Professional Documents
Culture Documents
a. Biaya Eksplorasi
- Survey
- Eksplorasi
- Studi kelayakan
- Studi UKL/UPL
- Biaya Pengujian 20 800,000
- Biaya Pemboran
Sub Total
b. Pembebasan Lahan
- Pembebasan Tanah/hektar 27 ha 10,000,000
- Ganti tanaman/ hektar 30 ha 7,500,000
- Ganti Rugi Pohon
kelapa Sawit 33600 pohon 25,000
Total
Sub Total
total
KSPLORASI
Biaya total
15,000,000
100,000,000
50,000,000
50,000,000
110,000,000
50,000,000
375,000,000
270,000,000
225,000,000
840,000,000
1,335,000,000
1,830,000,000
2,205,000,000
Biaya Konstruksi dan Rekayasa
40,000,000.00
150,000,000.00
300,000,000.00
30,000,000.00
25,000,000.00
500,000,000.00
500,000,000.00
40,000,000.00
1,585,000,000.00
900,000,000.00
900,000,000.00
500,000,000.00
100,000,000.00
100,000,000.00
75,000,000.00
775,000,000.00
3,260,000,000.00
Biaya Pembelian Peralatan Operasi (Investasi awal peralatan)
2,008,500,000
4,017,000,000
1004250000
6,025,500,000
8,000,000.00
10,000,000.00
12,000,000.00
3,000,000.00
33,000,000
9,000,000.00
300,000,000.00
57,500,000.00
675,000.00
3,000,000.00
370,175,000
6,250,000
22,500,000
15,000,000
3,000,000
450,000
150,000,000
1,000,000,000
1,197,200,000
7,625,875,000
Biaya Pembelian Peralatan
A. Peralatan tambang
Backhoe Komatsu PC200-7SEF (Sewa perjam) 2
Dump Truck Hino 130 HD (Sewa Perjam) 4
Bulldozer 1
Sub Total
B. Peralatan di Bengkel
- Dongkrak 4
- Alat las dan patri 2
- Alat bengkel 4
- Kompresor 1
Sub Total
C. Peralatan Pendukung Operasional
- Genset 1
- Mobil Operasional 2
- Sepeda Motor 5
- Bola Lampu Ruangan 45
- HT 15
Sub Total
D. Peralatan K3
- Helm pengaman 125
- Sepatu pengaman 125
- Kacamata pelindung 150
- Ear Protector 150
- Masker debu 150
- Ambulans 1
- Perlengkapan P3K 2
Sub Total
TOTAL INVESTASI PERALATAN
Biaya Pembelian Peralatan Operasi (Investasi peralatan tahunan)
2,000,000.00 8,000,000.00
5,000,000.00 10,000,000.00
3,000,000.00 12,000,000.00
3,000,000.00 3,000,000.00
33,000,000
9,000,000.00 9,000,000.00
150,000,000.00 300,000,000.00
11,500,000.00 57,500,000.00
15,000.00 675,000.00
200,000.00 3,000,000.00
370,175,000
50,000.00 6,250,000
180,000.00 22,500,000
100,000.00 15,000,000
20,000.00 3,000,000
3,000.00 450,000
150,000,000.00 150,000,000
500,000,000.00 1,000,000,000
1,197,200,000
7,625,875,000
BIAYA INVENTARIS
1. Inventaris Kantor
- meja 20 175,000 3,500,000 1
- Kursi 50 100,000 5,000,000 1
- Meja & kursi untuk rapat 2 1,500,000 3,000,000 1
- Lemari arsip 3 2,000,000 6,000,000 1
- Rak buku 2 1,500,000 3,000,000 1
- Komputer 10 4,500,000 45,000,000 1
- Printer kecil 2 1,000,000 2,000,000 1
- Printer besar 1 2,000,000 2,000,000 1
- Televisi 2 1,000,000 2,000,000 1
- Faximile 1 350,000 350,000 1
- Mesin Fotokopi 1 3,500,000 3,500,000 1
- Dispenser 2 250,000 500,000 1
- White Board 2 200,000 400,000 1
- Telephone 4 300,000 1,200,000 1
- Genset 1 2,600,000 2,600,000 1
- Proyektor 2 2,000,000 4,000,000 1
- CCTV 10 500,000 5,000,000 1
- Tempat Sampah 4 20,000 80,000 1
- AC 3 2,000,000 6,000,000 1
sub total 84,050,000 1
2. Inventaris Kantor Keamanan 1
- Meja 1 175,000 175,000 1
- Kursi 2 100,000 200,000 1
- Telephone 1 300,000 300,000 1
- Dispenser 1 250,000 250,000 1
- Tempat Sampah 1 20,000 20,000 1
- HT 2 400,000 800,000 1
- Televisi 1 500,000 500,000 1
subtotal 2,245,000 1
3. Inventaris Mess Karyawan
- Tempat tidur + kasur 40 2,500,000 100,000,000 1
- Televisi 20 500,000 10,000,000 1
- Lemari 20 600,000 12,000,000 1
- Kipas Angin 20 175,000 3,500,000 1
- Telephone 2 300,000 600,000 1
- Dispenser 5 250,000 1,250,000 1
subtotal 127,350,000 1
3. Inventaris Kantin
- Meja + Kursi 15Set 1,000,000 20,000,000 1
- Meja Prasmanan 1Set 2,000,000 2,000,000 1
- Peralatan Masak 1Set 4,000,000 4,000,000 1
- Peralatan Makan 7 set 100,000 700,000 1
- Dispenser 2 250,000 500,000 1
- Kulkas 1 1,200,000 1,200,000 1
- TV 1 500,000 500,000 1
- Tempat Sampah 3 20,000 60,000 1
subtotal 28,960,000.0
Total 242,605,000
Jenis Alat Jumlah (unit)
A. Peralatan tambang
Backhoe Komatsu PC200-7SEF (Sewa perjam) 2
Dump Truck Hino 130 HD (Sewa Perjam) 4
Bulldozer 1
Sub Total
B. Peralatan di Bengkel
- Dongkrak 4
- Kompresor 1
Sub Total
C. Peralatan Pendukung Operasional
- Genset 1
- Mobil Operasional 2
- Sepeda Motor 5
Sub Total
E. Peralatan K3
- Ambulans 1
Sub Total
TOTAL INVESTASI PERALATAN
Biaya Pembelian Peralatan Oper
l 200,850,000 602,550,000
1 903,825,000.00 1,807,650,000.00
1 903,825,000.00 3,615,300,000.00
1
1,807,650,000.00 5,422,950,000.00
1 1,800,000.00 7,200,000.00
1 2,700,000.00 2,700,000.00
4,500,000.00 9,900,000.00
1 8,100,000.00 8,100,000.00
1 135,000,000.00 270,000,000.00
1 10,350,000.00 51,750,000.00
153,450,000.00 329,850,000.00
1 135,000,000.00 135,000,000.00
135,000,000.00 135,000,000.00
0 2,100,600,000 5,897,700,000
2 3 4
2 3 4 5
TAHUN
Total Tereskalasi
eskalasi
BIAYA PERBAIKAN DAN PERAWATAN A
TAHUN
1 2 3
1 2 3
Err:509 Err:509 Err:509
6%
BIAYA PERBAIKAN DAN PERAWATAN ALAT
N
4 5 6
4 5 6
Err:509 Err:509 Err:509
TAHUN
7 8 9
7 8 9
Err:509 Err:509 Err:509
TAHUN
10 11 12
10 11 12
Err:509 Err:509 Err:509
TAHUN
13 14 15
13 14 15
Err:509 Err:509 Err:509
16
813,442,500.00
Err:509
1,485,000.00
49,477,500.00
Err:509
8,000,000.00
30,000,000.00
60,000,000.00
6,000,000.00
5,000,000.00
100,000,000.00
100,000,000.00
8,000,000.00
317,000,000
25,000,000.00
5,000,000.00
5,000,000.00
3,750,000.00
38,750,000
Err:509
16
Err:509
LAMPIRAN H.6
BIAYA KEBUTUHAN BBM
TOTAL
total daya perhari (kw) biaya per hari biaya per tahun
14 6,912 2,073,600
Dalam 1 Tahun = 2,903,040
Tahap /tahun : 1
Diklat/Kursus K3 12,000,000
Safety Campaign 4,000,000
Pemasangan Rambu-rambu 7,500,000
Pemeriksaan kesehatan 35,000,000
Total 58,500,000
Pengembangan Masyarakat
Tahap/Tahun 1
Pengembangan Masyarakat -
Perbaikan Sarana Pendidikan
Perpustakaan Keliling 60,000,000
Penyelenggaraan Pertandingan Olahraga
Pengadaan Sarana Olahraga
Perbaikan Sarana Kesehatan 180,000,000
Perbaikan Sarana Keagamaan
Pembangunan Sarana Air Bersih 100,000,000
Total - 340,000,000
AN LINGKUNGAN
2 3 4 5 6
12,000,000 12,000,000 12,000,000 12,000,000 12,000,000
4,000,000 4,000,000 4,000,000 4,000,000 4,000,000
7,500,000 7,500,000 7,500,000 7,500,000 7,500,000
35,000,000 35,000,000 35,000,000 35,000,000 35,000,000
58,500,000 58,500,000 58,500,000 58,500,000 58,500,000
mbangan Masyarakat
2 3 4 5 6
7 8 9 10 11
95,000,000
8,000,000 8,000,000 8,000,000 8,000,000 8,000,000
9,000,000
15,000,000
12 13 14 15 16
85,000,000
8,000,000 8,000,000
8,000,000 8,000,000
8,000,000 8,000,000
8,000,000 8,000,000
6,000,000 12,000,000
6,000,000 12,000,000
6,000,000 12,000,000
6,000,000 12,000,000
6,000,000 12,000,000
7,000,000 14,000,000
6,000,000 12,000,000
7,000,000 14,000,000
6,000,000 12,000,000
5,000,000 30,000,000
5,000,000 40,000,000
4,000,000 8,000,000
5,000,000 30,000,000
327,000,000
TAHUN
Total Tereskalasi 5% 1 2
0 0
3 4 5 6 7
0 0 0 0 0
8 9 10 11 12
0 0 0 0 0
13 14 15 16
0 0 0 0
Biaya Operasi
Komponen
- Biaya Variable
- Biaya Pemaikaian Listrik
- Biaya Pemaikaian Telepon
- Biaya Pemakaian Air
- Kebutuhan BBM
- Kesehatan dan Keselamatan Kerja
- Pengembangan Masyarakat
-Biaya Tetap
- Depresiasi (UU No. 36 Tahun 2008)
- Amortisasi (UU No. 36 Tahun 2008)
- Gaji Pegawai
- Biaya PBB (8% konstruksi)
Total Biaya Operasi
ya Operasi
Biaya
18,982,512
2,903,040
99,900,000
688,500,000
58,500,000
100,000,000
5,897,700,000
15,500,000
-
260,800,000
7,142,785,552
MODAL KERJA
3
4
5
c Fasilitas Penunjang
1
2
4
5
6
7
8
KEGIATAN
Biaya Langsung
Tapak Bekas Tambang
Pembongkaran Fasilitas Tambang
Reklamasi lahan bekas fasilitas tambang
Pembongkaran dan reklamasi Jalan Tambang
Reklamasi Tambang Permukaan (pit, waste dump)
Reklamasi lahan bekas kolam pengendap
Pengamanan semua bukaan tambang yang berpotensi bahaya
terhadap manusia (shaft, raise, stope, edit, decline, tunnel, dan lain-lain)
Fasilitas Pengolahan dan atau Pemurnian
Pembongkaran fasilitas pengolahan dan pemurnian
Reklamasi lahan bekas fasilitas pengolahan dan pemurnian
Bulan 1 2 3 4 5
Sasaran produksi 77617 77617 77617 77617 77617
eskalasi 1%
6 7
77617 77617
6 7
Rp 7,063,116,667 Rp 7,063,116,667
Rp 7,063,116,667 Rp 7,063,116,667
Bulan
A. BIAYA PERSIAPAN PEMBUKAAN TAMBANG
1 BIAYA EKSPLORASI
- Survey
- Pemetaan
- Study AMDAL
- Studi kelayakan
- Biaya pengujian
- Biaya pemboran
sub total
2 PEMBEBASAN LAHAN
- Pembebasan Lahan
- Ganti rugi tanaman
- Ganti rugi pohon
sub total
3 BIAYA PERIJINAN
- Surat Ijin Gangguan
- Surat Ijin Pemakaian Jalan
- Surat Ijin Usaha Penambangan
- Surat Pengajuan Tenaga Kerja
- Surat Usaha Perdagangan
- Surat Ijin Pengangkutan dan Penggunaan Alat
- Surat Ijin Kepolisian
- Surat Ijin Membangun Bangunan
- Surat Ijin Tempat Usaha
sub total
TOTAL
B BIAYA KONSTRUKSI DAN REKAYASA
1 Bangunan
- Kantor
- Tangki Bahan Bakar
- Mess
- Kantin
- Mushola
- Stock Yard
- Bengkel
- Pos Keamanan
2 Infrastruktur
- Jalan Tambang
- Instalasi Jaringan Listrik
- Instalasi Jaringan Air
- Instalasi Jaringan Telepon
3 Sarana Layanan Tambang
- Settling Pond
TOTAL
C INVESTASI ALAT
1 Peralatan tambang
2 Peralatan Inventaris
3 Peralatan bengkel
4 Peralatan K3
5 Peralatan Pendukung operasional
TOTAL
MODAL KERJA
Modal Kerja
D TOTAL
TOTAL INVESTASI/BLN
MODAL KERJA
KOMULATIF INVESTASI 1 TAHUN
TOTAL INVESTASI
BIAYA-BIAYA YANG DIBUTUHKAN PADA TAHUN 0
0 1 2 3 4
15,000,000
100,000,000
50,000,000
50,000,000
110,000,000
50,000,000
115,000,000 260,000,000
270,000,000
225,000,000
1,335,000,000
1,830,000,000
1,000,000
1,500,000
1,500,000
1,500,000
1,500,000
2,500,000
2,000,000
3,000,000
1,000,000 4,000,000 4,500,000 5,000,000
116,000,000 264,000,000 1,834,500,000 5,000,000
40,000,000
150,000,000
300,000,000
30,000,000
25,000,000
500,000,000
500,000,000
40,000,000
500,000,000
100,000,000
100,000,000
75,000,000
900,000,000
700,000,000 1,660,000,000 900,000,000
5,357,089,164
16,920,372,776
22,277,461,940
TUHKAN PADA TAHUN 0 (Rp. 1000)
5 6 7 8 9
6,025,500,000
242,605,000
33,000,000
1,197,200,000
370,175,000
6,301,105,000 0 1,197,200,000 370,175,000
15,000,000
100,000,000
50,000,000
50,000,000
110,000,000
50,000,000
375,000,000
0
270,000,000
225,000,000
1,335,000,000
1,830,000,000
0
1,000,000
1,500,000
1,500,000
1,000,000 1,000,000
1,500,000
1,500,000
2,500,000
2,000,000
3,000,000
1,000,000 15,500,000
1,000,000 2,220,500,000
40,000,000
150,000,000
300,000,000
30,000,000
25,000,000
500,000,000
500,000,000
40,000,000
0
500,000,000
100,000,000
100,000,000
75,000,000
0
900,000,000
3,260,000,000
6,025,500,000
242,605,000
33,000,000
1,197,200,000
370,175,000
7,868,480,000
Pembayaran Bunga
1 2 3
756,733,819 0 -756,733,819
Angsuran Pinjaman
1 2 3
7,567,338,194 7,567,338,194 7,567,338,194
Bunga
4 5
-1,513,467,639 -2,270,201,458
njaman
4 5
7,567,338,194 7,567,338,194
n Pinjaman
4 5
6,053,870,555 5,297,136,736
URAIAN
0
Pendapatan
Hasil Penjualan
Royalti (7%)
Pendapatan Setelah Royalti
Nilai Sisa
Biaya Operasi
- Biaya Variable
- Biaya Pemaikaian Listrik
- Biaya Pemaikaian Telepon
- Biaya Pemakaian Air
- Kebutuhan BBM
- Kesehatan dan Keselamatan Kerja
- CSR
Dana cadangan
- Reklamasi dan Pasca Tambang
-Biaya Tetap
- Depresiasi (UU No. 36 Tahun 2008)
- Amortisasi (UU No. 36 Tahun 2008)
- Bunga Pinjaman
- Gaji Pegawai
- Jaminan Sosial Tenaga Kerja (6% gaji)
- Biaya PBB
Total Biaya Operasi
Pendapatan Terpajak
Pajak (25%)
Pendapatan Bersih
Depresiasi
Amortisasi
Investasi Pengganti
Investasi Total -15,134,676,388
Modal Kerja Kembali
Modal Pinjaman 7,567,338,194
Angsuran Pinjaman
Jaminan Reklamasi dan Pasca Tambang Kembali
Net Cash Flow -7,567,338,194
Cumulative Cash Flow -7,567,338,194
i*=
NPV=
IRR=
PBP=
PBP=
CASH FLOW
1 2 3 4
1,785,696,388
-7,567,338,194
2,039,406,000
-1,178,859,266 -343,018,477 5,718,780,072 6,252,195,980
-8,746,197,460 -9,089,215,936 -3,370,435,865 2,881,760,115
15%
11,978,231,176
34%
3.6 Bulan
1.5 bulan
CASH FLOW
Bulan
5 6 7 8
18,326,000,000.00
84,757,400,000
(5,933,018,000)
78,824,382,000
655,300,000
-
-
(302,147,045)
(40,741,770)
(1,402,014,080)
(9,234,223,778)
(702,000,000)
(100,800,000)
(3,787,176,942)
-
(70,772,400,000)
31,000,000
3,783,669,097
(3,924,000,000)
(235,440,000)
(3,129,600,000)
(90,815,874,517)
(11,991,492,517)
2,997,873,129
(8,993,619,388)
70,772,400,000
186,000,000
(7,625,875,000)
-
1,785,696,388
-
(7,567,338,194)
2,039,406,000
50,596,669,806
193,305,572,941