Production and Operations Management -Set 1

Production and Operations Management


True/False
Question
After goods have been manufactured, route sheets and operation layouts should not be collected
back.
Correct Answer
False
True/False
Question
In case of centralised inspection, inspection rooms generally become bottleneck and cause delay
in taking action regarding rejection or rework.
Correct Answer
True
Multiple Choice Single Answer
Question
MRP is based on the concept of inventory demand which is of following type
Correct Answer
Dependent and independent
Multiple Choice Single Answer
Question
Any premise in which persons are employed for purpose of making any product/s is called
Correct Answer
Factory
Multiple Choice Multiple Answer
Question
Components of Production Management include
Correct Answer
Capacity Planning , Job Design , Production Planning
Multiple Choice Single Answer
Question
Which of the following is the criteria for the percentage defectives in the zone of the indecision?
Correct Answer
Lots having the percentage defective more than AQL but less than LPTD
Multiple Choice Multiple Answer
Question
Which of the following are examples of addition during recording for method study?

Correct Answer
Brazing , Welding , Riveting
Select The Blank
Question
The easiest way to bring the delayed job within the promised delivery time by using extra shift or
weekly holiday is ________.
Correct Answer
Overtime working
Select The Blank
Question
An Ideal OC curve is ________ shaped curve that accpets all the lots with quality equal to or
better than AQL .
Correct Answer
Rectangular
Multiple Choice Multiple Answer
Question
Which of the following causes can be responsible for derailing the production schedule in a
factory?
Correct Answer
Errors in drawings , Delay in receipt of material from vendor , Excessive absenteeism
Multiple Choice Multiple Answer
Question
Which of the following situations demand the economic consideration while selecting a job for
method study?
Correct Answer
Unorderly movement of men and materials , Excessive process defectives , Too many
suggestions received for improvement from a department or section
True/False
Question
During set up of X bar-R control chart, control limts should be practically revised from time to
time as additional data is accumulated.
Correct Answer
True
Multiple Choice Multiple Answer
Question
Which of the following are the basic requirements of quality standard?
Correct Answer
Deifinite , Undesrstandable , Economically viable
Match The Following

Question
Correct Answer
1.Toung
Sweet
2.Eye
Crack
3.Nose
Burnout
4.Ear
Impact
Select The Blank
Question
The ________ is the defect level for which lots are regarded as bad lots.
Correct Answer
Lot Tolerance Percentage Defective
True/False
Question
Floor inspection delays the identification of faults which can not be rectified immediately before
large lots are spoiled.
Correct Answer
False
True/False
Question
Cent percent inspection is required on WIP prior to the key, critical or costly operation.
Correct Answer
True
Multiple Choice Single Answer
Question
The document which incorporates details of process planning for a job is called
Correct Answer
Route Sheet
True/False
Question
Repetitive movements between work stations which are difficult to be traced on string diagrams
can be conveniently shown on flow diagrams.
Correct Answer
False
Multiple Choice Single Answer
Question

Which of the following is the most popular technique for Project Production?
Correct Answer
PERT & CPM
Multiple Choice Single Answer
Question
Technique of Value Engineering can be effectively employed in design of a product to
Correct Answer
To meet the intended function at lowest cost
Multiple Choice Single Answer
Question
What can be the worst effect due to excessive vibration?
Correct Answer
Breakdown
Multiple Choice Single Answer
Question
What is the relation between duration of an activity and length of an arrow?
Correct Answer
No relation
Multiple Choice Single Answer
Question
What is the nature of the sampling plan for critical defects?
Correct Answer
Tight
Select The Blank
Question
The ________ is the maintenance work initiated on a result of knowledge of the condition of an
item from routine or continuous checking.
Correct Answer
Condition monitoring
Multiple Choice Multiple Answer
Question
Which of the following are important considerations concerning activity times?
Correct Answer
Activity time should be obtained from the person responsible for the completion of an activity ,
Activity time must be independent of any influence which the preceding or succeeding activity
may have on it. , Activity time may assume that just the normal quantity of resources required to
carry out the activity are available.
Multiple Choice Single Answer
Question

Which of the following techniques is used by industrial engineering department to obtain the
utilisation index?
Correct Answer
Work Sampling Studies
Multiple Choice Multiple Answer
Question
Which of the following factors play important role while selecting or rejecting a particular site
from legislation and taxation point of view?
Correct Answer
Labour laws , Building codes , Policies regarding issue of licences
Multiple Choice Multiple Answer
Question
Which of the following cases can be referred as operation in method study recording?
Correct Answer
Change in physical characteristic , Consumption of physical effort , Change in chemical
characteristic
True/False
Question
An activity can share the same tail event and same head event with any other activity.
Correct Answer
False
Select The Blank
Question
The ________ must ensure that the product satisfy the functional requirements of its usage.
Correct Answer
Quality of design
Multiple Choice Multiple Answer
Question
Which of the following are examples of pure materials?
Correct Answer
Bakeries , Ice factories , Woolen
Select The Blank
Question
The ________ are the definitions of the measurable as well as nonmeasurable characteristics of
the product.
Correct Answer
Specifications
Multiple Choice Single Answer
Question

Site factors for plant location include


Select The Blank
Question
The ________ is the probability that a good lot will be rejected by the sampling plan.
Correct Answer
Producers risk
Multiple Choice Multiple Answer
Question
Which of the following defects can be observed during preventive inspection by using human
senses?
Correct Answer
Deviation from normal sound , Excessive Vibration , Leakage of a gas
Select The Blank
Question
The ________ includes preventive maintenance activities whose needs are identified through
inspection which requires stoppage of machines.
Correct Answer
Shutdown Maintenance
True/False
Question
Independent float either affects the float of preceding activities or that of succeeding activities.
Correct Answer
False
Multiple Choice Multiple Answer
Question
Lack of material planning results in the following
Correct Answer
Over ordering , under ordering , stockouts
True/False
Question
F W Taylor devised a system for classifying motions into basic divisions called Therbligs
Correct Answer
False
Select The Blank
Question
Work study is also called ________ study
Correct Answer
Time and Motion

Match The Following


Question
Correct Answer
1.Factor Analysis
Method to evaluate layouts
2.Minimization of production delays
Objective of good layout
3.Maximum visibility
Principles of good layout
4.Scale model
Layout analysis
Multiple Choice Single Answer
Question
Following is one of the techniques used for Material Planning for high value material
Correct Answer
MRP
Multiple Choice Single Answer
Question
What do you understand by totality of features and characteristics of a product or service that
bears on its ability to satisfy the customer?
Correct Answer
Quality
Select The Blank
Question
One detachable ticket is prepared for each ________.
Correct Answer
Operation