Revision History
Revision
Date of Rev Revision Description
Number
01 30-03-2015 Issued for review and approval
02 03-05-2015 Reissue for approval
03 13-07-2015 Reissue for approval
04 24-08-2015 PDO Comments incorporated Reissue for approval
2 Receiving & Handling Site Material handling Items checked as per Packing list,
QC
materials received at Procedure-CME0001- Physical condition,
100% Ma
site. G-PRC-002, Equipment release note.
Co
Approved drawings
3 Submission of Welding Approved WPS Approved WPS
Procedure / Welder Approved WPQT Approved WPQT
Qualification Approved NDT Approved NDT Procedures,
(If applicable). NDT Procedures, Applicable Spec
QA
Procedure SP1173,
100% We
ASME SEC IX ,
En
DEP .30.10.60.18,
& NDT as per ASME
SEC VIII and ASME
SEC V
Page 2 of 5
4 Construction Tools. Approved Drawings. Tools applicable to handle the equipment
Approved MS for Static without damage to the equipment.
Equipments Load testing certificates for the lifting Co
( CME-0001-M-MST- equipment. 100% sup
001 ) QC
11 Welding & Weld Visual Approved WPS Welding Parameter check as per
inspection Approved Drawings approved WPS, Welders qualifications
(If applicable). Approved method Applicable spec. Co
statement. 100% sup
SP-1173, QC
ASME SEC VIII (UW-
35)
12 NDT of weld Approved Drawings Frequency of NDT & defects 100% QC
(If applicable). Approved NDT acceptance limits as specified in the
Procedure approved drawings / Applicable spec.
ASME SEC-VIII(Table
Page 3 of 5
UW-12),
ASME SEC V
15 Check installation of Equipment drawings. All internal are erected as per approved
Co
internals. Approved Method drawings & instructions.
100% sup
(If applicable ) statement , Internal cleaning is acceptable.
QC
DEP-31.20.20.31
16 Check Leak / hydro Approved Method Pressure test as per approved drawings.
test ( If applicable ). statement for leak test / / Data Sheet / Applicable spec Tes
hydro test ,Vendor Rate of pressurization as per approved 100% Su
procedure, Vendor Procedure. QC
Approved Drawings. No leakage during the test.
17 Painting/Coating as applicable: Refer ITP : GEN-00-102961-QA-5733-00016-0000
18 Insulation & Fire Proofing: Refer ITP : GEN-00-102961-QA-5733-00017-0000
19 Final Inspection Approved drawings Final Inspection as per the approved
Applicable material drawings.
Co
specification Visual inspection as per applicable spec
100% sup
Approved Method
QC
statement.
DEP 61.10.08.11
20 Final Box -Up Approved Method Applicable specifications
Statement ,Approved Co
Drawing , 100% sup
DEP 61.10.08.11 QC
21 Collate Final Records Contract Quality Plan Proper compilation of all quality records.
& Handover 100% QA
Page 4 of 5
Inspection and test mark-up legend: M = Monitor, W = Witness, H = Hold Point, R = Document Review, A= Document Approval
Hold Point (H): A critical step in fabrication and testing where it is mandatory that the Responsible Party inspect the component/
designated as a Hold Point shall not proceed unless the Responsible Party is present or the Hold Point is formally waived. The R
specified in the contract in advance of the activity.
Witness Point (W): A critical step in fabrication and testing where it is desirable that the Responsible Party inspect the compone
Party shall be notified at a duration specified in the contract in advance of the activity. Once proper notification is given, the activ
regardless of the Responsible Party attendance.
Monitor Point (M): A critical step in fabrication and testing where it is optional that the Responsible Party inspect the component
Party shall be notified at a duration specified in the contract in advance of the first occurrence of the activity at each worksite. No
shall be required. The activity may proceed with or without the Responsible Party attendance.
Approval Point (A): A critical step in design, procurement, and or fabrication and testing where it is mandatory that the Respons
equipment/or activity. The Responsible Party shall be notified at a duration specified in the contract in advance of the first occurre
period of time specified by the contract. The activity may not proceed without the Responsible Party approval.
Review Point (R): A critical step in design, procurement, and or fabrication and testing where it is desirable that the Responsible
equipment/or activity. A separate notification is not needed unless otherwise specifically requested; the Responsible Party may p
types.
Page 5 of 5