PEB QUALITY ASSURANCE PLAN

Reference NO:

(Project)
DESCRIPTION

PARAMETERS

TYPE OF CHECK

FREQUENCY OF CHECK

To be filled by 3rd Party

Revision NO
SPEC. CODES &
STANDARDS FOR
ACCEPTANCE CRITERIA

To be filled by 3rd Party

ACTION
3rd
CONTRACTOR PARTY

CONSUL
TANT

CONTROL DOCUMENT

1 RAW MATERIAL
1.1 Steel Plate

1.2 Hot Rolled & Hollow


Sections
(Beam/Channel/Angle
Bar, Beams, pipes etc.)
1.3 Purlin & Panel Coils

a) Mill TC Verification

a) As per SS or code

b) Mill TC Verification
c) Measurement
a) Mill TC Verification
b) Mill TC Verification
c) Measurement

b) As per SS or code
c) Every Site Delivery

a) Chemical Properties
b) Mechanical Properties
c) Dimensions

a) Mill TC Verification
b) Mill TC Verification
c) Measurement

a) As per SS or code

a) Chemical properties
b) Mechanical properties
c) Dimension

SPEC. CODES &


STANDARDS FOR
ACCEPTANCE CRITERIA
SPEC. CODES &
STANDARDS FOR
ACCEPTANCE CRITERIA

a) R
b) R
c) I
a) R
b) R
c) I

a) Mill TC
b) Mill TC
c) CONTRACTOR Inspection report
a) Mill TC
b) Mill TC
c) CONTRACTOR -Inspection report

b) As per SS or code
c) Every Site Delivery

SPEC. CODES &


STANDARDS FOR
ACCEPTANCE CRITERIA

a) R
b) R
c) I

a) Mill TC
b) Mill TC
c) CONTRACTOR -Inspection report

a) Mfr. TC Verification
b) Mfr.TC Verification
c) Measurement

a) As per SS or code
b) As per SS or code
c) As per SS or code

SPEC. CODES &


STANDARDS FOR
ACCEPTANCE CRITERIA

a) R
b) R
c) I

a) Manufacturer TC
b) Manufacturer TC
c) CONTRACTOR -Inspection report

a) Material
b) Dimensions

a) Mfr. TC Verification
b) Measurement

a) As per SS or code
b) As per SS or code

SPEC. CODES &


STANDARDS FOR
ACCEPTANCE CRITERIA

a) R
b) R

a) Manufacturer TC
b) CONTRACTOR -Inspection report

a) Dimension

a) Measurement

Fabrication-As Per
Dwg. and specifications

a) I

a) CONTRACTOR -Inspection report

a) Dimension

a) Measurement

a) CONTRACTOR -Inspection report

b) Verification

Fabrication-As Per Dwg.


and Specifications

a) I

b) Part Identification

a) R
b) R
c) R
a) I
b) I
c) I
d) I

a) WPS
b) PQR
c) WPQ
a) CONTRACTOR -Inspection report
b) CONTRACTOR -Inspection report
c) CONTRACTOR -Inspection report
d) CONTRACTOR -Inspection report

a) As per SS or code
b) As per SS or code
c) Every Site Delivery

BOUGHT OUT ITEMS

2.1 Bolts, Nuts & Washers


(Fasteners)
2.2 Doors, Ladder, Handrails
Windows, FRP
ventilators, skylights etc.
3

a) Chemical Properties
b) Mechanical Properties
c) Dimensions
a) Chemical Properties
b) Mechanical Properties
c) Dimensions

FABRICATION PROCESS

3.1 Fabrication of Primary


Structure
3.2 Final Inspection (Before
Painting)
4 WELDING & NDT
4.1 Welding Procedure

a) As per SS or code
c) a) As per SS or
code
b) As per SS or code
As per SS or code
As per SS or code
c) As per SS or code

SPEC. CODES &


STANDARDS FOR
ACCEPTANCE CRITERIA

As
As
As
As

SPEC. CODES &


STANDARDS FOR
ACCEPTANCE CRITERIA

a) Procedure Specification
b) Procedure Qualification
c) Welder Qualification
4.2 Welding Inspection
a) Visual Defects
b) Weld size
c) Surface
Defects
d)Under
5 SURFACE CLEANING & PAINTING

a) Verification / Review
b) Verification / Review
c) Verification / Review
a) Visual
b) Measurement
c) DP Test
d) Ultrasonic Test

5.1 Surface Cleaning &


Painting process
6 Roll Forming
6.1 Purlin & Roof Sheeting
Roll Forming
LEGEND :-

a) Surface preparation
b) Surface Coating

a) Measurement & Visual a) 1 Sample / Day


b) Measurement- DFT
b) Random Site Delivery

As per Client
requirement and
Specifications

a) I

a) CONTRACTOR -Inspection report


b) CONTRACTOR -Inspection report

a) Dimensions
b) Surface & Shape

a) Measurement
b) Visual

As per
Drawing ,CONTRACTO
R & client Specifications

a) I

a) CONTRACTOR -Inspection report

R - Review
AWS - American Welding Society

I Inspection
MTC Mill Test Certificate

per SS
per SS
per SS
per SS

or code
or code
or code
or code

a) 1 Sample / Shift
b) Random Site Delivery

CONSULTANT
ASTM - American Society for Material & Testing
WPS - Welding Procedure Specifications

SS - Standard Specification