CIVIL ENGINEERING
Lab to be funded
STRUCTURAL ENGINEERING
Application Id -
0751-2364684
0751-2409300
Page x/y
of lab
Cost in Rs.
Year purchased
Compression testing
machine for cement
Compression testing
machine for concrete
Prestressing bed
Data logger
Add rows as required
Abstract
Equipments included in the proposal are based on latest technology which enables the
engineer to look into the constructed facilities. Thus quality of construction material,
presence of deficiencies, and regions of weakness can be identified. Most of the existing
equipments, installed in the lab have been procured way back in 60s. With the advent of
digital technology, manufacturers are now producing digital machine which are not only
easy to handle but also more precise. Therefore it is imperative to give exposure of such
machines to our students.
Add rows as required
Objective
The study is related to health monitoring of structures. Efforts will be made to develop
facility which can be used to identify the weaknesses in a structure with respect to its
strength, durability etc and establish its stability.
Add rows as required
Page x/y
Specifications
No of
units
Ultrasonic
Pulse Velocity
Meter
Rebar Locator
Cover Meter
Corrosion
Analyzing
Instrument
Digital
Rebound
Hammer &
Testing Anvil
for hammers
Application Id -
Justification
One
Approx.
Cost in
Rs.
5,00,000
One
4,00,000
To locate the
reinforcing bars
in RCC element,
estimate the
cover to steel,
diameter of
bars etc
One
5,00,000
To
highlights
corrosion
activity in RC
element before
rust
becomes
visible.
Early
detection may
help
in
preventing an
unanticipated
structural
failure.
Two
3,50,000
To estimate the
compressive
strength of
concrete, weak
spots etc
without causing
any damage to
it.
One
1,75,000
To establish the
accuracy of
measurements
To estimate
compressive
strength, crack
details etc.
Page x/y
through
rebound
hammers
Total(NR)
19,25,000
Add rows as required
75,000
Other
--Total
75,000
Add rows as required
NR
R1
R=NR+R1
19,25,000
75,000
20,00,000
Date of joining
Appointment Type
Scale of
Appointment
Department
Qualifications
UG
PG
PhD
Experience in years
Teaching
Industry
Research
Relevant experience
Other information
Give any other information that will help in accepting /funding this project
Cell number
Email
Signature
Application Id -
Page x/y
Name of
the Coordi-nator
Amt sanctioned
NR
a.
SEMINAR
-----
50, 000
b.
MODROB
----
c.
RPS
----
d.
MODROB
----
e.
TRAVEL
GRANT
MODROB
Dr. S.
Wadhwani
Dr. S.
Wadhwani
Dr. L.
Srivastava
Dr. P.K. Singhal
----
54, 632
Dr. A .K.
Wadhwani
Dr. P.K.
Singhal
Dr. Pratesh
Jayaswal
Dr. R. K.
Gupta
----
5, 50, 000
----
8, 10, 000
----
5, 00, 000
----
f.
Funds
Utilisation
position as
on today
UtilisationCertificate
details/ Reason for
non- submission of
Utilisation
Certificate
Fully Utilized
UC submitted
Fully utilized
UC in process
8024/RIFD/MOD/201/2011/12,
dated 07.12.2011
8024/RIFD/MOD-199/2011-12,
dated 7.12.2011
8024/RIFD/MOD-200/20112012, dated 9.12.2011
8024/RIFD/MOD-203/2011-12
dated 09/12/2011
Procurement
under process
Procurement
under process
Procurement
under process
Partial fund
utilized
Under
Progress
Fully utilized
------UC in process
Fully Utilized
UC submitted
------
g.
MODROB
h.
MODROB
i.
MODROB
j.
MODROB
3, 50, 000
----
8024/RIFD/MOD-202/2011-12,
dated 13.12.2011
Procurement
under process
k.
MODROB
----
l.
RPS
5, 00, 000
----
RPS
1, 75, 000
n.
RPS
8024/RIFD/MOD/ 204/2011/12
09/12/2011
8023/RID/RPS-64/2011-12
dated 01/12/2011
8023/RIFD/RPS/
66/2011-12, dated 1.12.2011
8023/RID/RPS-63/2011-2012,
dated 1.12.2011
Rs. 5,45,076/spent
Fully Utilized
m.
Prof. L. K.
Jain
Dr. R. K.
Gupta
Dr. R. Kansal
Procurement
under process
Procurement
under process
o.
RPS
RPS
q.
SDP
Dr. S.
Bhattacharya
Dr. M. Pandit
Partially
utilized
Rs.6,52,850/utilized
Fully Utilized
UC in process
p.
r.
SDP
Dr. R. K. Gupta
----
8023/RID/RPS-62/ 2011-2012,
dated 1.12.2011
8023/RID/RPS-65/2011-12,
dated 1.12.2011
F. No. 1-78/ RIFD/SDP(37)/11-12
dated 12.08.2011
RIFD/SDP/147/2011-12 dated
13/1/2012
s.
t.
u.
SDP
3,15,000/-
SEMINAR
-----
1, 00, 000
SEMINAR
Dr. R. K. Gupta
1, 00, 000/-
----
Dr.
S.Wadhwani
Dr. A .K.
Wadhwani
5,04,000/-
-----
1,00,000/-
----
v.
FDP
w.
SEMINAR
Dr. Rajesh
9, 30,000
Kumar; Co PI:
Dr. Manoj
Kumar
Dr. Rekha Gupta 6, 00, 000
1, 00, 000
60,000
7, 00, 000
25, 000
5, 49,197/-
Not submitted
RIFD/SDP/3/2011-12,
UC submitted
RIFD/SEM/7/2011-12
Utilized
UC submitted
RFID/SEM/187/2011-12 dated
28/02/12
F-1-7/AICTE/RIFD/FDP/P(1)20/2012-13
F-RIFD/SEM/5/2012-13
Utilized
To be
conducted
To be
conducted
---
UC being submitted
To be conducted
To be conducted
Page x/y
Abide by all the rules / regulations regarding utilization of amount that may be granted
to the Institute.
Submit timely progress reports about grant utilization.
Submit utilization certificate duly authenticated by CA on/before project period is over.
Return full/partial unutilized grant amount to the Council.
Important :
You need to apply on web portal using your Institute login and password. Select tab AQIS application. Press
New to create new application. Your application is assigned unique application Id. Fill all the details over there. Prepare
application in this proforma also. Attach PDF of it to the application on web portal. Now press submit on web portal to
submit application. Pay processing fees on web portal using appropriate payment option.
Application Id -
Page x/y