Training Contents
A
Model No
HDEG-JY211A
HDEG-JY211B
2 Application
1) hydrazine Dosing Device
The device is used for the preparation and dosing of hydrazine solution.
There are 1 inject points, Inject point to condensate water inlet. The
device is equipped with a control box for the operation and display of
operational status of all the electric sub-devices.
2) Phosphate Dosing Device
The device is used for the preparation and dosing of phosphate solution.
There are 1 inject points, Inject point to condensate water inlet. The device
is equipped with a control box for the operation and display of operational
status of all the electric sub-devices.
Flow rateL/h
Inject point
The inlet of condensate water
normal
rated
19
19
Pressure
MPa
1.4
normal
rated
19
19
Pressure
MPa
1.4
Item
Description
Manufacturer
Metering pump
Model: RA020S
Milton Roy
Solution tank
Material:304SS
YTwater
Qty: 1 sets
Model: UHZ-10A00N1000S1.0
3
Level meter
Material:304SS
Qty: 1sets
Beijing
Jinde
Mixer
Material: 304SS
YTwater
Qty: 1sets
Model: RVSS-FRT-6E-F
5
Safe-relief valve
Material: 316SS
Fitok
Qty: 2 sets
Model: Y-100BFZ 16Bar
6
Pressure gauge
Range0-16Bar
Wuxi Gete
Material:304SS
Qty: 2 units
Model: DAM250010S
7
Damper:
Control cabinet
1 sets
YTwater
Item
Description
Manufacturer
Metering pump
Model: RA020S
Milton Roy
Solution tank
Material:304SS
YTwater
Qty: 1sets
Model: UHZ-10A00N1000S1.0
3
Level meter
Material:304SS
Qty: 1sets
Beijing
Jinde
Mixer
Material: 304S
YTwater
Qty: 1sets
Model: RVSS-FRT-6E-F
5
Safe-relief valve
Material: 316SS
Fitok
Qty: 2 sets
Model: Y-100BFZ 16Bar
6
Pressure gauge
Range0-16Bar
Wuxi Gete
Material:304SS
Qty: 2 units
Model: DAM250010S
7
Damper:
Control cabinet
1 sets
YTwater
automatically after its starting for a period of time (can be set between 0-60
Minutes), also will stop automatically at a low-level set point and can not be
started until the level is up to above the low-level set point. The Solution
preparation process is completed.
Dosing process: After open the valve at the bottom of solution tank, dosing
process can be started by turning on the metering pump, so far. The flow rate
of metering is adjustable to required rate, by regulating the pump stroke
length manually. During the dosing process, when the liquid level drops to a
low-level set point, close the valve manually. When the Low-Low level set
point is reached, the metering pump will be stopped automatically.
Dosing process: After open the valve at the bottom of solution tank, dosing
process can be started by turning on the metering pump. The flow rate of
metering is adjustable to required rate, by regulating the pump stroke length
manually. During the dosing process, when the liquid level drops to a lowlevel set point, the dosing process stops. When the Low-Low level set point is
reached, the metering pump will be stopped automatically. This situation only
appears when low-level alarm fails.
6.2.2 Metering Pump Flow Control
1) The pumps in hydrazine dosing devices:
The flow rate of the metering pumps is adjustable both in running and stop
state. There are one methods for the pump flow regulation which are manual
adjustment . Under local operation model, can the manual adjustment be
taken by regulating pumps stroke length.
2) The pumps in Phosphate dosing devices:
The flow rate of the metering pumps is adjustable both in running and stop
state. There are one methods for the pump flow regulation which are manual
adjustment . Under local operation model, can the manual adjustment be
taken by regulating pumps stroke length.
6.2.3 Safety Protection:
Metering pumps built-in safety valve: this valve is to protect the metering
pump from work under over-pressure condition. When over-pressure
happens for some unusual factors, the built-in safety-relief-valve will open
at the set point to relief the pressure built up in its discharge line.
When they fail to operate normally that causes their electrical current
exceeds a set value, the metering pumps, mixers automatically stop
running.
The level meters of all solution tanks are set high, low, low-low level alarm
points. Mixer is inter-locked with low-level alarm point, and metering pump
is with low-low level alarm point to prevent the metering pump or mixer
operates without liquid.
Model No
YTQ-EG100A
YTQ-EG100B
YTQ-EG100C
the impurities from the filtrating orifice of the filter element, so as to increase
flow. When the protection valve is in running state, a cooling water cutting off
or sample water over-temperature protection test shall be made at regular
interval once a week, so as to check the reliability of the protective device.
Remark: in the test, close 50% the valves of the inlet or outlet of the cooling
water main pipe, to put all the protection valves under the protective condition,
the protection valve shall cut off the sample water completely.
Model No
YJY-3
2 General Description
This device should be supplied of input voltage AC 480V,60HZ,three-phase
four-wire accessed system.The control voltage is AC120V.
1)Sewage is pumped to liquid inlet of the equipment by lifting pump,which is
installed in sanitary sewage storage basin, with local individual electrical
cabinet which proveded local and remote control, but the control box is not
responsible for sewage pump control.The sanitary sewage pumps have two
sets toally, and one of them for standby. In the actual process two sewage
pumps should be taking turns to be standby one, and 24 hours (or decided by
yourself) for switching. The start or stop of sewage pumps is interlocked by
water level of sanitary sewage storage basin, and the high or low level alarm
signals are supplied by ultrasonic levelmeter equipped on baisn. When
sewage pump in local operation mode, start or stop sewage pump manually,
When sewage pump in remote operation mode, pump auto stop if low level in
basin alarm, pump auto start if high level in basin alarm.
2)Blowers are supplied by two sets and one of them for standby, In the actual
process two blowers should be taking turns to spare, and 4 hours (or decided
by yourself)for switching. When blower in local operation mode, start or stop
blower manually, When blower in remote operation mode, blower auto start if
sanitary sewage pump is running,blower auto delay 4 hours to stop if sanitary
sewage pumps stop working. If pumps stop working for long time(when little
sanitary,water level under work level),two blower continue alternately work for
ensuring biofilm normal growth,and every 2 hour for 20 mins running(interval
and work time should be adjusted according to actual situation).
3)The lifting mud device is auto starting once for every 24 hours, every time
working for five minutes, and open and close automatically.
4)When backflow pump in local operation mode, start or stop backflow pump
manually, When backflow pump in remote operation mode, pump is running
continuous.
3 Operation
First turn on power supply to "ON" position make the three-phase power is
connected, then switch tolocaloperation on control box operation panel.
press the start button respectively to check each pumps and fans whether
normal working, then switch to "remote" position make pumps into the
automatic control. Two fans of commissioning process is same with pumps,
working alternating time for four hours, but the two fans should not be worked
at the same time whether in "local"or"remote" mode. Mud lifting system auto
start to work every 24 hours and work 5 minutes each time,when the
comissioning is finished (or decided by yourself), the process come into
normal working.
4 Debugging
This set of sewage treatment equipment is great flexibility in debugging
operation, water quanity is designed to adapt water quality. The main process
is biological contact oxidation , the water flow into the basin which is used to
adjust water quality and quanity. Biomembrane that fall off by aerobic
biochemical contact in biochemical reaction basin then flow into sedimentation
basins with sewage. Then Sewage is cleared and separated in sedimentation
basins, sewage clarified flow into disinfect basin to disinfect. (disinfectant is
used solid chlorine piece , chlorine piece dosing quantity for 10PPM).To kill
the bacteria, the waste water treatment is completed after disinfection,then
drain out. The sludge in sedimentation basins is lifted to digestion tank by
sludge pump, then the sludge is drained out to sludge concentration pool
regularly after digest process ,wastewater treatment process is finished.
5 Piping & Instrument Diagram
Model No
DYH-400
LYSF-10
oil
Positioning bracket
As shown in the schematic, in some cases, it may need a positioning bracket
which height is free to adjust according to the need of installation. There are 4
holes on the bottom of the machine fixed on the bracket by 4bolts.
Horizontal
ruler
Roller
3) Place the filtering belt on the upper roller by reference to the replacement
of the belt in.
4) Place the lower roller as shown.
5)Connect the hoses with the oil and water outlet. So far, the scraper
installation is completed.
6) It is recommended that positioning the scraper away from the sources of
animal and vegetable oils.
2.3 Operation
1) First, fill clean water into the tank by the volume of half of the separation
tank.
2) Then switch on the built-in switch of the scraper, and make sure the belt
moves well.
3) Check if the moving belt and the scraper are matched well by the in and out
flows of the oily-water. They should be equal in normal condition.
4) The oil and water separates in the separation tank due to their different
specific gravity.
2.4 Belt replacement
Tools neededOpen-end and adjustable wrenchs
the chain gear, then the 2 screws on both sides of the water tray attached on
the bottom of the upper roller, finally take out the water tray.
3) After completing the steps above, pull the bearing up (as shown) and
remove away the belt, then place a new belt back in the way that the direction
of rotation is same as that of the arrow shown on the filter back.
4) To prevent the filter belt from offset, it is necessary to pay your attention to
the followings:
Check its levelness
Adjust the tightness of the bearings to make the belt moving easy.
Adjust the water tray and scraper position (as shown)
Move the scraper forward to the filtering belt gradually until the oil is scraped
off.
Start/stop back wash pumps, heater and open/close oil discharge electric
valves remotelly.
Automatically open discharge oil electric valve when high oil level
alarm,automatically close discharge oil electric valve when low oil level.
4 Piping & Instrument Diagram