1. Consider the following figure, it is required to prepare a quantity take-off for the
following types of work to be included on the bill of quantities:

a. Excavation.
b. . Backfilling
c. Plain concrete footing
Cost Estimating

Dr. Emad Elbeltagi

d. Reinforced concrete footings and smells and column necks till the ground level..
e. Insulation.

2. Consider the following figure, find the same requirements as above.