You are on page 1of 39

SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)

CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

Sr. No Description Page No

1 Relay Details . 2
2 Local Relay Power system data...... 2
3 Remote Relay Power system data....... 2
4 Relay Address 2
5 Visual Check.. 2
6 Measured Value Test..
6.1. CT Measurement. 3
6.2. VT Measurement. 3
7 Differential Protection
7.1. Differential and Restrain value measurement.. 4
7.2. 87-1 Differential Test... 5
7.3. 87-2 Differential Test... 5
7.4. 87-1 during Switch On Condition Test... 6
7.5. Stability Test. 7
7.6. Differential Function Block checks. 8
8 Distance Protection
8.1. Distance General Settings. 8
8.2. Distance Zone Setting.. 9
8.3. Distance Zone reach and Operating time test.. 9
8.4. SOTF Timings 9
8.5. Fault Locator. 10
8.6. Power Swing Detection. 10
8.7. Fuse fail monitoring checks. 10
9 Back Up Over Current Protection Test.
9.1. Definite Time (50/50N). 11
9.2. Inverse Time (51/51N).. 11
10 Thermal Over Load Protection. 12
11 Binary Inputs Test 12
12 Binary Outputs Test 12
13 LED Indication Test 13
14 Function Key Test 13
15 Fault Recorder Signals. 14
16 Functional Check 15
17 Instruments Used. 15
18 Annexure. 16

Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA


Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 1 of 39
SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)
CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

Line Differential and Backup Distance Protection - 7SD522


1. RELAY DETAILS:
Make : SIEMENS Relay Designation : F871
MLFB : 7SD52215AB999HL4----0S0G0G Firmware Version : V04.72.01
Nominal Current : 1.0 Amp P. Set. Version : V04.72.01
Local Relay : BF 1510509069 Auxiliary Volt. : 110V DC
IP address : 140.80.108.2 Rated Frequency : 50 Hz
2. LOCAL RELAY POWER SYSTEM DATA:
CT star point : Towards line
Rated primary voltage : 66 kV
Rated secondary voltage (Ph-Ph) : 110.0 V
CT Rated primary current : 1200 Amps
CT Rated secondary current : 1.0 Amp
k_alf/k_alf nominal : 1.50
CT Error in % at k_alf/k_alf nominal : 3.0%
CT Error in % at k_alf nominal : 10.0%

3. REMOTE RELAY POWER SYSTEM DATA:


CT star point : Towards line
Rated primary voltage : 66 kV
Rated secondary voltage (Ph-Ph) : 110.0 V
CT Rated primary current : 1200 Amps
CT Rated secondary current : 1.0 Amp
k_alf/k_alf nominal : 1.50
CT Error in % at k_alf/k_alf nominal : 3.0%
CT Error in % at k_alf nominal : 10.0%

4. RELAY ADDRESS:
For testing purpose B30 feeder kept as local end relay and B10 relay as remote end relay.
Local End Relay : 1
Remote End Relay : 2
5. VISUAL CHECK: Tested ( )
Inspect for no physical damage. :
Verify the wiring connection as per approved drawing. :
Confirm that only ring type Lugs are used for all CT. :
Relay case connected to a local earth bar. :
Confirm the LED & Function Key Labels are provided. :
Check Serial No. of relay matching with Serial No. of Case :
Check rating information as per approved scheme :

Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA


Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 2 of 39
SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)
CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

6. MEASURED VALUE TEST:

6.1. CT Measurement: Inject current in the relay as per the table below and observe the reading on
the relay display, in secondary values and in primary values.

Primary current read on relay Secondary current read on relay


Current display in kAmp display in Amp
Phase injected
injected (Amps) IR IY IB 3I0 IR IY IB 3I0

R-E 1.0 1.20 0 1.20 1.20 1.0 0 0 1.0

Y-E 1.0 0 1.20 0 1.20 0 1.0 0 1.0

B-E 1.0 0 0 1.20 1.20 0 0 1.0 1.0

R-Y 1.0 1.20 1.20 0 0 1.0 1.0 0 0

Y-B 1.0 0 1.20 1.20 0 0 1.0 1.0 0

B-R 1.0 1.20 0 1.20 0 1.0 0 1.0 0

R-Y-B 1.0 1.20 1.20 1.20 0 1.0 1.0 1.0 0

6.2. VT Measurement: Inject Voltage in the relay as per the table below. Observe the reading on the
relay display, in primary values.

Voltage Primary Voltage read on relay display in kV


Phase applied applied
(Volts) VRE VYE VBE VRY VYB VBR 3V0

R-E 63.51 38.1 0 0 38.1 0 38.1 38.1

Y-E 63.51 0 38.1 0 38.1 38.1 0 38.1

B-E 63.51 0 0 38.1 0 38.1 38.1 38.1

R-Y 110.0 38.1 38.1 0 65.9 38.1 38.1 38.1

Y-B 110.0 0 38.1 38.1 38.1 66.0 38.1 38.1

B-R 110.0 38.1 0 38.1 38.1 38.1 66.0 38.0

R-Y-B 110.0 38.1 38.1 38.1 65.9 66.0 66.0 0

Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA


Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 3 of 39
SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)
CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

7. DIFFERENTIAL PROTECTION:

7.1. Differential and Restrain Value Measurement:

Current of 1.0Amp injected in local end relay only. The differential and restraining currents observed in
both the relays.

I Rest. = I diff>setting + CT errors (local end) + CT Errors (remote end) + system errors

I Rest. during zero current in both sides = 0.3+0.00+0.00+0.01 = 0.31 A

I Rest. during 1.0 A at local end 0.0 A at remote end relays: = 0.3+0.03+0.00+0.01 = 0.34 A

Local End Relay in % Remote End Relay in %


Fault I Diff / *I
Type Rest.
R Y B 3I0 R Y B 3I0

I diff. % 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0


No
Current
I rest. % 31.3 31.3 31.3 31.3 31.3 31.3

I diff. % 99.6 0.0 0.0 99.6 99.4 0.0 0.0 99.6


R-E
I rest. % 34.2 31.3 31.3 34.5 31.4 31.3

I diff. % 0.0 99.7 0.0 99.7 0.0 99.5 0.0 99.7


Y-E
I rest. % 31.3 34.2 31.3 31.4 34.5 31.3

I diff. % 0.0 0.0 99.7 99.7 0.0 0.0 99.6 99.4


B-E
I rest. % 31.3 31.3 34.2 31.3 31.4 34.5

I diff. % 99.7 99.6 0.0 0.0 99.5 99.6 0.0 0.0


R-Y
I rest. % 34.2 34.2 31.3 34.5 34.5 31.3

I diff. % 0.0 99.7 99.7 0.0 0.0 99.8 99.7 0.0


Y-B
I rest. % 31.3 34.2 34.2 31.3 34.5 34.5

I diff. % 99.7 0.0 99.7 0.0 99.5 0.0 99.6 0.0


B-R
I rest. % 34.2 31.3 34.2 34.5 31.3 34.5

I diff. % 99.6 99.7 99.6 0.0 99.5 99.5 99.6 0.0


R-Y-B
I rest. % 34.2 34.2 34.2 34.5 34.5 34.5

Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA


Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 4 of 39
SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)
CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

7.2. 87-1 Pickup and Timing Test:

87-1 Pickup : 0.3A Time Delay : 0.00 sec


Expected PU = (87-1 setting x correction factor* + relay internal errors) / (1 CT errors)
Expected PU = (0.3x1.0 + 0.01) / (1-0.03) = 0.320 A
* = correction factor is applicable when transformer is in protection zone.

Actual Trip Time


Expected Pickup Actual Pickup Expected Trip Time
Fault Type in m-sec at
In Amp In Amp in m-sec
2 x 87-1 setting
R-E 0.320 0.326 31.90

Y-E 0.320 0.326 29.90

B-E 0.320 0.324 29.80

R-Y 0.320 0.324 34 ms Typical 30.10

Y-B 0.320 0.324 29.90

B-R 0.320 0.324 29.90

R-Y-B 0.320 0.324 30.10


Tolerance: Idiff -1 = 5 % Of Set Value

7.3. 87-2 Pickup and Timing Test:

87-2 Pickup : 1.20A


Expected PU = (87-2 setting x correction factor* + relay internal errors) / (1 CT errors)
Ph-E expected PU = (1.2x1.0 + 0.01) / (1- 0.10) =1.344 A
* = correction factor is applicable when transformer is in protection zone.

Actual Trip Time


Expected Pickup Actual Pickup Expected Trip Time
Fault Type in m-sec at
In Amp In Amp in m-sec
2 x 87-2 setting
R-E 1.344 1.300 17.80

Y-E 1.344 1.290 15.90

B-E 1.344 1.285 19.70

R-Y 1.344 1.290 17 ms Typical 14.90

Y-B 1.344 1.285 20.30

B-R 1.344 1.300 19.70

R-Y-B 1.344 1.295 14.90


Tolerance: Idiff -2 = 5 % Of Set Value

Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA


Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 5 of 39
SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)
CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

7.4. 87-1 Pickup and Timing Test during Switch ON Condition:

87-1 Pickup : 0.30A


87-1 Pickup under Switch on Condition : 0.40A
Seal-in Time for All Closures : 0.10 sec
Seal-in Time after manual Closer : 0.30 Sec
Expected PU = (87-1 Switch on setting x correction factor* + relay internal errors) / (1 CT errors)
Expected PU = (0.4x1) +0.01/ (1-0.03) = 0.422 A
* = correction factor is applicable when transformer is in protection zone.
Current inject Current inject
87-1 Switch on in Amp = 0.35 in Amp = 0.45
Fault Type
Pickup Exp Time Actual Time Exp Time Actual Time
in Amp (ms) (ms) (ms) (ms)

R-E 0.427 306.7 33.20

Y-E 0.422 304.9 34.90

B-E 0.425 305.0 35.10

R-Y 0.420 334 ms 304.9 34 ms 34.90

Y-B 0.425 305.0 33.90

B-R 0.426 304.8 29.90

R-Y-B 0.424 305.0 30.80

Tolerance: Idiff -1 = 5 % Of Set Value

Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA


Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 6 of 39
SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)
CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

7.5. Stability Test:

7.5.1. External through fault: Current of 1.0A on remote end and 1.0A on local end with 180 0 phase shift
between the two currents. The differential and restraining currents are observed in both the relays.

Fault I Diff / *I Local End Relay Remote End Relay


Type Rest. R Y B 3I0 R Y B 3I0

I diff % 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0


R-E
I rest % 37.4 31.3 31.3 37.4 31.3 31.3

I diff % 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0


Y-E
I rest % 31.3 37.4 31.3 31.3 37.4 31.3

I diff % 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0


B-E
I rest % 31.3 31.3 37.4 31.3 31.3 37.4

I diff % 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0


R-Y-B
I rest % 37.4 37.4 37.4 37.4 37.4 37.4

7.5.2. In-Zone fault: Current of 1.0A on remote end and 1.0A on local end with 0 0 phase shift between
the two currents. The differential and restraining currents are observed in both the relays.

Fault I Diff / *I Local End Relay Remote End Relay


Type Rest. R Y B 3I0 R Y B 3I0

I diff % 199.7 0.0 0.0 199.7 199.6 0.0 0.0 199.7


R-E
I rest % 37.4 31.3 31.3 37.4 31.3 31.3

I diff % 0.0 199.8 0.0 199.6 0.0 199.9 0.0 199.7


Y-E
I rest % 31.3 37.4 31.3 31.3 37.4 31.4

I diff % 0.0 0.0 199.6 199.7 0.0 0.0 199.7 199.9


B-E
I rest % 31.3 31.3 37.4 31.3 31.3 37.4

I diff % 199.5 199.8 199.5 0.0 199.5 199.5 199.4 0.0


R-Y-B
I rest % 37.4 37.4 37.4 37.4 37.4 37.4

Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA


Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 7 of 39
SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)
CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

7.6 DIFFERENTIAL FUNCTION BLOCK CHECKS:

7.6.1. Blocked by Communication Failure:

FO Removed at Injected Current in [A] -F871 Relay Operation


Remarks
Local__ S/S Remote__ S/S Local__S/S Remote__ S/S Local__S/S Remote__S/S

.... Tx / Rx-CH1 -- 1.00 Trip Trip OK

.... Tx / Rx-CH2 1.00 -- Trip Trip OK

Tx / Rx-CH1 .... -- 1.00 Trip Trip OK

Tx / Rx-CH2 .... 1.00 -- Trip Trip OK

.... Tx/Rx-CH1&2 -- 1.00 No Trip No Trip OK

.... Tx/Rx-CH1&2 1.00 -- No Trip No Trip OK

Tx/Rx-CH1 & 2 .... -- 1.00 No Trip No Trip OK

Tx/Rx-CH1 & 2 .... 1.00 -- No Trip No Trip OK

CH1&Ch2 Healthy CH1&Ch2 Healthy -- 1.00 Trip Trip OK

CH1&Ch2 Healthy CH1&Ch2 Healthy 1.00 -- Trip Trip OK

8. DISTANCE PROTECTION:

8.1. Distance General Settings:

Distance Phase Fault Characteristics : Quadrilateral


Distance Earth Fault Characteristics : Quadrilateral
Line Angle : 85
Line Reactance per length unit - X : 0.030 Ohm/km
Capacitance Per unit line length - c : 0.010 F/km
Line Length : 100 Km

8.2. Distance Zone Settings:

Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA


Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 8 of 39
SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)
CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

R (Ohms) RE (Ohms) Time Delay


Zones X (Ohms) Operating Mode
Ph-Ph Ph-E (sec)

Z1 2.500 1.250 2.500 0.00 Forward

Z1B (SOTF) 3.000 1.500 3.000 0.00 Forward

Z2 5.000 2.500 5.000 0.30 Forward

Z3 10.00 5.000 10.00 0.60 Reverse

Z4 12.00 12.00 12.00 0.90 Non Directional

Z5 -- -- -- -- Inactive

Z6 -- -- -- -- Inactive

8.3. Distance Zone Reach and Operating time:

Note: For Distance / SOTF reach and operating time results please refer Annexure -3 (Omicron tests
result).

8.4. SOTF Timings

Enabled With Binary Input (Manual Close).


Seal In Time Set = 0.3 sec

Fault Phase Measured Time (ms) Expected Time

R-E 17.50

Y-E 16.20

B-E 18.10

R-Y 15.60 Approx. 17 ms

Y-B 16.90

B-R 16.90

R-Y-B 16.80

8.5. Fault Locator:

Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA


Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 9 of 39
SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)
CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

Inject faults at different percentages of the line impedance and check the reading of the fault locator on
the relay display.

Fault Location
Fault Locator Indication
Fault Type
(km)
Percentage of the line Impedance ()

Ph-E 100 3.0 99.8

Ph-Ph 60 1.8 59.1

3 Ph 40 1.2 39.9

8.6. Power Swing Detection:

Operating Mode = all zones blocked


Power swing Trip = No

Distance Blocked with Power Swing Detection: OK / NOT OK

8.7. Fuse Fail Monitoring Checks:

3Uo= 30V 3Io= 0.1A V< (3ph) = 5V

Set Value Pickup


Quantity
R - phase Y - phase B - phase R - phase Y - phase B - phase

3U0 30.0 30.0 30.0 29.97 29.96 30.05

3I0 0.10 0.10 0.10 0.099 0.099 0.099

V< (3ph) 5.0 5.00

Blocking of distance protection during VT MCB Trip is checked : OK / NOT OK


Blocking of distance protection during Fuse Fail Monitor (1Ph, 2Ph and 3Ph) is checked: OK / NOT OK

9. BACKUP OVERCURRENT PROTECTION:

Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA


Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 10 of 39
SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)
CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

9.1. Definite Time 50(N):


50-B1 Pickup Setting (A): 1.50 Delay Setting (s): 1.00
50N-B1 Pickup Setting (A): 0.20 Delay Setting (s): 1.00
50-B2 Pickup Setting (A): 4.00 Delay Setting (s): 0.50
50N-B2 Pickup Setting (A): 0.60 Delay Setting (s): 0.50

50-B1/ 50-B1/ 50-B1/ 50-B2/ 50-B2/


50-B2/50N-B2
50N-B1 50N-B1 Actual 50N-B1 Actual 50N-B2 50N-B2 Actual
Actual Trip
Phase Actual Pickup Drop Out Trip Time @ Actual Pickup Drop out
Time @2 x
current current 2 x setting current current
setting (sec)
(A) (A) (sec) (A) (A)
R 1.500 1.395 1.030 4.004 3.723 0.533

Y 1.500 1.394 1.030 3.999 3.719 0.530

B 1.501 1.395 1.030 4.001 3.721 0.530

N 0.201 0.183 1.030 0.603 0.560 0.529


Dropout Ratio: 0.95 for I/In > 0.5
Tolerance:
Current: 3% of Iset or 1% In
Time: 1 % of setting value or 10 ms
9.2. Inverse Time 51(N):

51-B Pickup Setting (A): 1.00 Time Dial Setting: 0.60


51N-B Pickup Setting (A): 0.20 Time Dial Setting: 0.60
IEC Curve : Normal Inverse

Actual Operating Time (s) Operating Time (s) Operating Time(s)


Actual Drop
Pickup @ 2 x Setting @ 5 x Setting @ 10 x Setting
Phase out current
current
(A) Calculated Measured Calculated Measured Calculated Measured
(A)
R 1.101 1.024 6.017 6.014 2.568 2.572 1.782 1.779

Y 1.100 1.023 6.017 6.013 2.568 2.562 1.782 1.782

B 1.101 1.023 6.017 6.024 2.568 2.570 1.782 1.780

N 0.222 0.203 6.017 6.063 2.568 2.573 1.782 1.780

Limit: IDMT Pick up = 10 % above set value.


Pickup/Dropoff : 3% of set value.
Time Tolerance: 5% of set value + 15ms.
Note: IDMT Pick up = 10 % above set value. (Ref. Manual Page 313)

10. THERMAL OVER LOAD PROTECTION:

Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA


Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 11 of 39
SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)
CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

K-Factor : 1.0
Thermal Time Constant : 1.0 min.
Thermal Overload Alarm : 90 %

Without Pre load Condition


Current Injected Thermal Overload
Phase Expected Trip Time Actual Trip Time
in Amp Alarm in %
in sec in sec
R-Y-B 1.50 35.27 35.29

R-Y-B 2.00 89 17.26 17.32

R-Y-B 2.50 10.46 10.43

11. BINARY INPUT:

BI No. BI Assigned to Tested ( ) Remarks


BI1 BF Stg-2/BB/End Fault Trip (Intertrip Send) OK
BI2 CB (Q0) Close OK
BI3 CB (Q0) closing order from LCC ( To initiate SOTF) OK
BI4 VT MCB Trip ( Distance Prot. Block) OK
BI5 Test Block in Test Position (Differential Block) OK
BI6 Spare OK
BI7 Spare OK
BI8 BI DC Supply Fail OK

12. BINARY OUTPUT:

BO No. BO Assigned to Tested ( ) Remarks

BO1 Spare 0.2


BO2 Spare 0.2
BO3 Spare 0.2
87C Trip, B/U Dist. Prot. 21C-2, B/U O/C Prot., SOTF, Trip to CB
BO4 0.2
Trip Coil-1
87C Trip, B/U Dist. Prot. 21C-2, B/U O/C Prot., SOTF, Intertrip
BO5 0.2
Recv. Trip to K311 (86-1)
BO6 Spare 0.2
BO7 Spare 0.2
BO8 Spare 0.2
BO9 Spare 0.2
BO10 Spare 0.2
BO11 Spare 0.2
BO12 Spare 0.2

Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA


Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 12 of 39
SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)
CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

BO No. BO Assigned to Tested ( ) Remarks

BO13 Spare 0.2


BO14 Spare 0.2
BO15 Spare 0.2
Live Relay Fail 0.2
Contact

13. LED INDICATION:

LED No. LED Assigned to Tested ( ) Remarks

LED 1 Differential Trip Latched


LED 2 Distance Zone 1 Trip (SOTF Trip-Z1B) Latched
LED 3 Distance Zone 2 / Zone 3 Trip Latched
LED 4 Backup Over current Trip Latched
LED 5 Inter Trip Received Latched
LED 6 Inter Trip Send Latched
LED 7 Relay General Start Latched
LED 8 Differential Communication Channel 1 Fail Un Latched
LED 9 Differential Communication Channel 2 Fail Un Latched
LED 10 Differential Blocked Un Latched
LED 11 VT MCB Trip / VT Fuse Fail / Distance Blocked Un Latched
LED 12 Thermal Over Load Alarm Un Latched
LED 13 Remote Earth Switch Close Un Latched
LED 14 Remote Line Isolator Open Un Latched

14. FUNCTION KEY:

Function Key check:


F.Key Function Key Assigned to Tested ( ) Remarks
No.
F1 Differential Block OK
F2 Differential Release OK
F3 Last Fault OK
F4 I Diff. / I Rest. OK

15. FAULT RECORDER SIGNALS:

Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA


Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 13 of 39
SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)
CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

Digsi Online -> Test Fault Record -> Open Last recorded file and check the following signals are configured.

Fault Recorder Signal check: (Minimum Requirement As Per KM Standard)


1 Relay Pickup Phase A
2 Relay Pickup Phase B
3 Relay Pickup Phase C
4 Relay Pickup Ground
5 87 General Trip
6 87-1 Fault Detection
7 87-2 Fault Detection
8 Protection Interface 1 Failure (Diff. Comm. CH-1 Fail)
9 Protection Interface 2 Failure (Diff. Comm. CH-2 Fail)
10 87 is Blocked
11 Inter Trip Received CH 1
12 Inter Trip Received CH 2
13 Inter Trip Send CH 1
14 Inter Trip Send CH 2
15 21 General Trip
16 21 Z1 Pickup
17 21 Z1B Pickup (SOTF)
18 21 Z2 Pickup
19 21 Z3 Pickup
20 21 Z1 Trip with single Phase Fault
21 21 Z1 Trip with multi Phase Fault
22 21 Z1B Trip with single Phase Fault (SOTF)
23 21 Z1B Trip with multi Phase Fault (SOTF)
24 21 Z2 Trip
25 21 Z3 Trip
26 21 is Blocked
27 >Enable Z1B Instantaneous (SOTF)
28 VT MCB Trip
29 68 Power swing detected (PSB)
30 VT Fuse Fail>10s
31 VT Fuse Failure (Instantaneous)
32 49 Overload Alarm (Thermal OL Theta Alarm)
33 5X-B Pickup (Backup Over Current)
34 5X-B Trip (Backup Over Current)

16. FUNCTIONAL CHECK:


Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA
Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 14 of 39
SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)
CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

16.1. Tripping of CB/Lockout Relay on 87-1 Differential Trip : OK


16.2. Tripping of CB/Lockout Relay on 87-2 Differential Trip : OK
16.3. Diff. function blocked at both end when local end test switch in test position : OK
16.4. Diff. function blocked at both end when Remote end test switch in test position : OK
16.5. Diff. function blocked at both end when F1 Function Key is Pressed : OK
16.6. Diff. Prot. is blocked when both Communication Channels (FO Link) Fails : OK
16.7. Tripping of CB/Lockout Relay on 21 Distance Trip : OK
16.8. Tripping of CB/Lockout Relay on Z1B (SOTF) : OK
16.9. Tripping of CB/Lockout Relay on OC/EF Trip : OK
16.10. Tripping of Lockout Relay on Inter trip Received Trip : OK
16.11. Inter trip send on activation of binary input : OK
16.12. Test Switch Operation checked for tripping isolation : OK
16.13. Blocking of Zone 1 when Differential is Active : OK
16.14. Zone 1 Active with differential Inactive : OK
16.15. Intertrip send/Received checked on Diff. Block condition (Test block/Func. Key) : OK
16.16. PI unsymmetry auto reset Logic is implemented & Checked : OK

17. INSTRUMENTS USED:

Equipment Calibration due


Sl. No Description Make / Model Calibration date
Sl No. date

Secondary
1. Omicron-356 GK672N 14.11.2016 13.11.2017
Injection Kit

2. Multimeter Fluke 27350062 28.02.2016 27.02.2017

Remarks: Relay Found Healthy

18. Annexure

Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA


Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 15 of 39
SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)
CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

Reach Test:
. .
Test Object - Device Settings
. . .
Substation/Bay:
Substation: 66/11kV Substation Substation address: PSS-4
Bay: Cable Feeder Bay address: B30
. . .
Device:
Name/description: Line Diff + B/U Dist Manufacturer: Siemens
Device type: 7SD522 Device address: F871
Serial/model number: BF 1510509069
Additional info 1:
Additional info 2:
. . .
Nominal Values:
f nom: 50.00 Hz Number of phases: 3
V nom (secondary): 110.0 V V primary: 66.00 kV
I nom (secondary): 1.000 A I primary: 1.200 kA

Test Object - Distance Settings


Zone Settings:
Label Type Fault loop Trip time Tol.T rel Tol.T abs+ Tol.T abs- Tol.Z rel. Tol.Z abs
Z1 Tripping L-L 0.000 s 1.000 % 100.0 ms 100.0 ms 5.000 % 100.0 m
Z1 Tripping L-E 0.000 s 1.000 % 100.0 ms 100.0 ms 5.000 % 100.0 m
Z2 Tripping L-L 300.0 ms 1.000 % 100.0 ms 100.0 ms 5.000 % 100.0 m
Z2 Tripping L-E 300.0 ms 1.000 % 100.0 ms 100.0 ms 5.000 % 100.0 m
Z3 Tripping L-L 600.0 ms 1.000 % 100.0 ms 100.0 ms 5.000 % 100.0 m
Z3 Tripping L-E 600.0 ms 1.000 % 100.0 ms 100.0 ms 5.000 % 100.0 m
Z4 Tripping L-L 900.0 ms 1.000 % 100.0 ms 100.0 ms 5.000 % 100.0 m
Z4 Tripping L-E 900.0 ms 1.000 % 100.0 ms 100.0 ms 5.000 % 100.0 m

. .
Test Module
Name: OMICRON Advanced Distance Version: 3.00 SR 2
Test Start: 22-Nov-2016 11:41:27 Test End: 22-Nov-2016 11:55:38
User Name: Manager:
Company:

Test Results

Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA


Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 16 of 39
SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)
CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

Search Test: Fault Type L1-E

Zone Z act Phi act R act X act Assessed Qty. Nom. Dev. Result
Z1 2.516 0.00 2.516 0.000 |Z| 2.500 0.6297 % Passed
Z2 5.015 0.00 5.015 0.000 |Z| 5.000 0.3149 % Passed
Z4 11.96 0.00 11.96 0.000 |Z| 12.00 -0.3149 % Passed
Z1 2.494 85.00 217.3 m 2.484 |Z| 2.510 -0.6274 % Passed
Z2 5.003 85.00 436.1 m 4.984 |Z| 5.019 -0.3137 % Passed
Z4 12.01 85.00 1.047 11.96 |Z| 12.05 -0.3137 % Passed
Z1 2.516 90.00 0.000 2.516 |Z| 2.500 0.6274 % Passed
Z2 4.984 90.00 0.000 4.984 |Z| 5.000 -0.3137 % Passed
Z4 11.96 90.00 0.000 11.96 |Z| 12.00 -0.3137 % Passed
Z3 10.07 -95.00 -877.6 m -10.03 |Z| 10.04 0.3137 % Passed
Z4 12.01 -95.00 -1.047 -11.96 |Z| 12.05 -0.3137 % Passed
X/

10.0

7.5

5.0

2.5

0.0

-2.5

-5.0

-7.5

-10.0

-12.5

-15 -10 -5 0 5 10
R/

Search Test: Fault Type L2-E

Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA


Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 17 of 39
SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)
CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

Zone Z act Phi act R act X act Assessed Qty. Nom. Dev. Result
Z1 2.516 0.00 2.516 0.000 |Z| 2.500 0.6297 % Passed
Z2 5.015 0.00 5.015 0.000 |Z| 5.000 0.3149 % Passed
Z4 11.96 0.00 11.96 0.000 |Z| 12.00 -0.3149 % Passed
Z1 2.525 85.00 220.1 m 2.516 |Z| 2.510 0.6274 % Passed
Z2 5.035 85.00 438.8 m 5.016 |Z| 5.019 0.3137 % Passed
Z4 12.08 85.00 1.053 12.04 |Z| 12.05 0.3137 % Passed
Z1 2.516 90.00 0.000 2.516 |Z| 2.500 0.6274 % Passed
Z2 5.016 90.00 0.000 5.016 |Z| 5.000 0.3137 % Passed
Z4 12.04 90.00 0.000 12.04 |Z| 12.00 0.3137 % Passed
Z3 10.07 -95.00 -877.6 m -10.03 |Z| 10.04 0.3137 % Passed
Z4 12.08 -95.00 -1.053 -12.04 |Z| 12.05 0.3137 % Passed
X/

10.0

7.5

5.0

2.5

0.0

-2.5

-5.0

-7.5

-10.0

-12.5

-15 -10 -5 0 5 10
R/

Search Test: Fault Type L3-E

Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA


Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 18 of 39
SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)
CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

Zone Z act Phi act R act X act Assessed Qty. Nom. Dev. Result
Z1 2.516 0.00 2.516 0.000 |Z| 2.500 0.6297 % Passed
Z2 5.015 0.00 5.015 0.000 |Z| 5.000 0.3149 % Passed
Z4 11.96 0.00 11.96 0.000 |Z| 12.00 -0.3149 % Passed
Z1 2.525 85.00 220.1 m 2.516 |Z| 2.510 0.6274 % Passed
Z2 5.035 85.00 438.8 m 5.016 |Z| 5.019 0.3137 % Passed
Z4 12.08 85.00 1.053 12.04 |Z| 12.05 0.3137 % Passed
Z1 2.516 90.00 0.000 2.516 |Z| 2.500 0.6274 % Passed
Z2 5.016 90.00 0.000 5.016 |Z| 5.000 0.3137 % Passed
Z4 12.04 90.00 0.000 12.04 |Z| 12.00 0.3137 % Passed
Z3 10.07 -95.00 -877.6 m -10.03 |Z| 10.04 0.3137 % Passed
Z4 12.01 -95.00 -1.047 -11.96 |Z| 12.05 -0.3137 % Passed
X/

10.0

7.5

5.0

2.5

0.0

-2.5

-5.0

-7.5

-10.0

-12.5

-15 -10 -5 0 5 10
R/

Search Test: Fault Type L1-L2

Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA


Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 19 of 39
SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)
CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

Zone Z act Phi act R act X act Assessed Qty. Nom. Dev. Result
Z1 1.266 0.00 1.266 0.000 |Z| 1.250 1.26 % Passed
Z2 2.516 0.00 2.516 0.000 |Z| 2.500 0.6297 % Passed
Z4 12.04 0.00 12.04 0.000 |Z| 12.00 0.3149 % Passed
Z1 2.525 85.00 220.1 m 2.516 |Z| 2.510 0.6274 % Passed
Z2 5.035 85.00 438.8 m 5.016 |Z| 5.019 0.3137 % Passed
Z4 12.08 85.00 1.053 12.04 |Z| 12.05 0.3137 % Passed
Z1 2.516 90.00 0.000 2.516 |Z| 2.500 0.6274 % Passed
Z2 5.016 90.00 0.000 5.016 |Z| 5.000 0.3137 % Passed
Z4 12.04 90.00 0.000 12.04 |Z| 12.00 0.3137 % Passed
Z3 10.07 -95.00 -877.6 m -10.03 |Z| 10.04 0.3137 % Passed
Z4 12.08 -95.00 -1.053 -12.04 |Z| 12.05 0.3137 % Passed
X/

10.0

7.5

5.0

2.5

0.0

-2.5

-5.0

-7.5

-10.0

-12.5

-15 -10 -5 0 5 10
R/

Search Test: Fault Type L2-L3

Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA


Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 20 of 39
SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)
CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

Zone Z act Phi act R act X act Assessed Qty. Nom. Dev. Result
Z1 1.234 0.00 1.234 0.000 |Z| 1.250 -1.26 % Passed
Z2 2.516 0.00 2.516 0.000 |Z| 2.500 0.6297 % Passed
Z4 12.04 0.00 12.04 0.000 |Z| 12.00 0.3149 % Passed
Z1 2.494 85.00 217.3 m 2.484 |Z| 2.510 -0.6274 % Passed
Z2 5.003 85.00 436.1 m 4.984 |Z| 5.019 -0.3137 % Passed
Z4 12.01 85.00 1.047 11.96 |Z| 12.05 -0.3137 % Passed
Z1 2.484 90.00 0.000 2.484 |Z| 2.500 -0.6274 % Passed
Z2 4.984 90.00 0.000 4.984 |Z| 5.000 -0.3137 % Passed
Z4 12.04 90.00 0.000 12.04 |Z| 12.00 0.3137 % Passed
Z3 10.07 -95.00 -877.6 m -10.03 |Z| 10.04 0.3137 % Passed
Z4 12.01 -95.00 -1.047 -11.96 |Z| 12.05 -0.3137 % Passed
X/

10.0

7.5

5.0

2.5

0.0

-2.5

-5.0

-7.5

-10.0

-12.5

-15 -10 -5 0 5 10
R/

Search Test: Fault Type L3-L1

Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA


Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 21 of 39
SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)
CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

Zone Z act Phi act R act X act Assessed Qty. Nom. Dev. Result
Z1 1.234 0.00 1.234 0.000 |Z| 1.250 -1.26 % Passed
Z2 2.485 0.00 2.485 0.000 |Z| 2.500 -0.6297 % Passed
Z4 11.96 0.00 11.96 0.000 |Z| 12.00 -0.3149 % Passed
Z1 2.494 85.00 217.3 m 2.484 |Z| 2.510 -0.6274 % Passed
Z2 5.003 85.00 436.1 m 4.984 |Z| 5.019 -0.3137 % Passed
Z4 12.01 85.00 1.047 11.96 |Z| 12.05 -0.3137 % Passed
Z1 2.484 90.00 0.000 2.484 |Z| 2.500 -0.6274 % Passed
Z2 4.984 90.00 0.000 4.984 |Z| 5.000 -0.3137 % Passed
Z4 11.96 90.00 0.000 11.96 |Z| 12.00 -0.3137 % Passed
Z3 10.07 -95.00 -877.6 m -10.03 |Z| 10.04 0.3137 % Passed
Z4 12.08 -95.00 -1.053 -12.04 |Z| 12.05 0.3137 % Passed
X/

10.0

7.5

5.0

2.5

0.0

-2.5

-5.0

-7.5

-10.0

-12.5

-15 -10 -5 0 5 10
R/

Search Test: Fault Type L1-L2-L3

Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA


Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 22 of 39
SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)
CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

Zone Z act Phi act R act X act Assessed Qty. Nom. Dev. Result
Z1 1.266 0.00 1.266 0.000 |Z| 1.250 1.26 % Passed
Z2 2.516 0.00 2.516 0.000 |Z| 2.500 0.6297 % Passed
Z4 12.04 0.00 12.04 0.000 |Z| 12.00 0.3149 % Passed
Z1 2.525 85.00 220.1 m 2.516 |Z| 2.510 0.6274 % Passed
Z2 5.035 85.00 438.8 m 5.016 |Z| 5.019 0.3137 % Passed
Z4 12.08 85.00 1.053 12.04 |Z| 12.05 0.3137 % Passed
Z1 2.516 90.00 0.000 2.516 |Z| 2.500 0.6274 % Passed
Z2 5.016 90.00 0.000 5.016 |Z| 5.000 0.3137 % Passed
Z4 12.04 90.00 0.000 12.04 |Z| 12.00 0.3137 % Passed
Z3 10.07 -95.00 -877.6 m -10.03 |Z| 10.04 0.3137 % Passed
Z4 12.08 -95.00 -1.053 -12.04 |Z| 12.05 0.3137 % Passed
X/

10.0

7.5

5.0

2.5

0.0

-2.5

-5.0

-7.5

-10.0

-12.5

-15 -10 -5 0 5 10
R/

.
Test State:
Test passed

Timing Test:
Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA
Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 23 of 39
SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)
CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

. .
Test Object - Device Settings
. . .
Substation/Bay:
Substation: 66/11kV Substation Substation address: PSS-4
Bay: Cable Feeder Bay address: B30
. . .
Device:
Name/description: Line Diff + B/U Dist Manufacturer: Siemens
Device type: 7SD522 Device address: F871
Serial/model number: BF 1510509069
Additional info 1:
Additional info 2:
. . .
Nominal Values:
f nom: 50.00 Hz Number of phases: 3
V nom (secondary): 110.0 V V primary: 66.00 kV
I nom (secondary): 1.000 A I primary: 1.200 kA
. . .
Residual Voltage/Current Factors:
VLN / VN: 1.732 IN / I nom: 1.000
. . .
Limits:
V max: 500.0 V I max: 20.00 A
. . .
Debounce/Deglitch Filters:
Debounce time: 5.000 ms Deglitch time: 0.000 s
. . .
Overload Detection:
Suppression time: 50.00 ms

Test Object - Distance Settings


Zone Settings:
Label Type Fault loop Trip time Tol.T rel Tol.T abs+ Tol.T abs- Tol.Z rel. Tol.Z abs
Z1 Tripping L-L 0.000 s 1.000 % 100.0 ms 100.0 ms 5.000 % 100.0 m
Z1 Tripping L-E 0.000 s 1.000 % 100.0 ms 100.0 ms 5.000 % 100.0 m
Z2 Tripping L-L 300.0 ms 1.000 % 100.0 ms 100.0 ms 5.000 % 100.0 m
Z2 Tripping L-E 300.0 ms 1.000 % 100.0 ms 100.0 ms 5.000 % 100.0 m
Z3 Tripping L-L 600.0 ms 1.000 % 100.0 ms 100.0 ms 5.000 % 100.0 m
Z3 Tripping L-E 600.0 ms 1.000 % 100.0 ms 100.0 ms 5.000 % 100.0 m
Z4 Tripping L-L 900.0 ms 1.000 % 100.0 ms 100.0 ms 5.000 % 100.0 m
Z4 Tripping L-E 900.0 ms 1.000 % 100.0 ms 100.0 ms 5.000 % 100.0 m

. .

Test Module

Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA


Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 24 of 39
SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)
CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

Name: OMICRON Advanced Distance Version: 3.00 SR 2


Test Start: 22-Nov-2016 11:58:33 Test End: 22-Nov-2016 12:02:19
User Name: Manager:
Company:

Test Results
Shot Test: Fault Type L1-E
|Z| Phi % % of t nom t act. Dev. ITest Result
2.233 85.00 n/a 0.000 s 39.20 ms 39.20 ms 1.000 A Passed
2.786 85.00 n/a 300.0 ms 328.3 ms 9.433 % 1.000 A Passed
4.697 85.00 n/a 300.0 ms 344.7 ms 14.9 % 1.000 A Passed
5.254 85.00 n/a 900.0 ms 934.9 ms 3.878 % 1.000 A Passed
11.38 85.00 n/a 900.0 ms 936.9 ms 4.1 % 1.000 A Passed
12.44 85.00 n/a no trip no trip 1.000 A Passed
9.426 -95.00 n/a 600.0 ms 627.8 ms 4.633 % 1.000 A Passed
10.38 -95.00 n/a 900.0 ms 937.2 ms 4.133 % 1.000 A Passed
11.53 -95.00 n/a 900.0 ms 936.8 ms 4.089 % 1.000 A Passed
12.47 -95.00 n/a no trip no trip 1.000 A Passed

X/

10.0

7.5

5.0

2.5

0.0

-2.5

-5.0

-7.5

-10.0

-12.5

-12.5 -10.0 -7.5 -5.0 -2.5 0.0 2.5 5.0 7.5 10.0
R/

Shot Test: Fault Type L2-E


|Z| Phi % % of t nom t act. Dev. ITest Result
Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA
Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 25 of 39
SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)
CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

2.233 85.00 n/a 0.000 s 39.40 ms 39.40 ms 1.000 A Passed


2.786 85.00 n/a 300.0 ms 325.9 ms 8.633 % 1.000 A Passed
4.697 85.00 n/a 300.0 ms 337.3 ms 12.43 % 1.000 A Passed
5.254 85.00 n/a 900.0 ms 934.7 ms 3.856 % 1.000 A Passed
11.38 85.00 n/a 900.0 ms 935.5 ms 3.944 % 1.000 A Passed
12.44 85.00 n/a no trip no trip 1.000 A Passed
9.426 -95.00 n/a 600.0 ms 617.9 ms 2.983 % 1.000 A Passed
10.38 -95.00 n/a 900.0 ms 935.6 ms 3.956 % 1.000 A Passed
11.53 -95.00 n/a 900.0 ms 938.3 ms 4.256 % 1.000 A Passed
12.47 -95.00 n/a no trip no trip 1.000 A Passed

X/

10.0

7.5

5.0

2.5

0.0

-2.5

-5.0

-7.5

-10.0

-12.5

-12.5 -10.0 -7.5 -5.0 -2.5 0.0 2.5 5.0 7.5 10.0
R/

Shot Test: Fault Type L3-E


|Z| Phi % % of t nom t act. Dev. ITest Result

Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA


Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 26 of 39
SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)
CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

2.233 85.00 n/a 0.000 s 38.60 ms 38.60 ms 1.000 A Passed


2.786 85.00 n/a 300.0 ms 338.9 ms 12.97 % 1.000 A Passed
4.697 85.00 n/a 300.0 ms 344.9 ms 14.97 % 1.000 A Passed
5.254 85.00 n/a 900.0 ms 945.4 ms 5.044 % 1.000 A Passed
11.38 85.00 n/a 900.0 ms 949.1 ms 5.456 % 1.000 A Passed
12.44 85.00 n/a no trip no trip 1.000 A Passed
9.426 -95.00 n/a 600.0 ms 628.6 ms 4.767 % 1.000 A Passed
10.38 -95.00 n/a 900.0 ms 947.6 ms 5.289 % 1.000 A Passed
11.53 -95.00 n/a 900.0 ms 947.5 ms 5.278 % 1.000 A Passed
12.47 -95.00 n/a no trip no trip 1.000 A Passed

X/

10.0

7.5

5.0

2.5

0.0

-2.5

-5.0

-7.5

-10.0

-12.5

-12.5 -10.0 -7.5 -5.0 -2.5 0.0 2.5 5.0 7.5 10.0
R/

Shot Test: Fault Type L1-L2


|Z| Phi % % of t nom t act. Dev. ITest Result

Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA


Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 27 of 39
SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)
CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

2.233 85.00 n/a 0.000 s 36.70 ms 36.70 ms 1.000 A Passed


2.786 85.00 n/a 300.0 ms 327.9 ms 9.3 % 1.000 A Passed
4.697 85.00 n/a 300.0 ms 336.2 ms 12.07 % 1.000 A Passed
5.254 85.00 n/a 900.0 ms 937.0 ms 4.111 % 1.000 A Passed
11.38 85.00 n/a 900.0 ms 937.4 ms 4.156 % 1.000 A Passed
12.44 85.00 n/a no trip no trip 1.000 A Passed
9.426 -95.00 n/a 600.0 ms 614.8 ms 2.467 % 1.000 A Passed
10.38 -95.00 n/a 900.0 ms 935.6 ms 3.956 % 1.000 A Passed
11.53 -95.00 n/a 900.0 ms 936.4 ms 4.044 % 1.000 A Passed
12.47 -95.00 n/a no trip no trip 1.000 A Passed

X/

10.0

7.5

5.0

2.5

0.0

-2.5

-5.0

-7.5

-10.0

-12.5

-12.5 -10.0 -7.5 -5.0 -2.5 0.0 2.5 5.0 7.5 10.0
R/

Shot Test: Fault Type L2-L3


|Z| Phi % % of t nom t act. Dev. ITest Result

Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA


Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 28 of 39
SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)
CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

2.233 85.00 n/a 0.000 s 36.50 ms 36.50 ms 1.000 A Passed


2.786 85.00 n/a 300.0 ms 324.8 ms 8.267 % 1.000 A Passed
4.697 85.00 n/a 300.0 ms 337.7 ms 12.57 % 1.000 A Passed
5.254 85.00 n/a 900.0 ms 937.0 ms 4.111 % 1.000 A Passed
11.38 85.00 n/a 900.0 ms 935.6 ms 3.956 % 1.000 A Passed
12.44 85.00 n/a no trip no trip 1.000 A Passed
9.426 -95.00 n/a 600.0 ms 627.6 ms 4.6 % 1.000 A Passed
10.38 -95.00 n/a 900.0 ms 949.3 ms 5.478 % 1.000 A Passed
11.53 -95.00 n/a 900.0 ms 947.3 ms 5.256 % 1.000 A Passed
12.47 -95.00 n/a no trip no trip 1.000 A Passed

X/

10.0

7.5

5.0

2.5

0.0

-2.5

-5.0

-7.5

-10.0

-12.5

-12.5 -10.0 -7.5 -5.0 -2.5 0.0 2.5 5.0 7.5 10.0
R/

Shot Test: Fault Type L3-L1


|Z| Phi % % of t nom t act. Dev. ITest Result

Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA


Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 29 of 39
SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)
CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

2.233 85.00 n/a 0.000 s 36.50 ms 36.50 ms 1.000 A Passed


2.786 85.00 n/a 300.0 ms 338.4 ms 12.8 % 1.000 A Passed
4.697 85.00 n/a 300.0 ms 349.3 ms 16.43 % 1.000 A Passed
5.254 85.00 n/a 900.0 ms 948.3 ms 5.367 % 1.000 A Passed
11.38 85.00 n/a 900.0 ms 949.3 ms 5.478 % 1.000 A Passed
12.44 85.00 n/a no trip no trip 1.000 A Passed
9.426 -95.00 n/a 600.0 ms 618.5 ms 3.083 % 1.000 A Passed
10.38 -95.00 n/a 900.0 ms 936.6 ms 4.067 % 1.000 A Passed
11.53 -95.00 n/a 900.0 ms 937.2 ms 4.133 % 1.000 A Passed
12.47 -95.00 n/a no trip no trip 1.000 A Passed

X/

10.0

7.5

5.0

2.5

0.0

-2.5

-5.0

-7.5

-10.0

-12.5

-12.5 -10.0 -7.5 -5.0 -2.5 0.0 2.5 5.0 7.5 10.0
R/

Shot Test: Fault Type L1-L2-L3


|Z| Phi % % of t nom t act. Dev. ITest Result

Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA


Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 30 of 39
SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)
CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

2.233 85.00 n/a 0.000 s 34.90 ms 34.90 ms 1.000 A Passed


2.786 85.00 n/a 300.0 ms 338.2 ms 12.73 % 1.000 A Passed
4.697 85.00 n/a 300.0 ms 337.0 ms 12.33 % 1.000 A Passed
5.254 85.00 n/a 900.0 ms 936.7 ms 4.078 % 1.000 A Passed
11.38 85.00 n/a 900.0 ms 934.6 ms 3.844 % 1.000 A Passed
12.44 85.00 n/a no trip no trip 1.000 A Passed
9.426 -95.00 n/a 600.0 ms 617.3 ms 2.883 % 1.000 A Passed
10.38 -95.00 n/a 900.0 ms 936.2 ms 4.022 % 1.000 A Passed
11.53 -95.00 n/a 900.0 ms 938.8 ms 4.311 % 1.000 A Passed
12.47 -95.00 n/a no trip no trip 1.000 A Passed

X/

10.0

7.5

5.0

2.5

0.0

-2.5

-5.0

-7.5

-10.0

-12.5

-12.5 -10.0 -7.5 -5.0 -2.5 0.0 2.5 5.0 7.5 10.0
R/

.
Test State:
Test passed

Z1B Reach Test:


Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA
Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 31 of 39
SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)
CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

. .
Test Object - Device Settings
. . .
Substation/Bay:
Substation: 66/11kV Substation Substation address: PSS-4
Bay: Cable Feeder Bay address: B30
. . .
Device:
Name/description: Line Diff + B/U Dist Manufacturer: Siemens
Device type: 7SD522 Device address: F871
Serial/model number: BF 1510509069
Additional info 1:
Additional info 2:
. . .
Nominal Values:
f nom: 50.00 Hz Number of phases: 3
V nom (secondary): 110.0 V V primary: 66.00 kV
I nom (secondary): 1.000 A I primary: 1.200 kA

Test Object - Distance Settings


Zone Settings:
Label Type Fault loop Trip time Tol.T rel Tol.T abs+ Tol.T abs- Tol.Z rel. Tol.Z abs
Z1B extended L-L 0.000 s 1.000 % 100.0 ms 100.0 ms 5.000 % 100.0 m
Z1B extended L-E 0.000 s 1.000 % 100.0 ms 100.0 ms 5.000 % 100.0 m

. .
Test Module
Name: OMICRON Advanced Distance Version: 3.00 SR 2
Test Start: 22-Nov-2016 12:03:02 Test End: 22-Nov-2016 12:04:19
User Name: Manager:
Company:

Test Results

Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA


Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 32 of 39
SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)
CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

Search Test: Fault Type L1-E

Zone Z act Phi act R act X act Assessed Qty. Nom. Dev. Result
Z1B 3.019 0.00 3.019 0.000 |Z| 3.000 0.6297 % Passed
Z1B 2.993 85.00 260.8 m 2.981 |Z| 3.011 -0.6274 % Passed
Z1B 2.981 90.00 0.000 2.981 |Z| 3.000 -0.6274 % Passed
X/

5.0

4.0

3.0

2.0

1.0

0.0

-1.0 0.0 1.0 2.0 3.0 4.0 5.0


R/

Search Test: Fault Type L2-E

Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA


Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 33 of 39
SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)
CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

Zone Z act Phi act R act X act Assessed Qty. Nom. Dev. Result
Z1B 3.019 0.00 3.019 0.000 |Z| 3.000 0.6297 % Passed
Z1B 3.030 85.00 264.1 m 3.019 |Z| 3.011 0.6274 % Passed
Z1B 3.019 90.00 0.000 3.019 |Z| 3.000 0.6274 % Passed
X/

5.0

4.0

3.0

2.0

1.0

0.0

-1.0 0.0 1.0 2.0 3.0 4.0 5.0


R/

Search Test: Fault Type L3-E

Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA


Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 34 of 39
SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)
CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

Zone Z act Phi act R act X act Assessed Qty. Nom. Dev. Result
Z1B 3.019 0.00 3.019 0.000 |Z| 3.000 0.6297 % Passed
Z1B 3.030 85.00 264.1 m 3.019 |Z| 3.011 0.6274 % Passed
Z1B 3.019 90.00 0.000 3.019 |Z| 3.000 0.6274 % Passed
X/

5.0

4.0

3.0

2.0

1.0

0.0

-1.0 0.0 1.0 2.0 3.0 4.0 5.0


R/

Search Test: Fault Type L1-L2

Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA


Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 35 of 39
SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)
CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

Zone Z act Phi act R act X act Assessed Qty. Nom. Dev. Result
Z1B 1.519 0.00 1.519 0.000 |Z| 1.500 1.259 % Passed
Z1B 3.030 85.00 264.1 m 3.019 |Z| 3.011 0.6274 % Passed
Z1B 3.019 90.00 0.000 3.019 |Z| 3.000 0.6274 % Passed
X/

5.0

4.0

3.0

2.0

1.0

0.0

-1.0 0.0 1.0 2.0 3.0 4.0 5.0


R/

Search Test: Fault Type L2-L3

Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA


Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 36 of 39
SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)
CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

Zone Z act Phi act R act X act Assessed Qty. Nom. Dev. Result
Z1B 1.481 0.00 1.481 0.000 |Z| 1.500 -1.259 % Passed
Z1B 2.993 85.00 260.8 m 2.981 |Z| 3.011 -0.6274 % Passed
Z1B 2.981 90.00 0.000 2.981 |Z| 3.000 -0.6274 % Passed
X/

5.0

4.0

3.0

2.0

1.0

0.0

-1.0 0.0 1.0 2.0 3.0 4.0 5.0


R/

Search Test: Fault Type L3-L1

Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA


Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 37 of 39
SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)
CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

Zone Z act Phi act R act X act Assessed Qty. Nom. Dev. Result
Z1B 1.481 0.00 1.481 0.000 |Z| 1.500 -1.259 % Passed
Z1B 2.993 85.00 260.8 m 2.981 |Z| 3.011 -0.6274 % Passed
Z1B 2.981 90.00 0.000 2.981 |Z| 3.000 -0.6274 % Passed
X/

5.0

4.0

3.0

2.0

1.0

0.0

-1.0 0.0 1.0 2.0 3.0 4.0 5.0


R/

Search Test: Fault Type L1-L2-L3

Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA


Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 38 of 39
SITE ACCEPTANCE TEST FORMAT FOR LINE DIFFERENTIAL RELAY - 7SD522 (87C+ BU 21)
CLIENT: CONSULTANT: MAIN CONTRACTOR:

QATAR POWER TRANSMISSION SYSTEM EXPANSION Contract No. : GTC/488G/2012


PHASE 11 ADDENDUM SUBSTATIONS PACKAGE S-17, S-18 Date : 22.11.2016
Name of Substation : 66/11 kV PSS-4 Substation Bay Number : B30
Name of Equipment : Line Differential & Backup Distance Relay Main-1 (F871) Manufacturer : SIEMENS

Zone Z act Phi act R act X act Assessed Qty. Nom. Dev. Result
Z1B 1.519 0.00 1.519 0.000 |Z| 1.500 1.259 % Passed
Z1B 3.030 85.00 264.1 m 3.019 |Z| 3.011 0.6274 % Passed
Z1B 3.019 90.00 0.000 3.019 |Z| 3.000 0.6274 % Passed
X/

5.0

4.0

3.0

2.0

1.0

0.0

-1.0 0.0 1.0 2.0 3.0 4.0 5.0


R/

.
Test State:
Test passed

Tested by SIEMENS/NCC Verified by ENERGOPROJEKT/ KAHRAMAA


Signature Signature

Name Ritul Prajapati Name R. Ganesh Babu


Date 22.11.2016 Date 22.11.2016
Doc.No. PH11-8G-244-36-P034 Rev. 0 Annexure 2 Page No. 39 of 39