Professional Documents
Culture Documents
Slope
21
7.500
4.5%
3.5%
1.875
3.75
0.170
Slope
2:1
0.175
4.05
0.300
Approved Soil
8.88
10.08
Sub Engineer
S.D.O.
PMC
G-3 Layer
G-2 Layer
GSB
Subgrade
FORMAT - 4
0.020
0.075
0.075
0.175
0.300
7.500
3.5%
4.5%
3.75
1.875
4.05
Hard Shoulder
2.215
2.065
2.415
Slope
2:1
proved Soil
8.88
10.08
Executive Engineer
0
EARTHWORK CAC
VOLUME REPORT (Based on auto
NAME OF ROAD :
LENGTH OF ROAD :
Baghima To Tilaidih
1000.00
EARTHWORK SUM
Description
FOR UNLINED DRAIN
TWO SIDE :
w=(0.9+0.45)/2
d=0.45
A
TOTAL QUANTITY OF CUTTTING FROM DRAINS
B
TOTAL QUANTITY OF EMB FILLING FROM EARTHWORK SHEET
C
TOTAL QUANTITY OF EMB CUTTING FROM EARTHWORK SHEET
D
TOTAL QUANTITY OF EXCAVATION IN ROAD
E
QUANTITY OF EMB FILL FROM TOTAL EXCAVATED MATERIAL
F =(B-E)
QUANTITY OF FILL FOR EMB CONSTRUCTION (BORROW SOIL)
Chainage
Distance
Cut Area
Fill Area
0
25
50
75
100
125
150
170
175
200
225
250
275
300
325
340
350
375
400
425
450
475
500
525
550
575
600
620
625
0
25
25
25
25
25
25
20
5
25
25
25
25
25
25
15
10
25
25
25
25
25
25
25
25
25
25
20
5
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.34
3.19
2.15
0.13
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.03
5.00
7.06
11.39
17.35
10.17
5.75
5.06
2.34
0.60
0.00
0.00
0.00
0.00
0.29
0.43
1.54
3.10
4.81
6.20
6.79
7.30
5.90
4.03
2.41
1.03
0.47
0.57
1.28
650
675
700
725
750
775
800
825
850
875
900
925
950
975
1000
25
25
25
25
25
25
25
25
25
25
25
25
25
25
25
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.42
1.64
2.14
2.65
3.20
3.75
4.32
4.92
3.96
3.07
2.24
1.49
0.79
0.22
0.00
EARTHWORK CACULATIONS
OLUME REPORT (Based on autocad profile taken from DPR)
DISTRICT
BLOCK
EARTHWORK SUMMARY
NO
2.000
1000.000
0.675
Cut
Volume
Fill
Volume
Cum. Cut
Volume
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
16.713
56.563
66.775
28.575
0.990
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
75.42
150.79
230.59
359.16
343.94
199.02
108.13
18.50
36.72
7.48
0.00
0.00
0.03
3.59
5.40
9.90
58.05
98.86
137.66
162.48
176.14
164.90
124.09
80.55
42.98
18.71
10.38
4.62
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
16.71
73.28
140.05
168.63
169.62
169.62
169.62
169.62
169.62
169.62
169.62
169.62
169.62
169.62
169.62
169.62
169.62
169.62
SHEET
K SHEET
ERIAL
W SOIL)
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
33.80
38.32
47.26
59.83
73.10
86.85
100.92
115.58
111.09
87.89
66.38
46.71
28.59
12.64
2.71
169.62
169.62
169.62
169.62
169.62
169.62
169.62
169.62
169.62
169.62
169.62
169.62
169.62
169.62
169.62
GUMLA
PALKOT
QTY (CUM)
0.450
607.500
607.500
3539.76
169.62
777.12
388.56
3151.20
Cum. Fill
Volume
Remarks
75.42
226.20
456.79
815.96
1159.89
1358.91
1467.05
1485.55
1522.27
1529.75
1529.75
1529.75
1529.78
1533.37
1538.77
1548.66
1606.71
1705.58
1843.24
2005.71
2181.85
2346.76
2470.84
2551.39
2594.37
2613.08
2623.46
2628.08
2661.88
2700.21
2747.47
2807.30
2880.40
2967.25
3068.17
3183.74
3294.84
3382.73
3449.11
3495.82
3524.41
3537.05
3539.76
Ref no
1.1
1.2
2
2.1
2.2
2.3
2.4
2.5
2.6
4.1
4.2
4.3
5.1
4.2
4.3
4.4
5.1
DESCRIPTION
Clearing grass and removal of the rubbish upto a distance of 50 m outside the peripher
Description
Details of cost for 100 sqm.
Labour:
Beldars
Coolies
TOTAL
Add 1% for water charges
TOTAL
Add 15% for contractors profit and overheads
Cost of 100 sqm.
Say
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees
and saplings of girth upto 30 cm measured at a height of 1 m above ground level
and removal of rubbish upto a distance of 50 m outside the periphery of the area
cleared.
Description
Details of cost for 100 sqm.
Labour:
Beldars
Coolies
TOTAL
Add 1 % for water charges
TOTAL
Add 15% for contractors profit and overheads
Cost of 100 sqm.
Say
EARTH WORK
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means
over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) includin
disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be
levelled and neatly dressed.
Description
Details of cost for 10 cum.
Average output of Hydraulic Excavator per
hour = 30cum.
MACHINERY
Hydraulic Excavator (3D) with driver and fuel.
Hire and running charges of loader.
LabourMate
Beldar/Coolies
TOTAL
Add 1 % for water charges
TOTAL
Add 15% for contractors profit and overheads
Cost of 10 cum.
Cost of 1 cum.
Say
Say
Earth work in rough excavation, banking excavated earth in layers not exceedin
cm in depth, breaking clods watering, rolling each layer with tonne roller or w
or steel rammers, and rolling every 3rd and top-most layer with power roller of m
8 tonnes and dressing up in embankments for roads, flood banks, marginal bank
guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m
All kinds of soil
Description
Details of cost for 10 cum.
LabourBeldars
Coolies
Bhishti
Chokidar
Roller charges (one roller does 1850 sqm. of
consolidation per day)
Hire Charges
Diesel
Carriage of diesel
Sundries
TOTAL
Add 1 % for water charges
TOTAL
Add 15% for contractors profit and overheads
Cost of 10 cum.
Cost of 1 cum.
Say
TOTAL
Overhead chages/contractor profit @15%(a+b+c)
Cost for 100 cum = a+b+c+d
Rate per cum = (a+b+c+d+)/100
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading
compacted to meet requirement of table No. 300-2
Unit = cum
Taking output = 100 cum
a) Labour
Mate
Mazdoor
b) Machinery
Hydraulic excavator1 cum bucket capacity @ 60 cum per hour
Tipper 10 tonne capacity
Add 10 per cent of cost of carriage to cover cost of loading and unloading
Dozer 80 HP for spreading @ 200 cum per hour
Motor grader for grading @ 50 cum per hour
Water tanker with 6 km lead
Vibratory roller 8-10 tonnes @ 80 cum per hour
c) Material
Cost of water
Compensation for earth taken from private land
Total
d) Overhead Charges and Contractor Profit @ 15 % ( a+b+c)
Cost for 100 cum = a+b+c+d
Rate per cum = (a+b+c+d)/100
Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne
capacity after excavating earth to an average of 22.5 cm. depth, dressing to camber
and consolidating with road roller including making good the undulations etc. and
re-rolling the sub grade and disposal of surplus earth lead upto 50 metres.
Description
Details of cost for 22.5 cum.
(A) preparation of subgrade.
Earth work in excavation including dressing
etc. 100sqm.x22.5cm (average depth) =
22.5cum.
Labour
Mate
Coolie
Beldar
Hire charges of road roller
Chowkidar
Diesel for road roller @ 18 litres
Carriage of diesel
Sundries
Material used:
Moorum.
Details of cost for 22.5 cum.
Material
Cost of moorum at quarry
Carriage
Sub TOTAL
Total
Add 1% for water charges
TOTAL
Add 15% for contractors profit and overheads
Total (22.5 cum)
Cost for 1 Cum
Sundries
TOTAL
Add 1% for water charges
TOTAL
Add 15% for contractors profit and overheads
Cost for 1 cum
Say
Materials :
Description
Details of cost for 1.00 cum.
Materials :
Stone Aggregate 63mm (one size)
Stone Aggregate 53 mm (one size)
Stone Aggregate 45mm (one size)
Carriage
Description
Total
Add 1% for water charges.
Total
Add 15 % for contractors profit and overheads
Cost for 1 cum
Say
Providing and applying prime coat using hot straight run bitumen of grade 80/ 1
including heating the bitumen, spraying the bitumen with mechanically operated
spray unit fitted on bitumen boiler, cleaning and preparing the existing road
surface as per specifications :
On W.B.M. @ 0.75 Kg / sqm.
Description
Details of cost for 100.00sqm
Bitumen 80/100
Carriage of bitumen
Steam coal
Carriage of steam coal
Materials for cleaning the road surface :
Wire brush (with thick wire)
Soft brush
Gunny bags
Spray unit
Sundries
Labour:
(a) For cleaning:
Mate
Beldar
(b) For heating bitumen:
Beldar
(c) For applying tack coat:
Beldar
TOTAL
Add 1% for water charges
TOTAL
Add 15% for contractors profit and overheads
Providing and applying tack coat using bitumen emulsion (Rapid Setting)
complying with IS 8887-1995, spraying the bitumen emulsion with mechanically
operated spray unit, cleaning and preparing the existing road surface as per
specifications:
On bituminous surface @ 0,25kg/sqm.
Description
Details of cost for 100 sqm.
bitumen emulsion (R.S.)
Carriage of bitumen
Materials for cleaning the road surface :
Wire brush (with thick wire)
Soft brush
Gunny bags
Spray unit
Sundries
Labour:
(a) For cleaning:
Mate
Beldar
(c) For applying tack coat:
Beldar (0.47/0.050)x0.025=0.235
TOTAL
Add 1% for water charges
TOTAL,
Add 15% for contractors profit and overheads
Cost for 100 sqm.
Cost per Sqm.
Say
2 cm premix carpet surfacing with 1.8 cum and 0.90 cum of stone chippings of
13.2 mm size and 11.2 mm size respectively per 100 sqm. and 52 kg. and 56 kg.
hot bitumen per cum of stone chippings of 13.2 mm and 11.2 mm size respective
including a tack coat with hot straight run bitumen including consolidation with
road roller of 6 to 9 tonne capacity etc. complete: (tack coat to be paid for
separately).
With paving Asphalt 80/100 heated and then mixed with solvent at the rate of 70
grams per kg of asphalt.
Description
Details of cost for 100 sqm.
Asphalt 80/100
(i) Hot bitumen @52kg.per cum. of stone
chippings 1.8cum. of 13.2mm nominal size
chippings.
Providing and laying seal coat over prepared surface of road with bitumen heate
in bitumen boiler fitted with the spray set spraying using 98 kg of bitumen of gra
80/100 and blinding surface with 0.90cum of stone aggregate of 6.7 mm size (Pa
11.2mm sieve and retained on 2.36mm sieve) per 100 sqm of road surface includ
rolling and finishing with power road roller all complete.
Description
Details of cost for 100.00 sqm.
Bitumen 80/100
Carriage of bitumen
Stone aggregate
Carriage of stone aggregate
Steam coal for heating bitumen @ 2 qunitals
per tonne of bitumen =2x0.0.98=1.96 qtl.
Carriage of steam coal
Labour for cleaning road surface, heating
bitumen mixing and spreading aggregate :
(a) For heating and spraying bitumen :
Mistry
Sprayman
Beldar
(b) For cleaning:
Mate
Beldar
Coolie
(c) For screening and spraying aggregate :
Mate
Beldar
(d) Misc :
Chowkidar (at barrier for night watch and for
road roller)
Bhishti
Hire charges for road roller
Hire charges for tar sprayer unit
Diesel for road roller @ 18 litres per day
Hire charges of boiler
(e) Misc :
Wire brush (with thick wire)
Soft brush
Sundries
Brooms and gunny bags
TOTAL
Add 1% for water charges
TOTAL
Add 15% for contractors profit and overheads
Cost for 100 sqm.
Cost per sqm.
Say
Providing Retro-reflective regulatory sign board of size 900mm dia meter made out
of 2mm thick aluminium sheet, face to be fully covered with high intensity
Description
Painting with synthetic enamel paint
1x2.40x0.12=0.29 sqm
1x4.00x0.12=0.80 sqm, total = 0.29 + 0.80 =
1.09 sqm
Rate as per item no 13.61.1
Painting with epoxy paint on back side of
aluminium sheet, Rate as per Item no.13.52.1
Sundries & hole fast etc,
Total
Add 1% for water charges except on (A).
Total
Add 15% for contractors profit and overheads
Cost for 1 board
Say
RATE ANALYSIS
ea cleared.
Unit
Quantity
Day
Day
Unit
Rate
.6
.25
280
280
Quantity
Day
Day
Rate
1.08
.6
280
280
Unit
Quantity Rate
Day
Day
.04125
.04125
9,800
1,200
Day
Day
Unit
Day
Day
Day
Quantity
Rate
.2
2.5
.2
0.4
4
400
280
Amount
138.45
135.25
138.45
Unit
Quantity
Day
Day
Day
Day
Day
litre
quintal
L.S.
5.9
3.6
.4
.008
0.008
Rate
135.25
135.25
138.45
135.25
1000.00
.144
30.25
.0014
5.32
2.73
1
Unit
Day
Day
Quantity
Rate
.04125 6 000.00
.04125
800
Day
Day
.4
4.1
138.45
135.25
fts and leads, transporting to site, spreading, grading to required slope and compacting
Unit
Quantity
Rate
day
day
0.04
1
400
280
hour
tonne.km
1.67
6000
1700
hour
hour
day
hour
0.5
1
1
1
1750
2450
1500
1300
KL
cum
24
100
160
25
160 x L
say
Unit
Quantity
Rate
day
day
0.040
1.000
400.00
280.00
hour
tonne.km
1.670
175xL
6000.00
1700.00
hour
hour
hour
hour
0.500
2.000
4.000
1.250
1750.00
1225.00
1500.00
1300.00
KL
cum
24.000
100.000
160.00
25.00
say
Unit
Day
Day
Day
Day
Day
litre
L.S.
Quantity Rate
1.8
18
.27
.054
.054
.972
1.43
400
280
280
1,550
280
45
3
45 L.S.
6.76
Day
.054 1550`
Day
litre
L.S.
L.S.
.054
.972
1.43
6.76
cum
cum
Unit
280
45
3
3
22.5
22.5
Quantity
460
65
Rate
Day
Day
.26
.263
280
280
Day
Day
.033
.033
1,550
280
litre
L.S.
.59
1.43
45
3
L.S.
2.73
Unit
Quantity
cum
cum
cum
cum
Unit
Rate
.1
.65
.25
1
Quantity
1,000
1,100
1,100
68
Rate
Day
Day
.26
.263
280
280
Day
Day
.033
.033
1,550
280
litre
L.S.
L.S.
.59
1.43
2.73
45
3
3
45 liter
cum
cum
cum
cum
Unit
Unit
tonne
tonne
quintal
tonne
.05
.3
.65
1
Quantity
1,100
1,100
1,200
68
Rate
Quantity
Rate
.075
.075
.15
.015
32,000
58
350
60.81
each
each
L.S.
Day
L.S.
.05
.12
7.8
.03
9.1
15
12
1
250
1
Day
Day
.06
1.46
280
280
Day
.19
280
Day
.47
280
Unit
Quantity
Rate
tonne
tonne
.025
.025
32,000
58
each
each
L.S.
Day
L.S
.05
.12
7.8
.03
7.8
15
12
1
250
1
Day
Day
.061
1.46
280
280
Day
.235
280
Unit
Quantity
Rate
tonne
.144
25,000
.144
10.08
.1
1.8
58
18
6.2
750
.9
750
cum
quintal
2.7
.288
58
300
tonne
.0288
60.81
Day
Day
Day
.08
1.4
1.4
400
280
280
Day
.57
280
Day
Day
.19
5
280
280
Day
.27
280
Day
litre
L.S
Day
Day
.11
2
2.73
.13
.04
1,550
45
3
650
250
each
.11
15
each
L.S.
.32
6.76
12
1
tonne
kilogram
quintal
cum
cum
Unit
45 / liter
Quantity
Rate
tonne
tonne
cum
cum
quintal
.098
.098
.9
.9
1.9
25,000
58
750
58
300
tonne
.196
60.81
Day
Day
Day
.04
.06
.69
280
280
280
Day
Day
Day
.11
1.4
1.41
400
280
280
Day
Day
.05
.51
400
280
Day
.15
280
Day
Day
Day
litre
Day
.06
.06
.06
1.08
.06
280
1,550
250
45
595
each
each
L.S.
L.S.
.05
.12
18.2
2.73
15
12
1
1
Unit
kilogram
Quantity Rate
3.98
240
.98
1,800
kg
29.76
63
Day
Day
L.S.
.01
.25
70.23
280
280
3
sqm
sqm
1.09
.635
43.3
92
L.S.
31.2
sqm
Amount
168
70
238
23.8
261.8
39.27
301.01
301
Amount
302.4
168
470.4
4.7
475.1
71.26
546.36
546.35
Amount
404.25
49.5
160
1,120
1,733.75
17.34
1,751.09
262.66
2,013.75
201.37
201.4
27.69
338.12
27.69
393.5
3.94
397.44
59.62
457.06
45.71
45.7
Amount
797.98
486.9
55.38
1.08
8
4.36
.01
2.73
1 356.44
13.56
1 370.00
205.5
1 575.50
157.55
157.55
Amount
247.5
33
55.38
554.52
890.4
8.9
899.3
134.9
1,034.2
103.42
103.4
16
280
10020
1700
170
875
245
1500
1300
3840
2500
22446
3366.9
25812.9
258.129
258
Amount
16.00
280.00
10020.00
1700.00
170.00
875.00
2450.00
6000.00
1625.00
3840.00
2500.00
29476.00
4421.40
33897.40
338.97
338.97
Amount
720
5,040
75.6
83.7
15.12
43.74
4.29
20.28
83.7
15.12
43.74
4.29
20.28
6,169.86
10,350.0
1,462.5
11,812.5
17,982.4
179.8
18,162.2
2,724.3
20,886.5
928.3
Amount
72.8
73.64
51.15
9.24
26.55
4.29
8.19
245.86
2.45
248.31
37.25
285.55
285.55
Amount
100
715
275
68
1,158
11.58
1,169.58
175.437
1,345.017
1,345.1
Amount
72.8
73.64
51.15
9.24
26.55
4.29
8.19
246.02
2.46
248.48
37.272
285.752
285.8
55
330
780
68
Amount
1,233
12.33
1,245.33
186.8
1,432.13
1,432.1
Amount
2,400
4.35
52.5
.91
.75
1.44
7.8
7.5
9.1
16.8
408.8
53.2
131.6
2,059.03
20.59
3,094.75
464.21
3,558.96
35.58
35.6
Amount
800
1.45
.75
1.44
7.8
7.5
7.8
17.08
408.8
65.8
1,318.42
13.18
1,331.6
199.74
1,531.34
15.31
15.3
Amount
3,600
8.352
181.44
.62
1,350
675
156.6
86.4
1.75
32
392
392
159.6
53.2
1,400
75.6
170.5
90
8.19
84.5
10
1.65
3.84
6.76
8,940.22
89.4
7,125.97
1,354.41
8,480.3803
84.8
84.8
Amount
2,450
5.684
675
52.2
588
11.92
11.2
16.8
193.2
44
392
394.8
20
142.8
42
16.8
93
15
48.6
35.7
.75
1.44
18.2
2.73
4,879.82
48.79
4,928.61
739.29
5,667.9
56.67
56.7
Amount
955.2
1,764
1874.88
2.8
70
210.69
47.197
58.42
93.6
5,076.787
50.76
5,127.547
769.13
5,896.68
5,896.68
QUANTITY ESTIMATION
Road Name :-
Baghima To Tilaidih
1000.00
S.No.
REF.NO
DESCRIPTION OF ITEMS
Nos
2.2
Clearing jungle including uprooting of rank vegetation, grass, brush wood, treesand
saplings of girth upto 30 cm measured at a height of 1 m above ground leveland removal
(a)
C. EARTHWORK
1
2.3
2.4
2.1
2.2
2.5
(C)
2.50
4.1
4.2
For BT Road
3
4.30
Laying , spreading and compacting stone aggregate of specified sizes to WBM (GIII)specifications including spreading in uniform thickness, hand picking , rolling with3
wheeled road / vibratory roller 8-10 tonne in stages to proper grade and camber,applying
and brooming requisite type of screening / binding material to fillupinterstices of coarse
aggregate watering and compacting to the required density.
For BT Road
E. HARD SHOULDER
1
4.1
For BT Road
F. BITUMEN WORK
5.1
Prime Coat
Providing and applying prime coat using hot straight run bitumen of grade 80/ 100
including heating the bitumen, spraying the bitumen with mechanically operated spray
unit fitted on bitumen boiler, cleaning and preparing the existing roadsurface as per
specifications :
5.20
Tack Coat
Providing and applying tack coat using bitumen emulsion (Rapid Setting)complying with
IS 8887-1995, spraying the bitumen emulsion with mechanicallyoperated spray unit,
cleaning and preparing the existing road surface as per specifications:
5.3
5.4
Providing and laying seal coat over prepared surface of road with bitumen heated in bit
98 kg of bitumen of grade 80/100 and blinding surface with 0.90cum of stone aggregate
on 2.36mm sieve) per 100 sqm of road surface including rolling and finishing with powe
6.1
A
(I)
MATION
L(m)
B(m)
1000.00
1000.00
D(m)
UNIT
QUANTITY
4.00
sqm
4000.00
6.000
sqm
Total
6000.00
6000.00
1000.00
1000.00
3.000
0.150
Cum.
450.00
0.675
0.450
cum
607.50
777.12
Cum.
777.12
388.56
Cum.
388.56
dway Cutting
row Pits
3151.20
1000
2.145
0.325
Cum
3151.20
Cum.
1394.25
1000.000
1000.000
4.05
3.750
0.075
Cum
303.75
TOTAL
Cum.
303.75
Grand Total
Cum.
303.75
0.075
TOTAL
Cum.
Cum.
281.25
281.25
1000.000
3.750
0.075
TOTAL
1000.000
1.670
0.170
Cum.
281.25
Cum.
281.25
Sub Total GSB & WBM & Brick Soling:-
Cum.
567.80
1000.000
1000.000
3.750
TOTAL
Sqm
3750.00
3750.00
TOTAL
Sqm
3750.00
3750.00
3.750
1000.000
3.750
TOTAL
Sqm
3750.00
3750.00
h bitumen heated in bitumen boiler fitted with the spray set spraying using
cum of stone aggregate of 6.7 mm size (Passing 11.2mm sieve and retained
and finishing with power road roller all complete.
1000.000
3.750
TOTAL
Sqm
3750.00
3750.00
Sub Total Bitumen Work:-
ification signs
Each
3.00
Sub Total Sign Boards & KM Stones:-
GRAND TOTAL
SAY
Baghima To Tilaidih
1000.00
S.No.
REF.NO
Nos
Clearing grass and removal of the rubbish upto a distance of 50 m outside the periphery
of the area cleared.
2.2
Clearing jungle including uprooting of rank vegetation, grass, brush wood, treesand
saplings of girth upto 30 cm measured at a height of 1 m above ground leveland removal
(a)
C. EARTHWORK
1
2.3
2.4
2.1
2.2
2.5
(C)
2.6
4.1
4.2
For BT Road
4.30
E. HARD SHOULDER
1
4.1
For BT Road
F. BITUMEN WORK
1
5.1
Prime Coat
Providing and applying prime coat using hot straight run bitumen of grade 80/ 100
including heating the bitumen, spraying the bitumen with mechanically operated spray
unit fitted on bitumen boiler, cleaning and preparing the existing roadsurface as per
specifications :
5.20
Tack Coat
Providing and applying tack coat using bitumen emulsion (Rapid Setting)complying with
IS 8887-1995, spraying the bitumen emulsion with mechanicallyoperated spray unit,
cleaning and preparing the existing road surface as per specifications:
5.3
5.4
Providing and laying seal coat over prepared surface of road with bitumen heated in bit
blinding surface with 0.90cum of stone aggregate of 6.7 mm size (Passing 11.2mm sieve
with power road roller all complete.
6.1
A
(I)
PALKOT
L(m)
B(m)
1000.00
1000.00
D(m)
Package No
JH10IRC037
DISTRICT :-
GUMLA
UNIT
QUANTITY
RATE (Rs.)
4.00
sqm
4000.00
3.01
6.000
sqm
Total
6000.00
6000.00
5.46
1000.00
dway Cutting
1000.00
3.000
0.150
Cum.
450.00
157.55
0.675
0.450
cum
607.50
103.4
Cum.
777.12
201.40
777.12
388.56
Cum.
388.56
45.70
3151.20
Cum
3151.20
258.18
Cum.
1394.25
338.97
row Pits
1000
2.145
0.325
1000.000
1000.000
4.05
3.750
0.075
Cum
303.75
TOTAL
Cum.
303.75
Grand Total
Cum.
303.75
Cum.
281.25
0.075
928.30
TOTAL
Cum.
1000.000
3.750
0.075
TOTAL
Cum.
Cum.
1000.000
1.670
0.170
Cum.
281.25
1345.10
281.25
281.25
1432.10
Sub Total GSB & WBM & Brick Soling:-
567.80
928.30
1000.000
3.750
TOTAL
1000.000
Sqm
3750.00
3750.00
35.60
Sqm
3750.00
3750.00
15.30
3.750
TOTAL
1000.000
3.750
TOTAL
Sqm
3750.00
3750.00
84.80
h bitumen heated in bitumen boiler fitted with the spray set spraying using 98 kg of bitumen of grade 80/100 and
(Passing 11.2mm sieve and retained on 2.36mm sieve) per 100 sqm of road surface including rolling and finishing
1000.000
3.750
TOTAL
Sqm
3750.00
3750.00
56.70
Sub Total Bitumen Work:-
ification signs
Each
3.00
5896.68
Sub Total Sign Boards & KM Stones:-
GRAND TOTAL
SAY
42.50
RC037
LA
AMOUNT (Rs.)
12040.00
32781.00
44821.00
70897.50
62815.50
156511.97
17757.19
813576.82
472608.92
1594167.90
281971.00
378309.00
402778.00
1063058.00
527089.00
527089.00
133500.00
57375.00
318000.00
212625.00
721500.00
17690.00
17690.00
4250296.90
LACS.
Baghima To Tilaidih
1000.00
S.No.
REF.NO
DESCRIPTION OF ITEMS
Clearing grass and removal of the rubbish upto a distance of 50 m outside the periphery
of the area cleared.
2.2
Clearing jungle including uprooting of rank vegetation, grass, brush wood, treesand
saplings of girth upto 30 cm measured at a height of 1 m above ground leveland removal
(a)
SubTotal Sett
C. EARTHWORK
1
2.3
2.4
2.1
2.2
2.5
Construction of embankment with approved material obtained from borrow pits with a
lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting
to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause
301.5
(C)
3.14
4.1
4.2
For BT Road
TOTAL
3
4.30
E. HARD SHOULDER
1
4.1
For BT Road
F. BITUMEN WORK
1
5.1
Prime Coat
Providing and applying prime coat using hot straight run bitumen of grade 80/ 100
including heating the bitumen, spraying the bitumen with mechanically operated spray
unit fitted on bitumen boiler, cleaning and preparing the existing roadsurface as per
specifications :
5.20
Tack Coat
Providing and applying tack coat using bitumen emulsion (Rapid Setting)complying with
IS 8887-1995, spraying the bitumen emulsion with mechanicallyoperated spray unit,
cleaning and preparing the existing road surface as per specifications:
5.3
TOTAL
5.4
Providing and laying seal coat over prepared surface of road with bitumen heated in bit
using 98 kg of bitumen of grade 80/100 and blinding surface with 0.90cum of stone agg
retained on 2.36mm sieve) per 100 sqm of road surface including rolling and finishing w
TOTAL
6.1
A
(I)
ROAD CONSTRUCTION
Package No
JH10IRC037
DISTRICT :-
GUMLA
UNIT
QUANTITY
sqm
4000.00
sqm
Total
6000.00
6000.00
RATE (Rs.)
AMOUNT (Rs.)
0.00
0.00
0.00
Cum.
450.00
0.00
cum
607.50
0.00
Cum.
777.12
0.00
Cum.
388.56
0.00
Cum
3151.20
0.00
Cum.
1394.25
0.00
Cum
303.75
Cum.
303.75
Cum.
303.75
Cum.
281.25
0.00
0.00
Cum.
Cum.
Cum.
Cum.
281.25
281.25
281.25
Sub Total GSB & WBM & Brick Soling:-
567.80
0.00
0.00
0.00
0.00
0.00
Sqm
3750.00
3750.00
0.00
Sqm
3750.00
3750.00
0.00
Sqm
3750.00
3750.00
0.00
road with bitumen heated in bitumen boiler fitted with the spray set spraying
face with 0.90cum of stone aggregate of 6.7 mm size (Passing 11.2mm sieve and
ncluding rolling and finishing with power road roller all complete.
Sqm
3750.00
3750.00
Sub Total Bitumen Work:-
0.00
0.00
3.00
Sub Total Sign Boards & KM Stones:-
0.00
0.00
GRAND TOTAL
0.00
e indentification signs
Each
SAY
0.00
LACS.
S.No.
Description
Unit Quantity
0.98
1.09
0.635
1.1
0.65
0.25
1.1
0.65
0.25
0.05
0.3
0.65
0.075
0.15
0.025
0.144
1.8
0.288
0.098
0.9
1.9
980
1000
1000
1090
635
22.5
303
303
303
333.3
196.95
75.75
281.25
281.25
281.25
309.375
182.8125
70.3125
281.25
281.25
281.25
14.0625
84.375
182.8125
3750
3750
3750
281.25
562.5
93.75
3750
3750
3750
540
6750
1080
3750
3750
3750
367.5
3375
7125
Activities
Volume unit
1
Time(da Labour/
ys)
Machine
km
sq.m
2 Dozers
777.12
cum
1
Hydraulic
Excavator
Construction of embankment
with material obtained from
road way cutting
388.56
cum
2 mates
Construction of embankment
with material obtained from
borrow pit
3151.2
cum
10 mates
1394.25
cum
4 mates
303.75
cum
2 mates
WBM grading 2
281.25
cum
2 mates
WBM grading 3
281.25
cum
2 mates
Bitumen work
a) Prime coat
3750
Sq.m.
b)Tack coat
3750
sq.m.
3750
sq.m.
10
DAY 1
activity1
DAY 2
DAY 3
DAY 4
DAY 5
DAY 6
DAY 7
DAY 8
acitivity 2
activity 3
ac
DAY 9
DAY 10
DAY 11
DAY 12
DAY 13
DAY 14
DAY 15
activity 4 & 5
activity 6
DAY 16
DAY 17
DAY 18
DAY 19
DAY 20
DAY 21
DAY 22
DAY 23
activity 7
activity 8
activity 9
DAY 24
DAY 25
DAY 26
DAY 27
DAY 28
DAY 29
DAY 30
activity 10(a)
activity 10(b)
activity 10 c
LABOUR REQUIREMENT
SR NO. PARTICULARS
1 BELDAR
2 COLLIE
3 SAUNDRIES
4 MATE
5 CHOWKIDAR
6 DRIVER
7 BHISHTI
8 MAZDOOR
9 SPRAYMAN
TOTAL AMOUNT
NO. OF DAYS
30
30
30
30
30
30
30
30
30
30
RATE/DAY
280
280
250
400
280
280
280
280
280
QUANTITY
29.03
28.286
47.29
3.211
0.548
0.825
1.32
1
0.06
TOTAL QUANTITY
870.9
848.58
1418.7
96.33
16.44
24.75
39.6
30
1.8
AMOUNT
243852
237602.4
1418.7
38532
4603.2
6930
11088
8400
504
552930.3
Equipment
Sr no. Description
Quantity
1
3
a
Unit
Quantity
Excavation
Hydraulic Excavator
0.04125 day/10 cum 777.12
GSB
Road Roller
WBM
WBM Grade II
vibratory roller 0.033
WBM Grade II
vibratory roller 0.033
Unit
cum
cum
day/cum
281.5
cum
day/cum
281.5
cum
sq.m
uipment
Days
4
Remarks
7 hours working
Rate
per
8000 day
4000 day
10 8 hours working
4000 day
10 8 hours working
4000 day
4000 day
Total cost
32000
0
0
4000
0
0
0
40000
0
40000
0
0
16000