You are on page 1of 3

ANTHONY GEN NIEGAS ANDALLO

POSITION: CERTIFIED WELDER GTAW/SMAW


Availability: I can start for work as soon as possible
PERSONAL DATA
Age
Date of Birth
Gender
Civil Status
Height
Weight
Nationality
Religion
Permanent Address

:
:
:
:
:
:
:
:
:

34
August 2, 1978
Male
Married
173 cm
56.2 kg
Filipino
Christian
#445 Farmers Road, Malaya, Pililla, Rizal

:
:
:
:

Vocational Diploma/High School Diploma


Engineering (Metal Fabrication/Tool & Die/Welding)
Gen. Automotive/Welding Steel Fabrication Graduate
Regional Technical Education & Skills

EDUCATION
Education Level
Education Field
Course
School

SEMINARS & TRAINING ATTENDED


Basic Safety Training (Regulation VI/1 of the STCW-78 Convention, as amended)
Personal Survival Technique (IMO Model Course 1.19)
Fire Prevention & Fire Fighting (IMO Model Course 1.20)
Elementary First Aid (IMO Model Course 1.20)
Personal & Safety & Social Responsibility (IMO Model Course 1.21)
The Maritime Training Center of the Philippines (Sep. 28 October 7, 2009)
Basic Offshore Safety Induction Emergency Training
Consolidated Training System Inc. (Oct. 14 16, 2009)
Gas Metal Arc Welding (PASSO)
SAIPEM Welding System
Batam, Indonesia (Oct. 20 Nov. 20, 2009)
HSE Training Program for Oil & Gas Drilling Technology
1. Basic Introduction to Drilling Technology
2. Basic Rig Orientation for Safety & Awareness
3. Introduction to Hydrogen Sulfide
4. Basic First Aid
ENERLINK Management & Consultancy, Inc. (July 20 Aug. 1, 2009)

General Automotive Mechanic Course


Filipinas Shell Foundation Inc.
Oct. 01, 1998
Welding & Steel Fabrication
Technical Education & Skills Development Authority (TESDA)
March 31, 1998
Auto Aircon (TESDA) Dec. 19, 1997
Gas Welding (TESDA) Nov. 21, 1997
Leadership Enhancement & Attitude Development (LEAD) Seminar
For Shell-Skilled Scholars (26-28 Mar. 1998)
TRADE TEST CERTIFICATION
Welder Performance Qualification GTAW/GTAW/SMAW
TUV SUD INDUSTRIES SERVICE GMBH (Philippine Branch)
Jan. 15, 2010
Welder Performance Qualification GTAW/GTAW/SMAW
TUV SUD INDUSTRIES SERVICE GMBH (Philippine Branch)
May 8, 2009
General Welder Class B
PHIL-ASIA Technical Consultant & General Services, Inc.
June 27, 2007
WORK EXPERIENCE
Position
:
SMAW/GMAW (PASSO) WELDER
Duration
:
January 30 Aug. 16, 2010
Company
:
ENI SAIPEM
Company Industries :
Oil/Gas/Petroleum
Location
:
Italy / Vietnam
Department
:
Welding
Job Description
Welding to Final Pass 32 95 Km pipeline for SRG Sea Line LIVORNO Project (Italy)
GTAW (PASSO) process from root pass to final pass, filler wire used 1.0 mm
OERLIKON CARBOPIPE 70
Welding to final pass 6, 10, 285 km pipeline for BLOCK RW DEVELOPMENT
CHIMSAO/TOPAZ (VIETNAM) fields transportation & installation of CS WHP Gas
export 7 in field pipe lines and PLEMS, GMAW (PASSO) process from root pass to final
pass filler wire used REDAELI RMS 18.
Welding to final pass, 4 pipe, 95 km pipe line welding rod ESAB 7016-G
Welding to final pass, 6, 10 pipe 285 km pipeline welding
Full welding of conductor pipe butt joints size 28 schedule 80, all SMAW process from
root pass to capping
Full welding of 3 legs and 4 legs flat form butt joints 60 schedule 180, all SMAW
process from root pass to capping welding rod ESAB 7016-G/7018-G

Position
:
GTAW/SMAW WELDER
Duration
:
May 4, 2009 Jun. 4, 2009
Company
:
BOILER MAKER
Company Industries :
Power Plant
Location
:
Mauban Quezon (COVANTA ENERGY)
Department
:
Welding
Job Description
Full welding of control valve 6, 8 & 12 dia. Sch. 80 & 120 steam line for BM 7 AUX
steam, main steam de super heater pressure control valve, GTAW, process from root pass
to hot pass, SMAW process in filling to capping, filler rod 9 CRMOV-N ER90S-B9 7
welding rod LB 529018
Position
:
GTAW/SMAW WELDER
Duration
:
Aug. 30, 2007 Nov. 17, 2008
Company
:
JV IREM SPA Saudi Arabia Ltd.
Company Industries :
Oil/Gas/Petroleum
Location
:
Kingdom of Saudi Arabia
Department
:
Welding
Job Description
Assign in fabrication Shop for the preparation of all materials on welding work, first
assist tacking on pipe joints pipe 2, 4, 8 up to 24 7 8 dia. Filler used, carbon steel E70S, welding supercito E-7018
Job Site: full welding of joints size 1-1/2 2, 1 tig welding up to second pass & up to
finish, tig welding filler rod used E-70S
Full welding of pipe joints size 4 & 6, 1 tig welding up to second pass, 3rd pass
SMAW process up to final pass filler rod E-70S & welding rod E-7018, 7016, this kind of
filler rod & welding rod is always used on steel pipe for structural works.
Position
:
GTAW/SMAW WELDER
Duration
:
December 22, 2002 January 09, 2007
Company
:
ARABIAN FAL COMPANY
Company Industries :
Oil/Gas/Petroleum
Location
:
Kingdom of Saudi Arabia
Department
:
Welding
Job Description
Preparation of all tools, machine argon gas, tig tools, welding rod, heating tools, full
welding of butt joints sizes 4 dia, 8 dia up to 34 dia. Sch. 80 SMAW up to finish
Full welding of butt joints sizes dia. dia. 1 dia. Up to 1 dia up to 8 dia. Sch. 40
all tig up to finish capping ER316LS, S309L
Full welding of butt joints sizes 4 dia. 8 dia up to 48 dia. Sch 80 TIG/SMAW process
filler rod E70-S, rod E-70S-2

You might also like