You are on page 1of 1
ANNEXUREAII, Appendix-2{c) Ol & GAS BURNER & Boom ~2 Sets ou JRNER Oil & Gas Burner for complete & smokeless burning of the products of the test well on offshore rigs, with the following facilities: 4) Should have minimum three bumer heads mounted on boom. 'b) Combined oil capacity of three heads should be 9,000 BOPD. ©) Total gas capacity should be 60 MMSCF/DAY 4) Oil burning should be through full atomization of fluid to be disposed off for efficient combustion at varying flow rates / pressures with minimum backpressure. Dropping of liquid below the bumer isnot acceptable ©) LPG/Propane ignition pilot system with spark plug facility to be provided near burner heads & gas Tine outlet to ignite oil & gas efficiently with control at the base of bumer, Pilot to be fully protected from water (cooling spray). ) Oil & gas pipe line should be suitable for sour service as per NACE. specs MR-O1-75 (latest edition). 00M Bumer boom to support heads, provide safe walkway to approach burner head, and support all piping for oil, gas, water, air & LPG and should have the following 8) Boom length 60 ft minimum and should be suitable to fold 90 deg Vertically/ horizontally to facilitate boat operation during well testing. ») Should have built in hand rails and steel grating walkway for safe access of people to burner head (chains not acceptable) ©) Should be rugged enough to withstand 150 KMPH wind speed in hanging position. 4) The flow line piping for oil, gas and air should be of following size andl end connections, as per NACE MR-O1-75 (latest edition). Elow line Size End Connection i x 3" WECO Fig 602 Female Gas 3 3" WECO Fig 602 Female Water Eg 3 WECO Fig 602 Female Air 213" 2" WECO Fig 206 Female /3" WECO Fig 602 Female ({n case 3" 602 end connections are provided for the Air line, then suitable change over to convert the end connection to 2° WECO Fig 206 Female should be provided) «€) Oil flow lines to have 3" x 1500 PSI WP check valve and airline to have 2° x 500 PSIWP check valve at the end of the bumer boom. f) Suitable accessories including slings, base plate, kingpost & tie rods should be supplied for installation of burner. £8) The pilot ignition startup switch boxed in fireproof and explosion proof case with supply cable of 100’ length compatible with power supply of rig and fited with fuse etc. Lin a) 2"- 10k 1502 Upstream lines including Flexible line (Coflex hose) to connect Flow Head & Choke Manifold (Total about 50m) b) 3- 5k 602 Downstream lines to connect both oil & gas lines of the burners with the well test ‘separator including Oil & Gas diverters. & -193- =

You might also like