DATOS PARA VALORIZACION MODELO

RESIDENCIA DE OBRA
VALORIZACION N01 DE OBRA
MES

31/11/2016

ENTIDAD:

MUNICIPALIDAD DISTRITAL DE HUAYL

OBRA:

"SERVICIO DE LA CULMINACION DE RETIRO


EXTERNO DE LA PARTE FRONTAL DEL COLI
SUS ACCESORIOS (1,345.48 ML), RETIRO DEL
CHAPAS LAS PUERTAS (11), MEJORAMIENTO
LA PARTE DE LOS CAMERINOS (VARONES Y
TODO MATERIAL EXCEDENTE"

UBICACIN:
CONTRATISTA
INSPECTOR DE OBRA:
RESIDENTE DE OBRA:
PROCESO DE SELECCIN - OBRA

HUAYLLAY - PASCO - PASCO


LUIS ALBERTO PICOY ALVARADO SERV
ING. MANUEL NIETO MONTALVAN
ING. MANUEL NIETO MONTALVAN
AS-SM-5-2016-MDH-1

PRESUPUESTO BASE:
PRESUPUESTO CONTRATADO:
MONTO DEL CONTRATO SIN IGV
MONTO DEL FORMULAS
GASTOS GENERALES
UTILIDAD
FACTOR DE RELACION:

S/. 100,000.00
S/. 99,900.00
S/. 99,900.00
10.00%
10.00%
0.999

RESIDENTE:
ENTREGA DE TERRENO
ENTREGA DE ADELANTO DIRECTO
FECHA DE INICIO PLAZO CONTRACTUAL
PLAZO CONTRACTUAL:
FECHA TERMINO CONTRACTUAL:

ING. OMAR AUGUSTO HIDALGO QUISPE


10/13/2016
0.00
10/14/2016
45 DIAS CALENDARIO
11/28/2016

FECHA DE P.B.
FECHA DE REAJUSTE:
AREA GEOGRAFICA:
MES DE VALORIZACION

Sep-13

ADELANTO EN EFECTIVO
MONTO DEL ADELANTO
MONTO DEL ADELANTO SIN IGV
FECHA DEL ADELANTO

3
Nov-16

S/. 0.00
S/. 0.00
S/. 0.00

ADELANTO POR MATERIALES


MONTO DEL ADELANTO
MONTO DEL ADELANTO SIN IGV
FECHA DEL ADELANTO

VALORIZACION MODELO
DENCIA DE OBRA

AD DISTRITAL DE HUAYLLAY

A CULMINACION DE RETIRO DEL POLICARBONATO Y COLOCACION DE CALAMINON CON SUS ACCESORIOS DE LA PARTE DEL CENTR
PARTE FRONTAL DEL COLISEO (FACHADA 500.00 M2), REPARACION DEL TANQUE ELEVADO Y SUS ACCESORIOS COMO EL CIRCUITO
S (1,345.48 ML), RETIRO DEL MACHIEMBRADO DE LA PARTE ELEVADA DE LAS TRIBUNAS Y VACIADO DEL CONCRETO PULIDO CON O
ERTAS (11), MEJORAMIENTO DE LOS SS.HH. DE LA PARTE DE LOS CAMERINOS (VARONES Y MUJERES) COMO TAMBIEN EL MEJORAM
S CAMERINOS (VARONES Y MUJERES) COMO TAMBIEN EL MEJORAMIENTO DE LOS SS.HH, VARON MUJER (DEBAJO DE LAS TRIBUN
L EXCEDENTE"

ASCO - PASCO
PICOY ALVARADO SERVICIOS GENERALES EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADA
NIETO MONTALVAN
NIETO MONTALVAN
MDH-1

GUSTO HIDALGO QUISPE

NDARIO

10908365.33

OS DE LA PARTE DEL CENTRO (1,804.00M2), PINTADO


SORIOS COMO EL CIRCUITO DE AGUA POTABLE Y
L CONCRETO PULIDO CON OCRE ROJO, CAMBIOS DE
MO TAMBIEN EL MEJORAMIENTO DE LOS SS.HH DE
R (DEBAJO DE LAS TRIBUNAS) Y ELIMINACION DE

TADA

#REF!

DATOS GENERALES DE LA O
OBRA

ENTIDAD:
CONTRATISTA
INSPECTOR
RESIDENTE
FECHA

:
:
:
:
:

ACCESORIOS COMO EL CIRCUITO DE AGUA POTABLE Y SUS ACCESORIOS (1,345.48


LAS TRIBUNAS Y VACIADO DEL CONCRETO PULIDO CON OCRE ROJO, CAMBIOS DE
LA PARTE DE LOS CAMERINOS (VARONES Y MUJERES) COMO TAMBIEN EL MEJORAM
MUNICIPALIDAD DISTRITAL DE HUAYLLAY
LUIS ALBERTO PICOY ALVARADO SERVICIOS GENERALES EMPRESA INDIVIDUAL DE
ING. MANUEL NIETO MONTALVAN
ING. OMAR AUGUSTO HIDALGO QUISPE
Nov-16

Entidad Ejecutora

2
3
4

Ubicacin
rea Geogrfica
Obra

:
:
:

5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

Contratista
Residente de Obra
Inspector de Obra
Financiamiento
Cdigo y tipo de proceso de seleccin
Modalidad
Presupuesto Base y Fecha (Con IGV)
Presupuesto Base y Fecha (Sin IGV)
Contrato N y Fecha
Monto del Contrato (Con IGV)
Monto del Contrato (Sin IGV)
Plazo de Ejecucin Propuesto por Contratista
Plazo de Ejecucin segn Bases de Adjudicacin
Adicionales de Obra N 1 (Con IGV)
Total Adicionales de Obra (Con IGV)
Deductivos de Obra (Con IGV)
Monto de la Inversin (Con IGV)
Monto de la Inversin (Sin IGV)

:
:
:
:
:
:
S/.
S/.
:
S/.
S/.
:
:
S/.
S/.
S/.
S/.
S/.

23
24
25
26

Adelanto Directo (Con IGV)


Adelanto Directo (Sin IGV)
Fecha de Pago Adelanto Directo
Fecha Entrega del Terreno

S/.
S/.
:

27
28
29

Inicio Oficial del Plazo


Trmino de Obra
Penalidad por Mora en la Ejecucin de la Obra Art. 165 RLCE

:
:
:

#REF!

NERALES DE LA OBRA

S ACCESORIOS (1,345.48 ML), RETIRO DEL MACHIEMBRADO DE LA PARTE ELEVADA DE


OCRE ROJO, CAMBIOS DE CHAPAS LAS PUERTAS (11), MEJORAMIENTO DE LOS SS.HH. DE
MO TAMBIEN EL MEJORAMIENTO DE LOS SS.HH DE LA PARTE DE LOS CAMERINOS

MPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADA

"SERVICIO DEMUNICIPALIDAD
LA CULMINACION
DE RETIRO
POLICARBONATO Y
DISTRITAL
DE DEL
HUAYLLAY
COLOCACION DE CALAMINON CON SUS ACCESORIOS DE LA PARTE DEL
CENTRO
(1,804.00M2),
HUAYLLAY
- PASCO
- PASCO PINTADO EXTERNO DE LA PARTE FRONTAL DEL
3 COLISEO (FACHADA 500.00 M2), REPARACION DEL TANQUE ELEVADO Y SUS
ACCESORIOS COMO EL CIRCUITO DE AGUA POTABLE Y SUS ACCESORIOS
(1,345.48 ML), RETIRO DEL MACHIEMBRADO DE LA PARTE ELEVADA DE LAS
TRIBUNAS Y VACIADO DEL CONCRETO PULIDO CON OCRE ROJO, CAMBIOS DE
CHAPAS LAS PUERTAS (11), MEJORAMIENTO DE LOS SS.HH. DE LA PARTE DE
LUIS
ALBERTO PICOY
ALVARADO
SERVICIOS
GENERALES
INDIVIDUAL
LOS CAMERINOS
(VARONES
Y MUJERES)
COMO
TAMBIENEMPRESA
EL MEJORAMIENTO
DEDE RESPONSABILIDAD
LOS
SS.HH
DE LA PARTE
DE LOS
CAMERINOS (VARONES Y MUJERES) COMO
ING.
OMAR
AUGUSTO
HIDALGO
QUISPE
TAMBIEN
EL
MEJORAMIENTO
DE
LOS
SS.HH, VARON MUJER (DEBAJO DE LAS
ING. MANUEL NIETO MONTALVAN
TRIBUNAS) Y ELIMINACION DE TODO MATERIAL EXCEDENTE"
CANON, SOBRE CANON Y REGALIAS MINERAS
AS-SM-5-2016-MDH-1
SUMA ALZADA
100,000.00
99,900.00
CONTRATO N 001 -2016/MDH
99,900.00
99,900.00
45 DIAS CALENDARIO
45 DIAS CALENDARIO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
10/13/2016

10/14/2016
2/10/2017

VALORIZACIN DE MANTENIMI

"SERVICIO DE LA CULMINACION DE RETIRO DEL POLICARBONATO Y COLOCACION DE CALAMINON CON SUS ACCESORIOS
(FACHADA 500.00 M2), REPARACION DEL TANQUE ELEVADO Y SUS ACCESORIOS COMO EL CIRCUITO DE AGUA POTABLE
TRIBUNAS Y VACIADO DEL CONCRETO PULIDO CON OCRE ROJO, CAMBIOS DE CHAPAS LAS PUERTAS (11), MEJORAMIEN
MEJORAMIENTO DE LOS SS.HH DE LA PARTE DE LOS CAMERINOS (VARONES Y MUJERES) COMO TAMBIEN EL MEJORAMIEN
EXCEDENTE"

MANTENIM.

EJECUTA
RESIDENTE
INSPECTOR
UBICAC.

"SERVICIO DE LA CULMINACION DE RETIRO DEL POLICARBONATO Y COLOCACION DE CALAMINON CON SUS ACCESORIOS DE LA
REPARACION DEL TANQUE ELEVADO Y SUS ACCESORIOS COMO EL CIRCUITO DE AGUA POTABLE Y SUS ACCESORIOS (1,345.48 ML)
ROJO, CAMBIOS DE CHAPAS LAS PUERTAS (11), MEJORAMIENTO DE LOS SS.HH. DE LA PARTE DE LOS CAMERINOS (VARONES Y M
COMO TAMBIEN EL MEJORAMIENTO DE LOS SS.HH, VARON MUJER (DEBAJO DE
LUIS ALBERTO PICOY ALVARADO SERVICIOS GENERALES EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADA
ING. OMAR AUGUSTO HIDALGO QUISPE
ING. MANUEL NIETO MONTALVAN
HUAYLLAY - PASCO - PASCO

Partida

Descripcin

Und

Metrado

C.U.

Parcial

(S/.)

(S/.)

MANTENIMIENTO PARA EL SERVICIO DE LA CULMINACION DE RETIRO DEL POLICARBONATO Y


COLOCACION DE CALAMINON
01

ESTRUCTURAS

71,650.90

PARA DESMONTAJE DE POLICARBONATO

01.01
01.01.01

DESMONTAJE DE POLICARBONATO

3,567.59
m2

1,804.00

1.98

PARA MONTAJE DE CALAMINON

01.02
01.02.01
02

COLOCADO DE CALAMINON CON SUS ACCESORIOS

3,567.59
68,083.31

m2

1,804.00

37.74

ARQUITECTURA

68,083.31
648.40

02.01

PISOS Y PAVIMENTOS

02.01.01

RETIRO DEL MACHIHEMBRADO

M2

36.00

5.48

197.34

02.01.02

PISO DE CONCRETO, ACABADO PULIDO OCRE COLOR ROJO

M2

36.00

12.53

451.06

03

648.40

CARPINTERIA DE MADERA

1,230.00

03.01

PUERTAS

03.01.01

MEJORAMIENTO DE LAS PUERTAS EXISTENTES

04

CERRAJERIA

04.01

CERRADURAS

04.01.01

CAMBIO DE CHAPAS A LAS PUERTAS (11)

05

PINTURAS

5,153.24

05.01

PINTURA EN MUROS

5,153.24

1,230.00
GLB

1.00

1,230.00

1,230.00
148.85
148.85

UND

11.00

13.53

148.85

VALORIZACIN DE MANTENIMI

"SERVICIO DE LA CULMINACION DE RETIRO DEL POLICARBONATO Y COLOCACION DE CALAMINON CON SUS ACCESORIOS
(FACHADA 500.00 M2), REPARACION DEL TANQUE ELEVADO Y SUS ACCESORIOS COMO EL CIRCUITO DE AGUA POTABLE
TRIBUNAS Y VACIADO DEL CONCRETO PULIDO CON OCRE ROJO, CAMBIOS DE CHAPAS LAS PUERTAS (11), MEJORAMIEN
MEJORAMIENTO DE LOS SS.HH DE LA PARTE DE LOS CAMERINOS (VARONES Y MUJERES) COMO TAMBIEN EL MEJORAMIEN
EXCEDENTE"

MANTENIM.

EJECUTA
RESIDENTE
INSPECTOR
UBICAC.

"SERVICIO DE LA CULMINACION DE RETIRO DEL POLICARBONATO Y COLOCACION DE CALAMINON CON SUS ACCESORIOS DE LA
REPARACION DEL TANQUE ELEVADO Y SUS ACCESORIOS COMO EL CIRCUITO DE AGUA POTABLE Y SUS ACCESORIOS (1,345.48 ML)
ROJO, CAMBIOS DE CHAPAS LAS PUERTAS (11), MEJORAMIENTO DE LOS SS.HH. DE LA PARTE DE LOS CAMERINOS (VARONES Y M
COMO TAMBIEN EL MEJORAMIENTO DE LOS SS.HH, VARON MUJER (DEBAJO DE
LUIS ALBERTO PICOY ALVARADO SERVICIOS GENERALES EMPRESA INDIVIDUAL DE RESPONSABILIDAD LIMITADA
ING. OMAR AUGUSTO HIDALGO QUISPE
ING. MANUEL NIETO MONTALVAN
HUAYLLAY - PASCO - PASCO

Partida

Descripcin

Und

05.01.01

PINTADO EXTERNO DE LA PARTE FRONTAL DEL COLISEO

06

SANITARIAS

M2

06.01

SISTEMA DE AGUA FRIA

06.01.01

RESPARACION DEL CIRCUITO DEL SISTEMA DE AGUA POTABLE Y SUS ACCESORIOS

ML

06.01.02

REPARACION DEL TANQUE ELEVADO Y SUS ACCESORIOS

06.01.03

Metrado
500.00

C.U.

Parcial

(S/.)

(S/.)

10.31

5,153.24
5,714.37
5,714.37

1,345.84

2.28

3,074.37

GLB

1.00

1,000.00

1,000.00

MEJORAMIENTO DE LOS SS.HH DE LA PARTE DE LOS CAMERINOS (VARONES Y MUJERES)

GLB

1.00

820.00

820.00

06.01.04

MEJORAMIENTO DE LOS SS.HH VARON MUJER

GLB

1.00

820.00

07

VARIOS, LIMPIEZA

07.01

LIMPIEZA FINAL

07.02.01

ELIMINACION DE TODO MATERIAL EXCEDENTE

200.00
GLB

1.00

COSTO DIRECTO
FACTOR DE RELACION

820.00
200.00

200.00

200.00
84,745.76

0.99900

84,661.01

TOTAL (SIN. IGV)

84,661.01

IGV

15,238.98

MONTO TOTAL (INC. IGV)

99,900.00

E MANTENIMIENTO N 01

S ACCESORIOS DE LA PARTE DEL CENTRO (1,804.00M2), PINTADO EXTERNO DE LA PARTE FRONTAL DEL COLISEO
AGUA POTABLE Y SUS ACCESORIOS (1,345.48 ML), RETIRO DEL MACHIEMBRADO DE LA PARTE ELEVADA DE LAS
1), MEJORAMIENTO DE LOS SS.HH. DE LA PARTE DE LOS CAMERINOS (VARONES Y MUJERES) COMO TAMBIEN EL
EL MEJORAMIENTO DE LOS SS.HH, VARON MUJER (DEBAJO DE LAS TRIBUNAS) Y ELIMINACION DE TODO MATERIAL
CEDENTE"

ACCESORIOS DE LA PARTE DEL CENTRO (1,804.00M2), PINTADO EXTERNO DE LA PARTE FRONTAL DEL COLISEO (FACHADA 500.00 M2),
IOS (1,345.48 ML), RETIRO DEL MACHIEMBRADO DE LA PARTE ELEVADA DE LAS TRIBUNAS Y VACIADO DEL CONCRETO PULIDO CON OCRE
NOS (VARONES Y MUJERES) COMO TAMBIEN EL MEJORAMIENTO DE LOS SS.HH DE LA PARTE DE LOS CAMERINOS (VARONES Y MUJERES)
MUJER (DEBAJO DE LAS TRIBUNAS) Y ELIMINACION DE TODO MATERIAL EXCEDENTE"

FECHA :
VALORIZADO ANTERIOR
Metrado

Parcial (S/.)

VALORIZACION ACTUAL
%

Metrado

Parcial (S/.)

VALORIZACION ACUMULADA
%

Metrado

OCT 2016

SALDO POR VALORIZAR

Parcial (S/.)

Metrado

Parcial (S/.)

0.00
0.00

0.00

0.0%

1804.00

3,567.59

100.0%

1804.00

3,567.59

100.0%

0.00

0.00

0.0%

0.00

0.00

0.0%

1804.00

68,083.31

100.0%

1804.00

68,083.31

100.0%

0.00

0.00

0.0%

0.00

0.00

0.0%

36.00

197.34

100.0%

36.00

197.34

100.0%

0.00

0.00

0.0%

0.00

0.00

0.0%

36.00

451.06

100.0%

36.00

451.06

100.0%

0.00

0.00

0.00

0.00

0.0%

1.00

1,230.00

100.0%

1.00

1,230.00

100.0%

0.00

0.00

0.0%

0.00

0.00

0.0%

11.00

148.85

100.0%

11.00

148.85

100.0%

0.00

0.00

0.0%

E MANTENIMIENTO N 01

S ACCESORIOS DE LA PARTE DEL CENTRO (1,804.00M2), PINTADO EXTERNO DE LA PARTE FRONTAL DEL COLISEO
AGUA POTABLE Y SUS ACCESORIOS (1,345.48 ML), RETIRO DEL MACHIEMBRADO DE LA PARTE ELEVADA DE LAS
1), MEJORAMIENTO DE LOS SS.HH. DE LA PARTE DE LOS CAMERINOS (VARONES Y MUJERES) COMO TAMBIEN EL
EL MEJORAMIENTO DE LOS SS.HH, VARON MUJER (DEBAJO DE LAS TRIBUNAS) Y ELIMINACION DE TODO MATERIAL
CEDENTE"

ACCESORIOS DE LA PARTE DEL CENTRO (1,804.00M2), PINTADO EXTERNO DE LA PARTE FRONTAL DEL COLISEO (FACHADA 500.00 M2),
IOS (1,345.48 ML), RETIRO DEL MACHIEMBRADO DE LA PARTE ELEVADA DE LAS TRIBUNAS Y VACIADO DEL CONCRETO PULIDO CON OCRE
NOS (VARONES Y MUJERES) COMO TAMBIEN EL MEJORAMIENTO DE LOS SS.HH DE LA PARTE DE LOS CAMERINOS (VARONES Y MUJERES)
MUJER (DEBAJO DE LAS TRIBUNAS) Y ELIMINACION DE TODO MATERIAL EXCEDENTE"

FECHA :
VALORIZADO ANTERIOR

VALORIZACION ACTUAL

VALORIZACION ACUMULADA

OCT 2016

SALDO POR VALORIZAR

Metrado

Parcial (S/.)

Metrado

Parcial (S/.)

Metrado

Parcial (S/.)

Metrado

Parcial (S/.)

0.00

0.00

0.0%

500.00

5,153.24

100.0%

500.00

5,153.24

100.0%

0.00

0.00

0.0%

0.00

0.00

0.0%

1345.84

3,074.37

100.0%

1345.84

3,074.37

100.0%

0.00

0.00

0.0%

0.00

0.00

0.0%

1.00

1,000.00

100.0%

1.00

1,000.00

100.0%

0.00

0.00

0.0%

0.00

0.00

0.0%

1.00

820.00

100.0%

1.00

820.00

100.0%

0.00

0.00

0.0%

0.00

0.00

0.0%

1.00

820.00

100.0%

1.00

820.00

100.0%

0.00

0.00

0.0%

0.00

0.00

0.0%

1.00

200.00

100.0%

1.00

200.00

100.0%

0.00

0.00

0.0%

0.00
0.00

84,745.76
84,661.01

84,745.76

0.00

0.00

0.00

0.00

S/. 84,661.01

0.00

0.00

0.00

S/. 15,238.98

0.00

0.00

0.00

S/. 99,900.00

0.00

0.00

#REF!
#REF!
OBRA
EJECUTA
CLIENTE
UBICAC.

#REF!
#REF!

Partida

Descripcin

Und

Metrado

C.U.

Parcial

(S/.)

(S/.)

VALORIZADO ANTERIOR
MetradoParcial (S/.)

VALORIZACION ACTUAL
Metrado Parcial (S/.)

ARQUITECTURA - OBRAS EN TIERRA


01

MUROS Y TABIQUERIA DE ALBAILERIA

01.01

MURO DE LADRILLO KING KONG E=0.25m

m2

218.71

96.89

21,190.81

0.00

0.00

0.0%

0.00

0.00

01.02

MURO DE LADRILLO KING KONG E=0.15m

m2

2,274.00

60.34

137,213.16

0.00

0.00

0.0%

0.00

0.00

01.03

MURO DE LADRILLO KING KONG E=0.10m

m2

10.26

49.22

505.00

0.00

0.00

0.0%

0.00

0.00

02

REVOQUES ENLUCIDOS Y MOLDURAS

02.01

TARRAJEO DE MUROS INTERIORES

m2

2,095.94

28.33

59,377.98

0.00

0.00

0.0%

0.00

0.00

02.02

TARRAJEO DE MUROS EXTERIORES

m2

3,138.78

28.33

88,921.64

0.00

0.00

0.0%

0.00

0.00

02.03

TARRAJEO DE COLUMNAS

m2

1,021.28

33.61

34,325.22

0.00

0.00

0.0%

0.00

0.00

02.04

TARRAJEO DE VIGAS

m2

511.80

30.32

15,517.78

0.00

0.00

0.0%

0.00

0.00

VESTIDURA DE DERRAMES ANCHO = 15 CM.

361.88

9.86

3,568.14

0.00

0.00

0.0%

0.00

0.00

m2

1,590.46

38.50

61,232.71

0.00

0.00

0.0%

0.00

0.00

02.05
03
03.01
04

CIELORRASOS
CIELORRASOS CON MEZCLA DE CEMENTO-ARENA
PISOS

04.01

PISO DE CEMENTO PULIDO

m2

1,167.19

38.35

44,761.74

0.00

0.00

0.0%

0.00

0.00

04.02

PISO DE CERAMICO ANTIDESLIZANTE DE ALTO TRAFICO

m2

200.20

56.51

11,313.30

0.00

0.00

0.0%

0.00

0.00

04.03

PISO DE VINILICO DE ALTO TRAFICO

m2

223.07

59.89

13,359.66

0.00

0.00

0.0%

0.00

0.00

04.04

VEREDA

m2

1,591.00

56.05

89,175.55

0.00

0.00

0.0%

0.00

0.00

m2

249.05

46.76

11,645.58

0.00

0.00

0.0%

0.00

0.00

m2

28.22

8.99

253.70

0.00

0.00

0.0%

0.00

0.00

05
05.01
05.01.01
05.02
05.02.01

ZOCALOS Y CONTRAZOCALOS
ZOCALOS
ZOCALO DE CERAMICO COLOR 0.40X0.40m
CONTRAZOCALOS
CONTRAZOCALO DE CERAMICA H=0.10M

#REF!
#REF!
OBRA
EJECUTA
CLIENTE
UBICAC.

#REF!
#REF!

Partida

Descripcin

Und

Metrado

C.U.

Parcial

(S/.)

(S/.)

VALORIZADO ANTERIOR
MetradoParcial (S/.)

VALORIZACION ACTUAL
Metrado Parcial (S/.)

05.02.02

CONTRAZOCALO DE CEMENTO DISEO SANITARIO C. H=10 cm m

499.02

7.43

3,707.72

0.00

0.00

0.0%

1.00

7.43

05.02.03

CONTRAZOCALO DE CEDRO DE E=1",H=0.10M

151.36

20.85

3,155.86

0.00

0.00

0.0%

2.00

41.70

1,423.57

47.40

67,477.22

0.00

0.00

0.0%

0.00

0.00

06
06.01
07
07.01

COBERTURAS
CUBIERTA LADRILLO PASTELERO 24X24 ASENTADO C/MEZCLA 1:5m2
2
CARPINTERIA
CARPINTERIA METALICA

07.01.01

SUMINISTRO Y COLOCACION DE PUERTA METALICA DE 8.00X3. u

1.00

5,600.00

5,600.00

0.00

0.00

0.0%

0.00

0.00

07.01.02

SUMINISTRO Y COLOCACION DE PUERTA METALICA DE 0.90X2. u

1.00

510.00

510.00

0.00

0.00

0.0%

0.00

0.00

07.01.03

SUMINISTRO E INSTALACION DE PUERTA METALICA CON MALLAu

2.00

850.00

1,700.00

0.00

0.00

0.0%

0.00

0.00

07.01.04

SUMINISTRO E INSTALACION DE PUERTA 4.20X3.00m EN ACCES u

1.00

2,600.00

2,600.00

0.00

0.00

0.0%

0.00

0.00

07.01.05

SUMINISTRO E INSTALACION DE ESCALERA METALICA DE 9.50 Xu

1.00

7,195.44

7,195.44

0.00

0.00

0.0%

0.00

0.00

07.01.06

SUMINISTRO E INSTALACION DE PUERTA DE ALTO IMPACTO 2.40u

3.00

7,200.00

21,600.00

0.00

0.00

0.0%

0.00

0.00

07.01.07

SUMINISTRO E INSTALACION DE PUERTA DE ALTO IMPACTO 1.80u

6.00

5,400.00

32,400.00

0.00

0.00

0.0%

0.00

0.00

07.01.08

SUMINISTRO E INSTALACION DE PUERTA DE ALTO IMPACTO 1.15u

1.00

3,450.00

3,450.00

0.00

0.00

0.0%

0.00

0.00

07.02

CARPINTERIA DE ALUMINIO

07.02.01

SUMINISTRO E INSTALACION DE PUERTA SECCIONABLE PS 2.30u

8.00

4,050.00

32,400.00

0.00

0.00

0.0%

0.00

0.00

07.02.02

SUMINISTRO E INSTALACION DE PUERTA CORREDIZA 1.20X3.00 u

1.00

1,900.00

1,900.00

0.00

0.00

0.0%

0.00

0.00

07.02.03

SUMINISTRO E INSTALACION DE VENTANA ENRROLLABLE VE 2. u

7.00

1,695.00

11,865.00

0.00

0.00

0.0%

0.00

0.00

07.02.04

VENTANA DE ALUMINIO CON VIDRIO TEMPLADO

m2

239.92

292.43

70,159.81

0.00

0.00

0.0%

0.00

0.00

07.02.05

VENTANA MOSQUITERA

m2

109.60

417.46

45,753.62

0.00

0.00

0.0%

0.00

0.00

07.02.06

SUMINISTRO E INSTALACION DE PERSIANA FIJA DE ALUMINIO 3 u

7.00

101.52

710.64

0.00

0.00

0.0%

0.00

0.00

33.70

249.78

8,417.59

0.00

0.00

0.0%

0.00

0.00

07.03
07.03.01

CARPINTERIA DE MADERA
PUERTA APANELADA DE MADERA, CON MARCO DE MAD. CEDROm2

#REF!
#REF!
OBRA
EJECUTA
CLIENTE
UBICAC.

#REF!
#REF!

Partida

Descripcin

Und

Metrado

C.U.

Parcial

(S/.)

(S/.)

VALORIZADO ANTERIOR
MetradoParcial (S/.)

VALORIZACION ACTUAL
Metrado Parcial (S/.)

07.03.02

PUERTA CONTRAPLACADA E=45MM, TRIPLAY LUPUNA 6MM, CONm2

18.80

235.34

4,424.39

0.00

0.00

0.0%

0.00

0.00

07.03.03

TABIQUE DE MELAMINE PARA BAOS Y VESTIDORES, E=15MM m2

48.00

141.76

6,804.48

0.00

0.00

0.0%

0.00

0.00

08

CERRAJERIA

08.01

CERRADURA DOS GOLPES EN PUERTA CON TIRADOR

21.00

49.99

1,049.79

0.00

0.00

0.0%

0.00

0.00

08.02

CERRADURA DE PERILLA PARA PUERTAS INTERIORES

21.00

39.99

839.79

0.00

0.00

0.0%

0.00

0.00

08.03

CERRADURA DE PERILLA PARA PUERTAS SSHH.

3.00

33.42

100.26

0.00

0.00

0.0%

0.00

0.00

08.04

BISAGRA CAPUCHINA DE 3"

pza

228.00

17.53

3,996.84

0.00

0.00

0.0%

0.00

0.00

09

PINTURA

09.01

PINTURA EN MUROS Y COLUMNAS INTERIORES CON EPOXICO

m2

1,562.91

15.27

23,865.64

0.00

0.00

0.0%

0.00

0.00

09.02

PINTURA EN MUROS Y COLUMNAS INTERIORES CON LATEX

m2

1,549.03

11.47

17,767.37

0.00

0.00

0.0%

0.00

0.00

09.03

PINTURA EN PISOS CON EPOXICO

m2

996.97

16.30

16,250.61

0.00

0.00

0.0%

0.00

0.00

09.04

PINTURA EN MUROS, COLUMNAS Y VIGAS EXTERIORES CON LAT m2

3,124.47

11.47

35,837.67

0.00

0.00

0.0%

0.00

0.00

09.05

PINTURA EN CIELO RASO CON EPOXICO

m2

1,036.77

15.27

15,831.48

0.00

0.00

0.0%

0.00

0.00

09.06

PINTURA EN CIELO RASO CON PINTURA LATEX

m2

553.69

11.47

6,350.82

0.00

0.00

0.0%

0.00

0.00

10

OTROS

10.01

CORTINA DE TRASLAPE DE PVC (PROVISION Y COLOCACION)

m2

25.00

30.65

766.25

0.00

0.00

0.0%

0.00

0.00

10.02

PROTECCION DE BORDE DE PLATAFORMA

35.50

97.00

3,443.50

0.00

0.00

0.0%

0.00

0.00

10.03

POLICARBONATO COLOR BLANCO, E=16MM (INC ACCESORIOS, P m2

106.92

234.95

25,120.85

0.00

0.00

0.0%

0.00

0.00

10.04

SUMINISTRO E INSTALACION DE ABRIGO RETRACTIL

m2

7.00

5,000.00

35,000.00

0.00

0.00

0.0%

0.00

0.00

10.05

LIMPIEZA Y ENTREGA FINAL DE OBRA

glb

1.00

2,000.00

2,000.00

0.00

0.00

0.0%

0.00

0.00

#REF!
#REF!
OBRA
EJECUTA
CLIENTE
UBICAC.

#REF!
#REF!

Partida

Descripcin

Und

Metrado

COSTO DIRECTO
GASTOS GENERALES
UTILIDAD

TOTAL (SIN. IGV)

Parcial
(S/.)

VALORIZADO ANTERIOR
MetradoParcial (S/.)

VALORIZACION ACTUAL
Metrado Parcial (S/.)

1,112,414.59

0.00

49.13

14.17%

157,629.15

0.00

6.96

9.50%

105,679.39

0.00

4.67

1,375,723.13

0.00

60.76

SUB TOTAL
FACTOR DE RELACION

C.U.
(S/.)

1.00000

1,375,723.13
1,375,723.13

0.00
0.00

60.76
60.76

#REF!
#REF!

FECHA : 4/30/2013
VALORIZACION ACTUAL
%

VALORIZACION ACUMULADA
Metrado Parcial (S/.)

SALDO POR VALORIZAR


Metrado

Parcial (S/.)

0.0%

0.00

0.00

0.0%

218.71

21,190.81

100.0%

0.0%

0.00

0.00

0.0%

2,274.00

137,213.16

100.0%

0.0%

0.00

0.00

0.0%

10.26

505.00

100.0%

0.0%

0.00

0.00

0.0%

2,095.94

59,377.98

100.0%

0.0%

0.00

0.00

0.0%

3,138.78

88,921.64

100.0%

0.0%

0.00

0.00

0.0%

1,021.28

34,325.22

100.0%

0.0%

0.00

0.00

0.0%

511.80

15,517.78

100.0%

0.0%

0.00

0.00

0.0%

361.88

3,568.14

100.0%

0.0%

0.00

0.00

0.0%

1,590.46

61,232.71

100.0%

0.0%

0.00

0.00

0.0%

1,167.19

44,761.74

100.0%

0.0%

0.00

0.00

0.0%

200.20

11,313.30

100.0%

0.0%

0.00

0.00

0.0%

223.07

13,359.66

100.0%

0.0%

0.00

0.00

0.0%

1,591.00

89,175.55

100.0%

0.0%

0.00

0.00

0.0%

249.05

11,645.58

100.0%

0.0%

0.00

0.00

0.0%

28.22

253.70

100.0%

#REF!
#REF!

FECHA : 4/30/2013
VALORIZACION ACTUAL
%

VALORIZACION ACUMULADA
Metrado Parcial (S/.)

SALDO POR VALORIZAR


Metrado

Parcial (S/.)

0.2%

0.00

7.43

0.2%

499.02

3,700.29

99.8%

1.3%

0.00

41.70

1.3%

151.36

3,114.16

98.7%

0.0%

0.00

0.00

0.0%

1,423.57

67,477.22

100.0%

0.0%

0.00

0.00

0.0%

1.00

5,600.00

100.0%

0.0%

0.00

0.00

0.0%

1.00

510.00

100.0%

0.0%

0.00

0.00

0.0%

2.00

1,700.00

100.0%

0.0%

0.00

0.00

0.0%

1.00

2,600.00

100.0%

0.0%

0.00

0.00

0.0%

1.00

7,195.44

100.0%

0.0%

0.00

0.00

0.0%

3.00

21,600.00

100.0%

0.0%

0.00

0.00

0.0%

6.00

32,400.00

100.0%

0.0%

0.00

0.00

0.0%

1.00

3,450.00

100.0%

0.0%

0.00

0.00

0.0%

8.00

32,400.00

100.0%

0.0%

0.00

0.00

0.0%

1.00

1,900.00

100.0%

0.0%

0.00

0.00

0.0%

7.00

11,865.00

100.0%

0.0%

0.00

0.00

0.0%

239.92

70,159.81

100.0%

0.0%

0.00

0.00

0.0%

109.60

45,753.62

100.0%

0.0%

0.00

0.00

0.0%

7.00

710.64

100.0%

0.0%

0.00

0.00

0.0%

33.70

8,417.59

100.0%

#REF!
#REF!

FECHA : 4/30/2013
VALORIZACION ACTUAL
%

VALORIZACION ACUMULADA
Metrado Parcial (S/.)

SALDO POR VALORIZAR


Metrado

Parcial (S/.)

0.0%

0.00

0.00

0.0%

18.80

4,424.39

100.0%

0.0%

0.00

0.00

0.0%

48.00

6,804.48

100.0%

0.0%

0.00

0.00

0.0%

21.00

1,049.79

100.0%

0.0%

0.00

0.00

0.0%

21.00

839.79

100.0%

0.0%

0.00

0.00

0.0%

3.00

100.26

100.0%

0.0%

0.00

0.00

0.0%

228.00

3,996.84

100.0%

0.0%

0.00

0.00

0.0%

1,562.91

23,865.64

100.0%

0.0%

0.00

0.00

0.0%

1,549.03

17,767.37

100.0%

0.0%

0.00

0.00

0.0%

996.97

16,250.61

100.0%

0.0%

0.00

0.00

0.0%

3,124.47

35,837.67

100.0%

0.0%

0.00

0.00

0.0%

1,036.77

15,831.48

100.0%

0.0%

0.00

0.00

0.0%

553.69

6,350.82

100.0%

0.0%

0.00

0.00

0.0%

25.00

766.25

100.0%

0.0%

0.00

0.00

0.0%

35.50

3,443.50

100.0%

0.0%

0.00

0.00

0.0%

106.92

25,120.85

100.0%

0.0%

0.00

0.00

0.0%

7.00

35,000.00

100.0%

0.0%

0.00

0.00

0.0%

1.00

2,000.00

100.0%

#REF!
#REF!

FECHA : 4/30/2013
VALORIZACION ACTUAL
%

VALORIZACION ACUMULADA
Metrado Parcial (S/.)

SALDO POR VALORIZAR


Metrado

Parcial (S/.)

49.13

1,112,365.48

6.96

157,622.19

4.67

105,674.72

60.76

1,375,662.39

60.76
60.76

60.76

1,375,662.39
1,375,662.39

#REF!
#REF!
OBRA
EJECUTA
CLIENTE
UBICAC.

#REF!
#REF!

Partida

Descripcin

Und

Metrado

C.U.

Parcial

(S/.)

(S/.)

VALORIZADO ANTERIOR
MetradoParcial (S/.)

VALORIZACION ACTUAL
Metrado Parcial (S/.)

EQUIPAMIENTO
01

EQUIPO DE FRIO Y TAREAS PREVIAS

01.01

SUMINISTRO DE PRODUCTOR DE HIELO EN ESCAMAS DE 10 TN/Mglb

2.00

319,803.00

639,606.00

0.00

0.00

0.0%

0.00

0.00

01.02

SUMINISTRO DE SILO DE CONSERVACION DE HIELO 10TM

glb

2.00

68,310.00

136,620.00

0.00

0.00

0.0%

0.00

0.00

01.03

SUMINISTRO DE CAMARA FRIGORIFICA DE 5 TM -18 C

glb

1.00

61,479.00

61,479.00

0.00

0.00

0.0%

0.00

0.00

01.04

SUMINISTRO DE CAMARA FRIGORIFICA DE 10 TM 0 C

glb

1.00

95,634.00

95,634.00

0.00

0.00

0.0%

0.00

0.00

01.05

SUMINISTRO DE ENFRIADOR DE AGUA +15 C

glb

1.00

48,508.82

48,508.82

0.00

0.00

0.0%

0.00

0.00

01.06

EQUIPAMIENTO TAREAS PREVIAS

glb

1.00

96,064.00

96,064.00

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.0%

0.00

0.00

02
02.01
02.02
03
03.01

EQUIPO DE TRANSPORTE Y ESTIBA


ACCESORIOS PARA TRANSPORTE Y ESTIBA

glb

1.00

252,614.00

252,614.00

0.00

0.00

ACCESORIOS PARA PERSONAL OPERATIVO

glb

1.00

27,900.00

27,900.00

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

0.0%

0.00

0.00

MOBILIARIO VARIOS
MOBILIARIO VARIOS

glb

1.00

37,745.00

37,745.00

#REF!
#REF!
OBRA
EJECUTA
CLIENTE
UBICAC.

#REF!
#REF!

Partida

Descripcin

Und

Metrado

COSTO DIRECTO
GASTOS GENERALES
UTILIDAD

TOTAL (SIN. IGV)

Parcial
(S/.)

VALORIZADO ANTERIOR
MetradoParcial (S/.)

VALORIZACION ACTUAL
Metrado Parcial (S/.)

1,396,170.82

0.00

0.00

14.17%

197,837.41

0.00

0.00

9.50%

132,636.23

0.00

0.00

1,726,644.46

0.00

0.00

SUB TOTAL
FACTOR DE RELACION

C.U.
(S/.)

1.00000

1,726,644.46
1,726,644.46

0.00
0.00

0.00
0.00

#REF!
#REF!

FECHA : 4/30/2013
VALORIZACION ACTUAL
%

VALORIZACION ACUMULADA
Metrado Parcial (S/.)

SALDO POR VALORIZAR


Metrado

Parcial (S/.)

0.0%

0.00

0.00

0.0%

2.00

639,606.00

100.0%

0.0%

0.00

0.00

0.0%

2.00

136,620.00

100.0%

0.0%

0.00

0.00

0.0%

1.00

61,479.00

100.0%

0.0%

0.00

0.00

0.0%

1.00

95,634.00

100.0%

0.0%

0.00

0.00

0.0%

1.00

48,508.82

100.0%

0.0%

0.00

0.00

0.0%

1.00

96,064.00

100.0%

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

0.0%

1.00

252,614.00

100.0%

#DIV/0!
0.0%

0.00

0.00

0.0%

0.00

0.00

0.0%

1.00

27,900.00

100.0%

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

0.00

0.0%

1.00

37,745.00

100.0%

#DIV/0!
0.0%

0.00

#REF!
#REF!

FECHA : 4/30/2013
VALORIZACION ACTUAL
%

VALORIZACION ACUMULADA
Metrado Parcial (S/.)

SALDO POR VALORIZAR


Metrado

Parcial (S/.)

0.00

1,396,170.82

0.00

197,837.41

0.00

132,636.23

0.00

1,726,644.46

0.00
0.00

0.00

1,726,644.46
1,726,644.46

#REF!
#REF!
OBRA
EJECUTA
CLIENTE
UBICAC.

#REF!
#REF!

Partida

Descripcin

Und

Metrado

C.U.

Parcial

(S/.)

(S/.)

VALORIZADO ANTERIOR
MetradoParcial (S/.)

VALORIZACION ACTUAL
Metrado Parcial (S/.)

INSTALACIONES ELECTRICAS RED DE BAJA TENSION


01

OBRAS PRELIMINARES

01.01

TRAZO Y REPLANTEO.

200.00

2.58

516.00

0.00

0.00

0.0%

0.00

0.00

01.02

MOVILIZACION Y DESMOVILIZACION DE EQUIPOS

glb

1.00

3,353.15

3,353.15

0.00

0.00

0.0%

0.00

0.00

02

SALIDA DE ILUMINACION

0.00

0.00

#DIV/0!

0.00

0.00

02.01

CENTRO DE LUZ

pto

169.00

105.42

17,815.98

0.00

0.00

0.0%

0.00

0.00

02.02

SALIDA PARA LAMPARA EMERGENCIA

pto

42.00

98.42

4,133.64

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

pto

46.00

61.44

2,826.24

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

03
03.01
04

SALIDA DE INTERRUPTOR
SALIDA PARA INTERRUPTOR SIMPLE
SALIDA PARA TOMACORRIENTES

04.01

SALIDA PARA TOMACORRIENTE DOBLE UNIVERSAL C/LT

pto

60.00

69.49

4,169.40

0.00

0.00

0.0%

0.00

0.00

04.02

SALIDA PARA TOMACORRIENTE TRIFASICO

pto

7.00

344.95

2,414.65

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

pto

8.00

112.71

901.68

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

05

SALIDA DE FUERZA

05.01

SALIDA DE FUERZA

06

SALIDA DE VOZ Y DATA

06.01

SALIDA DE VOZ Y DATA

07

EQUIPOS DE ILUMINACION

pto

07.01

SUMINISTRO E INSTALACION DE LUMINARIAS P/ADOSAR DE 2 X 3 u

07.02

SUMINISTRO E INSTALACION DE LUMINARIAS P/ADOSAR DE 2 X u

07.03

SUMINISTRO E INSTALACION DE LUM. P/ADOSAR A PARED LA

07.04

REFLECTOR 400 W CON BRAZO DE FIJACION SELLADO HERMETI u

07.05
07.06

20.00

99.36

1,987.20

153.00

163.23

24,974.19

0.00

0.00

0.0%

0.00

0.00

5.00

276.46

1,382.30

0.00

0.00

0.0%

0.00

0.00

11.00

276.46

3,041.06

0.00

0.00

0.0%

0.00

0.00

28.00

458.28

12,831.84

0.00

0.00

0.0%

0.00

0.00

SUMINISTRO E INSTALACION DE LUMINARIA DE ALUMBRADO EXTu

15.00

520.36

7,805.40

0.00

0.00

0.0%

0.00

0.00

SUMINISTRO E INSTALACION DE LAMPARAS DE EMERGENCIA 2X1u

42.00

276.46

11,611.32

0.00

0.00

0.0%

0.00

0.00

#REF!
#REF!
OBRA
EJECUTA
CLIENTE
UBICAC.

#REF!
#REF!

Partida

Descripcin

Und

Metrado

C.U.

Parcial

(S/.)

(S/.)

VALORIZADO ANTERIOR
MetradoParcial (S/.)

VALORIZACION ACTUAL
Metrado Parcial (S/.)

07.07

POSTE DE C.A.C 12/ 200

26.00

1,235.16

32,114.16

0.00

0.00

0.0%

0.00

0.00

07.08

BUZONES DE CONCRETO 0.5X0.5X0.6 m

24.00

205.00

4,920.00

0.00

0.00

0.0%

0.00

0.00

DUCTO DE CONCRETO 2 VIAS

20.00

95.28

1,905.60

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

07.09
08

TABLEROS ELECTRICOS

08.01

Tablero de Distribucion TG 3 380V 40 POLOS, P/EMPOTRAR

1.00

1,497.99

1,497.99

0.00

0.00

0.0%

0.00

0.00

08.02

Tablero de Distribucion TD-1 3 380/220V 8 POLOS, P/EMPOTRAR

1.00

676.42

676.42

0.00

0.00

0.0%

0.00

0.00

08.03

Tablero de Distribucion TD-2 3 380/220V 8 POLOS, P/EMPOTRAR

1.00

676.42

676.42

0.00

0.00

0.0%

0.00

0.00

08.04

Tablero de Distribucion TD-3 3 380/220V 8 POLOS, P/EMPOTRAR

1.00

771.42

771.42

0.00

0.00

0.0%

0.00

0.00

08.05

Tablero de Distribucion TD-4 3 380/220V 8 POLOS, P/EMPOTRAR

1.00

887.42

887.42

0.00

0.00

0.0%

0.00

0.00

08.06

Tablero de Distribucion T-RE1 3 380/220V 8 POLOS, P/EMPOTRAR u

1.00

537.42

537.42

0.00

0.00

0.0%

0.00

0.00

08.07

Tablero de Distribucion TD-5 3 380/220V 8 POLOS, P/EMPOTRAR

1.00

771.42

771.42

0.00

0.00

0.0%

0.00

0.00

08.08

Tablero de Distribucion TD-6 3 380/220V 8 POLOS, P/EMPOTRAR

1.00

912.42

912.42

0.00

0.00

0.0%

0.00

0.00

08.09

Tablero de Distribucion T-RE2 3 380/220V 8 POLOS, P/EMPOTRAR u

1.00

632.42

632.42

0.00

0.00

0.0%

0.00

0.00

08.10

Tablero de Distribucion TD-7 3 380/220V 8 POLOS, P/EMPOTRAR

1.00

676.42

676.42

0.00

0.00

0.0%

0.00

0.00

08.11

Tablero de Distribucion TD-8 3 380/220V 8 POLOS, P/EMPOTRAR

1.00

887.42

887.42

0.00

0.00

0.0%

0.00

0.00

08.12

Tablero de Distribucion TD-9 3 380/220V 8 POLOS, P/EMPOTRAR

1.00

1,007.42

1,007.42

0.00

0.00

0.0%

0.00

0.00

08.13

Tablero de Distribucion T-RE3 3 380/220V 8 POLOS, P/EMPOTRAR u

1.00

537.42

537.42

0.00

0.00

0.0%

0.00

0.00

08.14

Tablero de Distribucion TD-10 3 380/220V 40 POLOS, P/EMPOTRAR u

1.00

1,264.84

1,264.84

0.00

0.00

0.0%

0.00

0.00

08.15

Tablero de Distribucion T-F3 3 380/220V 40 POLOS, P/EMPOTRAR u

1.00

1,197.84

1,197.84

0.00

0.00

0.0%

0.00

0.00

08.16

Tablero de Distribucion TD-11 3 380/220V 40 POLOS, P/EMPOTRAR u

1.00

1,177.84

1,177.84

0.00

0.00

0.0%

0.00

0.00

08.17

Tablero de Distribucion T-F1 3 380/220V 20 POLOS, P/EMPOTRAR u

1.00

1,059.42

1,059.42

0.00

0.00

0.0%

0.00

0.00

08.18

Tablero de Distribucion TD-12 3 380/220V 40 POLOS, P/EMPOTRAR u

1.00

1,207.84

1,207.84

0.00

0.00

0.0%

0.00

0.00

08.19

Tablero de Distribucion TD-12 3 380/220V 40 POLOS, P/EMPOTRAR u

1.00

1,207.84

1,207.84

0.00

0.00

0.0%

0.00

0.00

#REF!
#REF!
OBRA
EJECUTA
CLIENTE
UBICAC.

#REF!
#REF!

Partida

Descripcin

Und

Metrado

C.U.

Parcial

(S/.)

(S/.)

VALORIZADO ANTERIOR
MetradoParcial (S/.)

VALORIZACION ACTUAL
Metrado Parcial (S/.)

08.20

Tablero de Distribucion T-F2 3 380/220V 20 POLOS, P/EMPOTRAR u

1.00

769.42

769.42

0.00

0.00

0.0%

0.00

0.00

08.21

Tablero de Distribucion TD-M 3 380/220V 20 POLOS, P/EMPOTRAR u

1.00

824.42

824.42

0.00

0.00

0.0%

0.00

0.00

Tablero de Distribucion T-F4 3 380/220V 20 POLOS, P/EMPOTRAR u

1.00

769.42

769.42

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

08.22
09

ALIMENTADORES

09.01

De Medidor a Tablero TG

30.00

464.97

13,949.10

0.00

0.00

0.0%

0.00

0.00

09.02

De TG a TTA

10.00

466.87

4,668.70

0.00

0.00

0.0%

0.00

0.00

09.03

De TG (C4)

109.00

68.96

7,516.64

0.00

0.00

0.0%

0.00

0.00

09.04

De TG (C5)

70.29

68.64

4,824.71

0.00

0.00

0.0%

0.00

0.00

09.05

De TG (C1)

310.00

11.48

3,558.80

0.00

0.00

0.0%

0.00

0.00

09.06

De TG (C2)

140.00

11.38

1,593.20

0.00

0.00

0.0%

0.00

0.00

09.07

De TG (C2)

10.00

18.11

181.10

0.00

0.00

0.0%

0.00

0.00

09.08

TD-1

8.00

14.45

115.60

0.00

0.00

0.0%

0.00

0.00

09.09

TD-2

3.60

15.25

54.90

0.00

0.00

0.0%

0.00

0.00

09.10

TD-3

6.00

15.25

91.50

0.00

0.00

0.0%

0.00

0.00

09.11

TD-4

4.80

15.25

73.20

0.00

0.00

0.0%

0.00

0.00

09.12

De TD-4 a T-RE1

6.93

46.92

325.16

0.00

0.00

0.0%

0.00

0.00

09.13

TD-5

4.80

15.25

73.20

0.00

0.00

0.0%

0.00

0.00

09.14

TD-6

6.24

15.25

95.16

0.00

0.00

0.0%

0.00

0.00

09.15

De TD-6 a T-RE2

2.20

32.52

71.54

0.00

0.00

0.0%

0.00

0.00

09.16

TD-7

3.60

15.25

54.90

0.00

0.00

0.0%

0.00

0.00

09.17

TD-8

48.40

15.25

738.10

0.00

0.00

0.0%

0.00

0.00

09.18

TD-9

15.40

15.25

234.85

0.00

0.00

0.0%

0.00

0.00

09.19

De TD-9 a T-RE3

2.20

32.52

71.54

0.00

0.00

0.0%

0.00

0.00

#REF!
#REF!
OBRA
EJECUTA
CLIENTE
UBICAC.

#REF!
#REF!

Partida

Descripcin

Und

Metrado

C.U.

Parcial

(S/.)

(S/.)

VALORIZADO ANTERIOR
MetradoParcial (S/.)

VALORIZACION ACTUAL
Metrado Parcial (S/.)

09.20

TD-10

67.20

223.71

15,033.31

0.00

0.00

0.0%

0.00

0.00

09.21

T-F3

2.40

143.82

345.17

0.00

0.00

0.0%

0.00

0.00

09.22

De T-F3 a C1ES

9.90

49.71

492.13

0.00

0.00

0.0%

0.00

0.00

09.23

De T-F3 a C2ES

9.90

49.71

492.13

0.00

0.00

0.0%

0.00

0.00

09.24

De T-F3 a C3ES

6.60

21.84

144.14

0.00

0.00

0.0%

0.00

0.00

09.25

De T-F3 a C4ES

12.10

18.42

222.88

0.00

0.00

0.0%

0.00

0.00

09.26

TD-11

4.80

22.44

107.71

0.00

0.00

0.0%

0.00

0.00

09.27

T-F1

4.80

16.60

79.68

0.00

0.00

0.0%

0.00

0.00

09.28

TD-12

27.60

22.44

619.34

0.00

0.00

0.0%

0.00

0.00

09.29

T-F2

2.40

12.60

30.24

0.00

0.00

0.0%

0.00

0.00

09.30

TD-M

26.40

22.44

592.42

0.00

0.00

0.0%

0.00

0.00

09.31

De TD-M a T-F4

289.00

14.60

4,219.40

0.00

0.00

0.0%

0.00

0.00

09.32

ILUMINACION MUELLE

289.00

15.77

4,557.53

0.00

0.00

0.0%

0.00

0.00

09.33

POSTE DE C.A.C 10/200 EN MUELLE

15.00

880.16

13,202.40

0.00

0.00

0.0%

0.00

0.00

Err:518

0.00

0.00

#DIV/0!

0.00

0.00

10

CAJAS DE PASE

10.01

CAJA DE PASE CUADRADA DE 200 X 200 X 75

3.00

26.84

80.52

0.00

0.00

0.0%

0.00

0.00

10.02

CAJA DE PASE CUADRADA DE 350 X 350 X 150

15.00

26.84

402.60

0.00

0.00

0.0%

0.00

0.00

Err:518

0.00

0.00

#DIV/0!

0.00

0.00

11

POZO DE TIERRA

11.01

POZO DE TIERRA SISTEMA NORMAL

15.00

1,543.47

23,152.05

0.00

0.00

0.0%

0.00

0.00

11.02

POZO DE TIERRA SISTEMA DE FUERZA

4.00

1,912.97

7,651.88

0.00

0.00

0.0%

0.00

0.00

11.03

POZO DE TIERRA PARA RED ESTABILIZADA

3.00

3,596.47

10,789.41

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

0.0%

0.00

0.00

12
12.01

EXCAVACION DE ZANJAS
EXCAVAV. DE ZANJAS P/TUBERIA

120.00

17.90

2,148.00

#REF!
#REF!
OBRA
EJECUTA
CLIENTE
UBICAC.
Partida
12.02
13

#REF!
#REF!
Descripcin
RELL. COMP. C/PL VIBRADOR/ MANUAL E/T. N

Und
m

Metrado
120.00

C.U.

Parcial

(S/.)

(S/.)
9.12

1,094.40

EQUIPOS ELECTROMECANICOS

VALORIZADO ANTERIOR
MetradoParcial (S/.)

VALORIZACION ACTUAL
Metrado Parcial (S/.)

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

13.01

MONTAJE DE ELECTROBOMBA DE AGUA DULCE DE 2.0 HP

glb

2.00

280.40

560.80

0.00

0.00

0.0%

0.00

0.00

13.02

MONTAJE DE ELECTROBOMBA DE AGUA SALADA DE 4.0 HP

glb

2.00

440.80

881.60

0.00

0.00

0.0%

0.00

0.00

13.03

MONTAJE DE ELECTROBOMBA DE CAMARA DE BOMBEO DESAGUE


glb

2.00

250.16

500.32

0.00

0.00

0.0%

0.00

0.00

13.04

MONTAJE DE ELECTROBOMBA DE EMISOR SUBMARINO 4.0 HP

glb

2.00

440.80

881.60

0.00

0.00

0.0%

0.00

0.00

13.05

MONTAJE DE BOMBA CONTRAINCENDIO ACI 20.99 KW (FUERZA) glb

1.00

280.40

280.40

0.00

0.00

0.0%

0.00

0.00

13.06

MONTAJE DE BOMBA CONTRAINCENDIO JOCKEY 2,24 KW (CONTRglb

1.00

280.40

280.40

0.00

0.00

0.0%

0.00

0.00

13.07

SUMINISTRO Y MONTAJE EQUIPO DE OSMOSIS 20 KW

glb

1.00

15,633.60

15,633.60

0.00

0.00

0.0%

0.00

0.00

13.08

ARRANCADOR ELECTROBOMBA 3 DE 2 HP

4.00

246.03

984.12

0.00

0.00

0.0%

0.00

0.00

13.09

ARRANCADOR ELECTROBOMBA 3 DE 4 HP

4.00

246.03

984.12

0.00

0.00

0.0%

0.00

0.00

13.10

SUMINISTRO Y MONTAJE DEGENERADOR ELECTRICO 30 KW

1.00

85,500.00

85,500.00

0.00

0.00

0.0%

0.00

0.00

13.11

SUMINISTRO Y MONTAJE DEGENERADOR ELECTRICO 90 KW

1.00

350,000.00

350,000.00

0.00

0.00

0.0%

0.00

0.00

#REF!
#REF!
OBRA
EJECUTA
CLIENTE
UBICAC.

#REF!
#REF!

Partida

Descripcin

Und

Metrado

COSTO DIRECTO
GASTOS GENERALES
UTILIDAD

TOTAL (SIN. IGV)

Parcial
(S/.)

VALORIZADO ANTERIOR
MetradoParcial (S/.)

VALORIZACION ACTUAL
Metrado Parcial (S/.)

738,890.93

0.00

0.00

14.17%

104,700.84

0.00

0.00

9.50%

70,194.64

0.00

0.00

913,786.41

0.00

0.00

SUB TOTAL
FACTOR DE RELACION

C.U.
(S/.)

1.00000

913,786.41
913,786.41

0.00
0.00

0.00
0.00

#REF!
#REF!

FECHA : 4/30/2013
VALORIZACION ACTUAL
%

VALORIZACION ACUMULADA
Metrado Parcial (S/.)

SALDO POR VALORIZAR


Metrado

Parcial (S/.)

0.0%

0.00

0.00

0.0%

200.00

516.00

100.0%

0.0%

0.00

0.00

0.0%

1.00

3,353.15

100.0%

#DIV/0!

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

0.0%

0.00

0.00

0.0%

169.00

17,815.98

100.0%

0.0%

0.00

0.00

0.0%

42.00

4,133.64

100.0%

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

0.00

0.0%

46.00

2,826.24

100.0%

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

#DIV/0!
0.0%

0.00

#DIV/0!
0.0%

0.00

0.00

0.0%

60.00

4,169.40

100.0%

0.0%

0.00

0.00

0.0%

7.00

2,414.65

100.0%

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

0.00

0.0%

8.00

901.68

100.0%

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

#DIV/0!
0.0%

0.00

#DIV/0!
0.0%

0.00

#DIV/0!

0.00

0.0%

20.00

1,987.20

100.0%

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

153.00

24,974.19

100.0%

0.0%

0.00

0.00

0.0%

0.0%

0.00

0.00

0.0%

5.00

1,382.30

100.0%

0.0%

0.00

0.00

0.0%

11.00

3,041.06

100.0%

0.0%

0.00

0.00

0.0%

28.00

12,831.84

100.0%

0.0%

0.00

0.00

0.0%

15.00

7,805.40

100.0%

0.0%

0.00

0.00

0.0%

42.00

11,611.32

100.0%

#REF!
#REF!

FECHA : 4/30/2013
VALORIZACION ACTUAL
%

VALORIZACION ACUMULADA
Metrado Parcial (S/.)

SALDO POR VALORIZAR


Metrado

Parcial (S/.)

0.0%

0.00

0.00

0.0%

26.00

32,114.16

100.0%

0.0%

0.00

0.00

0.0%

24.00

4,920.00

100.0%

0.0%

0.00

0.00

0.0%

20.00

1,905.60

100.0%

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

#DIV/0!
0.0%

0.00

0.00

0.0%

1.00

1,497.99

100.0%

0.0%

0.00

0.00

0.0%

1.00

676.42

100.0%

0.0%

0.00

0.00

0.0%

1.00

676.42

100.0%

0.0%

0.00

0.00

0.0%

1.00

771.42

100.0%

0.0%

0.00

0.00

0.0%

1.00

887.42

100.0%

0.0%

0.00

0.00

0.0%

1.00

537.42

100.0%

0.0%

0.00

0.00

0.0%

1.00

771.42

100.0%

0.0%

0.00

0.00

0.0%

1.00

912.42

100.0%

0.0%

0.00

0.00

0.0%

1.00

632.42

100.0%

0.0%

0.00

0.00

0.0%

1.00

676.42

100.0%

0.0%

0.00

0.00

0.0%

1.00

887.42

100.0%

0.0%

0.00

0.00

0.0%

1.00

1,007.42

100.0%

0.0%

0.00

0.00

0.0%

1.00

537.42

100.0%

0.0%

0.00

0.00

0.0%

1.00

1,264.84

100.0%

0.0%

0.00

0.00

0.0%

1.00

1,197.84

100.0%

0.0%

0.00

0.00

0.0%

1.00

1,177.84

100.0%

0.0%

0.00

0.00

0.0%

1.00

1,059.42

100.0%

0.0%

0.00

0.00

0.0%

1.00

1,207.84

100.0%

0.0%

0.00

0.00

0.0%

1.00

1,207.84

100.0%

#REF!
#REF!

FECHA : 4/30/2013
VALORIZACION ACTUAL
%

VALORIZACION ACUMULADA
Metrado Parcial (S/.)

SALDO POR VALORIZAR


Metrado

Parcial (S/.)

0.0%

0.00

0.00

0.0%

1.00

769.42

100.0%

0.0%

0.00

0.00

0.0%

1.00

824.42

100.0%

0.0%

0.00

0.00

0.0%

1.00

769.42

100.0%

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

#DIV/0!
0.0%

0.00

0.00

0.0%

30.00

13,949.10

100.0%

0.0%

0.00

0.00

0.0%

10.00

4,668.70

100.0%

0.0%

0.00

0.00

0.0%

109.00

7,516.64

100.0%

0.0%

0.00

0.00

0.0%

70.29

4,824.71

100.0%

0.0%

0.00

0.00

0.0%

310.00

3,558.80

100.0%

0.0%

0.00

0.00

0.0%

140.00

1,593.20

100.0%

0.0%

0.00

0.00

0.0%

10.00

181.10

100.0%

0.0%

0.00

0.00

0.0%

8.00

115.60

100.0%

0.0%

0.00

0.00

0.0%

3.60

54.90

100.0%

0.0%

0.00

0.00

0.0%

6.00

91.50

100.0%

0.0%

0.00

0.00

0.0%

4.80

73.20

100.0%

0.0%

0.00

0.00

0.0%

6.93

325.16

100.0%

0.0%

0.00

0.00

0.0%

4.80

73.20

100.0%

0.0%

0.00

0.00

0.0%

6.24

95.16

100.0%

0.0%

0.00

0.00

0.0%

2.20

71.54

100.0%

0.0%

0.00

0.00

0.0%

3.60

54.90

100.0%

0.0%

0.00

0.00

0.0%

48.40

738.10

100.0%

0.0%

0.00

0.00

0.0%

15.40

234.85

100.0%

0.0%

0.00

0.00

0.0%

2.20

71.54

100.0%

#REF!
#REF!

FECHA : 4/30/2013
VALORIZACION ACTUAL
%

VALORIZACION ACUMULADA
Metrado Parcial (S/.)

SALDO POR VALORIZAR


Metrado

Parcial (S/.)

0.0%

0.00

0.00

0.0%

67.20

15,033.31

100.0%

0.0%

0.00

0.00

0.0%

2.40

345.17

100.0%

0.0%

0.00

0.00

0.0%

9.90

492.13

100.0%

0.0%

0.00

0.00

0.0%

9.90

492.13

100.0%

0.0%

0.00

0.00

0.0%

6.60

144.14

100.0%

0.0%

0.00

0.00

0.0%

12.10

222.88

100.0%

0.0%

0.00

0.00

0.0%

4.80

107.71

100.0%

0.0%

0.00

0.00

0.0%

4.80

79.68

100.0%

0.0%

0.00

0.00

0.0%

27.60

619.34

100.0%

0.0%

0.00

0.00

0.0%

2.40

30.24

100.0%

0.0%

0.00

0.00

0.0%

26.40

592.42

100.0%

0.0%

0.00

0.00

0.0%

289.00

4,219.40

100.0%

0.0%

0.00

0.00

0.0%

289.00

4,557.53

100.0%

0.0%

0.00

0.00

0.0%

15.00

13,202.40

100.0%

#DIV/0!

Err:518

0.00

Err:518

Err:518

Err:518

Err:518

0.0%

0.00

0.00

0.0%

3.00

80.52

100.0%

0.0%

0.00

0.00

0.0%

15.00

402.60

100.0%

#DIV/0!

Err:518

0.00

Err:518

Err:518

Err:518

Err:518

0.0%

0.00

0.00

0.0%

15.00

23,152.05

100.0%

0.0%

0.00

0.00

0.0%

4.00

7,651.88

100.0%

0.0%

0.00

0.00

0.0%

3.00

10,789.41

100.0%

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

0.00

0.0%

120.00

2,148.00

100.0%

#DIV/0!
0.0%

0.00

#REF!
#REF!

FECHA : 4/30/2013
VALORIZACION ACTUAL
%
0.0%

VALORIZACION ACUMULADA
Metrado Parcial (S/.)
0.00

#DIV/0!

SALDO POR VALORIZAR


Metrado

Parcial (S/.)

0.00

0.0%

120.00

1,094.40

100.0%

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

0.0%

0.00

0.00

0.0%

2.00

560.80

100.0%

0.0%

0.00

0.00

0.0%

2.00

881.60

100.0%

0.0%

0.00

0.00

0.0%

2.00

500.32

100.0%

0.0%

0.00

0.00

0.0%

2.00

881.60

100.0%

0.0%

0.00

0.00

0.0%

1.00

280.40

100.0%

0.0%

0.00

0.00

0.0%

1.00

280.40

100.0%

0.0%

0.00

0.00

0.0%

1.00

15,633.60

100.0%

0.0%

0.00

0.00

0.0%

4.00

984.12

100.0%

0.0%

0.00

0.00

0.0%

4.00

984.12

100.0%

0.0%

0.00

0.00

0.0%

1.00

85,500.00

100.0%

0.0%

0.00

0.00

0.0%

1.00

350,000.00

100.0%

#REF!
#REF!

FECHA : 4/30/2013
VALORIZACION ACTUAL
%

VALORIZACION ACUMULADA
Metrado Parcial (S/.)

SALDO POR VALORIZAR


Metrado

Parcial (S/.)

0.00

738,890.92

0.00

104,700.84

0.00

70,194.64

0.00

913,786.40

0.00
0.00

0.00

913,786.40
913,786.40

#REF!
#REF!
OBRA
EJECUTA
CLIENTE
UBICAC.

#REF!
#REF!

Partida

Descripcin

Und

Metrado

C.U.

Parcial

(S/.)

(S/.)

VALORIZADO ANTERIOR
MetradoParcial (S/.)

VALORIZACION ACTUAL
Metrado Parcial (S/.)

INSTALACIONES SANITARIAS
01
01.01

RED DE AGUA POTABLE


RED DE DISTRIBUCION

01.01.01

TRAZO Y REPLANTEO

190.00

2.37

450.30

0.00

0.00

0.0%

0.00

0.00

01.01.02

EXCAVAV. DE ZANJAS P/TUBERIA

190.00

17.90

3,401.00

0.00

0.00

0.0%

0.00

0.00

01.01.03

REFINE Y NIVELACION DE ZANJA P/TUBERIA

189.00

2.03

383.67

0.00

0.00

0.0%

0.00

0.00

01.01.04

PREP. D/CAMA DE APOYO (E=10 CM)

190.00

15.07

2,863.30

0.00

0.00

0.0%

0.00

0.00

01.01.05

SUM./ INST. T/PRUEBA HIDRA./ TUB. PVC 2" C-10

190.00

24.11

4,580.90

0.00

0.00

0.0%

0.00

0.00

01.01.06

RELL. COMP. C/PL VIBRADOR/ MANUAL E/T. N

190.00

9.12

1,732.80

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

01.02

SALIDAS

01.02.01

SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"

pto

85.00

81.54

6,930.90

0.00

0.00

0.0%

0.00

0.00

01.02.02

SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 3/4"

pto

2.00

81.52

163.04

0.00

0.00

0.0%

0.00

0.00

01.03

VALVULAS

0.00

0.00

#DIV/0!

0.00

0.00

01.03.01

VALVULA COMPUERTA DE BRONCE DE U.R. DE 3/4"

21.00

48.74

1,023.54

0.00

0.00

0.0%

0.00

0.00

01.03.02

VALVULA COMPUERTA DE BRONCE DE U.R. DE 1"

7.00

115.09

805.63

0.00

0.00

0.0%

0.00

0.00

01.03.03

VALVULA COMPUERTA DE 1/2"

44.00

75.25

3,311.00

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

01.04

TUBERIA

01.04.01

SUM./ INST. / TUB. PVC 1/2 C-10

60.64

15.20

921.73

0.00

0.00

0.0%

0.00

0.00

01.04.02

SUM./ INST. T/PRUEBA HIDRA./ TUB. PVC 3/4" C-10

162.25

21.49

3,486.75

0.00

0.00

0.0%

0.00

0.00

01.04.03

SUM./ INST. T/PRUEBA HIDRA./ TUB. PVC 1" C-10

26.25

25.14

659.93

0.00

0.00

0.0%

0.00

0.00

01.04.04

SUM./ INST. T/PRUEBA HIDRA./ TUB. PVC 1 1/2" C-10

12.53

32.07

401.84

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

0.0%

0.00

0.00

01.05
01.05.01

VARIOS
NICHO Y TAPA DE MADERA PARA VALVULA EN PARED

72.00

43.33

3,119.76

#REF!
#REF!
OBRA
EJECUTA
CLIENTE
UBICAC.

#REF!
#REF!

Partida
01.05.02
01.06
01.06.01
01.07
01.07.01
01.08

Descripcin
SISTEMA DE CLORACION

Und
u

Metrado
1.00

C.U.

Parcial

(S/.)

(S/.)

1,542.73

1,542.73

ACCESORIOS
VALVULA Y ACCESORIOS PARA CISTERNA Y TANQUE ELEVADO u

2.00

224.67

449.34

PRUEBAS HIDRAULICAS
PRUEBA HIDRAULICA PARA TUBERIA DE AGUA FRIA

451.67

5.73

2,588.07

EQUIPO DE BOMBEO

VALORIZADO ANTERIOR
MetradoParcial (S/.)

VALORIZACION ACTUAL
Metrado Parcial (S/.)

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.0%

0.00

0.00

01.08.01

ADQUIS./INST./02 ELECTROBOMBAS Q=3.5 LTS/SEG, ADT=18 M Pu

2.00

3,224.32

6,448.64

0.00

0.00

01.08.02

ACCESORIOS PARA LA BOMBA

2.00

900.81

1,801.62

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

01.09
01.09.01
02
02.01

glb

LINEA DE IMPULSION
SUM./ INST. T/ TUB. PVC 2" C-10

18.00

21.40

385.20

SISTEMA DE DESAGUE DOMESTICO


SANEAMIENTO

02.01.01

EXCAV. DE ZANJAS E/T SEM CONGL.

65.05

31.32

2,037.37

0.00

0.00

0.0%

0.00

0.00

02.01.02

REFINE Y NIVELACION DE ZANJA P/TUBERIA

65.05

7.13

463.81

0.00

0.00

0.0%

0.00

0.00

02.01.03

PREP. D/CAMA DE APOYO (E=10 CM)

65.05

15.07

980.30

0.00

0.00

0.0%

0.00

0.00

02.01.04

SUM./ INST. T/PRUEBA HIDRA./ TUB. PVC 4" C-10

65.05

31.26

2,033.46

0.00

0.00

0.0%

0.00

0.00

02.01.05

RELL. COMP. C/PL VIBRADOR/ MANUAL E/T. N

65.05

9.12

593.26

0.00

0.00

0.0%

0.00

0.00

02.01.06

ELIMINACION MATERIAL EXCEDENTE DMT=5 KM

m3

52.69

8.95

471.58

0.00

0.00

0.0%

0.00

0.00

02.02

CAJA DE REGISTRO

0.00

0.00

#DIV/0!

0.00

0.00

02.02.01

CAJA DE REGISTRO DE 12" X 24" CON TAPA DE CONCRETO

6.00

167.91

1,007.46

0.00

0.00

0.0%

0.00

0.00

02.02.02

CAJA DE REGISTRO DE 24" X 24" CON TAPA DE CONCRETO

1.00

218.54

218.54

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

0.0%

0.00

0.00

02.03
02.03.01

TUBERIA
INSTALACION DE TUBERIA PVC SAL 2"

82.51

14.80

1,221.15

#REF!
#REF!
OBRA
EJECUTA
CLIENTE
UBICAC.

#REF!
#REF!

Partida
02.03.02

Descripcin
INSTALACION DE TUBERIA PVC SAL 4"

Und
m

Metrado
40.26

C.U.

Parcial

(S/.)

(S/.)

19.92

02.04

SALIDA DE DESAGUE Y VENTILACION

02.04.01

SALIDA DE DESAGUE PVC SAL 2"

pto

49.00

23.41

02.04.02

SALIDA DE DESAGUE PVC SAL 4"

pto

12.00

32.68

02.04.03

SALIDA DE VENTILACION PVC SAL 2"

pto

8.00

63.49

02.05
02.05.01
02.06

VALORIZACION ACTUAL
Metrado Parcial (S/.)

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

1,147.09

0.00

0.00

0.0%

0.00

0.00

392.16

0.00

0.00

0.0%

0.00

0.00

507.92

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

0.0%

0.00

0.00

801.98

ADITAMENTOS VARIOS
ACCESORIOS PARA DESAGUE

VALORIZADO ANTERIOR
MetradoParcial (S/.)

glb

1.00

900.81

900.81

REGISTROS

0.00

0.00

#DIV/0!

0.00

0.00

02.06.01

REGISTRO DE BRONCE DE 2"

7.00

53.45

374.15

0.00

0.00

0.0%

0.00

0.00

02.06.02

REGISTRO DE BRONCE DE 4"

12.00

64.64

775.68

0.00

0.00

0.0%

0.00

0.00

02.07

SUMIDERO

0.00

0.00

#DIV/0!

0.00

0.00

02.07.01

SUMIDERO DE 2"

26.00

50.43

1,311.18

0.00

0.00

0.0%

0.00

0.00

02.07.02

SUMIDERO DE 4"

4.00

82.99

331.96

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

0.0%

0.00

0.00

02.08
02.08.01
02.09
02.09.01
02.10
02.10.01
02.11
02.11.01
02.12
02.12.01

CAMARA DE BOMBEO, CUARTO DE BOMBAS


SUMINISTRO E INSTALACION DE EQUIPO DE BOMBEO, 02 BOMBu

2.00

10,101.35

20,202.70

35.00

24.11

843.85

LINEA DE IMPULSION
SUM./ INST. T/PRUEBA HIDRA./ TUB. PVC 2" C-10

PRUEBAS DE NIVELACION
PRUEBA DE NIVELACION P/DESAGUE

187.82

3.41

640.47

PRUEBAS HIDRAULICAS
PRUEBA DE NIVELACION P/DESAGUE

187.82

3.41

640.47

CAMARA DE BOMBEO PATIO ZONA DE EMBARQUE


EQUIPO DE BOMBEO, 02 BOMBAS SUMERGIBLES Q=0.5 L/S, Pot u

2.00

6,389.14

12,778.28

#REF!
#REF!
OBRA
EJECUTA
CLIENTE
UBICAC.

#REF!
#REF!

Partida
03
03.01
03.01.01
03.02

Descripcin

Und

Metrado

C.U.

Parcial

(S/.)

(S/.)

SISTEMA DE AGUA DE MAR


CAMARA DE BOMBEO EN CABEZO MUELLE
CASETA DE CAPTACION

1.00

2,965.12

2,965.12

EQUIPOS DE BOMBEO

VALORIZADO ANTERIOR
MetradoParcial (S/.)

VALORIZACION ACTUAL
Metrado Parcial (S/.)

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

03.02.01

ADQUIS./INST./02 ELECTROBOMBAS Q=11.3 LTS/SEG, ZDT=12m. u

2.00

3,751.35

7,502.70

0.00

0.00

0.0%

0.00

0.00

03.02.02

ACCESORIOS PARA LA BOMBA

1.00

900.81

900.81

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

03.03

glb

SISTEMA DE TRATAMIENTO CLORACION - DESINFECCION

03.03.01

ACCESORIOS PARA SISTEMA DE CLORACION - DESINFECCION glb

2.00

1,950.81

3,901.62

0.00

0.00

0.0%

0.00

0.00

03.03.02

EQUIPO DE TRATAMIENTO DE AGUA DE MAR POR OSMOSIS INV u

1.00

233,639.81

233,639.81

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

03.04

LINEA DE IMPULSION

03.04.01

EXCAV. DE ZANJAS E/T SEM CONGL.

80.00

31.32

2,505.60

0.00

0.00

0.0%

0.00

0.00

03.04.02

REFINE Y NIVELACION DE ZANJA P/TUBERIA

80.00

7.13

570.40

0.00

0.00

0.0%

0.00

0.00

03.04.03

PREP. D/CAMA DE APOYO (E=10 CM)

80.00

15.07

1,205.60

0.00

0.00

0.0%

0.00

0.00

03.04.04

SUM./ INST. T/PRUEBA HIDRA./ TUB. PVC 2 1/2" C-10

80.00

28.77

2,301.60

0.00

0.00

0.0%

0.00

0.00

03.04.05

RELL. COMP. C/PL VIBRADOR/ MANUAL E/T. N

80.00

9.12

729.60

0.00

0.00

0.0%

0.00

0.00

03.05

TUBERIA AEREA

0.00

0.00

#DIV/0!

0.00

0.00

03.05.01

SUM./ INST. T/PRUEBA HIDRA./ TUB. PVC 4" C-10

96.00

22.19

2,130.24

0.00

0.00

0.0%

0.00

0.00

03.05.02

SUM./ INST. T/PRUEBA HIDRA./ TUB. PVC 2 1/2" C-10

32.00

28.77

920.64

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

3,977.64

0.00

0.00

0.0%

0.00

0.00

03.06

RED DE DISTRIBUCION

03.06.01

EXCAV. DE ZANJAS E/T SEM CONGL.

127.00

31.32

03.06.02

REFINE Y NIVELACION DE ZANJA P/TUBERIA

127.00

7.13

905.51

0.00

0.00

0.0%

0.00

0.00

03.06.03

PREP. D/CAMA DE APOYO (E=10 CM)

127.00

15.07

1,913.89

0.00

0.00

0.0%

0.00

0.00

03.06.04

SUM./ INST. T/PRUEBA HIDRA./ TUB. PVC 2 1/2" C-10

127.00

28.77

3,653.79

0.00

0.00

0.0%

0.00

0.00

#REF!
#REF!
OBRA
EJECUTA
CLIENTE
UBICAC.

#REF!
#REF!

Partida
03.06.05
03.07
03.07.01
03.08

Descripcin
RELL. COMP. C/PL VIBRADOR/ MANUAL E/T. N

Und
m

Metrado
127.00

C.U.

Parcial

(S/.)

(S/.)
9.12

1,158.24

SALIDA DE AGUA DE MAR


SALIDA DE AGUA DE MAR PVC SAP 3/4"

pto

36.00

194.50

7,002.00

VALVULAS

VALORIZADO ANTERIOR
MetradoParcial (S/.)

VALORIZACION ACTUAL
Metrado Parcial (S/.)

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

03.08.01

VALVULA COMPUERTA DE BRONCE DE U.R. DE 3/4"

36.00

48.74

1,754.64

0.00

0.00

0.0%

0.00

0.00

03.08.02

VALVULA COMPUERTA DE BRONCE DE U.R. DE 1"

2.00

115.09

230.18

0.00

0.00

0.0%

0.00

0.00

03.08.03

VALVULA COMPUERTA DE 2 1/2"

2.00

578.26

1,156.52

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

4.00

43.33

173.32

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

03.09
03.09.01
03.10

VARIOS
NICHO Y TAPA DE MADERA PARA VALVULA EN PISO
EQUIPO DE BOMBEO AGUA SALADA

03.10.01

ADQUIS./INST./02 ELECTROBOMBAS Q=4.57 LTS/SEG, ADT=18 M u

2.00

1,843.80

3,687.60

0.00

0.00

0.0%

0.00

0.00

03.10.02

ACCESORIOS PARA LA BOMBA

glb

2.00

600.81

1,201.62

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

1.00

790.43

790.43

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

37,630.45

0.00

0.00

0.0%

0.00

0.00

Err:518

0.00

0.00

#DIV/0!

0.00

0.00

31.32

1,882.33

0.00

0.00

0.0%

0.00

0.00

03.11
03.11.01
03.12
03.12.01
03.13

SISTEMA DE AGUA RESIDUAL


TRAMPA DE GRASAS Y SOLIDOS ACCESORIOS
CANALETAS
COLOCACION DE REJILLA EN CANALETA

m2

93.45

402.68

TUBERIA

03.13.01

EXCAV. DE ZANJAS E/T SEM CONGL.

60.10

03.13.02

REFINE Y NIVELACION DE ZANJA P/TUBERIA

60.10

7.13

428.51

0.00

0.00

0.0%

0.00

0.00

03.13.03

PREP. D/CAMA DE APOYO (E=10 CM)

60.10

15.07

905.71

0.00

0.00

0.0%

0.00

0.00

03.13.04

SUM./ INST. T/PRUEBA HIDRA./ TUB. PVC 6" C-10

60.10

40.46

2,431.65

0.00

0.00

0.0%

0.00

0.00

03.13.05

RELL. COMP. C/PL VIBRADOR/ MANUAL E/T. N

60.10

9.12

548.11

0.00

0.00

0.0%

0.00

0.00

Err:518

0.00

0.00

#DIV/0!

0.00

0.00

03.14

CAJA DE DISTRIBUCION DE CAUDALES

#REF!
#REF!
OBRA
EJECUTA
CLIENTE
UBICAC.

#REF!
#REF!

Partida
03.14.01
03.15
03.15.01
03.16

Descripcin
CAJA DE DISTRIBUCION

Und
u

Metrado
1.00

C.U.

Parcial

(S/.)

(S/.)

572.15

SEDIMENTADOR
EQUIPAMIENTO SEDIMENTADOR

1.00

2,486.84

CAMARA DE BOMBEO

VALORIZADO ANTERIOR
MetradoParcial (S/.)

VALORIZACION ACTUAL
Metrado Parcial (S/.)

572.15

0.00

0.00

0.0%

0.00

0.00

Err:518

0.00

0.00

#DIV/0!

0.00

0.00

2,486.84

0.00

0.00

0.0%

0.00

0.00

Err:518

0.00

0.00

#DIV/0!

0.00

0.00

03.16.01

SEDIMENTADOR - ACCESORIOS

pto

1.00

3,686.84

3,686.84

0.00

0.00

0.0%

0.00

0.00

03.16.02

FILTRO ANAEROBICO DE ACCESORIOS

glb

1.00

3,100.81

3,100.81

0.00

0.00

0.0%

0.00

0.00

03.16.03

ADQUIS./INST./02 ELECTROBOMBAS Q=4.5 L/S, ADT=22m., Pot=2.glb

2.00

13,101.35

26,202.70

0.00

0.00

0.0%

0.00

0.00

Err:518

0.00

0.00

#DIV/0!

0.00

0.00

64.25

50.82

3,265.19

0.00

0.00

0.0%

0.00

0.00

Err:518

0.00

0.00

#DIV/0!

0.00

0.00

03.17
03.17.01
03.18
03.18.01

LINEA DE IMPULSION
TUBERI A DE PVC 3

EMISOR SUBMARINO
SUMINISTRO DE TUBERIAS

Err:518

0.00

0.00

#DIV/0!

0.00

0.00

528.77

60.50

31,990.59

0.00

0.00

0.0%

0.00

0.00

20.00

61.71

1,234.20

0.00

0.00

0.0%

0.00

0.00

ACCESORIOS SUMINISTRO DE TUBERIA HDPE

glb

1.00

3,732.20

3,732.20

0.00

0.00

0.0%

0.00

0.00

SUMINIST DE TUBERIA LISA HDPE PECC-100 Dext. 90 MM (3

1,100.00

14.59

16,049.00

0.00

0.00

0.0%

0.00

0.00

03.18.01.01

SUMINIST DE TUBERIA LISA HDPE PECC-100 Dext. 160 MM (6") m

03.18.01.02

SUMINIST DE TUBERIA LISA HDPE PECC-100 Dext. 160 MM

03.18.01.03
03.18.01.04
03.18.02

BALASTROS DE CONCRETO

Err:518

0.00

0.00

#DIV/0!

0.00

0.00

03.18.02.01

LASTRE DE CONCRETO TIPO A+B SEPARACION 4.5 MTS C/U

45.00

490.65

22,079.25

0.00

0.00

0.0%

0.00

0.00

03.18.02.02

LASTRE DE CONCRETO TIPO A SEPARACION 4.5 MTS C/U

72.00

341.40

24,580.80

0.00

0.00

0.0%

0.00

0.00

LASTRE DE CONCRETO TIPO II SEPARACION 4.5 MTS C/U

6.00

533.10

3,198.60

0.00

0.00

0.0%

0.00

0.00

Err:518

0.00

0.00

#DIV/0!

0.00

0.00

03.18.02.03
03.18.03

TERMOFUSION

03.18.03.01

SERVICIO DE TERMOFUSION DE TUBERIAS DE 160MM PN-10 glb

1.00

22,105.60

22,105.60

0.00

0.00

0.0%

0.00

0.00

03.18.03.02

SERVICIO DE TERMOFUSION DE TUBERIAS DE 90MM PN-10 ( glb

1.00

4,105.60

4,105.60

0.00

0.00

0.0%

0.00

0.00

Err:518

0.00

0.00

#DIV/0!

0.00

0.00

03.18.04

ULTRASONIDO - CONTROL DE CALIDAD

#REF!
#REF!
OBRA
EJECUTA
CLIENTE
UBICAC.

#REF!
#REF!

Partida
03.18.04.01
03.18.05

Descripcin
INSPECCION ULTRASONICA DE JUNTA

Und
glb

Metrado
1.00

C.U.

Parcial

(S/.)

(S/.)

7,000.00

LAZAMIENTO Y HUNDIMIENTO

VALORIZADO ANTERIOR
MetradoParcial (S/.)

VALORIZACION ACTUAL
Metrado Parcial (S/.)

7,000.00

0.00

0.00

0.0%

0.00

0.00

Err:518

0.00

0.00

#DIV/0!

0.00

0.00

03.18.05.01

LANZAMIENTO Y HUNDIMIENTO DE LINEA

glb

1.00

66,000.00

66,000.00

0.00

0.00

0.0%

0.00

0.00

03.18.05.02

FIJACION PRIMEROS METRIS DE TUBERIA CON CONCRETO C m3

3.00

830.12

2,490.36

0.00

0.00

0.0%

0.00

0.00

03.18.05.03

PRUEBA Y PUESTA EN MARCHA EMISOR SUBMARINO

1.00

5,000.00

5,000.00

0.00

0.00

0.0%

0.00

0.00

Err:518

0.00

0.00

#DIV/0!

0.00

0.00

0.0%

0.00

0.00

03.19

glb

CAJA DE REGISTRO

03.19.01

CAJA DE REGISTRO DE 12" X 24" CON TAPA DE CONCRETO

5.00

177.67

888.35

0.00

0.00

03.19.02

CAJA DE REGISTRO DE 24" X 24" CON TAPA DE CONCRETO

1.00

218.54

218.54

0.00

0.00

0.0%

0.00

0.00

Err:518

0.00

0.00

#DIV/0!

0.00

0.00

31.32

5,230.44

0.00

0.00

0.0%

0.00

0.00

03.20

SISTEMA CONTRA INCENDIO

03.20.01

EXCAV. DE ZANJAS E/T SEM CONGL.

167.00

03.20.02

REFINE Y NIVELACION DE ZANJA P/TUBERIA

167.00

7.13

1,190.71

0.00

0.00

0.0%

0.00

0.00

03.20.03

PREP. D/CAMA DE APOYO (E=10 CM)

167.00

15.07

2,516.69

0.00

0.00

0.0%

0.00

0.00

03.20.04

SUM./ INST. T/PRUEBA HIDRA./ TUB. PVC 2 1/2" C-10

167.00

28.77

4,804.59

0.00

0.00

0.0%

0.00

0.00

03.20.05

RELL. COMP. C/PL VIBRADOR/ MANUAL E/T. N

167.00

9.12

1,523.04

0.00

0.00

0.0%

0.00

0.00

03.20.06

SERVICIO DE TERMOFUSION DE TUBERIAS DE 110MM PN-10

glb

1.00

11,105.60

11,105.60

0.00

0.00

0.0%

0.00

0.00

03.20.07

INSPECCION ULTRASONICA DE JUNTA

glb

0.50

7,000.00

3,500.00

0.00

0.00

0.0%

0.00

0.00

Err:518

0.00

0.00

#DIV/0!

0.00

0.00

03.21
03.21.01
03.22

TUBERIA COLGADA MUELLE


SUMINIST DE TUBERIA LISA HDPE PECC-100 Dext. 110 MM (4")

94.00

97.35

9,150.90

0.00

0.00

0.0%

0.00

0.00

EQUIPOS CONTRA INCENDIO

Err:518

0.00

0.00

#DIV/0!

0.00

0.00

03.22.01

GABINETE CONTRA INCENDIO

3.00

1,311.45

3,934.35

0.00

0.00

0.0%

0.00

0.00

03.22.02

ADQUIS./INST.ELECTROBOMBA CI TURBINA VERTICAL Q=15.9 L/ u

1.00

40,007.49

40,007.49

0.00

0.00

0.0%

0.00

0.00

03.22.03

ADQUIS./INST.ELECTROBOMBA CI TURBINA VERTICAL Q=15.9 L/ u

1.00

2,512.49

2,512.49

0.00

0.00

0.0%

0.00

0.00

Err:518

0.00

0.00

#DIV/0!

0.00

0.00

03.23

APARATOS Y ACCESORIOS SANITARIOS

#REF!
#REF!
OBRA
EJECUTA
CLIENTE
UBICAC.

#REF!
#REF!

Partida
03.23.01

Descripcin

Und

Metrado

C.U.

Parcial

(S/.)

(S/.)

APARATOS SANITARIOS

VALORIZADO ANTERIOR
MetradoParcial (S/.)

VALORIZACION ACTUAL
Metrado Parcial (S/.)

Err:518

0.00

0.00

#DIV/0!

0.00

0.00

INODORO COLOR BLANCO CON ASIENTO

pza

15.00

407.25

6,108.75

0.00

0.00

0.0%

0.00

0.00

03.23.01.02

URINARIO

pza

5.00

554.53

2,772.65

0.00

0.00

0.0%

0.00

0.00

03.23.02

LAVATORIOS

Err:518

0.00

0.00

#DIV/0!

0.00

0.00

03.23.01.01

03.23.02.01

LAVATORIO DE PARED

pza

21.00

294.08

6,175.68

0.00

0.00

0.0%

0.00

0.00

03.23.02.02

LAVADERO DE COCINA DE ACERO INOXIDABLE

pza

4.00

376.86

1,507.44

0.00

0.00

0.0%

0.00

0.00

03.23.02.03

DUCHAS CROMADAS DE CABEZA GIRATORIA

pza

8.00

424.08

3,392.64

0.00

0.00

0.0%

0.00

0.00

03.23.02.04

GRIFERIA PARA LAVADEROS

21.00

231.01

4,851.21

0.00

0.00

0.0%

0.00

0.00

03.23.02.05

PAPELERA C/EJE ADHESIVO C/SILICONA BLANCO STANDAR

15.00

124.21

1,863.15

0.00

0.00

0.0%

0.00

0.00

03.23.02.06

TOALLERO DE BARRA

8.00

151.04

1,208.32

0.00

0.00

0.0%

0.00

0.00

#REF!
#REF!
OBRA
EJECUTA
CLIENTE
UBICAC.

#REF!
#REF!

Partida

Descripcin

Und

Metrado

COSTO DIRECTO
GASTOS GENERALES
UTILIDAD

TOTAL (SIN. IGV)

Parcial
(S/.)

VALORIZADO ANTERIOR
MetradoParcial (S/.)

VALORIZACION ACTUAL
Metrado Parcial (S/.)

792,176.92

0.00

0.00

14.17%

112,251.47

0.00

0.00

9.50%

75,256.81

0.00

0.00

979,685.20

0.00

0.00

SUB TOTAL
FACTOR DE RELACION

C.U.
(S/.)

1.00000

979,685.20
979,685.20

0.00
0.00

0.00
0.00

#REF!
#REF!

FECHA : 4/30/2013
VALORIZACION ACTUAL
%

VALORIZACION ACUMULADA
Metrado Parcial (S/.)

SALDO POR VALORIZAR


Metrado

Parcial (S/.)

0.0%

0.00

0.00

0.0%

190.00

450.30

100.0%

0.0%

0.00

0.00

0.0%

190.00

3,401.00

100.0%

0.0%

0.00

0.00

0.0%

189.00

383.67

100.0%

0.0%

0.00

0.00

0.0%

190.00

2,863.30

100.0%

0.0%

0.00

0.00

0.0%

190.00

4,580.90

100.0%

0.0%

0.00

0.00

0.0%

190.00

1,732.80

100.0%

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

#DIV/0!
0.0%

0.00

0.00

0.0%

85.00

6,930.90

100.0%

0.0%

0.00

0.00

0.0%

2.00

163.04

100.0%

#DIV/0!

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

0.0%

0.00

0.00

0.0%

21.00

1,023.54

100.0%

0.0%

0.00

0.00

0.0%

7.00

805.63

100.0%

0.0%

0.00

0.00

0.0%

44.00

3,311.00

100.0%

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

#DIV/0!
0.0%

0.00

0.00

0.0%

60.64

921.73

100.0%

0.0%

0.00

0.00

0.0%

162.25

3,486.75

100.0%

0.0%

0.00

0.00

0.0%

26.25

659.93

100.0%

0.0%

0.00

0.00

0.0%

12.53

401.84

100.0%

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

0.00

0.0%

72.00

3,119.76

100.0%

#DIV/0!
0.0%

0.00

#REF!
#REF!

FECHA : 4/30/2013
VALORIZACION ACTUAL
%
0.0%

VALORIZACION ACUMULADA
Metrado Parcial (S/.)
0.00

#DIV/0!
0.0%

0.00

#DIV/0!
0.0%

0.00

#DIV/0!

SALDO POR VALORIZAR


Metrado

Parcial (S/.)

0.00

0.0%

1.00

1,542.73

100.0%

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

0.00

0.0%

2.00

449.34

100.0%

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

0.00

0.0%

451.67

2,588.07

100.0%

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

0.0%

2.00

6,448.64

100.0%

0.0%

0.00

0.00

0.0%

0.00

0.00

0.0%

2.00

1,801.62

100.0%

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

0.00

0.0%

18.00

385.20

100.0%

#DIV/0!

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

#DIV/0!

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

#DIV/0!
0.0%

0.00

0.0%

0.00

0.00

0.0%

65.05

2,037.37

100.0%

0.0%

0.00

0.00

0.0%

65.05

463.81

100.0%

0.0%

0.00

0.00

0.0%

65.05

980.30

100.0%

0.0%

0.00

0.00

0.0%

65.05

2,033.46

100.0%

0.0%

0.00

0.00

0.0%

65.05

593.26

100.0%

0.0%

0.00

0.00

0.0%

52.69

471.58

100.0%

#DIV/0!

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

0.0%

0.00

0.00

0.0%

6.00

1,007.46

100.0%

0.0%

0.00

0.00

0.0%

1.00

218.54

100.0%

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

0.00

0.0%

82.51

1,221.15

100.0%

#DIV/0!
0.0%

0.00

#REF!
#REF!

FECHA : 4/30/2013
VALORIZACION ACTUAL
%
0.0%

VALORIZACION ACUMULADA
Metrado Parcial (S/.)
0.00

#DIV/0!

SALDO POR VALORIZAR


Metrado

Parcial (S/.)

0.00

0.0%

40.26

801.98

100.0%

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

0.0%

0.00

0.00

0.0%

49.00

1,147.09

100.0%

0.0%

0.00

0.00

0.0%

12.00

392.16

100.0%

0.0%

0.00

0.00

0.0%

8.00

507.92

100.0%

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

0.00

0.0%

1.00

900.81

100.0%

#DIV/0!
0.0%

0.00

#DIV/0!

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

0.0%

0.00

0.00

0.0%

7.00

374.15

100.0%

0.0%

0.00

0.00

0.0%

12.00

775.68

100.0%

#DIV/0!

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

0.0%

0.00

0.00

0.0%

26.00

1,311.18

100.0%

0.0%

0.00

0.00

0.0%

4.00

331.96

100.0%

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

0.00

0.0%

2.00

20,202.70

100.0%

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

0.00

0.0%

35.00

843.85

100.0%

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

#DIV/0!
0.0%

0.00

#DIV/0!
0.0%

0.00

#DIV/0!
0.0%

0.00

#DIV/0!
0.0%

0.00

#DIV/0!
0.0%

0.00

0.00

0.0%

187.82

640.47

100.0%

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

0.00

0.0%

187.82

640.47

100.0%

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

0.00

0.0%

2.00

12,778.28

100.0%

#REF!
#REF!

FECHA : 4/30/2013
VALORIZACION ACTUAL
%

VALORIZACION ACUMULADA
Metrado Parcial (S/.)

SALDO POR VALORIZAR


Metrado

Parcial (S/.)

#DIV/0!

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

#DIV/0!

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

0.0%

0.00

#DIV/0!

0.00

0.0%

1.00

2,965.12

100.0%

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!
100.0%

0.0%

0.00

0.00

0.0%

2.00

7,502.70

0.0%

0.00

0.00

0.0%

1.00

900.81

100.0%

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!
100.0%

#DIV/0!
0.0%

0.00

0.00

0.0%

2.00

3,901.62

0.0%

0.00

0.00

0.0%

1.00

233,639.81

100.0%

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

#DIV/0!
0.0%

0.00

0.00

0.0%

80.00

2,505.60

100.0%

0.0%

0.00

0.00

0.0%

80.00

570.40

100.0%

0.0%

0.00

0.00

0.0%

80.00

1,205.60

100.0%

0.0%

0.00

0.00

0.0%

80.00

2,301.60

100.0%

0.0%

0.00

0.00

0.0%

80.00

729.60

100.0%

#DIV/0!

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

0.0%

0.00

0.00

0.0%

96.00

2,130.24

100.0%

0.0%

0.00

0.00

0.0%

32.00

920.64

100.0%

#DIV/0!

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

0.0%

0.00

0.00

0.0%

127.00

3,977.64

100.0%

0.0%

0.00

0.00

0.0%

127.00

905.51

100.0%

0.0%

0.00

0.00

0.0%

127.00

1,913.89

100.0%

0.0%

0.00

0.00

0.0%

127.00

3,653.79

100.0%

#REF!
#REF!

FECHA : 4/30/2013
VALORIZACION ACTUAL
%
0.0%

VALORIZACION ACUMULADA
Metrado Parcial (S/.)
0.00

#DIV/0!
0.0%

0.00

#DIV/0!

SALDO POR VALORIZAR


Metrado

Parcial (S/.)

0.00

0.0%

127.00

1,158.24

100.0%

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

0.00

0.0%

36.00

7,002.00

100.0%

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

0.0%

0.00

0.00

0.0%

36.00

1,754.64

100.0%

0.0%

0.00

0.00

0.0%

2.00

230.18

100.0%

0.0%

0.00

0.00

0.0%

2.00

1,156.52

100.0%

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

0.00

0.0%

4.00

173.32

100.0%

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

#DIV/0!
0.0%

0.00

#DIV/0!
0.0%

0.00

0.00

0.0%

2.00

3,687.60

100.0%

0.0%

0.00

0.00

0.0%

2.00

1,201.62

100.0%

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

0.00

0.0%

1.00

790.43

100.0%

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!
100.0%

#DIV/0!
0.0%

0.00

#DIV/0!
0.0%

0.00

0.00

0.0%

93.45

37,630.45

#DIV/0!

Err:518

0.00

Err:518

Err:518

Err:518

Err:518

0.0%

0.00

0.00

0.0%

60.10

1,882.33

100.0%

0.0%

0.00

0.00

0.0%

60.10

428.51

100.0%

0.0%

0.00

0.00

0.0%

60.10

905.71

100.0%

0.0%

0.00

0.00

0.0%

60.10

2,431.65

100.0%

0.0%

0.00

0.00

0.0%

60.10

548.11

100.0%

#DIV/0!

Err:518

0.00

Err:518

Err:518

Err:518

Err:518

#REF!
#REF!

FECHA : 4/30/2013
VALORIZACION ACTUAL
%

VALORIZACION ACUMULADA
Metrado Parcial (S/.)

SALDO POR VALORIZAR


Metrado

Parcial (S/.)

0.0%

0.00

0.00

0.0%

1.00

572.15

100.0%

#DIV/0!

Err:518

0.00

Err:518

Err:518

Err:518

Err:518

0.0%

0.00

0.00

0.0%

1.00

2,486.84

100.0%

#DIV/0!

Err:518

0.00

Err:518

Err:518

Err:518

Err:518

0.0%

0.00

0.00

0.0%

1.00

3,686.84

100.0%

0.0%

0.00

0.00

0.0%

1.00

3,100.81

100.0%

0.0%

0.00

0.00

0.0%

2.00

26,202.70

100.0%

#DIV/0!

Err:518

0.00

Err:518

Err:518

Err:518

Err:518

0.0%

0.00

0.00

0.0%

64.25

3,265.19

100.0%

#DIV/0!

Err:518

0.00

Err:518

Err:518

Err:518

Err:518

#DIV/0!

Err:518

0.00

Err:518

Err:518

Err:518

Err:518

0.0%

0.00

0.00

0.0%

528.77

31,990.59

100.0%

0.0%

0.00

0.00

0.0%

20.00

1,234.20

100.0%

0.0%

0.00

0.00

0.0%

1.00

3,732.20

100.0%

0.0%

0.00

0.00

0.0%

1,100.00

16,049.00

100.0%

#DIV/0!

Err:518

0.00

Err:518

Err:518

Err:518

Err:518

0.0%

0.00

0.00

0.0%

45.00

22,079.25

100.0%

0.0%

0.00

0.00

0.0%

72.00

24,580.80

100.0%

0.0%

0.00

0.00

0.0%

6.00

3,198.60

100.0%

#DIV/0!

Err:518

0.00

Err:518

Err:518

Err:518

Err:518

0.0%

0.00

0.00

0.0%

1.00

22,105.60

100.0%

0.0%

0.00

0.00

0.0%

1.00

4,105.60

100.0%

#DIV/0!

Err:518

0.00

Err:518

Err:518

Err:518

Err:518

#REF!
#REF!

FECHA : 4/30/2013
VALORIZACION ACTUAL
%

VALORIZACION ACUMULADA
Metrado Parcial (S/.)

SALDO POR VALORIZAR


Metrado

Parcial (S/.)

0.0%

0.00

0.00

0.0%

1.00

7,000.00

100.0%

#DIV/0!

Err:518

0.00

Err:518

Err:518

Err:518

Err:518

0.0%

0.00

0.00

0.0%

1.00

66,000.00

100.0%

0.0%

0.00

0.00

0.0%

3.00

2,490.36

100.0%
100.0%

0.0%

0.00

0.00

0.0%

1.00

5,000.00

#DIV/0!

Err:518

0.00

Err:518

Err:518

Err:518

Err:518

0.0%

0.00

0.00

0.0%

5.00

888.35

100.0%
100.0%

0.0%

0.00

0.00

0.0%

1.00

218.54

#DIV/0!

Err:518

0.00

Err:518

Err:518

Err:518

Err:518

0.0%

0.00

0.00

0.0%

167.00

5,230.44

100.0%

0.0%

0.00

0.00

0.0%

167.00

1,190.71

100.0%

0.0%

0.00

0.00

0.0%

167.00

2,516.69

100.0%

0.0%

0.00

0.00

0.0%

167.00

4,804.59

100.0%

0.0%

0.00

0.00

0.0%

167.00

1,523.04

100.0%

0.0%

0.00

0.00

0.0%

1.00

11,105.60

100.0%
100.0%

0.0%

0.00

0.00

0.0%

0.50

3,500.00

#DIV/0!

Err:518

0.00

Err:518

Err:518

Err:518

Err:518

0.0%

0.00

0.00

0.0%

94.00

9,150.90

100.0%

#DIV/0!

Err:518

0.00

Err:518

Err:518

Err:518

Err:518

0.0%

0.00

0.00

0.0%

3.00

3,934.35

100.0%

0.0%

0.00

0.00

0.0%

1.00

40,007.49

100.0%

0.0%

0.00

0.00

0.0%

1.00

2,512.49

100.0%

#DIV/0!

Err:518

0.00

Err:518

Err:518

Err:518

Err:518

#REF!
#REF!

FECHA : 4/30/2013
VALORIZACION ACTUAL
%

VALORIZACION ACUMULADA
Metrado Parcial (S/.)

SALDO POR VALORIZAR


Metrado

Parcial (S/.)

#DIV/0!

Err:518

0.00

Err:518

Err:518

Err:518

Err:518

0.0%

0.00

0.00

0.0%

15.00

6,108.75

100.0%

0.0%

0.00

0.00

0.0%

5.00

2,772.65

100.0%

#DIV/0!

Err:518

0.00

Err:518

Err:518

Err:518

Err:518

0.0%

0.00

0.00

0.0%

21.00

6,175.68

100.0%

0.0%

0.00

0.00

0.0%

4.00

1,507.44

100.0%

0.0%

0.00

0.00

0.0%

8.00

3,392.64

100.0%

0.0%

0.00

0.00

0.0%

21.00

4,851.21

100.0%

0.0%

0.00

0.00

0.0%

15.00

1,863.15

100.0%

0.0%

0.00

0.00

0.0%

8.00

1,208.32

100.0%

#REF!
#REF!

FECHA : 4/30/2013
VALORIZACION ACTUAL
%

VALORIZACION ACUMULADA
Metrado Parcial (S/.)

SALDO POR VALORIZAR


Metrado

Parcial (S/.)

0.00

792,176.96

0.00

112,251.48

0.00

75,256.81

0.00

979,685.25

0.00
0.00

0.00

979,685.25
979,685.25

#REF!
#REF!
OBRA
EJECUTA
CLIENTE
UBICAC.

#REF!
#REF!

Partida

Descripcin

Und

Metrado

C.U.

Parcial

(S/.)

(S/.)

VALORIZADO ANTERIOR
MetradoParcial (S/.)

VALORIZACION ACTUAL
Metrado Parcial (S/.)

INSTALACIONES ELECTRICAS RED DE MEDIA TENSION


01

TRABAJOS PRELIMINARES

01.01

CARTEL DE OBRA

1.00

2,230.66

2,230.66

0.00

0.00

0.0%

0.00

0.00

01.02

TRANSPORTE DE MATERIALES Y EQUIPO

glb

1.00

5,162.62

5,162.62

0.00

0.00

0.0%

0.00

0.00

01.03

PAGO DE CONEXION EDELNOR

glb

1.00

10,000.00

10,000.00

0.00

0.00

0.0%

0.00

0.00

02

SUMINISTRO DE MATERIALES

02.01

POSTES, ACCESORIOS Y CRUCETAS

1.00

46,506.00

46,506.00

0.00

0.00

0.0%

0.00

0.00

02.02

CONDUCTORES DE ALUMINIO Y ACCESORIOS

glb

1.00

27,600.96

27,600.96

0.00

0.00

0.0%

0.00

0.00

02.03

AISLADORES Y ACCESORIOS

glb

1.00

19,549.40

19,549.40

0.00

0.00

0.0%

0.00

0.00

02.04

RETENIDAS Y ANCLAJE

glb

1.00

11,927.00

11,927.00

0.00

0.00

0.0%

0.00

0.00

02.05

PUESTA A TIERRA

glb

1.00

4,414.75

4,414.75

0.00

0.00

0.0%

0.00

0.00

02.06

TABLERO DE DISTRIBUCION

1.00

6,823.44

6,823.44

0.00

0.00

0.0%

0.00

0.00

02.07

SECCIONADOR Y ACCESORIOS

glb

1.00

2,033.50

2,033.50

0.00

0.00

0.0%

0.00

0.00

02.08

TRANSFORMADORES Y SISTEMA DE MEDICION

glb

1.00

56,984.00

56,984.00

0.00

0.00

0.0%

0.00

0.00

02.09

CONCRETO F'C=210 KG/CM2

m3

14.00

362.53

5,075.42

0.00

0.00

0.0%

0.00

0.00

03

MONTAJE ELECTROMECANICO
2,400.00

1.05

2,520.00

0.00

0.00

0.0%

0.00

0.00

03.01
03.01.01
03.01.02
03.02

OBRAS PRELIMINARES
REPLANTEO TOPOGRAFICO DE LA LINEA Y UBICACION DE ES

CAMPAMENTO PROVISIONAL DE LA OBRA

glb

1.00

8,000.00

8,000.00

0.00

0.00

0.0%

0.00

0.00

INSTALACION DE POSTES

03.02.01

CAMION GRUA TRANSPORTE E IZAJE DE POSTES

est

42.00

199.73

8,388.66

0.00

0.00

0.0%

0.00

0.00

03.02.02

EXCAVACION HUECO PARA POSTE EN TERRENO NORMAL

42.00

74.59

3,132.78

0.00

0.00

0.0%

0.00

0.00

03.02.03

INSTALACION DE POSTE DE CONCRETO ARMADO Y AISLADORE u

42.00

49.73

2,088.66

0.00

0.00

0.0%

0.00

0.00

#REF!
#REF!
OBRA
EJECUTA
CLIENTE
UBICAC.

#REF!
#REF!

Partida

Descripcin

Und

Metrado

C.U.

Parcial

(S/.)

(S/.)

VALORIZADO ANTERIOR
MetradoParcial (S/.)

VALORIZACION ACTUAL
Metrado Parcial (S/.)

03.02.04

CIMENTACION DE POSTE DE CONCRETO

42.00

142.08

5,967.36

0.00

0.00

0.0%

0.00

0.00

03.02.05

CONSTRUCCION DE SOLADO DE CONCRETO

42.00

49.73

2,088.66

0.00

0.00

0.0%

0.00

0.00

03.02.06

RECUBRIMIENTO DEL POSTE CON SUSTANCIA BITUMINOSA

42.00

21.39

898.38

0.00

0.00

0.0%

0.00

0.00

03.02.07

RECUBRIMIENTO DEL POSTE HASTA 3M CON SELLADOR IMPER u

42.00

31.89

1,339.38

0.00

0.00

0.0%

0.00

0.00

03.02.08

NUMERACION Y SEALIZACION DE POSTE

42.00

23.89

1,003.38

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

0.0%

0.00

0.00

03.03

INSTALACION DE RETENIDAS

03.03.01

EXCAVACION DE ZANJA PARA RETENIDA EN TERRENO NORMAL u

38.00

49.73

1,889.74

0.00

0.00

03.03.02

INSTALACION DE RETENIDA INC. RELLENO Y COMPACTACION

38.00

75.48

2,868.24

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

03.04

MONTAJE DE ARMADOS

03.04.01

ARMADO PMI-3

1.00

245.74

245.74

0.00

0.00

0.0%

0.00

0.00

03.04.02

ARMADO PSI-3L Soporte de Alineamiento

21.00

122.87

2,580.27

0.00

0.00

0.0%

0.00

0.00

03.04.03

ARMADO PA1-3 Soporte anclaje angulo

18.00

97.52

1,755.36

0.00

0.00

0.0%

0.00

0.00

03.04.04

ARMADO SE

1.00

342.30

342.30

0.00

0.00

0.0%

0.00

0.00

03.04.05

INSTALACION DE TABLERO DE DISTRIBUCION, PROTECCION Y u

1.00

171.15

171.15

0.00

0.00

0.0%

0.00

0.00

0.00

0.00

#DIV/0!

0.00

0.00

03.05

MONTAJE DE CONDUCTORES

03.05.01

TENDIDO Y PUESTA EN FLECHA DE CONDUCTOR AAAC 50MM2 / m

7,500.00

2.29

17,175.00

0.00

0.00

0.0%

0.00

0.00

03.05.02

INSTALACION CABLE DE ENERGIA NYY - 1 KV 3 X 1 X 70+1 X 70 m

90.00

68.46

6,161.40

0.00

0.00

0.0%

0.00

0.00

Err:518

0.00

0.00

#DIV/0!

0.00

0.00

03.06

INSTALACION DE PUESTA A TIERRA

03.06.01

EXCAVACION DE HUECO PARA PUESTA A TIERRA, EN TERRENO u

15.00

68.46

1,026.90

0.00

0.00

0.0%

0.00

0.00

03.06.02

INSTALACION DE PUESTA A TIERRA EN ESTRUCTURAS (INCLU u

15.00

342.30

5,134.50

0.00

0.00

0.0%

0.00

0.00

Err:518

0.00

0.00

#DIV/0!

0.00

0.00

1.00

684.60

684.60

0.00

0.00

0.0%

0.00

0.00

Err:518

0.00

0.00

#DIV/0!

0.00

0.00

03.07
03.07.01
03.08

MONTAJE DE TRANSFORMADOR
MONTAJE DE TRANSFORMADOR DE 350 KVA, INCLUYE TABLEROu
PRUEBAS Y PUESTA EN SERVICIO

#REF!
#REF!
OBRA
EJECUTA
CLIENTE
UBICAC.
Partida
03.08.01

#REF!
#REF!
Descripcin
PRUEBA Y PUESTA EN SERVICIO

Und
m

Metrado
2,400.00

C.U.

Parcial

(S/.)

(S/.)
0.85

2,040.00

VALORIZADO ANTERIOR
MetradoParcial (S/.)
0.00

0.00

%
0.0%

VALORIZACION ACTUAL
Metrado Parcial (S/.)
0.00

0.00

#REF!
#REF!
OBRA
EJECUTA
CLIENTE
UBICAC.

#REF!
#REF!

Partida

Descripcin

Und

Metrado

COSTO DIRECTO
GASTOS GENERALES
UTILIDAD

TOTAL (SIN. IGV)

Parcial
(S/.)

VALORIZADO ANTERIOR
MetradoParcial (S/.)

VALORIZACION ACTUAL
Metrado Parcial (S/.)

275,810.21

0.00

0.00

14.17%

39,082.31

0.00

0.00

9.50%

26,201.97

0.00

0.00

341,094.49

0.00

0.00

SUB TOTAL
FACTOR DE RELACION

C.U.
(S/.)

1.00000

341,094.49
341,094.49

0.00
0.00

0.00
0.00

#REF!
#REF!

FECHA : 4/30/2013
VALORIZACION ACTUAL
%

VALORIZACION ACUMULADA
Metrado Parcial (S/.)

SALDO POR VALORIZAR


Metrado

Parcial (S/.)

0.0%

0.00

0.00

0.0%

1.00

2,230.66

100.0%

0.0%

0.00

0.00

0.0%

1.00

5,162.62

100.0%

0.0%

0.00

0.00

0.0%

1.00

10,000.00

100.0%

0.0%

0.00

0.00

0.0%

1.00

46,506.00

100.0%

0.0%

0.00

0.00

0.0%

1.00

27,600.96

100.0%

0.0%

0.00

0.00

0.0%

1.00

19,549.40

100.0%

0.0%

0.00

0.00

0.0%

1.00

11,927.00

100.0%

0.0%

0.00

0.00

0.0%

1.00

4,414.75

100.0%

0.0%

0.00

0.00

0.0%

1.00

6,823.44

100.0%

0.0%

0.00

0.00

0.0%

1.00

2,033.50

100.0%

0.0%

0.00

0.00

0.0%

1.00

56,984.00

100.0%

0.0%

0.00

0.00

0.0%

14.00

5,075.42

100.0%

0.0%

0.00

0.00

0.0%

2,400.00

2,520.00

100.0%

0.0%

0.00

0.00

0.0%

1.00

8,000.00

100.0%

0.0%

0.00

0.00

0.0%

42.00

8,388.66

100.0%

0.0%

0.00

0.00

0.0%

42.00

3,132.78

100.0%

0.0%

0.00

0.00

0.0%

42.00

2,088.66

100.0%

#REF!
#REF!

FECHA : 4/30/2013
VALORIZACION ACTUAL
%

VALORIZACION ACUMULADA
Metrado Parcial (S/.)

SALDO POR VALORIZAR


Metrado

Parcial (S/.)

0.0%

0.00

0.00

0.0%

42.00

5,967.36

100.0%

0.0%

0.00

0.00

0.0%

42.00

2,088.66

100.0%

0.0%

0.00

0.00

0.0%

42.00

898.38

100.0%

0.0%

0.00

0.00

0.0%

42.00

1,339.38

100.0%

0.0%

0.00

0.00

0.0%

42.00

1,003.38

100.0%

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

0.0%

38.00

1,889.74

100.0%

#DIV/0!
0.0%

0.00

0.00

0.0%

0.00

0.00

0.0%

38.00

2,868.24

100.0%

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

#DIV/0!
0.0%

0.00

0.00

0.0%

1.00

245.74

100.0%

0.0%

0.00

0.00

0.0%

21.00

2,580.27

100.0%

0.0%

0.00

0.00

0.0%

18.00

1,755.36

100.0%

0.0%

0.00

0.00

0.0%

1.00

342.30

100.0%

0.0%

0.00

0.00

0.0%

1.00

171.15

100.0%

0.00

#DIV/0!

#VALUE!

0.00

#DIV/0!

#DIV/0!
0.0%

0.00

0.00

0.0%

7,500.00

17,175.00

100.0%

0.0%

0.00

0.00

0.0%

90.00

6,161.40

100.0%

#DIV/0!

Err:518

0.00

Err:518

Err:518

Err:518

Err:518

0.0%

0.00

0.00

0.0%

15.00

1,026.90

100.0%

0.0%

0.00

0.00

0.0%

15.00

5,134.50

100.0%

#DIV/0!

Err:518

0.00

Err:518

Err:518

Err:518

Err:518

0.0%

0.00

0.00

0.0%

1.00

684.60

100.0%

#DIV/0!

Err:518

0.00

Err:518

Err:518

Err:518

Err:518

#REF!
#REF!

FECHA : 4/30/2013
VALORIZACION ACTUAL
%
0.0%

VALORIZACION ACUMULADA
Metrado Parcial (S/.)
0.00

0.00

SALDO POR VALORIZAR


Metrado

0.0%

2,400.00

Parcial (S/.)
2,040.00

%
100.0%

#REF!
#REF!

FECHA : 4/30/2013
VALORIZACION ACTUAL
%

VALORIZACION ACUMULADA
Metrado Parcial (S/.)

SALDO POR VALORIZAR


Metrado

Parcial (S/.)

0.00

275,810.21

0.00

39,082.31

0.00

26,201.97

0.00

341,094.49

0.00
0.00

0.00

341,094.49
341,094.49

#REF!
#REF!
OBRA
EJECUTA
CLIENTE
UBICAC.

#REF!
#REF!

Partida

Descripcin

Und

Metrado

C.U.

Parcial

(S/.)

(S/.)

VALORIZADO ANTERIOR
Metrado Parcial (S/.)

VALORIZACION ACTUAL

Metrado Parcial (S/.)

VIAS DE ACCESO
01

OBRAS PRELIMINARES

01.01

TRAZO Y REPLANTEO

km

2.66

710.43

1,889.74

2.66

1,889.74

100.0%

0.00

0.00

01.02

MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y MAQUINARIAS glb

1.00

11,659.08

11,659.08

0.25

2,914.77

25.0%

0.25

2,914.77

02

MOVIMIENTO DE TIERRA

02.01

CORTE DE MATERIAL SUELTO

m3

11,758.00

5.58

65,609.64

1000.00

5,580.00

9.0%

1000.00

5,580.00

02.02

CONFORMACION DE TERRAPLENES C/MAT. PROPIO

m3

11,758.00

20.30

238,687.40

0.00

0.00

0.0%

0.00

0.00

02.03

RELLENO CON MATERIAL DE PRESTAMO

m3

5,138.91

40.63

208,793.91

0.00

0.00

0.0%

0.00

0.00

02.04

ELIMINACION MATERIAL EXCEDENTE

m3

10,628.00

12.83

136,357.24

0.00

0.00

0.0%

2300.00

29,509.00

03
03.01

OBRAS DE ARTE
MUROS DE CONCRETO CICLOPEO

03.01.01

EXCAVACION PARA ESTRUCTURAS T/NORMAL

m3

3.52

28.36

99.83

0.00

0.00

0.0%

0.00

0.00

03.01.02

RELLENO COMPACTADO C/MAT. PROPIO

m3

0.92

31.61

29.08

0.00

0.00

0.0%

0.00

0.00

03.01.03

ENCOFRADO Y DESENCOFRADO

m2

14.96

47.46

710.00

0.00

0.00

0.0%

0.00

0.00

03.01.04

CONCRETO CICLOPEO FC=175 KG/CM2 + 30% PG.

m3

3.32

241.87

803.01

0.00

0.00

0.0%

0.00

0.00

03.01.05

DREN TUBERIA PERFORADA DE PVC 4"

24.00

21.73

521.52

0.00

0.00

0.0%

0.00

0.00

1.69

35,922.64

0.00

0.00

0.0%

0.00

0.00

04

PAVIMENTOS

04.01

PERFILADO Y COMPACTADO DE SUB RASANTE

m2

21,256.00

04.02

EXTRACCION Y PREPARACION DE MATERIAL DE BASE

m3

5,314.00

6.48

34,434.72

0.00

0.00

0.0%

0.00

0.00

04.03

CARGUIO Y TRANSPORTE DE MATERIAL DE BASE

m3

5,314.00

16.67

88,584.38

0.00

0.00

0.0%

0.00

0.00

04.04

EXTENDIDO, RIEGO Y COMPACTACION DE BASE E=0.15 M.

m2

21,256.00

5.05

107,342.80

0.00

0.00

0.0%

0.00

0.00

04.05

IMPRIMACION ASFALTICA

m2

21,256.00

3.55

75,458.80

0.00

0.00

0.0%

0.00

0.00

04.06

CARPETA ASFALTICA EN FRIO 2"

m3

1,594.20

144.49

230,345.96

0.00

0.00

0.0%

0.00

0.00

#REF!
#REF!
OBRA
EJECUTA
CLIENTE
UBICAC.

#REF!
#REF!

Partida
05

Descripcin

Und

Metrado

POSTES KILOMETRICOS

4.00

05.02

SEALES PREVENTIVAS

05.03

SEALES INFORMATIVAS

05.04

MARCAS EN EL PAVIMENTO

06.01

Parcial
(S/.)

VALORIZADO ANTERIOR
Metrado Parcial (S/.)

VALORIZACION ACTUAL

Metrado Parcial (S/.)

SEALIZACION

05.01

06

C.U.
(S/.)
76.16

304.64

0.00

0.00

0.0%

0.00

0.00

7.00

454.23

3,179.61

0.00

0.00

0.0%

0.00

0.00

1.00

1,639.41

1,639.41

0.00

0.00

0.0%

0.00

0.00

m2

848.70

10.32

8,758.58

0.00

0.00

0.0%

0.00

0.00

m2

26,580.00

0.09

2,392.20

0.00

0.00

0.0%

0.00

0.00

LIMPIEZA FINAL DE OBRA


LIMPIEZA FINAL DE OBRA

#REF!
#REF!
OBRA
EJECUTA
CLIENTE
UBICAC.

#REF!
#REF!

Partida

Descripcin

Und

Metrado

COSTO DIRECTO
GASTOS GENERALES
UTILIDAD

TOTAL (SIN. IGV)

Parcial
(S/.)

VALORIZADO ANTERIOR
Metrado Parcial (S/.)

VALORIZACION ACTUAL
Metrado Parcial (S/.)

1,253,524.20

10,384.51

38,003.77

14.17%

177,624.38

1,471.49

5,385.13

9.50%

119,084.80

986.53

3,610.36

1,550,233.38

12,842.53

46,999.26

SUB TOTAL
FACTOR DE RELACION

C.U.
(S/.)

1.00000

1,550,233.38
1,550,233.38

12,842.53
12,842.53

46,999.26
46,999.26

#REF!
#REF!

FECHA : 4/30/2013
VALORIZACION ACTUAL
%

VALORIZACION ACUMULADA
Metrado Parcial (S/.)

SALDO POR VALORIZAR


Metrado

Parcial (S/.)

0.0%

2.66

1,889.74

100.0%

0.00

0.00

0.0%

25.0%

0.50

5,829.54

50.0%

0.50

5,829.54

50.0%

8.5%

2000.00

11,160.00

17.0%

9,758.00

54,449.64

83.0%

0.0%

0.00

0.00

0.0%

11,758.00

238,687.40

100.0%

0.0%

0.00

0.00

0.0%

5,138.91

208,793.91

100.0%

21.6%

2300.00

29,509.00

21.6%

8,328.00

106,848.24

78.4%

0.0%

0.00

0.00

0.0%

3.52

99.83

100.0%

0.0%

0.00

0.00

0.0%

0.92

29.08

100.0%

0.0%

0.00

0.00

0.0%

14.96

710.00

100.0%

0.0%

0.00

0.00

0.0%

3.32

803.01

100.0%

0.0%

0.00

0.00

0.0%

24.00

521.52

100.0%

0.0%

0.00

0.00

0.0%

21,256.00

35,922.64

100.0%

0.0%

0.00

0.00

0.0%

5,314.00

34,434.72

100.0%

0.0%

0.00

0.00

0.0%

5,314.00

88,584.38

100.0%

0.0%

0.00

0.00

0.0%

21,256.00

107,342.80

100.0%

0.0%

0.00

0.00

0.0%

21,256.00

75,458.80

100.0%

0.0%

0.00

0.00

0.0%

1,594.20

230,345.96

100.0%

#REF!
#REF!

FECHA : 4/30/2013
VALORIZACION ACTUAL
%

VALORIZACION ACUMULADA
Metrado Parcial (S/.)

SALDO POR VALORIZAR


Metrado

Parcial (S/.)

0.0%

0.00

0.00

0.0%

4.00

304.64

100.0%

0.0%

0.00

0.00

0.0%

7.00

3,179.61

100.0%

0.0%

0.00

0.00

0.0%

1.00

1,639.41

100.0%

0.0%

0.00

0.00

0.0%

848.70

8,758.58

100.0%

0.0%

0.00

0.00

0.0%

26,580.00

2,392.20

100.0%

#REF!
#REF!

FECHA : 4/30/2013
VALORIZACION ACTUAL
%

VALORIZACION ACUMULADA
Metrado Parcial (S/.)

SALDO POR VALORIZAR


Metrado

Parcial (S/.)

48,388.28

1,205,135.91

6,856.62

170,767.76

4,596.89

114,487.91

59,841.79

1,490,391.58

59,841.79
46,999.26

59,841.79

1,490,391.58
1,490,391.58

SUPERVISION DE OBRA
CONTROL DE AVANCE DE OBR
SEGN CRONOGRAMA REPROGRAMADO
% AVANCE ACUMULADO

Nombre del Proyecto :


Modalidad de Ejecucin
Contartista:
Residente de Obra:
Supervisor de Obra:
Fecha de Inicio de Obra:
Fecha
14-Oct-16
31/04/2013
31-May-13
30-Jun-13
31-Jul-13
31-Aug-13
30-Sep-13
31-Oct-13
30-Nov-13
31-Dec-13
31-Jan-14
28-Feb-14
31-Mar-14
17-Apr-14

Inicio de Obra

Fin de Obra

CUADRO DE
CUADRO
AVANCEDE
L.P.
AVANCE
023-95

"SERVICIO DE LA CULMINACION DE RETIRO DEL POLICARBONATO Y COLOCACION DE CALAMINON


COLISEO (FACHADA 500.00 M2), REPARACION DEL TANQUE ELEVADO Y SUS#REF!
ACCESORIOS COMO E
ELEVADA DE LAS TRIBUNAS Y VACIADO DEL CONCRETO PULIDO CON OCRE ROJO, CAMBIOS DE C
MUJERES)
CONTRATA COMO TAMBIEN EL MEJORAMIENTO DE LOS SS.HH DE LA PARTE DE LOS CAMERINOS (
TRIBUNAS) Y ELIMINACION DE TODO MATERIAL EXCEDENTE"
LUIS ALBERTO PICOY ALVARADO SERVICIOS GENERALES EMPRESA INDIVIDUAL DE RESPONSABIL
ING. OMAR AUGUSTO HIDALGO QUISPE
ING. MANUEL NIETO MONTALVAN
14-Oct-16
Avance ReProgramado
Avance Ejecutado
0.00%
0.00%
#REF!
0.62%
3.22%
#REF!

Avance ReProgramado
Avance Ejecutado
Avance ReProgramado

100.00%
90.00%
PORCENTAJE DE AVANCE (%)
80.00%

Avance ReProgramado
Avance Ejecutado
Avance ReProgramado

100.00%
90.00%
PORCENTAJE DE AVANCE (%)
80.00%
70.00%
60.00%
50.00%
40.00%
30.00%
20.00%
10.00%
0.00%
0.00% 0.00%
14-Oct-16

0.62%
31/04/2013

3.22%
31-May-13

30-Jun-13

31-Jul-13

31-Aug-13

30-Sep-13

31-Oct-13

SUPERVISION DE OBRA
TROL DE AVANCE DE OBRA
GRAMA REPROGRAMADO - MAYO 2013.
% AVANCE ACUMULADO

ATO Y COLOCACION DE CALAMINON CON SUS ACCESORIOS DE LA PARTE DEL CENTRO (1,804.00M2), PINTADO EXTERNO DE LA PARTE FRONTAL DEL
EVADO Y SUS#REF!
ACCESORIOS COMO EL CIRCUITO DE AGUA POTABLE Y SUS ACCESORIOS (1,345.48 ML), RETIRO DEL MACHIEMBRADO DE LA PARTE
O CON OCRE ROJO, CAMBIOS DE CHAPAS LAS PUERTAS (11), MEJORAMIENTO DE LOS SS.HH. DE LA PARTE DE LOS CAMERINOS (VARONES Y
DE LA PARTE DE LOS CAMERINOS (VARONES Y MUJERES) COMO TAMBIEN EL MEJORAMIENTO DE LOS SS.HH, VARON MUJER (DEBAJO DE LAS

RESA INDIVIDUAL DE RESPONSABILIDAD LIMITADA

OBRA ADELANTADA

Avance ReProgramado
Avance Ejecutado
Avance ReProgramado

Avance ReProgramado
Avance Ejecutado
Avance ReProgramado

30-Sep-13

31-Oct-13

30-Nov-13

31-Dec-13

31-Jan-14

28-Feb-14

31-Mar-14

PLAZO DE EJECUCION: 365 DIAS

17-Apr-14

0
METRADOS
#REF!
#REF!
OBRA

#REF!

EJECUTA
CLIENTE
UBICAC.

#REF!

SUPERVISOR: Ing. GONZALO CACERES V


FECHA :

Partida

Descripcin

Und Metrado

3/31/2012
ANTERIOR

ACTUAL

Metrado

Metrado

ARQUITECTURA - OBRAS EN TIERRA


01

MUROS Y TABIQUERIA DE ALBAILERIA

01.01

MURO DE LADRILLO KING KONG E=0.25m

m2

218.71

0.00

0.00

01.02

MURO DE LADRILLO KING KONG E=0.15m

m2

2274.00

0.00

0.00

01.03

MURO DE LADRILLO KING KONG E=0.10m

m2

10.26

0.00

0.00

02

REVOQUES ENLUCIDOS Y MOLDURAS

02.01

TARRAJEO DE MUROS INTERIORES

m2

2095.94

0.00

0.00

02.02

TARRAJEO DE MUROS EXTERIORES

m2

3138.78

0.00

0.00

02.03

TARRAJEO DE COLUMNAS

m2

1021.28

0.00

0.00

02.04

TARRAJEO DE VIGAS

m2

511.80

0.00

0.00

02.05

VESTIDURA DE DERRAMES ANCHO = 15 CM.

361.88

0.00

0.00

m2

1590.46

0.00

0.00

03
03.01
04

CIELORRASOS
CIELORRASOS CON MEZCLA DE CEMENTO-ARENA
PISOS

04.01

PISO DE CEMENTO PULIDO

m2

1167.19

0.00

0.00

04.02

PISO DE CERAMICO ANTIDESLIZANTE DE ALTO TRAFICO m2

200.20

0.00

0.00

04.03

PISO DE VINILICO DE ALTO TRAFICO

m2

223.07

0.00

0.00

04.04

VEREDA

m2

1591.00

0.00

0.00

m2

249.05

0.00

0.00

05
05.01
05.01.01
05.02

ZOCALOS Y CONTRAZOCALOS
ZOCALOS
ZOCALO DE CERAMICO COLOR 0.40X0.40m
CONTRAZOCALOS

05.02.01

CONTRAZOCALO DE CERAMICA H=0.10M

m2

28.22

0.00

0.00

05.02.02

CONTRAZOCALO DE CEMENTO DISEO SANITARIO C.

499.02

0.00

1.00

05.02.03

CONTRAZOCALO DE CEDRO DE E=1",H=0.10M

151.36

0.00

2.00

1423.57

0.00

0.00

06
06.01
07
07.01

COBERTURAS
CUBIERTA LADRILLO PASTELERO 24X24 ASENTADO C/MEZC
m2
CARPINTERIA
CARPINTERIA METALICA

07.01.01

SUMINISTRO Y COLOCACION DE PUERTA METALICA DE u

1.00

0.00

0.00

07.01.02

SUMINISTRO Y COLOCACION DE PUERTA METALICA DE u

1.00

0.00

0.00

07.01.03

SUMINISTRO E INSTALACION DE PUERTA METALICA CO u

2.00

0.00

0.00

07.01.04

SUMINISTRO E INSTALACION DE PUERTA 4.20X3.00m

1.00

0.00

0.00

07.01.05

SUMINISTRO E INSTALACION DE ESCALERA METALICA Du

1.00

0.00

0.00

07.01.06

SUMINISTRO E INSTALACION DE PUERTA DE ALTO IMPA u

3.00

0.00

0.00

07.01.07

SUMINISTRO E INSTALACION DE PUERTA DE ALTO IMPA u

6.00

0.00

0.00

07.01.08

SUMINISTRO E INSTALACION DE PUERTA DE ALTO IMPA u

1.00

0.00

0.00

07.02

CARPINTERIA DE ALUMINIO

07.02.01

SUMINISTRO E INSTALACION DE PUERTA SECCIONABLE u

8.00

0.00

0.00

07.02.02

SUMINISTRO E INSTALACION DE PUERTA CORREDIZA 1 u

1.00

0.00

0.00

07.02.03

SUMINISTRO E INSTALACION DE VENTANA ENRROLLAB u

7.00

0.00

0.00

07.02.04

VENTANA DE ALUMINIO CON VIDRIO TEMPLADO

239.92

0.00

0.00

m2

0
METRADOS
#REF!
#REF!
OBRA

#REF!

EJECUTA
CLIENTE
UBICAC.

#REF!

SUPERVISOR: Ing. GONZALO CACERES V


FECHA :

Partida

Descripcin

Und Metrado

07.02.05

VENTANA MOSQUITERA

07.02.06

SUMINISTRO E INSTALACION DE PERSIANA FIJA DE AL u

07.03

m2

3/31/2012
ANTERIOR

ACTUAL

Metrado

Metrado

109.60

0.00

0.00

7.00

0.00

0.00

CARPINTERIA DE MADERA

07.03.01

PUERTA APANELADA DE MADERA, CON MARCO DE MADm2

33.70

0.00

0.00

07.03.02

PUERTA CONTRAPLACADA E=45MM, TRIPLAY LUPUNA m2

18.80

0.00

0.00

07.03.03

TABIQUE DE MELAMINE PARA BAOS Y VESTIDORES,

m2

48.00

0.00

0.00

08

CERRAJERIA

08.01

CERRADURA DOS GOLPES EN PUERTA CON TIRADOR

21.00

0.00

0.00

08.02

CERRADURA DE PERILLA PARA PUERTAS INTERIORES

21.00

0.00

0.00

08.03

CERRADURA DE PERILLA PARA PUERTAS SSHH.

3.00

0.00

0.00

08.04

BISAGRA CAPUCHINA DE 3"

pza

228.00

0.00

0.00

09.01

PINTURA EN MUROS Y COLUMNAS INTERIORES CON EPOXm2

1562.91

0.00

0.00

09.02

PINTURA EN MUROS Y COLUMNAS INTERIORES CON LATEm2

1549.03

0.00

0.00

09.03

PINTURA EN PISOS CON EPOXICO

m2

996.97

0.00

0.00

09.04

PINTURA EN MUROS, COLUMNAS Y VIGAS EXTERIORES C m2

3124.47

0.00

0.00

09.05

PINTURA EN CIELO RASO CON EPOXICO

m2

1036.77

0.00

0.00

09.06

PINTURA EN CIELO RASO CON PINTURA LATEX

m2

553.69

0.00

0.00

10.01

CORTINA DE TRASLAPE DE PVC (PROVISION Y COLOCACI m2

25.00

0.00

0.00

10.02

PROTECCION DE BORDE DE PLATAFORMA

35.50

0.00

0.00

10.03

POLICARBONATO COLOR BLANCO, E=16MM (INC ACCESOm2

106.92

0.00

0.00

10.04

SUMINISTRO E INSTALACION DE ABRIGO RETRACTIL

m2

7.00

0.00

0.00

10.05

LIMPIEZA Y ENTREGA FINAL DE OBRA

glb

1.00

0.00

0.00

09

10

PINTURA

OTROS
u

0
METRADOS
#REF!
#REF!

SUPERVISOR: Ing. GONZALO CACERES VALDIVIA


ACUMULADO

SALDO

Metrado

Metrado

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
1.00
2.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
METRADOS
#REF!
#REF!

SUPERVISOR: Ing. GONZALO CACERES VALDIVIA


ACUMULADO

SALDO

Metrado

Metrado
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
METRADOS
#REF!
#REF!
OBRA

#REF!

EJECUTA
CLIENTE
UBICAC.

#REF!

SUPERVISOR: Ing. GONZALO CACERES V


FECHA :

Partida

Descripcin

Und Metrado

3/31/2012
ANTERIOR

ACTUAL

Metrado

Metrado

EQUIPAMIENTO
01

EQUIPO DE FRIO Y TAREAS PREVIAS

01.01

SUMINISTRO DE PRODUCTOR DE HIELO EN ESCAMAS DE glb

0.00

0.00

01.02

SUMINISTRO DE SILO DE CONSERVACION DE HIELO 10TMglb

0.00

0.00

01.03

SUMINISTRO DE CAMARA FRIGORIFICA DE 5 TM -18 C

glb

0.00

0.00

01.04

SUMINISTRO DE CAMARA FRIGORIFICA DE 10 TM 0 C

glb

0.00

0.00

01.05

SUMINISTRO DE ENFRIADOR DE AGUA +15 C

glb

0.00

0.00

01.06

EQUIPAMIENTO TAREAS PREVIAS

glb

0.00

0.00

02

EQUIPO DE TRANSPORTE Y ESTIBA

02.01

ACCESORIOS PARA TRANSPORTE Y ESTIBA

glb

0.00

0.00

02.02

ACCESORIOS PARA PERSONAL OPERATIVO

glb

0.00

0.00

glb

0.00

0.00

03
03.01

MOBILIARIO VARIOS
MOBILIARIO VARIOS

0
METRADOS
#REF!
#REF!

SUPERVISOR: Ing. GONZALO CACERES VALDIVIA


ACUMULADO

SALDO

Metrado

Metrado

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0
METRADOS
#REF!
#REF!
OBRA

#REF!

EJECUTA
CLIENTE
UBICAC.

#REF!

SUPERVISOR: Ing. GONZALO CACERES V


FECHA :

Partida

Descripcin

Und Metrado

3/31/2012
ANTERIOR

ACTUAL

Metrado

Metrado

INSTALACIONES ELECTRICAS RED DE BAJA TENSION


01
01.01
01.02
02
02.01
02.02
03
03.01
04
04.01
04.02
05
05.01
06
06.01
07

OBRAS PRELIMINARES
TRAZO Y REPLANTEO.
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
SALIDA DE ILUMINACION
CENTRO DE LUZ
SALIDA PARA LAMPARA EMERGENCIA
SALIDA DE INTERRUPTOR
SALIDA PARA INTERRUPTOR SIMPLE
SALIDA PARA TOMACORRIENTES
SALIDA PARA TOMACORRIENTE DOBLE UNIVERSAL C/LT
SALIDA PARA TOMACORRIENTE TRIFASICO
SALIDA DE FUERZA
SALIDA DE FUERZA
SALIDA DE VOZ Y DATA
SALIDA DE VOZ Y DATA
EQUIPOS DE ILUMINACION

07.01

SUMINISTRO E INSTALACION DE LUMINARIAS P/ADOSAR DE 2 X 36 WATTS TIPO RAS-M JOSFEL O SIMILAR

07.02

SUMINISTRO E INSTALACION DE LUMINARIAS P/ADOSAR DE 2 X 18 WATTS TIPO SPOTH GLACIAR 2L

07.03

SUMINISTRO E INSTALACION DE LUM. P/ADOSAR A PARED LAMP. AHORRADORA FLUORESCENTES COMPACTAS TC-D26W

07.04

REFLECTOR 400 W CON BRAZO DE FIJACION SELLADO HERMETICO

07.05

SUMINISTRO E INSTALACION DE LUMINARIA DE ALUMBRADO EXTERIOR

07.06

SUMINISTRO E INSTALACION DE LAMPARAS DE EMERGENCIA 2X18 W

07.07

POSTE DE C.A.C 12/ 200

07.08

BUZONES DE CONCRETO 0.5X0.5X0.6 m

07.09
08

DUCTO DE CONCRETO 2 VIAS


TABLEROS ELECTRICOS

08.01

Tablero de Distribucion TG 3 380V 40 POLOS, P/EMPOTRAR

08.02

Tablero de Distribucion TD-1 3 380/220V 8 POLOS, P/EMPOTRAR

08.03

Tablero de Distribucion TD-2 3 380/220V 8 POLOS, P/EMPOTRAR

08.04

Tablero de Distribucion TD-3 3 380/220V 8 POLOS, P/EMPOTRAR

08.05

Tablero de Distribucion TD-4 3 380/220V 8 POLOS, P/EMPOTRAR

08.06

Tablero de Distribucion T-RE1 3 380/220V 8 POLOS, P/EMPOTRAR

08.07

Tablero de Distribucion TD-5 3 380/220V 8 POLOS, P/EMPOTRAR

08.08

Tablero de Distribucion TD-6 3 380/220V 8 POLOS, P/EMPOTRAR

08.09

Tablero de Distribucion T-RE2 3 380/220V 8 POLOS, P/EMPOTRAR

08.10

Tablero de Distribucion TD-7 3 380/220V 8 POLOS, P/EMPOTRAR

08.11

Tablero de Distribucion TD-8 3 380/220V 8 POLOS, P/EMPOTRAR

08.12

Tablero de Distribucion TD-9 3 380/220V 8 POLOS, P/EMPOTRAR

08.13

Tablero de Distribucion T-RE3 3 380/220V 8 POLOS, P/EMPOTRAR

08.14

Tablero de Distribucion TD-10 3 380/220V 40 POLOS, P/EMPOTRAR

08.15

Tablero de Distribucion T-F3 3 380/220V 40 POLOS, P/EMPOTRAR

0
METRADOS
#REF!
#REF!
OBRA

#REF!

EJECUTA
CLIENTE
UBICAC.

#REF!

SUPERVISOR: Ing. GONZALO CACERES V


FECHA :

Partida

Descripcin

Und Metrado

08.16

Tablero de Distribucion TD-11 3 380/220V 40 POLOS, P/EMPOTRAR

08.17

Tablero de Distribucion T-F1 3 380/220V 20 POLOS, P/EMPOTRAR

08.18

Tablero de Distribucion TD-12 3 380/220V 40 POLOS, P/EMPOTRAR

08.19

Tablero de Distribucion TD-12 3 380/220V 40 POLOS, P/EMPOTRAR

08.20

Tablero de Distribucion T-F2 3 380/220V 20 POLOS, P/EMPOTRAR

08.21

Tablero de Distribucion TD-M 3 380/220V 20 POLOS, P/EMPOTRAR

08.22

Tablero de Distribucion T-F4 3 380/220V 20 POLOS, P/EMPOTRAR

09

ALIMENTADORES

09.01

De Medidor a Tablero TG

09.02

De TG a TTA

09.03

De TG (C4)

09.04

De TG (C5)

09.05

De TG (C1)

09.06
09.07

De TG (C2)
De TG (C2)

09.08

TD-1

09.09

TD-2

09.10

TD-3

09.11

TD-4

09.12

De TD-4 a T-RE1

09.13

TD-5

09.14

TD-6

09.15

De TD-6 a T-RE2

09.16

TD-7

09.17

TD-8

09.18

TD-9

09.19

De TD-9 a T-RE3

09.20

TD-10

09.21

T-F3

09.22

De T-F3 a C1ES

09.23

De T-F3 a C2ES

09.24

De T-F3 a C3ES

09.25

De T-F3 a C4ES

09.26

TD-11

09.27

T-F1

09.28

TD-12

09.29

T-F2

09.30

TD-M

09.31

De TD-M a T-F4

09.32

ILUMINACION MUELLE

09.33
10

POSTE DE C.A.C 10/200 EN MUELLE


CAJAS DE PASE

10.01

CAJA DE PASE CUADRADA DE 200 X 200 X 75

10.02

CAJA DE PASE CUADRADA DE 350 X 350 X 150

3/31/2012
ANTERIOR

ACTUAL

Metrado

Metrado

0
METRADOS
#REF!
#REF!
OBRA

#REF!

EJECUTA
CLIENTE
UBICAC.

#REF!

SUPERVISOR: Ing. GONZALO CACERES V


FECHA :

Partida
11

Descripcin
POZO DE TIERRA

11.01

POZO DE TIERRA SISTEMA NORMAL

11.02

POZO DE TIERRA SISTEMA DE FUERZA

11.03

POZO DE TIERRA PARA RED ESTABILIZADA

12
12.01
12.02
13

Und Metrado

EXCAVACION DE ZANJAS
EXCAVAV. DE ZANJAS P/TUBERIA
RELL. COMP. C/PL VIBRADOR/ MANUAL E/T. N
EQUIPOS ELECTROMECANICOS

13.01

MONTAJE DE ELECTROBOMBA DE AGUA DULCE DE 2.0 HP

13.02

MONTAJE DE ELECTROBOMBA DE AGUA SALADA DE 4.0 HP

13.03

MONTAJE DE ELECTROBOMBA DE CAMARA DE BOMBEO DESAGUE 2.0 HP

13.04

MONTAJE DE ELECTROBOMBA DE EMISOR SUBMARINO 4.0 HP

13.05

MONTAJE DE BOMBA CONTRAINCENDIO ACI 20.99 KW (FUERZA)

13.06

MONTAJE DE BOMBA CONTRAINCENDIO JOCKEY 2,24 KW (CONTROL)

13.07

SUMINISTRO Y MONTAJE EQUIPO DE OSMOSIS 20 KW

13.08

ARRANCADOR ELECTROBOMBA 3 DE 2 HP

13.09

ARRANCADOR ELECTROBOMBA 3 DE 4 HP

13.10

SUMINISTRO Y MONTAJE DEGENERADOR ELECTRICO 30 KW

13.11

SUMINISTRO Y MONTAJE DEGENERADOR ELECTRICO 90 KW

3/31/2012
ANTERIOR

ACTUAL

Metrado

Metrado

0
METRADOS
#REF!
#REF!

SUPERVISOR: Ing. GONZALO CACERES VALDIVIA


ACUMULADO

SALDO

Metrado

Metrado

/ADOSAR DE 2 X 36 WATTS TIPO RAS-M JOSFEL O SIMILAR

R A PARED LAMP. AHORRADORA FLUORESCENTES COMPACTAS TC-D26W MOD. MUSA JOSFEL

0
METRADOS
#REF!
#REF!

SUPERVISOR: Ing. GONZALO CACERES VALDIVIA


ACUMULADO

SALDO

Metrado

Metrado

0
METRADOS
#REF!
#REF!

SUPERVISOR: Ing. GONZALO CACERES VALDIVIA


ACUMULADO

SALDO

Metrado

Metrado

0
METRADOS
#REF!
#REF!
OBRA

#REF!

EJECUTA
CLIENTE
UBICAC.

#REF!

SUPERVISOR: Ing. GONZALO CACERES V


FECHA :

Partida

Descripcin

Und Metrado

INSTALACIONES SANITARIAS
01
01.01

RED DE AGUA POTABLE


RED DE DISTRIBUCION

01.01.01

TRAZO Y REPLANTEO

01.01.02

EXCAVAV. DE ZANJAS P/TUBERIA

01.01.03

REFINE Y NIVELACION DE ZANJA P/TUBERIA

01.01.04

PREP. D/CAMA DE APOYO (E=10 CM)

01.01.05

SUM./ INST. T/PRUEBA HIDRA./ TUB. PVC 2" C-10

01.01.06

RELL. COMP. C/PL VIBRADOR/ MANUAL E/T. N

01.02
01.02.01
01.02.02
01.03

SALIDAS
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2pto
SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 3/4pto
VALVULAS

01.03.01

VALVULA COMPUERTA DE BRONCE DE U.R. DE 3/4"

01.03.02

VALVULA COMPUERTA DE BRONCE DE U.R. DE 1"

01.03.03

VALVULA COMPUERTA DE 1/2"

01.04

TUBERIA

01.04.01

SUM./ INST. / TUB. PVC 1/2 C-10

01.04.02

SUM./ INST. T/PRUEBA HIDRA./ TUB. PVC 3/4" C-10

01.04.03

SUM./ INST. T/PRUEBA HIDRA./ TUB. PVC 1" C-10

01.04.04

SUM./ INST. T/PRUEBA HIDRA./ TUB. PVC 1 1/2" C-10 m

01.05

VARIOS

01.05.01

NICHO Y TAPA DE MADERA PARA VALVULA EN PARED

01.05.02

SISTEMA DE CLORACION

01.06
01.06.01
01.07
01.07.01
01.08
01.08.01
01.08.02
01.09
01.09.01
02
02.01

ACCESORIOS
VALVULA Y ACCESORIOS PARA CISTERNA Y TANQUE E u
PRUEBAS HIDRAULICAS
PRUEBA HIDRAULICA PARA TUBERIA DE AGUA FRIA

EQUIPO DE BOMBEO
ADQUIS./INST./02 ELECTROBOMBAS Q=3.5 LTS/SEG, A u
ACCESORIOS PARA LA BOMBA

glb

LINEA DE IMPULSION
SUM./ INST. T/ TUB. PVC 2" C-10

SISTEMA DE DESAGUE DOMESTICO


SANEAMIENTO

02.01.01

EXCAV. DE ZANJAS E/T SEM CONGL.

02.01.02

REFINE Y NIVELACION DE ZANJA P/TUBERIA

02.01.03

PREP. D/CAMA DE APOYO (E=10 CM)

02.01.04

SUM./ INST. T/PRUEBA HIDRA./ TUB. PVC 4" C-10

02.01.05

RELL. COMP. C/PL VIBRADOR/ MANUAL E/T. N

02.01.06

ELIMINACION MATERIAL EXCEDENTE DMT=5 KM

m3

02.02

CAJA DE REGISTRO

3/31/2012
ANTERIOR

ACTUAL

Metrado

Metrado

0
METRADOS
#REF!
#REF!
OBRA

#REF!

EJECUTA
CLIENTE
UBICAC.

#REF!

SUPERVISOR: Ing. GONZALO CACERES V


FECHA :

Partida

Descripcin

Und Metrado

02.02.01

CAJA DE REGISTRO DE 12" X 24" CON TAPA DE CONCR u

02.02.02

CAJA DE REGISTRO DE 24" X 24" CON TAPA DE CONCR u

02.03

TUBERIA

02.03.01

INSTALACION DE TUBERIA PVC SAL 2"

02.03.02

INSTALACION DE TUBERIA PVC SAL 4"

02.04

SALIDA DE DESAGUE Y VENTILACION

02.04.01

SALIDA DE DESAGUE PVC SAL 2"

pto

02.04.02

SALIDA DE DESAGUE PVC SAL 4"

pto

02.04.03

SALIDA DE VENTILACION PVC SAL 2"

pto

02.05
02.05.01
02.06
02.06.01
02.06.02
02.07

ADITAMENTOS VARIOS
ACCESORIOS PARA DESAGUE

glb

REGISTROS
REGISTRO DE BRONCE DE 2"

REGISTRO DE BRONCE DE 4"

SUMIDERO

02.07.01

SUMIDERO DE 2"

02.07.02

SUMIDERO DE 4"

02.08
02.08.01
02.09
02.09.01
02.10
02.10.01
02.11
02.11.01
02.12
02.12.01
03
03.01
03.01.01
03.02
03.02.01
03.02.02
03.03

CAMARA DE BOMBEO, CUARTO DE BOMBAS


SUMINISTRO E INSTALACION DE EQUIPO DE BOMBEO, u
LINEA DE IMPULSION
SUM./ INST. T/PRUEBA HIDRA./ TUB. PVC 2" C-10

PRUEBAS DE NIVELACION
PRUEBA DE NIVELACION P/DESAGUE

PRUEBAS HIDRAULICAS
PRUEBA DE NIVELACION P/DESAGUE

CAMARA DE BOMBEO PATIO ZONA DE EMBARQUE


EQUIPO DE BOMBEO, 02 BOMBAS SUMERGIBLES Q=0.5u
SISTEMA DE AGUA DE MAR
CAMARA DE BOMBEO EN CABEZO MUELLE
CASETA DE CAPTACION

EQUIPOS DE BOMBEO
ADQUIS./INST./02 ELECTROBOMBAS Q=11.3 LTS/SEG, u
ACCESORIOS PARA LA BOMBA

glb

SISTEMA DE TRATAMIENTO CLORACION - DESINFECCION

03.03.01

ACCESORIOS PARA SISTEMA DE CLORACION - DESINFE glb

03.03.02

EQUIPO DE TRATAMIENTO DE AGUA DE MAR POR OSMOu

03.04

LINEA DE IMPULSION

03.04.01

EXCAV. DE ZANJAS E/T SEM CONGL.

03.04.02

REFINE Y NIVELACION DE ZANJA P/TUBERIA

03.04.03

PREP. D/CAMA DE APOYO (E=10 CM)

03.04.04

SUM./ INST. T/PRUEBA HIDRA./ TUB. PVC 2 1/2" C-10 m

03.04.05
03.05
03.05.01

RELL. COMP. C/PL VIBRADOR/ MANUAL E/T. N

TUBERIA AEREA
SUM./ INST. T/PRUEBA HIDRA./ TUB. PVC 4" C-10

3/31/2012
ANTERIOR

ACTUAL

Metrado

Metrado

0
METRADOS
#REF!
#REF!
OBRA

#REF!

EJECUTA
CLIENTE
UBICAC.

#REF!

SUPERVISOR: Ing. GONZALO CACERES V


FECHA :

Partida
03.05.02
03.06

Descripcin

Und Metrado

SUM./ INST. T/PRUEBA HIDRA./ TUB. PVC 2 1/2" C-10 m


RED DE DISTRIBUCION

03.06.01

EXCAV. DE ZANJAS E/T SEM CONGL.

03.06.02

REFINE Y NIVELACION DE ZANJA P/TUBERIA

03.06.03

PREP. D/CAMA DE APOYO (E=10 CM)

03.06.04

SUM./ INST. T/PRUEBA HIDRA./ TUB. PVC 2 1/2" C-10 m

03.06.05
03.07
03.07.01
03.08

RELL. COMP. C/PL VIBRADOR/ MANUAL E/T. N

SALIDA DE AGUA DE MAR


SALIDA DE AGUA DE MAR PVC SAP 3/4"

pto

VALVULAS

03.08.01

VALVULA COMPUERTA DE BRONCE DE U.R. DE 3/4"

03.08.02

VALVULA COMPUERTA DE BRONCE DE U.R. DE 1"

03.08.03

VALVULA COMPUERTA DE 2 1/2"

03.09
03.09.01
03.10
03.10.01
03.10.02
03.11
03.11.01
03.12
03.12.01
03.13

VARIOS
NICHO Y TAPA DE MADERA PARA VALVULA EN PISO

EQUIPO DE BOMBEO AGUA SALADA


ADQUIS./INST./02 ELECTROBOMBAS Q=4.57 LTS/SEG, u
ACCESORIOS PARA LA BOMBA

glb

SISTEMA DE AGUA RESIDUAL


TRAMPA DE GRASAS Y SOLIDOS ACCESORIOS

CANALETAS
COLOCACION DE REJILLA EN CANALETA

m2

TUBERIA

03.13.01

EXCAV. DE ZANJAS E/T SEM CONGL.

03.13.02

REFINE Y NIVELACION DE ZANJA P/TUBERIA

03.13.03

PREP. D/CAMA DE APOYO (E=10 CM)

03.13.04

SUM./ INST. T/PRUEBA HIDRA./ TUB. PVC 6" C-10

03.13.05

RELL. COMP. C/PL VIBRADOR/ MANUAL E/T. N

03.14
03.14.01
03.15
03.15.01
03.16

CAJA DE DISTRIBUCION DE CAUDALES


CAJA DE DISTRIBUCION

SEDIMENTADOR
EQUIPAMIENTO SEDIMENTADOR

CAMARA DE BOMBEO

03.16.01

SEDIMENTADOR - ACCESORIOS

pto

03.16.02

FILTRO ANAEROBICO DE ACCESORIOS

glb

03.16.03

ADQUIS./INST./02 ELECTROBOMBAS Q=4.5 L/S, ADT=2 glb

03.17
03.17.01
03.18
03.18.01

LINEA DE IMPULSION
TUBERI A DE PVC 3

EMISOR SUBMARINO
SUMINISTRO DE TUBERIAS

03.18.01.01

SUMINIST DE TUBERIA LISA HDPE PECC-100 Dext. 16 m

03.18.01.02

SUMINIST DE TUBERIA LISA HDPE PECC-100 Dext

03.18.01.03

ACCESORIOS SUMINISTRO DE TUBERIA HDPE

glb

SUMINIST DE TUBERIA LISA HDPE PECC-100 Dext.

03.18.01.04
03.18.02

BALASTROS DE CONCRETO

3/31/2012
ANTERIOR

ACTUAL

Metrado

Metrado

0
METRADOS
#REF!
#REF!
OBRA

#REF!

EJECUTA
CLIENTE
UBICAC.

#REF!

SUPERVISOR: Ing. GONZALO CACERES V


FECHA :

Partida

Descripcin

Und Metrado

03.18.02.01

LASTRE DE CONCRETO TIPO A+B SEPARACION 4.5 M u

03.18.02.02

LASTRE DE CONCRETO TIPO A SEPARACION 4.5 MTS u

03.18.02.03
03.18.03
03.18.03.01
03.18.03.02
03.18.04
03.18.04.01
03.18.05

LASTRE DE CONCRETO TIPO II SEPARACION 4.5 MTS u


TERMOFUSION
SERVICIO DE TERMOFUSION DE TUBERIAS DE 160MMglb
SERVICIO DE TERMOFUSION DE TUBERIAS DE 90MM glb
ULTRASONIDO - CONTROL DE CALIDAD
INSPECCION ULTRASONICA DE JUNTA

glb

LAZAMIENTO Y HUNDIMIENTO

03.18.05.01

LANZAMIENTO Y HUNDIMIENTO DE LINEA

03.18.05.02

FIJACION PRIMEROS METRIS DE TUBERIA CON CONC m3

03.18.05.03
03.19

glb

PRUEBA Y PUESTA EN MARCHA EMISOR SUBMARINO glb


CAJA DE REGISTRO

03.19.01

CAJA DE REGISTRO DE 12" X 24" CON TAPA DE CONCR u

03.19.02

CAJA DE REGISTRO DE 24" X 24" CON TAPA DE CONCR u

03.20

SISTEMA CONTRA INCENDIO

03.20.01

EXCAV. DE ZANJAS E/T SEM CONGL.

03.20.02

REFINE Y NIVELACION DE ZANJA P/TUBERIA

03.20.03

PREP. D/CAMA DE APOYO (E=10 CM)

03.20.04

SUM./ INST. T/PRUEBA HIDRA./ TUB. PVC 2 1/2" C-10 m

03.20.05

RELL. COMP. C/PL VIBRADOR/ MANUAL E/T. N

03.20.06

SERVICIO DE TERMOFUSION DE TUBERIAS DE 110MM Pglb

03.20.07
03.21
03.21.01
03.22

INSPECCION ULTRASONICA DE JUNTA

m
glb

TUBERIA COLGADA MUELLE


SUMINIST DE TUBERIA LISA HDPE PECC-100 Dext. 110 m
EQUIPOS CONTRA INCENDIO

03.22.01

GABINETE CONTRA INCENDIO

03.22.02

ADQUIS./INST.ELECTROBOMBA CI TURBINA VERTICAL

03.22.03

ADQUIS./INST.ELECTROBOMBA CI TURBINA VERTICAL

03.23
03.23.01
03.23.01.01
03.23.01.02
03.23.02

APARATOS Y ACCESORIOS SANITARIOS


APARATOS SANITARIOS
INODORO COLOR BLANCO CON ASIENTO

pza

URINARIO

pza

LAVATORIOS

03.23.02.01

LAVATORIO DE PARED

pza

03.23.02.02

LAVADERO DE COCINA DE ACERO INOXIDABLE

pza

03.23.02.03

DUCHAS CROMADAS DE CABEZA GIRATORIA

pza

03.23.02.04

GRIFERIA PARA LAVADEROS

03.23.02.05

PAPELERA C/EJE ADHESIVO C/SILICONA BLANCO STA u

03.23.02.06

TOALLERO DE BARRA

3/31/2012
ANTERIOR

ACTUAL

Metrado

Metrado

0
METRADOS
#REF!
#REF!

SUPERVISOR: Ing. GONZALO CACERES VALDIVIA


ACUMULADO

SALDO

Metrado

Metrado

0
METRADOS
#REF!
#REF!

SUPERVISOR: Ing. GONZALO CACERES VALDIVIA


ACUMULADO

SALDO

Metrado

Metrado

0
METRADOS
#REF!
#REF!

SUPERVISOR: Ing. GONZALO CACERES VALDIVIA


ACUMULADO

SALDO

Metrado

Metrado

0
METRADOS
#REF!
#REF!

SUPERVISOR: Ing. GONZALO CACERES VALDIVIA


ACUMULADO

SALDO

Metrado

Metrado

#REF!
METRADOS
#REF!
#REF!
OBRA

#REF!

EJECUTA
CLIENTE
UBICAC.

#REF!

SUPERVISOR: Ing. GONZALO CACERES VALDIVI


FECHA :

Partida

Descripcin

Und

INSTALACIONES ELECTRICAS RED DE MEDIA TENSION


01

TRABAJOS PRELIMINARES

01.01

CARTEL DE OBRA

01.02

TRANSPORTE DE MATERIALES Y EQUIPO

glb

01.03

PAGO DE CONEXION EDELNOR

glb

02

SUMINISTRO DE MATERIALES

02.01

POSTES, ACCESORIOS Y CRUCETAS

02.02

CONDUCTORES DE ALUMINIO Y ACCESORIOS

glb

02.03

AISLADORES Y ACCESORIOS

glb

02.04

RETENIDAS Y ANCLAJE

glb

02.05

PUESTA A TIERRA

glb

02.06

TABLERO DE DISTRIBUCION

02.07

SECCIONADOR Y ACCESORIOS

glb

02.08

TRANSFORMADORES Y SISTEMA DE MEDICION

glb

02.09

CONCRETO F'C=210 KG/CM2

m3

03
03.01
03.01.01
03.01.02
03.02

MONTAJE ELECTROMECANICO
OBRAS PRELIMINARES
REPLANTEO TOPOGRAFICO DE LA LINEA Y UBICACION DE ES m
CAMPAMENTO PROVISIONAL DE LA OBRA

glb

INSTALACION DE POSTES

03.02.01
03.02.02

CAMION GRUA TRANSPORTE E IZAJE DE POSTES


EXCAVACION HUECO PARA POSTE EN TERRENO NORMAL

03.02.03

INSTALACION DE POSTE DE CONCRETO ARMADO Y AISLADORu

03.02.04

CIMENTACION DE POSTE DE CONCRETO

03.02.05

CONSTRUCCION DE SOLADO DE CONCRETO

03.02.06

RECUBRIMIENTO DEL POSTE CON SUSTANCIA BITUMINOSA

03.02.07

RECUBRIMIENTO DEL POSTE HASTA 3M CON SELLADOR IMPE u

03.02.08
03.03
03.03.01
03.03.02
03.04

NUMERACION Y SEALIZACION DE POSTE

est
u

INSTALACION DE RETENIDAS
EXCAVACION DE ZANJA PARA RETENIDA EN TERRENO NORMALu
INSTALACION DE RETENIDA INC. RELLENO Y COMPACTACION u
MONTAJE DE ARMADOS

03.04.01

ARMADO PMI-3

03.04.02

ARMADO PSI-3L Soporte de Alineamiento

03.04.03

ARMADO PA1-3 Soporte anclaje angulo

03.04.04

ARMADO SE

03.04.05

INSTALACION DE TABLERO DE DISTRIBUCION, PROTECCION Y u

03.05

MONTAJE DE CONDUCTORES

03.05.01

TENDIDO Y PUESTA EN FLECHA DE CONDUCTOR AAAC 50MM2m

03.05.02

INSTALACION CABLE DE ENERGIA NYY - 1 KV 3 X 1 X 70+1 X m

03.06
03.06.01

INSTALACION DE PUESTA A TIERRA


EXCAVACION DE HUECO PARA PUESTA A TIERRA, EN TERREN u

Metrado

3/31/2012
ANTERIOR

ACTUAL

Metrado

Metrado

#REF!
METRADOS
#REF!
#REF!
OBRA

#REF!

EJECUTA
CLIENTE
UBICAC.
Partida
03.06.02
03.07
03.07.01
03.08
03.08.01

#REF!

SUPERVISOR: Ing. GONZALO CACERES VALDIVI


FECHA :
Descripcin
INSTALACION DE PUESTA A TIERRA EN ESTRUCTURAS (INCL

Und
u

MONTAJE DE TRANSFORMADOR
MONTAJE DE TRANSFORMADOR DE 350 KVA, INCLUYE TABLERu
PRUEBAS Y PUESTA EN SERVICIO
PRUEBA Y PUESTA EN SERVICIO

Metrado

3/31/2012
ANTERIOR

ACTUAL

Metrado

Metrado

#REF!
METRADOS
#REF!
#REF!

SUPERVISOR: Ing. GONZALO CACERES VALDIVIA

ACUMULADO

SALDO

Metrado

Metrado

#REF!
METRADOS
#REF!
#REF!

SUPERVISOR: Ing. GONZALO CACERES VALDIVIA

ACUMULADO

SALDO

Metrado

Metrado

#REF!
METRADOS
#REF!
#REF!
OBRA

#REF!

EJECUTA
CLIENTE
UBICAC.

#REF!

SUPERVISOR: Ing. GONZALO CACERES VALDIVI


FECHA :

Partida

Descripcin

Und

VIAS DE ACCESO
01

OBRAS PRELIMINARES

01.01

TRAZO Y REPLANTEO

01.02

MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y MAQUINARIA glb

02

km

MOVIMIENTO DE TIERRA

02.01

CORTE DE MATERIAL SUELTO

m3

02.02

CONFORMACION DE TERRAPLENES C/MAT. PROPIO

m3

02.03

RELLENO CON MATERIAL DE PRESTAMO

m3

02.04

ELIMINACION MATERIAL EXCEDENTE

m3

03
03.01

OBRAS DE ARTE
MUROS DE CONCRETO CICLOPEO

03.01.01

EXCAVACION PARA ESTRUCTURAS T/NORMAL

m3

03.01.02

RELLENO COMPACTADO C/MAT. PROPIO

m3

03.01.03

ENCOFRADO Y DESENCOFRADO

m2

03.01.04

CONCRETO CICLOPEO FC=175 KG/CM2 + 30% PG.

m3

DREN TUBERIA PERFORADA DE PVC 4"

03.01.05
04

PAVIMENTOS

04.01

PERFILADO Y COMPACTADO DE SUB RASANTE

m2

04.02

EXTRACCION Y PREPARACION DE MATERIAL DE BASE

m3

04.03

CARGUIO Y TRANSPORTE DE MATERIAL DE BASE

m3

04.04
04.05

EXTENDIDO, RIEGO Y COMPACTACION DE BASE E=0.15 M.


IMPRIMACION ASFALTICA

m2
m2

04.06

CARPETA ASFALTICA EN FRIO 2"

m3

05

SEALIZACION

05.01

POSTES KILOMETRICOS

05.02

SEALES PREVENTIVAS

05.03

SEALES INFORMATIVAS

05.04

MARCAS EN EL PAVIMENTO

m2

06
06.01

LIMPIEZA FINAL DE OBRA


LIMPIEZA FINAL DE OBRA

m2

Metrado

3/31/2012
ANTERIOR

ACTUAL

Metrado

Metrado

#REF!
METRADOS
#REF!
#REF!

SUPERVISOR: Ing. GONZALO CACERES VALDIVIA

ACUMULADO

SALDO

Metrado

Metrado