CAR PARK HOUSE

PROJECT CHARTER

CAR PARK HOUSE


SUSANA HEIGHTS SUBDIVISION
MUNTINLUPA
GARCIA FAMILY

TABLE OF CONTENTS
GENERAL INFORMATION

PROJECT PURPOSE

PROJECT SCOPE

PROJECT OBJECTIVES

HIGH-LEVEL REQUIREMENTS

CONSTRAINTS, ASSUMPTIONS AND RISKS

PROJECT PROCESS SUMMARY

SCHEDULE / MILESTONES SUMMARY

BUDGET

STAKEHOLDERS

PROJECT APPROVAL REQUIREMENTS

Project charter | car park house

2 OF 8

PROJECT CHARTER
CAR PARK HOUSE

This Charter formally authorizes the project to commence for the design of
single-storey home for a family situated on the edge of a steep slope in stage of
the building services. A project plan will be developed and submitted to the
Project Sponsor for approval. Commencement of project activities will begin
upon approval of the project plan and the resources to execute it handed over by
the Project Sponsor. Included in the project plan are to be a scope statement;
schedule; cost estimate; budget; and provisions for scope, resource, schedule,
communications, quality, risk, procurement, and stakeholder management as
well as project control.

GENERAL INFORMATION
Project Title

Project Manager

Car Park House

Ms.

Project Client

Prepared by

Garcia Family

Ms.

Project Sponsor
Mr. Paul Garcia
PROJECT PURPOSE
The Car Park House is a modern residence for businessman Paul Garcia and
his family situated at Susana Heights Subdivision, Munitinlupa and is
located along a sloping site.
The project is to bring the lifestyle of the family in a well spent scheduled
manner. The overall design and requirements meets the desired date for
faster completion by construction and project management in accordance
to consider the key constraints of the stakeholders.

Project charter | car park house

3 OF 8

PROJECT SCOPE
The boundaries of the project are limited to providing the following:
Design and construction of house and fence
Installation of architectural finishes
Corresponding Construction method

PROJECT OBJECTIVES
The project aims to:
Provide a modern dwelling for the client that suits the familys lifestyle
Execute the project within a short period of time

HIGH-LEVEL REQUIREMENTS

The following table presents the requirements that the projects


product, service or result must meet in order for the project
objectives to be satisfied.
Req. #

I Requirement Description

All of the information of the project must be spell out by the


business.

The planning stage should be well planned to track the status of


the project.

There should be a sharing of information regarding the possible


outcomes of the project.
CONSTRAINTS, ASSUMPTIONS AND RISKS
4 following
As possible,
report
all the happenings
on the
The
factors will
be considered
throughout
theproject.
project activities in
order to succeed.
5
Susana Heights is the chosen location of this project, research
the technicalities of this area
CONSTRAINTS
6 following
The car
park house
should are
be satisfied
the needs
of the owner.
The
constraints
foreseen
to be considered
throughout
the project.
7

The
project
is needed
beproject,
done within
a short
period
time in a
Time
is treasure
for to
this
the project
must
be of
finished
The
project
is
located
in
a
sloping
site
short period of time.

ASSUMPTIONS
The project will be a success presuming the following:

Fabrication and delivery of prefabricated materials will not be delayed.


The approved architectural and structural design will not

RISKS

Tight timeframe. The deadline doesnt allow for any force majeure
Project charter | car park house

4 OF 8

circumstances during construction process


Technical risk: Method of construction may not be applicable in the
proposed location of project

PROJECT PROCESS SUMMARY


The Project Management Methodology used will be in accordance with the
PMBOK guidelines. The Systems Development Life Cycle Methodology used
will be the waterfall method where the progress flows like a waterfall from
the top to the bottom.

SCHEDULE / MILESTONES SUMMARY

Project charter | car park house

5 OF 8

BUDGET
The budget in terms of finances inclusive of man power, construction material
cost is set to a maximum of 20,000,000.00 as provided by the project
sponsor.

STAKEHOLDERS
Project charter | car park house

6 OF 8

CLIENT

Garcia Family

SPONSOR

Mr. Paul Garcia

PROJECT MANAGER

Ms. Lime Romero

PROJECT TEAM
ARCHITECT
STRUCTURAL
ENGINEER
SUPPLIERS
CONTRACTORS
CONSULTANTS

Simon Storey

LOCAL AUTHORITIES

PROJECT APPROVAL REQUIREMENTS


The approvals for this project include:
The sponsor will approve the WBS before planning and execution efforts
continue

Project Team: Project manager, Architect, Structural Engineer, Suppliers,


Utilities, Contractors, Local authorities, Government agencies and Consultants.
Project Charter Approval Form
Project Name: Car Park House
Project charter | car park house

7 OF 8

Project Manager:
By signing, this document, the individuals mentioned below formally indicate
their agreement and acceptance of the Project Charter and their commitment to
the project and end product.
I have reviewed the information contained in this Project Charter and agree.
Name

Signature

Date

Project charter | car park house

8 OF 8