Professional Documents
Culture Documents
UP
TRAN
SFOR
MER
WORK ROOM
6700X6480
SPECIMEN
COLLECTION
COUNTER WITH
PLATFORM
(REF. DETAIL)
TOI.
SHAFT
PCC PLINTH
PROTECTION
(REFER DETAIL)
WAITING AREA
CORRIDOR
STORE
FILM
FOR
STORES APPLIANCES
& EQUIP.
OFFICE,
RECEP.
& COMP
UTER
RECE
PTION
PATHOLOGIST
AHU-10
cutout in
slab above
OPENING
UPTO DOOR
HEIGHT
PATHOLOGY
WAITING
LOUNGE
CORRIDOR
RECEIVING
LOBBY
WCL
TOI.
TOI.
cutout in
slab above
UP
CONSUL CONSUL
TANT-6
TANT-5
CONSUL CONSUL
TANT-4
TANT-3
CONSUL
TANT-2
STRESS
LAB-1
C O R R I D O R (2850 WIDE)
AIR LOCK
ECG
ROOM-1
TOI.
(G)
ECO
CARDIO-1
AMBULA
ECO
CARDIO-3 TORY BP
ECO
CARDIO-2
LIFT
(10P)
250
WC
RAMP
TOI.
TOI.
RECEP.
ECG
ROOM-2
STRESS
LAB-3
TROLLEY
BAY
cutout in
slab above
LIFT LOBBY
150
AHU-2
cutout in
slab above
150
ELECTRICAL-3
RECEP
TION
2000
500
REHAB
HEAD
OF
CONSUL
TANT-6
P.A.
WAITING AREA
SEMINAR
RECEP.COUNTER
(REF. DETAIL)
UP
TOI.
UP
CORRIDOR
TOI.
PANTRY
CONSUL
TANT-7
2400
TOI.
TOI.
CONSUL
TANT-8
LIFT
LOBBY
ATRIUM ABOVE
LIFT
(20P)
CHA
OCCUPATIONAL
THERAPY/
PHYSIOTHERAPIST
ROOM/OFFICE/
RECEIVING
LOBBY
cutout in
slab above
2000
CLEAN
DUMP
WEIGH
TER
SHELVES
SHAFT
TOI.
DRUG STORE
SHAFT FOR
ELEC. CABLE
TROLLEY
BAY
RCC SHELVES
3 TIER
SHAFT
LIFT
(20P)
LIFT
(20P)
MAIN
RECEPTION
+RECORD
DISPENSARY
SERVER ROOM
MEDICAL STORE
ELEC.-1
COUNTER
(REF. DETAIL)
STAIR -2
WAITING AREA
TROLLEY
BAY
NURSING
OFFICERS
CORRIDOR
C O R R I D O R (2850 WIDE)
AIR LOCK
COUNTER
(REF. DETAIL)
UP
TOILET
PHYSIOTHERAPY TOI.
RECEPTION
COUNTER
(REF. DETAIL)
AIR CURTAIN
TOI.
SHAFT
CHA
DUCT ENTRY
AT 7350 LVL.
ISSUE COUNTER
C O R R I D O R (2960 WIDE)
SHAFT
SLOPE-1:100
JALI
WC
WC
JANITOR
CLOSET
250
CORRIDOR
LOUNGE -2 (A.C)
+450
+450
SLOPE-1:100
N MAIN PANEL
cutout in
slab above
250
ENTRANCE
LOBBY
PROJECTION OF
FLOOR SLAB
PCC PLINTH
PROTECTION
(REFER DETAIL)
OFFICE RECORD
UP
cutout in
slab above
ELECTRICAL -5
AIR CURTAIN
RAMP
LOCKERS
LOBBY
AHU-8
SLOPE-1:100
OPEN PLATFORM
MAIN ENTRANCE
+440
CANTILEVER SLABE
PROJECTION AT IST
LVL.
GYMNASIUM
COUNTER
(REF. DETAIL)
WAITING
ROOF TO BE
COVERED IN
FUTURE
DUTY ROOM
FOR ELEc.
SPECIALLY
FOR OT &ICU
STORE
TOI.
PHYSIOTHERAPIST
ROOM/OFFICE/
OCCUPATIONAL
THERAPY
STAIR -1
cutout in
slab above
SLOPE-1:100
FIRE
ALARM
RCC
SHELVES
3 TIER
STAFF
CHANGING
SHAFT
37780
PLATFORM
+440
SHELVES
3 TIER
CCTV / MUSIC
CONTROL
ROOM
SHAFT
CORRIDOR
JALI
AIR CURTAIN
DUCT ENTRY
AT 7350 LVL.
OPEN
PLATFORM
AIR LOCK
C O R R I D O R (2850 WIDE)
+440
DOCTORS'
ENTRY
TOI.
TOI.
SD1
250 250
cutout in
slab above
TOI.
TROLLEY
BAY
cutout in
slab above
RCC
SHELVES
3 TIER
TOI.
WARD
STORE
OFFICE,REC.
& COM. ROOM
cutout in
slab above
RECEP.
OPEN
CAFETERIA
AREA
JALI
CONSUL
TANT-3
RCC SHELVES
3 TIER
ISSUE
OFFICE
MINOR OT
JALI
RCC SHELVES
3 TIER
PROVISIONAL
STORE /
RESUSCITATION
SPACE
FRAME ABOVE
(IN FUTURE)
DOPPLER
EXAM
JALI
NURSE
ASSISTANCE /
TRIAGE AREA
MO DUTY &
EXAM
JALI
ECG
WAITING AREA
TOI.
JALI
TOI.
150
CONSUL
TANT-1
150
cutout in
slab above
C O R R I D O R (2850 WIDE)
TOI.
JALI
DOCTORS
CONFERENCE
SEMINAR
TOI.
DETENTION
CURTAIN ROD
RESUSCITATION
NURSE STATION/
TREATMENT ROOM
TOI.
(L)
TOI.
WC
TRIAGE AREA
COUNTER
(REF. DETAIL)
WC
150
cutout in
slab above
HEAD OF
CONSULTANT
BOUNDARY
WALL WITH GRIL
SHAFT
UP
INJ.
ROOM
JALI
TOI.
P.A.
A.H.U.-5
AIR LOCK
+440
TOI .
JANITOR
CLOSET WC
WC
TOILET
BOUNDARY
WALLWITH GRIL
STEEL SLIDING
GATE (REF. DETAIL
A.H.U.-6
TOI.
(G) WC
TOI.
UP
ENTRANCE HALL
AIR CURTAIN
BK STEP
RAMP UP
OPEN PLATFORM
STAIR -6
AMBU
LANCE
DRIVER
PLATFORM
+440
STAIR -5
UP
PCC PLINTH
PROTECTION
QM STORE /
ADM
PLETHYS MO
GRAPHY
PANTRY
TOI.
WARD
MASTER/QM /
DETENTION
COUNTER
(REF. DETAIL)
REVIEW
ROOM
CONSUL
TANT-2
MORTAL
REMAINS
RAMP
RCC SHELVES
3 TIER
ISSUE COUNTER
PASSAGE
JALI
VASCULAR OPD
MEDICAL STORE /
ADM BLOCK
AHU-7
STORE
STAIR -7
RECEP.
COUNTER
(REF.
DETAIL)
CONSUL
TANT-4
TOI.
BRICK STEPS
UP
STORE/AREA FOR
ADM. BLOCK
WASH
150
JALI
PCC PLINTH
PROTECTION
JALI
(REFER DETAIL)
PANTRY
cutout in
slab above
150
CARDIOTHROCIC OPD
PASSAGE
A,H.U.-1
CHA
JALI
OPENING UPTO
DOOR HT.
ELEC.-2
OFFICE
&
COMPUTER
ROOM
UP
RAMP
UP
BK STEP
RCC CANOPY
ABOVE
ACCIDENT &EMERGENCY
TOI.
CONSUL
TANT-5
CORRIDOR
CONSUL
TANT-4
150
WAITING AREA
SLOPEE-1:100
SLOPEE-1:100
TOI.
CONSUL
TANT-2
SLOPEE-1:100
CONSUL
TANT-1
SLOPEE-1:100
AHU-3
150
250
cutout in
slab above
UP
STAIR -4
250
BK STEP
150
UP
UP
SHELVES
3 TIER
SHELVES
3 TIER
TROLLEY BAY
WC
BK STEP
SHELVES
3 TIER
JANITOR
CLOSET
OFFICE
UP
CHA CHA
NGE NGE
PANTRY
2200
WAITING
SEMINAR
250
STRESS
LAB-2
CHA
NGE
AHU-9
500
150
HEAD
OF
CONSUL
TANT-7
SHELVES
3 TIER
LIFT MECHANIC/
SOLAR WATER
PLANT ATTENDANT
C O R R I D O R (3600 WIDE)
LIFT
(10P)
RECEP.COUNTER
(REFER DETAIL)
VERANDAH
STERILE
STORE
AUTO
CLAVE
LOUNGE
250
PA/OFFICE CONSUL
&RECORD TANT-8
SHAFT
JANITOR
CLOSET
NON
INVASIVE
EQP.
ROOM.
HEAD
UP TILT
250
TOILET
SHELVES
3 TIER
PREPARA
TION &
PACKING
OPENING UP TO
DOOR HT.
RECEP.
CHA
NGE
TOI.
UP
OPENING UP TO
DOOR HT.
500
150 CONSUL
TANT-1
UP
CHA
NGE
CHECKING
CLEANING SORTING
& GRADING
C O R R I D O R (2960 WIDE)
TOI.
CORRIDOR
TOI.
CHA
NGE
150
BK STEP
TOI.
AHU-4
150
TOI.
STAIR -3
CANTILEVER SLABE
PROJECTION AT IST
LVL.
TOILET
RECEIVING
LOBBY
SHAFT
TOI.
(L)
CSSD
JALI
SHAFT
cutout in
slab above
PCC PLINTH
PROTECTION
(REFER DETAIL)
PCC PLINTH
PROTECTION
(REFER DETAIL)
LOBBY
+450
ELEC-4
SLIDING DOOR
CARDIOLOGY OPD
ASSISTANT
CHEMICAL/
CRATE
STORES
RAILING REF.
DETAIL
PCC PLINTH
PROTECTION
(REFER DETAIL)
DIRTY
DUMB
WEIGHTER
SHAFT
RADIOLOGIST
ROOM
USG
UP
SHAFT
C O R R I D O R (2850 WIDE)
WATER
COOLER
RAILING REF.
DETAIL
RAMP
LANDING
RECEPTION
COUNTER
(REF. DETAIL)
WAITING HALL
PROPOSED BRIDGE
TO RR HOSPITAL
RAILING REF.
UP
DETAIL
PATH LAB
FLUROS
COPY
CHA
TOI. GE
RAMP
TOI.
TOI.(L)
CSSD
VERANDAH
CORRIDOR
RADIOLOGY
(500 M.A MACHINE)
RADIOLOGY
UP
RCC WORKING
PLATFORM
AT 800 LVL.
FINISHED
WITH CERAMIC
TILES
CORRIDOR
CHAN
TOI. GE