You are on page 1of 9

Station 1

Column
=
Total
length

2 pcs
5.63 m

Volume
1
2
3

=
1.188 m3
DESCRIPTION
Deformed bar 20mm x 7.5m
Deformed bar 12mm x 7.5m
Deformed bar 10mm x 7.5m

Gravel G-1 (gravel bed)

0.28 m3

Gravel G-1

1.19 m3

White sand
Cement
Tie Wire
Cement (plaster)

0.59 m3
10.69 bag
3.65 kg.
1.00 bag

ITEM

5
6
7
8
9
10

White sand (plaster)


Slag Block
Station 2
Column
=
Total
length
Volume

ITEM

QTY
UNIT
4.00 pcs
14.33 pcs
6.57 pcs

0.04 m3
380.00 pcs

1 pcs
20.47 m

=
4.05306 m3
DESCRIPTION

QTY

UNIT

1
2
3

Deformed bar 20mm x 7.5m


Deformed bar 12mm x 7.5m
Deformed bar 10mm x 7.5m

2.00 pcs
53.00 pcs
3.17 pcs

Gravel G-1 (gravel bed)

1.01 m3

Gravel G-1 (concrete pouring)

4.05 m3

White sand (concrete pouring)


Cement (concrete pouring)
Tie Wire (concrete pouring)
Cement (plaster)

2.03 m3
36.48 bag
6.95 kg.
2.76 bag

5
6
7
8
9
10

White sand (plaster)


Slag Block
Station 3
Column
=
Total
length

1.54 m3
1365.00 pcs

1 pcs
26.11 m

Volume
ITEM
1
2
3

=
5.16978 m3
DESCRIPTION
Deformed bar 20mm x 7.5m
Deformed bar 12mm x 7.5m
Deformed bar 10mm x 7.5m

QTY
UNIT
2.00 pcs
68.00 pcs
3.17 pcs

4
5
6
7
8

Gravel G-1 (gravel bed)

1.29 m3

Gravel G-1 (concrete pouring)

5.17 m3

White sand (concrete pouring)


Cement (concrete pouring)
Tie Wire (concrete pouring)
Cement (plaster)

2.58 m3
46.53 bag
8.62 kg.
3.52 bag

9
10

White sand (plaster)


Slag Block
Station 4
Column
=
Total
length

1.96 m3
1741.00 pcs

1 pcs
73.46 m

Volume
1
2
3

= 14.54508 m3
DESCRIPTION
Deformed bar 20mm x 7.5m
Deformed bar 12mm x 7.5m
Deformed bar 10mm x 7.5m

Gravel G-1 (gravel bed)

ITEM

5
6
7
8

QTY
UNIT
2.00 pcs
179.67 pcs
3.17 pcs
3.64 m3

Gravel G-1 (concrete pouring)

14.55 m3

White sand (concrete pouring)


Cement (concrete pouring)
Tie Wire (concrete pouring)
Cement (plaster)

7.27 m3
130.91 bag
21.12 kg.
9.92 bag

9
10

White sand (plaster)


Slag Block
Station 5
Column
=
Total
length

5.51 m3
4898.00 pcs

1 pcs
29.5 m

Volume
1
2
3

=
5.841 m3
DESCRIPTION
Deformed bar 20mm x 7.5m
Deformed bar 12mm x 7.5m
Deformed bar 10mm x 7.5m

Gravel G-1 (gravel bed)

1.46 m3

Gravel G-1 (concrete pouring)

5.84 m3

White sand (concrete pouring)


Cement (concrete pouring)
Tie Wire (concrete pouring)
Cement (plaster)

2.92 m3
52.57 bag
9.39 kg.
3.98 bag

ITEM

5
6
7
8
9
10

White sand (plaster)


Slag Block

QTY
UNIT
2.00 pcs
74.83 pcs
3.17 pcs

2.21 m3
1967.00 pcs

SUMMARY
ITEM
DESCRIPTION
1
Deformed bar 20mm x 7.5m
2
Deformed bar 12mm x 7.5m
3
Deformed bar 10mm x 7.5m
4

Gravel G-1 (gravel bed)


Gravel G-1

5
6
7
8
9
10

QTY
UNIT
12.00 pcs
389.83 pcs
19.25 pcs
7.68 m3
30.80 m3

White sand
Cement
Tie Wire
Cement (plaster)
White sand (plaster)
Slag Block

15.40
277.17
49.73
21.19

11.26 m3
10,351.00 pcs

Excavation productivity:
1 labor =
1 labor =

0.8 m3 per day or 8hrs


1.11 L-M per day or 8hrs

If 10hrs total
1 labor =
1 labor =

m3
bag
kg.
bag

1 m3 per 10hrs
1.39 L-M per day or 8hrs

September 4, 2016 Sunday


SUMMARY
ITEM
1
2
3
4
5
6
7
8
9
10

DESCRIPTION
Deformed bar 20mm x 7.5m
Deformed bar 12mm x 7.5m
Deformed bar 10mm x 7.5m
Gravel G-1 (gravel bed)
Gravel G-1
White sand
Cement
Tie Wire
Cement (plaster)
White sand (plaster)
Slag Block

QTY
#REF!

UNIT
#REF!

"11 L.M. EQUALS 2 CUBIC METER OF RMC"

Month
Day
Date

ITEM
1
2
3
4
5
6
7
8
9
10
11

August
W

DESCRIPTION
Deformed bar 20mm x 7.5m
Deformed bar 12mm x 7.5m
Deformed bar 10mm x 7.5m
Gravel G-1 (gravel bed)
Gravel G-1
White sand
Cement
Tie Wire
Cement (plaster)
White sand (plaster)
Slag Block

Activity
A. Clearing
1.0 Manpower:
2 skilled
2.0 Productivity:
50L-M per 10hrs
3.0 Duration:
4days
E. Hauling of slag
1.0 Manpower:
5 labor
2.0 Productivity:
500pcs per 10hrs
3.0 Duration:
20days

31

Th F S S M T W Th F S
1 2 3 4 5 6 7 8 9 10

QTY
12.00
389.83
19.25
7.68
30.80
15.40
277.17
49.73
21.19
11.26
10,351.00

Remarks
Delivered excess 2pcs
300pcs delivered, bal. is 89pcs
Delivered excess 3pcs

Only 648pcs delivered

B. Excavation
1.0 Manpower:

5 skilled & 3 l
2.0

Productivity:

11.12L-M per
3.0

Duration:
16days

F. Concrete pouring of footing


1.0 Manpower:
3 skilled
2.0 Productivity:
30L-M per 10
3.0 Duration:
7

September
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6

emarks
excess 2pcs
ivered, bal. is 89pcs
excess 3pcs

cs delivered

5 skilled & 3 labor


11.12L-M per 10hrs
16days

uring of footing
3 skilled
30L-M per 10hrs

C. Fabrication of rebars
1.0 Manpower:
3 skilled
2.0 Productivity:
30L-M per 10hrs
3.0 Duration:
7

D. Slag Block Laying


1.0 Manpower:
2.0

Productivity:

3.0

Duration:

October
F S S M T W Th F S S
7 8 9 10 11 12 13 14 15 16

Slag Block Laying


Manpower:
1 skilled & 3 labor
Productivity:
200pcs per 10hrs
Duration:
4days