You are on page 1of 2

AJK ENGINEERS (PVT.) LTD.

Engineers, Contractors and Geotechnical Site Investigators


Head Office: 3rd Floor, 72-West, Opp. Saudi Pak Tower, Blue Area, Islamabad
Phone: 051-2803010, 2803266 Fax: 051-2803011 Email: info@ajk.net.pk

PRICE QUOTATION
M/s National Engineering Services Pakistan (Pvt) Ltd. Q. No. AJK-GT/17/01/38
Lahore. Date 25-Jan-17
P.O. No.
Date
Ref: Geotechnical Investigations for Rasul Barrage between Jhelum and Mandi Bahauddin, Punjab.
NTN NO. 4382398-0
Sr. Rate Amount
Description Unit Qty.
No. (Rs.) (Rs.)
A. FIELD INVESTIGATIONS
A1 Mobilization and demobilization to the site including
L.S. 1 50,000 50,000
Straight rotary rig, crew and staff
A2 Drilling of Eight (08) boreholes in any type of soil or
rock, using straight rotary drilling method including
backfilling of boreholes to their original position. as
per following detail: L.M 120 3,500 420,000
1) 4 x 20m = 80m
2) 4 x 10m = 40m
A3 Performance of Standard Penetration Tests (SPTs) in
boreholes along with collection of SPT samples
(ASTM D1586) in general, or as necessary, including No. 10 300 3,000
their labeling, packing, storage & transportation to an
approved testing laboratory.
A4 Collection of undisturbed soil samples from boreholes
through Shelby tube/Pitcher/Denison sampler
including their labeling, packing, storage & No. 5 1,500 7,500
transportation to an approved testing laboratory
A5 Performance of Permeability Tests in boreholes No 4 5,000 20,000
A6 Collection of water samples from boreholes including
their labeling, packing, storage & transportation to an No. 5 500 2,500
approved testing laboratory.
Sub-Total A 503,000
B. LABORATORY TESTING

B1 Sieve Analysis No. 4 1,000 4,000


B2 Hydrometer Analysis No 4 1,500 6,000
Atterburg Limits Test
B3 No. 4 1,200 4,800
(Liquid and plastic limits )
B4 Bulk & Dry Density No. 4 1,500 6,000
B5 Natural Moisture Content No. 4 300 1,200
B6 Consolidation Test No. 4 7,500 30,000

Lahore Office: G-5, Al-Hafeez View, 67-D/I, Sir Syed Road, Gulberg-III, Lahore. Ph: 042-35789953, Fax: 042-35789954
Sr. Rate Amount
Description Unit Qty.
No. (Rs.) (Rs.)
B7 Direct Shear Test No. 4 3,000 12,000
B8 Unconfined Compression test. Soil No. 4 2,500 10,000
B9 Sulphate Content of Soil No. 4 1,000 4,000
B10 Chloride Content of Soil No. 4 1,000 4,000
B11 Organic Metter Content No. 4 1,000 4,000
Complete Chemical Analysis of Water samples at
B12 No. 4 5,000 20,000
site i/c TDS, Cl, SO4, and pH Values
Sub-Total B 106,000

C. GEOTECHNICAL INVESTIGATION REPORT

Preparation of Comprehensive Geotechnical


C1 Investigation Report, and provision of one soft copy No. 1 50,000 50,000
and three hard copies.

Sub-Total C 50,000
Total (A+B+C) 659,000
In Words: PAK Rupees - Seven Hundred Sixty Four
16% GST 105,440
Thousand Four Hundred and Forty Only.
Total I/C GST 764,440

TERMS AND CONDITIONS


MOBILIZATION: Within one week after award of work.
TIME FOR FIELD INVESTIGATIONS: Approx.7-10days depending upon climatic
conditions.
TERMS OF PAYMENT: 50% Advance payment, 30% upon completion of
Field investigation and balance payment upon
submission of Report.
FINAL REPORT: Within Two (02) weeks after de-mobilization.

(Arif Junaid Kareem)


Director

Lahore Office: G-5, Al-Hafeez View, 67-D/I, Sir Syed Road, Gulberg-III, Lahore. Ph: 042-35789953, Fax: 042-35789954

You might also like