Professional Documents
Culture Documents
Column
=
Total
length
2 pcs
5.63 m
Volume
1
2
3
=
1.188 m3
DESCRIPTION
Deformed bar 20mm x 7.5m
Deformed bar 12mm x 7.5m
Deformed bar 10mm x 7.5m
0.28 m3
Gravel G-1
1.19 m3
White sand
Cement
Tie Wire
Cement (plaster)
0.59 m3
10.69 bag
3.65 kg.
1.00 bag
ITEM
5
6
7
8
9
10
ITEM
QTY
UNIT
4.00 pcs
14.33 pcs
6.57 pcs
0.04 m3
380.00 pcs
1 pcs
20.47 m
=
4.05306 m3
DESCRIPTION
QTY
UNIT
1
2
3
2.00 pcs
53.00 pcs
3.17 pcs
1.01 m3
4.05 m3
2.03 m3
36.48 bag
6.95 kg.
2.76 bag
5
6
7
8
9
10
1.54 m3
1365.00 pcs
1 pcs
26.11 m
Volume
ITEM
1
2
3
=
5.16978 m3
DESCRIPTION
Deformed bar 20mm x 7.5m
Deformed bar 12mm x 7.5m
Deformed bar 10mm x 7.5m
QTY
UNIT
2.00 pcs
68.00 pcs
3.17 pcs
4
5
6
7
8
1.29 m3
5.17 m3
2.58 m3
46.53 bag
8.62 kg.
3.52 bag
9
10
1.96 m3
1741.00 pcs
1 pcs
73.46 m
Volume
1
2
3
= 14.54508 m3
DESCRIPTION
Deformed bar 20mm x 7.5m
Deformed bar 12mm x 7.5m
Deformed bar 10mm x 7.5m
ITEM
5
6
7
8
QTY
UNIT
2.00 pcs
179.67 pcs
3.17 pcs
3.64 m3
14.55 m3
7.27 m3
130.91 bag
21.12 kg.
9.92 bag
9
10
5.51 m3
4898.00 pcs
1 pcs
29.5 m
Volume
1
2
3
=
5.841 m3
DESCRIPTION
Deformed bar 20mm x 7.5m
Deformed bar 12mm x 7.5m
Deformed bar 10mm x 7.5m
1.46 m3
5.84 m3
2.92 m3
52.57 bag
9.39 kg.
3.98 bag
ITEM
5
6
7
8
9
10
QTY
UNIT
2.00 pcs
74.83 pcs
3.17 pcs
2.21 m3
1967.00 pcs
SUMMARY
ITEM
DESCRIPTION
1
Deformed bar 20mm x 7.5m
2
Deformed bar 12mm x 7.5m
3
Deformed bar 10mm x 7.5m
4
5
6
7
8
9
10
QTY
UNIT
12.00 pcs
389.83 pcs
19.25 pcs
7.68 m3
30.80 m3
White sand
Cement
Tie Wire
Cement (plaster)
White sand (plaster)
Slag Block
15.40
277.17
49.73
21.19
11.26 m3
10,351.00 pcs
Excavation productivity:
1 labor =
1 labor =
If 10hrs total
1 labor =
1 labor =
m3
bag
kg.
bag
1 m3 per 10hrs
1.39 L-M per day or 8hrs
DESCRIPTION
Deformed bar 20mm x 7.5m
Deformed bar 12mm x 7.5m
Deformed bar 10mm x 7.5m
Gravel G-1 (gravel bed)
Gravel G-1
White sand
Cement
Tie Wire
Cement (plaster)
White sand (plaster)
Slag Block
QTY
#REF!
UNIT
#REF!
Month
Day
Date
ITEM
1
2
3
4
5
6
7
8
9
10
11
August
W
DESCRIPTION
Deformed bar 20mm x 7.5m
Deformed bar 12mm x 7.5m
Deformed bar 10mm x 7.5m
Gravel G-1 (gravel bed)
Gravel G-1
White sand
Cement
Tie Wire
Cement (plaster)
White sand (plaster)
Slag Block
Activity
A. Clearing
1.0 Manpower:
2 skilled
2.0 Productivity:
50L-M per 10hrs
3.0 Duration:
4days
E. Hauling of slag
1.0 Manpower:
5 labor
2.0 Productivity:
500pcs per 10hrs
3.0 Duration:
20days
31
Th F S S M T W Th F S
1 2 3 4 5 6 7 8 9 10
QTY
12.00
389.83
19.25
7.68
30.80
15.40
277.17
49.73
21.19
11.26
10,351.00
Remarks
Delivered excess 2pcs
300pcs delivered, bal. is 89pcs
Delivered excess 3pcs
B. Excavation
1.0 Manpower:
5 skilled & 3 l
2.0
Productivity:
11.12L-M per
3.0
Duration:
16days
September
S M T W Th F S S M T W Th F S S M T W Th F S S M T W Th
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6
emarks
excess 2pcs
ivered, bal. is 89pcs
excess 3pcs
cs delivered
uring of footing
3 skilled
30L-M per 10hrs
C. Fabrication of rebars
1.0 Manpower:
3 skilled
2.0 Productivity:
30L-M per 10hrs
3.0 Duration:
7
Productivity:
3.0
Duration:
October
F S S M T W Th F S S
7 8 9 10 11 12 13 14 15 16