Date: 23/03/2015
ECP 11-0201
Summary:
This document details the grid and primary system test forms for commissioning
and maintenance.
Owner:
Kevin Burt
Date:
23/03/2015
Approved By:
Steve Mockford
Approved Date:
06/05/2015
This document forms part of the Companys Integrated Business System and its requirements are mandatory throughout UK
Power Networks. Departure from these requirements may only be taken with the written approval of the Director of Asset
Management. If you have any queries about this document please contact the author or owner of the current issue.
Circulation
UK Power Networks
External
G81 Website
Asset Management
Contractors
Capital Programme
ICPs/IDNOs
Connections
Meter Operators
HSS&TT
Network Operations
UK Power Networks Services
Other
THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE
Version: 3.0
Revision Record
Version
3.0
Review Date
23/03/2019
Date
23/03/2015
Author
Stephen Tucker
Why has the document been updated: Document revised to incorporate the test form matrix and
changes to other test forms. Document re-titled.
What has changed:
Version
2.2
Review Date
11/03/2016
Date
11/03/2011
Author
Stephen Tucker
Version
2.0
Review Date
24/04/2012
Date
24/04/2007
Author
Stephen Tucker
Document rebranded
1.0
Review Date
17/11/2009
Date
17/11/2004
Author
Stephen Tucker
Original
2 of 6
Contents
1
Introduction ............................................................................................................. 4
Scope ....................................................................................................................... 4
References ............................................................................................................... 4
3 of 6
Introduction
1.1
This document details the available test forms for commissioning and maintenance
of plant, protection, equipment and systems at grid and primary substations and
other locations on the 132kV and 33kV network.
1.2
This procedure and the associated check list (ECP 11-0201a) are provided to assist
with the commissioning of grid and primary substations and other locations.
Scope
2.1
The test forms apply to the EPN, LPN and SPN networks. Please contact the
author if any additional/forms are required.
2.1
This document is intended for use by UK Power Networks field staff, contractors
and external connection providers.
References
3.1
3.2
4 of 6
ECP 11-0203
ECP 11-0204
ECP 11-0205
ECP 11-0206
ECP 11-0207
ECP 11-0208
ECP 11-0209
ECP 11-0210
ECP 11-0211
ECP 11-0212
ECP 11-0213
ECP 11-0214
ECP 11-0215
ECP 11-0216
ECP 11-0217
ECP 11-0218
ECP 11-0219
ECP 11-0220
ECP 11-0221
ECP 11-0222
ECP 11-0223
ECP 11-0224a
ECP 11-0224b
ECP 11-0301
ECP 11-0302
ECP 11-0303
ECP 11-0304
ECP 11-0305
ECP 11-0306
ECP 11-0307
ECP 11-0308
ECP 11-0309
ECP 11-0310
ECP 11-0311a
ECP 11-0311b
ECP 11-0311c
ECP 11-0312
ECP 11-0313
ECP 11-0314
ECP 11-0315
ECP 11-0401
ECP 11-0402
ECP 11-0403
ECP 11-0404
ECP 11-0405
ECP 11-0406
ECP 11-0010a
* Tests if applicable
ECP 11-0202
Tests mandatory
General
ECP 11-0201
Disconnector
Earthing Switch
Earthing Device
Circuit Breaker
Current Transformers
Voltage Transformers
Surge Diverter
Transformer
Neutral Earthing
Synchronising
Delayed Auto-reclose
Version: 3.0
Date: 23/03/2015
PLANT
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
5 of 6
LVAC Switchboard
High Voltage Pressure Test
Resistance Measurements
Disconnector - Manually Operated
Disconnector - Motorised
Earthing Switch
Maintenance Earthing Device
Fault Throwing Switch
Interlocks
Circuit Breaker
Capacitor Voltage Transformer
Electromagnetic Voltage Transformer
Transformer (& Reactor)
Neutral Earthing Resistor
Surge Diverter
Substation 415V Switchboard
General Secondary Wiring & Multicore Cabling
DC Supplies & Common Services
DC Operations
Overall Tripping & Control
Instrument & Transducer Circuits
Synchronising Scheme
Delayed Auto-reclose (including Check Sync)
Automatic Voltage Control
SuperTAPP Automatic Voltage Control
Insulation Resistance
Current Transformer Magnetisation Curve
Current Transformer Primary Injection
Current Transformer & Lead Resistance Diagram
Tripping & Auxiliary Relays
IDMT & Instantaneous Overcurrent & Earth Fault Protection
High Impedance Earth Fault (REF) Protection
DUOBIAS Biased Differential Transformer Protection
Circulating Current Protection
High Impedance Differential Busbar Protection
SOLKOR R & RF Feeder Unit Protection
SOLKOR N Feeder Unit Protection
TRANSLAY S Feeder Unit Protection
Distance Protection Automatic Test Results
Pilot Supervision
Directional Overcurrent & Earth Fault
G59 Generator Connection Tests
Telecontrol Checks
Scheme Functional Checks
Pre-energisation Checks
Post-energisation Checks
Pilot Cable Tests
Earthing System
Metering Equipment Commissioning
ECP 11-0202
ECP 11-0203
ECP 11-0204
ECP 11-0205
ECP 11-0206
ECP 11-0207
ECP 11-0208
ECP 11-0209
ECP 11-0210
ECP 11-0211
ECP 11-0212
ECP 11-0213
ECP 11-0214
ECP 11-0215
ECP 11-0216
ECP 11-0217
ECP 11-0218
ECP 11-0219
ECP 11-0220
ECP 11-0221
ECP 11-0222
ECP 11-0223
ECP 11-0224a
ECP 11-0224b
ECP 11-0301
ECP 11-0302
ECP 11-0303
ECP 11-0304
ECP 11-0305
ECP 11-0306
ECP 11-0307
ECP 11-0308
ECP 11-0309
ECP 11-0310
ECP 11-0311a
ECP 11-0311b
ECP 11-0311c
ECP 11-0312
ECP 11-0313
ECP 11-0314
ECP 11-0315
ECP 11-0401
ECP 11-0402
ECP 11-0403
ECP 11-0404
ECP 11-0405
ECP 11-0406
ECP 11-0010a
* Tests if applicable
General
Tests mandatory
ECP 11-0201
General
Transformer
Metering
Version: 3.0
Date: 23/03/2015
Unit
Directional
Distance
Busbar
G59 Generator
PROTECTION
Earthing
*
*
*
*
*
*
MISCELLANEOUS
6 of 6