Professional Documents
Culture Documents
PRESUPUESTO
PROPIETARIO:
45 mecanico (vailarina)
FECHA: 2/27/2016
PU TOTAL
1,070.18 85,614.55
4,829.37 96,587.36
15,885.36 857,809.66
3,203.90 25,631.21
7,633.13 131,900.43
7,633.13 -
40,984.74 262,302.35
40,984.74 104,920.94
26,035.79 37,960.17
33,625.18 29,052.16
1,516.53 144,713.17
1,562.50 101,009.81
1,488.61 151,780.66
36,175.03 166,694.54
9,409.53 135,497.24
36,175.03 46,882.84
3,038.88 28,006.28
7,914.88 8,864.66
16,542.15 37,054.42
1,516.53 1,810,723.60
1,488.61 405,663.76
36,175.03 243,096.21
12,647.93 682,988.26
16,542.15 132,337.22
12,600.09 100,800.74
1,308.51 140,272.41
36,175.03 723,500.61
1,047.62 1,717,366.38
1,454.95 840,963.61
1,454.95 336,385.44
193.20 44,514.01
193.20 89,028.02
193.20 479,901.24
23,502.82 1,880,225.46
1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DEPRECIACION
estacas de madera pza 4.00 1.00
pintura blanca esmalte gl 0.10 1.00
1.00
1.00
1.00
TOTAL DE MATERIALES
UNITARIO DE MATERIALES
2. EQUIPOS
DESCRIPCION CANTIDAD COSTO DEPRECIACION
gps de topografia 1.00000 345,000.00 0.001200
3. MANO DE OBRA
DESCRIPCION CANTIDAD SALARIO
topografo 1.00000 2,000.00
ayudante topografo 2.00000 1,200.00
PRECIO UNITARIO
UNIDAD m3 RENDIMIENTO 100.000000
CANTIDAD 20.00 CODIGO COV. S/C
Descripcion de la obra:
Descripcion de la partida: Acondicionamiento del terreno
1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DEPRECIACION
nulon rollo 1.00 1.00
cabilla 3/8" x 0,40cm pza 4.00 1.00
1.00
1.00
1.00
TOTAL DE MATERIALES
UNITARIO DE MATERIALES
2. EQUIPOS
DESCRIPCION CANTIDAD COSTO DEPRECIACION
Herramientas menores, pico, pala, carretilla 1.00000 13,456.00 0.045200
UNITARIO DE EQUIPOS
3. MANO DE OBRA
DESCRIPCION CANTIDAD SALARIO
maestro de obra 1.00000 1,500.00
ayudante 2.00000 1,200.00
obrero 4.00000 1,000.00
1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DEPRECIACION
material de relleno m3 1.00 1.00
1.00
1.00
1.00
1.00
TOTAL DE MATERIALES
UNITARIO DE MATERIALES
2. EQUIPOS
DESCRIPCION CANTIDAD COSTO DEPRECIACION
camion volteo 1.00000 8,200,000.00 0.000250
retroexcavadora 1.00000 30,800,000.00 0.002500
UNITARIO DE EQUIPOS
3. MANO DE OBRA
DESCRIPCION CANTIDAD SALARIO
maestro de obra 1.00000 1,500.00
operador de equipo pesado 1.00000 1,500.00
chofer 1.00000 1,500.00
ayudante 2.00000 1,200.00
obrero 5.00000 1,000.00
1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DEPRECIACION
1.00
1.00
1.00
1.00
1.00
TOTAL DE MATERIALES
UNITARIO DE MATERIALES
2. EQUIPOS
DESCRIPCION CANTIDAD COSTO DEPRECIACION
vibro compactadora 450 kg 1.00000 20,000.00 0.250000
Herramientas menores, pico, pala, carretilla 1.00000 13,456.00 0.045200
UNITARIO DE EQUIPOS
3. MANO DE OBRA
DESCRIPCION CANTIDAD SALARIO
maestro de obra 1.00000 1,500.00
ayudante 2.00000 1,200.00
obrero 5.00000 1,000.00
1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DEPRECIACION
1.00
1.00
1.00
1.00
1.00
TOTAL DE MATERIALES
UNITARIO DE MATERIALES
2. EQUIPOS
DESCRIPCION CANTIDAD COSTO DEPRECIACION
retroexcavadora 1.00000 30,800,000.00 0.002500
Herramientas menores, pico, pala, carretilla 1.00000 13,456.00 0.045200
UNITARIO DE EQUIPOS
3. MANO DE OBRA
DESCRIPCION CANTIDAD SALARIO
maestro de obra 1.00000 1,500.00
ayudante 2.00000 1,200.00
obrero 5.00000 1,000.00
operador de equipo pesado 1.00000 1,500.00
1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DEPRECIACION
1.00
1.00
1.00
1.00
1.00
TOTAL DE MATERIALES
UNITARIO DE MATERIALES
2. EQUIPOS
DESCRIPCION CANTIDAD COSTO DEPRECIACION
retroexcavadora 1.00000 30,800,000.00 0.002500
Herramientas menores, pico, pala, carretilla 1.00000 13,456.00 0.045200
UNITARIO DE EQUIPOS
3. MANO DE OBRA
DESCRIPCION CANTIDAD SALARIO
maestro de obra 1.00000 1,500.00
ayudante 2.00000 1,200.00
obrero 5.00000 1,000.00
operador de equipo pesado 1.00000 1,500.00
ANALISIS DE PRECIOS UNITARIOS
1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DEPRECIACION
1.00
1.00
1.00
1.00
1.00
TOTAL DE MATERIALES
UNITARIO DE MATERIALES
2. EQUIPOS
DESCRIPCION CANTIDAD COSTO DEPRECIACION
UNITARIO DE EQUIPOS
3. MANO DE OBRA
DESCRIPCION CANTIDAD SALARIO
maestro de obra 1.00000 1,500.00
ayudante 2.00000 1,200.00
obrero 5.00000 1,000.00
ANALISIS DE PRECIOS UNITARIOS
1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DEPRECIACION
1.00
1.00
1.00
1.00
1.00
TOTAL DE MATERIALES
UNITARIO DE MATERIALES
2. EQUIPOS
DESCRIPCION CANTIDAD COSTO DEPRECIACION
UNITARIO DE EQUIPOS
3. MANO DE OBRA
DESCRIPCION CANTIDAD SALARIO
maestro de obra 1.00000 1,500.00
ayudante 2.00000 1,200.00
ANALISIS DE PRECIOS UNITARIOS
mecanico (vailarina)
1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DEPRECIACION
1.00
1.00
1.00
1.00
1.00
TOTAL DE MATERIALES
UNITARIO DE MATERIALES
2. EQUIPOS
DESCRIPCION CANTIDAD COSTO DEPRECIACION
vibro compactadora de aire 1.00000 17,000.00 0.250000
Herramientas menores, pico, pala, carretilla 1.00000 13,456.00 0.045200
UNITARIO DE EQUIPOS
3. MANO DE OBRA
DESCRIPCION CANTIDAD SALARIO
ANALISIS DE PRECIOS UNITARIOS
1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DEPRECIACION
concreto premezclado Rcc 180 kg/cm2 m3 1.00 1.00
1.00
1.00
1.00
1.00
TOTAL DE MATERIALES
UNITARIO DE MATERIALES
2. EQUIPOS
DESCRIPCION CANTIDAD COSTO DEPRECIACION
vibrador para concreto 1.00000 35,000.00 0.250000
Herramientas menores, pico, pala, carretilla 1.00000 13,456.00 0.045200
UNITARIO DE EQUIPOS
ANALISIS DE PRECIOS UNITARIOS
3. MANO DE OBRA
DESCRIPCION CANTIDAD SALARIO
maestro de obra 1.00000 1,500.00
ayudante 2.00000 1,200.00
obrero 5.00000 1,000.00
1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DEPRECIACION
cabilla estriada de 1/2" fy=4200 kg/cm2 kg 1.00 1.00
alambre cal. 18 kg 0.10 1.00
1.00
1.00
1.00
TOTAL DE MATERIALES
UNITARIO DE MATERIALES
2. EQUIPOS
DESCRIPCION CANTIDAD COSTO DEPRECIACION
dobladora de cabilla 1.00000 5,000.00 0.250000
Herramientas menores, tenaza, cegueta, alicate 1.00000 13,456.00 0.045200
ANALISIS DE PRECIOS UNITARIOS
UNITARIO DE EQUIPOS
3. MANO DE OBRA
DESCRIPCION CANTIDAD SALARIO
maestro de obra 1.00000 1,500.00
ayudante 2.00000 1,200.00
obrero 2.00000 1,000.00
cabillero 1ra 1.00000 1,500.00
1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DEPRECIACION
cabilla estriada de 5/8" fy=4200 kg/cm2 kg 1.00 1.00
alambre cal. 18 kg 0.10 1.00
1.00
1.00
1.00
TOTAL DE MATERIALES
UNITARIO DE MATERIALES
2. EQUIPOS
DESCRIPCION CANTIDAD COSTO DEPRECIACION
dobladora de cabilla 1.00000 5,000.00 0.250000
Herramientas menores, tenaza, cegueta, alicate 1.00000 13,456.00 0.045200
ANALISIS DE PRECIOS UNITARIOS
UNITARIO DE EQUIPOS
3. MANO DE OBRA
DESCRIPCION CANTIDAD SALARIO
maestro de obra 1.00000 1,500.00
ayudante 2.00000 1,200.00
obrero 2.00000 1,000.00
cabillero 1ra 1.00000 1,500.00
1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DEPRECIACION
cabilla estriada de 3/8" fy=4200 kg/cm2 kg 1.00 1.00
alambre cal. 18 kg 0.10 1.00
1.00
1.00
1.00
TOTAL DE MATERIALES
UNITARIO DE MATERIALES
2. EQUIPOS
DESCRIPCION CANTIDAD COSTO DEPRECIACION
dobladora de cabilla 1.00000 5,000.00 0.250000
Herramientas menores, tenaza, cegueta, alicate 1.00000 13,456.00 0.045200
ANALISIS DE PRECIOS UNITARIOS
UNITARIO DE EQUIPOS
3. MANO DE OBRA
DESCRIPCION CANTIDAD SALARIO
maestro de obra 1.00000 1,500.00
ayudante 2.00000 1,200.00
obrero 2.00000 1,000.00
cabillero 1ra 1.00000 1,500.00
1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DEPRECIACION
concreto premezclado Rcc 250 kg/cm2 m3 1.00 1.00
1.00
1.00
1.00
1.00
TOTAL DE MATERIALES
UNITARIO DE MATERIALES
2. EQUIPOS
DESCRIPCION CANTIDAD COSTO DEPRECIACION
vibrador para concreto 1.00000 35,000.00 0.250000
ANALISIS DE PRECIOS UNITARIOS
UNITARIO DE EQUIPOS
3. MANO DE OBRA
DESCRIPCION CANTIDAD SALARIO
maestro de obra 1.00000 1,500.00
ayudante 2.00000 1,200.00
obrero 5.00000 1,000.00
1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DEPRECIACION
madera saki saki m3 0.25 1.00
cuarton 4x4 m3 0.15 1.00
clavos 2"x1.5 kg 0.20 1.00
alambre cal. 18 kg 0.10 1.00
1.00
TOTAL DE MATERIALES
UNITARIO DE MATERIALES
2. EQUIPOS
ANALISIS DE PRECIOS UNITARIOS
UNITARIO DE EQUIPOS
3. MANO DE OBRA
DESCRIPCION CANTIDAD SALARIO
maestro de obra 1.00000 1,500.00
ayudante 2.00000 1,200.00
obrero 2.00000 1,000.00
carpintero 1ra 1.00000 1,500.00
1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DEPRECIACION
concreto premezclado Rcc 250 kg/cm2 m3 1.00 1.00
1.00
1.00
1.00
1.00
TOTAL DE MATERIALES
ANALISIS DE PRECIOS UNITARIOS
UNITARIO DE MATERIALES
2. EQUIPOS
DESCRIPCION CANTIDAD COSTO DEPRECIACION
vibrador para concreto 1.00000 35,000.00 0.250000
Herramientas menores, pico, pala, carretilla 1.00000 13,456.00 0.045200
UNITARIO DE EQUIPOS
3. MANO DE OBRA
DESCRIPCION CANTIDAD SALARIO
maestro de obra 1.00000 1,500.00
ayudante 2.00000 1,200.00
obrero 5.00000 1,000.00
1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DEPRECIACION
1.00
1.00
1.00
1.00
ANALISIS DE PRECIOS UNITARIOS
1.00
TOTAL DE MATERIALES
UNITARIO DE MATERIALES
2. EQUIPOS
DESCRIPCION CANTIDAD COSTO DEPRECIACION
vibro compactadora de aire 1.00000 17,000.00 0.250000
Herramientas menores, pico, pala, carretilla 1.00000 13,456.00 0.045200
UNITARIO DE EQUIPOS
3. MANO DE OBRA
DESCRIPCION CANTIDAD SALARIO
maestro de obra 1.00000 1,500.00
operador de equipo liviano 1.00000 1,500.00
ayudante 2.00000 1,200.00
obrero 5.00000 1,000.00
de riostras
1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DEPRECIACION
1.00
1.00
ANALISIS DE PRECIOS UNITARIOS
1.00
1.00
1.00
TOTAL DE MATERIALES
UNITARIO DE MATERIALES
2. EQUIPOS
DESCRIPCION CANTIDAD COSTO DEPRECIACION
vibro compactadora de aire 1.00000 17,000.00 0.250000
Herramientas menores, pico, pala, carretilla 1.00000 13,456.00 0.045200
UNITARIO DE EQUIPOS
3. MANO DE OBRA
DESCRIPCION CANTIDAD SALARIO
maestro de obra 1.00000 1,500.00
ayudante 2.00000 1,200.00
obrero 5.00000 1,000.00
1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DEPRECIACION
ANALISIS DE PRECIOS UNITARIOS
1.00
1.00
1.00
TOTAL DE MATERIALES
UNITARIO DE MATERIALES
2. EQUIPOS
DESCRIPCION CANTIDAD COSTO DEPRECIACION
camion volteo 1.00000 8,200,000.00 0.000250
retroexcavadora 1.00000 30,800,000.00 0.002500
UNITARIO DE EQUIPOS
3. MANO DE OBRA
DESCRIPCION CANTIDAD SALARIO
maestro de obra 1.00000 1,500.00
operador de equipo pesado 1.00000 1,500.00
chofer 1.00000 1,500.00
ayudante 2.00000 1,200.00
obrero 5.00000 1,000.00
0
ANALISIS DE PRECIOS UNITARIOS
1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DEPRECIACION
cabilla estriada de 1/2" fy=4200 kg/cm2 kg 1.00 1.00
alambre cal. 18 kg 0.10 1.00
1.00
1.00
1.00
TOTAL DE MATERIALES
UNITARIO DE MATERIALES
2. EQUIPOS
DESCRIPCION CANTIDAD COSTO DEPRECIACION
dobladora de cabilla 1.00000 5,000.00 0.250000
Herramientas menores, tenaza, cegueta, alicate 1.00000 13,456.00 0.045200
UNITARIO DE EQUIPOS
3. MANO DE OBRA
DESCRIPCION CANTIDAD SALARIO
maestro de obra 1.00000 1,500.00
ayudante 2.00000 1,200.00
obrero 2.00000 1,000.00
cabillero 1ra 1.00000 1,500.00
1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DEPRECIACION
cabilla estriada de 3/8" fy=4200 kg/cm2 kg 1.00 1.00
alambre cal. 18 kg 0.10 1.00
1.00
1.00
1.00
TOTAL DE MATERIALES
UNITARIO DE MATERIALES
2. EQUIPOS
DESCRIPCION CANTIDAD COSTO DEPRECIACION
dobladora de cabilla 1.00000 5,000.00 0.250000
Herramientas menores, tenaza, cegueta, alicate 1.00000 13,456.00 0.045200
UNITARIO DE EQUIPOS
3. MANO DE OBRA
DESCRIPCION CANTIDAD SALARIO
maestro de obra 1.00000 1,500.00
ayudante 2.00000 1,200.00
obrero 2.00000 1,000.00
cabillero 1ra 1.00000 1,500.00
1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DEPRECIACION
concreto premezclado Rcc 250 kg/cm2 m3 1.00 1.00
1.00
1.00
1.00
1.00
TOTAL DE MATERIALES
UNITARIO DE MATERIALES
2. EQUIPOS
DESCRIPCION CANTIDAD COSTO DEPRECIACION
vibrador para concreto 1.00000 35,000.00 0.250000
Herramientas menores, pico, pala, carretilla 1.00000 13,456.00 0.045200
UNITARIO DE EQUIPOS
3. MANO DE OBRA
DESCRIPCION CANTIDAD SALARIO
maestro de obra 1.00000 1,500.00
ayudante 2.00000 1,200.00
obrero 5.00000 1,000.00
1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DEPRECIACION
encofrado metalico ml 1.00 1.00
cabilla 3/8" x 0,40cm pza 4.00 1.00
1.00
TOTAL DE MATERIALES
UNITARIO DE MATERIALES
2. EQUIPOS
DESCRIPCION CANTIDAD COSTO DEPRECIACION
equipo de herreria 1.00000 85,000.00 0.250000
Herramientas menores, martillo, metro, 1.00000 13,456.00 0.045200
UNITARIO DE EQUIPOS
3. MANO DE OBRA
DESCRIPCION CANTIDAD SALARIO
maestro de obra 1.00000 1,500.00
ayudante 2.00000 1,200.00
obrero 2.00000 1,000.00
PRECIO UNITARIO
UNIDAD m3 RENDIMIENTO 75.00
CANTIDAD 8.00 CODIGO COV. S/C
Descripcion de la obra:
Descripcion de la partida: Suministro, transporte y colocacion de material granular
1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DEPRECIACION
material granular grava m3 1.00 1.00
1.00
1.00
1.00
1.00
TOTAL DE MATERIALES
UNITARIO DE MATERIALES
2. EQUIPOS
DESCRIPCION CANTIDAD COSTO DEPRECIACION
camion volteo 1.00000 8,200,000.00 0.000250
retroexcavadora 1.00000 30,800,000.00 0.002500
UNITARIO DE EQUIPOS
3. MANO DE OBRA
DESCRIPCION CANTIDAD SALARIO
maestro de obra 1.00000 1,500.00
operador de equipo pesado 1.00000 1,500.00
chofer 1.00000 1,500.00
ayudante 2.00000 1,200.00
obrero 5.00000 1,000.00
elementos de fijacion.
1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DEPRECIACION
cabilla estriada de 5/8" fy=4200 kg/cm2 pza 6.00 1.00
plancha 19mm pza 1.00 1.00
1.00
1.00
1.00
TOTAL DE MATERIALES
UNITARIO DE MATERIALES
2. EQUIPOS
DESCRIPCION CANTIDAD COSTO DEPRECIACION
dobladora de cabilla 1.00000 5,000.00 0.250000
Herramientas menores, tenaza, cegueta, alicate 1.00000 13,456.00 0.045200
UNITARIO DE EQUIPOS
3. MANO DE OBRA
DESCRIPCION CANTIDAD SALARIO
maestro de obra 1.00000 1,500.00
ayudante 2.00000 1,200.00
obrero 2.00000 1,000.00
cabillero 1ra 1.00000 1,500.00
truckson 100mmx100mmx4.0mm
1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DEPRECIACION
malla truckson 100x100x4 kg 1.00 1.00
alambre cal. 18 kg 0.10 1.00
1.00
1.00
1.00
TOTAL DE MATERIALES
UNITARIO DE MATERIALES
2. EQUIPOS
DESCRIPCION CANTIDAD COSTO DEPRECIACION
equipo de cabilla de cabilla 1.00000 5,000.00 0.250000
Herramientas menores, tenaza, cegueta, alicate 1.00000 13,456.00 0.045200
UNITARIO DE EQUIPOS
3. MANO DE OBRA
DESCRIPCION CANTIDAD SALARIO
maestro de obra 1.00000 1,500.00
ayudante 2.00000 1,200.00
obrero 2.00000 1,000.00
cabillero 1ra 1.00000 1,500.00
1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DEPRECIACION
concreto premezclado Rcc 250 kg/cm2 m3 1.00 1.00
1.00
1.00
1.00
1.00
TOTAL DE MATERIALES
UNITARIO DE MATERIALES
2. EQUIPOS
DESCRIPCION CANTIDAD COSTO DEPRECIACION
vibrador para concreto 1.00000 35,000.00 0.250000
Herramientas menores, pico, pala, carretilla 1.00000 13,456.00 0.045200
UNITARIO DE EQUIPOS
3. MANO DE OBRA
DESCRIPCION CANTIDAD SALARIO
maestro de obra 1.00000 1,500.00
ayudante 2.00000 1,200.00
obrero 5.00000 1,000.00
1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DEPRECIACION
eco 175x175x5.5mm fy=3515kg/cm2 kg 1.00 1.00
oxigeno kg 0.01 1.00
gas kg 0.01 1.00
acetileno kg 0.01 1.00
Electrodos 6013X1/8" kg 0.05 1.00
Disco de corte 7" und 0.01 1.00
Disco de Esmeril 7" und 0.01 1.00
TOTAL DE MATERIALES
UNITARIO DE MATERIALES
2. EQUIPOS
DESCRIPCION CANTIDAD COSTO DEPRECIACION
maquina de soldar 1.00000 801,882.50 0.000200
esmeril 7" 1.00000 33,204.50 0.002000
herramientas menores de herreria, andamios 1.00000 13,405.20 0.004520
UNITARIO DE EQUIPOS
3. MANO DE OBRA
DESCRIPCION CANTIDAD SALARIO
obrero 0.10000 1,000.00
ayudante 0.10000 1,200.00
soldador 0.10000 1,500.00
-
ANALISIS DE PRECIOS UNITARIOS
1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DEPRECIACION
eco 220x090x4.5mm fy=3515kg/cm2 kg 1.00 1.00
oxigeno kg 0.01 1.00
gas kg 0.01 1.00
acetileno kg 0.01 1.00
Electrodos 6013X1/8" kg 0.05 1.00
Disco de corte 7" und 0.01 1.00
Disco de Esmeril 7" und 0.01 1.00
TOTAL DE MATERIALES
UNITARIO DE MATERIALES
2. EQUIPOS
DESCRIPCION CANTIDAD COSTO DEPRECIACION
maquina de soldar 1.00000 801,882.50 0.000200
esmeril 7" 1.00000 33,204.50 0.002000
herramientas menores de herreria, andamios 1.00000 13,405.20 0.004520
UNITARIO DE EQUIPOS
3. MANO DE OBRA
DESCRIPCION CANTIDAD SALARIO
obrero 0.10000 1,000.00
ayudante 0.10000 1,200.00
ANALISIS DE PRECIOS UNITARIOS
1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DEPRECIACION
eco 180x065x4.0mm fy=3515kg/cm2 kg 1.00 1.00
oxigeno kg 0.01 1.00
gas kg 0.01 1.00
acetileno kg 0.01 1.00
Electrodos 6013X1/8" kg 0.05 1.00
Disco de corte 7" und 0.01 1.00
Disco de Esmeril 7" und 0.01 1.00
TOTAL DE MATERIALES
UNITARIO DE MATERIALES
2. EQUIPOS
DESCRIPCION CANTIDAD COSTO DEPRECIACION
maquina de soldar 1.00000 801,882.50 0.000200
esmeril 7" 1.00000 33,204.50 0.002000
herramientas menores de herreria 1.00000 13,405.20 0.004520
UNITARIO DE EQUIPOS
3. MANO DE OBRA
DESCRIPCION CANTIDAD SALARIO
ANALISIS DE PRECIOS UNITARIOS
1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DEPRECIACION
eco 180x065x4.0mm fy=3515kg/cm2 kg 1.00 1.00
oxigeno kg 0.01 1.00
gas kg 0.01 1.00
acetileno kg 0.01 1.00
Electrodos 6013X1/8" kg 0.05 1.00
Disco de corte 7" und 0.01 1.00
Disco de Esmeril 7" und 0.01 1.00
TOTAL DE MATERIALES
UNITARIO DE MATERIALES
2. EQUIPOS
DESCRIPCION CANTIDAD COSTO DEPRECIACION
maquina de soldar 1.00000 801,882.50 0.000200
esmeril 7" 1.00000 33,204.50 0.002000
herramientas menores de herreria 1.00000 13,405.20 0.004520
UNITARIO DE EQUIPOS
ANALISIS DE PRECIOS UNITARIOS
3. MANO DE OBRA
DESCRIPCION CANTIDAD SALARIO
obrero 0.10000 1,000.00
ayudante 0.10000 1,200.00
soldador 0.10000 1,500.00
-
0.30 TOTAL MANO DE OBRA
MANO DE OBRA DIRECTA
1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DEPRECIACION
fondo anticorrosivo gl 0.01 1.00
thinner gl 0.01 1.00
cepillo de alambre para esmeril 7" pza 0.01 1.00
TOTAL DE MATERIALES
UNITARIO DE MATERIALES
2. EQUIPOS
DESCRIPCION CANTIDAD COSTO DEPRECIACION
herramientas menores, brocha, espatula, guantes 1.00000 801,882.50 0.000200
esmeril 7" 1.00000 33,204.50 0.002000
compresor de aire 1.00000 500,000.00 0.000250
ANALISIS DE PRECIOS UNITARIOS
UNITARIO DE EQUIPOS
3. MANO DE OBRA
DESCRIPCION CANTIDAD SALARIO
obrero 0.10000 1,000.00
ayudante 0.10000 1,200.00
pintor 0.10000 1,500.00
-
0.30 TOTAL MANO DE OBRA
MANO DE OBRA DIRECTA
1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DEPRECIACION
fondo anticorrosivo gl 0.01 1.00
thinner gl 0.01 1.00
cepillo de alambre para esmeril 7" pza 0.01 1.00
TOTAL DE MATERIALES
UNITARIO DE MATERIALES
2. EQUIPOS
DESCRIPCION CANTIDAD COSTO DEPRECIACION
herramientas menores, brocha, espatula, guantes 1.00000 801,882.50 0.000200
ANALISIS DE PRECIOS UNITARIOS
UNITARIO DE EQUIPOS
3. MANO DE OBRA
DESCRIPCION CANTIDAD SALARIO
obrero 0.10000 1,000.00
ayudante 0.10000 1,200.00
pintor 0.10000 1,500.00
-
0.30 TOTAL MANO DE OBRA
MANO DE OBRA DIRECTA
1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DEPRECIACION
fondo anticorrosivo gl 0.01 1.00
thinner gl 0.01 1.00
cepillo de alambre para esmeril 7" pza 0.01 1.00
TOTAL DE MATERIALES
UNITARIO DE MATERIALES
2. EQUIPOS
ANALISIS DE PRECIOS UNITARIOS
UNITARIO DE EQUIPOS
3. MANO DE OBRA
DESCRIPCION CANTIDAD SALARIO
obrero 0.10000 1,000.00
ayudante 0.10000 1,200.00
pintor 0.10000 1,500.00
-
0.30 TOTAL MANO DE OBRA
MANO DE OBRA DIRECTA
1. MATERIALES
DESCRIPCION UNIDAD CANTIDAD DEPRECIACION
Lamina carilica transparente M2 1.00 ###
Ganchos de fijacion PZA 4.00 1.00
1.00
TOTAL DE MATERIALES
ANALISIS DE PRECIOS UNITARIOS
UNITARIO DE MATERIALES
2. EQUIPOS
DESCRIPCION CANTIDAD COSTO DEPRECIACION
EQUIPO COLOCACION DE HERRERIA 1.00000 23,750.00 0.045200
UNITARIO DE EQUIPOS
3. MANO DE OBRA
DESCRIPCION CANTIDAD SALARIO
obrero 0.10000 1,000.00
ayudante 0.10000 1,200.00
soldador 0.10000 1,500.00
maestro de obra 0.10000 1,500.00
0.40 TOTAL MANO DE OBRA
MANO DE OBRA DIRECTA
FECHA: 2/27/2016
PARTIDA: 37
COSTO TOTAL
20.00 80.00
3,500.00 350.00
-
-
-
TOTAL DE MATERIALES 430.00
UNITARIO DE MATERIALES 430.00
TOTAL
414.00
-
-
-
-
-
-
TOTAL EQUIPOS 414.00
TOTAL
2,000.00
2,400.00
-
-
-
-
TOTAL MANO DE OBRA 4,400.00
MANO DE OBRA DIRECTA 4,400.00
490% F.C.A. 21,560.00
50 Bs/DIA BONO ALIMENTACION 1,950.00
TOTAL MANO DE OBRA 27,910.00
UNITARIO MANO DE OBRA 1.99
COSTO DIRECTO POR UNIDAD 845.99
DMINISTRATIVOS Y GENERALES 84.60
SUB TOTAL 930.59
15% UTILIDAD E IMPREVISTOS 139.59
ANALISIS DE PRECIOS UNITARIOS
COSTO TOTAL
2,500.00 2,500.00
200.00 800.00
-
-
-
TOTAL DE MATERIALES 3,300.00
UNITARIO DE MATERIALES 3,300.00
TOTAL
608.21
-
-
-
-
-
-
TOTAL EQUIPOS 608.21
UNITARIO DE EQUIPOS 6.08
TOTAL
1,500.00
2,400.00
4,000.00
-
-
-
TOTAL MANO DE OBRA 7,900.00
MANO DE OBRA DIRECTA 7,900.00
490% F.C.A. 38,710.00
50 Bs/DIA BONO ALIMENTACION 4,550.00
TOTAL MANO DE OBRA 51,160.00
UNITARIO MANO DE OBRA 511.60
COSTO DIRECTO POR UNIDAD 3,817.68
DMINISTRATIVOS Y GENERALES 381.77
ANALISIS DE PRECIOS UNITARIOS
COSTO TOTAL
11,000.00 11,000.00
-
-
-
-
TOTAL DE MATERIALES 11,000.00
UNITARIO DE MATERIALES 11,000.00
TOTAL
2,050.00
77,000.00
-
-
-
-
-
TOTAL EQUIPOS 79,050.00
UNITARIO DE EQUIPOS 790.50
TOTAL
1,500.00
1,500.00
1,500.00
2,400.00
5,000.00
-
TOTAL MANO DE OBRA 11,900.00
MANO DE OBRA DIRECTA 11,900.00
490% F.C.A. 58,310.00
50 Bs/DIA BONO ALIMENTACION 6,500.00
TOTAL MANO DE OBRA 76,710.00
UNITARIO MANO DE OBRA 767.10
ANALISIS DE PRECIOS UNITARIOS
COSTO TOTAL
-
-
-
-
-
TOTAL DE MATERIALES -
UNITARIO DE MATERIALES -
TOTAL
5,000.00
608.21
-
-
-
-
-
TOTAL EQUIPOS 5,608.21
UNITARIO DE EQUIPOS 224.33
TOTAL
1,500.00
2,400.00
5,000.00
-
-
-
TOTAL MANO DE OBRA 8,900.00
MANO DE OBRA DIRECTA 8,900.00
490% F.C.A. 43,610.00
50 Bs/DIA BONO ALIMENTACION 5,200.00
ANALISIS DE PRECIOS UNITARIOS
COSTO TOTAL
-
-
-
-
-
TOTAL DE MATERIALES -
UNITARIO DE MATERIALES -
TOTAL
77,000.00
608.21
-
-
-
-
-
TOTAL EQUIPOS 77,608.21
UNITARIO DE EQUIPOS 3,233.68
TOTAL
1,500.00
2,400.00
5,000.00
1,500.00
-
-
TOTAL MANO DE OBRA 10,400.00
MANO DE OBRA DIRECTA 10,400.00
ANALISIS DE PRECIOS UNITARIOS
COSTO TOTAL
-
-
-
-
-
TOTAL DE MATERIALES -
UNITARIO DE MATERIALES -
TOTAL
77,000.00
608.21
-
-
-
-
-
TOTAL EQUIPOS 77,608.21
UNITARIO DE EQUIPOS 3,233.68
TOTAL
1,500.00
2,400.00
5,000.00
1,500.00
-
-
ANALISIS DE PRECIOS UNITARIOS
COSTO TOTAL
-
-
-
-
-
TOTAL DE MATERIALES -
UNITARIO DE MATERIALES -
TOTAL
-
608.21
-
-
-
-
-
TOTAL EQUIPOS 608.21
UNITARIO DE EQUIPOS 337.90
TOTAL
1,500.00
2,400.00
5,000.00
-
ANALISIS DE PRECIOS UNITARIOS
-
-
TOTAL MANO DE OBRA 8,900.00
MANO DE OBRA DIRECTA 8,900.00
490% F.C.A. 43,610.00
50 Bs/DIA BONO ALIMENTACION 5,200.00
TOTAL MANO DE OBRA 57,710.00
UNITARIO MANO DE OBRA 32,061.11
COSTO DIRECTO POR UNIDAD 32,399.01
DMINISTRATIVOS Y GENERALES 3,239.90
SUB TOTAL 35,638.91
15% UTILIDAD E IMPREVISTOS 5,345.84
PRECIO UNITARIO 40,984.74
FECHA: 2/27/2016
PARTIDA: 44
COSTO TOTAL
-
-
-
-
-
TOTAL DE MATERIALES -
UNITARIO DE MATERIALES -
TOTAL
-
608.21
-
-
-
-
-
TOTAL EQUIPOS 608.21
UNITARIO DE EQUIPOS 337.90
TOTAL
1,500.00
2,400.00
ANALISIS DE PRECIOS UNITARIOS
5,000.00
-
-
-
TOTAL MANO DE OBRA 8,900.00
MANO DE OBRA DIRECTA 8,900.00
490% F.C.A. 43,610.00
50 Bs/DIA BONO ALIMENTACION 5,200.00
TOTAL MANO DE OBRA 57,710.00
UNITARIO MANO DE OBRA 32,061.11
COSTO DIRECTO POR UNIDAD 32,399.01
DMINISTRATIVOS Y GENERALES 3,239.90
SUB TOTAL 35,638.91
15% UTILIDAD E IMPREVISTOS 5,345.84
PRECIO UNITARIO 40,984.74
FECHA: 2/27/2016
PARTIDA: 45
COSTO TOTAL
-
-
-
-
-
TOTAL DE MATERIALES -
UNITARIO DE MATERIALES -
TOTAL
4,250.00
608.21
-
-
-
-
-
TOTAL EQUIPOS 4,858.21
UNITARIO DE EQUIPOS 1,598.10
TOTAL
ANALISIS DE PRECIOS UNITARIOS
1,500.00
2,400.00
5,000.00
-
-
-
TOTAL MANO DE OBRA 8,900.00
MANO DE OBRA DIRECTA 8,900.00
490% F.C.A. 43,610.00
50 Bs/DIA BONO ALIMENTACION 5,200.00
TOTAL MANO DE OBRA 57,710.00
UNITARIO MANO DE OBRA 18,983.55
COSTO DIRECTO POR UNIDAD 20,581.65
DMINISTRATIVOS Y GENERALES 2,058.16
SUB TOTAL 22,639.81
15% UTILIDAD E IMPREVISTOS 3,395.97
PRECIO UNITARIO 26,035.79
FECHA: 2/27/2016
PARTIDA: 46
re Mr 48 kg/cm2
COSTO TOTAL
17,000.00 17,000.00
-
-
-
-
TOTAL DE MATERIALES 17,000.00
UNITARIO DE MATERIALES 17,000.00
TOTAL
8,750.00
608.21
-
-
-
-
-
TOTAL EQUIPOS 9,358.21
UNITARIO DE EQUIPOS 1,336.89
ANALISIS DE PRECIOS UNITARIOS
TOTAL
1,500.00
2,400.00
5,000.00
-
-
-
TOTAL MANO DE OBRA 8,900.00
MANO DE OBRA DIRECTA 8,900.00
490% F.C.A. 43,610.00
50 Bs/DIA BONO ALIMENTACION 5,200.00
TOTAL MANO DE OBRA 57,710.00
UNITARIO MANO DE OBRA 8,244.29
COSTO DIRECTO POR UNIDAD 26,581.17
DMINISTRATIVOS Y GENERALES 2,658.12
SUB TOTAL 29,239.29
15% UTILIDAD E IMPREVISTOS 4,385.89
PRECIO UNITARIO 33,625.18
FECHA: 2/27/2016
PARTIDA: 47
fuerzo fy=4200
COSTO TOTAL
900.00 900.00
2,000.00 200.00
-
-
-
TOTAL DE MATERIALES 1,100.00
UNITARIO DE MATERIALES 1,100.00
TOTAL
1,250.00
608.21
-
-
-
-
-
ANALISIS DE PRECIOS UNITARIOS
TOTAL
1,500.00
2,400.00
2,000.00
1,500.00
-
-
TOTAL MANO DE OBRA 7,400.00
MANO DE OBRA DIRECTA 7,400.00
490% F.C.A. 36,260.00
50 Bs/DIA BONO ALIMENTACION 3,900.00
TOTAL MANO DE OBRA 47,560.00
UNITARIO MANO DE OBRA 95.12
COSTO DIRECTO POR UNIDAD 1,198.84
DMINISTRATIVOS Y GENERALES 119.88
SUB TOTAL 1,318.72
15% UTILIDAD E IMPREVISTOS 197.81
PRECIO UNITARIO 1,516.53
FECHA: 2/27/2016
PARTIDA: 48
fuerzo fy=4200
COSTO TOTAL
911.63 911.63
2,000.00 200.00
-
-
-
TOTAL DE MATERIALES 1,111.63
UNITARIO DE MATERIALES 1,111.63
TOTAL
1,250.00
608.21
-
-
-
ANALISIS DE PRECIOS UNITARIOS
-
-
TOTAL EQUIPOS 1,858.21
UNITARIO DE EQUIPOS 4.65
TOTAL
1,500.00
2,400.00
2,000.00
1,500.00
-
-
TOTAL MANO DE OBRA 7,400.00
MANO DE OBRA DIRECTA 7,400.00
490% F.C.A. 36,260.00
50 Bs/DIA BONO ALIMENTACION 3,900.00
TOTAL MANO DE OBRA 47,560.00
UNITARIO MANO DE OBRA 118.90
COSTO DIRECTO POR UNIDAD 1,235.18
DMINISTRATIVOS Y GENERALES 123.52
SUB TOTAL 1,358.69
15% UTILIDAD E IMPREVISTOS 203.80
PRECIO UNITARIO 1,562.50
FECHA: 2/27/2016
PARTIDA: 49
fuerzo fy=4200
COSTO TOTAL
894.40 894.40
2,000.00 200.00
-
-
-
TOTAL DE MATERIALES 1,094.40
UNITARIO DE MATERIALES 1,094.40
TOTAL
1,250.00
608.21
-
ANALISIS DE PRECIOS UNITARIOS
-
-
-
-
TOTAL EQUIPOS 1,858.21
UNITARIO DE EQUIPOS 3.10
TOTAL
1,500.00
2,400.00
2,000.00
1,500.00
-
-
TOTAL MANO DE OBRA 7,400.00
MANO DE OBRA DIRECTA 7,400.00
490% F.C.A. 36,260.00
50 Bs/DIA BONO ALIMENTACION 3,900.00
TOTAL MANO DE OBRA 47,560.00
UNITARIO MANO DE OBRA 79.27
COSTO DIRECTO POR UNIDAD 1,176.76
DMINISTRATIVOS Y GENERALES 117.68
SUB TOTAL 1,294.44
15% UTILIDAD E IMPREVISTOS 194.17
PRECIO UNITARIO 1,488.61
FECHA: 2/27/2016
PARTIDA: 50
COSTO TOTAL
27,000.00 27,000.00
-
-
-
-
TOTAL DE MATERIALES 27,000.00
UNITARIO DE MATERIALES 27,000.00
TOTAL
8,750.00
ANALISIS DE PRECIOS UNITARIOS
608.21
-
-
-
-
-
TOTAL EQUIPOS 9,358.21
UNITARIO DE EQUIPOS 222.81
TOTAL
1,500.00
2,400.00
5,000.00
-
-
-
TOTAL MANO DE OBRA 8,900.00
MANO DE OBRA DIRECTA 8,900.00
490% F.C.A. 43,610.00
50 Bs/DIA BONO ALIMENTACION 5,200.00
TOTAL MANO DE OBRA 57,710.00
UNITARIO MANO DE OBRA 1,374.05
COSTO DIRECTO POR UNIDAD 28,596.86
DMINISTRATIVOS Y GENERALES 2,859.69
SUB TOTAL 31,456.55
15% UTILIDAD E IMPREVISTOS 4,718.48
PRECIO UNITARIO 36,175.03
FECHA: 2/27/2016
PARTIDA: 51
COSTO TOTAL
15,000.00 3,750.00
12,000.00 1,800.00
1,500.00 300.00
2,000.00 200.00
-
TOTAL DE MATERIALES 6,050.00
UNITARIO DE MATERIALES 6,050.00
ANALISIS DE PRECIOS UNITARIOS
TOTAL
21,250.00
608.21
-
-
-
-
-
TOTAL EQUIPOS 21,858.21
UNITARIO DE EQUIPOS 437.16
TOTAL
1,500.00
2,400.00
2,000.00
1,500.00
-
-
TOTAL MANO DE OBRA 7,400.00
MANO DE OBRA DIRECTA 7,400.00
490% F.C.A. 36,260.00
50 Bs/DIA BONO ALIMENTACION 3,900.00
TOTAL MANO DE OBRA 47,560.00
UNITARIO MANO DE OBRA 951.20
COSTO DIRECTO POR UNIDAD 7,438.36
DMINISTRATIVOS Y GENERALES 743.84
SUB TOTAL 8,182.20
15% UTILIDAD E IMPREVISTOS 1,227.33
PRECIO UNITARIO 9,409.53
FECHA: 2/27/2016
PARTIDA: 52
COSTO TOTAL
27,000.00 27,000.00
-
-
-
-
TOTAL DE MATERIALES 27,000.00
ANALISIS DE PRECIOS UNITARIOS
TOTAL
8,750.00
608.21
-
-
-
-
-
TOTAL EQUIPOS 9,358.21
UNITARIO DE EQUIPOS 222.81
TOTAL
1,500.00
2,400.00
5,000.00
-
-
-
TOTAL MANO DE OBRA 8,900.00
MANO DE OBRA DIRECTA 8,900.00
490% F.C.A. 43,610.00
50 Bs/DIA BONO ALIMENTACION 5,200.00
TOTAL MANO DE OBRA 57,710.00
UNITARIO MANO DE OBRA 1,374.05
COSTO DIRECTO POR UNIDAD 28,596.86
DMINISTRATIVOS Y GENERALES 2,859.69
SUB TOTAL 31,456.55
15% UTILIDAD E IMPREVISTOS 4,718.48
PRECIO UNITARIO 36,175.03
FECHA: 2/27/2016
PARTIDA: 53
COSTO TOTAL
-
-
-
-
ANALISIS DE PRECIOS UNITARIOS
-
TOTAL DE MATERIALES -
UNITARIO DE MATERIALES -
TOTAL
4,250.00
608.21
-
-
-
-
-
TOTAL EQUIPOS 4,858.21
UNITARIO DE EQUIPOS 161.94
TOTAL
1,500.00
1,500.00
2,400.00
5,000.00
-
-
TOTAL MANO DE OBRA 10,400.00
MANO DE OBRA DIRECTA 10,400.00
490% F.C.A. 50,960.00
50 Bs/DIA BONO ALIMENTACION 5,850.00
TOTAL MANO DE OBRA 67,210.00
UNITARIO MANO DE OBRA 2,240.33
COSTO DIRECTO POR UNIDAD 2,402.27
DMINISTRATIVOS Y GENERALES 240.23
SUB TOTAL 2,642.50
15% UTILIDAD E IMPREVISTOS 396.38
PRECIO UNITARIO 3,038.88
FECHA: 2/27/2016
PARTIDA: 54
COSTO TOTAL
-
-
ANALISIS DE PRECIOS UNITARIOS
-
-
-
TOTAL DE MATERIALES -
UNITARIO DE MATERIALES -
TOTAL
4,250.00
608.21
-
-
-
-
-
TOTAL EQUIPOS 4,858.21
UNITARIO DE EQUIPOS 485.82
TOTAL
1,500.00
2,400.00
5,000.00
-
-
-
TOTAL MANO DE OBRA 8,900.00
MANO DE OBRA DIRECTA 8,900.00
490% F.C.A. 43,610.00
50 Bs/DIA BONO ALIMENTACION 5,200.00
TOTAL MANO DE OBRA 57,710.00
UNITARIO MANO DE OBRA 5,771.00
COSTO DIRECTO POR UNIDAD 6,256.82
DMINISTRATIVOS Y GENERALES 625.68
SUB TOTAL 6,882.50
15% UTILIDAD E IMPREVISTOS 1,032.38
PRECIO UNITARIO 7,914.88
FECHA: 2/27/2016
PARTIDA: 55
COSTO TOTAL
ANALISIS DE PRECIOS UNITARIOS
11,000.00 11,000.00
-
-
-
-
TOTAL DE MATERIALES 11,000.00
UNITARIO DE MATERIALES 11,000.00
TOTAL
2,050.00
77,000.00
-
-
-
-
-
TOTAL EQUIPOS 79,050.00
UNITARIO DE EQUIPOS 1,054.00
TOTAL
1,500.00
1,500.00
1,500.00
2,400.00
5,000.00
-
TOTAL MANO DE OBRA 11,900.00
MANO DE OBRA DIRECTA 11,900.00
490% F.C.A. 58,310.00
50 Bs/DIA BONO ALIMENTACION 6,500.00
TOTAL MANO DE OBRA 76,710.00
UNITARIO MANO DE OBRA 1,022.80
COSTO DIRECTO POR UNIDAD 13,076.80
DMINISTRATIVOS Y GENERALES 1,307.68
SUB TOTAL 14,384.48
15% UTILIDAD E IMPREVISTOS 2,157.67
PRECIO UNITARIO 16,542.15
FECHA: 2/27/2016
PARTIDA: 56
fuerzo fy=4200
ANALISIS DE PRECIOS UNITARIOS
COSTO TOTAL
900.00 900.00
2,000.00 200.00
-
-
-
TOTAL DE MATERIALES 1,100.00
UNITARIO DE MATERIALES 1,100.00
TOTAL
1,250.00
608.21
-
-
-
-
-
TOTAL EQUIPOS 1,858.21
UNITARIO DE EQUIPOS 3.72
TOTAL
1,500.00
2,400.00
2,000.00
1,500.00
-
-
TOTAL MANO DE OBRA 7,400.00
MANO DE OBRA DIRECTA 7,400.00
490% F.C.A. 36,260.00
50 Bs/DIA BONO ALIMENTACION 3,900.00
TOTAL MANO DE OBRA 47,560.00
UNITARIO MANO DE OBRA 95.12
COSTO DIRECTO POR UNIDAD 1,198.84
DMINISTRATIVOS Y GENERALES 119.88
SUB TOTAL 1,318.72
15% UTILIDAD E IMPREVISTOS 197.81
PRECIO UNITARIO 1,516.53
FECHA: 2/27/2016
PARTIDA: 57
fuerzo fy=4200
ANALISIS DE PRECIOS UNITARIOS
COSTO TOTAL
894.40 894.40
2,000.00 200.00
-
-
-
TOTAL DE MATERIALES 1,094.40
UNITARIO DE MATERIALES 1,094.40
TOTAL
1,250.00
608.21
-
-
-
-
-
TOTAL EQUIPOS 1,858.21
UNITARIO DE EQUIPOS 3.10
TOTAL
1,500.00
2,400.00
2,000.00
1,500.00
-
-
TOTAL MANO DE OBRA 7,400.00
MANO DE OBRA DIRECTA 7,400.00
490% F.C.A. 36,260.00
50 Bs/DIA BONO ALIMENTACION 3,900.00
TOTAL MANO DE OBRA 47,560.00
UNITARIO MANO DE OBRA 79.27
COSTO DIRECTO POR UNIDAD 1,176.76
DMINISTRATIVOS Y GENERALES 117.68
SUB TOTAL 1,294.44
15% UTILIDAD E IMPREVISTOS 194.17
PRECIO UNITARIO 1,488.61
FECHA: 2/27/2016
PARTIDA: 58
ANALISIS DE PRECIOS UNITARIOS
COSTO TOTAL
27,000.00 27,000.00
-
-
-
-
TOTAL DE MATERIALES 27,000.00
UNITARIO DE MATERIALES 27,000.00
TOTAL
8,750.00
608.21
-
-
-
-
-
TOTAL EQUIPOS 9,358.21
UNITARIO DE EQUIPOS 222.81
TOTAL
1,500.00
2,400.00
5,000.00
-
-
-
TOTAL MANO DE OBRA 8,900.00
MANO DE OBRA DIRECTA 8,900.00
490% F.C.A. 43,610.00
50 Bs/DIA BONO ALIMENTACION 5,200.00
TOTAL MANO DE OBRA 57,710.00
UNITARIO MANO DE OBRA 1,374.05
COSTO DIRECTO POR UNIDAD 28,596.86
DMINISTRATIVOS Y GENERALES 2,859.69
SUB TOTAL 31,456.55
15% UTILIDAD E IMPREVISTOS 4,718.48
PRECIO UNITARIO 36,175.03
FECHA: 2/27/2016
ANALISIS DE PRECIOS UNITARIOS
PARTIDA: 59
COSTO TOTAL
8,000.00 8,000.00
200.00 800.00
-
-
-
TOTAL DE MATERIALES 8,800.00
UNITARIO DE MATERIALES 8,800.00
TOTAL
21,250.00
608.21
-
-
-
-
-
TOTAL EQUIPOS 21,858.21
UNITARIO DE EQUIPOS 437.16
TOTAL
1,500.00
2,400.00
2,000.00
-
-
-
TOTAL MANO DE OBRA 5,900.00
MANO DE OBRA DIRECTA 5,900.00
490% F.C.A. 28,910.00
50 Bs/DIA BONO ALIMENTACION 3,250.00
TOTAL MANO DE OBRA 38,060.00
UNITARIO MANO DE OBRA 761.20
COSTO DIRECTO POR UNIDAD 9,998.36
DMINISTRATIVOS Y GENERALES 999.84
SUB TOTAL 10,998.20
15% UTILIDAD E IMPREVISTOS 1,649.73
ANALISIS DE PRECIOS UNITARIOS
COSTO TOTAL
11,000.00 11,000.00
-
-
-
-
TOTAL DE MATERIALES 11,000.00
UNITARIO DE MATERIALES 11,000.00
TOTAL
2,050.00
77,000.00
-
-
-
-
-
TOTAL EQUIPOS 79,050.00
UNITARIO DE EQUIPOS 1,054.00
TOTAL
1,500.00
1,500.00
1,500.00
2,400.00
5,000.00
-
TOTAL MANO DE OBRA 11,900.00
MANO DE OBRA DIRECTA 11,900.00
490% F.C.A. 58,310.00
50 Bs/DIA BONO ALIMENTACION 6,500.00
TOTAL MANO DE OBRA 76,710.00
UNITARIO MANO DE OBRA 1,022.80
COSTO DIRECTO POR UNIDAD 13,076.80
DMINISTRATIVOS Y GENERALES 1,307.68
ANALISIS DE PRECIOS UNITARIOS
COSTO TOTAL
911.00 5,466.00
1,200.00 1,200.00
-
-
-
TOTAL DE MATERIALES 6,666.00
UNITARIO DE MATERIALES 6,666.00
TOTAL
1,250.00
608.21
-
-
-
-
-
TOTAL EQUIPOS 1,858.21
UNITARIO DE EQUIPOS 123.88
TOTAL
1,500.00
2,400.00
2,000.00
1,500.00
-
-
TOTAL MANO DE OBRA 7,400.00
MANO DE OBRA DIRECTA 7,400.00
490% F.C.A. 36,260.00
50 Bs/DIA BONO ALIMENTACION 3,900.00
TOTAL MANO DE OBRA 47,560.00
UNITARIO MANO DE OBRA 3,170.67
ANALISIS DE PRECIOS UNITARIOS
fuerzo fy=4200
COSTO TOTAL
650.00 650.00
2,000.00 200.00
-
-
-
TOTAL DE MATERIALES 850.00
UNITARIO DE MATERIALES 850.00
TOTAL
1,250.00
608.21
-
-
-
-
-
TOTAL EQUIPOS 1,858.21
UNITARIO DE EQUIPOS 6.93
TOTAL
1,500.00
2,400.00
2,000.00
1,500.00
-
-
TOTAL MANO DE OBRA 7,400.00
MANO DE OBRA DIRECTA 7,400.00
490% F.C.A. 36,260.00
50 Bs/DIA BONO ALIMENTACION 3,900.00
ANALISIS DE PRECIOS UNITARIOS
COSTO TOTAL
27,000.00 27,000.00
-
-
-
-
TOTAL DE MATERIALES 27,000.00
UNITARIO DE MATERIALES 27,000.00
TOTAL
8,750.00
608.21
-
-
-
-
-
TOTAL EQUIPOS 9,358.21
UNITARIO DE EQUIPOS 222.81
TOTAL
1,500.00
2,400.00
5,000.00
-
-
-
TOTAL MANO DE OBRA 8,900.00
MANO DE OBRA DIRECTA 8,900.00
ANALISIS DE PRECIOS UNITARIOS
on y colocacion de
COSTO TOTAL
482.00 482.00
100.00 1.00
20.00 0.20
100.00 1.00
5,800.00 290.00
3,500.00 35.00
1,600.00 16.00
-
-
-
-
-
-
TOTAL DE MATERIALES 825.20
UNITARIO DE MATERIALES 825.20
TOTAL
160.38
66.41
60.59
TOTAL EQUIPOS 287.38
UNITARIO DE EQUIPOS 0.32
TOTAL
100.00
120.00
150.00
-
ANALISIS DE PRECIOS UNITARIOS
on y colocacion de
COSTO TOTAL
644.00 644.00
100.00 1.00
20.00 0.20
100.00 1.00
5,800.00 290.00
3,500.00 35.00
1,600.00 16.00
-
-
-
-
-
-
TOTAL DE MATERIALES 987.20
UNITARIO DE MATERIALES 987.20
TOTAL
160.38
66.41
60.59
TOTAL EQUIPOS 287.38
UNITARIO DE EQUIPOS 0.32
TOTAL
100.00
120.00
ANALISIS DE PRECIOS UNITARIOS
150.00
-
TOTAL MANO DE OBRA 370.00
MANO DE OBRA DIRECTA 370.00
490% F.C.A. 1,813.00
50 Bs/DIA BONO ALIMENTACION 195.00
TOTAL MANO DE OBRA 2,378.00
UNITARIO MANO DE OBRA 2.64
COSTO DIRECTO POR UNIDAD 990.16
DMINISTRATIVOS Y GENERALES 99.02
SUB TOTAL 1,089.18
15% UTILIDAD E IMPREVISTOS 163.38
PRECIO UNITARIO 1,252.55
FECHA: 2/27/2016
PARTIDA: 66
on y colocacion de
COSTO TOTAL
804.00 804.00
100.00 1.00
20.00 0.20
100.00 1.00
5,800.00 290.00
3,500.00 35.00
1,600.00 16.00
-
-
-
-
-
-
TOTAL DE MATERIALES 1,147.20
UNITARIO DE MATERIALES 1,147.20
TOTAL
160.38
66.41
60.59
TOTAL EQUIPOS 287.38
UNITARIO DE EQUIPOS 0.32
TOTAL
ANALISIS DE PRECIOS UNITARIOS
100.00
120.00
150.00
-
TOTAL MANO DE OBRA 370.00
MANO DE OBRA DIRECTA 370.00
490% F.C.A. 1,813.00
50 Bs/DIA BONO ALIMENTACION 195.00
TOTAL MANO DE OBRA 2,378.00
UNITARIO MANO DE OBRA 2.64
COSTO DIRECTO POR UNIDAD 1,150.16
DMINISTRATIVOS Y GENERALES 115.02
SUB TOTAL 1,265.18
15% UTILIDAD E IMPREVISTOS 189.78
PRECIO UNITARIO 1,454.95
FECHA: 2/27/2016
PARTIDA: 67
on y colocacion de
COSTO TOTAL
804.00 804.00
100.00 1.00
20.00 0.20
100.00 1.00
5,800.00 290.00
3,500.00 35.00
1,600.00 16.00
-
-
-
-
-
-
TOTAL DE MATERIALES 1,147.20
UNITARIO DE MATERIALES 1,147.20
TOTAL
160.38
66.41
60.59
TOTAL EQUIPOS 287.38
UNITARIO DE EQUIPOS 0.32
ANALISIS DE PRECIOS UNITARIOS
TOTAL
100.00
120.00
150.00
-
TOTAL MANO DE OBRA 370.00
MANO DE OBRA DIRECTA 370.00
490% F.C.A. 1,813.00
50 Bs/DIA BONO ALIMENTACION 195.00
TOTAL MANO DE OBRA 2,378.00
UNITARIO MANO DE OBRA 2.64
COSTO DIRECTO POR UNIDAD 1,150.16
DMINISTRATIVOS Y GENERALES 115.02
SUB TOTAL 1,265.18
15% UTILIDAD E IMPREVISTOS 189.78
PRECIO UNITARIO 1,454.95
FECHA: 2/27/2016
PARTIDA: 68
vo 2 manos en
COSTO TOTAL
5,000.00 50.00
7,000.00 70.00
3,000.00 30.00
-
-
-
-
-
-
-
-
-
-
TOTAL DE MATERIALES 150.00
UNITARIO DE MATERIALES 150.00
TOTAL
160.38
66.41
125.00
ANALISIS DE PRECIOS UNITARIOS
TOTAL
100.00
120.00
150.00
-
TOTAL MANO DE OBRA 370.00
MANO DE OBRA DIRECTA 370.00
490% F.C.A. 1,813.00
50 Bs/DIA BONO ALIMENTACION 195.00
TOTAL MANO DE OBRA 2,378.00
UNITARIO MANO DE OBRA 2.38
COSTO DIRECTO POR UNIDAD 152.73
DMINISTRATIVOS Y GENERALES 15.27
SUB TOTAL 168.00
15% UTILIDAD E IMPREVISTOS 25.20
PRECIO UNITARIO 193.20
FECHA: 2/27/2016
PARTIDA: 69
vo 2 manos en
COSTO TOTAL
5,000.00 50.00
7,000.00 70.00
3,000.00 30.00
-
-
-
-
-
-
-
-
-
-
TOTAL DE MATERIALES 150.00
UNITARIO DE MATERIALES 150.00
TOTAL
160.38
ANALISIS DE PRECIOS UNITARIOS
66.41
125.00
TOTAL EQUIPOS 351.79
UNITARIO DE EQUIPOS 0.35
TOTAL
100.00
120.00
150.00
-
TOTAL MANO DE OBRA 370.00
MANO DE OBRA DIRECTA 370.00
490% F.C.A. 1,813.00
50 Bs/DIA BONO ALIMENTACION 195.00
TOTAL MANO DE OBRA 2,378.00
UNITARIO MANO DE OBRA 2.38
COSTO DIRECTO POR UNIDAD 152.73
DMINISTRATIVOS Y GENERALES 15.27
SUB TOTAL 168.00
15% UTILIDAD E IMPREVISTOS 25.20
PRECIO UNITARIO 193.20
FECHA: 2/27/2016
PARTIDA: 70
vo 2 manos en
COSTO TOTAL
5,000.00 50.00
7,000.00 70.00
3,000.00 30.00
-
-
-
-
-
-
-
-
-
-
TOTAL DE MATERIALES 150.00
UNITARIO DE MATERIALES 150.00
ANALISIS DE PRECIOS UNITARIOS
TOTAL
160.38
66.41
125.00
TOTAL EQUIPOS 351.79
UNITARIO DE EQUIPOS 0.35
TOTAL
100.00
120.00
150.00
-
TOTAL MANO DE OBRA 370.00
MANO DE OBRA DIRECTA 370.00
490% F.C.A. 1,813.00
50 Bs/DIA BONO ALIMENTACION 195.00
TOTAL MANO DE OBRA 2,378.00
UNITARIO MANO DE OBRA 2.38
COSTO DIRECTO POR UNIDAD 152.73
DMINISTRATIVOS Y GENERALES 15.27
SUB TOTAL 168.00
15% UTILIDAD E IMPREVISTOS 25.20
PRECIO UNITARIO 193.20
FECHA: 2/27/2016
PARTIDA: 71
COSTO TOTAL
13,770.50 13,770.50
1,200.00 4,800.00
-
-
-
-
-
-
-
-
-
-
-
TOTAL DE MATERIALES 18,570.50
ANALISIS DE PRECIOS UNITARIOS
TOTAL
1,073.50
-
-
TOTAL EQUIPOS 1,073.50
UNITARIO DE EQUIPOS 2.15
TOTAL
100.00
120.00
150.00
150.00
TOTAL MANO DE OBRA 520.00
MANO DE OBRA DIRECTA 520.00
490% F.C.A. 2,548.00
50 Bs/DIA BONO ALIMENTACION 260.00
TOTAL MANO DE OBRA 3,328.00
UNITARIO MANO DE OBRA 6.66
COSTO DIRECTO POR UNIDAD 18,579.30
DMINISTRATIVOS Y GENERALES 1,857.93
SUB TOTAL 20,437.23
15% UTILIDAD E IMPREVISTOS 3,065.58
PRECIO UNITARIO 23,502.82
COMPUTOS METRICOS
ELEMENTOS CANT
1.00 80.00
-
-
TOTAL 80.00
ELEMENTOS CANT
1.00 20.00
-
-
TOTAL 20.00
ELEMENTOS CANT
1.00 54.00
-
-
TOTAL 54.00
ELEMENTOS CANT
1.00 8.00
-
-
TOTAL 8.00
ELEMENTOS CANT
8.00 17.28
-
-
TOTAL 17.28
ELEMENTOS CANT
- -
-
-
TOTAL -
COMPUTOS METRICOS
ELEMENTOS CANT
2.00 6.40
-
-
TOTAL 6.40
ELEMENTOS CANT
4.00 2.56
-
-
TOTAL 2.56
ELEMENTOS CANT
-
9.00 1.46
-
TOTAL 1.46
ELEMENTOS CANT
-
8.00 0.86
-
TOTAL 0.86
ELEMENTOS CANT
-
80.00 95.42
-
TOTAL 95.42
ELEMENTOS CANT
-
32.00 64.65
-
TOTAL 64.65
COMPUTOS METRICOS
ELEMENTOS CANT
-
96.00 101.96
-
TOTAL 101.96
ELEMENTOS CANT
-
8.00 4.61
-
TOTAL 4.61
ELEMENTOS CANT
-
36.00 14.40
-
TOTAL 14.40
ELEMENTOS CANT
-
8.00 1.30
-
TOTAL 1.30
ELEMENTOS CANT
-
8.00 9.22
-
TOTAL 9.22
ELEMENTOS CANT
2.00 0.80
4.00 0.32
-
TOTAL 1.12
COMPUTOS METRICOS
ELEMENTOS CANT
2.00 1.60
4.00 0.64
-
TOTAL 2.24
ELEMENTOS CANT
12.00 444.91
60.00 526.62
6.00 222.46
TOTAL 1,193.99
ELEMENTOS CANT
268.00 194.76
107.00 77.76
-
TOTAL 272.51
ELEMENTOS CANT
2.00 4.80
4.00 1.92
-
TOTAL 6.72
ELEMENTOS CANT
-
3.00 22.50
7.00 31.50
TOTAL 54.00
ELEMENTOS CANT
-
1.00 8.00
-
COMPUTOS METRICOS
TOTAL 8.00
ELEMENTOS CANT
8.00 8.00
-
-
TOTAL 8.00
ELEMENTOS CANT
1.00 107.20
-
-
TOTAL 107.20
ELEMENTOS CANT
1.00 20.00
-
-
TOTAL 20.00
ELEMENTOS CANT
8.00 1,639.30
-
-
TOTAL 1,639.30
ELEMENTOS CANT
6.00 2,486.40
18.00 1,491.84
-
TOTAL 3,978.24
COMPUTOS METRICOS
ELEMENTOS CANT
2.00 578.00
-
-
TOTAL 578.00
ELEMENTOS CANT
4.00 231.20
-
-
TOTAL 231.20
ELEMENTOS CANT
1.00 230.40
-
-
TOTAL 230.40
ELEMENTOS CANT
1.00 460.80
-
-
TOTAL 460.80
ELEMENTOS CANT
1.00 2,483.92
-
-
TOTAL 2,483.92
ELEMENTOS CANT
1.00 80.00
-
-
TOTAL 80.00
CRONOGRAMA ACTIVIDADES
41 Excavacion en tierra con uso de maquina para asentamiento de m3 17.28 24.00 0.72
fundaciones, entre 0,00 m y 1,80 m de profundidad (F1)
42 Excavacion en tierra con uso de maquina para asentamiento de m3 - 24.00 0.00
fundaciones, entre 0,00 m y 1,80 m de profundidad (F2)
43 Excavacion en tierra a mano para zanjas u otros m3 6.40 1.80 3.56
inc. Perfilamiento. Seccion F1 (viga de riostra)
44 Excavacion en tierra a mano para zanjas u otros m3 2.56 1.80 1.42
inc. Perfilamiento. Seccion F2 (viga de riostra)
45 Compactacion de suelo base para fundaciones con pison m3 1.46 3.04 0.48
mecanico (vailarina)
46 Suministro, transporte y colocacion de concreto pobre Mr 48 kg/cm2 m3 0.86 7.00 0.12
premezclado para sub base de zapata e= 7,5 cm
47 Suministro, preparacion y colocacion de acero de refuerzo fy=4200 kgf 95.42 500.00 0.19
kg/cm2 para base de fundacion utilizando cabilla estriada
48 Suministro, preparacion y colocacion de acero de refuerzo fy=4200 kgf 64.65 400.00 0.16
kg/cm2 para pedestales utilizando cabilla estriada
49 Suministro, preparacion y colocacion de acero de refuerzo fy=4200 kgf 101.96 600.00 0.17
kg/cm2 para estribos en pedestales utilizando cabilla estriada 3/8
50 Suministro, transporte y colocacion de concreto Rcc 250 kg/cm2 m3 4.61 42.00 0.11
premezclado para base de fundaciones.
51 Encofrado de madera vertical para pedestales m2 14.40 50.00 0.29
CRONOGRAMA ACTIVIDADES
van. 8.29
N DESCRIPCION DE LA PARTIDA UM CANT RENDIM- TOTAL DIAS
DIA DIAS 1 2 3 4 5 6 7 8 9
52 Suministro, transporte y colocacion de concreto Rcc 250 kg/cm2 m3 1.30 42.00 0.03
premezclado para pedestales
53 Colocacion de material extraido de la excavacion para relleno de m3 9.22 30.00 0.31
fundaciones. Inc. Compactacion.
10 11 12 13 14 15 16
CRONOGRAMA ACTIVIDADES
10 11 12 13 14 15 16
CRONOGRAMA ACTIVIDADES
10 11 12 13 14 15 16
CURVA DE INVERSION
PORCENTAJE
120.00
100.00
80.00
60.00
40.00
20.00
-
1 2 3 4
1 2 3
DESEMBOLS 10,280,138.42 5,140,069.21 5,140,069.21
PORCENTAJE 50.00 25.00 25.00
ERSION
TOTAL
20,560,276.83
100.00