Professional Documents
Culture Documents
Pipeline Integrity
Management
1. ........................................................ 3
2. ........................................................ 3
3. .................................................... 4
3.1 .............................................. 4
3.2 ........................................ 5
3.3 .................................... 5
3.4 .................................... 7
4. BPA ............................................10
4.1 ....................................................10
4.2 UKOP .......................................11
4.3 ..........................................11
5. LICENERGY ..............................17
5.1 ....................................................17
5.2 ................................................17
6. ..................................................20
7. () ..................................................21
1.
2.
9 12 9 13
9 14 10 13 BPA UKOP
10 14 10 23 LICENERGY
10 24 10 25
3.
3.1
Pipelines Act 1962- 1962
1996 Pipelines Safety Regulation
1996
Health and Safety Executive HSE
A guide to the Pipelines Safety Regulation
1996
1 31
1962
31 Regulations 4
Part 1. Introduction
1~ 4
Part 2. General
5~17
Part 4. Miscellaneous
28~31 1962
3.2
4 2
Part 1.Pipelines on landgeneral
3.3
1
Pipelines Act 1962
2
British Standard Code of practice for Pipelines
3
Requisitioned Land and War Works Act 1948
4
The Land Powers Defence Act 1958
5
Shell-Mex and BP London Airport PipelineAct 1959
Shell BP
5
6
Esso Petroleum Company Act 1961Esso
6
1960 20
(design life) 40
(easement)
70%
30%
3
6
1
2
6
4
5
7
8
9
10
11 400
(1300 )
12 30 (100
)
Institution of Petroleum IP
Pipeline Safety Code
3.4
Country
Code
Title
IGE/TD/1Ed3 1993
Steel Pipelines for High Pressure
Gas Transmission
ASME/ANSI B31.81995
Gas Transmission & Piping Systems
ISO/FDIS 136232000
Petroleum & Natural Gas Industries
-Pipeline Transportation Systems
SniP 2.05.06-851988
Construction norms & Regulations
-Trunk & Pipelines
Code
BS8010
Design Factor
Max.0.72(rural)down
to <0.3(urban)
IGE/TD/1 Max.0.72(rural)down
to <0.3(suburban)
ASME/ANSI Max.0.80(remote)B31.8
Min. undefined
ISO/FDIS Max.0.83(remote)13623
Min. undefined
SniP
Typically up to
Max.0.90(remote)
0.9 m
16km maximum
16km
Typically 1.1 m
Not Specified
0.6 m(remote)
32km maximum
32km
0.6m(rural)to 1.2 Not Specified
m(urban/crossings)
1.0 m(rural)
Maximum 30km and
either side of river
crossings
30km
Code
BS8010
Classifications
Testing
Class 4city
For design factor> 0.3,
1.5 x design pressure may be
allowable 24 hours
0.3 1.5
24
1 hour test at 1.2 ~ 1.4 x MOP
ISO/FDIS Class 1remote
(depending on location)
13623
Class 2rural
Class 3intermediate then 8 hours at 1.1 x MOP
1.2 1.4 1
Class 4urban
1.1 8
Class 5city
SniP
Not Specified
24 hours test at 1.1 x MOP
then 12 hours at MOP
1.1 24
12
4. BPA
4.1
BRITISH PIPELINE AGENCY LIMITEDBPA
BSI
UKOP BP
ShellTexacoMobilFina 5 1965
BPA BP
Shell BPA 100
30
60 Kingsbury terminal
UKOP
Kingsbury SCADA(Supervisory Control
And Data Acquisition)
pressure meters
flow meters
density meters
color meters
temperature meters
prover
loop
remote
1200 100
UKOP 24 BPShell
ThamesMersey
4 Heathrow Gatwick
10
4.2 UKOP
3 Thames-Mersey
(multi-product pipeline)
Thames-Mersey
505km
1965-68
10-14
8
1999
7538
West London
62km
1968(&84)
6-10
3135
Walton-Gatwick
36km
1984
10
1485
8
4 17 terminal 4
Kingsbury 1990 SCADA
5 BPShellTexacoMobilFina
1999 1215.8
4.3
BPA
1 SCADA
11
3
4
BPA
BPA
pipeline safety management system 11
1 Risk Assessment
2 Programme Planning
3 Performance Measurement & Reporting
4 Management Review
5 Staff Involvement
6/ Incident/accident Investigation
7 Legislative Compliance
8 System Development
9 HSEQ Training
10 Staff Communications
11 Emergency Preparedness
BPA
(leak detection)
corrosion protection
wayleave management
liaison and education
on-line inspection
pressure testing
12
emergency planning
A(leak detection)
a.(technology)
Supervisory Control And Data Acquisition
(SCADA)
SCADA
SCADA
SCADA
SCADA
b.(visual detection)
Bcorrosion protection
a.(coatings)
13
(bitumen) PE
(epoxy)
b.cathodic protection
Himphrey Davy 1820 1930
Cwayleave management
a.ground surveillance
b.aerial monitoring
14
pig
clean pig
geometric pig
pig pig
15
BS8010
90% 150% 24 1.25 2
G(emergency planning)
BPA
pig 7
BPA 30 UKOP
(stable)
0.1% 0.15%
BPA U prover loop UKOP
16
Turbine
SCADA
UKOP
5. LICENERGY
5.1
LICENERGY 1976 1998
LICENERGY
SCADA
125
LICENERGY
5.2
17
A
a.
b.
B
a.
b.
c.
18
d.
e.
:
(conservation of mass)
(conservation of momentum)
(conservation of energy)
(equation of state)
LICENERGY LICMONITOR
real time
on-line
dynamic
/
PIPELINE STUDIO
transient
steady stateoff-line
19
6.
(code)
ASME B31BS8010
20
ASME B31
BPA
7. ()
21