SCOPE OF WORK - EKLIT Engineerig

SHIFTING and UTILITY & DRAIN LINE INSTALLATION THEIS PRESSOR DRYER
Item No Description
Material
Size
Fabricate and fix STEAM line to the machine, and Start
from the related PRV Station, need to have 7 ELBOWS 1
1 1/2" &
1/2" & 5 ELBOWS 1". 2 FLANGE SETS, 1 STRAINER, 1 SS Shed 10
22
1"
3P ball VALVE, Mounting brackets are to be fabricate &
fixed proper way.

Elbow
Size inches
QTY

Ball Valve
Size
QTY

1.5 & 1

24

Fabricate and fix CONDENSATE line to the machine,


Start from the 50mm Condensate main line, need to have
6 ELBOWS, 1FLANGE SETS, 1-3P BALL VALVE,
Mounting brackets are to be fabricate & fixed proper way.

SS Shed 10

1 1/2" x 4Mtr

1.5

27

Fabricate and fix COOLING WATER line to the machine,


Start from the 100mm Cooling water Main line, need to
have 6 ELBOWS, 1 NRV, 1 BALL VALVE, Mounting
brackets are to be fixed along with the line proper way.

SS Shed 10

1 " x 4Mtr

NRV & BV

28

Fabricate and fix COOLING WATER RETURN line to the


100mm Main Return line Inside the Trench, Start from the
machine, need to have 6 ELBOWS, 1 NRV, 1 BALL
VALVE, 1 UNION, Mounting brackets are to be fixed
along with the line proper way.

SS Shed 10

1 " x 4Mtr

NRV, BV &
Union

29

Fabricate and fix Cooling Cylinder DRAIN line to the


Open Trench, Start from the machine, need to have 6
ELBOWS, 1 - T' Sockets, Mounting brackets are to be
fixed along with the line proper way.

SS Shed 10

1" x 4mtr

1 inch , L
bows and T

30

Fabricate and fix KIER DRAIN line to the Open Trench,


Start from the machine, need to have 4 ELBOWS,
Mounting brackets are to be fixed along with the line
proper way.

SS Shed 10

1/2" x 3Mtr

0.5

31

Fabricate and fix PRV SAFETY DEVICE line to the Open


Trench, Start from the PRV Station, need to have 6
ELBOWS, Mounting brackets are to be fixed along with
the line & in the trench proper way.

SS Shed 10

1" x 3mtr

32

Fabricate and fix PRV WATER SEPERATOR DRAIN line


to the Open Trench, Start from the PRV Station, need to
have 5 ELBOWS, Mounting brackets are to be fixed along
with the line & in the trench proper way.

SS Shed 10

1/2" x 3mtr

0.5

33

Fabricate and fix PRV AUTO DRAIN MODULE line to the


Condesate Return Main, Start from the PRV Station, need
to have 5 ELBOWS, Mounting brackets are to be fixed
along with the line & in the trench proper way.

SS Shed 10

1/2" x 3mtr

0.5

34

Fabricate and fix SILENCER line to the Building out,


SS Shine
Concrete slab top of the Main Drug Stores Roof. With
using existing Materials. Start from the machine, need to 1.5mm (existing 2 1/2" x 25mtrs
)
have 8 ELBOWS, Mounting brackets are to be fixed along
with the line wall proper way.

2.5

35

Fabricate and fix SAFETY DEVICE line to the Open


Trench, Start from the machine, need to have 4 ELBOWS,
Mounting brackets are to be fixed along with the line & in
the trench proper way.

SS Shed 10

3" x 3Mtr

36

Fabricate and fix MISCELLANIOUS LINES line to the


Open Trench, Start from the machine, need to have Total
6 ELBOWS,

SS Shed 10

1" x 3Mtr

37

Compress Air Line. Fabricate and fixed to the machine.


Supply get from 50mm Compressed air main line. 10
SS Shed 10
ELBOWS, 1- 1" BALL VALVE, 1" - NRV. & 1/2" NRV, 1 'T'
Sockets.

1 & 1/2" x 5Mtr

1 & 0.5 inches


Elbows and T

11

BV and NRVs

TOTAL AMOUNT

Flange Set
Size
QTY

81

10

Stainer
Size
QTY