ScopeofWork Responsibility

1.Sitesurvey
1a.Survey

IncludesConductingsitesurveyandpreparationofrelateddocuments
includingphotographs(asapplicable)andfillingsitesurveychecklist.Site
surveyinvolvescheckingtheExistingPowersystemratingsincludingDG,
PIU,PowerPlantandBattery,parmetersincludedinNSNSpecified
TIVendor
checklist.SiteSurveysalsoincludecheckingspaceforNewAntenna,
FeederSystemandspacefortheFlexiNodeBInstallationincluding
DDF/Transmission.SubmissionofSurveyreportwithcomplete
dimensionstoproduceCADLayout.

1b.SiteSurveyLayout,ProposalandAsBuiltDrawings
IncludesPreparationofAutoCADDrawingsofExistingSite,Planned
Layout&AsbuiltLayout.GivendrawingsshallbeinAutoCad.DWG TIVendor
formataswellasPrintout.
1c.SDRPreparation&Submission
IncludespreparationofmaterialRequestnoteasperthesitesurveyand
thePlanningdata(RF/Tx)datagivenbytheplanner.SDRreportsmustbe
handedoverinNSNspecifiedformatinSoftaswellasinHardcopyto
TIVendor
respectiveNSNrepresentive.
SDRuploadinginIPM

2.MaterialKitting

VerificationofmaterialasperSDR.
KittingasperSDR. TIVendor
AssuranceofcompletematerialdispatchasperSDR.

3.RFIAssurance
SiteshouldbedeclaredfreefromInfraPunchPointsandhundredpercentready
forSiteInstallation.IncaseofpendingPunchpointthesamemustbereported
totheNSNrepersentive.CommencementofSiteReadinesscanbedoneIf
critical/majorPunchPointisnotpending.
TIVendor
OCIIncludesHardwaredeliverycheckingaspertheSDRreportatSitelocation.
IncaseofanydeficiencythesamemustbereportedtoProjectTeam.
ApprovalofMaterialdeliveryfromcustomer

4.FlexiNodeBInstallation

4a.InstallationofIndoorFlexiBTSCabinet

InstallationandfixingofindoorFlexibasestationcabinet
InstallationofgroundingcablefortheindoorFlexibasestationcabinet
TIVendor
withfixingaccessories(cableties),labelsandconnectors(lugs)uptothe
definedlengthincludingtestingofthecompletecablerun.
4b.InstallationofFlexiBSplinth(ApplicableforStack,Floor,Walloron
PoleMast)

InstallationofFlexibasestationPlinth
InstallationandfixingofFlexibasestationplinthonfloor,wallor
pole/mast.

InstallationofgroundingcablefortheFlexibasestationplinthwithfixing TIVendor
accessories(cableties),labelsandconnectors(lugs)uptothedefined
lengthincludingtestingofthecompletecablerun.

LabelingofCables&accessories.

4c.InstallationofFlexiNodeBsystemmodule

Installationofintegratedtransmissionpluginunit(Flexibasestation
systemmodule).
InstallationofFlexibasestationsystemmoduleincludingcasing,fixingof
earthquakeprotectionscrews,frontandbackcoversifapplicable.
InstallationofgroundingcablebetweenFlexibasestationsystemmodule
andFlexibasestationplinthwithfixingaccessories(cableties)including
testingofthecompletecablerun.
InstallationofDCpowercablewithfixingaccessories(cableties),labels
andconnectors(shoes)uptothedefinedlengthifapplicableincluding
testingofthecompletecableruns.
Installationofalarmcablewithfixingaccessories(cableties),labelsand TIVendor
connectorsuptothedefinedlengthincludingtestingofthecomplete
cablerun.
InstallationoflabelsforDCbreakers,AIBandADM.
TerminatingofFlexBuscable,fiberopticorPCMcablestotheintegrated
transmissionpluginunit(onlyforexistingcables).
InstallationtestingoftheBaseStationsystemunitandintegrated
transmissionpluginunit.

Installation&LayingofPowerCablefromDCSource

InstallationofOVPincaseofOutdoor/distributedcase,includinglayingof
powercable
4d.InstallationofFlexiBSRFmodule

InstallationofFlexibasestationRFmoduleincludingcasing,fixingof
earthquakeprotectionscrews,frontandbackcoversifapplicable.
InstallationofgroundingcablebetweenFlexibasestationRFmoduleand
Flexibasestationplinthwithfixingaccessories(cableties)including
testingofthecompletecablerunifapplicable.
InstallationofdeliveredinternalpowercablingbetweenFlexibasestation
RFmoduleandsystemmodule,includingfixingaccessories(cableties).
InstallationofdeliveredinternaldatabuscablingbetweenFlexibase
TIVendor
stationRFmoduleandsystemmodule,includingcleaningofoptical
connectorsandfixingaccessories(cableties).
ConnectingRFantennalinestotheFlexibasestationRFmodule.
InstallationandLayingofPowerCableincludingtestingofthecomplete
cablerunifapplicable.
Installation&LayingofPowerCablefromDCSource
InstallationofOVPincaseofOutdoor/distributedsolutioncase,including
layingofpowercable
Installation&LayingofOpticalCablefromSystemModuletoRFModule
includingtestingofthecompletecablerunifapplicable.

4e.InstallationofRemoteRFmodule

Installationof1/2"jumpercableinthebasiclengthwithfixingaccessories
,weatherproofingmaterialsandlabelsincludingtestingofthefeederrun
initscompletelength.
Terminationofthejumpercableincludingweatherproofing.
TIVendor
Installation&LayingofPowerCablefromDCSource
InstallationofOVPincaseofdistributedsolutioncase,includinglayingof
powercable
Installation&LayingofOpticalCablefromSystemModuletoRFModule

4f.InstallationofJumperCables

InstallationofaJumperbasiclength(3M&7M).
Dismantlingandreassemblyofthecableentryorgland.
Installationofjumpercableinthebasiclengthwithfixingaccessories, TIVendor
weatherproofingmaterialsandlabelsincludingVSWRtestingofthe
feederruninitscompletelength.
Terminationofthejumpercableincludingweatherproofing.

4g.InstallationofDiplexer(Indoor)

Installationof3SetsDoubleDiplexerincaseof2PortWideBandAntenna
&6setsDoublediplexerincaseof4portAntenna.FirstthreeSetsneed
tobeinstalledindoorand3setsoutdoor.
Dismantlingandreassemblyofthecableentryorgland.
Installationofjumpercableinthebasiclengthwithfixingaccessories,
weatherproofingmaterialsandlabelsincludingtestingofthefeederrun
initscompletelength. TIVendor

Deinstallation&InstallationofExistingGSMVendorAntennaJumper/BTS
Jumper,ifrequiredextraconnectorizationpreparation,alsoneedtobe
Installed.

Terminationofthejumpercableincludingweatherproofing.

5.InstallationofDDF

Installationandtestingofbasiclengthof120ohmPCMcabletoan
existingDDFblockforBaseStationorCellularTransmissionsites.
Installationof120ohmPCMcablewithfixingaccessories,labelsand
connectors.
TIVendor
TestingofthePCMcableinitscompletelength.
TerminationofthePCMcabletotheequipmentandexistingDDFblock.
InstallationoflabelsfortheDDFblock.

6.InstallationofExternalAlarm/Termination

InstallationofDDFandTerminationofExtenalAlarmcablesfromexisting
Sources. TIVendor
AlarmIntegrationandcommissioningatNIC.

7.Installation&CommissioningofRFantenna
Installationofgroundingcablewithfixingaccessories(cableties),labels
andconnectors(lugs)uptothedefinedlength.
Installationoflabelsfortheantenna.
Installationofpanelantennabiggerthanupto4mwithitsownmounting
bracketsandtiltingkits.
TIVendor
Terminationofthegroundingcabletothegroundingterminationpoint
(portofagroundingbusbar).
Terminationofthefeederlinetotheantenna(onlyifRFfeederexists).
Adjustmentofthepanelantennaazimuthandtilt.

8.Installation&CommissioningFeederline
Installationoffeedercableinthedefinedlengthwithfixingaccessories
(clamps,cableties),groundingkitsandweatherproofingmaterials,labels
andconnectorsincludingtestingofthefeederruninitscompletelength
withjumpers.
Installationofjumpercableswithfixingaccessories,weatherproofing
TIVendor
materialsandlabels,TerminationoftheantennalinetotheBaseStation.
Terminationoftheantennalinetotheantennaincluding
weatherproofingoftheoutdoorconnector(ifantennaexists).
VSWRTestingofantennaline.SitemastertobearrangedbyTIPartner.
9.Commissioning&IntegrationofBaseStation
Integrationofbasestationincludingelectricalcrossconnectiondefinition
inthebasestationasperNSNdefinedProcedure
CommissioningofbasestationasperNSNPlanningdata.
TIVendor
IntegrationwithE1andconfirmationtotheNIC/UTRAN.
ConductingalltherelevanttestsasperNSNSiteFolder.

10.SelfAssesment
FilltheQualitychecklistforthesiteasperNSNstandardsandnoting
deficienciesifany.
Correctingthedeficienciesasperagreedplan.SeQImustbezerofor TIVendor
InstalledSite.
UpdateintheIPM.

11.SiteFolderPreparation
PreparationandupdationofsitefolderasperNSNstandards,SiteFolder
mustbesubmittedinHardcopies(01forSite,01forNSNRecords&01 TIVendor
forCustomer)andsoftcopytobeUploadedinIPM.

12.AcceptanceTesting
PerformingtheAcceptancetestingasperNSNtestprocedures.
PreparingtheAcceptancetestreports
TIVendor
ArrangingTestEquipmentsforAT.
ATcertificationfromCustomer

13.QualityAssurance
NSNmaycommencequalityauditforinstalledsites,TIPartnermay
NSN
participatefortheAudit.
Remarks

1.ThesurveyToolKitincludingPowermeasuringkitwillbearranged
byTIPartnerincludingDigitalCamera(Minimum5Megapixel).
2.Thelaptopforcommissioning&IntegrationwillbearrangedbyTI
partner.
3.TheToolKitwillbearrangedbyTIPartner.
4.TheTestEquipmentslikesitemaster/OpticalPowerMeterincluding
attenuatorneedtobearrangedbyTIpartner