GOALS
PERMEABILITY
OBJECTIVES/STRATEGIES
1.1. Repair linkages of Bankerohan to Metro
Davao
LEGIBILITY
INTERVENTIONS
1.1.1. Widen pedestrian access to Bankerohan Market from
Pichon and Marfori Streets.
1.1.2. Extend Posadas Street towards Quirino Avenue and
make the new stretch an exclusively pedestrian path.
1.1.3. Make the site edges flanking Quirino Avenue and A.
Pichon St. pervious to human traffic.
1.1.4. Create a path that permeates from to the center of site
from the pedestrian overpass along Quirino Avenue.
1.1.5. Cater to Transport Terminals and Jeepney Stops within
proximity of site nodes
1.2.1. Pedestrianize the stretch of Marfori Street that bisects
the site from the corner of San Pedro St. to Datu Bago St.
This will be a hybrid of a public park/activity area and a
circulation space, and will feature a bike lane, and overhead
semi-opaque canopy across it's length.
1.2.2. Extend Posadas Street towards Quirino Avenue andwill
be the first of two pedestrian arteries perpendicular to the
Marfori pedestrian artery. This will follow the existing width of
Posadas street and will feature a median garden bike paths.
1.2.3. Introduce new path connecting the existing overhead
pedestrian walkway crossing Quirino Avenue to Rasay St.
This will be the second minor artery perpendicular to the
Marfori pedestrian artery.
1.4.1. Allow jeepney stops on only the following key points A.)
Corner of Quirino Avenue and A. Pichon St., B.) Corner of
Marfori and A. Pichon Sts., C.) Corner of Rasay and A. Pichon
Sts., D.) Corner of Posadas and Rasay Sts., E.) Corner of
Rasay and Datu Bago Sts., F.) Corner of Datu Bago and
Marfori Sts., with a terminal at the end of Datu Bago Street.
1.4.2. Allow tricycle to hold terminal on only the following key
points: A.) Corner of A. Pichon St. and Quirino Avenue, B.)
Along Rasay St., and C.) Terminal at the end of Datu Bago St.
1.4.3. Allow market delivery trucks only along the main roads
of A. Pichon, Rasay and Datu Bago Sts., and with the service
alley in between Marfori St. and Quirino Avenue.
1.4.4. Allow private cars only along the main roads of A.
Pichon, Rasay and Datu Bago Sts., and with the service alley
in between Marfori St. and Quirino Avenue. Parking of private
vehicles limited to these roads.
1.4.5. Create a parking structure to accomodate to the
marketgoers at Rasay St. from the market that is no longer
being utilized.
ROBUSTNESS
COMMUNITY WELLNESS