You are on page 1of 36

UNIVERSITI TEKNOLOGI MARA

FACULTY OF ARCHITECTURE, PLANNING & SURVEYING


DEPARTMENT OF SCIENCE GEOMATIC
AP220, BACHELOR IN GEOMATIC SCIENCE (HONOUR)

SUBJECT

SUG 559 : ADVANCE CADASTRAL SURVEYING

TITLE

STRATA TITLE SURVEY

SUPERVISOR

SIR AHMAD NORHISYAM BIN HJ IDRIS

DUE DATE

23 November 2016

LOCATION

KOLEJ TERATAI 2
MUHAMAD SHAHRIZAL BIN ABD RAHMAN

2014569141

MOHAMAD SHAFIQ BIN RAHMAD

2014351267

MEMBERS
NAME

MOHD IZWAN BIN TALIB

2014326993

NUR IKMA BINTI ISMAIL

2014767343

NURUL ATIKAH BT AB AZIZ

2014950629

MARKS:

GROUP MEMBERS

MUHAMAD SHAHRIZAL BIN ABD RAHMAN


2014569141
019 6358142

MOHD IZWAN BIN TALIB


2014326993
011 17567957

MOHAMAD SHAFIQ BIN RAHMAD


2014351267
011 33317789

NUR IKMA BT ISMAIL


2014767343
011 10885494
NURUL ATIKAH BT AB AZIZ
2014950629
016 6922140

ACKNOWLEDGEMENT
This Strata title survey is a course established in field scheme under
cadastral survey for semester fourth syllabus. Practical period is for six weeks at
2

Teratai collage 2. There are a few objectives which have to be full fill by each of
the students. To start the field works, we are required to have appropriate
instruments which are very important to obtain good results. The instrument
used is Total Station, prism, levelling staff and tripod. We are also need to follow
the flow of the procedure wisely so that we will not make any mistakes that will
affect the results that we will obtain soon. The results that have been obtained
do not have any error and it is not that hard to get the correct answer especially
in calculations. In addition, the software that involved in cadastral field is
AutoCAD. A good teamwork are required to make the work goes smoothly and to
prevent any problem involving group member.

TABLE OF CONTENT

Group Members
Acknowledgement
Table Of Content

PAGES
2-4

List Figure
List Table
List Appendix
CHAPTER 1 : Introduction
1.0Strata Title Survey
1.1Objective
1.2Project Background
1.3Site Location
1.4Project Diary
CHAPTER 2 : Literature Review
2.1Introduction To Strata Title Survey
2.2Strata Plan
2.3Guideline Of Strata Survey
2.4Numbering
2.5Share Unit
CHAPTER 3 : Equipment
3.0 Equipment
CHAPTER 4 : Methodology
4.1Process Flow Of Work
4.2Guideline Of Strata Title Survey (KPUP 2002)
4.3 Procedure
CHAPTER 5 : Result And Analysis
5.0
5.1Differential Of Strata Title Survey
5.2Field Book
5.3 Traverse
5.4 C Correction
5.5Linear Misclosure
5.6Detail Result
5.7Solar Observation
5.8Share Unit
CHAPTER 6 : Conclusion
6.0Conclusion
6.1 Individual Comment
List Of Appendix
A. Certified Plan
B. Field Book
C. Certified Strata And Property Plan
D. Other

5
5
5
6
7
8
9
10
10
10
11-12
13
14
15
22
22
23
23
23
24-26
27
28
29
30-31

32

CHAPTER 1 : INTRODUCTION

1.0AIM

To carry Strata Title Survey until Strata Plan produce.


4

1.1OBJECTIVE
To familiar with strata survey on the real environment job according

by the law regulation of cadastral surveying in Malaysia.


To understand the concept and procedure to conduct Strata Title

survey.
To understand how to start Strata Title worked using Panasonic

Toughbook using TSM software.


To produce Location Plan.
To produce Storey Plan.
To produce Certified Strata Plan.

1.2PROJECT BACKGROUND
1.2.1 Title of the project
Strata Titile for Kolej Teratai 2 UITM Shah Alam.
1.2.2 Location
Kolej Teratai 2 UITM Shah Alam.
1.2.3 Duration
We start this practical on 9 November 2016 until 21
December 2016. It takes 5 week to complete our
project. That is because our class on Wednesday.
1.2.4 Date
On 9 November 2016 we start find the point for
traverse. We make this practical in Wednesday and
out of time schedule. Last practical site we make
the solar observation on 21 December 2016. The
submitted report on 23 December 2016.

1.3SITE LOCATION
Kolej Teratai 2 are near of Photovoltaic Monitoring Centre. Also near
to DC. It has 5 floors conclude the basement. There are including
staff resident house at 1st floor. It also has their parking lot. Refer to
(figure 1.0 ).

Figure 1.0 : Shown the location of kolej teratai 2 in the traverse line.

1.4PROJECT DIARY
DATE
9
2016

November

ACHIEVEMENT
Briefing about practical survey by Sir Ahmad Norhisyam bin
Hj Idris
Briefing at site regarding :

Working procedure
Reconnaissance of site location
Marking boundary points of traverse
Today we start doing Traverse survey. There are include 5
16
2016

November

pkt around kolej teratai 2.


We continue the Traverse survey. That is because the data

23
2016

November

that we havd are missing.

24
2016

November

After we have done and close traverse, we start doing the

7
2016

December

Topography surveying and GPS.


Continue the doing the Topography surveying.

When we done with the traverse we start make Dimension


2
2014

December

of building (Strata) after get the permission for the office.

Differential field test


14
2016

December

On last day of practical we make Solar observation. Since


21
2016

December

the weather is good we get 1 set of solar observation.

After 8 week we had completed our Strata Title survey.


21
2016

December

We completed our report and have to submit on 23


22
2016

December

December 2016 to Sir Ahmad Norhisyam Bin Hj Idris.

CHAPTER 2 : LITRETURE REVIEW


2.1INTRODUCTION TO STRATA TITLE SURVEY
Strata title defines as the title issued in respect of parcels in
multi-storeyed

buildings

such

as

condominiums,

commercial

complex, and multi-purpose complex .In other words, it also define


as subdivision of building issue of separates titles under Strata
Titles Act (STA) 1985 for each of the parcel (units) in the building
which has two or more than one storeys located in a single lot
involves the subdivision of the building into parcels or units, each
parcel or unit to be issued a separate title called strata title or an
accessory parcel. Strata title is necessary to guarantee the interest
of every parcel owner and to facilitate transactions in respect of
the parcel. When the building is subdivided, the land on which the
building stands is retained but it will be registered under body that
called as The Management Corporation (MC).
The MC is a corporation that exists automatically as soon the
strata titles to the parcels are registered. MC will be responsible for
payment of the tax of the land, insurance to the building and to
keep in good condition the facilities available in and around the
building. The MC consists of all the purchase body that are
registered as owners of the strata titles of the parcels. When the
strata titles are registered, all the titles are in the name of the
proprietor was last registered as owner of the land.
Strata

development

is

an

important

part

of

property

development in urban areas. Since 1985 when the Strata Titles Act
was introduced, it has been improved greatly to create new
opportunities and facilitate various new developments in urban
areas including phased development, low-cost development and
gated community living. This book is written to provide a simple and
practical guide on the law and practice of strata titles, including the
application and processing of application for issuance of strata titles,
and the management of strata schemes in Malaysia.

2.2STRATA PLAN
A strata plan is a plan comprising of a location and a storey
plan for each building and include a plan on division or
amalgamation of any parcel shown in an approved strata plan. As
amended in Circular of KPUP num. 1/1995; point 2.1 where all of
common properties details must be measured and being shown the
position and the used Strata Plan.
Plan required Strata Title :
o

Strata Plan
A strata plan is a plan comprising of a location
plan and a storey plan and a each building and
includes a plan division or amalgamation of any
parcels shown in an approved strata pan.

Location plan
Specify the lot number, title number and area
the lot.
Delineate the boundaries and boundary marks of
the lot and the position of the building theorem,
showing which of these building are to be subdivided.
Includes a vertical section from front view of
each building showing the floor and ceiling of
each storey and the height of each storey.

Storey Plan
Specify the lot number, title number and storey
number to which the plan relates.
Delineates each proposed parcel and defined
the boundaries by reference to floor and walls
showing the horizontal dimensions without it
being necessary to show the bearing.
Indicate in respect of each parcel the number by
which it is described in Form 1.
Specify the approximate floor area of each
parcel.
Distinguish such parts as are not to be include in
any of the parcel but are to become part of
common property.
Contain such other details as necessary,
according to Survey regulation.

2.3GUIDELINE OF STRATA SURVEY


2.3.1 Resurvey the lot Boundary
All the lot boundaries have to be survey
according to latest Survey Regulation. Purpose is o
make sure that old boundary mark are in position. If
old boundary marks are not in position, refixation and
if necessary new certified plan is need.
2.3.2 Survey to Determine the Position and Orientation of the
Building
Building offset is done by survey the location of
the each building include eaves, awning and
provisional block are stated. The most important is the
position for all building or lands that have finished
provisional block are in the lot.
2.3.3 Determine of Each Storey
The measurement is done and recorded to nearest
0.01 m.
2.3.4 Measure the Horizontal Dimension of Each Parcel
Thick of wall party wall is measured at the middle
of the floor, walls and ceiling unless otherwise stated in
the building plan and it is drawn and in survey field
book.
2.3.5 Survey of Parcel of Floor for The Dimension
The measurement is done and recorded to
nearest 0.01 m and it is measured from wall surface.
2.4NUMBERING
2.4.1 Numbering Of Buildings
Buildings will be numbered serially with the prefix M.
As we have only 1 building, we will number it as M1.
2.4.2 Numbering Of Storey
Storey above the ground level will be numbered
consecutively upwards i.e storey 1,2,3, 4,5(the
highest storey for Applied Science)
2.4.3 Numbering Of Parcels
There shall be only one series of parcel numbers in
each strata scheme. The parcels are numbered
serially beginning from the lowest storey in the
building, including the basement storey, going
upwards. The numbers are unique that it cannot be
repeated.
2.5SHARE UNIT

10

Share unit been assigned to the parcel by the developers


licensed land surveyor based on the features that exist on the
strata building where the share unit are being approved by the
director referring to the section 18 from the Strata Titles Act 1985.
3. CHAPTER 3 : EQUIPMENT
3.1EQUIPMENT
EQUIPMENT

FUNCTION

QUANTITY

Total Station

Total Station is used to


measured distance and
bearing.

Tripod

Tripod is used to place


the total station and
prism on top of it

Prism

Reflect a wave to get


bearing
and
distance
reading

Pole

To support mini prism

11

Mini Prism

It used to measure the


height of selected object.

Distometer

It used to measure the


width, length and height
of the building.

GPS

That is to found the 2


coordinate for find the
baseline.

12

4. CHAPTER 4: METHODOLOGY
4.1PROCESS FLOW OF WORK

PREPARE SURVEY
DATA (PDUK)

RECONNAISSANC

START WORK WITH


DATUM

TRAVERSE

OFFSET

SOLAR

DETERMINE
DIMENSION OF
BUILDING

PROCESS DATA
(CALCULATE SHARE
UNIT)

PRODUCE PLAN

13

4.2GUIDELINE OF STRATA TITLE SURVEY (KPUP 2002)


4.2.1 Resurvey the lot Boundary
Lot boundaries have to be survey according to latest
Survey Regulation.
Boundary marks which are found to be out of position
or lost are to be refixed or replaced.
If required, a new certified plan for the lot to be
drawn.
Digital data for the survey must be submitted
according to format and medium of the Survey
Department.
4.2.2 Survey to Determine the Position and Orientation of the
Building
Survey work to determine the height of each storey is
to be carried out and recorded to the nearest 0.01 m.
It is sufficient to measure the difference between the
levels of each floor using tape thorough the stairs or
any suitable section of the building. However, the use
of higher technology equipment like EDM and Total
Station is permitted.
4.2.3 To Measure the Horizontal Dimension of Each Parcel,
Accessory Parcels and The Common Property
All measurements have to be recorded to the nearest
0.01 m.
It is sufficient to measure the horizontal dimensions
from the surface of the walls. However the use of
EDM OR Total Station equipment is allowed.
The thickness of the walls must also be determinate
and drawn in the field book taking into consideration
the non _ uniformity of the thickness of the walls.
The position of all accessory parcels outside the
building has to be determinate by referring to the
appropriate building in strata scheme.
It is sufficient for measurements of the common
property be carried put to determine the limit of the
perimeter area covered for the common property
except in case related with access in which its
measurement must carried out in more detail and
their use stated in field book.
The introduction of the relevant floor, building and
the north direction has to be shown in for each figure.
14

4.3PROCEDURE
4.3.1 Reconnaissance
Our strata title survey work is held at Kolej Teratai 2
UITM Shah Alam. On the first day we there, we survey the
located the blocks. The blocks are surrounded by building
facilities in Uitm such as bank, food court and all. The
building contains 6 storey with 23 parcels for every level.
Next, based on certified plan, we found 20 systematically,
we decide the datum for the traverse and position of pickets
for the traverse and planned to pick up the boundary marks.
A. Preparation of field work :
a. Find the location of survey.
b. Selecting the best station to perform solar
observation.
c. Find the nearest boundary mark ang TBM to the
survey site.
d. Understanding the purpose of the project.
e. Understanding the purpose of the survey.
f. Planning the best method of survey in term of
accuracy, economical, time factor, man power
tobe used, details to be survey and preparations
of site plans.
B. Guidelines to survey for Strata Title :
a. Resurvey of lot boundaries.
b. Survey the position of the buildings, example
eaves, awning and balcony.
c. Determine heights of each storey where to
measure the difference between the levels of
each floor.
d. Measure the horizontal dimensions of the
parcels and the common property (like stairs).
e. To survey of parcels on the floors which are
similar in dimensions the thickness of the walls.
f. The measurements recorded nearest 0.01 m.
g. The features of permanent construction such as
planter box, space for air conditioner and space
in front of main door with features of permanent
construction.
h. It is sufficient to measure the horizontal
dimensions from the surface of the walls.

15

4.3.2

DIFFERENTIAL FIELD TEST

i.

A straight line L1 was measured at about 50m marked two

ii.

point as A and B
Firstly, total station was set up at point A and end of the line
and the prism at point B at another end of the line.
Prism
B

Total Station
A
L1

iii.

Then, total station was moved to the centre of the line and
marked as point C. Prism were set up at each point A and
point B.

Prism
A

L2
iv.

Prism
B

Total Station
C

L3

L1
The measured distance was calculated to find the error.

4.3.3 DATUM
16

According to KPUP Circular number 3, 2003, each


cadastre or title survey needs to be based on a satisfied
datum. Every cadastral survey should be start with datum.
There are three criteria of datum:
1. Two reference mark which is adjacent from survey
had done before which is the position of that
reference mark were approved in good position with
direct survey or traverse and with a calculation and
with solar observation follow the JUPEM procedure.
2. Three reference mark from survey had done before
which is two from that reference mark are adjacent
were approved with the measurement of angle and
distance or with traverse and calculation are in a
good position.
3. Any two reference mark from survey had

before

which is had approved in a good position by using


GPS method.
The tolerance for the certified datum is the distance for
line datum should more than 30m. if the line is less than
40m, then the maximum tolerance is 0.015m. If the line is
more than 40m, the tolerance is 0.006m for every 20m and
the maximum tolerance is 0.05m. The interior angle between
two line PA and measure should less than 10. But the
conditions can be changed to not exceed 20 if the old survey
was made in second class survey. The procedure of datum
that show as follow:
i.
ii.

Found boundary mark near to the site.


Check if the boundary mark is satisfied to the limit

iii.

of displacement.
Then the boundary mark satisfied to the criteria of

iv.

the datum used as a datum.


Set up Total Station at station 2 and prism at

v.

station1 as back bearing.


Observed the distance between this two boundary

vi.

marks which more than 30m.


Compared the observed distance with distance in
Certified Plan.
17

vii.

After found a good datum, start do the traverses


refer to that datum.

4.3.4 TRAVERSE SURVEY


Traversing is form of a control survey that is used in a
wide variety of surveys. Traverses are a series of established
stations that are linked together by the angle and distance
between adjacent points. The angles are measured by Total
Station, and the distances are measured by an EDM. The
function of total station is combination both of these
functions. The instrument used are:
Total Station
Prism
Tripod
Allowable Error:
The survey has to make sure the work they did
meet the requirement given by the survey
department.

The

maximum

misclosure

in

cadastral survey is below:


o The bearing closed for the traverse must
not exceed 115 where for each station
o

have maximum C correction 10.


The minimum linear misclose obtained is

1: 8000 for first class of survey.


C correction
o The different between the first and the
last bearing reading for the same traverse
line within 115 (usually it is the
reading

of

Certified

Azimuth).

These

different then divided to each station and


the value of correction is cumulative to
the end.
M correction
o The
value

from

different

bearing

observation and the bearing Certified


Plan.

This

value

then

is

added

or

deducted to each station. The value


applied is same to each station.
18

A. Procedure of Traverse and Pick Boundary Mark


a. Station 1 and Station 2 are set with assumed
bearing.
b. Station 2 are set back bearing.
c. Total Station 1 set the back bearing to station
2 though face left then read the forward
bearing station 3.
d. The observation are recorded. Then change
to face right.
e. Total station on station 1 set the back bearing
to station 2 and read the forward bearing
station 3.
f. The observation are record in the field book.
g. During make the traverse, pick up offset of
the building.
h. Then the Total station move to station 3 and
i.

set station I as back bearing.


The step repeat until the traverse closed.

Figure 4.3 Image of traverse.

4.3.5 OFFSET SURVEY


Each of building must be take the offset from the traverse
line. This offset used to plot the location plan of building.
The offset is taken as ordinary where the offset is taken from
the station of traverse. The offset must be take follow the
corner of the building, the stairs and drainage. The offset
must be taking around the building. The instrument used
are:
Total Station
19

Prism
Mini prism and pole
Tripod
A. The procedure:
a. Set up instrument at station, back bearing
and start to observe for each building and
access road of the of Kolej Teratai 2 using
pole with mini orism.
b. Each visible edges

of

the

building

are

observed by making the mini prism as the


reflector.
c. The regarding of the edges of the building
and access road comprises of horizontal
bearing and horizontal distance is taken and
recorded in field book.
d. The shape of building and access road will
be taken.
e. The same step is repeated until the whole
building is covered.

Diagram offset
4.3.6 STRATA TITLE SURVEY
A. Survey to determine the heights of each storey.
a. To measure the height of each storey, we can
use distometer to determine the height, width
and length of the building.
b. The distometer was directed to the place that
needed to measure until laser dot visible.

20

c. To measure the horizontal dimensions of the


parcels, accessory parcels and the common
property.
d. The horizontal dimension from the surface of the
walls to the opposite walls can be measured by
using distometer or even the measuring tap.
e. All measurements have to be recorded to the
f.

nearest 0.01 meter.


The thicness of the wall must also be surveyed
and drawn in the field bbok as the thickness of

the walls are not uniform.


g. The position of all accessory parcels outside the
building has to be determined by referring to the
appropriate building in the strata scheme.
h. It is sufficient for measurements of the common
property be carried out to determine the limit of
the perimeter area covered for the common
property except in the case related with access
or laluan in which its measurements must be
carried out in more detail and their use stated in
i.

the field book.


The introduction (title) of the relevant floor,
building and the north direction has to be shown
for each figure.

B. Survey of parcels on the floors which are similar in


dimensions.
a. Each parcel whether on the floor which has
similar dimensions has to be surveyed.

5. CHAPTER 5: RESULT AND ANALYSIS


5.1DIFFERENTIAL OF STRATA TITLE SURVEY
Different Field Test:
Station 1-2: 46.047m
Station 1 A: 31.064m
A-station 2: 14.982m
21

DFT: (31.064+14.982)-46.047m = 0.001m


5.2FIELD BOOK

File
Number
:

teratai 2

2.
BEARING / SUDUT
Stesen

Penyilang
Kiri

Penyilang
Kanan

Garis
Asas

2
1

000 00 02

180 00 02

287 27 30

107 27 35

107 27 32

287 27 32

309 18 21

129 18 21

129 18 21

309 18 21

Bearing
Muktamat

Stn

Sudut
Pugak

Jarak

000 00 02

000 00 00

090 02 22

30.867

M 000 00 00

Pkt

Pkt

269 57 51

30.867

287 27 32

089 10 37

46.047

Pkt

270 49 32

46.047

090 22 36

66.921

Pkt

269 37 35

66.921

091 29 10

45.902

Pkt

268 31 00

45.903

089 25 04

77.000

Pkt

270 35 11

77.001

287 27 30

309 18 21

309 18 20

055 58 54

055 58 50

M 000 00 00

Pkt (Terabas)

Jarak
Tarikh
Muktama
Dan Masa
t
18 Nov
2016
14:59:07

18 Nov
2016
15:09:08

30.867

46.042

18 Nov
2016
15:28:24

66.920

18 Nov
2016
15:45:32

45.903

C 000 00 00

055 58 54

235 58 53

235 58 54

055 58 54

131 30 05
M 000 00 00

Pkt (Terabas)
131 30 06

Stn

C 000 00 00

Purata

M 000 00 00

Pkt (Terabas)

Ke

C 000 00 00

GARISAN

M 000 00 00

Pkt (Terabas)

Dari

131 30 10

18 Nov
2016
15:56:17

77.000

C 000 00 00
311 30 04

5.3TRAVERSE
6.

BEARING CLOSE STATEMENT REPORT


7.
File
Number

teratai 2

22

:
8.
1

Garisan
Sepatutnya
Tikaian
Pembetulan

2-1

dibaca
dibaca
Ialah
Ialah

179 59 59
180 00 02
- 000 00 03 dlm 5 stn iaitu 1,3,4,5,2
+ 000 00 01 Sestesen.

5.3C CORRECTION

CORRECTION COMPARISON REPORT


File
Number
:

teratai 2

From Stn

Occ Stn

To Stn

Correction
No

Value Per
Stone

Index

Correction
Type

Start Station

Line Code

000 00 01

12

000 00 01

12

000 00 01

12

000 00 01

12

000 00 01

14

5.4LINEAR MISCLOSURE
Missclosure: 1:18625

23

5.5DETAIL RESULT
Station 2
no
1
2
3
4
5
6
7
8
9
10
11
12
13
14

Bearing
21 54 48
356 26 35
350 40 23
198 00 54
277 03 59
261 16 16
251 28 51
250 20 58
306 54 30
31 21 54
46 09 42
27 31 59
351 19 12
347 37 47

Distance
30.225
30.211
30.864
21.246
11.531
13.789
13.617
10.824
13.920
15.715
25.205
31.264
21.323
25.853

Mark
Bt1
Bt1
Bt1
Bt2
Bt2
Bt2
Bt2
Bt2
Jln
Jln
Jln
Jln
Jln
jln

Bearing
291 26 57
47 35 12
67 10 34
67 03 48
245 15 12
299 13 02
335 25 03
56 18 17
168 10 50
76 59 36
121 24 39

Distance
21.228
17.386
15.535
11.221
4.468
5.233
2.806
1.511
10.028
9.432
10.932

Mark
Bt2
jln
Jln
Jln
Jln
Jln
Jln
Jln
Jln
Jln
Jln

Station 1:
no
1
2
3
4
5
6
7
8
9
10
11

24

Station 3:
no
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

Bearing
84 51 06
320 17 43
289 25 34
266 56 22
312 52 24
94 58 54
102 28 04
103 46 33
136 53 19
124 40 17
112 19 57
101 00 17
83 49 19
108 04 04
299 57 10
305 31 36
255 44 53
216 34 28
209 15 34
233 52 16
234 42 06
233 27 59
154 58 00
144 52 30
121 20 05
128 36 52

Distance
21.801
43.161
12.620
13.395
44.300
20.450
20.600
24.101
7.690
8.478
8.330
7.559
6.058
4.967
25.020
25.251
15.755
13.287
17.639
17.325
18.842
21.305
18.935
15.134
26.475
29.697

Mark
Bt2
Bt2
Bank
Bank
Jln
Jln
Jln
Jln
Jln
Jln
Jln
Jln
Jln
jln
Jln
Jln
Jln
Jln
Jln
Jln
Jln
Jln
Jln
Jln
Jln
Jln

25

Station 4:
no
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

Bearing
76 24 18
124 00 19
196 04 39
32 22 53
49 38 08
134 57 32
138 52 20
197 38 34
196 23 11
203 13 43
208 29 06
210 59 02
205 54 21
133 40 28
152 21 26
224 18 44
278 22 17
304 06 43
353 44 31
10 42 34
21 35 50
6 52 52
19 14 33
30 08 07
37 45 52

Distance
13.270
18.970
15.524
45.212
38.837
33.760
34.478
12.522
10.042
10.185
10.898
12.996
16.016
5.952
3.740
2.005
3.328
5.299
21.919
23.859
24.087
33.564
33.018
36.084
43.287

Mark
Bt2
Bt2
Bank
Bt1
Bt1
Jln
Jln
Jln
Jln
Jln
Jln
Jln
Jln
jln
Jln
Jln
Jln
Jln
Jln
Jln
Jln
Jln
Jln
Jln
Jln

Distance
21.001
23.295
22.115
22.251
18.431
13.789
39.199
4.627
39.035
36.647
40.629
58.200
49.736
54.424
46.185

Mark
Bt2
Bt2
Bt2
Bt2
Bt2
Bt1
Jln
Jln
Jln
Jln
Jln
Jln
Jln
jln
jln

Station 5:
no
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Bearing
204 26 02
200 13 50
195 34 09
194 26 03
190 29 09
339 51 55
139 11 19
252 38 06
285 12 13
283 19 27
289 55 13
257 00 52
257 58 25
308 17 54
309 52 39
5.6SOLAR OBSERVATION

26

Waktu

Ufuk

180

00

"
00

09

325

21

09

10

324

09

10

09

11

09

P.Ki.

T.R.

P.Ka

Purata 1

T.R.

Pugak / Zenit

Gelembong

Zenit

"

26

64

41

30

47

38

64

33

10

144

51

33

29
5

36

32

145

29

52

29
5

43

58

00

02

Ki

Ka

09:10:00
1:10:00 UT

09

25

31'

Purata
Ke matahari

325 07 37

01

Purata
Ke TR.

180 00 01

25

29'

27"
42
45"

180

00

00

18

326

00

32

62

43

59

09

18

325

25

43

39

21

09

19

145

28

01

33

19

09

19

146

08

03

62
29
7
29
7

38

40

00

01

P.Ki.

P.Ka

Purata 2
J

T.R.

T.R.

09:18:30
1:18:30 UT

Koordinat:

27

27'

Purata
Ke matahari

325 45 35

01

Purata
Ke TR.

180 00 01

27

25'

Origin

U/
S

55960.950

Koordinat:
Origin

T/B

10"
32
38"

-21759.480

27

U/
S
U/
S

Stese
n

Jum/Sel.

Jum/Sel. x 0.03256

-11580.029

-67540.979

G. Lintang Origin U

G. Lintang Stesen U

36'

Jum/Sel.

49.
0

T/B

-22828.453

T/B

-1068.973

Sel. G.Bujur + Jum./Sel. x 0.03246

34.7'
'

Sel. G. Bujur x Sain G. Lintang =

1.9''

39"
40

04'

Stesen

T (-) / B (+) Tirusan =

10"

0 00'
02"

Penilikan 1
Sudutistiwa
pada
jam U.T.
U/S

23

26

02

Selisih

00

00

Sudutistiwa
pada waktu
penilikan
U/S

Jarak
kutub
= P
G.
Lintang
=

23

26

02

113

26

02

04'

10"

25

29

45

Azimut Matahari
yang dikira

117

49

38

Azimut
(Purata ke matahari)

325

07

37

207

18

00

180

00

01

Tinjah dilaras =

Selisih = Az - Tilikan

T.R. yang ditilik


(Purata ke TR)

T.R. Sebenar
(Sel + T.R. yang
ditilik)

332 42 00

Aras
Tirusan
Bering Gerid T.R.
Purata Bg. Gerid T.R.

00

02

332 42 02
332 42 05

28

Penilikan 2

29

23

26

02

00

00

23

26

02

113

26

02

G.
Lintang
=

04'

27

25

38

118

27

31

325

45

35

207

18

04

180

00

01

10"

332 41 57

00

02

332 41 59
332 42 05

Purata Bg. Gerid T.R.

Ditilik oleh

rizal

Dihitung oleh

rizal

Tarikh

21 Disember 2016

30

5.7SHARE UNIT
Share units of parcel = (A x F1 x F2) + (B x F3)
Share units of land parcel = (A x 0.8) + (B x F3)
where,
(a) A is the area of the parcel;
(b) B is the area of the accessory parcel;
(c) F1 is the weightage for the type of parcel as specified in
Schedule A;
(d) F2 is the weightage for the overall floor parcel as specified in
Schedule B; and
(e) F3 is the weightage for the accessory parcel as specified in
Schedule C.

31

6 CHAPTER 6 : CONCLUSION
6.4CONCLUSION
In conclusion, Under The Strata Title Act (STA) 1985, subdivision of
building means the issue of separate titles which are called strata titles for
each of the parcel (unit) in the building which are called strata titles for
each of the parcel (unit) in the building which has two or more storey.
When the building is subdivided, title to the land on which the building
stands is retained but it will be registered under a body called the
Management Corporation (MC) that existed automatically as soon as the
strata title to the parcels are registered.
Strata titles can be said as one of the title structure of ownership
and control over property. It is usually applied to subdivided buildings or
complexes such as high-rise buildings, town houses, duplexes, flats,
apartments, condominiums and commercial buildings. This form of title
gives individual unit holders title over the space they occupy while the
land

and

common

property

are

controlled

by

the

Management

Corporation. Strata schemes are designed to give property owners more


control over the space they occupy. The structure of strata titles
designates the Management Corporation as the owner of the land. Strata
titles act been introduced in order to give guidance or restriction to the
developer and surveyor and also to make the development of building is
legal and any improvement or amendment in strata title act is needed in
order to fulfill the needed of society.

32

6.5INDIVIDUAL COMMENT
NAME

COMMENTS

MUHAMAD

In this practical, using strata survey such as how to

SHAHRIZAL

BIN

ABD RAHMAN
2014569141

determine the position of the building and the provisional


blocks, determine the heights of each storey, measured the
horizontal dimensions of the parcels or land parcel and
accessory parcels. During working with my team, I have
learned teamwork is really important where we try to
understand each other strong and weakness. We try to
solve for every problem occur through discussion time
especially during facing problem about toughbook. I am
thankful my team has finished the task as time given. I
hope this experience I get, help me to face the real job in
the future.

MOHD IZWAN BIN

During this practical, I have learnt a lot a new skills whether

TALIB

on the field or during the processing part. This truly

2014326993

improved and strengthened my knowledge in this field.


During the fieldwork phase, we conducted work using
toughbook. We also faced some problem with toughbook.
The time we had mainly to do solar observation is limited. I
can say that this fieldwork have given me a lot of
experience needed and apply what have learnt in class. Not
to forget to my group members for the commitment given
by them in cooperating to complete this task.

MOHAMAD SHAFIQ

From this field scheme, I had learnt a lot knowledge and

BIN RAHMAD

experience such as do traversing around the building and

2014351267

do

the

detailing.

For

measurement

of

building

and

dimension, we used disto meter, record and drawn it in


field book. After finish all field work we start out data
processing. First we calculate linear misclose our traverse.
Lastly we use AutoCAD to produce strata plan and certified
plan The output of our work is strata plan following the
JUPEM specification. From this task, our big challenging is
toughbook, because of toughbook our data is missing and
33

then we must do our traverse again. To improve a quality of


practical task in the future, we must ensure the instrument
in a good condition. My group members give a good
attitude during this practical.

NUR

IKMA

BT

ISMAIL

During the fieldwork phase, many a new that I have learnt


such as do the traversing around the building, determine
the heights for each storey, using the disto meter, how to
calculate unit share and produce the strata plan. Being

2014767343

exposed regularly to the site environment on the real job


and need to be independent to settle up any problem at
site. For this task we are going to use the toughbook for
record our data. The new thing that I have learned from this
task such as get to know how decimals are in plan and field
book. Another experience is relationship as a team work
during the survey which is not work and it must have a
conflict with instrument.

NURUL ATIKAH BT

On the practical, I have learned a lot of experience about

AB AZIZ

running strata title survey. In this fieldwork has helped me


in improving my knowledge on handling strata title survey.
In strata survey, has five step to be followed. Firstly, we

2014950629

should resurvey lot boundary, then survey for determine


the position and orientation of the building. Thirdly, we
have to determine the high of each storey, then we can
measure the dimension of each parcel. Last step is we
should survey of parcel of floor for the dimension. During
this practical session, we encounter some problem with us
to complete the work quickly due to time limitation of our
fieldwork and toughbook not in a good condition. My group
members

give

good

attitude,

cooperation

and

commitment until finish this job.


7

34

APPENDIX
A. OTHER

Group member while doing observation.

GPS observation coordinate

35

Report making.

36