A. Introduction
Typically, electrostatic discharge (ESD) causes more than one-third of the field failures in the
semiconductor industry. ESD-induced failures in semiconductors can be seen in the form of
leakage, short, burnout, contact damage, gate oxide rupture, and resistor-metal interface damage.
Transportation lengthens the time cycle of the process. Since the device, laser diode, is
sensitive to electrostatic discharge, having the units to move a lot causes defects.
Problems arose when the demand for the laser diode increased. With the process being
manual, fewer machines compared to other devices, and areas far from each other, delays and
lengthening the time cycle is visible. In laser diode manufacturing, 430 ft. is the total
transportation which causes delays and fatigue for operators.
With the device being exposed to electrostatic discharge, defects of one lot of laser diode
is contributed by having the device move from one place to another.
Page | 1
D. Objective of the Study
Page | 2
CHAPTER 2: DISCUSSION OF PRESENT SYSTEM
MANUAL DIE-ATTACH
CURING
MANUAL WIREBOND
CURING
CASTING
CURING
DAMBAR
SINGULATION
LAPPING
ELECTRICAL TEST
PACKING
PACKAGING
Page | 3
Laser diodes are usually for sensing and as a range finder. This device uses gold
lead frames and pure gold wires. It is the companys one of the most expensive product,
selling for $4 each. Laser diodes are sensitive to Electrostatic Discharge (ESD), thus
having more complicated processes and precautions.
Diodes consist of a chip and a lead frame in a form of metal strip. Lead frame is
the diodes skeleton. It has two parts the wedge and the post. The wedge is where the
die pad is. It holds the chip. The post is where a wire connects it to the wedge.
First step for laser diode is Die Attach. This is a process where the chips are
attached to the lead frames using epoxy as its glue. The needed equipment are: Wrist
strap, responsible in decreasing the ESD produced by the operators movements;
Microscope, for clearly guiding the operator; Epoxy dispenser, for easy squeezing of
epoxy in the lead frame.
Lead frame is placed under the microscope. With the microscopes help, the
operator will dispense epoxy on the die pad. After putting epoxy in the frames, attach the
chip on pad using tweezers.
To properly secure the chip on the die pad, lead frames are to be cured in a
convection type oven that should be 175 C to 185 C for an hour and a half.
Second step is for the laser diode to undergo wire bonding. Wire bonding is where
the machine connects the bonding pad to the post using a golden wire. In wire bonding,
the gold wire tip is melted, thus, forming a ball. The wire is then connected to the post. To
strengthen the wire bond, the lead frames are then transferred to an oven for curing.
Curing lasts for an hour and 10 minutes and should be 175 C to 180 C.
Third step is casting, wherein the lead frame is then encapsulated with an epoxy
gel. The mixture is then degassed. The degassed epoxy gel will be placed in an injection
used for encapsulation. The operator grabs a lead frame cup and sprays a mold release.
Lead frame is then pre-dipped into an epoxy gel, and then placed in the lead frame cups.
Epoxy gel will be then injected individually to the cups. To harden the gel, the lead
frames will be cured twice.
Fourth step would be the dambar trimming and singulation. 20 leads are in lead
frame connected through a dambar. In dambar trimming, the machines remove the
dambar. After removing the dambar, lead frame is then singulated.
In lapping, diodes are cleaned thoroughly. After the lapping, each diode is then
tested to know if its parameters are correct and accepted. When all diodes are properly
checked, diodes are then packed properly according to its limitations.
B. Flow Process Charts
The table shows that this process have a cycle time of 5,571.2 seconds. All
throughout manual die attach, 94 ft. was covered. 1.6% of the cycle time is used in
transportation that did not occur in the same area. This flow process chart limits to
one lead frame with 20 diodes.
The table shows that this process have a cycle time of 115.1 seconds. All
throughout manual wire bonding, 100 ft. was covered. 82.9% of the cycle time is
used in transportation that did not occur in place. This flow process chart limits to
one diode in a leadframe.
3. Casting
The table shows that this process have a cycle time of 26,860.1 seconds.
All throughout manual die attach, 61 ft. was covered. 0.2% of the cycle time is
used in transportation that did not occurred in place. This flow process chart limits
to one leadframe.
4. Dambar Trimming
The table shows that this process have a cycle time of 11.4 seconds. All
throughout dambar trimming, 1 ft. was covered. 7.9% of the cycle time is used in
transportation that did not occur in place. This flow process chart limits to one
leadframe
5. Singulation
The table shows that this process have a cycle time of 42.6 seconds. All
throughout singulation, 34 ft. was covered. 75.6% of the cycle time is used in
transportation. This flow process chart limits to one lead frame.
1Table 1.5 Flow Process Chart (Singulation)
6. Lapping
The table shows that this process have a cycle time of 571.7 seconds. All
throughout lapping, 49 ft. was covered. 8.2% of the cycle time is used in
transportation that did not occur in place. This flow process chart limits to 45
units.
7. Electrical Testing
The table shows that this process have a cycle time of 91.6 seconds. All
throughout electrical testing, 54 ft. was covered. 57% of the cycle time is used in
transportation that did not occur in place. This flow process chart limits to 1
diode.
The table shows that this process have a cycle time of 140.8 seconds.
All throughout final visual inspection, 21 ft. was covered. 14.1% of the cycle time
is used in transportation that did not occur in place. This flow process chart limits
to 1 diode.
9. Packing
The table shows that this process have a cycle time of 701.1 seconds. All
throughout packing, 110 ft. was covered. 14.2% of the cycle time is used in
transportation. This flow process chart limits to 100 diodes.
Figure 2.
Present Lay-
out (2nd floor)
Figure 3. Present Lay-out (3rd Floor)
LEGEND
1 Manual Die Attach
2 Oven
3 Manual
Wire Bonding
4 Oven
4 Epoxy
Preparation
5 Casting
6 Oven
7 Binder
Oven
8 Dambar
Trimming
9
Singulation
10 Lapping
11- Electrical
Testing
12 Final
Visual
Inspection
13 Packing
14 Vacuum
Table 2.
Distance
travelled by
operators
TOTAL DISTANCE: 430 ft
D. Defects Chart
A lot size of laser diode consists of one thousand six hundred (1,600) units. An
average yield for one lot of laser diode is ninety-five percent (95%). As of current, the
defects mostly responsible for low yield are those induced by electrical overstress due to
exposure of device to electrostatic discharge. In every week, one lot of laser diode is
shipped.
14
12
10
0
contact damage short leakage chip out misplaced die cracks
When a device is ESD sensitive, if not taken care of properly, major defects can
happen and will have poor feedbacks. The defect may then extend over time with the
device failing after several hours.
As seen in the figure the defect contact damage and short had the highest
percentage in the defects chart. Defects caused by being exposed to ESDs are contact
damage, short, and leakage. While other defects are due to mishandling, and machine
problems.
With the current lay-out, the researchers did an Activity Relationship Chart for the
laser diode manufacturing in order to know the essential relationships between processes.
Figure 5. ARC in Laser Diode Manufacturing
Legend:
A= Absolute Necessary
E= Especially Important
I= Important
O= Okay
U= Unimportant
X= Undesirable
B. Relationship Diagram
Relationship diagram position the activities spatially. This diagram shows that
proximities are typically used to reflect the relationship between pair of activities
Figure 6. Relationship Diagram of Laser Diode Manufacturing
The figure above shows the relationship diagram between processes of the Laser
Diode manufacturing
The tables above shows the present layouts relationship chart with computations.
The present layout scoring a negative twenty eight (-28).
C. Alternative Layouts
According to observations and data, the researchers are seeing to
recommend to swap the Tin Dip area and the Lapping room, since it has the same
dimensions, there will be no encountered problems.
Figure 7. Proposal
The figure above shows that the researchers would like to swap the lapping area
and the tin dip area. Lapping area is where only one process is done. The lapping process
is part of a re-designed process for one of their devices. Since its only an addition, the
area where it was placed have a big remaining space.
A. Proposal Lay-out
1. Proposal Layout Process Flow
According to data and activity relationship chart, the second alternative would be
the best for re-designing the layout of laser diode manufacturing.
For the proposal layout almost all processes involved in laser diode
manufacturing are placed in one area. Packing and packaging are left outside since this
processes should be near the shipping area. The figure below shows the new sequence of
laser diode manufacturing in parallel with the proposed layout
The researchers proposed a lay-out where the room of lapping and tin dip
be swapped since both have the same dimensions. With the table 2 and table 4 compared,
the present lay-out covers 430 ft., while the proposed lay-out covers 40 ft. It decreased by
almost ninety percent (90%).
TOTAL DISTANCE: 40 ft
The figure above shows the new relationship diagram between processes of the
Laser Diode manufacturing
The researchers used this tool to evaluate the layout changes initiative.
Assumptions:
ESD related defects of laser diode manufacturing will decrease.
Weekly yield of one laser diode lot will be ninety-eight percent (98%)
Project will be finished in 1 week
Costs:
Table 6.1. Costs Table
Benefits:
The tables above shows that for re-designing the laser diode manufacturing
processes would cost the company a total of Php 46,070 for a year. With the assumptions
of the proposed layout increasing the yield by 3% will benefit the company Php 469,248
within a year.
With this analysis, we could see that re-designing the layout greatly benefits the
company.
B. Summary of Changes
This table shows the changes in transportation delays once the proposed changes
is applied. Massive difference is seen in transportation delays of present and proposed
method. It also shows the tabular summarization of changes that will occur once the
proposed method is applied in transportation delays for laser diode manufacturing.
In the proposal, most of the processes that affects the transportation delays was
reduced. Almost all the machines being in one place helps the monitoring of orders and
operators. Thus, reduces the total cycle time.
Total
number of
Number of weeks weeks
Activity
consumed
1 2 3 4 5 6 7 8
1. Presentation of proposal to the 1
administrators.
1
2. Approval of the administrators
With the new proposed lay-out, the distance travelled was decreased from 430 ft
to 40 ft.
Using the Cost Benefit Analysis, we have concluded that re-designing the layout
for laser diode manufacturing greatly benefits the company. Once the proposed plan is
initiated, it will increase the yield thus increasing profit.
B. Recommendations
A. Remove unnecessary elements
With the data gathered, elements such as transportation took up all the
effort in producing laser diodes.
To lessen the transportation experienced, the researchers recommend new
lay-out for laser diode production.
Facilities planning and design shall implemented for laser diode
production.
1. Advantages
The 27.5% of the total time cycle for laser diode production will
definitely decrease since transportations will be cancelled.
Machines needed for production will be near to each other.
The workplace will be ergonomically designed.
2. Disadvantages
Rearranging a workplace to be ergonomically designed requires
time and money. This will cost a lot of money for the company.
B. JIT
This methodology aims to reduce time cycle of the production.
The present system in producing laser diode is not in the slightest
continuous flow. With this lean tool, the production will have continuous
flow.
1. Advantages
Production of laser diode will be as lean as other devices in the
company.
Time cycle will definitely shorten.
2. Disadvantage
Laser diode is one of their most expensive products but production
of this device is by batch sheet, thus, applying costly methods will
give doubts to the management.
C. Forecasting
In our research, the results say that one of the problem in laser diode is not
anticipating when the orders will be. Forecasting is an IE tool used as a
basis for any decision for the future. Recording past values and pattern
will help the company in buying raw materials.