Abstract of cost of work (outer sheet)

Office: - Sr. DME/TSK

Rs. 7401945.00

Total

Adv.Misc.

Rs 74, 01, 945 (Rupees


forty five only) approx Seventy Four Lakh, one
thousand and nine hundred and

Detailed Estimated Cost:

Deposit

Allocation
RevenueOnly.

C.L.W.R.

D.R.F.

D.F.

Capital

Stores to be
purchased

stockStores is

Material

Work

Dated 03-02-2016

4200/DF3

Sub-Head of work

Department :-Mechanical
Estimate No. M-246/1/PLG(Wheel Lathe)
Pink Book Item No. 618 of 2013 14
Framed by :- Sri A. Gupta
Designation :-Sr. DME/TSK
Region :- N.F. Railway
District :- Tinsukia.
Station or Mileage: - Dibrugarh.
Name of work: of At DBRG Additional works for functional of Under Floor Wheel Lathe.
Plan No. :-
Estimated cost
Original
Total in case
Total
of Revised
Estimate

Fund will be available during 2016-17 to head of allocation 4200/DF3


Provided from budget for 2016-17 item No.. Direct or by re-appropriation.
Report & Justification at reverse page.
Specification .. Drawing & Annexure.

Signature
Designation .

No Date Sanction Register as/Incident and allocation/verified.


(Subject to the check note attached)
This requires the sanction of the
No date
.
Signature.
Designation

Justification: The work of At DBRG Additional works for functional of Under Floor Wheel Lathe at cost of Rs. 65.96 lakhs was sanctioned
under Pink Book Item No. 618 of 2013 14 under PH 4200 (SN 1 to 3) which includes Engg and Elect Estimate. (SN/-53 to 69)
The processing for the work was not continued as the shifting of KYQ Wheel Lathe was not done. However, vide Dy
CME/Planning/MLGs L/No. M/218/RNY-MZS(PMP) dtd. 7.12.15 (SN/-12) and CME/MLGs letter no. M/218/RNY-MZS/PMP/Pt. I dtd.
28-11-15 (SN/-10), considering the utility and steady expansion of coaching services of DBRG and TSK base with Rajdhani and other trains
also being taken in for Primary Maintenance in the near future the underfloor Wheel Lathe sanctioned under RNY-MZS GC project is to be
located at DBRG and the subject work revived. The GA drawing has been signed and sent to M/S HYT Engg Co Pvt Lt, New Delhi who was
awarded the contract for Under Floor Wheel Lathe. (SN/-4 to 9)

Sr. DME/TSK

Abstract of cost of work (outer sheet)


Office: - Sr. DME/TSK

Store
0.00
0.00
0.00
0.00

Total
17300898.00
353307.00
217310.00
17871515.00

Revised Estimate:
Cash
Store
Total
Mech0
13279740.00 13279740.00
Engg- 5432009.00
0.00
5432009.00
Elect344797.00
0.00
344797.00
Total 5776806.00 13279740.00 19056546.00

Total

Adv.Misc.

Deposit

RevenueOnly.

Allocation
C.L.W.R.

D.R.F.

D.F.

Capital

Stores to be
purchased

stockStores is

Material

Work

Abstract Estimate Cost:


Cash
Mech- 17300898.00
Engg353307.00
Elect217310.00
Total 17871515.00

Dated 24.09.2014

Rs. 1,90,56,546.00 (Rupees One


approxcrore, ninty lakhs, fifty six thousand
and five hundred and forty six only)

DF-1/5300-03

Sub-Head of work

Department :-Mechanical
Estimate No. Mech/Mechanized Laundry/DBRG/02/R(03)
Original sanctioned estimate No. Mech/Mechanized Laundry/DBRG/02 dtd. 29.12.2011
Framed by :- Sri L. Boro
Designation :-ADME (P)/TSK
Region :- N.F. Railway
District :- Tinsukia.
Station or Mileage: - Tinsukia.
Name of work: - Setting up of Mechanized Laundry at DBRG.
Plan No. :-
Estimated cost
Original
Total in case
Total
of Revised
Estimate

Fund will be available during 2014-15 to head of allocation DF-1/5300-03


Provided from budget for 2013-14 item No 749 of LAW 2013-14 Direct or by re-appropriation.
Signature
Report & Justification at reverse page.
Specification .. Drawing & Annexure.
Designation .
No Date Sanction Register as/Incident and allocation/verified.
(Subject to the check note attached)
This requires the sanction of the
No date
.
Signature.
Designation

JUSTIFICATION:
The work At TSK- Setting up of Mechanized Laundry at DBRG at cost Rs. 1,78,72,000.00 was sanctioned in Item No. LAW Item
No. 1321 for the year 2011-12 under PH- 5300. The same has appeared in LAW 2013-14 vide item No. 749.
Tender for Engineering and Electrical works have been awarded long back. Almost 90% of the Engineering work has already been
completed.
The store tender for procurement of laundry equipments has been done by HQ Stores which has been accepted at 87.51% higher
than the sanctioned estimate for the items.
In view of the above, the revised estimate has been prepared. The total cost of work on revision of the estimate comes to
Rs. 1, 90, 56, 546.00 (Rupees One crore, ninty lakhs, fifty six thousand and five hundred and forty six only) approx.

ADME (P)/TSK

ABSTRACT ESTIMATE

Cash
Mechanical
Engineering
Cost:
Civil
Engineering
Cost
Electrical
Engineering
Cost

Store

Total

DETAILED ESTIMATE