COSTO DE MANO DE OBRA

(VIGENTE AL 01.06.2016 AL 31.05.2017)

CATEGORIA
DESCRIPCION OPERADOR OPERADOR
OPERARIO OFICIAL PEON
EQ. MEDIANO EQ. PESADO

REMUNERACION BASICA VIGENTE (RB) 61.40 50.30 44.90 61.40 61.40


(vigente del 2016-06-01 al 2017-05-31)

BONIFICACION UNIFICADA DE CONSTRUCCION (BUC) 19.65 15.09 13.47 19.65 19.65


(vigente del 2016-06-01 al 2017-05-31)

BONIFICACION POR ALTA ESPECIALIZACIN


OPERADOR EQUIPO MEDIANO (8%) 4.91
OPERADOR EQUIPO PESADO (10%) 6.14
TOPOGRAFO (9%)

LEYES Y BENEFICIOS SOCIALES SOBRE LA RB 113.65% 69.78 57.17 51.03 69.78 69.78

LEYES Y BENEFICIOS SOCIALES SOBRE EL BUC 12.00% 2.36 1.81 1.62 2.36 2.36

BONIFICACIN POR MOVILIDAD ACUMULADA 7.20 7.20 7.20 7.20 7.20

OVEROL (02 unidades anuales) 0.40 0.40 0.40 0.40 0.40

Total dia 8 horas 160.79 131.97 118.62 165.70 166.93

Costo Hora Hombre (HH) S/. 20.10 S/. 16.50 S/. 14.83 S/. 20.71 S/. 20.87

HH
CATEGORIA FACTOR
S/.
CAPATAZ 1.25 OPERARIO 25.12

AYUDANTE DE TOPOGRAFIA 1.25 PEON 18.53


TOPOGRAFO

61.40

19.65

5.53

69.78

2.36

7.20

0.40

166.32

S/. 20.79
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
A) EQUIPO TRANSPORTADO

TIPO DE VEHICULO PESO DISTRIBUCION DE VIAJ


UND A MOVILIZAR Y DESMOVILIZAR CAMION CAMION
CAMA BAJA CAMA BAJA
KG. 25 TON 18 TON
1 CARGADOR SOBRE LLANTAS 125-155 HP 3 yd3 16,584.00 1.00
1 CARGADOR SOBRE LLANTAS 200-250 HP 4-4.1 yd3 20,830.00 1.00
1 EXCAVADORA SOBRE ORUGA 115-165 HP 0.75-1.4 Y3 23,400.00 1.00
1 MINICARGADOR BOB CAT 953 1.00
1 MOTONIVELADORA DE 125 HP 11,515.00 1.00
1 RETROEXCAVADOR SOBRE ORUGA 80-110HP 0.5-1.3 Y 17,300.00 1.00
1 RODILLO LISO VIBR. AUTOP. 101-135HP 10-12 ton 11,100.00 1.00
1 TRACTOR DE ORUGAS DE 140-160 HP 14,900.00 1.00
2 TRACTOR DE ORUGAS DE 190-240 HP 20,520.00 2.00
1 ZARANDA METALICA DE 2 1/2" 3,000.00 1.00
TOTALES 4.00 7.00
DURACION DEL VIAJE DE IDA 7.00 7.00

FACTOR DE RETORNO VACIO 1.00 1.00

COSTO HORARIO ALQUILER EQUIPO 249.06 248.50

MOVILIZACION DE EQUIPO TRANSPORTADO 6,973.68 12,176.50

DESMOVILIZACION DE EQUIPO TRANSPORTADO 6,973.68 12,176.50

SEGUROS DE TRANSPORTE 697.37 1,217.65

TOTAL MOVILIZACION Y DESMOVILIZACION EQUIPO TRANSPORTADO

B ) EQUIPO AUTOTRANSPORTADO

Velocidad
CANT. DESCRIPCION HORAS
(Km/H)

1 CAMION CISTERNA 4 X 2 (AGUA) 2,000 gl (INC MOTOBOMBA) 60.00 6.00

1 CAMIONETA PICK UP 4X2 CABINA SIMPLE 84 HP 70.00 4.00

2 CAMION VOLQUETE DE 15 M3 60.00 5.00

MOVILIZACION

DESMOVILIZACION

SEGUROS 10.00%

COSTO DE MOVILIZACION Y DESMOVILIZACION DE EQUIPOS


MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
DISTANCIA VELOCIDAD

TIEMPO DE MOVILIZACION DE
EQUIPOS (Cama bajas y Semi
DETALLE DEL CALCULO DEL
TIEMPO
RUTAS PROMEDIO
PROMEDIO (H)
(Km.) (Km./H)
Trujillo - Shirn 32.10 50.00 0.60
Traylers)
Shirn - Huamachuco 149.60 35.00 4.30
Huamachuco - Chugay 50.00 30.00 1.70
Chugay - C.G. Obra 25.00 30.00 0.80
TOTAL 7.00
ACION Y DESMOVILIZACION DE EQUIPOS

DISTRIBUCION DE VIAJES
CAMION SEMI
PLATAFORMA TRAYLER
19 TON 35 TON

- -
7.00 7.00

1.00 ###

248.50 221.39

- -

- -

- -

40,215.38

ALQUILER COSTO
HORARIO TOTAL S/.

128.62 772.00

42.65 171.00

220.76 2,208.00

3,151.00

3,151.00

630.20

6,932.20

47,147.58
ACION Y DESMOVILIZACION DE EQUIPOS
1.- INSTALACION Y DESINSTALACION DE PLANTA DE CHANCADORA
UND CANTIDAD PRECIO (S/.) HORAS
MANO DE OBRA
CAPATAZ HH 1.00 25.12 160.00
OPERARIO HH 2.00 20.10 160.00
PEON HH 2.00 14.83 160.00

EQUIPO
HERRAMIENTAS MANUALES %MO 3% 15,195.90
CARGADOR SOBRE LLANTAS 125-155 HP 3 YD3. HM 1.00 160.62 80.00

SUBPARTIDAS
CONCRETO (F'C=210 KG/CM2) M3 4.00 350.25
ACERO DE REFUERZO* KG 240.00 4.48
ENCOFRADO Y DESENCOFRADO* M2 16.80 53.96

TOTAL

2.- MONTAJE Y DESMONTAJE DE ZARANDAS VIBRATORIAS


UND CANTIDAD PRECIO (S/.) HORAS
MANO DE OBRA
CAPATAZ HH 1.00 25.12 80.00
OPERARIO HH 2.00 20.10 80.00
PEON HH 2.00 14.83 80.00

EQUIPO
HERRAMIENTAS MANUALES %MO 3% 7,597.95
CARGADOR S/LLANTAS 125-155 HP 3 YD3. HM 1.00 160.62 40.00

SUBPARTIDAS
CONCRETO (F'C=210 KG/CM2) M3 4.00 350.25
ACERO DE REFUERZO* KG 240.00 4.48
ENCOFRADO Y DESENCOFRADO* M2 16.80 53.96

TOTAL
PARCIAL (S/.)

4,019.73
6,431.56
4,744.61

455.88
12,849.60

1,401.00
1,075.20
906.53

31,884.11

PARCIAL (S/.)

2,009.86
3,215.78
2,372.31

227.94
6,424.80

1,401.00
1,075.20
906.53

17,633.42
CONSORCIO LOS ANDES
Estudio Definitivo para el Mejoramiento y Rehabilitacin de la Carretera: Ayacucho-Abancay, Tramo: KM.154+000 KM.210+000

EQUIPO MINIMO REFERENCIAL

POT. CAPACIDAD PESO CANTIDAD


EQUIPO MECANICO
HP KG
BUS 1.00
CAMION CISTERNA 4X2 3,000 GAL (INC MOTOBOMBA) 178-210 3000 GLN 19,000 3.00
CAMION IMPRIMADOR DE 1800 GLS. 210 1800 GLN 13,500 1.00
CAMIONETA PICK UP 4X2 C.SIMPLE 1 TON 84 5 PASAJEROS 2,740 1.00
CARGADOR S/LLANTAS 125-155 HP 3 YD3. 125-155 3 YD3 16,584 10.00
CHANCAD.PRIM.SECUND.5FAJAS 75HP 46-70 T/ 75 46-70 TON/HR 39,000 2.00
EXCAVADORA SOBRE ORUGAS 115-165 HP 0.75 - 1.4 YD3 115-165 0.75-1.4 23,400 3.00
FAJA TRANSPORTADORA 150 TON/HS 3 150 TON/HR 4,000 5.00
GRUA HIDRAULICA AUTOPROPULSADA 18 TON 127 18 TON - 9 M 20,000 1.00
MINICARGADOR 70 HP 70 0.5 YD3 1.00
MOTONIVELADORA 145 - 150 HP 145 -150 13,540 3.00
PAVIMENTADORA SOBRE LLANTAS 69 HP 10-16 69 12,000 1.00
PLANTA DE ASFALTO EN CALIENTE 60-115 TON/HS 46,800 1.00
RETROEXCAVADORA SOBRE LLANTAS 58 HP 1 YD3 58 1 YD3 9,000 4.00
RODILLO LISO VIBRATORIO AUTOP 101-135 HP 10-12T 101-135 10-12 TON 11,100 4.00
RODILLO NEUMATICO AUTOPROP 135 HP 9-26 TON 135 9-26 TON 9,000 1.00
RODILLO TANDEM VIBRATORIO AUTOPROPULSADO 111 - 130 HP 9-11 TON 111-130 9-11 TON 9,000 1.00
TRACTOR DE ORUGAS DE 140-160 HP 140-160 14,900 1.00
TRACTOR DE ORUGAS DE 190-240 HP 190-240 20,520 6.00
VOLQUETE DE 15 M3 15 M3 26,000 23.00
ZARANDA VIBRATORIA 4" x 6" x 14 M.E. 15 HP 15 7,000 3.00
CONSORCIO LOS ANDES
Estudio Definitivo para el Mejoramiento y Rehabilitacin de la Carretera: Ayacucho-Abancay, Tramo: KM.154+000 KM.210+000

TIEMPO
ITEM DESCRIPCION UND CANT
(MESES)

102.A TOPOGRAFIA Y GEOREFERENCIACION

MANO DE OBRA
Topgrafo MES 2 2.00
Nivelador MES 2 2.00
Ayudante Topografa MES 6 2.00
Ayudante Nivelacin MES 6 2.00
Peones MES 2 2.00
EQUIPOS
Herramientas % 5 1.00
Estacin total MES 2 2.00
Nivel MES 2 2.00

MATERIALES
Para estacado y monumentacin Est 1.00
Para tablillas Est 1.00

Total
+000

VALOR
COSTO S/. TOTAL
S/.

3,979.20 15,916.80
3,979.20 15,916.80
2,469.60 29,635.20
2,469.60 29,635.20
2,469.60 9,878.40

100,982.40 5,049.12
3,600.00 14,400.00
1,680.00 6,720.00

7,500.00 7,500.00
1,500.00 1,500.00

136,151.52