Professional Documents
Culture Documents
II FUEL STORAGE
1.
Supply and installation of underground double
wall tank, entirely as per EN 12285-2 standard,
capacity 50m3, with manhole base for welding
and tank manhole of following dimensions
1.0m x 1.0m x 1.4m and 1.0m x 1.0m x 1.9m,
coated with basic paint and Kondor film #4mm,
with overlaps of 10 cm at joints, complete with
aluminum manhole cover. Aluminum cover
MUST be fitted with scissor type lifting to provide
open position. Tank manhole MUST be welded
on the base, along the entire length, to form
impermeable joint.
each 1.00 13,218,520.69 13,218,520.69
2.
Electric motor fuel pump set, consisting of two
pumps (operating and stand-by), filters, mano-
vaccum gauge, counter-flanges, pressure limiting
valve, check valves, stop valves and pressure
gauge, produced by ALLWEILER-Germany or
similar, with following technical characteristics:
Model ZAS 550F
Capacity 550 l/h
Pressure 5 bar
Motor power 0.37 kW
10. Delivery and mounting of AT valves 2" each 2.00 56,250.00 112,500.00
11. Delivery and mounting of 6/4" check valves each 2.00 43,750.00 87,500.00
12. Delivery and mounting of 6/4" ball valves each 12.00 37,500.00 450,000.00
13. Delivery and mounting of 5/4" ball valves each 4.00 35,625.00 142,500.00
14. Delivery and mounting of 3/4" ball valves each 8.00 35,000.00 280,000.00
15. Delivery and mounting of 1/2" ball valves each 2.00 31,250.00 62,500.00
22.
Supply and assembly of elastic reinforced hoses
with 1" connector for elastic connection of
pipework and connectors for refueling and
recovery on daily fuel tank, located in the diesel
generator stand, complete with all required
connecting material, entirely as per valid
regulations for this type of work and drawings.
each 8.00 603,906.25 4,831,250.00
VI PREPARATORY-FINISHING OPERATIONS
1 Familiarization with design, scaling,
harmonization with actual conditions on site,
clearing of site, participation in final check and
acceptance of works by competent authorities
and inspections, making reports, certificates etc. lump
sum 562,500.00 562,500.00
2 lump
Survey of underground utility services sum 312,500.00 312,500.00
Provision of technical documents and certificates lump
by Contractor sum 312,500.00 312,500.00