You are on page 1of 30

1ST JULY

A)

WELL LOGS:

B)

WELL DATA:

available on the well location for lifting & cleaning.

Frac string is 3.5 EUE tested at 8000 psi


Connection required at surface is 3 1/8 5 Kpsi, for Tree Saver Rig up

1. M/U & RIH with Schl. open end Frac. assy. on same 3 1/2 EUE TBG, Bottomsup is as follows:-

2 7/8 WLEG (to be just above 5 T.O.L)


2 7/8 EUE TBG joint.
X/O
4.9 Sapesco Fishable External Bundle carrier equipped with 2*15 K psi
Quartz memory gauges to read inside the string (program same to read
every 1 sec during the Frac job).
X/O
10 K psi 7 Flex Pac PKR with two hold down slips to fit 26 # CSG
Safety Joint.
Pipe Tester Valve (PTV).
X/O
3 EUE TBG Till gets the recommended weight below the slip joint.
X/O
5 Schlumberger Slip Joint [2.25 I.D (closed)] {As per Schl. down hole
engineer Recommendations and should be reviewed and accepted from
drilling department}.
3 1/2 EUE TBG to surface.
2.

N/U 3 1/8 5 K psi X-Mass Tree

3.

N/U Schl. Well Head Isolation Tool.

o
o

Close Schlumberger 2 x 2 valve in Annulus line and ensure annulus wing valve is closed. Pressure test the
annulus surface line to 3500 psi against Schlumberger 2 x 2 valve. Observe for 10 minutes and bleed off
line pressure.
Open Schlumberger 2 x 2 valve and pressure lines to annulus wing valve to 2,500 psi. Observe for 5
minutes and bleed off line pressure. Company man on location to confirm any discrepancies in maximum
pressure limitations for testing.
Open the isolation valve to the pressure relief valve and set PRV to 2,300 psi. Pressure up line to confirm
pop-off activation pressure. Reset Pop-off PRV. Re-test until activation pressure is exact.

3.75

3.5

1.75

-1.75

-3.5

-3.75

3713

7427

11140

FracCADE*

KPC
AG 101
2_AG-101_20/40
28-6-2013

ACL Fracture Profile and Proppant Concentration


9840

Well Depth (TVD) - ft

9880
< 0.0 lb/ft2
0.0 - 0.5 lb/ft2
0.5 - 0.9 lb/ft2
0.9 - 1.4 lb/ft2
1.4 - 1.9 lb/ft2
1.9 - 2.3 lb/ft2
2.3 - 2.8 lb/ft2
2.8 - 3.3 lb/ft2
3.3 - 3.7 lb/ft2
> 3.7 lb/ft2

9920

9960
Fracture# 1 Initiation MD = 9907.05 ft
10000
6000

8000

10000 -0.3 -0.2 -0.1

Stress - psi

-0

0.1

0.2

0.3

150

ACL Width at Wellbore - in

300

450

600

750

Fracture Half-Length - ft

*Mark of Schlumberger

Bottomhole Pressure

Surface Pressure

Total Inj. Rate

EOJ

10000

30

8000

20

7000
6000

10

5000
4000
0

10

20

30

40

50

60

70

Treatment T ime - min

80

90

100

110

0
120

Pump Rate - bbl/min

Pressure - psi

9000

Premature
screen out

All
proppant
displaced into
well ?

No

Close wellhead
at master valve

Open bleed
line to the pit (or
pump prime-up
lines)

Yes

Reset pumps
Monitor pressure
Bleed down if
above max
working pressure

Shut in Wellhead
Isolation valve

Bleed down
surface lines

Monitor pressure
of well and start
forced closure
procedure

Open all pumps to


ensure integrity of
pumps

Bleed off surface


pressure to pit

Fan pumps slowly


till no more
prop returns

Continuously
clear prop from
outlet of bleed
to avoid plugging

Blender
Screen
out

Back up
blender (side)
working?

Pump
manifolds
clear?

No

No

Stop pumping

Yes

No
Yes

Lines open to
pumps?

Yes

Close in the
screened out
blender (side)

Continue
treament

Yes

Continue as
planned with
backup side

No

Displace the
treatment

Switch to direct
feed from fluid
source and
flush well

High
pressure
pump
failure

Go to flush
Yes

Are
backups
available?

No

Did the
well screen
out?

No

Enough
rate for job
as
designed?

No

Redesign
job

Yes
Yes

Shift the load of


this pump over on
the remaining
pumps

No

Complete the
treatment as
designed

Go to flush

Client
approves new
design?

Yes

Complete the
treatment as
designed

Failure of
Sand
Chief

Yes

Enough
prop to continue
job while
repairing?

Yes

Switch to other
compartments,
complete repairs
and finish job as
designed

No
Hydraulic
(belt) or gate
failure?

Gate

Same
prop in other
compartments?

No
Go to flush

Hydraulics

Backup
hydraulic system

Yes

rigged up?

No

Reduce rate as
much as possible
and swap to
backup

Go to flush

Client
approves?

Yes

Complete job on
backup

No

Computer
or Comm
failure
Go to
flush
Yes

Is the
job still per
design?

No

Can
the job
continue?

No

Prop in
the well?

No

Stop Pumping

Yes
Redesign the
treatment for the
current situation

Yes

Client
approves?

Yes

What
failed?

POD
Computer

Both or
one?

Network
(Communication)
FracCAT
Computer

One
Both

Continue
pumping - POD
controls blending

Continue
pumping - POD
controls blending

Shift to other side


and run POD as
normal on
one side only

Can job
continue in
manual?

Yes
Do not attempt to
reestablish
communication

Run the POD in


manual
Use radios to
communicate
rates

No

Go to
flush

No

Go to
flush

Failure of
high
pressure
iron

Stop Pumping

Leak or
complete
failure?

Complete

Leak

Can the
line be
isolated?

Secure the well


and isolate the
surface lines

No

Yes

No
Isolate the line

Can the
job be
continued?

No

Is there
prop in the
lines?

Yes

Yes

Continue the
job as
designed

Secure the well


and isolate the
surface lines

Flush proppant
out of surface lines
to the pit

Make repairs

Failure of
the low
pressure
side

Can
the leak
be isolated?

No

Stop pumping

Secure the
equipment

Isolate the failure

Can
the spill be
contained?

Contain the spill

Yes

Job rate
reduced?

No

Yes

No

Can the
spill be dealt
with after the
job?

Yes
Yes

Can
the job
continue?

Continue the
treatment as
scheduled
Yes

No, not enough rate

Stop pumping

Secure the
equipment

Contain the spill