You are on page 1of 15

REVISION

REVISIONCERTIFICATION
CERTIFICATE

(DCC) NO. _____________________

BY DRAWING COMPLETION CERTIFICATE

04/08/16

8/7/15

00A
00b

02-14

DATE

REV
NO.

JF

IFB LSTK LAB & TUNNEL


IFB LSTK LAB & TUNNEL

10-01402

JF

ISSUED FOR 90% FEED REVIEW

10-01402

DB

DB

DKB

ENGG CERT

JAF

DESCRIPTION

10-01402

JO/EWO

PMT OPRNS

SAUDI ARABIAN OIL COMPANY

BI-10-01402

EXPEC ADVANCED RESEARCH CENTER EXPANSION


DHAHRAN, SAUDI ARABIA

FIRE PROTECTION SYSTEMS STUDY

DISCIPLINE
ENGINEER
CW

IFB LSTK LAB & TUNNEL


APRIL 08, 2016

04/08/16
DATE:
PROJECT
ENGINEER

04/08/16
JF

CERTIFIED

04/08/16
DB

PREPARED BY:

CONSTRUCTION
AGENCY

DATE:

OPERATIONS

KLINGSTUBBINS (KS)

DATE:

PHILADELPHIA, PENNSYLVANIA, USA

FIRE PROTECTION SYSTEMS STUDY


EXPEC ADVANCED RESEARCH CENTER EXPANSION

DHAHRAN

DWG.TYPE PLANT NO. INDEX

DOC

SAUDI ARABIA

502

JO / EWO:

DRAWING NO.

HE-348837

10-01402

SHT.NO.

REV.NO.

1
of
15

00B

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

DATE:

BY:

CONTROL NUMBER

DATE:

APPROVAL/CERTIFICATION REQUIREMENTS,

EDSD
VERIFICATION
DATE:

OF THIS DRAWING IS COVERED, FOR ALL

THIS INDICATES THAT REV. NO.__________

Saudi Aramco 2616-ENG (03/99)

SECTION

TITLE

1.

Fire Protection Systems Study


General Overview
Fire Protection Water Supply
Fire Hydrants
Fire Pumps
Standpipes
Sprinkler Systems
Wet-Pipe Sprinkler Systems
Design Criteria
Materials and Equipment
Preaction Sprinkler Systems
Design Criteria
Materials and Equipment
Portable Fire Extinguishers
Open Issues

1.1.
1.2.
1.3.
1.4
1.5
1.6
1.6.1
1.6.1.a
1.6.1.b
1.6.2
1.6.2.a
1.6.2.b
1.7
1.8

10-01402
04/08/16
00b

DISCIPLINE
ENGINEER
CW

04/08/16
DATE:
PROJECT
ENGINEER
JF
DATE:

04/08/16

CERTIFIED
DB
DATE:

04/08/16

CONSTRUCTION
AGENCY

DATE:

OPERATIONS

DATE:
(DCC) NO. _____________________

BY:
BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
REVISIONCERTIFICATION
CERTIFICATE

THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

CONTROL NUMBER

DATE:

FIRE PROTECTION SYSTEMS STUDY


EXPEC ADVANCED RESEARCH CENTER EXPANSION
DHAHRAN

DWG.TYPE PLANT NO. INDEX

DOC

SAUDI ARABIA

502
JO / EWO:

DRAWING NO.

HE-348837

10-01402

SHT.NO.

REV.NO.

2
of
15

00B

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

DB
JF

TABLE OF CONTENTS

IFB LSTK LAB & TUNNEL

10-01402
8/7/15
00A

REV
NO.

02-14

DATE

10-01402

JO/EWO

IFB LSTK LAB & TUNNEL

ISSUED FOR 90% FEED REVIEW

JF

JAF

DB

DKB

SAUDI ARABIAN OIL COMPANY

DESCRIPTION

ENGG CERT

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

1 Fire Protection Systems


Study
1.1

JF

JF

General Overview

This report outlines the various fire protections systems and their associated
design criteria as applied to the design for the Saudi ARAMCO EXPEC ARC
Laboratory Building, Maintenance Building/Shaded Area, and Electrical

10-01402
04/08/16

IFB LSTK LAB & TUNNEL

10-01402
8/7/15

IFB LSTK LAB & TUNNEL

10-01402

The design and installation of the fire protection systems will be in accordance
with the following:

00b

00A

JO/EWO

02-14
A

REV
NO.

DATE

DESCRIPTION

ISSUED FOR 90% FEED REVIEW

Building.

DISCIPLINE
ENGINEER
CW

04/08/16
DATE:
PROJECT
ENGINEER

SAEP-327 Disposal of Wastewater from Cleaning, Flushing and


Dewatering Pipelines and Vessels (2012)

SAES-A-105 Noise Control (2012)

SAES-B-067 Safety Identification and Safety Colors (2010)

SAES-L-105 Piping Material Specifications (2012)

SAES-M-100 Saudi Aramco Building Code (2012)

SAES-B-017 Fire Water System Design (2012)

SAES-B-019 Portable, Mobile and Special Fixed Fire Fighting


Equipment (2012)

SAES-S-040 Saudi Aramco Water Systems (2012)

SAES-S-050 Sprinkler and Standpipe Systems in Buildings (2012)

SAES-S-060 Saudi Aramco Plumbing Code (2013)

SAES-S-070 Installation of Utility Piping Systems (2012)

International Building Code IBC (2009)

International Fire Code IFC (2009)

NFPA 10 Standard for Portable Fire Extinguishers (2013)

NFPA 13 Standard for the Installation of Sprinkler Systems (2013)

NFPA 14 Standard for the Installation of Standpipe and Hose


Systems (2013)

NFPA 20 Standard for the Installation of Stationary Fire Pumps for


Fire Protection (2013)

NFPA 24 Standard for the Installation of Private Fire Service Mains


and Their Appurtenances (2013)

JF
DATE:

04/08/16

CERTIFIED
DB
DATE:

04/08/16

CONSTRUCTION
AGENCY

DATE:

OPERATIONS

DATE:
(DCC) NO. _____________________

BY:
BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
REVISIONCERTIFICATION
CERTIFICATE

THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

CONTROL NUMBER

DATE:

FIRE PROTECTION SYSTEMS STUDY


EXPEC ADVANCED RESEARCH CENTER EXPANSION
DHAHRAN

DWG.TYPE PLANT NO. INDEX

DOC

SAUDI ARABIA

502
JO / EWO:

DRAWING NO.

HE-348837

10-01402

SHT.NO.

REV.NO.

3
of
15

00B

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

DB

DB

DKB

SAUDI ARABIAN OIL COMPANY

JAF

ENGG CERT

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

(UL) or Factory Mutual Global (FMG) approved.

DB

DB

DKB

All fire protection system equipment and materials shall be Underwriters Listed

1.2
JF

JF

Fire Protection Water

The raw water system utility will be the source of water for fire protection

Supply

systems within the buildings. The flow and pressure for the raw water system is
not known at this time. Prior to fire protection systems design for each building,

IFB LSTK LAB & TUNNEL

IFB LSTK LAB & TUNNEL

adequacy of the available raw water supply. This flow test information will
ultimately be conveyed to the fire protection contractor via the contract
documents for use in performing hydraulic calculations.
The hydrant flow test data should include the following information:
For Hydrant Flow Test

Flow lpm (gpm):

00b

REV
NO.

10-01402

04/08/16

Residual Pressure kPa (psig):

10-01402

8/7/15

Static Pressure kPa (psig):

00A

10-01402

Date of test:

JO/EWO

Location of Test (Flow Hydrant, Pressure Hydrant):

02-14

Test performed by:

DATE

DESCRIPTION

ISSUED FOR 90% FEED REVIEW

a current (less than 1 year old) firewater flow test will be required to verify

DISCIPLINE
ENGINEER
CW

04/08/16
DATE:
PROJECT
ENGINEER
JF
DATE:

04/08/16

Laboratory Building

CERTIFIED
DB
DATE:

04/08/16

The fire water supply for the proposed Laboratory Building will be obtained

CONSTRUCTION
AGENCY

from the existing site direct buried raw water distribution piping system.
Preliminary load calculations for the Laboratory Building estimate a maximum

DATE:

OPERATIONS

peak flow demand of 5678 liters/min (1500 gpm) for fire protection systems. A
200 mm (8 inch) connection will be made to the existing 300 mm (12 inch)
cement lined steel (CLS) pipe which currently crosses from east to west just

protection systems in the Maintenance Building and Shaded Area.

DATE:
(DCC) NO. _____________________

BY:

south of the building site. This service will also supply fire water to the fire

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
REVISIONCERTIFICATION
CERTIFICATE

THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

CONTROL NUMBER

DATE:

FIRE PROTECTION SYSTEMS STUDY


EXPEC ADVANCED RESEARCH CENTER EXPANSION
DHAHRAN

DWG.TYPE PLANT NO. INDEX

DOC

SAUDI ARABIA

502
JO / EWO:

DRAWING NO.

HE-348837

10-01402

SHT.NO.

REV.NO.

4
of
15

00B

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

SAUDI ARABIAN OIL COMPANY

JAF

ENGG CERT

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

the site raw water system as none is specifically required per Aramco Standard
SAES-S-040, 5.8.

JF

JF

DB

DB

DKB

Backflow prevention will not be provided on the fire water service connection to

On-site storage is not being considered at this time.

building to enable the fire department to pressurize the firewater system via

IFB LSTK LAB & TUNNEL

IFB LSTK LAB & TUNNEL

DESCRIPTION

ISSUED FOR 90% FEED REVIEW

A fire department connection will be provided at an accessible location on the

pumper trucks.

The fire department connection inlets will be threaded as

required by the local fire department.


A valved connection to the drinking water system will be provided in the
Laboratory Building fire pump room. This connection will allow the fire
standpipe/sprinkler system piping to be initially charged with drinking water.
And then switched over to the primary raw water system. The initial charge of

10-01402

10-01402

10-01402

02-14

8/7/15

04/08/16

00A

00b

JO/EWO
DATE

Maintenance Building

REV
NO.

provided on this drinking water connection.

drinking water will help minimize corrosion. Backflow prevention will be

The fire water supply for the proposed Maintenance Building will be obtained

DISCIPLINE
ENGINEER
CW

from the pumped sprinkler main located in the Laboratory Building. Preliminary
load calculations for the Maintenance Building estimate a maximum peak flow

04/08/16
DATE:
PROJECT
ENGINEER

demand of 5678 liters/min (1500 gpm) for fire protection systems. A 200 mm

JF
DATE:

(8 inch) connection will be made to the 200 mm (8 inch) main located in the

04/08/16

Fire Pump Room of the Laboratory Building.

CERTIFIED
DB
DATE:

04/08/16

Backflow prevention will not be provided on the fire water service connection to

CONSTRUCTION
AGENCY

the site raw water system as none is specifically required per Aramco Standard
SAES-S-040, 5.8.

DATE:

OPERATIONS

A valved connection to the drinking water system will be provided in the


Maintenance Building. This connection will allow the fire sprinkler system
piping to be initially charged with drinking water. And then switched over to the
DATE:

minimize corrosion. Backflow prevention will be provided on this drinking water


connection.

(DCC) NO. _____________________

BY:

primary raw water system. The initial charge of drinking water will help

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
REVISIONCERTIFICATION
CERTIFICATE

THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

CONTROL NUMBER

DATE:

FIRE PROTECTION SYSTEMS STUDY


EXPEC ADVANCED RESEARCH CENTER EXPANSION
DHAHRAN

DWG.TYPE PLANT NO. INDEX

DOC

SAUDI ARABIA

502
JO / EWO:

DRAWING NO.

HE-348837

10-01402

SHT.NO.

REV.NO.

5
of
15

00B

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

SAUDI ARABIAN OIL COMPANY

JAF

ENGG CERT

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

DB

DB

DKB

Electrical Building
The fire water supply for the proposed Electrical Building will be obtained from
the pumped sprinkler main located in the Laboratory Building. Preliminary load
JF

JF

calculations for the Electrical Building estimate a maximum peak flow demand
of 5678 liters/min (1500 gpm) for fire protection systems. A 200 mm (8 inch)

IFB LSTK LAB & TUNNEL

IFB LSTK LAB & TUNNEL

DESCRIPTION

ISSUED FOR 90% FEED REVIEW

connection will be made to the 200 mm (8 inch) main located in the Fire Pump
Room of the Laboratory Building.
Backflow prevention will not be provided on the fire water service connection to
the site raw water system as none is specifically required per Aramco Standard
SAES-S-040, 5.8.
On-site storage is not being considered at this time.

10-01402

10-01402

10-01402

02-14

8/7/15

04/08/16

00A

00b

JO/EWO
DATE
REV
NO.

A fire department connection will be provided at an accessible location on the


building to enable the fire department to pressurize the firewater system via
pumper trucks.

required by the local fire department.


1.3

Fire Hydrants

DISCIPLINE
ENGINEER
CW

Fire Hydrants will be located around each building in accordance with SAES-B017 and SAES-M-100. Hydrants will be served by a minimum 150 mm (6 inch)
water supply line. Hydrants will be located on a maximum 75 m (245 ft.)

04/08/16
DATE:
PROJECT
ENGINEER

spacing along the travel path of the adjoining roadway and within 6 m (19.7 ft.)

JF
DATE:

The fire department connection inlets will be threaded as

of the roadway available to fire department apparatus. A hydrant will be located

04/08/16

within 30 m (100 ft.) of each fire department connection (FDC).

CERTIFIED
DB
DATE:

04/08/16

Backflow prevention will not be provided on the fire water service connection to

CONSTRUCTION
AGENCY

the site raw water system as none is specifically required per Aramco Standard
SAES-S-040, 5.8.

DATE:

OPERATIONS

1.4

Fire Pumps

Laboratory Building
The Laboratory Building shall be provided with an automatic, centrifugal,

DATE:

BY:

electric motor driven fire pump taking suction from the 200 mm (8 inch) fire
service connection.

A secondary, backup diesel driven fire pump sized to

(DCC) NO. _____________________

match the primary fire pump will also be provided.


BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
REVISIONCERTIFICATION
CERTIFICATE

THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

CONTROL NUMBER

DATE:

FIRE PROTECTION SYSTEMS STUDY


EXPEC ADVANCED RESEARCH CENTER EXPANSION
DHAHRAN

DWG.TYPE PLANT NO. INDEX

DOC

SAUDI ARABIA

502
JO / EWO:

DRAWING NO.

HE-348837

10-01402

SHT.NO.

REV.NO.

6
of
15

00B

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

SAUDI ARABIAN OIL COMPANY

JAF

ENGG CERT

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

The fire booster pumps should be minimally rated at 5678 lpm (1500 gpm), 6.9
bar (100 psig) and 93 kW (125 HP). The pump discharge pressure will not be
less than 860 kPag (125 psig) in accordance with SAES-B-017 Section 13.3.2.

JF

JF

DB

DB

DKB

The fire pump will supply the sprinkler and standpipe demands of the building.

Two electric jockey pumps will be provided with the fire booster pump to satisfy

IFB LSTK LAB & TUNNEL

IFB LSTK LAB & TUNNEL

DESCRIPTION

ISSUED FOR 90% FEED REVIEW

the minor building system pressure fluctuations. The primary jockey pump will
be rated for 57 lpm (15 gpm), 6.9 bar (100 psig) and 1 kW (1.5 HP). The
second jockey pump will match the ratings of the primary jockey pump and will
be installed as a spare. The jockey pump ratings will be less than those
specified in SAES-B-017 Section 14.3 as permitted by the exception. Jockey
pump controller shall be provided with lead/lag capabilities to ensure equal run
time for each pump.

10-01402

the flow test.

04/08/16

A location with proper drainage will be provided to accommodate discharge


from fire pumps during annual testing in accordance with NFPA 20

00b

8/7/15
00A

10-01402

02-14

DATE
REV
NO.

10-01402

JO/EWO

The above fire pump sizes will be adjusted accordingly based on the result of

Fire Pump will be located in minimum 1 hour fire rated room.

DISCIPLINE
ENGINEER
CW

1.5

04/08/16
DATE:
PROJECT
ENGINEER

Laboratory Building
The Laboratory Building will be provided with a Class I, automatic wet

JF
DATE:

Standpipes

04/08/16

standpipe system. Each exit stairwell will be provided with a 150 mm (6 inch)

CERTIFIED

combination wet standpipe/sprinkler riser. All standpipes within the Laboratory

DB
DATE:

04/08/16

Building will be interconnected. The standpipe system will be designed such

CONSTRUCTION
AGENCY

that the standpipe demand can be met in accordance with NFPA 14 (A.7.8.1.2)
by a fire apparatus pumping the required standpipe flow rate at 1207 kPa (175

DATE:

OPERATIONS

psi) at any required fire department connection as permitted by Exception 6 to


SAES-M-100 Section 905.3.1. The minimum flow rate for the most
hydraulically vertical standpipe riser will be 1893 lpm (500 gpm) and the

standpipe with the total not to exceed 3785 lpm (1000 gpm). The minimum

DATE:
(DCC) NO. _____________________

BY:

minimum flow rate for the additional standpipes shall be 946 lpm (250 gpm) per

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
REVISIONCERTIFICATION
CERTIFICATE

THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

CONTROL NUMBER

DATE:

pressure required at the top of the standpipe is 690 kPa (100 psi).

FIRE PROTECTION SYSTEMS STUDY


EXPEC ADVANCED RESEARCH CENTER EXPANSION
DHAHRAN

DWG.TYPE PLANT NO. INDEX

DOC

SAUDI ARABIA

502
JO / EWO:

DRAWING NO.

HE-348837

10-01402

SHT.NO.

REV.NO.

7
of
15

00B

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

SAUDI ARABIAN OIL COMPANY

JAF

ENGG CERT

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

combination wet standpipe/sprinkler riser.

DB

DB

DKB

A control valve with tamper switch will be installed at the base of each

A 65 mm (2 inch) fire hose valve and cabinet will be provided at the main
JF

JF

landing of each standpipe. Fire hose valves will be brass.

check valve, pressure gauge, butterfly control valve with tamper switch and a

IFB LSTK LAB & TUNNEL

IFB LSTK LAB & TUNNEL

DESCRIPTION

ISSUED FOR 90% FEED REVIEW

A floor control valve assembly (FCVA), consisting of a flow detection device,

test/drain connection, will also be provided at the main landing. This assembly
will provide separate zone and monitoring control of the wet sprinkler system
for each floor.
Hose reels are not required for occupancies in the Laboratory Building per
SAES-B-019 Table 1, and therefore will not be provided.

10-01402

Standpipes will be designed in accordance with SAES-B-017 Fire Water

04/08/16

System Design, SAES-S-050 Sprinkler and Standpipe Systems in Buildings


and NFPA 14 Standard for the Installation of Standpipe and Hose Systems.

00b

8/7/15
00A

10-01402

02-14

DATE
REV
NO.

10-01402

JO/EWO

Piping for the standpipe system will be minimum Schedule 40 black steel.

1.6

DISCIPLINE
ENGINEER
CW

Sprinkler Systems

Building and Electrical Building will be fully sprinklered in accordance with the

04/08/16
DATE:
PROJECT
ENGINEER

applicable codes, regulations and standards. Fully sprinklered means that all
spaces of the building project area will be provided with automatic sprinklers;

JF
DATE:

The Laboratory Building, Maintenance Building, Connecting Tunnel, Hub

04/08/16

including, but not limited to, mechanical equipment rooms, elevator shafts,

CERTIFIED

elevator machine rooms and telecommunications equipment rooms.

DB
DATE:

04/08/16

CONSTRUCTION
AGENCY

1.6.1

Wet-Pipe Sprinkler
Systems

Wet-pipe sprinklers will be provided throughout all areas, except for the
computer labs and the specialized wet lab spaces in the Laboratory Building,

DATE:

Connecting Tunnel and Hub Building as identified in the Preaction Sprinkler

OPERATIONS

Systems section below.


1.6.1.a Design Criteria

The various wet-pipe sprinkler system zones will generally be designed and

DATE:
(DCC) NO. _____________________

BY:

installed in accordance with the sprinkler design criteria listed in the following

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
REVISIONCERTIFICATION
CERTIFICATE

THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

CONTROL NUMBER

DATE:

tables:

FIRE PROTECTION SYSTEMS STUDY


EXPEC ADVANCED RESEARCH CENTER EXPANSION
DHAHRAN

DWG.TYPE PLANT NO. INDEX

DOC

SAUDI ARABIA

502
JO / EWO:

DRAWING NO.

HE-348837

10-01402

SHT.NO.

REV.NO.

8
of
15

00B

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

SAUDI ARABIAN OIL COMPANY

JAF

ENGG CERT

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

DB

Design
Area
2
m
(ft2)

Area per
Sprinkler
m2
(ft2)

Hose
Stream
lpm
(gpm)

Office/Corridors/ Common
Areas

6.1
(0.15)

139
(1500)

12.1
(130)

946
(250)

Labs and Lab Support


Spaces

8.1
(0.20)

139
(1500)

12.1
(130)

946
(250)

Cylinder Storage/Central
Chemical and Material
Storage

12.2
(0.30)

232
(2500)
or Room

9.3
(100)

1893
(500)

Mechanical/ Electrical
Areas/Workshops

6.1
(0.15)

139
(1500)

12.1
(130)

946
(250)

Interior Loading Dock Areas/


Non-Chemical Store Rooms
(max. storage height =
3.66 m)

8.1
(0.20)

139
(1500)

12.1
(130)

946
(250)

JF

10-01402

10-01402

8/7/15

04/08/16
00b

Maintenance Building

DISCIPLINE
ENGINEER
CW

Design
Density
lpm/m2
(gpm/ft2)

Design
Area
m2
2
(ft )

Area per
Sprinkler
m2
2
(ft )

Hose
Stream
lpm
(gpm)

Office/Corridors/ Common
Areas

6.1
(0.15)

139
(1500)

12.1
(130)

946
(250)

Material Storage &


Carpentry Shop

8.1
(0.20)

139
(1500)

12.1
(130)

946
(250)

Shaded Cylinder Storage,


Chemical Storage &
Dispensing, Painting,
Welding, Liquid/Solid/Mixed
Waste Staging Areas

12.2
(0.30)

232
(2500)
or Room

9.3
(100)

1893
(500)

Mechanical/ Electrical
Areas/Workshops

6.1
(0.15)

139
(1500)

12.1
(130)

946
(250)

Occupancy/Area

04/08/16
DATE:
PROJECT
ENGINEER
JF
DATE:

Design
Density
lpm/m2
(gpm/ft2)

Occupancy/Area

IFB LSTK LAB & TUNNEL

10-01402

00A

JO/EWO

02-14
A

REV
NO.

DATE

IFB LSTK LAB & TUNNEL

ISSUED FOR 90% FEED REVIEW

JF

JAF

DB

DKB

Laboratory Building

04/08/16

CERTIFIED
DB
DATE:

04/08/16

CONSTRUCTION
AGENCY

DATE:

OPERATIONS

DATE:
(DCC) NO. _____________________

BY:
BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
REVISIONCERTIFICATION
CERTIFICATE

THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

CONTROL NUMBER

DATE:

FIRE PROTECTION SYSTEMS STUDY


EXPEC ADVANCED RESEARCH CENTER EXPANSION
DHAHRAN

DWG.TYPE PLANT NO. INDEX

DOC

SAUDI ARABIA

502
JO / EWO:

DRAWING NO.

HE-348837

10-01402

SHT.NO.

REV.NO.

9
of
15

00B

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

SAUDI ARABIAN OIL COMPANY

DESCRIPTION

ENGG CERT

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

JF

Occupancy/Area

Design
Density
lpm/m2
(gpm/ft2)

Design
Area
m2
2
(ft )

Area per
Sprinkler
m2
2
(ft )

Hose
Stream
lpm
(gpm)

Mechanical/ Electrical Areas

6.1
(0.15)

139
(1500)

12.1
(130)

946
(250)

Sprinkler types provided for the various spaces within each building will be as
identified in the following tables:

Laboratory Building
Response
Class.

Style

Finish

Orifice
mm (in)

Temp
C (F)

All areas except as


noted otherwise below

Quick

Concealed
Pendent

White

13
(0.50)

68
(155)

Mechanical/ Electrical
Rooms without ceilings

Standard

Upright

Brass

13
(0.50)

93
(200)

Storage/Interior
Loading Docks without
ceilings

Standard

Upright

Brass

13
(0.50)

141
(286)

Cylinder Storage Areas


and other Extra Hazard
Spaces w/ ceilings

Standard

Pendent

Chrome

14
(0.53)

68
(155)

Cylinder Storage Areas


and other Extra Hazard
Spaces w/o ceilings

Standard

Upright

Brass

14
(0.53)

68
(155)

Light Hazard spaces


without ceilings

Quick

Upright

Brass

13
(0.50)

68
(155)

Other areas without


ceilings

Standard

Upright

Brass

13
(0.50)

68
(155)

10-01402
04/08/16
00b

8/7/15
00A

10-01402

02-14

DATE
REV
NO.

10-01402

JO/EWO

Occupancy/ Area

DISCIPLINE
ENGINEER
CW

04/08/16
DATE:
PROJECT
ENGINEER
JF
DATE:

04/08/16

CERTIFIED
DB
DATE:

04/08/16

CONSTRUCTION
AGENCY

DATE:

OPERATIONS

DATE:
(DCC) NO. _____________________

BY:
BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
REVISIONCERTIFICATION
CERTIFICATE

THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

CONTROL NUMBER

DATE:

FIRE PROTECTION SYSTEMS STUDY


EXPEC ADVANCED RESEARCH CENTER EXPANSION
DHAHRAN

DWG.TYPE PLANT NO. INDEX

DOC

SAUDI ARABIA

502
JO / EWO:

DRAWING NO.

HE-348837

10-01402

SHT.NO.

REV.NO.

10
of
15

00B

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

DB

Electrical Building

IFB LSTK LAB & TUNNEL

IFB LSTK LAB & TUNNEL

ISSUED FOR 90% FEED REVIEW

JF

JAF

DB

DKB

SAUDI ARABIAN OIL COMPANY

DESCRIPTION

ENGG CERT

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

DB
JF

10-01402

10-01402

8/7/15

04/08/16

00A

IFB LSTK LAB & TUNNEL

10-01402
02-14

Response
Class.

Style

Finish

Orifice
mm (in)

Temp
C (F)

All areas except as


noted otherwise below

Quick

Concealed
Pendent

White

13
(0.50)

68
(155)

Mechanical/ Electrical
Rooms without ceilings

Standard

Upright

Brass

13
(0.50)

93
(200)

Storage/Interior
Loading Docks without
ceilings

Standard

Upright

Brass

13
(0.50)

141
(286)

Cylinder Storage Areas


and other Extra Hazard
Spaces w/ ceilings

Standard

Pendent

Chrome

14
(0.53)

68
(155)

Cylinder Storage Areas


and other Extra Hazard
Spaces w/o ceilings

Standard

Upright

Brass

14
(0.53)

68
(155)

Shop Areas

Standard

Pendent

Brass

13
(0.50)

68
(155)

Other areas without


ceilings

Standard

Upright

Brass

13
(0.50)

68
(155)

Occupancy/ Area

00b

JO/EWO
DATE
REV
NO.

IFB LSTK LAB & TUNNEL

ISSUED FOR 90% FEED REVIEW

JF

JAF

DB

DKB

Maintenance Building

DISCIPLINE
ENGINEER
CW

04/08/16
DATE:
PROJECT
ENGINEER

Electrical Building

JF
DATE:

04/08/16

CERTIFIED

Response
Class.

Style

Finish

Orifice
mm (in)

C (F)

Mechanical/ Electrical
Rooms without ceilings

Standard

Upright

Brass

13
(0.50)

93
(200)

DB
DATE:

04/08/16

CONSTRUCTION
AGENCY

Temp

Occupancy/ Area

DATE:

OPERATIONS

The hydraulic design of all sprinkler systems will include a 69 kPa (10 psi) safety
factor over and above the system demand.

DATE:
(DCC) NO. _____________________

BY:
BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
REVISIONCERTIFICATION
CERTIFICATE

THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

CONTROL NUMBER

DATE:

FIRE PROTECTION SYSTEMS STUDY


EXPEC ADVANCED RESEARCH CENTER EXPANSION
DHAHRAN

DWG.TYPE PLANT NO. INDEX

DOC

SAUDI ARABIA

502
JO / EWO:

DRAWING NO.

HE-348837

10-01402

SHT.NO.

REV.NO.

11
of
15

00B

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

SAUDI ARABIAN OIL COMPANY

DESCRIPTION

ENGG CERT

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

NFPA 13 and ANSI A17.1 requirements. Hydraulic elevator shafts will be


provided with a sprinkler at the bottom of each shaft; none are required and none
will be provided at the bottom of electric driven elevator shafts. No sprinklers will

JF

JF

DB

DB

DKB

Elevator machine rooms and hoistways will be sprinklered in accordance with

be provided at the top of the shaft; electric or hydraulic driven. Power shutdown
prior to sprinkler discharge, activated by heat detection, will be provided for all
IFB LSTK LAB & TUNNEL

IFB LSTK LAB & TUNNEL

DESCRIPTION

ISSUED FOR 90% FEED REVIEW

elevator machine rooms in accordance with ANSI/ASME A17.1 Elevator Safety


Code. Power shut-down is not required for the elevator shafts (i.e. hydraulic
elevator shafts) where the sprinkler is located no more than 610 mm (2 ft.) above
the bottom of the elevator pit. No shut-off valves are required for sprinklers
serving elevator shafts or elevator machine rooms by code; none will be provided.
Water curtains will be provided and designed in accordance with NFPA 13 as
required (Laboratory Building). At a minimum, water curtains shall be provided at

10-01402

10-01402

10-01402

02-14

8/7/15

04/08/16

00A

00b

JO/EWO
DATE

Sprinkler protection will be provided in all flammable gas cabinets.

REV
NO.

4700 and 4701).

the glass separation between all lab/office zones, at the glass separation at Stairs
th
#9 and #10 and at the glass separation between the 4 floor and atrium (Corridor

1.6.1.b Materials and


Equipment

DISCIPLINE
ENGINEER
CW

Piping for wet pipe sprinkler system will be Schedule 40.

All piping, fittings,

devices and their installation will comply with the requirements of NFPA 13.

04/08/16
DATE:
PROJECT
ENGINEER

All pendent sprinklers shall be installed on return bends, connected to the top of

JF
DATE:

branchlines in order to prevent the accumulation of sediment in the sprinkler

04/08/16

CERTIFIED

drops.

DB
DATE:

04/08/16

All material and equipment will be UL listed for fire protection service.

CONSTRUCTION
AGENCY

1.6.2

DATE:

OPERATIONS

Preaction Sprinkler
Systems

Single interlock preaction sprinkler systems will be provided in the computer lab
spaces (as identified in Design Criteria Table below), the specialized wet lab
spaces (not yet specifically defined) of the Laboratory Building, the Connecting
Tunnel and Hub Building.

DATE:

enter the piping network when the electronic detection system (heat detection)
activates, operates the solenoid valve and opens the preaction valve.

(DCC) NO. _____________________

BY:

A single-interlock preaction system is arranged so that water is only allowed to

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
REVISIONCERTIFICATION
CERTIFICATE

THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

CONTROL NUMBER

DATE:

FIRE PROTECTION SYSTEMS STUDY


EXPEC ADVANCED RESEARCH CENTER EXPANSION
DHAHRAN

DWG.TYPE PLANT NO. INDEX

DOC

SAUDI ARABIA

502
JO / EWO:

DRAWING NO.

HE-348837

10-01402

SHT.NO.

REV.NO.

12
of
15

00B

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

SAUDI ARABIAN OIL COMPANY

JAF

ENGG CERT

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

zone with an independent preaction valve assembly located as close as possible


to the protected space.

JF

JF

DB

DB

DKB

Each space protected with a preaction system will be provided as a separate

1.6.2.a Design Criteria

All spaces protected by preaction sprinkler systems will be designed and installed

10-01402
04/08/16

IFB LSTK LAB & TUNNEL

10-01402
8/7/15

IFB LSTK LAB & TUNNEL

10-01402

Design
Density
lpm/m2
(gpm/ft2)

Design
Area
m2
2
(ft )

Area per
Sprinkler
m2
2
(ft )

Hose
Stream
lpm
(gpm)

4.1
(0.10)

139
(1500)

20.9
(225)

379
(100)

Specialized Wet Lab Spaces (to be


defined)

12.2
(0.30)

232
(2500)
or
Room

9.3
(100)

1893
(500)

Connecting Tunnel & Hub Building

6.1
(0.15)

139
(1500)

12.1
(130)

946
(250)

Occupancy/Area

Computer Lab Spaces; including,

00b

00A

JO/EWO

02-14
A

REV
NO.

DATE

DESCRIPTION

ISSUED FOR 90% FEED REVIEW

in accordance with the following sprinkler design criteria:

1.

Legible Interfaces Lab

2.

Augmented Reality Lab

3.

High Performance
Computing lab

DISCIPLINE
ENGINEER
CW

04/08/16
DATE:
PROJECT
ENGINEER
JF
DATE:

04/08/16

Sprinkler types provided for the various spaces within the building will be as

CERTIFIED

identified in the following table:

DB
DATE:

04/08/16

CONSTRUCTION
AGENCY

Occupancy/ Area

Response
Class.

Style

Finish

Quick

Concealed
Pendent

White

Standard

Pendent

Chrome

Temp

Orifice
mm (in)

C (F)

13
(0.50)

68
(155)

14
(0.53)

68
(155)

DATE:

OPERATIONS

All areas except as


noted otherwise below
Specialized Wet Lab
Areas and other Extra
Hazard Spaces w/
ceilings

DATE:
(DCC) NO. _____________________

BY:
BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
REVISIONCERTIFICATION
CERTIFICATE

THIS INDICATES THAT REV. NO.__________

EDSD
VERIFICATION

CONTROL NUMBER

DATE:

FIRE PROTECTION SYSTEMS STUDY


EXPEC ADVANCED RESEARCH CENTER EXPANSION
DHAHRAN

DWG.TYPE PLANT NO. INDEX

DOC

SAUDI ARABIA

502
JO / EWO:

DRAWING NO.

HE-348837

10-01402

SHT.NO.

REV.NO.

13
of
15

00B

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

SAUDI ARABIAN OIL COMPANY

JAF

ENGG CERT

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

Response
Class.

Style

Finish

Specialized Wet Lab


Areas and other Extra
Hazard Spaces w/o
ceilings

Standard

Upright

Areas without ceilings

Standard

Upright

DB
JF
IFB LSTK LAB & TUNNEL

IFB LSTK LAB & TUNNEL

ISSUED FOR 90% FEED REVIEW

JF

JAF

DB

DKB

Occupancy/ Area

1.6.2.b Materials and Equipment

Temp

Orifice
mm (in)

C (F)

Brass

14
(0.53)

68
(155)

Brass

13
(0.50)

141
(286)

Piping for preaction sprinkler systems will be Schedule 40, galvanized steel.
All pendent sprinklers shall be installed on return bends, connected to the top
of branchlines in order to prevent the accumulation of sediment in the sprinkler
drops. This is also required for pendent sprinklers installed on preaction

10-01402

10-01402

10-01402

8/7/15

04/08/16

air compressor(s) via an air maintenance device(s). The air pressure shall

water into the system piping. The air also serves as the supervisory medium

00b

00A

JO/EWO

02-14

maintain the system preaction deluge valve in the closed position, allowing no

REV
NO.

The preaction sprinkler systems will be pressurized with air generated by an

DATE

systems in accordance with NFPA 13.

for monitoring leaks or breaks in the preaction system piping.

DISCIPLINE
ENGINEER
CW

Riser mounted air compressors will be provided for each of the preaction

04/08/16
DATE:
PROJECT
ENGINEER

sprinkler systems. A listed regenerative air dryer shall be provided for each

JF
DATE:

compressed air supply to remove the moisture from the air, thereby

04/08/16

minimizing internal pipe corrosion and extending the life of the piping.

CERTIFIED
DB
DATE:

04/08/16

Preaction system piping will be pitched as required by NFPA 13.

CONSTRUCTION
AGENCY

1.7

DATE:

OPERATIONS

Dry Chemical extinguisher capacities will be 4.54 kg (10 lb) with a UL rating of

DATE:

BY:

4A:60B:C.
Electrical equipment areas and telephone equipment rooms will be provided

(DCC) NO. _____________________

with CO2 portable fire extinguishers.


BY DRAWING COMPLETION CERTIFICATE

CONTROL NUMBER
APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

EDSD
VERIFICATION

REVISION
REVISIONCERTIFICATION
CERTIFICATE

All areas will be provided with multi-purpose dry-chemical (Class ABC)


extinguishers, except as noted below.

DATE:

THIS INDICATES THAT REV. NO.__________

Portable Fire Extinguishers

CO2 extinguisher capacities will be 4.54 kg (10 lb) with a UL rating of 10B:C.

FIRE PROTECTION SYSTEMS STUDY


EXPEC ADVANCED RESEARCH CENTER EXPANSION
DHAHRAN

DWG.TYPE PLANT NO. INDEX

DOC

SAUDI ARABIA

502
JO / EWO:

DRAWING NO.

HE-348837

10-01402

SHT.NO.

REV.NO.

14
of
15

00B

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

SAUDI ARABIAN OIL COMPANY

DESCRIPTION

ENGG CERT

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

DB

in accordance with NFPA 10:

10-01402

Lab and Lab Support Spaces

15 m (50 ft.)

Mechanical/Electrical Spaces

15 m (50 ft.)

Storage Areas

15 m (50 ft.)

Shop Areas

15 m (50 ft.)

10-01402
04/08/16

Open Issues

The following open issues need to be resolved for the fire protection systems:
1.

areas), further discussion is required to determine if all of these


spaces are required to be protected with preaction systems or only
specific rooms of these types.

04/08/16
DATE:
PROJECT
ENGINEER

2.

04/08/16

Computer Labs. This protection is an option, but is not specifically

CERTIFIED
DB

required. SAES-B-014 Section 8.1 indicates that fixed gaseous fire

04/08/16

suppression is not required in new facilities that are designed to meet

CONSTRUCTION
AGENCY

the remainder of the standard SAES-B-014. This is also repeated in


SAES-B-017 Section 6.5. At this time gaseous suppression (clean

DATE:

OPERATIONS

agent, CO2) is not being included for any spaces as it was not
specifically required in the DBSP document and has not been

DATE:
(DCC) NO. _____________________

BY:

specifically required by Aramco.

BY DRAWING COMPLETION CERTIFICATE

APPROVAL/CERTIFICATION REQUIREMENTS,

OF THIS DRAWING IS COVERED, FOR ALL

REVISION
REVISIONCERTIFICATION
CERTIFICATE

EDSD
VERIFICATION

CONTROL NUMBER

DATE:

THIS INDICATES THAT REV. NO.__________

Gaseous clean agent fire suppression (specifically FM-200) has been


indicated in the room data sheets for Rack Room areas in the

JF

DATE:

While

some spaces have been defined (specifically in the Computing lab

DISCIPLINE
ENGINEER
CW

DATE:

The DBSP states that Preaction systems shall be provided in the


computer lab spaces and the specialized wet lab spaces.

00b

00A

8/7/15

10-01402

JO/EWO

02-14

DATE

23 m (75 ft.)

The extinguishers will be UL listed for fire protection service.


1.8

REV
NO.

Office/Common Areas
JF
IFB LSTK LAB & TUNNEL

IFB LSTK LAB & TUNNEL

ISSUED FOR 90% FEED REVIEW

JF

JAF

DB

DKB

Extinguishers will located to be reachable within the following travel distances

FIRE PROTECTION SYSTEMS STUDY


EXPEC ADVANCED RESEARCH CENTER EXPANSION
DHAHRAN

DWG.TYPE PLANT NO. INDEX

DOC

SAUDI ARABIA

502
JO / EWO:

DRAWING NO.

HE-348837

10-01402

SHT.NO.

REV.NO.

15
of
15

00B

EDSD/2616-0399.doc

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

SAUDI ARABIAN OIL COMPANY

DESCRIPTION

ENGG CERT

PMT OPRNS

Saudi Aramco 2616-ENG (03/99)

You might also like