3
6,594.00
3572.57 1 M3
2,822.00
3155.86 1 No
9,468.00
1231.77 1 M3
35,795.00
13.43.
1
4x2 0.75
0.09
0.07
0.0378
Providing
and fixing glazed shutters for doors, 0.0599 M3
Total
windows and clerestory windows using 4 mm thick
float glass panes including ISI marked M.S. pressed
O-45 11a
butt hinges bright finished of required size with
necessary screws. Using Pincoda wood 30mm thick
0.79 M2
4x2
0.3
0.33
shutters
Supplying and fixing 20mm thick ready made PVC
O-292 12 door (75*200cm) with frame 50*42 mm including
conveyance,cost of fitting , labour for fixing etc.
11.38
3 nos
racks
1.80
1.20
4.32
1.00
1.20
2.40
3.10
1.40
4.34
12
2.00
0.50
12.00
1.50
0.50
6.00
Total
29.06 M2
Page 10 of 153
Code
Sl
No.
11.36
Description of work
toilets
Qty
6.00
1.80
21.60
4.00
1.80
14.40
9.00
1.80
16.20
Rate
Unit
Amount
52.20 M2
1139.43 1 M3
59,478.00
120 M2
57.81 1 M3
6,937.00
66.05 1 M3
13,210.00
12x2.
25
1.2
2.1
68.04 M2
windows
28x2
1.5
1.35
113.4 M2
2.5
1.5
11.25 M2
grills
192.69 M2
say
200 M2
76.00
6.00
456 M2
inside building
42.00
3.00
126 M2
18.00
3.00
54 M2
16.00
3.00
48 M2
Page 11 of 153
Code
Sl
No.
Description of work
Qty
conference hall
47.40
3.00
142.2 M2
varandah
12.00
3.00
36 M2
ceiling
28.00
11.00
616 M2
deduct -doors
-12
1.20
2.10
-30.24 M2
windows
-28
1.50
1.35
-56.7 M2
grills
-3
2.50
1.50
-11.25 M2
Rate
Unit
Amount
1380 M2
71.50 1 M3
98,671.00
2 no
4620.65 1 M3
9,241.00
4M
104.53 1 M
418.00
3 no
29.50 1 M
89.00
50 M
104.53 1 M
5,227.00
20 M
509.48 1 M
10,190.00
20 M
139.79 1 M
2,796.00
say
17.29
19
Page 12 of 153
Code
Sl
No.
17.7.2 22
Description of work
Qty
4 no
Rate
Unit
2737.90 1 n
Amount
10,952.00
of
7.50
5.00
37.5
1
1
7.80
11.00
5.50
9.60
42.9
105.6
4.30
3.90
Total
say
Dismantling roofing including ridges, hips, valleys
15.28.
23a and gutters etc., and stacking the material within 50
1
metres lead of: G.S.sheet
Ridge capinging with pre painted galvenised steel
sheets 0.5 mm thick 60 cm wide including all cost
and materials, conveyance, labour charges etc.
O-259 23b
complete.
16.77
202.77
203 M2
599.99 1 M2
121,798.00
200 M2
85.83 1 M2
17,166.00
15 M
442.24 1 M
6,634.00
150 kg
102.55 1 kg
15,383.00
20 M
473.40 1 M
9,468.00
15 M
218.02 1 M
3,270.00
14.43
Page 13 of 153
600 M2
10.35 1 M2
6,210.00
Sl
Description of work
No. Providing and fixing 12 mm thick prelaminated
particle board flat pressed three layer or graded
wood particle board conforming to IS: 12823 Grade
I Type II, in panelling fixed in aluminum doors,
21.2.1 28
windows shutters and partition frames with C.P.
brass / stainless steel screws etc. complete as per
architectural drawings and directions of Engineer-inPre-laminated particle board with decorative
Charge.
lamination on one side and balancing lamination on
other side
Code
12
0.5
Qty
Rate
Unit
Amount
24 M2
1417.67 1 M2
34,024.00
35 kg
552.79 1 Kg
19,348.00
10
520.43 1 No
5,204.00
O-93
deduct-wooden
grains false
ceiling area
Total
8.8
8.6
75.68 M2
3.1
3.3
10.23 M2
-1
5.00
5.00
-25 M2
60.91 M2
Page 14 of 153
Code
Sl
No.
Description of work
say
O-94
32
Rate
Unit
Amount
61 M2
656.00 1 M2
40,016.00
25 M2
768.00 1 M2
19,200.00
33
Qty
5.00
5.00
Unforseen
items
2,669.00
Total
695,000.00
Page 15 of 153
Sl
No.
Description of work
Qty
Rate
Unit
REVISED ESTIMATE
15.56
0.7
3.50
0.9
2.70
0.6
0.6
1.80
Compound wall
0.6
0.7
1.68
floor
0.3
0.3
0.27
ceiling
Total
9.95
M2
26.35
M2
340.27
M2
13.12
ceiling
0.7
3.50
0.9
2.70
0.6
0.6
1.80
Total
8.00
Say
16.00
1 M2
15.7.4
15.12.1
Total
Not done
0.00 M3
Page 16 of 153
Note
done
nos
991.11
1 M3
185.64 1 No
4.1.3
O-17(b)
Code
Sl
No.
Description of work
Qty
0.00
Say
0.00
5.22.6
13.4.1
5948.93
1 M3
M3
7184.36
1 M3
89.50
1 M3
Note
done
0.00
Total
M3
Note
done
0.00
Total
Unit
Note
done
Total
Rate
M3
0.60
0.70
1.68
floor
0.30
0.30
0.27
patch work 5
president office
1.00
0.70
3.50
0.90
1.00
2.70
0.60
0.60
1.80
Total
Applying one coat of thinnable cement primer of
13.43.
9 approved brand and manufacture on wall surface
1
water thinneable cement primer
area vide item 8
Renewing glass panes, with putty and nails
14.5.1 10 wherever necessary including racking out the old
putty :Float glass panes of thickness 4 mm
for repairs
15
0.3
1.2
Page 17 of 153
9.95 M2
226.45 1 M2
9.95 M2
47.12 1 M2
M2
907.79 1 M2
Code
Sl
No.
Description of work
Qty
Rate
Unit
0.035
0.07
0.0221
4x2 0.75
0.09
0.07
0.0378
Total
M3
1089.23 1 M3
M2
153.64 1 M3
nos
3820.21 1 No
0.3
0.33
11.38
2.40
1.90
Total
4.56
4.60 M2
Page 18 of 153
1188.72 1 M3
Code
Sl
No.
11.36
Description of work
toilets
Qty
6.00
1.80
10.80
4.00
1.80
14.40
9.00
1.80
16.20
Rate
Unit
M2
1099.61 1 M3
M2
55.79 1 M3
12x2.
25
1.2
2.1
68.04 M2
windows
28x2
1.5
1.35
113.4 M2
2.5
1.5
11.25 M2
grills
192.69 M2
say
Providing and fixing water closet squatting pan
(Indian type W.C. pan) with 100 mm Sand Cast Iron
P or S trap, 10 litre low level white P.V.C. flushing
cistern, including flush pipe, manually controlled
17.1.1 18
device (handle lever) conforming to IS : 7231, with
all fittings and fixtures complete, including cutting
and making good the walls and floors wherever
required:
Page 19 of 153
M2
48.56 1 M3
no
4489.16 1 M3
Code
Sl
No.
Description of work
Qty
Rate
Unit
no
4371.49 1 M3
108.56 1 M
no
38.77 1 M
42.3 M
277.48 1 M
1.6 M
501.63 1 M
135.59 1 M
17.29
21
7.00
14
11.00
11
2.00
front
9.30
9.3
6.00
Total
Providing and fixing PVC pipes, fittings including
fixing the pipe with clamps at 1.00 m spacing. This
includes jointing of pipes with one step PVC solvent
O-133 23 cement and testing of joints complete as per
direction of Engineer-in-Charge. Concealed work,
including cutting chases and making good the wall
etc. 110mm pipe 6kgf/cm2
1
1.6
Code
Sl
No.
17.7.2 25
Description of work
Qty
Rate
no
Unit
2642.20 1 n
13.40
9.75
130.65
-1
5.50
3.00
-16.5
10.80
9.65
104.22
-1
3.75
3.60
-13.5
2.60
1.50
3.9
12.47
5.52
68.834
4.62
5.27
24.347
5.70
7.20
41.04
East side
10.10
1.70
17.17
over generator
6.40
2.00
12.8
3.90
1.70
6.63
9.10
0.80
7.28
deduct
deduct
front extension
Total
386.87 M2
deduct
13.40
9.75
130.65
-1
5.50
3.00
-16.5
10.80
9.65
104.22
-1
3.75
3.60
-13.5
Page 21 of 153
592.29 1 M2
Code
Sl
No.
Description of work
Qty
2.60
1.50
3.9
12.47
5.52
68.834
4.62
5.27
24.347
5.70
7.20
41.04
East side
10.10
1.70
17.17
over generator
6.40
2.00
12.8
3.90
1.70
6.63
9.10
0.80
7.28
front extension
Total
387 M2
13.40
9.75
130.65
-1
5.50
3.00
-16.5
10.80
9.65
104.22
-1
3.75
3.60
-13.5
2.60
1.50
3.9
12.47
5.52
68.834
4.62
5.27
24.347
5.70
7.20
41.04
East side
10.10
1.70
17.17
over generator
6.40
2.00
12.8
3.90
1.70
6.63
9.10
0.80
7.28
deduct
front extension
Unit
386.87
say
deduct
Rate
Total
386.87
Page 22 of 153
458.74 1 M2
Code
Sl
No.
Description of work
Qty
say
387 M2
Rate
Unit
303.11 1 M2
13.40
9.75
130.65
-1
5.50
3.00
-16.5
10.80
9.65
104.22
-1
3.75
3.60
-13.5
2.60
1.50
3.9
12.47
5.52
68.834
4.62
5.27
24.347
5.70
7.20
41.04
East side
10.10
1.70
17.17
over generator
6.40
2.00
12.8
3.90
1.70
6.63
9.10
0.80
7.28
deduct
deduct
front extension
Total
386.87
say
387 M2
deduct
13.40
9.75
130.65
-1
5.50
3.00
-16.5
10.80
9.65
104.22
-1
3.75
3.60
-13.5
2.60
1.50
3.9
Page 23 of 153
271.86 1 M2
Code
Sl
No.
Description of work
Qty
12.47
5.52
68.834
4.62
5.27
24.347
5.70
7.20
41.04
East side
10.10
1.70
17.17
over generator
6.40
2.00
12.8
3.90
1.70
6.63
9.10
0.80
7.28
front extension
Total
Rate
Unit
386.87
say
387 M2
209.67 1 M2
EXTRA ITEMS
15.28.
1
10.40
9.75
101.40
4.25
3.00
12.75
3.75
6.00
22.50
7.05
9.65
68.03
2.60
1.50
3.90
Total
15.57
208.58 M2
10.40
9.75
101.40
4.25
3.00
12.75
Page 24 of 153
82.52 1 M2
Code
O-259
Sl
No.
Description of work
Qty
3.75
6.00
22.50
7.05
9.65
68.03
2.60
1.50
3.90
Total
208.58 M2
Ridge capinging with pre painted galvenised steel
sheets 0.5 mm thick 60 cm wide including all cost
and materials, conveyance, labour charges etc.
3
complete.
13.4
13.4
12.5
12.5
Total
O-169
25.9 M
Unit
28.71 1 M2
442.24 1 M
28
5.5
5.5
9.5
9.5
43 M
O-165
Rate
14
11
11
side roof
front
9.3
9.3
6
Page 25 of 153
177.62 1 M
Code
Sl
No.
Description of work
Qty
Total
42.3 M
8.80
3.30
58.08 M2
8.70
3.30
57.42 M2
3.25
3.30
21.45 M2
filler projections
12
0.23
3.30
9.108 M2
kudumba sree
office - ceiling
7.60
4.90
37.24 M2
wall
7.60
3.30
25.08 M2
Page 26 of 153
Rate
Unit
253.50 1 M
Code
Sl
No.
Description of work
Qty
4.90
3.30
32.34 M2
3.75
3.30
12.375 M2
projections
0.23
3.30
3.036 M2
wall - common
area
4.75
3.00
28.5 M2
6.05
3.00
18.15
1.05
3.00
3.15
projections
0.23
3.00
2.07
ceiling
3.25
0.85
2.7625
13.80
3.00
82.8
4.20
3.00
25.2
projections
0.23
3.00
4.14
ceiling
10.00
0.75
7.5
ceiling
10.00
5.80
58
beam side
5.80
0.30
6.96
wall
10.00
3.60
72
5.80
3.60
41.76
5.80
10.00
58
2x2
5.80
0.30
6.96
5.80
3.60
41.76
10.00
0.60
12
Mini hall
wall
LSGD/Jalanidhi
Ground Floor
main office
bulding - ceiling
beam side
wall
PMGSY- office
opening- jamb
& sil
0.38
2.00
1.52
back portion
9.15
0.70
6.405
Page 27 of 153
Rate
Unit
Code
Sl
No.
Description of work
Qty
2x2
4.05
0.30
4.86
ceiling
9.15
4.05
37.058
wall
9.15
3.60
65.88
4.05
3.60
14.58
2.00
0.90
10.8
0.45
0.90
2.43
Secretary off
6.00
3.35
20.1
wall
6.00
3.03
36.36
3.35
3.05
20.435
corridoor ceiling
7.60
2.00
15.2
wall
7.60
2.00
30.4
2.00
3.05
12.2
Vice presiroom
3.00
4.10
12.3
wall
3.00
3.05
18.3
4.20
0.60
5.04
president
ceiling
3.10
3.00
9.3
wall
3.10
3.05
18.91
3.00
3.05
18.3
VEO ceiling
3.25
3.00
9.75
wall
3.25
3.05
19.825
3.00
3.05
18.3
5.15
2.75
14.163
wall
5.15
3.05
31.415
2.75
3.05
16.775
5.20
3.10
16.12
3.10
2.10
6.51
beam side
Almarah inside
porch ceiling
Page 28 of 153
Rate
Unit
Code
Sl
No.
Description of work
Qty
5.20
3.05
31.72
3.10
3.05
18.91
0.05
2.20
0.22
ceiling
5.15
6.00
30.9
beam side
5.15
0.30
3.09
wall
5.15
3.05
31.415
6.00
3.05
36.6
5.10
3.20
32.64
1.35
3.20
8.64
6.80
3.30
44.88
3.55
6.75
47.925
2.40
4.60
11.04
compound wall
inside
15.80
1.20
18.96
projections
0.10
1.20
1.08
pillers
0.50
1.15
0.575
1.20
0.95
1.14
1.00
0.95
0.95
porch piller
1.38
1.30
3.588
compound wall
3.55
0.95
3.3725
Deduct opening
-1
1.87
1.27
-2.3749
-1
2.70
1.27
-3.429
6.70
0.25
1.675
7.94
0.25
1.985
1.35
0.25
0.3375
4.57
0.10
0.457
wall
extra parapet
piller
Library
FF varandah
GF varandah wall
stair room
add
Page 29 of 153
Rate
Unit
Code
Sl
No.
Description of work
1
Qty
5.10
1.35
Out side
6.885
0
east
9.37
6.85
64.185
well side
5.45
6.85
37.333
5.45
(0.30+1.10
)/2
1.75
1.85
3.2375
2.60
7.95
20.67
back
8.70
parapet
9.20
1.03
9.476
9.20
0.70
6.44
0.85
2.30
3.91
7.00
1.20
8.4
1.90
0.90
1.71
1.70
0.60
1.02
2.65
0.60
1.59
2.40
0.60
1.44
toilets
2.65
3.30
8.745
Secretary off.
Back side
4.35
3.30
14.355
left side
2.65
1.20
6.36
ceiling
4.35
4.05
17.618
shade
projection
14.30
0.60
8.58
1.70
0.60
1.02
1.50
1.20
1.8
1.40
0.20+1.10/
2
0.91
0.50
1.10
0.55
1.65
3.30
5.445
ceiling
stair (outside)
toilets
(7.95+8.15+
7.40)/3
3.81
68.15
Page 30 of 153
Rate
Unit
Code
Sl
No.
Description of work
Qty
outer
14.30
7.00
100.1
beam side
1.70
3.30
5.61
5.50
0.30
1.65
4.25
4.25
0.50
2.125
9.60
8.20
78.72
0.25
8.20
14.35
shade
10.20
2.10
42.84
east
1.30
8.20
10.66
shade
1.30
8.20
21.32
1.00
2.00
4.24
8.20
34.768
0.25
8.20
4.1
4.54
1.60
7.264
6.19
1.90
11.761
1.45
8.20
11.89
1.30
1.20
1.56
6.50
8.20
53.3
0.23
8.20
5.658
6.50
1.60
10.4
6.50
1.60
10.4
1.30
1.60
2.08
9.90
9.90
1.30
12.87
9.90
0.90
8.91
west side
(7.00+8.00)/
2
31.87
front side
shade
shade
(7.20+8.00)/
2
75.24
Page 31 of 153
Rate
Unit
Code
Sl
No.
Description of work
Qty
2.00
1.00
1.85
8.20
15.17
2x2
1.40
1.20
8.00
9.6
1.20
2.00
4.8
3.80
8.20
31.16
3.80
1.30
4.94
3.00
1.25
3.75
post off/porch
8.90
0.25
2.225
shade
5.60
0.80
4.48
4.50
1.25
5.625
8.90
0.25
2.225
9.50
0.70
6.65
w3 steel
-12x1
1.35
1.35
-21.87
w2 steel
-6x1
0.95
1.35
-7.69
w4 steel
-1
1.80
1.35
-2.43
w3 wood
20x1
1.60
1.40
-44.8
w3 wood
2x1
2.10
1.50
-6.3
w2 wood
-1
1.10
2.00
-2.2
w -fixed glass
-1
2.10
1.35
-1.65
-1
0.90
1.35
-1.23
w1
-1/2
0.70
1.40
-0.49
-12x1
1.20
2.10
-30.24
-1
1.10
2.10
-2.31
president off/
porch
top shade
(0.60+0.10)/
2
1.96
Deductions
windows
Door - D
Page 32 of 153
Rate
Unit
Code
Sl
No.
Description of work
Qty
-2x1
0.90
2.10
-3.78
-1
0.80
2.10
-1.68
-1
1.00
2.10
-2.1
-2
0.80
2.00
-3.2
-1x2
2.70
1.27
-6.85
1x2
1.87
1.27
-4.74
1x2
2.75
1.50
-8.25
-1x2
2.65
1.50
-7.95
-1
1.60
2.00
-3.2
-2x2
2.00
2.10
-16.8
2.00
2.10
-1.8
rolling shutter
porch
-1x2
2.70
2.20
-11.88
-1x2
3.10
2.20
-13.64
GF front
varandah
-1
1.20
2.10
-2.52
rear side
-1
3.80
2.80
-10.64
D(PVC)
Rate
Unit
openings
FF varandah
GF varandah grill
PMGSY room
corridoor
M2
71.50 1 M3
no
44559.16 1 M3
no
29.50 1 M
shutter
17.29
23
10.40
9.75
Page 33 of 153
101.40
Code
Sl
No.
Description of work
Qty
4.25
3.00
12.75
3.75
6.00
22.50
7.05
9.65
68.03
2.60
1.50
3.90
Total
Rate
Unit
208.58 M2
85.83 1 M2
kg
102.55 1 kg
90.75 M
473.40 1 M
7.5
7.50
15.9
15.90
front extension
9.25
9.25
1.35
1.35
east roof
10.75
10.75
side shed
10.25
10.25
front
12.6
12.60
7.5
7.50
5.35
5.35
10.3
10.30
Total
Providing and fixing PVC pipes including fixing the
pipe with clamps/ clips at 1.00 m spacing. This
includes jointing of pipes with one step PVC solvent
O-168 26
cement and testing of joints complete as per
direction of Engineer-in-Charge 75mm dia
6Kgf/cm2 -External work - Exposed on wall
4
28.00
Page 34 of 153
Code
Sl
No.
Description of work
Qty
5.5
5.50
9.5
9.50
Total
14.43
Rate
179.75 M
Unit
218.02 1 M
M2
10.35 1 M2
M2
1417.67 1 M2
kg
552.79 1 Kg
12
0.5
Page 35 of 153
520.43 1 No
Code
Sl
No.
O-93
Description of work
conference hall
deduct-wooden
grains false
ceiling area
Total
Qty
8.8
8.6
75.68 M2
3.1
3.3
10.23 M2
-1
5.00
5.00
-25 M2
32
M2
656.00 1 M2
M2
768.00 1 M2
33
Unit
60.91 M2
say
O-94
Rate
5.00
5.00
Unforseen
items
Total
AMOUNT RUPEES THREE LAKHS ONLY
REVISED ESTIMATE
15.28.1 1
40.40
9.75
393.90
4.25
3.00
12.75
3.75
6.00
22.50
7.05
9.65
68.03
2.60
1.50
3.90
Total
501.08 M2
Page 36 of 153
62.80 1 M2
Code
Sl
No.
15.57 2
Description of work
Qty
Rate
Unit
kudumbasree
mini hall
8.80
8.70
76.56
3.25
2.60
8.45
7.60
4.90
37.24
6.05
4.75
28.74
13.80
4.20
57.96
Total
208.95 M2
Page 37 of 153
29.76 1 M2
Amount
262.00
5,445.00
0.00
Page 38 of 153
Amount
0.00
0.00
0.00
2,253.00
469.00
0.00
Page 39 of 153
Amount
0.00
0.00
0.00
5,468.00
Page 40 of 153
Amount
0.00
0.00
0.00
0.00
Page 41 of 153
Amount
0.00
0.00
0.00
11,737.00
803.00
0.00
Page 42 of 153
Amount
0.00
229,140.00
Page 43 of 153
Amount
177,532.00
Page 44 of 153
Amount
117,304.00
105,210.00
Page 45 of 153
Amount
81,142.00
17,212.23
Page 46 of 153
Amount
5,988.40
11,454.00
7,638.00
Page 47 of 153
Amount
10,723.00
Page 48 of 153
Amount
Page 49 of 153
Amount
Page 50 of 153
Amount
Page 51 of 153
Amount
Page 52 of 153
Amount
Page 53 of 153
Amount
Page 54 of 153
Amount
0.00
0.00
0.00
Page 55 of 153
Amount
17,903.00
0.00
42,961.00
Page 56 of 153
Amount
39,189.00
0.00
0.00
0.00
0.00
Page 57 of 153
Amount
0.00
0.00
31,468.00
Page 58 of 153
Amount
6,218.00
927,519.63
Page 59 of 153
Sl
No.
Description of work
Qty
Rate
Unit
Amount
REVISED ESTIMATE
15.56
0.7
3.50
0.9
2.70
0.6
0.6
1.80
Compound wall
0.6
0.7
1.68
floor
0.3
0.3
0.27
ceiling
Total
9.95
M2
27.31
M2
340.27
M2
272.00
1 M2
0.00
1 M3
0.00
13.12
ceiling
0.7
3.50
0.9
2.70
0.6
0.6
1.80
8.00
Total
Say
O-17(b)
15.12.
1
15.7.4
Total
Dismantling
doors, windows and clerestory windows
(steel or wood) shutter including chowkhats,
4 architrave,
Solid block holdfasts
masonry etc.
usingcomplete
pre cast and
solidstacking
blocks
within
50
metres
lead:Of
area
3
sq.
and
(Factory made) of size 30x20x15cm metres
or nearest
below
available size confirming to IS 2185 part I of 1979
5
for super structure up to floor two level with
thickness 15cm in: CM 1:6 (1 cement : 6
coarse
Total sand) etc complete
Not done
0.00 M3
Note
done
Page 60 of 153
192.37 1 No
Note
done
0.00
0.00
Say
nos
991.11
M3
6454.70
1 M3
0.00
Sl
No.
Rate
Unit
6822.59
1 M3
0.00
9231.23
1 M3
0.00
92.75 1 kg
0.00
M2
234.66 1 M2
0.00
30.29 1 M2
0.00
940.66 1 M2
0.00
M3
110177.22 1 M3
0.00
M2
3572.57 1 M3
0.00
O-17(a)
Code
5.3
Description of work
Solid block masonry using pre cast solid blocks
(Factory made) of size 30x20x15cm or nearest
5a available size confirming to IS 2185 part I of 1979
for foundation and plinth with thickness 15cm in:
CM 1:6 (1 cement : 6 coarse sand) etc complete
Total
Note
done
Note
done
0.00
M3
0.00
Total
5.22.6
Qty
M3
13.4.1
0.60
0.70
1.68
floor
0.30
0.30
0.27
Total
13.43.
1
Amount
4x2 0.75
0.09
0.07
Providing
and fixing glazed shutters for doors,
Total
windows and clerestory windows using 4 mm thick
float glass panes including ISI marked M.S. pressed
O-45 11a
butt hinges bright finished of required size with
necessary screws. Using Pincoda wood 30mm thick
4x2
0.3
0.33
shutters
Page 61 of 153
0.0378
Code
Sl
No.
Description of work
Qty
11.38
Unit
Amount
nos
3155.86 1 No
0.00
M2
1231.77 1 M3
0.00
M2
1139.43 1 M3
0.00
M2
57.81 1 M3
0.00
racks
1.80
1.20
4.32
1.00
1.20
2.40
3.10
1.40
4.34
12
2.00
0.50
12.00
1.50
0.50
6.00
Total
11.36
Rate
6.00
1.80
21.60
4.00
1.80
14.40
9.00
1.80
16.20
Page 62 of 153
Code
Sl
No.
Description of work
Qty
Rate
Unit
Amount
12x2.
25
1.2
2.1
68.04 M2
windows
28x2
1.5
1.35
113.4 M2
2.5
1.5
11.25 M2
grills
192.69 M2
say
M2
8.80
3.30
58.08 M2
8.70
3.30
57.42 M2
3.25
3.30
21.45 M2
filler projections
12
0.23
3.30
9.108 M2
kudumba sree
office - ceiling
7.60
4.90
37.24 M2
wall
7.60
3.30
25.08 M2
4.90
3.30
32.34 M2
3.75
3.30
12.375 M2
projections
0.23
3.30
3.036 M2
wall - common
area
4.75
3.00
28.5 M2
6.05
3.00
18.15
1.05
3.00
3.15
projections
0.23
3.00
2.07
ceiling
3.25
0.85
2.7625
13.80
3.00
82.8
4.20
3.00
25.2
Mini hall
wall
Page 63 of 153
66.05 1 M3
0.00
Code
Sl
No.
Description of work
Qty
projections
0.23
3.00
4.14
ceiling
10.00
0.75
7.5
ceiling
10.00
5.80
58
beam side
5.80
0.30
6.96
wall
10.00
3.60
72
5.80
3.60
41.76
5.80
10.00
58
2x2
5.80
0.30
6.96
5.80
3.60
41.76
10.00
0.60
12
LSGD/Jalanidhi
Ground Floor
main office
bulding - ceiling
beam side
wall
PMGSY- office
opening- jamb
& sil
0.38
2.00
1.52
back portion
9.15
0.70
6.405
2x2
4.05
0.30
4.86
ceiling
9.15
4.05
37.058
wall
9.15
3.60
65.88
4.05
3.60
14.58
2.00
0.90
10.8
0.45
0.90
2.43
Secretary off
6.00
3.35
20.1
wall
6.00
3.03
36.36
3.35
3.05
20.435
corridoor ceiling
7.60
2.00
15.2
wall
7.60
2.00
30.4
beam side
Almarah inside
Page 64 of 153
Rate
Unit
Amount
Code
Sl
No.
Description of work
Qty
2.00
3.05
12.2
Vice presiroom
3.00
4.10
12.3
wall
3.00
3.05
18.3
4.20
0.60
5.04
president
ceiling
3.10
3.00
9.3
wall
3.10
3.05
18.91
3.00
3.05
18.3
VEO ceiling
3.25
3.00
9.75
wall
3.25
3.05
19.825
3.00
3.05
18.3
5.15
2.75
14.163
wall
5.15
3.05
31.415
2.75
3.05
16.775
5.20
3.10
16.12
3.10
2.10
6.51
5.20
3.05
31.72
3.10
3.05
18.91
0.05
2.20
0.22
ceiling
5.15
6.00
30.9
beam side
5.15
0.30
3.09
wall
5.15
3.05
31.415
6.00
3.05
36.6
5.10
3.20
32.64
1.35
3.20
8.64
6.80
3.30
44.88
porch ceiling
wall
extra parapet
piller
Library
FF varandah
GF varandah wall
Page 65 of 153
Rate
Unit
Amount
Code
Sl
No.
Description of work
Qty
3.55
6.75
47.925
2.40
4.60
11.04
compound wall
inside
15.80
1.20
18.96
projections
0.10
1.20
1.08
pillers
0.50
1.15
0.575
1.20
0.95
1.14
1.00
0.95
0.95
porch piller
1.38
1.30
3.588
compound wall
3.55
0.95
3.3725
Deduct opening
-1
1.87
1.27
-2.3749
-1
2.70
1.27
-3.429
6.70
0.25
1.675
7.94
0.25
1.985
1.35
0.25
0.3375
4.57
0.10
0.457
5.10
1.35
6.885
stair room
add
Out side
east
9.37
6.85
64.185
well side
5.45
6.85
37.333
5.45
(0.30+1.10
)/2
1.75
1.85
3.2375
2.60
7.95
20.67
back
8.70
parapet
9.20
1.03
9.476
9.20
0.70
6.44
0.85
2.30
3.91
(7.95+8.15+
7.40)/3
3.81
68.15
Page 66 of 153
Rate
Unit
Amount
Code
Sl
No.
Description of work
Qty
7.00
1.20
8.4
1.90
0.90
1.71
1.70
0.60
1.02
2.65
0.60
1.59
2.40
0.60
1.44
toilets
2.65
3.30
8.745
Secretary off.
Back side
4.35
3.30
14.355
left side
2.65
1.20
6.36
ceiling
4.35
4.05
17.618
shade
projection
14.30
0.60
8.58
1.70
0.60
1.02
1.50
1.20
1.8
1.40
0.20+1.10/
2
0.91
0.50
1.10
0.55
toilets
1.65
3.30
5.445
outer
14.30
7.00
100.1
beam side
1.70
3.30
5.61
5.50
0.30
1.65
4.25
4.25
0.50
2.125
9.60
8.20
78.72
0.25
8.20
14.35
shade
10.20
2.10
42.84
east
1.30
8.20
10.66
shade
1.30
8.20
21.32
1.00
2.00
ceiling
stair (outside)
west side
(7.00+8.00)/
2
31.87
Page 67 of 153
Rate
Unit
Amount
Code
Sl
No.
Description of work
Qty
front side
1
4.24
8.20
34.768
0.25
8.20
4.1
4.54
1.60
7.264
6.19
1.90
11.761
1.45
8.20
11.89
1.30
1.20
1.56
6.50
8.20
53.3
0.23
8.20
5.658
6.50
1.60
10.4
6.50
1.60
10.4
1.30
1.60
2.08
9.90
9.90
1.30
12.87
9.90
0.90
8.91
2.00
1.00
1.85
8.20
15.17
2x2
1.40
1.20
8.00
9.6
1.20
2.00
4.8
3.80
8.20
31.16
3.80
1.30
4.94
3.00
1.25
3.75
post off/porch
8.90
0.25
2.225
shade
5.60
0.80
4.48
4.50
1.25
5.625
shade
shade
president off/
porch
(7.20+8.00)/
2
75.24
(0.60+0.10)/
2
1.96
Page 68 of 153
Rate
Unit
Amount
Code
Sl
No.
Description of work
Qty
8.90
0.25
2.225
9.50
0.70
6.65
w3 steel
-12x1
1.35
1.35
-21.87
w2 steel
-6x1
0.95
1.35
-7.69
w4 steel
-1
1.80
1.35
-2.43
w3 wood
20x1
1.60
1.40
-44.8
w3 wood
2x1
2.10
1.50
-6.3
w2 wood
-1
1.10
2.00
-2.2
w -fixed glass
-1
2.10
1.35
-1.65
-1
0.90
1.35
-1.23
w1
-1/2
0.70
1.40
-0.49
-12x1
1.20
2.10
-30.24
-1
1.10
2.10
-2.31
-2x1
0.90
2.10
-3.78
-1
0.80
2.10
-1.68
-1
1.00
2.10
-2.1
-2
0.80
2.00
-3.2
-1x2
2.70
1.27
-6.85
1x2
1.87
1.27
-4.74
1x2
2.75
1.50
-8.25
-1x2
2.65
1.50
-7.95
-1
1.60
2.00
-3.2
-2x2
2.00
2.10
-16.8
top shade
Deductions
windows
Door - D
D(PVC)
openings
FF varandah
GF varandah grill
PMGSY room
corridoor
Page 69 of 153
Rate
Unit
Amount
Code
Sl
No.
Description of work
Qty
2.00
2.10
-1.8
rolling shutter
porch
-1x2
2.70
2.20
-11.88
-1x2
3.10
2.20
-13.64
GF front
varandah
-1
1.20
2.10
-2.52
rear side
-1
3.80
2.80
-10.64
Rate
Unit
Amount
M2
71.50 1 M3
0.00
no
4620.65 1 M3
0.00
104.53 1 M
0.00
no
29.50 1 M
0.00
42.3 M
104.53 1 M
4,422.00
1.6 M
509.48 1 M
815.00
shutter
17.29
19
7.00
14
11.00
11
1
1
1
2.00
9.30
6.00
2
9.3
6
Total
Providing and fixing PVC pipes, fittings including
fixing the pipe with clamps at 1.00 m spacing. This
includes jointing of pipes with one step PVC solvent
O-133 20a cement and testing of joints complete as per
direction of Engineer-in-Charge. Concealed work,
including cutting chases and making good the wall
etc. 110mm pipe 6kgf/cm2
1
1.6
Page 70 of 153
Code
Sl
No.
Description of work
Qty
Rate
Unit
Amount
139.79 1 M
0.00
no
2737.90 1 n
0.00
17.7.2 22
13.40
9.75
130.65
deduct
-1
5.50
3.00
-16.5
deduct
1
-1
1
10.80
3.75
2.60
9.65
3.60
1.50
104.22
-13.5
3.9
12.47
5.52
68.834
1
1
1
4.62
5.70
10.10
5.27
7.20
1.70
24.347
41.04
17.17
1
1
1
6.40
3.90
9.10
2.00
1.70
0.80
12.8
6.63
7.28
East side
over generator
front extension
Total
say
386.87
387 M2
599.99 1 M2
232,196.00
85.83 1 M2
17,903.00
10.40
9.75
101.40
4.25
3.00
12.75
1
1
3.75
7.05
6.00
9.65
22.50
68.03
2.60
1.50
Total
Page 71 of 153
3.90
208.58 M2
Code
Sl
No.
Description of work
Qty
Rate
Unit
Amount
13.4
12.5
Total
13.4
12.5
25.9 M
442.24 1 M
11,454.00
kg
102.55 1 kg
0.00
473.40 1 M
42,961.00
218.02 1 M
39,189.00
1
1
1
7.5
15.9
9.25
7.50
15.90
9.25
1
1
1
1.35
10.75
10.25
1.35
10.75
10.25
front
1
1
1
12.6
7.5
5.35
12.60
7.50
5.35
10.3
10.30
90.75 M
Total
Providing and fixing PVC pipes including fixing the
pipe with clamps/ clips at 1.00 m spacing. This
includes jointing of pipes with one step PVC solvent
O-168 26
cement and testing of joints complete as per
direction of Engineer-in-Charge 75mm dia
6Kgf/cm2 -External work - Exposed on wall
4
1
1
5.5
9.5
28.00
5.50
9.50
179.75 M
Total
14.43
Page 72 of 153
M2
10.35 1 M2
0.00
Sl
Description of work
No. Providing and fixing 12 mm thick prelaminated
particle board flat pressed three layer or graded
wood particle board conforming to IS: 12823 Grade
I Type II, in panelling fixed in aluminum doors,
21.2.1 28
windows shutters and partition frames with C.P.
brass / stainless steel screws etc. complete as per
architectural drawings and directions of Engineer-inPre-laminated particle board with decorative
Charge.
lamination on one side and balancing lamination on
other side
Code
12
0.5
Qty
Rate
Unit
Amount
M2
1417.67 1 M2
0.00
kg
552.79 1 Kg
0.00
520.43 1 No
0.00
O-93
deduct-wooden
grains false
ceiling area
Total
8.8
8.6
75.68 M2
3.1
3.3
10.23 M2
-1
5.00
5.00
-25 M2
60.91 M2
Page 73 of 153
Code
Sl
No.
Description of work
Qty
say
O-94
32
Unit
Amount
M2
656.00 1 M2
0.00
M2
768.00 1 M2
0.00
33
Rate
5.00
5.00
Unforseen
items
Total
349,212.00
REVISED ESTIMATE
15.28.1 1
40.40
9.75
393.90
4.25
3.00
12.75
3.75
6.00
22.50
1
1
7.05
2.60
9.65
1.50
68.03
3.90
Total
15.57 2
501.08 M2
62.80 1 M2
31,468.00
29.76 1 M2
6,218.00
8.80
8.70
76.56
3.25
2.60
8.45
1
1
1
7.60
6.05
13.80
4.90
4.75
4.20
37.24
28.74
57.96
208.95 M2
Total
Page 74 of 153
Code
Sl
No.
Description of work
Qty
Page 75 of 153
Rate
Unit
Amount
Estimate Report
Name of work
Estimate
Amount
Rs:
3.00
Lakhs
The propasal is to construct retaining walls to protect Asserikkad Nalukettu road which
road surface is about 3m above ground level. Cement concrete drain also proposed to
avoid the run off rainwater.
The CPWD rate having 31.43% cost index on DSR is taken for the data rates.
with 15 % CP and Over Head charges. 1% water charge is also added to the rates.The
total cost of estimate is comes to Rs: 3.00 lakhs. The fund for the same is proposed in
the 2015-16 year project of Nadathara Grama Panhayath with its Plan fund.
DATA
Name of work:- Ollukkara Block Panchayath 2011 - 2012 (MP LAD) Construction of Meeting hall a
Library over Panchayath Office Building
Item No.
Sl. No.
Quantity
132(b)
Description
Unit
10sq.m
Main Data
10.00 dm
0.14 M2
10.00
Form work
Total
Add 10% C.P.
Total
10.00
Say Rs146.00/10dm3
132(a)
10sq.m
133
10 dm
0.124 M
Main Data
Cement concrete 1:1:3
10
Form work
10
Total
10sq.m
12
133
10 dm3
0.083 M2
Main Data
Cement concrete 1:1:3
10
Form work
10
Total
Add 10% C.P.
Total
Say Rs109.00/10dm3
5381.6300
1794
2.00
4.00
2
20.82
Qty of concrete
1
for plinth beam
1
well covering beam
1
well parapet
Total
1719
Say
Net toal
Add 10% CP and 5% over head
charges
Say
There fore for 10 dm3
107/10dm3
Say
Unit
Rate
Amount
10sq.m
4226.98
845.40
5072.38
dm3
M2
63.55
63.55
5072.38
69.49
133.04
13.30
146.35
10sq.m
4226.98
422.70
4649.68
dm3
M
63.55
63.55
4649.68
57.66
121.21
12.12
133.33
10sq.m
4226.98
dm3
M2
63.55
63.55
4226.98
35.22
98.77
9.88
108.65
16.70
0.30
10.02
3.00
3.00
0.30
1.20
3.60
7.20
20.82
1794 /10m2
16.70
3.00
3.00
@
0.23
0.23
0.10
0.30
0.30
1.20
71.44 /10m3
3735
1.15
0.21
0.36
1.719
12283
16018
2403
18420
107.16
Name of Work
Sl.
No.
Probable
Quantity
Description of work
Unit
Rate in
Figures
Words
9.95 M2
1 M2
27.31
0.00 M2
1 M2
340.27
0.00 M3
991.11
192.37
Note
done
0.00 M3
1 M3
6,454.70
5a
0.00 M3
1 M3
6,822.59
Page 82 of 153
0.00 M3
1 M3
9,231.23
0.00 Kg
92.75
0.00 M2
0.00 M2
10
0.00 M2
11
11a
12
13
14
15
15a
16
234.66
1 M2
30.29
1 M2
940.66
1 M3
###
1 M2
3,572.57
1 nos
3,155.86
1 M2
1,231.77
1 M2
1,139.43
1 M2
57.81
1 M2
66.05
1 M2
71.50
Page 83 of 153
17
18
19
20
20a
21
22
23
23a
1 nos
0.00 M
23b
0.00 M
24
0.00 kg
25
0.00 M
26
0.00 M
27
0.00 M2
4,620.65
1 M
104.53
1 M
29.50
1 M
0.00
1 M
0.00
1 M
139.79
1 nos
2,737.90
1 M2
599.99
1 M2
0.00
1 M
0.00
1 kg
102.55
1 M
0.00
1 M
0.00
1 M2
10.35
Page 84 of 153
28
0.00 M2
Page 85 of 153
maintenance in
/16)
Amount
272.00
0.00
0.00
#VALUE!
0.00
0.00
Page 86 of 153
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 87 of 153
0.00
0.00
0.00
0.00
0.00
0.00
0.00
232,196.00
0.00
0.00
0.00
0.00
0.00
0.00
Page 88 of 153
0.00
0.00
0.00
0.00
0.00
#VALUE!
NEER
THARA.G.P
Page 89 of 153
ske t\mokv
(IcmdpImc\v sS kzoIcnpsImv Abp Iv)
0
\
t{]nX,
Assistant Engineer
LSGD Section
Nadathara Grama Panchayath
kzoImhv,
0
0
0
k,
ta]d {]]rnv Xm
12/30/1899 XnbXnbn
kan sS Fm km[\fpsSbpw hnebpw ISv Iqenbpw hmSIbpw
bt{m]IcWfpsS hnebpw ISv Iqenbpw bt{m]IcWfpsS
Fm ]Wnqenbpw DssS Fntans
iXam\w
0.01% Below
\ncn AwKoIcnncnpp.
Xm Cu t\mokv e`nv Hcmgvpn, AXmbXv 11/10/2011
mw XnbXnp apv 100 cq]bpsS ap{Z Isemkpw \vnX cq]nep
Icm DSSn _ppw
kwJyp Pmaym\nt]n\mbp
0
t]mkvtm^okv nc \nt] kn^ntm {Sjdn tkhnwKvkv sUtmkntm, NSC sbm
t]cn ]WbsSpnbXv, hmv dPnkvt{Sj kn^nv (t^mdw \ 4),
hmv tImuv sNphm\p A\phmZw Dsn (t^mdw \ 4 Un),
]m ImUv FnhbpsS HdnPn\epw t^mtmtImnbpw klnXw Icm DSSn
HphbvpXn\mbn Cu Hm^okn lmPcmtXmWv.
Icm DSSn Hp hv Hcmgvpn {]hn \Sp ew
GphmtXpw, {]hn F\vPn\obdpsS \nti{]Imcw Bcw`ntXpamWv.
CXn hogvN hcpnbm XmfpsS \jvtSmchmZn asmcp
GPknsbsmv \SnpXmWv
XnbXn
11/7/2011
Assistant Engineer
LSGD Section
SELECTION NOTICE
Office of Assistant Engineer
LSGD Section
Nadathara Grama Panchayath
Dated
30/12/1899
No
To
Sri.
0
0
0
Sub: Nadathara GP Annual Plan 2015-16 : Panchayath offfice maintenance in Nadathara Grama
Panchayath (Project No. xx/16)
Ref: Your Tender dated
###
3 The Contractor should bring the original and photocopies VAT Registration (Form No 4), Permission to Pay
Compound Tax U/S 8 (Form No 4 D) if compouded rate is applicable.
4 It must be understood that on no account will percentage rate one fixed be increased
5 The work should be completed within
###
6 All terms and conditions of the notice inviting tenders and tender shall be binding on the contractor.
Assistant Engineer
LSGD Section
Nadathara Grama Panchayath
2 Estimate amount
xxxx
Taken over
Assistant Engineer
LSGD Section
Nadathara Grama Panchayath
Contractor
0
0
0
AG R E E M E NT S C H E D U LE
Name of Work
Sl.
No.
Nadathara GP
Probable
Quantity
#REF! M
Unit
Rate
Figures
#REF!
10 M
#REF!
#REF! M2
#REF!
10 M2
#REF!
#REF! M
#REF!
1 M
#REF!
#REF! M3
#REF!
1 M3
#REF!
#REF! M2
#REF!
10 M2
#REF!
Rupees Two lakh ninty eight thousand six hundred and fourty eight only only
Total Proba
I / We agree to execute the above work at estimate rate or . % above / below estimate rate less cost o
CONTRACTOR
ASSISTA
LSGD SECTIO
AG R E E M E NT S C H E D U LE
(Project No.
Amount
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
. % above / below estimate rate less cost of departmental materials, if any supplied.
ASSISTANT ENGINEER
LSGD SECTION, NADATHARA.G.P
Assistant Engineer
LSGD Section
Nadathara Grama Panchayath
0.000
Estimate Rate
Signature of Contractor
0
0
0
K.P.W. FORM 23
Name of Contractor:
0
0
0
NIL
Reference to Agreement
xxxx
NA
xxxx
ENT DEPARTMENT
ath
Reference to
Measurement
Quantity or
Quantity or
weight
weight
supplies made
Rs. Ps
Rs.
Ps
Unit
Quantities of work
or supplies made
Book
Book No.
Page Up to date
Since last
bill
Value at
agreement rate
10
0.000
XXXX
0.000
XXXX
0.000
XXXX
0.000
XXXX
0.000
XXXX
Up to date
Rs. Ps
Rs Ps
II
I2
Remarks
Item No.
Estimate
Rate
Number
13
0.000
XXXX
0.000
XXXX
0.000
XXXX
0.000
XXXX
0.000
XXXX
10
0.000
XXXX
11
0.000
XXXX
12
0.000
XXXX
13
0.000
XXXX
14
0.000
XXXX
15
0.000
XXXX
16
0.000
XXXX
17
0.000
XXXX
18
0.000
XXXX
19
0.000
XXXX
20
0.000
XXXX
21
0.000
XXXX
22
0.000
XXXX
23
0.000
XXXX
24
0.000
XXXX
25
0.000
XXXX
26
0.000
XXXX
27
0.000
XXXX
28
0.000
XXXX
29
0.000
XXXX
30
0.000
XXXX
31
0.000
XXXX
32
0.000
XXXX
33
0.000
XXXX
34
0.000
XXXX
35
0.000
XXXX
36
0.000
XXXX
37
0.000
XXXX
38
0.000
XXXX
39
0.000
XXXX
40
0.000
XXXX
41
0.000
XXXX
42
0.000
XXXX
43
0.000
XXXX
44
0.000
XXXX
45
0.000
XXXX
46
0.000
XXXX
47
0.000
XXXX
48
0.000
XXXX
49
Total
Deduct cost of materials
Net
Add/ deduct tender excess /below
or esimate rate
0.00
0.00%
0.00
0.00
Net
and cost of materials
0.00
0.00
0.00
0.00
Total
Add / deduct for rounding
Net Total
GrandTotal of the value of the work done or supplies made to data (A)
Deduct value of work or Supplies shown in previous bills
Assistant Engineer
LSGD Section
Figures(F) in words..
Assistant Engineer
LSGD Section
Nadathara Grama Panchayath
Divisional Officer
C. AUDIT SECTION
Checked again the calculation and verified the rate against the contract schedule, quantities against
estimate Provision and receipt and issues against scantioned data.
Accountant
Accountant
Head Clerk
Divisional Accountant
Figures for
works
abstract
Rs
Ps Rs.
P.s.
Total Amount
of
RECOVERIES
VAT
3.03%
0 0.00%
0 0.00%
0
0
IT
2.24%
KCWWF
1%
0.00
0.00 0
0.00 0
00
0.00
and duties
By Cheque
TOTAL
the previous Payments and including the amount withhold the bill is passed for Rs
Head Accountant
Paid in cheque
0
Dated Signature
Rank Assistant Engineer
LSGD Section
Nadathara Grama Panchayath
Divisional Officer..
0
Divisional Officer
Paid in cash
0
Received rupees (in words) #VALUE!
on account of this work(as a final payment in settlement of all demands
Left hand thumb impression)
Date..
Rupees 0
..
Full Signature of contractor
Witness
.
STAMP
Balance in hand
Total
issue
10
11
With
With
Departmental
Contractor
Agencies
12
13
0
0
0
Note:- Col.4 If materials not provided for in the agreement are issued vide paragraph 359 recovery will have to be made at the issue issue rate or market rate at the time of
supply whichever May be greater and should include storage charges vide paragraph 350 of K. P. W. D. Code.
Col.2 Vide paragraph 358 of the K.P.W.A.code.
Verified.
... Accountant
Audit Section.
Officer measuring
Signature
Assistant Engineer
LSGD Section
Rank Nadathara Grama Panchayath
Total
14
Remarks
Unit
Since Issues
Transferred to
other works as per
W.B.O
Description of Materials
Divisional
or as per
Since receipt
General Store Issue
Note and Cash
Quantity
book Voucher No.
Total in
Rate as in in hand
hand upto As per
Agreement as per
This bill
date
this bill
last c.c.
W.B.O. Issue note
Issue
W. B. O.No.
note No.
4
5
6
7
8
9
Serial no.
15
To
The Assistant Executive Engineer
LSGD Sub Division
Ollukkara Block Panchayath
Nadathara GP Annual Plan 2015-16 : Panchayath offfice maintenance in
Sub: Nadathara Grama Panchayath (Project No. xx/16)
in Nadathara Grama Pachayath
Ref:
Agreement No & Date xxxx
With reference to the above I am herewith submitting work bill. The relevant details
of the work bill are given below.
Serial No of Work Bill
Name of Contractor
Amount of Bill
Rs.
NA
Rs. 150000
Assistant Engineer
LSGD Section
Nadathara Grama Panchayath
Enclosures
MB No. XXXX
Bill Copy in Triplicate
WORK SLIP
Sl
No
LS
Total
0
0
0
-
0
0
=
=
0
0
SLIP
COMPARATIVE STATEMENT
Sl
No
LS
Total
0
0
0
-
0
0
=
=
0
0
STATEMENT
ANNEXURE C - III
(See Para 7.1 of G. O.(P) No. 177/ 2006 / Fin. Dated, 12.04.2006)
: XX/11-12
Name of LSGI
Code of LSGI
: G 080503
: T.P.Sanukuttan
Designation of officer
: Assistant Engineer
:0
Nadathara GP
Annual Plan 2015-16 :
: Panchayath offfice maintenance in Nadathara
Grama Panchayath
(Project No. xx/16)
0
Date:
Project Cost:
:0
Category of Funds A / B / C / D
: Category C
Sector
Purpose in brief
XX/XX/XXXX
(PLAN)
Amount allotted before this request for the same purpose / project Rs.
NIL
ANNEXURE C-VII
(See.Para 5.2 of G.O.(P) No. 117 / 2006 / Fin. Dated 12.04.2006)
Proceeding of the Assistant Engineer LSGD Nadathara Grama Panchayath (DDO)
(Present Smt. Leeza.V.A)
Sub: Withdrawal form Consolidated Fund / Public Account-Sanctioned-Orders issused
Ref: 1)
2)
XX/11-12 dated
XX/11-12 dated
XX/XX/XXXX
0 /-
###
from the
Sub Treasury
SCHEME
0 /-
PROJECT
CATEGORY Aa
GENb
CATEGORY B
SCP
TSP
CATEGORY C
OTHERS
MG ( R )
MG ( NR )
Signature of DDO
Name:
T.P.Sanukuttan
Assistant Engineer
LSGD Section
Nadathara Grama Panchayath
To
The Sub Treassury Officer
Sub Treasury,Chembukkavu,Thrissur.
Copy to
1 The Secretary Nadathara Grama Panchayath
2 Bill Section
3 Office Copy
4 Stock File
TAN No.
Below Rs
GLb
#VALUE!
SCP
TSP
ANNEXURE C-VI
(See Para 5.2 of the G.O. (P) No. 177/2006/Fin. Dated, 12.04.2006
TR 59B
[See Rule 187 (c ) (e ) of KTC Vol.1]
BILL FOR DRAWAL OF MONEY FROM PUBLIC ACCOUNT BY LOCAL SELF GOVERNMENT INSTITUTIONS
Name of Treasury
Sub Treasury,Chembukkavu,Thrissur.
Computer Sequence No. / Token No
Date
Scroll No..
LSGI Code
DDO Code
1406
520
094
Name of LSGI
Nadathara Grama Panchayath
Bill No
XX/11-12
Dated
XX/XX/XXXX
Head of account as per State Budget:
No and Date of
Sanction
Details of numbers of
Sub Vouchers
1
XX/11-12
2 dated XX/XX/XXXX
3
4
5
1 Work Bill
VPFA III
0
Sl.
No
2015-16
Amount
Rs.
T.P.Sanukuttan
VAT
Income Tax
0
0
0
. .
Total
Amount in Rs.
#VALUE!
Received contents:
Allocation received for current year
XXXX
#VALUE!
XXXX
#VALUE!
Serial No of allotment
XX/11-12
Station:
Nadathara Grama Panchayath
T.P.Sanukuttan
Date:
XX/XX/XXXX
(seal)
Assistant Engineer
LSGD Section
Nadathara Grama Panchayath
Name and Signature of Drawing Officer with Designation
SPACE FOR ENDORSEMENT
Contents received
Assistant Engineer
LSGD Section
Nadathara Grama Panchayath
Accountant
Accountant
CERTIFICATES
Certified that:(1) The expenditure charged in this bill could not , with due regard to the interest of public service , be avoided.
(2) To the best of my knowledge and belief, the payment entered in this bill have been made based on actual requirement and will be paid on
receipt of the money drawn in this bill.
(3) I have obtained vouchers for all the items clamed in this bill, duly defaced and the duplicate copies kept in my office for audit purpose.
(4) The material and stores billed for above have been brought on the respective inventories and that all materials and stores are
being duly accounted for and verified in the manner laid down in articles 149 - 161 of Kerala Financial code , Vol. 1
(5) The articles or materials billed for have been purchased on the tender system prescribed in Articles 126 - 139 of Kerala Financial Code and
have been received in good order , that their quantities are correct their quality good, that the rates paid are not in excess of the accepted
and the market rates and that suitable notes of payment have been recorded against the original indents and invoices concerned to prevent
double payment.
(6) The amount drawn in the bill is used only for the purpose approved by the DPC and LSGI.
(7) The amount as per this bill is drawn after obtaining administrative section and technical sanction where ever necessary.
(8) In respect of amount drawn on account of rents, rates and taxes in this bill, (I) no portion of the building for which the expenditure was
incurred was utilized for residential or other purpose duing the period for which the charges were paid (ii) the expenditure in respect of the
portion of the building used for residential or other puposes doing the period for which the charges were paid has been recovered from the
Government servants from whom it was due.
(9) The monetary or quantitative limits prescribed by Government in respect of the items of contingencies included in the bill have not been
exceeded.
Assistant Engineer
LSGD Section
Station:
Date :
XX/XX/XXXX
(seal)
Auditor
Note:-
SO/AAO
Branch officer
The progress of expenditure should be recroded under each such head of appropriation and, if so, directed by a
controlling authority under each detailed account head.
TAN No.
CHNO 00927D
TAN No.
CHNO 00927D
GOVERNMENT OF KERALA
TAN No.
CHNO 00927D
GOVERNMENT OF KERALA
CHALAN
ORIGINAL
GOVERNMENT OF KERALA
CHALAN
FORM T. R.12
DUPLICATE
CHALAN
FORM T. R.12
TRIPLICATE
FORM T. R.12
at Sub Treasury,Chembukkavu,Thrissur.
Computer seq. No .
Head of Account :
*DDO Code: (Dept.)
*SDO Code
By whom paid and
Name and adress of
the person on whose
behalf money is paid
Date :
8658
00
112
MAJ
SMJ
MIN
1406
520
at Sub Treasury,Chembukkavu,Thrissur.
OBJ
SOBJ
Computer seq. No .
Head of Account :
SUB
DET
(DDO)
094
64863
Purpose of
remittance &
authority, if any
Amount in
Rs.
Order to the
Bank
Date :
8658
00
112
MAJ
SMJ
MIN
1406
520
Nadathara Grama
Panchayath
Signature &
Designation of the
Department Officer
countersigning the
remittance
Total in words
Remittance of
Income tax
Receive and
grant receipt
Treassury
officer
Total
Received Rs
Assistant Engineer
LSGD Section
Nadathara Grama
Panchayath
Signature &
Designation of the
Department Officer
countersigning the
remittance
Total in words
Signature of Remitter
OBJ
SOBJ
DET
(DDO)
094
64863
Purpose of
remittance &
authority, if any
Computer seq. No .
Amount in
Rs.
Order to the
Bank
8658
00
112
MAJ
SMJ
MIN
1406
520
SUB
DET
*SDO Code
64863
Purpose of
remittance &
authority, if any
Remittance of
Income tax
Receive and
grant receipt
Treassury
officer
Total
Assistant Engineer
LSGD Section
Remittance of
Income tax
Nadathara Grama
Panchayath
Amount in
Rs.
Treassury
officer
Total
#VALUE!
Signature of Remitter
Assistant Engineer
Assistant Engineer
LSGD Section
LSGD Section
LSGD Section
Order to the
Bank
Receive and
grant receipt
Signature of Remitter
SOBJ
094
CORRECT
#VALUE!
OBJ
(DDO)
Assistant Engineer
0 /-
Date :
CORRECT
#VALUE!
Head of Account :
SUB
CORRECT
Assistant Engineer
LSGD Section
at Sub Treasury,Chembukkavu,Thrissur.
0 /-
Received Rs
0 /-
(Rupees
(Rupees
(Rupees
..only)
..only)
..only)
Date
Signature of Treasurer/Cashier
Seal
Date
Signature of Treasurer/Cashier
Seal
Date
Signature of Treasurer/Cashier
Seal
Note:
Note:
Note:
Nature of work
Out turn
:
:
Mahin.T.A
Overseer Grade III
LSGD Section
Nadathara Grama Panchayath
Copy submitted to The Asst.Engineer,
Nadathara Grama Panchayath
Copy submitted to The Asst.Executive Engineer
Ollukkara Block Panchayath
Nature of work
Out turn
:
:
Mahin.T.A
Overseer Grade III
LSGD Section
Nadathara Grama Panchayath
Copy submitted to The Asst.Engineer,
Nadathara Grama Panchayath
Copy submitted to The Asst.Executive Engineer
Ollukkara Block Panchayath
Nature of work
Out turn
:
:
Mahin.T.A
Overseer Grade III
LSGD Section
Nadathara Grama Panchayath
Copy submitted to The Asst.Engineer,
Nadathara Grama Panchayath
Copy submitted to The Asst.Executive Engineer
Ollukkara Block Panchayath
Nadathara GP Annual Plan 2015-16 : Panchayath offfice maintenance in Nadathara Grama Panchayath
in Nadathara Grama Pachayath
Out turn:
Submitting to the Assistant Executive Engineer ,
Mahin.T.A
Overseer Grade III
LSGD Section
Nadathara Grama Panchayath
T.P.Sanukuttan
Assistant Engineer
LSGD Section
Nadathara Grama Panchayath
Nadathara GP Annual Plan 2015-16 : Panchayath offfice maintenance in Nadathara Grama Panchayath
in Nadathara Grama Pachayath
Out turn:
Submitting to the Assistant Executive Engineer ,
Mahin.T.A
Overseer Grade III
LSGD Section
Nadathara Grama Panchayath
T.P.Sanukuttan
Assistant Engineer
LSGD Section
Nadathara Grama Panchayath
Nadathara GP Annual Plan 2015-16 : Panchayath offfice maintenance in Nadathara Grama Panchayath
in Nadathara Grama Pachayath
Out turn:
Submitting to the Assistant Executive Engineer ,
Mahin.T.A
Overseer Grade III
LSGD Section
Nadathara Grama Panchayath
T.P.Sanukuttan
Assistant Engineer
LSGD Section
Nadathara Grama Panchayath
GOVERNMENT OF KERALA
GOVERNMENT OF KERALA
CHALAN
ORIGINAL
CHALAN
FORM T. R.12
DUPLICATE
FORM T. R.12
at Sub Treasury,Chembukkavu,Thrissur.
Computer seq. No .
Head of Account :
*DDO Code: (Dept.)
*SDO Code
By whom paid and
Name and adress of
the person on whose
behalf money is paid
at Sub Treasury,Chembukkavu,Thrissur.
Date :
Computer seq. No .
8448
00
109
98
VPF
453
MAJ
SMJ
MIN
SUB
DET
OBJ
SOBJ
1406
520
(DDO)
094
64863
Head of Account :
*DDO Code: (Dept.)
*SDO Code
Purpose of
remittance &
authority, if any
Amount in
Rs.
Order to the
Bank
Date :
8448
00
109
98
VPF
453
MAJ
SMJ
MIN
SUB
DET
OBJ
SOBJ
1406
520
(DDO)
094
64863
Purpose of
remittance &
authority, if any
Amount in
Rs.
CORRECT
Assistant Engineer
LSGD Section
Nadathara Grama
Panchayath
Signature &
Designation of the
Department Officer
countersigning the
remittance
Total in words
Remittance of
Retention to VPF
Receive and
grant receipt
Treassury
officer
Total
Assistant Engineer
LSGD Section
Nadathara Grama
Panchayath
Signature &
Designation of the
Department Officer
countersigning the
remittance
Total in words
Signature of Remitter
Remittance of
Retention to VPF
Receive and
grant receipt
Treassury
officer
Total
#VALUE!
Signature of Remitter
Assistant Engineer
Assistant Engineer
LSGD Section
LSGD Section
Order to the
Bank
CORRECT
#VALUE!
0 /-
Received Rs
0 /-
(Rupees
(Rupees
..only)
..only)
Date
Signature of Treasurer/Cashier
Seal
Date
Signature of Treasurer/Cashier
Seal
Note:
Note:
GOVERNMENT OF KERALA
CHALAN
TRIPLICATE
FORM T. R.12
[See Rules 102 ( C ) & 124 Of Kerala Treasury Code ]
Chalan for Payment of Money into the District Treasury /
Sub Treasury / State Bank of India / State Bank of Travancore
at Sub Treasury,Chembukkavu,Thrissur.
Computer seq. No .
Head of Account :
*DDO Code: (Dept.)
Date :
8448
00
109
98
VPF
453
MAJ
SMJ
MIN
SUB
DET
OBJ
SOBJ
1406
520
(DDO)
*SDO Code
64863
Purpose of
remittance &
authority, if any
094
Amount in
Rs.
Order to the
Bank
CORRECT
Assistant Engineer
LSGD Section
Nadathara Grama
Panchayath
Remittance of
Retention to VPF
Receive and
grant receipt
Treassury
officer
#VALUE!
Signature of Remitter
Assistant Engineer
LSGD Section
Nadathara Grama Panchayath
Received Rs
0 /-
(Rupees
..only)
Date
Signature of Treasurer/Cashier
Seal
Note:
1. The seal /stamp of the Treasury/bank of Collection shall be affixed.
2. if remittance is of official capacity (*SDO/DDO), write corresponding code in
the column provided.
3. If loan repayment of SDO, write instament number in purpose column.
ANNEXURE - B- V
(See Para 26.6 of G. O.)
PROJECT REGISTER
1 Name of LSGI
2 Year
: 2015-16
3 Name of Project
: New
7 Mode of Implementation
: Contractor
Rs. 0
: Assistant Engineer
: Development Fund Plan General
:
Amount provided
(Rs)
Category C
Total
Date
Bill No./ Cheque No.
XX/XX/XXXX
XX/11-12
Particulars
Amout (Rs.)
First & Final Bill
Releasing retention
Other Deductions
Total
VAT
IT
KB&OCWWF
Retention
To Contractor
Source of fund
0
Category C
0
0
0
0
0
0
0
0
0
Assistant Engineer
LSGD Section
Nadathara Grama Panchayath
Category A Plan
Category C Maintainence
FORM NO. 20 F
CERTIFICATE
[TO BE ISSUES BY AWARDER TO CONTRACTOR]
{See Rule 42(A) }
THIS IS TO CERTIFY THAT I/ WE T.P.Sanukuttan
Assistant Engineer
LSGD Section
0
TIN NO.
xxxxxxx
(Name and address of the contractor with TIN) AND EFFECTED PAYMENTS AS PER PARTICULARS
FURNISHED BELOW
1. WORK ORDER NO. & DATE.
xxxx
699000
VAT Rs 0
CT Rs.
PT Rs.
NIL
NIL
Challan dated
Sub
Treasury,Chembukkavu,Thri
XX/XX/XXXX ssur.
T.P.Sanukuttan
SEAL
Assistant Engineer
LSGD Section
Nadathara Grama Panchayath
SIGNATURE NAME & STATUS OF THE AUTHORISED SIGNATORY
FORM NO. 16 A
(See Rule 31 (1) (b))
CERTIFICATE OF DEDUCTION OF TAX AT SOURCE UNDER SECTION 203 OF THE
INCOME TAX ACT, 1961.
For Interest on Securities; Dividends, Interest other than "Interest on securities"; winnings from lottery or crossword puzzle;
winnings from horse race; payments to contractors and sub contractors; Insurance commission; payments to non resident
sportsmen/ sport association; payments in respect of deposits under National Savings Scheme; payments on account of
repurchase of units of Mutual fund or Unit Trust of India; commission; renumeration or prize on scale of lottery tickets; rent; fees
for profesional or techinical services; Income in respect ; other sums under section 195; income of forigen companies reffered to
in section 196 A(2); income from foreign curency bonds or share of an Indian company reffered to in section 196 C; Income of
ForeignInstitutional investers frome securites referred to in section 196 D.
TDS circle where annual
Name and Address of the person to
Name and address of the person
return under Section 206 is
whom payment made or in whose
deducting tax
to be delivered
account is credited
0
T.P.Sanukuttan
Thrissur
0
Assistant Engineer
0
LSGD Section
Nadathara Grama Panchayath
Tax deduction A/C No of the deductor
Nature of payment
CHNO01155A
FOR THE PERIOD
From
30/12/1899
To
30/12/1899
XX/XX/XXXX
Total
Amount
paid/credited
(Rs)
Rate at
Amount of income
which
tax deducted
Deducted
2.24%
Challan dated
XX/XX/XXXX
Sub
Treasury,Chembu
kkavu,Thrissur.
0
Certified that a sum of Rs.
0 (in words)
#VALUE!
has been deducted at source and paid to the credit of the central Government as per details given above.
Signature of person responsible for Deduction of tax
Place
Date
T.P.Sanukuttan
Designation
Assistant Engineer
LSGD Section
Nadathara Grama Panchayath
ANNEXURE C - VIII
PROJECT WISE STATEMENT OF EXPENDITURE FOR THE YEAR 2015-16
Funds Alottment
No and Date of
Allotment Letter
dathara GP Annual Plan 2015-16 :0Panchayath offfice maintenance in Nadathara Grama Panchayath
0 XX/11-12
(Project
XX/XX/XXXX
No. xx/16)
Amount
Rs
No and Date of
Allotment Letter
Own Fund
Amount
Rs
Expenditure
Amount
Rs
Rs C
Rs
Own
Rs
Rs
C Fund
Wheather the
amount
refunded was
drawn during
the current
year
A Fund
Amount
Total
project
cost
Project No &
name
Challan No &
date
Sl No
Total
Total for the Current Year
Percentage Progress
1500000
1500000
1500000
1500000
1500000
1500000
1500000
0%
0%
0%
0%
0%
0%
0%
Remarks
First & Final Bill
xxxx
S.No
Description of materials
Unit
Bitumin
Kg
Quantity
Amount
Remarks
Received correct
Signature of contractor
0
0
0
1104
96720
14959
12000
23200
97214
47300
34320