CLIENT: Public Utilities Board (PUB)

INSTRUMENTATION AND MONITORING


FOR CONSTRUCTION OF STAMFORD DIVERSION
CANAL CONTRACT 2

AT
GRANGE ROAD
GEOTECHNICAL INSTRUMENTATION
MONITORING REPORT
(CUT AND COVER)

REPORT NO. ON:


348 3-Feb-2017

Client: Public Utilities Board (PUB)

Instrumentation Contractor: GeoApplication Engineers Pte Ltd


5 Upper Aljunied Link, #06-01
Quartz Industrial Building
Tel: 6383 1548 (Main Office Line) Fax: 6287 5848
Monitoring Report 347

GeoApplication Engineers Pte Ltd

CONTENT

I General

II Installation Status

III Summary of Results

IV Vibration Meter Results

V Noise Meter Results

VI Conclusion

Appendix - Detailed Monitoring Results and Instrument Layout Plans


I. General
The instrumentation work for this project involves supply , installation and monitoring work for the installed geotechnical instrument at the site of Construction of Stamford Diversion Canal - Contract 2.The
monitoring work will be carried out according to the main construction program and based on the monitoring zone. The installed instruments will be monitored thrice weekly @ launching shaft during the
excavation period.

II. Installation Status


Item Instrument Name Location Installed Proposed Progress ( % ) Remarks
1 Ground Settlement Marker Zion Church 8
2 Building settlement markers Zion Church 4
3 Tiltmeters Zion Church 3
4 Vibration monitoring sensor Zion Church 1
5 Crack Meter Zion Church 11
1 Building Settlement Marker Canal Alignment 40 0%
2 Ground Settlement Marker Canal Alignment 39 149 26%
3 Inclinometer Canal Alignment 8 35 23% IS20804; IS20805; IS20808; IS20807; IS20809; IS20810; IS20812; IS20803
4 Water standpipe Canal Alignment 3 10 30% GWS20808; GWS20804; GWS20809
5 Piezometer Canal Alignment 3 10 30% GWV20808; GWV20804; GWV20809
6 Tilt Meter Canal Alignment 10 0%
7 Vibration Meter Canal Alignment 10 0%
8 Noise Meter Canal Alignment 10 0%
9 Strain Gauge Canal Alignment 4 SG51-1; SG51-2; SG52-1; SG52-2 - Removed
1 Ground Settlement Marker Irwell Bank Rd 6 12 50%
2 Inclinometer Irwell Bank Rd 6 12 50%
3 Piezometer Irwell Bank Rd 2 4 50%

III. Summary of Monitoring Results


1. Building Settlement Markers
Cumulative settlement Change (mm) from Initial
Instrument Alert Suspension Monitoring
Current reduced level (m) Reading Location
ID (mm) on 03 Feb 2017 last reading on 02 Feb 2017 Date (mm) (mm) Frequency
(m)
LB20805 -0.4 0.3 105.3735 105.3739 25-Jun-2015 -18 -25 Zion Gospel Church Daily
LB20806 0.8 0.4 105.2787 105.2779 25-Jun-2015 -18 -25 Zion Gospel Church Daily
LB20807 -1.0 0.1 105.2870 105.2880 25-Jun-2015 -18 -25 Zion Gospel Church Daily
LB20808 1.7 0.1 105.2985 105.2968 25-Jun-2015 -18 -25 Zion Gospel Church Daily
LB20809 -0.3 0.3 105.3520 105.3523 12-Dec-2016 -18 -25 Zion Gospel Church Daily
LB20810 0.3 0.3 105.2909 105.2906 12-Dec-2016 -18 -25 Zion Gospel Church Daily
LB20811 0.4 0.2 105.2295 105.2291 12-Dec-2016 -18 -25 Zion Gospel Church Daily
Note:
Interpretation: No significant changes were recorded during this monitoring period, all changes were within alert level.

2. Ground Settlement Markers


Cumulative settlement Change (mm) from Initial
Instrument Alert Suspension Monitoring
Current reduced level (m) Reading Location
ID (mm) on 03 Feb 2017 last reading on 02 Feb 2017 Date (mm) (mm) Frequency
(m)
LG20801 1.1 0.2 105.0408 105.0397 25-Jun-2015 Zion Gospel Church Daily
LG20802 0.6 0.4 104.9752 104.9746 25-Jun-2015 Zion Gospel Church Daily
LG20803 1.9 0.4 104.9401 104.9382 25-Jun-2015 Zion Gospel Church Daily
LG20804 -2.6 0.1 104.8925 104.8951 25-Jun-2015 Zion Gospel Church Daily
LG20805 0.1 0.4 104.9119 104.9118 25-Jun-2015 Zion Gospel Church Daily
LG20806 -5.8 0.2 105.0484 105.0499 25-Jun-2015 Zion Gospel Church Daily
LG20807 -3.3 0.3 105.0570 105.0603 25-Jun-2015 Zion Gospel Church Daily
LG20808 -1.6 -0.1 104.9578 104.9594 25-Jun-2015 Zion Gospel Church Daily
LG20751B - 106.8114 30-Apr-2016 -13 -19 Canal Alignment Thrice Weekly
LG20752B - 106.7524 30-Apr-2016 -13 -19 Canal Alignment Thrice Weekly
LG20753B - 106.7536 30-Apr-2016 -13 -19 Canal Alignment Covered
LG20754A - 106.7899 25-Feb-2016 -13 -19 Canal Alignment Thrice Weekly
LG20755 - 106.9796 26-Jan-2016 -13 -19 Canal Alignment Covered
LG20756 - 107.1271 26-Jan-2016 -13 -19 Canal Alignment Thrice Weekly
LG20761A - 106.8446 23-Feb-2016 -13 -19 Canal Alignment Completed
LG20762A - 106.8555 23-Feb-2016 -13 -19 Canal Alignment Completed
LG20763B - 106.7233 30-Apr-2016 -13 -19 Canal Alignment Completed
LG20764B - 106.7575 30-Apr-2016 -13 -19 Canal Alignment Completed
LG20765B - 106.8297 5-May-2016 -13 -19 Canal Alignment Completed
LG20766 - 106.8782 22-Oct-2015 -13 -19 Canal Alignment Completed
LG20771 - 107.5877 22-Sep-2015 -13 -19 Canal Alignment Covered
LG20772 - 107.4194 22-Sep-2015 -13 -19 Canal Alignment Damaged
LG20773A - 107.5305 7-Jan-2016 -13 -19 Canal Alignment Covered
LG20774 - 106.5744 22-Sep-2015 -13 -19 Canal Alignment Damaged
LG20775 - 106.5599 22-Sep-2015 -13 -19 Canal Alignment Covered
LG20776 - 106.5269 22-Sep-2015 -13 -19 Canal Alignment Covered
LG20781A - 108.1107 7-Jan-2016 -13 -19 Canal Alignment Damaged
LG20782A - 107.7869 7-Jan-2016 -13 -19 Canal Alignment Damaged
LG20783A - 107.5293 7-Jan-2016 -13 -19 Canal Alignment Covered
LG20784A - 106.7278 7-Jan-2016 -13 -19 Canal Alignment Covered
LG20785A - 106.4662 7-Jan-2016 -13 -19 Canal Alignment Covered
LG20786A - 106.1983 7-Jan-2016 -13 -19 Canal Alignment Covered
LG20811A - 108.0094 16-Aug-2016 -13 -19 Canal Alignment Twice Weekly
LG20812A - 107.8624 16-Aug-2016 -13 -19 Canal Alignment Twice Weekly
LG20813A - 107.7016 16-Aug-2016 -13 -19 Canal Alignment Twice Weekly
LG20814A - 106.6002 16-Aug-2016 -13 -19 Canal Alignment Twice Weekly
LG20815 - 106.5221 18-Jun-2016 -13 -19 Canal Alignment Twice Weekly
LG20816 - 106.3093 18-Jun-2016 -13 -19 Canal Alignment Twice Weekly
LG20821 - 111.9433 3-May-2016 -38 -54 Canal Alignment Covered
LG20822 - 111.9761 3-May-2016 -38 -54 Canal Alignment Twice Weekly
LG20823 - 111.9668 3-May-2016 -38 -54 Canal Alignment Covered
LG20824 - 110.3443 3-May-2016 -37 -53 Canal Alignment Twice Weekly
LG20825 - 110.4534 3-May-2016 -37 -53 Canal Alignment Twice Weekly
LG20826 - 110.5429 3-May-2016 -37 -53 Canal Alignment Twice Weekly
LG20834 - 111.5574 3-May-2016 -38 -54 Canal Alignment Covered
LG20835 - 111.4880 3-May-2016 -38 -54 Canal Alignment Covered
LG20836 - 111.3911 3-May-2016 -38 -54 Canal Alignment Twice Weekly
SM201 - 116.9544 23-Nov-2016 -20 -30 Irwell Bank Road Twice Weekly
SM202 - 116.7319 23-Nov-2016 -20 -30 Irwell Bank Road Twice Weekly
SM203 - 116.4207 23-Nov-2016 -20 -30 Irwell Bank Road Twice Weekly
SM204 - 115.7946 23-Nov-2016 -20 -30 Irwell Bank Road Twice Weekly
SM205 - 115.1078 23-Nov-2016 -20 -30 Irwell Bank Road Twice Weekly
SM206 - 114.5677 23-Nov-2016 -20 -30 Irwell Bank Road Twice Weekly
SM207 - 113.1498 29-Dec-2016 -20 -30 Irwell Bank Road Twice Weekly
SM208 - 111.4718 29-Dec-2016 -20 -30 Irwell Bank Road Twice Weekly
SM209 - 110.2948 29-Dec-2016 -20 -30 Irwell Bank Road Twice Weekly
SM210 - 109.0629 29-Dec-2016 -20 -30 Irwell Bank Road Twice Weekly
SM211 - 108.6405 29-Dec-2016 -20 -30 Irwell Bank Road Twice Weekly
SM212 - 108.2785 29-Dec-2016 -20 -30 Irwell Bank Road Twice Weekly
Note:
Interpretation: No significant changes were recorded during this monitoring period.

3. Tilt Meter
Instrument Current Reading on 03 Feb 2017 Change (min) from Alert Suspension Monitoring
Initial Date Location
ID (1:) Tilt (min) mm/m reading on 02 Feb 2017 ( 1: ) ( 1: ) Frequency
TM20802 943 3.644 1.060 -0.069 25-Jun-2015 750 500 Zion Gospel Church Daily
TM20803 1020 3.369 0.980 0.206 25-Jun-2015 750 500 Zion Gospel Church Daily
TM20804 1613 2.131 0.620 -0.069 25-Jun-2015 750 500 Zion Gospel Church Daily
ATM20805 12500 0.275 0.080 -0.138 8-Dec-2016 750 500 Zion Gospel Church Daily
ATM20806 0.069 0.020 0.138 8-Dec-2016 750 500 Zion Gospel Church Daily
Note:
Interpretation: No significant changes were recorded during this monitoring period, all changes were within alert level.

4. Inclinometer
Current reading on 03 Feb 2017 Change (mm) from
Initial Date
Instrument A Direction B Direction last reading on 02 Feb 2017 Alert Suspension
Location Monitoring Frequency
ID Max. Max. (mm) (mm)
@ depth @ depth A B Reading Date
Movement Movement
IS20803 15.26 0.50 -4.78 1.00 -0.18 0.50 0.00 29-Nov-2016 +/- 16 +/- 23 Canal Alignment Twice Weekly
IS20804 25.11 6.50 -10.59 1.50 -0.03 -0.38 0.00 4-Feb-2016 +/- 16 +/- 23 Canal Alignment Thrice Weekly
IS20805 0.00 2-Feb-2016 +/- 16 +/- 23 Canal Alignment Covered
IS20807 0.00 11-Feb-2016 +/- 16 +/- 23 Canal Alignment Completed
IS20808 0.00 20-Jan-2015 +/- 16 +/- 23 Canal Alignment Completed
IS20810 0.00 7-Jul-2016 +/- 16 +/- 23 Canal Alignment Completed
IS20809 3.23 0.50 3.99 3.50 1.78 0.30 0.00 10-Sep-2016 +/- 43 +/- 61 Canal Alignment Twice Weekly
IS20811 0.67 1.50 -1.52 1.00 0.67 -1.52 0.00 26-Jan-2017 +/- 46 +/- 66 Canal Alignment Twice Weekly
IS20812 24.93 0.50 9.38 0.50 16.67 13.67 0.00 10-Sep-2016 +/- 46 +/- 66 Canal Alignment Twice Weekly
IS20814 -0.68 2.00 1.78 0.50 -0.68 1.78 0.00 26-Jan-2017 +/- 46 +/- 66 Canal Alignment Twice Weekly
1) IS20808 breached AL due to sheet piling installation works. The breach in review level has been reported to BCA in the monthly Annex E submission. The excavation is currently at the backfilling stage after construction of
Note:
permanent works. Monitoring of inclinometer to continue till backfilling works is completed.
IS20807 was reinitialised due to disturbance of the IS20807 during Installation of Soldier Pile using Vibro Hammeron on 20-2-2016.
Significant changes for IS20810 on 20-9-2016.
Interpretation: No significant changes were recorded during this monitoring period, all changes were within alert level.

4.1 Inclinometer (Irwell Bank Rd)


Current reading on 17 Jan 2017 Change (mm) from
Initial Date
Instrument A Direction B Direction last reading on 14 Jan 2017 Alert Suspension
Location Monitoring Frequency
ID Max. Max. (mm) (mm)
@ depth @ depth A B Reading Date
Movement Movement
IS201 0.72 1.50 -0.42 4.50 -0.21 0.36 0.00 14-Nov-2016 +/- 40 +/- 50 Irwell Bank Rd Twice Weekly
IS202 -2.18 0.50 -4.06 0.50 -0.73 0.84 0.00 17-Nov-2016 +/- 40 +/- 50 Irwell Bank Rd Twice Weekly
IS203 -1.39 1.00 -1.52 2.00 0.00 -0.07 0.00 26-Nov-2016 +/- 40 +/- 50 Irwell Bank Rd Twice Weekly
IS204 2.74 0.50 3.26 1.50 0.52 1.28 0.00 26-Nov-2016 +/- 40 +/- 50 Irwell Bank Rd Twice Weekly
IS205 -3.04 0.50 -2.75 0.50 -0.19 -0.18 0.00 3-Dec-2016 +/- 40 +/- 50 Irwell Bank Rd Twice Weekly
IS206 -5.49 2.00 1.39 1.50 -0.44 -1.85 0.00 3-Dec-2016 +/- 40 +/- 50 Irwell Bank Rd Twice Weekly
IS207 7.78 0.50 -3.56 0.50 10.60 -5.82 0.00 20-Dec-2016 +/- 40 +/- 50 Irwell Bank Rd Twice Weekly
IS208 0.97 0.50 -1.02 0.50 0.42 -1.48 0.00 23-Dec-2016 +/- 40 +/- 50 Irwell Bank Rd Twice Weekly
IS209 1.10 0.50 0.71 1.50 1.73 -0.29 0.00 27-Dec-2016 +/- 40 +/- 50 Irwell Bank Rd Twice Weekly
IS210 1.24 0.50 1.58 0.50 0.98 2.07 0.00 31-Dec-2017 +/- 40 +/- 50 Irwell Bank Rd Twice Weekly
IS211 -1.23 0.50 -1.68 0.50 1.30 -0.40 0.00 31-Dec-2017 +/- 40 +/- 50 Irwell Bank Rd Twice Weekly
Note:
Interpretation: No significant changes were recorded during this monitoring period, all changes were within alert level.
5. Water Standpipe
Change (m) from Initial Predetermined
Instrument Cumulative change Alert
Current water level (m) Level Location Monitoring Frequency
ID (m) on 03 Feb 2017 last reading 21 Jan 2017 Reading (m) Date (m)
(m)
GWS20804 -0.89 0.01 104.4970 105.3870 4-Feb-2016 -4.0 Canal Alignment Thrice Weekly
GWS20808 106.0180 20-Oct-2015 -4.0 Canal Alignment Completed
GWS20809 -0.05 0.02 104.3085 104.3585 10-Sep-2016 -4.0 Canal Alignment Twice Weekly
GWS202 -0.39 -0.03 112.6651 113.0551 17-Nov-2016 -4.0 Irwell Bank Rd Twice Weekly
GWS205 -0.09 0.02 111.4638 111.5538 29-Nov-2016 -4.0 Irwell Bank Rd Twice Weekly
GWS208 -0.17 -0.03 107.8072 107.9772 23-Dec-2016 -4.0 Irwell Bank Rd Twice Weekly
Note:
Interpretation: No significant changes were recorded during this monitoring period, all changes were within alert level.

6. VW Piezometer
Cumulative change (kPa) Change (kPa) from Current reading Initial Predetermined
Instrument Alert
Piezometric Piezometric Level Location Monitoring Frequency
ID on 03 Feb 2017 last reading 17 Jan 2017 Pressure (kPa) Date (kPa)
Level (m) Level (m) (kPa)
GWV20804 2.805 1.147 106.6317 105.8297 105.5434 4-Feb-2016 -40 Canal Alignment Thrice Weekly
GWV20808 105.3213 20-Oct-2015 -40 Canal Alignment Completed
GWV20809 7.050 0.513 108.4198 103.9463 103.2269 10-Sep-2016 -40 Canal Alignment Twice Weekly
GWV202 -11.565 -0.905 40.4358 111.5999 112.7800 17-Nov-2016 -40 Irwell Bank Rd Twice Weekly
GWV205 -1.895 1.505 52.3031 111.4452 111.6386 29-Nov-2016 -40 Irwell Bank Rd Twice Weekly
GWV208 -1.490 0.000 64.0179 108.8712 109.0233 23-Dec-2016 -40 Irwell Bank Rd Twice Weekly
Note:
Interpretation: No significant changes were recorded during this monitoring period, all changes were within alert level.

7. Strain Gauge
Instrument Current load (kN) Change (kN) from Initial Alert Suspension
Struct No. Monitoring Frequency
ID on 18 Jun 2016 last reading on 14 Jun 2016 Reading date (KN) (KN)

SG51-1 1A-1HS6
SG51 597.20 -15.44 0.00 03-Mar-16 898 1098 Completed
SG51-2 (1st Layer)
SG52-1 1A-1HS6
SG52 274.74 29.14 0.00 07-Apr-16 1990 2577 Completed
SG52-2 (2nd Layer)
Note: SG52 has completed, last reading on 26-4-2016. SG51 has completed on 18 June 2016
Interpretation:

8. Crack Meter (BUTTON)


Change (mm) from Current Reading on 03 Feb 2017 Initial
Alert Suspension Monitoring
Instru. ID last reading on 02 Feb 2017 Crack development (mm) Reading (mm) Location
(mm) (mm) Frequency
Reading (mm) Date
X Y X Y X Y

CM-01 -0.01 0.00 0.32 0.00 31.50 0.00 31.18 17-May-16 Zion Gospel Church Daily
CM-02 0.00 0.00 0.38 0.00 26.89 0.00 26.51 17-May-16 Zion Gospel Church Daily
CM-03 0.00 0.00 0.12 0.00 36.25 0.00 36.13 17-May-16 Zion Gospel Church Daily
CM-04 -0.01 0.00 0.35 0.00 21.43 0.00 21.08 17-May-16 Zion Gospel Church Daily
CM-05 0.00 0.00 -0.91 0.00 21.24 0.00 22.15 17-May-16 Zion Gospel Church Daily
CM-06 0.00 0.00 0.10 0.00 18.28 0.00 18.18 17-May-16 Zion Gospel Church Daily
CM-07 0.01 0.00 -1.05 0.00 21.11 0.00 22.16 17-May-16 Zion Gospel Church Daily
CM-08 0.00 0.00 0.35 0.00 27.23 0.00 26.88 17-May-16 Zion Gospel Church Daily
CM-09 0.00 0.00 -0.12 0.00 30.35 0.00 30.47 17-May-16 Zion Gospel Church Daily
CM-10 0.00 0.00 0.83 0.00 27.85 0.00 27.02 17-May-16 Zion Gospel Church Daily
CM-11 0.00 0.00 0.02 0.00 32.10 0.00 32.08 17-May-16 Zion Gospel Church Daily
Note:
Interpretation: No significant changes were recorded during this monitoring period.
REPORT NO. 347
IV. Summary of Vibration Results

3.0 Introduction for Vibration Meters

Vibration Meter VM20701 was installed on 21-March-2015; VM20802 was installed on 23-June-2015 to monitoring vibration level

caused by construction work on site. The vibration transducer was placed as indicated in attached location plan.

Monitoring
period: 23-Jan-2017 TO 2-Feb-2017

3.1 Vibration monitoring system


The vibration monitor system can be used to monitor the level of vibrations in order to minimize inconvenience caused to residents,
to give forearming to building structures and to comply with statutory requirements. Vibration monitorings were carried out using the
Minisupergraph Monitoring System. The Vibration monitoring system is essentially a computer readout unit connected to one sensitive
transducer. The transducer is installed on the ground or structure and connected to the recording unit. The recording unit will automatically
record the peak particle velocity in recording unit. The recording unit will automatically record the peak particle velocity in the vertical,
longitudinal, and transverse direction from the vibration source and compared the readings to a preset threshold level. The results will be
stored in the in-built memory if the threshold is exceeded and will download and submit the report weekly. The initial preset threshold will
be set to 2.5mm/s for VM1101 according to the instruction from client.The Alert Level is 10mm/s and Work Suspension Level is
15mm/s.The vibration transducer was placed as indicated in attached location plan.

3.2 Site activities


At the time of monitoring construction work are in progress.

3.3 Results

VM20701: There was no events recorded during this monitoring period.

VM20802: There was no events recorded during this monitoring period.

MOE-VM01: There 2 events recorded during this monitoring period. Max event recorded was 5.76mm/sec on 6th Jan 2017.

GeoApplication Engineers Pte Ltd


3.4 Interpretation of Vibration Data

Guidelines extracted from DIN 4150 for short term vibration on structures

Vibration at
horizontal
Type of structure Vibration at the foundation at a frequency of plane of highest
floor at all
frequencies
1 to 10 Hz 10 to 50 Hz 50 to 100 Hz
Buildings used for industrial
buildings, and industrial buildings,
1 and buildings of similar design 20 mm/s 20 to 40 mm/s 40 to 50 mm/s 40 mm/s

Dwellings and buildings of similar


2 design, and/ or occupancy 5 mm/s 5 to 15 mm/s 15 to 20 mm/s 15 mm/s

Structures that, because of their


particular sensitivity to vibration,
cannot be classified under lines 1
3 and 2 and are of great intrinsic 3 mm/s 3 to 8 mm/s 8 to 10 mm/s 8 mm/s
value(e.g. listed buildings under
preservation order)

* At frequencies above 100 Hz , the values given in this column be used as minimum values

3.5 Conclusion
VM20701: There was no events recorded during this monitoring period.

VM20802: There was no events recorded during this monitoring period.

MOE-VM01: There 2 events recorded during this monitoring period. Max event recorded was 5.76mm/sec on 6th Jan 2017.

GeoApplication Engineers Pte Ltd


REPORT NO. 347
V. Summary of Noise Meter Results

4.0 Introduction for Noise Meters

Noise Meter NM20701 was installed on 21-March-2015 to noise level caused by construction work on site. The noise meter
transducer was placed as indicated in attached location plan.

Monitoring
period: 1-Oct-2016 TO 29-Nov-2016

4.2 Site activities


At the time of monitoring construction work are in progress.

4.3 Results

As attached in appendix

VI. Conclusion
Please refer to the following pages for details on installation and initial reading status, latest instrument reading, and all instrument reading
in graphic format.

GeoApplication Engineers Pte Ltd


Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2
Client: PUBLIC UTILITIES BOARD (PUB) Report No: 348

Initial Cumulative Cumulative Cumulative Cumulative Cumulative Cumulative Cumulative Cumulative


Instrument Initial
Reading 20-Jan-17 settlement 21-Jan-17 settlement 23-Jan-17 settlement 25-Jan-17 settlement 26-Jan-17 settlement 1-Feb-17 settlement 2-Feb-17 settlement 3-Feb-17 settlement
No. Reading
Date (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm)
LB20805 25-Jun-15 105.3739 105.3728 -1.1 105.3735 -0.4 105.3737 -0.2 105.3739 0.0 105.3734 -0.5 105.3737 -0.2 105.3732 -0.7 105.3735 -0.4
LB20806 25-Jun-15 105.2779 105.2791 1.2 105.2782 0.3 105.2780 0.1 105.2778 -0.1 105.2790 1.1 105.2788 0.9 105.2783 0.4 105.2787 0.8
LB20807 25-Jun-15 105.2880 105.2870 -1.0 105.2865 -1.5 105.2866 -1.4 105.2867 -1.3 105.2866 -1.4 105.2869 -1.1 105.2869 -1.1 105.2870 -1.0
LB20808 25-Jun-15 105.2968 105.2979 1.1 105.2981 1.3 105.2979 1.1 105.2977 0.9 105.2980 1.2 105.2981 1.3 105.2984 1.6 105.2985 1.7
LB20809 12-Dec-16 105.3523 105.3507 -1.6 105.3508 -1.5 105.3505 -1.8 105.3502 -2.1 105.3512 -1.1 105.3509 -1.4 105.3517 -0.6 105.3520 -0.3
LB20810 12-Dec-16 105.2906 105.2913 0.7 105.2913 0.7 105.2916 1.0 105.2919 1.3 105.2911 0.5 105.2913 0.7 105.2906 0.0 105.2909 0.3
LB20811 12-Dec-16 105.2291 105.2296 0.5 105.2294 0.3 105.2295 0.4 105.2296 0.5 105.2293 0.2 105.2294 0.3 105.2293 0.2 105.2295 0.4
Settlement (mm) Settlement (mm)

-30
-25
-20
-15
-10
-5
0
5
10
15
20

-30.0
-25.0
-20.0
-15.0
-10.0
-5.0
0.0
5.0
10.0
15.0
20.0
11/12/16 20/06/15

11/07/15

25/12/16 01/08/15

22/08/15
12/09/15

LB20805
08/01/17

LB20809
03/10/15

22/01/17 24/10/15
14/11/15

05/02/17 05/12/15

LB20806
26/12/15

LB20810
16/01/16
19/02/17
06/02/16
27/02/16
05/03/17
LB20807 19/03/16

LB20811
09/04/16
19/03/17
30/04/16
21/05/16
02/04/17
11/06/16
LB20808

02/07/16
16/04/17
23/07/16

13/08/16
30/04/17
03/09/16

24/09/16
14/05/17
15/10/16

05/11/16
28/05/17
26/11/16

17/12/16
11/06/17

AL
07/01/17
AL

Settlement Development Graph 02 (LB- Zion Church)


Settlement Development Graph 01 (LB - Zion Church)

28/01/17
25/06/17 18/02/17

11/03/17

WSL
09/07/17
WSL

01/04/17

22/04/17
23/07/17 13/05/17

03/06/17
Date

Date
Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2
Client: PUBLIC UTILITIES BOARD (PUB) Report No: 348

Cumulative Cumulative Cumulative Cumulative Cumulative Cumulative Cumulative Cumulative


Instrument Initial Initial
20-Jan-17 settlement 21-Jan-17 settlement 23-Jan-17 settlement 25-Jan-17 settlement 26-Jan-17 settlement 1-Feb-17 settlement 2-Feb-17 settlement 3-Feb-17 settlement
No. Reading Date Reading
(mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm)
LG20801 25-Jun-15 105.0397 105.0390 -0.7 105.0398 0.1 105.0395 -0.2 105.0392 -0.5 105.0406 0.9 105.0409 1.2 105.0406 0.9 105.0408 1.1
LG20802 25-Jun-15 104.9746 104.9742 -0.4 104.9742 -0.4 104.9741 -0.5 104.9740 -0.6 104.9751 0.5 104.9754 0.8 104.9748 0.2 104.9752 0.6
LG20803 25-Jun-15 104.9382 104.9386 0.4 104.9392 1.0 104.9390 0.8 104.9388 0.6 104.9393 1.1 104.9392 1.0 104.9397 1.5 104.9401 1.9
LG20804 25-Jun-15 104.8951 104.8927 -2.4 104.8932 -1.9 104.8934 -1.7 104.8936 -1.5 104.8926 -2.5 104.8928 -2.3 104.8924 -2.7 104.8925 -2.6
LG20805 25-Jun-15 104.9118 104.9118 0.0 104.9110 -0.8 104.9109 -0.9 104.9108 -1.0 104.9112 -0.6 104.9114 -0.4 104.9115 -0.3 104.9119 0.1
LG20806 25-Jun-15 105.0499 105.0486 -5.6 105.0488 -5.4 105.0487 -5.5 105.0486 -5.6 105.0489 -5.3 105.0492 -5.0 105.0482 -6.0 105.0484 -5.8
LG20807 25-Jun-15 105.0603 105.0578 -2.5 105.0578 -2.5 105.0581 -2.2 105.0584 -1.9 105.0571 -3.2 105.0574 -2.9 105.0567 -3.6 105.0570 -3.3
LG20808 25-Jun-15 104.9594 104.9590 -0.4 104.9581 -1.3 104.9579 -1.5 104.9577 -1.7 104.9577 -1.7 104.9578 -1.6 104.9579 -1.5 104.9578 -1.6
LG20751B 30-Apr-16 106.8114 Covered Covered Covered
LG20752B 30-Apr-16 106.7524 Covered Covered Covered
LG20753B 30-Apr-16 106.7536 Covered Covered Covered
LG20754A 25-Feb-16 106.7899 106.7670 -22.9 106.7683 -21.6 106.7682 -21.7
LG20755 26-Jan-16 106.9796 Covered Covered Covered
LG20756 26-Jan-16 107.1271 107.1242 3.9 107.1253 5.0 107.1254 5.1
LG20761A 23-Feb-16 106.8446 Completed Completed Completed
LG20762A 23-Feb-16 106.8555 Completed Completed Completed
LG20763B 30-Apr-16 106.7233 Completed Completed Completed
LG20764B 30-Apr-16 106.7575 Completed Completed Completed
LG20765B 05-May-16 106.8297 Completed Completed Completed
LG20766 22-Oct-15 106.8782 Completed Completed Completed
LG20771 22-Sep-15 107.5877 Covered Covered Covered
LG20772 22-Sep-15 107.4194 Damaged Damaged Damaged
LG20773A 07-Jan-16 107.5305 Covered Covered Covered
LG20774 22-Sep-15 106.5744 Damaged Damaged Damaged
LG20775 22-Sep-15 106.5599 Covered Covered Covered
LG20776 22-Sep-15 106.5269 Covered Covered Covered
LG20781A 07-Jan-16 108.1107 Damaged Damaged Damaged
LG20782A 07-Jan-16 107.7869 Damaged Damaged Damaged
LG20783A 07-Jan-16 107.5293 Covered Covered Covered
LG20784A 07-Jan-16 106.7278 Covered Covered Covered
LG20785A 07-Jan-16 106.4662 Covered Covered Covered
LG20786A 07-Jan-16 106.1983 Covered Covered Covered
Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2
Client: PUBLIC UTILITIES BOARD (PUB) Report No: 348

Cumulative Cumulative Cumulative Cumulative Cumulative Cumulative Cumulative Cumulative


Instrument Initial Initial
20-Jan-17 settlement 21-Jan-17 settlement 23-Jan-17 settlement 25-Jan-17 settlement 26-Jan-17 settlement 1-Feb-17 settlement 2-Feb-17 settlement 3-Feb-17 settlement
No. Reading Date Reading
(mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm)
LG20811A 16-Aug-16 108.0094 108.0075 -1.9 108.0072 -2.2
LG20812A 16-Aug-16 107.8624 107.8620 -0.4 107.8614 -1.0
LG20813A 16-Aug-16 107.7016 107.6996 -2.0 107.7002 -1.4
LG20814A 16-Aug-16 106.6002 106.5963 -3.9 106.5956 -4.6
LG20815 18-Jun-16 106.5221 106.5156 -6.5 106.5153 -6.8
LG20816 18-Jun-16 106.3093 106.3040 -5.3 106.3044 -4.9
LG20821 03-May-16 111.9433 Covered Covered
LG20822 03-May-16 111.9761 111.9576 -18.5 111.9577 -18.4
LG20823 03-May-16 111.9668 Covered 111.9584 -8.4
LG20824 03-May-16 110.3443 Covered 110.3317 -12.6
LG20825 03-May-16 110.4534 110.4224 -31.0 110.4229 -30.5
LG20826 03-May-16 110.5429 110.5368 -6.1 110.5367 -6.2
LG20834 03-May-16 111.5574 Covered Covered
LG20835 03-May-16 111.4880 Covered Covered
LG20836 03-May-16 111.3911 111.3721 -4.2 111.3725 -3.8
SM201 23-Nov-16 116.9544 116.9506 -3.8 116.9507 -3.7
SM202 23-Nov-16 116.7319 116.7276 -4.3 116.7275 -4.4
SM203 23-Nov-16 116.4207 116.4163 -4.4 116.4165 -4.2
SM204 23-Nov-16 115.7946 115.7877 -6.9 115.7871 -7.5
SM205 23-Nov-16 115.1078 115.1018 -6.0 115.1017 -6.1
SM206 23-Nov-16 114.5677 114.5648 -2.8 114.5642 -3.5
SM207 29-Dec-16 113.1498 113.1480 -1.8 113.1480 -1.8
SM208 29-Dec-16 111.4718 111.4726 0.8 111.4722 0.4
SM209 29-Dec-16 110.2948 110.2948 0.0 110.2951 0.3
SM210 29-Dec-16 109.0629 109.0626 -0.3 109.0622 -0.7
SM211 29-Dec-16 108.6405 108.6388 -1.7 108.6394 -1.1
SM212 29-Dec-16 108.2785 108.2793 0.8 108.2795 1.0
Settlement (mm) Settlement (mm) Settlement (mm)

-25.0
-20.0
-15.0
-10.0
-5.0
0.0
5.0
10.0
15.0
20.0
25.0
-20.0
-15.0
-10.0
-5.0
0.0
5.0
10.0
15.0
20.0
-20.0
-15.0
-10.0
-5.0
0.0
5.0
10.0
15.0
25/01/16 20/06/15 20/06/15 20.0

11/07/15 11/07/15
15/02/16
01/08/15 01/08/15
07/03/16 22/08/15 22/08/15

LG20751B
12/09/15 12/09/15

LG20801

LG20805
28/03/16
03/10/15 03/10/15
18/04/16
24/10/15 24/10/15

09/05/16 14/11/15 14/11/15


05/12/15 05/12/15

LG20752B
30/05/16

LG20802

LG20806
26/12/15 26/12/15
20/06/16 16/01/16 16/01/16

06/02/16 06/02/16
11/07/16
27/02/16 27/02/16

LG20753B
01/08/16 19/03/16
LG20803
19/03/16

LG20807
09/04/16 09/04/16
22/08/16
30/04/16 30/04/16
12/09/16 21/05/16
21/05/16
11/06/16

LG20754A
03/10/16 11/06/16
02/07/16
LG20804

LG20808
02/07/16
24/10/16 23/07/16
23/07/16
14/11/16 13/08/16
13/08/16
03/09/16

LG20755
03/09/16
05/12/16
24/09/16
24/09/16
26/12/16 15/10/16
15/10/16
05/11/16
16/01/17 05/11/16
26/11/16

LG20756
26/11/16
06/02/17 17/12/16
17/12/16
07/01/17
07/01/17
AL

27/02/17

AL
28/01/17
Settlement Development Graph 01 (LG - Zion Church)

Settlement Development Graph 02 (LG - Zion Church)

AL
28/01/17
20/03/17 18/02/17
18/02/17

Settlement Development Graph 03 (LG - Canal Alignment)


11/03/17
10/04/17 11/03/17
01/04/17
WSL

01/04/17
WSL

WSL
01/05/17 22/04/17
22/04/17
13/05/17
22/05/17 13/05/17
03/06/17
12/06/17 03/06/17
Date

Date

Date
Settlement (mm) Settlement (mm) Settlement (mm)

-25.0
-20.0
-15.0
-10.0
-5.0
0.0
5.0
10.0
15.0
20.0
25.0

-25.0
-20.0
-15.0
-10.0
-5.0
-25.0
-20.0
-15.0
-10.0

0.0
5.0
10.0
15.0
20.0
25.0
-5.0
0.0
5.0
10.0
15.0
20.0
25.0
07/01/16 20/09/15 20/10/15
04/10/15 10/11/15
21/01/16 18/10/15
01/12/15
01/11/15
04/02/16 22/12/15

LG20771

LG20781A
LG20761A
15/11/15
29/11/15 12/01/16
18/02/16
13/12/15 02/02/16

03/03/16 27/12/15 23/02/16

LG20772
10/01/16

LG20782A
LG20762A
15/03/16
17/03/16 24/01/16
05/04/16
07/02/16
31/03/16 26/04/16
21/02/16
06/03/16 17/05/16

LG20773A
14/04/16

LG20783A
LG20763B
20/03/16 07/06/16
28/04/16 03/04/16
28/06/16
17/04/16
12/05/16 19/07/16
01/05/16

LG20774

LG20784A
LG20764B

15/05/16 09/08/16
26/05/16
29/05/16 30/08/16
12/06/16 20/09/16
09/06/16
26/06/16
11/10/16

LG20775

LG20785A
10/07/16
LG20765B

23/06/16
01/11/16
24/07/16
07/07/16 07/08/16 22/11/16

21/08/16 13/12/16
21/07/16

LG20776
04/09/16
LG20766

LG20786A
03/01/17
18/09/16
04/08/16 24/01/17
02/10/16
14/02/17
AL
16/10/16
AL

AL
18/08/16
30/10/16 07/03/17
Settlement Development Graph 05 (LG - Canal Alignment)

Settlement Development Graph 06 (LG - Canal Alignment)


Settlement Development Graph 04 (LG - Canal Alignment )

01/09/16 13/11/16 28/03/17


27/11/16
WSL

18/04/17
WSL

WSL
15/09/16
11/12/16
09/05/17
25/12/16
29/09/16 30/05/17
08/01/17

Date
Date
Date
Settlement (mm) Settlement (mm) Settlement (mm)

-60.0
-50.0
-40.0
-30.0
-20.0
-10.0
10.0
20.0
30.0
-25.0
-20.0
-15.0
-10.0
-5.0
10.0
15.0
20.0
25.0

0.0
0.0
5.0

-60.0
-50.0
-40.0
-30.0
-20.0
-10.0
10.0
20.0
30.0

0.0
03/05/16 01/05/16 17/06/16

22/05/16 01/07/16
24/05/16

15/07/16
14/06/16 12/06/16

LG20811A

LG20821

LG20824
29/07/16
05/07/16 03/07/16
12/08/16
26/07/16 24/07/16
26/08/16

LG20812A
16/08/16 14/08/16

LG20822

LG20825
09/09/16

06/09/16 04/09/16 23/09/16

27/09/16 25/09/16 07/10/16


LG20813A

LG20823

LG20826
16/10/16 21/10/16
18/10/16

04/11/16
08/11/16 06/11/16
LG20814A

18/11/16
29/11/16 27/11/16
02/12/16

20/12/16 18/12/16
16/12/16
LG20815

10/01/17 08/01/17
30/12/16

31/01/17 29/01/17 13/01/17

21/02/17 19/02/17 27/01/17


LG20816

12/03/17 10/02/17

AL

AL
14/03/17

24/02/17
AL

04/04/17 02/04/17
Settlement Development Graph 07 (LG - Canal Alignment)

Settlement Development Graph 09 (LG - Canal Alignment)


Settlement Development Graph 08 (LG - Canal ALignment)

10/03/17
25/04/17 23/04/17
WSL

WSL
24/03/17
WSL

16/05/17 14/05/17
07/04/17

06/06/17 04/06/17
21/04/17
Date
Date

Date
Settlement (mm) Settlement (mm) Settlement (mm)

-60.0
-50.0
-40.0
-30.0
-20.0
-10.0
0.0
10.0
20.0
30.0
40.0
50.0

-35.0
-25.0
-15.0
-5.0
5.0
15.0
25.0
35.0

-35.0
-25.0
-15.0
-5.0
5.0
15.0
25.0
35.0
20/12/16 20/11/16 01/05/16

27/12/16 27/11/16
15/05/16
04/12/16
03/01/17
29/05/16
11/12/16

SM201

SM207
10/01/17

LG20834
18/12/16 12/06/16
17/01/17
25/12/16
26/06/16
24/01/17 01/01/17

SM202

SM208
10/07/16
31/01/17 08/01/17

LG20835
15/01/17 24/07/16
07/02/17
22/01/17
14/02/17 07/08/16
29/01/17

SM203

SM209
21/02/17 21/08/16
05/02/17
28/02/17
LG20836

12/02/17 04/09/16

07/03/17 19/02/17
18/09/16

SM204

SM210
14/03/17 26/02/17
02/10/16
05/03/17
21/03/17
12/03/17 16/10/16
28/03/17

SM205

SM211
19/03/17
30/10/16
04/04/17
26/03/17
11/04/17 13/11/16
02/04/17

18/04/17 09/04/17 27/11/16

SM206

SM212
25/04/17 16/04/17
11/12/16
23/04/17
02/05/17
25/12/16
AL

30/04/17

AL
AL
09/05/17
Settlement Development Graph 11 (Irwell Bank Road)

Settlement Development Graph 12 (Irwell Bank Road)


07/05/17 08/01/17
16/05/17
Settlement Development Graph 10 (LG - Canal Alignment)

14/05/17
22/01/17
23/05/17
21/05/17
WSL

WSL
WSL

05/02/17
30/05/17 28/05/17

06/06/17 04/06/17 19/02/17

11/06/17
Date

Date
Date

13/06/17 05/03/17
TILT METER READINGS
Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)


Tiltmeter No: TM20802 Date: 3-Feb-17 Report No: 348
Elasped
Cum Change Tilt in Tilt Change
Date Time Peg 1 Peg 3 Diff of 1-3 Tilt Angle (min) Gradient (1:) Remark
in Diff mm/m in Min
(Days)
25-Jun-15 0 29 -7 36 0 0.000 0 - Initial
30-Dec-16 554 52 -31 83 47 3.231 1064 0.94 0.000
31-Dec-16 555 52 -30 82 46 3.163 1087 0.92 -0.069
3-Jan-17 558 51 -32 83 47 3.231 1064 0.94 0.069
4-Jan-17 559 53 -30 83 47 3.231 1064 0.94 0.000
5-Jan-17 560 54 -29 83 47 3.231 1064 0.94 0.000
6-Jan-17 561 55 -30 85 49 3.369 1020 0.98 0.138
7-Jan-17 562 54 -31 85 49 3.369 1020 0.98 0.000
10-Jan-17 565 55 -30 85 49 3.369 1020 0.98 0.000
11-Jan-17 566 56 -31 87 51 3.507 980 1.02 0.138
12-Jan-17 567 57 -30 87 51 3.507 980 1.02 0.000
13-Jan-17 568 58 -29 87 51 3.507 980 1.02 0.000
14-Jan-17 569 57 -30 87 51 3.507 980 1.02 0.000
17-Jan-17 572 58 -31 89 53 3.644 943 1.06 0.138
18-Jan-17 573 57 -31 88 52 3.575 962 1.04 -0.069
19-Jan-17 574 58 -30 88 52 3.575 962 1.04 0.000
20-Jan-17 575 56 -30 86 50 3.438 1000 1.00 -0.138
21-Jan-17 576 57 -30 87 51 3.507 980 1.02 0.069
23-Jan-17 578 56 -31 87 51 3.507 980 1.02 0.000
25-Jan-17 580 57 -30 87 51 3.507 980 1.02 0.000
26-Jan-17 581 57 -31 88 52 3.575 962 1.04 0.069
1-Feb-17 587 58 -31 89 53 3.644 943 1.06 0.069
2-Feb-17 588 59 -31 90 54 3.713 926 1.08 0.069
3-Feb-17 589 59 -30 89 53 3.644 943 1.06 -0.069

Tilt Vs Time
10

4
Tilt Angle in Min

-2

-4

-6

-8

-10
6/25/2015

7/16/2015

8/6/2015

8/27/2015

9/17/2015

10/8/2015

10/29/2015

11/19/2015

12/10/2015

12/31/2015

1/21/2016

2/11/2016

3/3/2016

3/24/2016

4/14/2016

5/5/2016

5/26/2016

6/16/2016

7/7/2016

7/28/2016

8/18/2016

9/8/2016

9/29/2016

10/20/2016

11/10/2016

12/1/2016

12/22/2016

1/12/2017

2/2/2017

2/23/2017

3/16/2017

4/6/2017

4/27/2017

5/18/2017

6/8/2017

TM20802 Alert(+) Alert(-) Suspension(+) Suspension(-)

Location: Zion Full Gospel Church Trigger Level


Date of Installation: 25-Jun-15 Alert 4.58 1/750
Date of Initial reading: 25-Jun-15 Suspension 6.88 1/500
TILT METER READINGS
Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)


Tiltmeter No: TM20803 Date: 3-Feb-17 Report No: 348
Elasped
Cum Change Tilt in Tilt Change
Date Time Peg 1 Peg 3 Diff of 1-3 Tilt Angle (min) Gradient (1:) Remark
in Diff mm/m in Min
(Days)
25-Jun-15 0 134 -90 224 0 0.000 0 - Initial
30-Dec-16 554 142 -123 265 41 2.819 1220 0.82 -0.069
31-Dec-16 555 143 -123 266 42 2.888 1190 0.84 0.069
3-Jan-17 558 142 -124 266 42 2.888 1190 0.84 0.000
4-Jan-17 559 142 -122 264 40 2.750 1250 0.80 -0.138
5-Jan-17 560 144 -121 265 41 2.819 1220 0.82 0.069
6-Jan-17 561 145 -122 267 43 2.956 1163 0.86 0.138
7-Jan-17 562 143 -121 264 40 2.750 1250 0.80 -0.206
10-Jan-17 565 144 -122 266 42 2.888 1190 0.84 0.138
11-Jan-17 566 144 -123 267 43 2.956 1163 0.86 0.069
12-Jan-17 567 145 -122 267 43 2.956 1163 0.86 0.000
13-Jan-17 568 144 -122 266 42 2.888 1190 0.84 -0.069
14-Jan-17 569 145 -122 267 43 2.956 1163 0.86 0.069
17-Jan-17 572 146 -121 267 43 2.956 1163 0.86 0.000
18-Jan-17 573 147 -120 267 43 2.956 1163 0.86 0.000
19-Jan-17 574 146 -120 266 42 2.888 1190 0.84 -0.069
20-Jan-17 575 148 -121 269 45 3.094 1111 0.90 0.206
21-Jan-17 576 149 -120 269 45 3.094 1111 0.90 0.000
23-Jan-17 578 149 -122 271 47 3.231 1064 0.94 0.138
25-Jan-17 580 150 -121 271 47 3.231 1064 0.94 0.000
26-Jan-17 581 150 -122 272 48 3.300 1042 0.96 0.069
1-Feb-17 587 151 -120 271 47 3.231 1064 0.94 -0.069
2-Feb-17 588 151 -119 270 46 3.163 1087 0.92 -0.069
3-Feb-17 589 152 -121 273 49 3.369 1020 0.98 0.206

Tilt Vs Time
10

4
Tilt Angle in Min

-2

-4

-6

-8

-10
6/25/2015

7/16/2015

8/6/2015

8/27/2015

9/17/2015

10/8/2015

10/29/2015

11/19/2015

12/10/2015

12/31/2015

1/21/2016

2/11/2016

3/3/2016

3/24/2016

4/14/2016

5/5/2016

5/26/2016

6/16/2016

7/7/2016

7/28/2016

8/18/2016

9/8/2016

9/29/2016

10/20/2016

11/10/2016

12/1/2016

12/22/2016

1/12/2017

2/2/2017

2/23/2017

3/16/2017

4/6/2017

4/27/2017

5/18/2017

6/8/2017

TM20803 Alert(+) Alert(-) Suspension(+) Suspension(-)

Location: Zion Full Gospel Church Trigger Level


Date of Installation: 25-Jun-15 Alert 4.58 1/750
Date of Initial reading: 25-Jun-15 Suspension 6.88 1/500
TILT METER READINGS
Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)


Tiltmeter No: TM20804 Date: 3-Feb-17 Report No: 348
Elasped
Cum Change Tilt in Tilt Change
Date Time Peg 1 Peg 3 Diff of 1-3 Tilt Angle (min) Gradient (1:) Remark
in Diff mm/m in Min
(Days)
25-Jun-15 0 95 -76 171 0 0.000 0 - Initial
30-Dec-16 554 102 -98 200 29 1.994 1724 0.58 0.000
31-Dec-16 555 103 -97 200 29 1.994 1724 0.58 0.000
3-Jan-17 558 103 -98 201 30 2.063 1667 0.60 0.069
4-Jan-17 559 101 -99 200 29 1.994 1724 0.58 -0.069
5-Jan-17 560 100 -98 198 27 1.856 1852 0.54 -0.138
6-Jan-17 561 99 -99 198 27 1.856 1852 0.54 0.000
7-Jan-17 562 100 -98 198 27 1.856 1852 0.54 0.000
10-Jan-17 565 101 -97 198 27 1.856 1852 0.54 0.000
11-Jan-17 566 102 -96 198 27 1.856 1852 0.54 0.000
12-Jan-17 567 101 -97 198 27 1.856 1852 0.54 0.000
13-Jan-17 568 102 -95 197 26 1.788 1923 0.52 -0.069
14-Jan-17 569 103 -95 198 27 1.856 1852 0.54 0.069
17-Jan-17 572 103 -94 197 26 1.788 1923 0.52 -0.069
18-Jan-17 573 103 -95 198 27 1.856 1852 0.54 0.069
19-Jan-17 574 104 -96 200 29 1.994 1724 0.58 0.138
20-Jan-17 575 102 -96 198 27 1.856 1852 0.54 -0.138
21-Jan-17 576 102 -95 197 26 1.788 1923 0.52 -0.069
23-Jan-17 578 103 -97 200 29 1.994 1724 0.58 0.206
25-Jan-17 580 102 -98 200 29 1.994 1724 0.58 0.000
26-Jan-17 581 103 -98 201 30 2.063 1667 0.60 0.069
1-Feb-17 587 103 -99 202 31 2.131 1613 0.62 0.069
2-Feb-17 588 103 -100 203 32 2.200 1563 0.64 0.069
3-Feb-17 589 104 -98 202 31 2.131 1613 0.62 -0.069

Tilt Vs Time
10

4
Tilt Angle in Min

-2

-4

-6

-8

-10
6/25/2015

7/16/2015

8/6/2015

8/27/2015

9/17/2015

10/8/2015

10/29/2015

11/19/2015

12/10/2015

12/31/2015

1/21/2016

2/11/2016

3/3/2016

3/24/2016

4/14/2016

5/5/2016

5/26/2016

6/16/2016

7/7/2016

7/28/2016

8/18/2016

9/8/2016

9/29/2016

10/20/2016

11/10/2016

12/1/2016

12/22/2016

1/12/2017

2/2/2017

2/23/2017

3/16/2017

4/6/2017

4/27/2017

5/18/2017

6/8/2017

TM20804 Alert(+) Alert(-) Suspension(+) Suspension(-)

Location: Zion Full Gospel Church Trigger Level


Date of Installation: 25-Jun-15 Alert 4.58 1/750
Date of Initial reading: 25-Jun-15 Suspension 6.88 1/500
TILT METER READINGS
Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)


Tiltmeter No: ATM20805 Date: 3-Feb-17 Report No: 348
Elasped
Cum Change Tilt in Tilt Change
Date Time Peg 1 Peg 3 Diff of 1-3 Tilt Angle (min) Gradient (1:) Remark
in Diff mm/m in Min
(Days)
8-Dec-16 0 175 -145 320 0 0.000 0 - Initial
30-Dec-16 22 184 -137 321 1 0.069 0.02 0.000
31-Dec-16 23 184 -138 322 2 0.138 25000 0.04 0.069
3-Jan-17 26 185 -138 323 3 0.206 16667 0.06 0.069
4-Jan-17 27 184 -138 322 2 0.138 25000 0.04 -0.069
5-Jan-17 28 183 -137 320 0 0.000 0.00 -0.138
6-Jan-17 29 185 -136 321 1 0.069 0.02 0.069
7-Jan-17 30 185 -137 322 2 0.138 25000 0.04 0.069
10-Jan-17 33 186 -138 324 4 0.275 12500 0.08 0.138
11-Jan-17 34 187 -137 324 4 0.275 12500 0.08 0.000
12-Jan-17 35 188 -137 325 5 0.344 10000 0.10 0.069
13-Jan-17 36 188 -136 324 4 0.275 12500 0.08 -0.069
14-Jan-17 37 189 -137 326 6 0.413 8333 0.12 0.138
17-Jan-17 40 189 -135 324 4 0.275 12500 0.08 -0.138
18-Jan-17 41 189 -136 325 5 0.344 10000 0.10 0.069
19-Jan-17 42 190 -137 327 7 0.481 7143 0.14 0.138
20-Jan-17 43 190 -135 325 5 0.344 10000 0.10 -0.138
21-Jan-17 44 189 -135 324 4 0.275 12500 0.08 -0.069
23-Jan-17 46 191 -134 325 5 0.344 10000 0.10 0.069
25-Jan-17 48 192 -133 325 5 0.344 10000 0.10 0.000
26-Jan-17 49 194 -133 327 7 0.481 7143 0.14 0.138
1-Feb-17 55 193 -132 325 5 0.344 10000 0.10 -0.138
2-Feb-17 56 194 -132 326 6 0.413 8333 0.12 0.069
3-Feb-17 57 193 -131 324 4 0.275 12500 0.08 -0.138

Tilt Vs Time
10

4
Tilt Angle in Min

-2

-4

-6

-8

-10
12/8/2016

12/29/2016

1/19/2017

2/9/2017

3/2/2017

3/23/2017

4/13/2017

5/4/2017

5/25/2017

6/15/2017

7/6/2017

7/27/2017

8/17/2017

9/7/2017

9/28/2017

10/19/2017

11/9/2017

11/30/2017

12/21/2017

1/11/2018

2/1/2018

2/22/2018

3/15/2018

4/5/2018

ATM20805 Alert(+) Alert(-) Suspension(+) Suspension(-)

Location: Zion Full Gospel Church Trigger Level


Date of Installation: 08-Dec-16 Alert 4.58 1/750
Date of Initial reading: 08-Dec-16 Suspension 6.88 1/500
TILT METER READINGS
Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)


Tiltmeter No: ATM20806 Date: 3-Feb-17 Report No: 348
Elasped
Cum Change Tilt in Tilt Change
Date Time Peg 1 Peg 3 Diff of 1-3 Tilt Angle (min) Gradient (1:) Remark
in Diff mm/m in Min
(Days)
8-Dec-16 0 150 -119 269 0 0.000 0 - Initial
30-Dec-16 22 157 -113 270 1 0.069 0.02 0.000
31-Dec-16 23 156 -113 269 0 0.000 0.00 -0.069
3-Jan-17 26 156 -113 269 0 0.000 0.00 0.000
4-Jan-17 27 158 -112 270 1 0.069 0.02 0.069
5-Jan-17 28 159 -113 272 3 0.206 16667 0.06 0.138
6-Jan-17 29 160 -111 271 2 0.138 25000 0.04 -0.069
7-Jan-17 30 159 -111 270 1 0.069 0.02 -0.069
10-Jan-17 33 158 -110 268 -1 -0.069 -50000 -0.02 -0.138
11-Jan-17 34 159 -109 268 -1 -0.069 -50000 -0.02 0.000
12-Jan-17 35 160 -110 270 1 0.069 0.02 0.138
13-Jan-17 36 160 -108 268 -1 -0.069 -50000 -0.02 -0.138
14-Jan-17 37 159 -109 268 -1 -0.069 -50000 -0.02 0.000
17-Jan-17 40 161 -107 268 -1 -0.069 -50000 -0.02 0.000
18-Jan-17 41 161 -106 267 -2 -0.138 -25000 -0.04 -0.069
19-Jan-17 42 160 -105 265 -4 -0.275 -12500 -0.08 -0.138
20-Jan-17 43 162 -105 267 -2 -0.138 -25000 -0.04 0.138
21-Jan-17 44 162 -106 268 -1 -0.069 -50000 -0.02 0.069
23-Jan-17 46 163 -104 267 -2 -0.138 -25000 -0.04 -0.069
25-Jan-17 48 164 -104 268 -1 -0.069 -50000 -0.02 0.069
26-Jan-17 49 166 -102 268 -1 -0.069 -50000 -0.02 0.000
1-Feb-17 55 165 -103 268 -1 -0.069 -50000 -0.02 0.000
2-Feb-17 56 166 -102 268 -1 -0.069 -50000 -0.02 0.000
3-Feb-17 57 167 -103 270 1 0.069 0.02 0.138

Tilt Vs Time
10

4
Tilt Angle in Min

-2

-4

-6

-8

-10
12/8/2016

12/29/2016

1/19/2017

2/9/2017

3/2/2017

3/23/2017

4/13/2017

5/4/2017

5/25/2017

6/15/2017

7/6/2017

7/27/2017

8/17/2017

9/7/2017

9/28/2017

10/19/2017

11/9/2017

11/30/2017

12/21/2017

1/11/2018

2/1/2018

2/22/2018

3/15/2018

4/5/2018

ATM20806 Alert(+) Alert(-) Suspension(+) Suspension(-)

Location: Zion Full Gospel Church Trigger Level


Date of Installation: 08-Dec-16 Alert 4.58 1/750
Date of Initial reading: 08-Dec-16 Suspension 6.88 1/500
INCLINOMETER READINGS

PROJECT: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

CLIENT: PUBLIC UTILITIES BOARD (PUB) Coordinate: N:0.000 E:0.000

Inclinometer No: IS20803 Report Date: 3-Feb-17 Report No: 348


DEPTH READING ZERO SUM INITIAL CHANGE DEFORMATION(mm) Deg. From
(m) A0 A180 B0 B180 A B A B A B A B R A0
0.5 613 -606 -339 324 7 -15 160 -855 10.59 1.92 15.26 -2.86 15.53 10.62
1.0 386 -415 -547 521 -29 -26 252 -781 5.49 -2.87 4.67 -4.78 6.68 45.67
1.5 -16 23 -465 441 7 -24 39 -832 -0.78 -0.74 -0.82 -1.91 2.08 113.23
2.0 -382 383 -572 540 1 -32 -701 -1125 -0.64 0.13 -0.04 -1.17 1.17 91.96
2.5 -532 532 -595 565 0 -30 -1029 -1169 -0.35 0.09 0.60 -1.30 1.43 65.22
3.0 -522 524 -549 519 2 -30 -1023 -1074 -0.23 0.06 0.95 -1.39 1.68 55.65
3.5 -444 446 -475 443 2 -32 -873 -912 -0.17 -0.06 1.18 -1.45 1.87 50.86
4.0 -391 392 -411 377 1 -34 -768 -782 -0.15 -0.06 1.35 -1.39 1.94 45.84
4.5 -363 367 -369 341 4 -28 -712 -713 -0.18 0.03 1.50 -1.33 2.00 41.56
5.0 -332 331 -347 312 -1 -35 -557 -751 -1.06 0.92 1.68 -1.36 2.16 38.99
5.5 -307 306 -365 337 -1 -28 -498 -801 -1.15 0.99 2.74 -2.28 3.56 39.76
6.0 -263 265 -454 429 2 -25 -520 -856 -0.08 -0.27 3.89 -3.27 5.08 40.05
6.5 -244 248 -481 454 4 -27 -545 -885 0.53 -0.50 3.97 -3.00 4.98 37.08
7.0 -238 243 -498 476 5 -22 -552 -913 0.71 -0.61 3.44 -2.50 4.25 36.01
7.5 -254 261 -507 486 7 -21 -550 -944 0.35 -0.49 2.73 -1.89 3.32 34.70
8.0 -284 288 -421 404 4 -17 -606 -818 0.34 -0.07 2.38 -1.40 2.76 30.47
8.5 -285 283 -408 379 -2 -29 -601 -766 0.33 -0.21 2.04 -1.33 2.44 33.10
9.0 -248 247 -396 368 -1 -28 -524 -752 0.29 -0.12 1.71 -1.12 2.04 33.22
9.5 -213 211 -382 349 -2 -33 -442 -719 0.18 -0.12 1.42 -1.00 1.74 35.15
10.0 -171 171 -382 350 0 -32 -361 -713 0.19 -0.19 1.24 -0.88 1.52 35.36
10.5 -140 142 -376 352 2 -24 -294 -725 0.12 -0.03 1.05 -0.69 1.26 33.31
11.0 -177 174 -468 431 -3 -37 -351 -898 0.00 -0.01 0.93 -0.66 1.14 35.36
11.5 -209 212 -463 429 3 -34 -428 -889 0.07 -0.03 0.93 -0.65 1.13 34.95
12.0 -238 240 -457 422 2 -35 -481 -870 0.03 -0.09 0.86 -0.62 1.06 35.79
12.5 -250 252 -447 414 2 -33 -509 -852 0.07 -0.09 0.83 -0.53 0.98 32.56
13.0 -273 274 -437 405 1 -32 -542 -840 -0.05 -0.02 0.76 -0.44 0.88 30.07
13.5 -284 287 -440 406 3 -34 -580 -846 0.09 0.00 0.81 -0.42 0.91 27.41
INCLINOMETER READINGS

PROJECT: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

CLIENT: PUBLIC UTILITIES BOARD (PUB) Coordinate: N:0.000 E:0.000

Inclinometer No: IS20803 Report Date: 3-Feb-17 Report No: 348


DEPTH READING ZERO SUM INITIAL CHANGE DEFORMATION(mm) Deg. From
(m) A0 A180 B0 B180 A B A B A B A B R A0
14.0 -311 315 -465 435 4 -30 -627 -893 0.01 -0.07 0.72 -0.42 0.83 30.26
14.5 -296 294 -483 448 -2 -35 -581 -932 -0.09 0.01 0.71 -0.35 0.79 26.24
15.0 -259 257 -495 463 -2 -32 -503 -962 -0.13 0.04 0.80 -0.36 0.88 24.23
15.5 -244 241 -520 490 -3 -30 -473 -1010 -0.12 0.00 0.93 -0.40 1.01 23.27
16.0 -217 213 -566 545 -4 -21 -486 -1081 0.56 -0.30 1.05 -0.40 1.12 20.85
16.5 -218 218 -539 519 0 -20 -427 -1058 -0.09 0.00 0.49 -0.10 0.50 11.53
17.0 -327 332 -489 458 5 -31 -653 -961 -0.06 0.14 0.58 -0.10 0.59 9.78
17.5 -377 380 -490 454 3 -36 -759 -944 0.02 0.00 0.64 -0.24 0.68 20.56
18.0 -330 332 -504 467 2 -37 -671 -967 0.09 -0.04 0.62 -0.24 0.66 21.16
18.5 -319 320 -533 499 1 -34 -641 -1036 0.02 0.04 0.53 -0.20 0.57 20.67
19.0 -313 314 -568 538 1 -30 -638 -1105 0.11 -0.01 0.51 -0.24 0.56 25.20
19.5 -341 343 -600 572 2 -28 -690 -1179 0.06 0.07 0.40 -0.23 0.46 29.90
20.0 -382 383 -553 526 1 -27 -770 -1069 0.05 -0.10 0.34 -0.30 0.45 41.42
20.5 -447 449 -513 483 2 -30 -898 -997 0.02 0.01 0.29 -0.20 0.35 34.59
21.0 -490 491 -510 473 1 -37 -990 -980 0.09 -0.03 0.27 -0.21 0.34 37.87
21.5 -431 434 -523 492 3 -31 -875 -1012 0.10 -0.03 0.18 -0.18 0.25 45.00
22.0 -355 357 -539 515 2 -24 -718 -1063 0.06 0.09 0.08 -0.15 0.17 61.93
22.5 -311 310 -662 641 -1 -21 -623 -1279 0.02 -0.24 0.02 -0.24 0.24 85.24
INCLINOMETER READINGS

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)


Inclinometer No: IS20803 Report Date: 3-Feb-17 Report No: 348
Location: Alert Level: +/- 16 mm
Installation Depth: 23 m Suspension Level: +/- 23 mm
Ground R.L. 0.0000 m Elapsed Time: 66 days
Date of Base Reading: 29-Nov-16 Date of Last Reading: 26-Jan-17

Displacement (mm) Displacement (mm)


A(180) <<<===============>>> A(0) B(180) <<<===============>>> B(0)

0.0 0.0
1.0 1.0
2.0 2.0
3.0 3.0
4.0 4.0
5.0 5.0
6.0 6.0
7.0 7.0
8.0 8.0
9.0 9.0
10.0 10.0
Depth (m)

Depth (m)
11.0 11.0
12.0 12.0
13.0 13.0
14.0 14.0
15.0 15.0
16.0 16.0
17.0 17.0
18.0 18.0
19.0 19.0
20.0 20.0
21.0 21.0
22.0 22.0

23.0 23.0
-25 -20 -15 -10 -5 0 5 10 15 20 25 30 -25 -20 -15 -10 -5 0 5 10 15 20 25

2-Feb-17 26-Jan-17 2-Feb-17 26-Jan-17

25-Jan-17 Alert 25-Jan-17 Alert

Alert (-) Suspension Alert (-) Suspension

Suspension (-) Suspension (-)


INCLINOMETER READINGS

Excavation Recorded Max-Displacement in A Ditrction:

A0 (+) Date: 03-Feb-17


Depth of Max Deflection: 0.500

B180 (-) B0 (+) Max-Disp (mm): 15.260

Orientation: A Dir

A180 (-) (Clock-wise direction from A0)

30.0

15.0
Max Deflection (mm)

0.0

-15.0

-30.0
25-Apr-17

6-Jun-17
29-Nov-16

20-Dec-16

10-Jan-17

31-Jan-17

21-Feb-17

14-Mar-17

4-Apr-17

16-May-17

27-Jun-17

18-Jul-17

8-Aug-17

29-Aug-17

19-Sep-17
A B Alert Alert (-) Suspension Suspension (-)
INCLINOMETER READINGS

PROJECT: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

CLIENT: PUBLIC UTILITIES BOARD (PUB) Coordinate: N:0.000 E:0.000

Inclinometer No: IS20804 Report Date: 3-Feb-17 Report No: 348


DEPTH READING ZERO SUM INITIAL CHANGE DEFORMATION(mm) Deg. From
(m) A0 A180 B0 B180 A B A B A B A B R A0
0.5 455 -449 1046 -1060 6 -14 -201 1618 11.05 4.88 30.71 -3.35 30.89 6.23
1.0 239 -240 832 -864 -1 -32 -141 1460 6.20 2.36 19.66 -8.23 21.31 22.71
1.5 130 -129 327 -361 1 -34 110 754 1.49 -0.66 13.46 -10.59 17.13 38.19
2.0 97 -97 -188 161 0 -27 298 -211 -1.04 -1.38 11.97 -9.93 15.55 39.68
2.5 110 -111 -265 231 -1 -34 292 -383 -0.71 -1.13 13.01 -8.55 15.57 33.31
3.0 108 -108 -196 169 0 -27 208 -312 0.08 -0.53 13.72 -7.42 15.60 28.41
3.5 51 -55 -215 181 -4 -34 97 -336 0.09 -0.60 13.64 -6.89 15.28 26.80
4.0 -51 55 -213 181 4 -32 7 -369 -1.13 -0.25 13.55 -6.29 14.94 24.90
4.5 -24 27 -241 209 3 -32 137 -415 -1.88 -0.35 14.68 -6.04 15.87 22.36
5.0 145 -143 -226 194 2 -32 422 -413 -1.34 -0.07 16.56 -5.69 17.51 18.96
5.5 24 -14 -173 150 10 -23 402 -363 -3.64 0.40 17.90 -5.62 18.76 17.43
6.0 -28 30 -53 19 2 -34 299 -244 -3.57 1.72 21.54 -6.02 22.37 15.61
6.5 267 -261 -90 60 6 -30 185 -117 3.43 -0.33 25.11 -7.74 26.28 17.13
7.0 245 -249 -59 27 -4 -32 144 -35 3.50 -0.51 21.68 -7.41 22.91 18.87
7.5 227 -229 -30 2 -2 -28 78 54 3.78 -0.86 18.18 -6.90 19.45 20.78
8.0 158 -155 1 -19 3 -18 86 108 2.27 -0.88 14.40 -6.04 15.62 22.76
8.5 88 -87 87 -118 1 -31 75 205 1.00 0.00 12.13 -5.16 13.18 23.04
9.0 72 -70 102 -129 2 -27 -12 269 1.54 -0.38 11.13 -5.16 12.27 24.87
9.5 49 -47 125 -157 2 -32 -102 302 1.98 -0.20 9.59 -4.78 10.72 26.49
10.0 -42 43 134 -164 1 -30 -179 331 0.94 -0.33 7.61 -4.58 8.88 31.04
10.5 -81 82 129 -161 1 -32 -247 321 0.84 -0.31 6.67 -4.25 7.91 32.50
11.0 -56 56 119 -148 0 -29 -190 281 0.78 -0.14 5.83 -3.94 7.04 34.05
11.5 -26 26 67 -94 0 -27 -135 178 0.83 -0.17 5.05 -3.80 6.32 36.96
12.0 -33 33 18 -45 0 -27 -126 74 0.60 -0.11 4.22 -3.63 5.57 40.70
12.5 -60 62 -21 -10 2 -31 -154 -1 0.32 -0.10 3.62 -3.52 5.05 44.20
13.0 -86 84 -29 1 -2 -28 -193 -7 0.23 -0.23 3.30 -3.42 4.75 46.02
13.5 -24 35 0 -32 11 -32 -94 69 0.35 -0.37 3.07 -3.19 4.43 46.10
INCLINOMETER READINGS

PROJECT: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

CLIENT: PUBLIC UTILITIES BOARD (PUB) Coordinate: N:0.000 E:0.000

Inclinometer No: IS20804 Report Date: 3-Feb-17 Report No: 348


DEPTH READING ZERO SUM INITIAL CHANGE DEFORMATION(mm) Deg. From
(m) A0 A180 B0 B180 A B A B A B A B R A0
14.0 127 -128 52 -82 -1 -30 232 141 0.23 -0.07 2.72 -2.82 3.92 46.03
14.5 205 -206 19 -47 -1 -28 386 73 0.25 -0.07 2.49 -2.75 3.71 47.84
15.0 203 -205 -4 -31 -2 -35 382 30 0.26 -0.03 2.24 -2.68 3.49 50.11
15.5 176 -175 -21 -9 1 -30 305 -14 0.46 0.02 1.98 -2.65 3.31 53.23
16.0 102 -101 -71 44 1 -27 182 -110 0.21 -0.05 1.52 -2.67 3.07 60.35
16.5 79 -76 -105 84 3 -21 149 -178 0.06 -0.11 1.31 -2.62 2.93 63.43
17.0 64 -64 -82 56 0 -26 117 -125 0.11 -0.13 1.25 -2.51 2.80 63.53
17.5 35 -42 -72 41 -7 -31 57 -92 0.20 -0.21 1.14 -2.38 2.64 64.41
18.0 -22 23 -66 37 1 -29 -54 -80 0.09 -0.23 0.94 -2.17 2.36 66.58
18.5 -45 46 -48 21 1 -27 -105 -53 0.14 -0.16 0.85 -1.94 2.12 66.34
19.0 -44 44 -50 26 0 -24 -111 -68 0.23 -0.08 0.71 -1.78 1.92 68.25
19.5 -34 37 -62 33 3 -29 -91 -67 0.20 -0.28 0.48 -1.70 1.77 74.23
20.0 -38 36 -38 8 -2 -30 -83 6 0.09 -0.52 0.28 -1.42 1.45 78.85
20.5 -73 75 50 -77 2 -27 -156 172 0.08 -0.45 0.19 -0.90 0.92 78.08
21.0 -156 157 118 -136 1 -18 -316 271 0.03 -0.17 0.11 -0.45 0.46 76.26
21.5 -245 244 103 -128 -1 -25 -493 258 0.04 -0.27 0.08 -0.28 0.29 74.05
22.0 -266 262 130 -154 -4 -24 -532 285 0.04 -0.01 0.04 -0.01 0.04 14.04
INCLINOMETER READINGS

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)


Inclinometer No: IS20804 Report Date: 3-Feb-17 Report No: 348
Location: Alert Level: +/- 16 mm
Installation Depth: 22.5 m Suspension Level: +/- 23 mm
Ground R.L. 106.9489 m Elapsed Time: 365 days
Date of Base Reading: 04-Feb-16 Date of Last Reading: 26-Jan-17

Displacement (mm) Displacement (mm)


A(180) <<<===============>>> A(0) B(180) <<<===============>>> B(0)

1.5 1.5

2.5 2.5

3.5 3.5

4.5 4.5

5.5 5.5

6.5 6.5

7.5 7.5

8.5 8.5

9.5 9.5

10.5 10.5
Depth (m)

Depth (m)
11.5 11.5

12.5 12.5

13.5 13.5

14.5 14.5

15.5 15.5

16.5 16.5

17.5 17.5

18.5 18.5

19.5 19.5

20.5 20.5

21.5 21.5

22.5 22.5
-25 -20 -15 -10 -5 0 5 10 15 20 25 30 -25 -20 -15 -10 -5 0 5 10 15 20 25

2-Feb-17 26-Jan-17 2-Feb-17 26-Jan-17

25-Jan-17 Alert 25-Jan-17 Alert

Alert (-) Suspension Alert (-) Suspension

Suspension (-) Suspension (-)


INCLINOMETER READINGS

Excavation Recorded Max-Displacement in A Ditrction:

A0 (+) Date: 03-Feb-17


Depth of Max Deflection: 6.500

B180 (-) B0 (+) Max-Disp (mm): 25.110

Orientation: A Dir

A180 (-) (Clock-wise direction from A0)

30.0

15.0
Max Deflection (mm)

0.0

-15.0

-30.0
28-Apr-16

9-Jun-16

5-Jan-17

20-Apr-17

1-Jun-17
4-Feb-16

25-Feb-16

17-Mar-16

7-Apr-16

19-May-16

30-Jun-16

21-Jul-16

11-Aug-16

1-Sep-16

22-Sep-16

13-Oct-16

3-Nov-16

24-Nov-16

15-Dec-16

26-Jan-17

16-Feb-17

9-Mar-17

30-Mar-17

11-May-17
A B Alert Alert (-) Suspension Suspension (-)
INCLINOMETER READINGS

PROJECT: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

CLIENT: PUBLIC UTILITIES BOARD (PUB) Coordinate: N:0.000 E:0.000

Inclinometer No: IS20805 Report Date: 3-Feb-17 Report No: 348


DEPTH READING ZERO SUM INITIAL CHANGE DEFORMATION(mm) Deg. From
(m) A0 A180 B0 B180 A B A B A B A B R A0
0.5 717 -723 -535 530 -6 -5 1107 -923 3.33 -1.42 10.86 14.69 18.27 306.47
1.0 382 -399 -161 190 -17 29 906 -470 -1.25 1.19 9.08 15.87 18.28 299.78
1.5 399 -412 -231 241 -13 10 792 -455 0.19 -0.17 11.15 13.20 17.28 310.19
2.0 385 -397 -236 250 -12 14 719 -433 0.63 -0.53 11.25 13.29 17.41 310.25
2.5 327 -348 -235 157 -21 -78 644 -414 0.31 0.22 10.95 13.69 17.53 308.65
3.0 304 -318 -153 165 -14 12 536 -376 0.86 0.58 10.84 13.30 17.16 309.18
3.5 356 -372 -80 93 -16 13 427 -361 3.01 1.88 10.38 12.53 16.27 309.64
4.0 129 -144 -216 199 -15 -17 254 -438 0.19 0.23 7.89 10.80 13.38 306.15
4.5 114 -128 -209 219 -14 10 225 -451 0.17 0.23 8.03 10.63 13.32 307.07
5.0 97 -111 -215 226 -14 11 187 -478 0.21 0.37 7.96 10.44 13.13 307.32
5.5 82 -95 -255 252 -13 -3 151 -545 0.26 0.38 7.84 10.19 12.86 307.57
6.0 30 -4 -300 334 26 34 68 -641 -0.34 0.07 7.72 10.12 12.73 307.34
6.5 -12 -3 -336 345 -15 9 -27 -676 0.18 -0.05 8.34 10.43 13.35 308.65
7.0 83 -93 -257 265 -10 8 166 -532 0.10 0.10 8.52 9.95 13.10 310.57
7.5 92 -102 -303 300 -10 -3 192 -624 0.02 0.21 7.59 9.91 12.48 307.45
8.0 112 -121 -330 328 -9 -2 233 -694 0.00 0.36 7.46 10.04 12.51 306.61
8.5 116 -125 -343 344 -9 1 237 -726 0.04 0.39 7.31 9.92 12.32 306.39
9.0 157 -169 -336 333 -12 -3 300 -692 0.26 0.23 7.22 9.65 12.05 306.80
9.5 198 -215 -310 335 -17 25 374 -663 0.39 0.18 6.67 9.13 11.31 306.15
10.0 286 -295 -305 314 -9 9 550 -636 0.31 0.17 5.74 8.99 10.67 302.56
10.5 300 -311 -272 280 -11 8 569 -576 0.42 0.24 5.01 8.47 9.84 300.60
11.0 307 -326 -243 171 -19 -72 588 -534 0.45 1.20 4.46 7.91 9.08 299.42
11.5 376 -390 -186 198 -14 12 729 -406 0.37 0.22 3.84 6.39 7.46 301.00
12.0 504 -516 -150 156 -12 6 979 -332 0.41 0.26 2.69 5.62 6.23 295.58
12.5 552 -562 -157 208 -10 51 1084 -376 0.30 0.11 1.39 5.22 5.40 284.91
13.0 364 -375 -260 269 -11 9 711 -559 0.28 0.30 0.91 5.37 5.45 279.62
13.5 294 -309 -410 396 -15 -14 569 -843 0.34 0.37 2.20 5.98 6.37 290.20
INCLINOMETER READINGS

PROJECT: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

CLIENT: PUBLIC UTILITIES BOARD (PUB) Coordinate: N:0.000 E:0.000

Inclinometer No: IS20805 Report Date: 3-Feb-17 Report No: 348


DEPTH READING ZERO SUM INITIAL CHANGE DEFORMATION(mm) Deg. From
(m) A0 A180 B0 B180 A B A B A B A B R A0
14.0 263 -283 -536 549 -20 13 509 -1140 0.37 0.55 2.35 6.76 7.16 289.17
14.5 326 -339 -545 561 -13 16 626 -1125 0.39 0.19 1.98 7.05 7.32 285.69
15.0 369 -384 -450 453 -15 3 718 -918 0.35 0.15 1.04 6.50 6.58 279.09
15.5 367 -381 -205 195 -14 -10 726 -414 0.22 0.14 0.42 5.33 5.35 274.51
16.0 367 -379 48 -37 -12 11 731 57 0.15 0.28 0.51 3.07 3.11 279.43
16.5 318 -334 -62 63 -16 1 634 -154 0.18 0.29 0.16 2.51 2.52 273.65
17.0 354 -367 -85 90 -13 5 706 -202 0.15 0.27 0.20 2.79 2.80 274.10
17.5 377 -389 -90 106 -12 16 752 -212 0.14 0.16 -0.32 2.57 2.59 262.90
18.0 369 -384 -163 212 -15 49 736 -373 0.17 -0.02 -0.49 2.53 2.58 259.04
18.5 414 -425 -42 24 -11 -18 831 -75 0.08 0.09 -0.69 3.13 3.21 257.57
19.0 371 -382 174 -159 -11 15 744 316 0.09 0.17 -1.11 2.83 3.04 248.58
19.5 434 -446 130 -124 -12 6 870 216 0.10 0.38 -1.02 2.47 2.67 247.56
20.0 394 -406 198 -197 -12 1 797 385 0.03 0.10 -1.27 2.48 2.79 242.88
20.5 269 -284 376 -369 -15 7 574 730 -0.21 0.15 -1.06 1.33 1.70 231.45
21.0 -122 107 497 -485 -15 12 -222 983 -0.07 -0.01 -0.54 0.18 0.57 198.43
21.5 -403 399 677 -675 -4 2 -801 1353 -0.01 -0.01 -0.32 0.19 0.37 210.70
INCLINOMETER READINGS

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)


Inclinometer No: IS20805 Report Date: 3-Feb-17 Report No: 348
Location: Alert Level: +/- 16 mm
Installation Depth: 22 m Suspension Level: +/- 23 mm
Ground R.L. 0.0000 m Elapsed Time: 370 days
Date of Base Reading: 30-Jan-16 Date of Last Reading: 23-Jun-16

Displacement (mm) Displacement (mm)


A(180) <<<===============>>> A(0) B(180) <<<===============>>> B(0)

0.0 0.0
1.0 1.0
2.0 2.0
3.0 3.0
4.0 4.0
5.0 5.0

6.0 6.0

7.0 7.0

8.0 8.0

9.0 9.0

10.0 10.0
Depth (m)

Depth (m)
11.0 11.0

12.0 12.0

13.0 13.0

14.0 14.0

15.0 15.0

16.0 16.0

17.0 17.0

18.0 18.0

19.0 19.0

20.0 20.0

21.0 21.0

22.0 22.0

-25 -20 -15 -10 -5 0 5 10 15 20 25 -25 -20 -15 -10 -5 0 5 10 15 20 25

25-Jun-16 23-Jun-16 25-Jun-16 23-Jun-16


21-Jun-16 Alert 21-Jun-16 Alert
Alert (-) Suspension Alert (-) Suspension
Suspension (-) Suspension (-)
INCLINOMETER READINGS

Excavation Recorded Max-Displacement in A Ditrction:

A0 (+) Date: 03-Feb-17

Depth of Max Deflection: 2.000

B180 (-) B0 (+) Max-Disp (mm): 11.250

Orientation: A Dir

A180 (-) (Clock-wise direction from A0)

30.0

15.0
Max Deflection (mm)

0.0

-15.0

-30.0
19-Feb-16

29-Feb-16

8-Jul-16
30-Jan-16

9-Feb-16

10-Mar-16

20-Mar-16

30-Mar-16

19-Apr-16

29-Apr-16

9-May-16

19-May-16

29-May-16

8-Jun-16

18-Jun-16

28-Jun-16

18-Jul-16

28-Jul-16

17-Aug-16
9-Apr-16

7-Aug-16
A B Alert Alert (-) Suspension Suspension (-)
INCLINOMETER READINGS

PROJECT: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

CLIENT: PUBLIC UTILITIES BOARD (PUB) Coordinate: N:0.000 E:0.000

Inclinometer No: IS20807 Report Date: 3-Feb-17 Report No: 348


DEPTH READING ZERO SUM INITIAL CHANGE DEFORMATION(mm) Deg. From
(m) A0 A180 B0 B180 A B A B A B A B R A0
0.5 658 -673 592 -582 -15 10 1381 1102 -0.50 0.72 2.38 -2.51 3.46 46.52
1.0 442 -456 581 -559 -14 22 902 1183 -0.04 -0.43 3.02 -3.43 4.57 48.64
1.5 193 -197 223 -205 -4 18 437 506 -0.47 -0.78 3.00 -3.12 4.33 46.12
2.0 186 -198 38 -20 -12 18 426 62 -0.42 -0.04 3.39 -2.24 4.06 33.46
2.5 147 -162 15 21 -15 36 405 9 -0.96 -0.15 3.81 -2.11 4.36 28.98
3.0 77 -86 -56 68 -9 12 221 -101 -0.58 -0.23 4.77 -1.74 5.08 20.04
3.5 71 -81 -219 230 -10 11 185 -444 -0.33 -0.05 5.32 -1.26 5.47 13.32
4.0 34 -48 -116 121 -14 5 189 -230 -1.07 -0.07 5.65 -1.23 5.78 12.28
4.5 -62 50 329 -320 -12 9 -89 687 -0.23 -0.38 6.71 -1.21 6.82 10.22
5.0 83 -95 89 -76 -12 13 98 159 0.80 0.06 6.93 -0.85 6.98 6.99
5.5 241 -246 -103 99 -5 -4 470 -284 0.17 0.82 6.13 -0.88 6.19 8.17
6.0 100 -110 -93 111 -10 18 243 -188 -0.33 -0.16 5.97 -1.74 6.22 16.25
6.5 163 -171 -71 95 -8 24 334 -216 0.00 0.50 6.32 -1.62 6.52 14.38
7.0 273 -280 -131 165 -7 34 474 -201 0.79 -0.95 6.31 -2.22 6.69 19.38
7.5 119 -135 -44 70 -16 26 28 139 2.26 -2.53 5.52 -1.27 5.66 12.96
8.0 186 -195 -151 177 -9 26 328 -188 0.53 -1.40 3.25 1.18 3.46 340.05
8.5 143 -155 -148 152 -12 4 341 -264 -0.43 -0.36 2.73 2.55 3.74 316.95
9.0 176 -186 -111 131 -10 20 324 -357 0.38 1.15 3.16 2.87 4.27 317.75
9.5 177 -185 -201 233 -8 32 389 -577 -0.27 1.43 2.78 1.68 3.25 328.85
10.0 206 -222 -218 252 -16 34 435 -559 -0.07 0.89 3.06 0.30 3.07 354.40
10.5 81 -95 -16 24 -14 8 174 -54 0.02 0.14 3.13 -0.62 3.19 11.20
11.0 66 -80 0 37 -14 37 129 -41 0.17 0.04 3.15 -0.66 3.22 11.83
11.5 154 -170 8 35 -16 43 289 -12 0.35 -0.15 2.98 -0.60 3.04 11.38
12.0 182 -193 12 17 -11 29 345 -26 0.30 0.21 2.65 -0.35 2.67 7.52
12.5 207 -220 -58 87 -13 29 398 -121 0.29 -0.24 2.36 -0.46 2.40 11.03
13.0 274 -281 31 -8 -7 23 523 42 0.32 -0.03 2.07 -0.15 2.08 4.14
13.5 309 -278 -110 120 31 10 505 -226 0.82 -0.04 1.72 -0.03 1.72 1.00
INCLINOMETER READINGS

PROJECT: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

CLIENT: PUBLIC UTILITIES BOARD (PUB) Coordinate: N:0.000 E:0.000

Inclinometer No: IS20807 Report Date: 3-Feb-17 Report No: 348


DEPTH READING ZERO SUM INITIAL CHANGE DEFORMATION(mm) Deg. From
(m) A0 A180 B0 B180 A B A B A B A B R A0
14.0 244 -257 -174 202 -13 28 484 -391 0.17 0.15 0.91 0.07 0.91 355.60
14.5 261 -276 -213 240 -15 27 509 -468 0.28 0.15 0.75 -0.01 0.75 0.76
15.0 276 -290 -289 322 -14 33 566 -630 0.00 0.19 0.43 -0.20 0.47 24.94
15.5 210 -193 -243 259 17 16 430 -500 -0.27 -0.02 0.44 -0.30 0.53 34.29
16.0 176 -192 -112 145 -16 33 357 -264 0.11 0.07 0.68 -0.22 0.71 17.93
16.5 331 -338 -140 162 -7 22 662 -307 0.07 0.05 0.51 -0.17 0.54 18.43
17.0 401 -424 -260 288 -23 28 798 -586 0.27 0.38 0.51 -0.27 0.58 27.90
17.5 448 -467 -307 337 -19 30 913 -680 0.02 0.36 0.21 -0.57 0.61 69.78
18.0 500 -512 -346 376 -12 30 1001 -761 0.11 0.39 0.22 -0.88 0.91 75.96
18.5 524 -536 -370 399 -12 29 1048 -795 0.12 0.26 0.18 -1.10 1.11 80.71
19.0 545 -555 -378 411 -10 33 1089 -812 0.11 0.23 0.08 -1.24 1.24 86.31
19.5 419 -433 -374 409 -14 35 853 -786 -0.01 0.03 0.00 -1.21 1.21 90.00
20.0 448 -459 -358 391 -11 33 897 -744 0.10 -0.05 0.04 -1.02 1.02 87.75
20.5 443 -456 -335 373 -13 38 895 -703 0.04 -0.05 0.01 -0.56 0.56 88.98
21.0 436 -447 -317 353 -11 36 877 -660 0.06 -0.10 0.03 -0.11 0.11 74.74
21.5 427 -437 -323 296 -10 -27 864 -642 0.00 0.23 0.00 0.17 0.17 270.00
INCLINOMETER READINGS

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)


Inclinometer No: IS20807 Report Date: 3-Feb-17 Report No: 348
Location: Alert Level: +/- 16 mm
Installation Depth: 22 m Suspension Level: +/- 23 mm
Ground R.L. 0.0000 m Elapsed Time: 358 days
Date of Base Reading: 11-Feb-16 Date of Last Reading: 02-Jun-16

Displacement (mm) Displacement (mm)


A(180) <<<===============>>> A(0) B(180) <<<===============>>> B(0)

0.0 0.0

1.0 1.0

2.0 2.0

3.0 3.0

4.0 4.0

5.0 5.0

6.0 6.0

7.0 7.0

8.0 8.0

9.0 9.0

10.0 10.0
Depth (m)

Depth (m)
11.0 11.0

12.0 12.0

13.0 13.0

14.0 14.0

15.0 15.0

16.0 16.0

17.0 17.0

18.0 18.0

19.0 19.0

20.0 20.0

21.0 21.0

22.0 22.0

-25 -20 -15 -10 -5 0 5 10 15 20 25 -25 -20 -15 -10 -5 0 5 10 15 20 25

4-Jun-16 2-Jun-16 4-Jun-16 2-Jun-16

31-May-16 Alert 31-May-16 Alert

Alert (-) Suspension Alert (-) Suspension

Suspension (-) Suspension (-)


INCLINOMETER READINGS

Excavation Recorded Max-Displacement in A Ditrction:

A0 (+) Date: 03-Feb-17

Depth of Max Deflection: 5.000

B180 (-) B0 (+) Max-Disp (mm): 6.930

Orientation: A Dir

A180 (-) (Clock-wise direction from A0)

30.0

15.0
Max Deflection (mm)

0.0

-15.0

-30.0

10-Jul-16

20-Jul-16

30-Jul-16
11-Feb-16

21-Feb-16

2-Mar-16

12-Mar-16

22-Mar-16

11-Apr-16

21-Apr-16

11-May-16

21-May-16

31-May-16
1-Apr-16

9-Aug-16
1-May-16

10-Jun-16

20-Jun-16

30-Jun-16
A B Alert Alert (-) Suspension Suspension (-)
INCLINOMETER READINGS

PROJECT: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

CLIENT: PUBLIC UTILITIES BOARD (PUB) Coordinate: N:0.000 E:0.000

Inclinometer No: IS20808 Report Date: 3-Feb-17 Report No: 348


DEPTH READING ZERO SUM INITIAL CHANGE DEFORMATION(mm) Deg. From
(m) A0 A180 B0 B180 A B A B A B A B R A0
0.5 -173 164 -86 136 -9 50 97 -312 -4.34 0.90 7.87 -1.44 8.00 10.37
1.0 -58 49 -96 122 -9 26 -115 -119 0.08 -0.99 12.21 -2.34 12.43 10.85
1.5 -88 77 42 -17 -11 25 -265 151 1.00 -0.92 12.13 -1.35 12.20 6.35
2.0 -74 60 92 -50 -14 42 -218 154 0.84 -0.12 11.13 -0.43 11.14 2.21
2.5 -63 53 145 -69 -10 76 -137 92 0.21 1.22 10.29 -0.31 10.29 1.73
3.0 -61 48 105 -65 -13 40 -77 28 -0.32 1.42 10.08 -1.53 10.20 8.63
3.5 -29 12 85 -50 -17 35 -36 -4 -0.05 1.39 10.40 -2.95 10.81 15.84
4.0 -116 107 112 -75 -9 37 -44 -80 -1.79 2.67 10.45 -4.34 11.32 22.55
4.5 -113 104 -1 20 -9 19 61 -184 -2.78 1.63 12.24 -7.01 14.11 29.80
5.0 -52 39 -113 153 -13 40 111 -160 -2.02 -1.06 15.02 -8.64 17.33 29.91
5.5 27 -39 -120 158 -12 38 172 -107 -1.06 -1.71 17.04 -7.58 18.65 23.98
6.0 36 -47 -22 68 -11 46 232 -14 -1.49 -0.76 18.10 -5.87 19.03 17.97
6.5 86 -105 -32 65 -19 33 244 120 -0.53 -2.17 19.59 -5.11 20.25 14.62
7.0 168 -175 97 -84 -7 13 260 308 0.83 -1.27 20.12 -2.94 20.33 8.31
7.5 89 -97 288 -268 -8 20 250 700 -0.64 -1.44 19.29 -1.67 19.36 4.95
8.0 184 -196 386 -373 -12 13 301 1010 0.79 -2.51 19.93 -0.23 19.93 0.66
8.5 251 -263 570 -600 -12 -30 346 1313 1.68 -1.43 19.14 2.28 19.28 353.21
9.0 323 -337 760 -718 -14 42 369 1527 2.91 -0.49 17.46 3.71 17.85 348.00
9.5 286 -304 805 -730 -18 75 387 1639 2.03 -1.04 14.55 4.20 15.14 343.90
10.0 255 -265 822 -783 -10 39 417 1611 1.03 -0.06 12.52 5.24 13.57 337.29
10.5 312 -329 746 -715 -17 31 467 1356 1.74 1.05 11.49 5.30 12.65 335.24
11.0 239 -250 673 -640 -11 33 385 1236 1.04 0.77 9.75 4.25 10.64 336.45
11.5 170 -186 572 -544 -16 28 291 1087 0.65 0.29 8.71 3.48 9.38 338.22
12.0 94 -109 456 -427 -15 29 161 889 0.42 -0.06 8.06 3.19 8.67 338.41
12.5 51 -62 344 -327 -11 17 25 666 0.88 0.05 7.64 3.25 8.30 336.96
13.0 8 -13 189 -177 -5 12 -27 368 0.48 -0.02 6.76 3.20 7.48 334.67
13.5 167 -179 -187 226 -12 39 265 -386 0.81 -0.27 6.28 3.22 7.06 332.85
14.0 129 -139 -236 276 -10 40 192 -543 0.76 0.31 5.47 3.49 6.49 327.46
14.5 120 -133 -328 367 -13 39 125 -711 1.28 0.16 4.71 3.18 5.68 325.97
INCLINOMETER READINGS

PROJECT: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

CLIENT: PUBLIC UTILITIES BOARD (PUB) Coordinate: N:0.000 E:0.000

Inclinometer No: IS20808 Report Date: 3-Feb-17 Report No: 348


DEPTH READING ZERO SUM INITIAL CHANGE DEFORMATION(mm) Deg. From
(m) A0 A180 B0 B180 A B A B A B A B R A0
15.0 88 -101 -404 446 -13 42 54 -875 1.35 0.25 3.43 3.02 4.57 318.64
15.5 25 -36 -483 521 -11 38 22 -1016 0.39 0.12 2.08 2.77 3.46 306.90
16.0 63 -74 -526 556 -11 30 109 -1102 0.28 0.20 1.69 2.65 3.14 302.53
16.5 199 -212 -572 597 -13 25 390 -1213 0.21 0.44 1.41 2.45 2.83 299.92
17.0 217 -228 -677 701 -11 24 424 -1423 0.21 0.45 1.20 2.01 2.34 300.84
17.5 215 -226 -785 813 -11 28 424 -1636 0.17 0.38 0.99 1.56 1.85 302.40
18.0 204 -219 -895 917 -15 22 402 -1852 0.21 0.40 0.82 1.18 1.44 304.80
18.5 160 -173 -958 982 -13 24 326 -1967 0.07 0.27 0.61 0.78 0.99 308.03
19.0 140 -154 -969 1002 -14 33 284 -1985 0.10 0.14 0.54 0.51 0.74 316.64
19.5 48 -62 -985 1007 -14 22 97 -1978 0.13 -0.14 0.44 0.37 0.57 319.94
20.0 74 -83 -901 922 -9 21 157 -1821 0.00 -0.02 0.31 0.51 0.60 301.29
20.5 87 -100 -870 897 -13 27 181 -1787 0.06 0.20 0.31 0.53 0.61 300.32
21.0 103 -118 -905 921 -15 16 216 -1854 0.05 0.28 0.25 0.33 0.41 307.15
21.5 88 -100 -934 967 -12 33 191 -1928 -0.03 0.27 0.20 0.05 0.21 345.96
22.0 61 -93 -1001 950 -32 -51 131 -1929 0.23 -0.22 0.23 -0.22 0.32 43.73
INCLINOMETER READINGS

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)


Inclinometer No: IS20808 Report Date: 3-Feb-17 Report No: 348
Location: Alert Level: +/- 16 mm
Installation Depth: 22.5 m Suspension Level: +/- 23 mm
Ground R.L. 107.8380 m Elapsed Time: 472 days
Date of Base Reading: 20-Oct-15 Date of Last Reading: 31-May-16

Displacement (mm) Displacement (mm)


A(180) <<<===============>>> A(0) B(180) <<<===============>>> B(0)

0.0 0.0

1.0 1.0

2.0 2.0

3.0 3.0

4.0 4.0

5.0 5.0

6.0 6.0

7.0 7.0

8.0 8.0

9.0 9.0

10.0 10.0
Depth (m)

Depth (m)
11.0 11.0

12.0 12.0

13.0 13.0

14.0 14.0

15.0 15.0

16.0 16.0

17.0 17.0

18.0 18.0

19.0 19.0

20.0 20.0

21.0 21.0

22.0 22.0

-25 -20 -15 -10 -5 0 5 10 15 20 25 -25 -20 -15 -10 -5 0 5 10 15 20 25

2-Jun-16 31-May-16 2-Jun-16 31-May-16

28-May-16 Alert 28-May-16 Alert

Alert (-) Suspension Alert (-) Suspension

Suspension (-) Suspension (-)


INCLINOMETER READINGS

Excavation Recorded Max-Displacement in A Ditrction:

A0 (+) Date: 03-Feb-17


Depth of Max Deflection: 7.000

B180 (-) B0 (+) Max-Disp (mm): 20.120

Orientation: A Dir

A180 (-) (Clock-wise direction from A0)

30.0

15.0
Max Deflection (mm)

0.0

-15.0

-30.0
20-Oct-15

9-Nov-15

29-Nov-15

19-Dec-15

8-Jan-16

28-Jan-16

17-Feb-16

8-Mar-16

28-Mar-16

17-Apr-16

7-May-16

27-May-16

16-Jun-16

6-Jul-16

26-Jul-16

15-Aug-16
A B Alert Alert (-) Suspension Suspension (-)
INCLINOMETER READINGS

PROJECT: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

CLIENT: PUBLIC UTILITIES BOARD (PUB) Coordinate: N:0.000 E:0.000

Inclinometer No: IS20809 Report Date: 3-Feb-17 Report No: 348


DEPTH READING ZERO SUM INITIAL CHANGE DEFORMATION(mm) Deg. From
(m) A0 A180 B0 B180 A B A B A B A B R A0
0.5 261 -252 -1021 993 9 -28 470 -2000 0.43 -0.14 3.23 2.80 4.27 319.08
1.0 193 -187 -815 773 6 -42 355 -1578 0.25 -0.10 2.88 2.96 4.13 314.22
1.5 157 -150 -545 527 7 -18 280 -1084 0.27 0.12 2.71 3.28 4.25 309.56
2.0 198 -187 -384 362 11 -22 368 -746 0.17 0.00 2.51 3.47 4.28 305.88
2.5 216 -212 -281 247 4 -34 425 -520 0.03 -0.08 2.37 3.47 4.20 304.33
3.0 265 -262 -93 78 3 -15 513 -161 0.14 -0.10 2.28 3.77 4.41 301.16
3.5 232 -227 -120 87 5 -33 452 -220 0.07 0.13 2.03 3.99 4.48 296.97
4.0 236 -236 -151 128 0 -23 467 -287 0.05 0.08 1.82 3.79 4.20 295.65
4.5 269 -266 -152 127 3 -25 530 -275 0.05 -0.04 1.65 3.81 4.15 293.42
5.0 310 -308 -132 103 2 -29 609 -236 0.09 0.01 1.45 3.85 4.11 290.64
5.5 310 -302 -159 136 8 -23 609 -308 0.03 0.13 1.26 3.93 4.13 287.78
6.0 224 -225 -283 263 -1 -20 436 -554 0.13 0.08 1.15 3.53 3.71 288.04
6.5 137 -135 -273 238 2 -35 267 -516 0.05 0.05 0.97 3.21 3.35 286.81
7.0 122 -117 -280 252 5 -28 235 -532 0.04 0.00 0.89 3.12 3.24 285.92
7.5 122 -116 -309 284 6 -25 232 -599 0.06 0.06 0.81 3.06 3.17 284.83
8.0 132 -126 -289 265 6 -24 256 -559 0.02 0.05 0.68 2.89 2.97 283.24
8.5 155 -150 -265 247 5 -18 292 -510 0.13 -0.02 0.73 2.73 2.83 284.97
9.0 -15 22 -200 161 7 -39 -32 -359 -0.05 -0.02 0.60 2.76 2.82 282.26
9.5 -33 37 -214 184 4 -30 -74 -390 0.04 -0.08 0.61 2.58 2.65 283.30
10.0 11 -7 -245 212 4 -33 14 -449 0.04 -0.08 0.55 2.62 2.68 281.86
10.5 35 -31 -255 227 4 -28 63 -476 0.03 -0.06 0.49 2.53 2.58 280.96
11.0 29 -24 -259 231 5 -28 49 -488 0.04 -0.02 0.44 2.49 2.53 280.02
11.5 55 -52 -269 262 3 -7 110 -538 -0.03 0.07 0.40 2.44 2.47 279.31
12.0 244 -241 -135 114 3 -21 488 -256 -0.03 0.07 0.42 2.38 2.42 280.01
12.5 292 -284 -215 169 8 -46 574 -400 0.02 0.16 0.48 2.22 2.27 282.20
13.0 334 -328 -269 238 6 -31 660 -507 0.02 0.00 0.48 1.96 2.02 283.76
13.5 370 -366 -306 282 4 -24 731 -589 0.05 0.01 0.48 1.83 1.89 284.70
14.0 378 -371 -288 261 7 -27 748 -552 0.01 0.03 0.44 1.91 1.96 282.97
14.5 411 -406 -319 307 5 -12 823 -630 -0.06 0.04 0.45 1.83 1.88 283.82
15.0 529 -524 -328 294 5 -34 1045 -627 0.08 0.05 0.48 1.75 1.81 285.34
15.5 559 -552 -319 295 7 -24 1105 -617 0.06 0.03 0.40 1.71 1.76 283.17
16.0 477 -470 -328 300 7 -28 945 -617 0.02 -0.11 0.35 1.58 1.62 282.49
16.5 400 -394 -288 262 6 -26 791 -554 0.03 0.04 0.30 1.61 1.64 280.56
17.0 422 -420 -275 244 2 -31 844 -514 -0.02 -0.05 0.27 1.53 1.55 280.01
17.5 497 -484 -252 238 13 -14 974 -481 0.07 -0.09 0.30 1.46 1.49 281.61
18.0 379 -379 -50 20 0 -30 759 -73 -0.01 0.03 0.25 1.56 1.58 279.10
18.5 340 -334 -116 86 6 -30 670 -207 0.04 0.05 0.27 1.42 1.45 280.77
19.0 371 -365 -146 121 6 -25 739 -271 -0.03 0.04 0.23 1.22 1.24 280.68
19.5 467 -464 -171 146 3 -25 930 -320 0.01 0.03 0.27 1.08 1.11 284.04
INCLINOMETER READINGS

PROJECT: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

CLIENT: PUBLIC UTILITIES BOARD (PUB) Coordinate: N:0.000 E:0.000

Inclinometer No: IS20809 Report Date: 3-Feb-17 Report No: 348


DEPTH READING ZERO SUM INITIAL CHANGE DEFORMATION(mm) Deg. From
(m) A0 A180 B0 B180 A B A B A B A B R A0
20.0 544 -540 -249 219 4 -30 1082 -470 0.02 0.02 0.29 0.96 1.00 286.81
20.5 420 -403 -200 175 17 -25 816 -363 0.07 -0.12 0.26 0.87 0.91 286.64
21.0 342 -343 -236 216 -1 -20 680 -451 0.05 -0.01 0.22 1.04 1.06 281.94
21.5 353 -348 -259 230 5 -29 698 -495 0.03 0.06 0.16 0.94 0.95 279.66
22.0 353 -349 -274 247 4 -27 700 -528 0.02 0.07 0.15 0.73 0.75 281.61
22.5 406 -399 -166 146 7 -20 807 -313 -0.02 0.01 0.14 0.63 0.65 282.53
23.0 443 -437 -219 209 6 -10 881 -431 -0.01 0.03 0.16 0.40 0.43 291.80
23.5 387 -399 -399 369 -12 -30 771 -771 0.15 0.03 0.17 0.32 0.36 297.98
24.0 332 -323 -367 342 9 -25 653 -714 0.02 0.05 0.06 0.15 0.16 291.80
24.5 204 -193 -335 312 11 -23 392 -644 0.05 -0.03 -0.03 -0.08 0.09 110.56
25.0 115 -109 -220 211 6 -9 222 -411 0.02 -0.20 0.02 0.02 0.03 315.00
25.5 266 -261 -340 314 5 -26 519 -659 0.08 0.05 0.06 0.24 0.25 284.04
26.0 322 -313 -272 257 9 -15 634 -505 0.01 -0.24 -0.04 0.07 0.08 240.26
INCLINOMETER READINGS

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)


Inclinometer No: IS20809 Report Date: 3-Feb-17 Report No: 348
Location: Alert Level: +/- 43 mm
Installation Depth: 26.5 m Suspension Level: +/- 61 mm
Ground R.L. 110.8698 m Elapsed Time: 146 days
Date of Base Reading: 10-Sep-16 Date of Last Reading: 25-Jan-17

Displacement (mm) Displacement (mm)


A(180) <<<===============>>> A(0) B(180) <<<===============>>> B(0)

0.0 0.0
1.0 1.0
2.0 2.0
3.0 3.0
4.0 4.0
5.0 5.0
6.0 6.0
7.0 7.0
8.0 8.0
9.0 9.0
10.0 10.0
11.0 11.0
12.0 12.0
Depth (m)

Depth (m)
13.0 13.0
14.0 14.0
15.0 15.0
16.0 16.0
17.0 17.0
18.0 18.0
19.0 19.0
20.0 20.0
21.0 21.0
22.0 22.0
23.0 23.0
24.0 24.0
25.0 25.0
26.0 26.0
27.0 27.0
-65 -50 -35 -20 -5 10 25 40 55 -65 -50 -35 -20 -5 10 25 40 55
2-Feb-17 25-Jan-17 2-Feb-17 25-Jan-17
19-Jan-17 Alert 19-Jan-17 Alert
Alert (-) Suspension Alert (-) Suspension
Suspension (-) Suspension (-)
INCLINOMETER READINGS

Excavation Recorded Max-Displacement in A Ditrction:

A0 (+) Date: 03-Feb-17


Depth of Max Deflection: 0.500

B180 (-) B0 (+) Max-Disp (mm): 3.230

Orientation: A Dir

A180 (-) (Clock-wise direction from A0)

75.0

60.0

45.0
Max Deflection (mm)

30.0

15.0

0.0

-15.0

-30.0

-45.0

-60.0

-75.0
10-Sep-16

30-Sep-16

9-Nov-16

29-Nov-16

19-Dec-16

8-Jan-17

17-Feb-17

9-Mar-17

29-Mar-17

18-Apr-17
20-Oct-16

28-Jan-17

8-May-17

28-May-17
A B Alert Alert (-) Suspension Suspension (-)
INCLINOMETER READINGS

PROJECT: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

CLIENT: PUBLIC UTILITIES BOARD (PUB) Coordinate: N:0.000 E:0.000

Inclinometer No: IS20810 Report Date: 3-Feb-17 Report No: 348


DEPTH READING ZERO SUM INITIAL CHANGE DEFORMATION(mm) Deg. From
(m) A0 A180 B0 B180 A B A B A B A B R A0
0.5 -99 105 31 -49 6 -18 52 594 -2.56 -5.14 40.33 -10.36 41.64 14.41
1.0 -55 64 -162 136 9 -26 137 81 -2.56 -3.79 42.89 -5.22 43.21 6.94
1.5 -43 46 -256 234 3 -22 66 -439 -1.55 -0.51 45.45 -1.43 45.47 1.80
2.0 54 -48 -328 301 6 -27 94 -680 0.08 0.51 47.00 -0.92 47.01 1.12
2.5 21 -7 -404 378 14 -26 76 -725 -0.48 -0.57 46.92 -1.43 46.94 1.75
3.0 61 -49 -354 335 12 -19 -9 -652 1.19 -0.37 47.40 -0.86 47.41 1.04
3.5 16 -5 -271 255 11 -16 -117 -565 1.38 0.39 46.21 -0.49 46.21 0.61
4.0 -132 142 -161 147 10 -14 -115 -581 -1.59 2.73 44.83 -0.88 44.84 1.12
4.5 110 -99 -289 257 11 -32 152 -566 0.57 0.20 46.42 -3.61 46.56 4.45
5.0 197 -186 -252 227 11 -25 229 -411 1.54 -0.68 45.85 -3.81 46.01 4.75
5.5 316 -299 -210 187 17 -23 229 -291 3.86 -1.06 44.31 -3.13 44.42 4.04
6.0 352 -345 -166 149 7 -17 188 -227 5.09 -0.88 40.45 -2.07 40.50 2.93
6.5 180 -176 -54 31 4 -23 159 -156 1.97 0.71 35.36 -1.19 35.38 1.93
7.0 240 -219 -27 10 21 -17 134 -91 3.25 0.54 33.39 -1.90 33.44 3.26
7.5 355 -342 -58 27 13 -31 226 -70 4.71 -0.15 30.14 -2.44 30.24 4.63
8.0 279 -270 -117 88 9 -29 177 -164 3.72 -0.41 25.43 -2.29 25.53 5.15
8.5 211 -203 -148 124 8 -24 85 -217 3.29 -0.55 21.71 -1.88 21.79 4.95
9.0 161 -154 -183 153 7 -30 25 -290 2.90 -0.46 18.42 -1.33 18.47 4.13
9.5 121 -112 -222 196 9 -26 -42 -381 2.75 -0.37 15.52 -0.87 15.54 3.21
10.0 43 -32 -272 246 11 -26 -129 -513 2.04 -0.05 12.77 -0.50 12.78 2.24
10.5 -52 55 -383 348 3 -35 -275 -743 1.68 0.12 10.73 -0.45 10.74 2.40
11.0 -97 105 -400 380 8 -20 -339 -769 1.37 -0.11 9.05 -0.57 9.07 3.60
11.5 -142 149 -399 376 7 -23 -403 -763 1.12 -0.12 7.68 -0.46 7.69 3.43
12.0 -179 187 -394 368 8 -26 -453 -755 0.87 -0.07 6.56 -0.34 6.57 2.97
12.5 -211 221 -380 357 10 -23 -510 -739 0.78 0.02 5.69 -0.27 5.70 2.72
13.0 -238 244 -354 329 6 -25 -559 -678 0.77 -0.05 4.91 -0.29 4.92 3.38
13.5 -219 229 -157 114 10 -43 -502 -244 0.54 -0.27 4.14 -0.24 4.15 3.32
14.0 -194 201 -65 46 7 -19 -455 -119 0.60 0.08 3.60 0.03 3.60 359.52
14.5 -205 213 -67 45 8 -22 -472 -121 0.54 0.09 3.00 -0.05 3.00 0.95
15.0 -219 227 -71 50 8 -21 -495 -124 0.49 0.03 2.46 -0.14 2.46 3.26
INCLINOMETER READINGS

PROJECT: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

CLIENT: PUBLIC UTILITIES BOARD (PUB) Coordinate: N:0.000 E:0.000

Inclinometer No: IS20810 Report Date: 3-Feb-17 Report No: 348


DEPTH READING ZERO SUM INITIAL CHANGE DEFORMATION(mm) Deg. From
(m) A0 A180 B0 B180 A B A B A B A B R A0
15.5 -239 248 -76 55 9 -21 -523 -132 0.36 0.01 1.97 -0.17 1.98 4.93
16.0 -240 248 -77 51 8 -26 -507 -136 0.19 0.08 1.61 -0.18 1.62 6.38
16.5 -96 109 -157 132 13 -25 -164 -296 -0.41 0.07 1.42 -0.26 1.44 10.38
17.0 -49 56 -158 133 7 -25 -116 -283 0.11 -0.08 1.83 -0.33 1.86 10.22
17.5 -56 64 -158 135 8 -23 -128 -286 0.08 -0.07 1.72 -0.25 1.74 8.27
18.0 -52 61 -161 133 9 -28 -119 -294 0.06 0.00 1.64 -0.18 1.65 6.26
18.5 -63 71 -165 144 8 -21 -154 -307 0.20 -0.02 1.58 -0.18 1.59 6.50
19.0 -94 105 -185 164 11 -21 -210 -352 0.11 0.03 1.38 -0.16 1.39 6.61
19.5 -135 141 -195 177 6 -18 -296 -337 0.20 -0.35 1.27 -0.19 1.28 8.51
20.0 -155 162 -114 93 7 -21 -334 -203 0.17 -0.04 1.07 0.16 1.08 351.50
20.5 -221 234 -99 80 13 -19 -486 -178 0.31 -0.01 0.90 0.20 0.92 347.47
21.0 -304 311 -148 132 7 -16 -641 -298 0.26 0.18 0.59 0.21 0.63 340.41
21.5 -364 374 -230 225 10 -5 -767 -449 0.29 -0.06 0.33 0.03 0.33 354.81
22.0 -416 429 -297 272 13 -25 -849 -578 0.04 0.09 0.04 0.09 0.10 293.96
INCLINOMETER READINGS

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)


Inclinometer No: IS20810 Report Date: 3-Feb-17 Report No: 348
Location: Alert Level: +/- 16 mm
Installation Depth: 22.5 m Suspension Level: +/- 23 mm
Ground R.L. 0.0000 m RL (top) Elapsed Time: 211 days
Date of Base Reading: 07-Jul-16 Date of Last Reading: 07-Jan-17

Displacement (mm) Displacement (mm)


A(180) <<<===============>>> A(0) B(180) <<<===============>>> B(0)

0.0 0.0

1.0 1.0

2.0 2.0

3.0 3.0

4.0 4.0

5.0 5.0

6.0 6.0

7.0 7.0

8.0 8.0

9.0 9.0

10.0 10.0
Depth (m)

Depth (m)
11.0 11.0

12.0 12.0

13.0 13.0

14.0 14.0

15.0 15.0

16.0 16.0

17.0 17.0

18.0 18.0

19.0 19.0

20.0 20.0

21.0 21.0

22.0 22.0

-25 -15 -5 5 15 25 35 45 -25 -20 -15 -10 -5 0 5 10 15 20 25


9-Jan-17 7-Jan-17 9-Jan-17 7-Jan-17

6-Jan-17 Alert 6-Jan-17 Alert

Alert (-) Suspension Alert (-) Suspension

Suspension (-) Suspension (-)


INCLINOMETER READINGS

Excavation Recorded Max-Displacement in A Ditrction:

A0 (+) Date: 03-Feb-17


Depth of Max Deflection: 3.000

B180 (-) B0 (+) Max-Disp (mm): 47.400

Orientation: A Dir

A180 (-) (Clock-wise direction from A0)

50.0

35.0
Max Deflection (mm)

20.0

5.0

-10.0

-25.0

-40.0
7-Jul-16

27-Jul-16

16-Aug-16

5-Sep-16

25-Sep-16

4-Nov-16

24-Nov-16

14-Dec-16

3-Jan-17

12-Feb-17

4-Mar-17
15-Oct-16

23-Jan-17
A B Alert Alert (-) Suspension Suspension (-)
INCLINOMETER READINGS

PROJECT: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

CLIENT: PUBLIC UTILITIES BOARD (PUB) Coordinate: N:0.000 E:0.000

Inclinometer No: IS20811 Report Date: 3-Feb-17 Report No: 348


DEPTH READING ZERO SUM INITIAL CHANGE DEFORMATION(mm) Deg. From
(m) A0 A180 B0 B180 A B A B A B A B R A0
0.5 521 -484 -646 655 37 9 1061 -1305 -0.56 0.04 0.02 -1.48 1.48 89.23
1.0 495 -486 -455 432 9 -23 990 -872 -0.09 -0.15 0.58 -1.52 1.63 69.11
1.5 66 -58 -151 100 8 -51 100 -240 0.24 -0.11 0.67 -1.37 1.53 63.94
2.0 -204 205 -182 167 1 -15 -419 -362 0.10 0.13 0.43 -1.26 1.33 71.16
2.5 -380 391 -351 313 11 -38 -775 -646 0.04 -0.18 0.33 -1.39 1.43 76.64
3.0 -487 496 -268 232 9 -36 -985 -505 0.02 0.05 0.29 -1.21 1.24 76.52
3.5 -470 475 -225 183 5 -42 -951 -410 0.06 0.02 0.27 -1.26 1.29 77.91
4.0 -506 510 -346 325 4 -21 -1020 -655 0.04 -0.16 0.21 -1.28 1.30 80.68
4.5 -861 874 -595 580 13 -15 -1732 -1174 -0.03 -0.01 0.17 -1.12 1.13 81.37
5.0 -825 832 -438 408 7 -30 -1661 -843 0.04 -0.03 0.20 -1.11 1.13 79.79
5.5 -754 762 -87 95 8 8 -1517 -177 0.01 -0.05 0.16 -1.08 1.09 81.57
6.0 -638 645 165 -181 7 -16 -1276 356 -0.07 -0.10 0.15 -1.03 1.04 81.71
6.5 -442 450 303 -337 8 -34 -891 650 -0.01 -0.10 0.22 -0.93 0.96 76.69
7.0 -460 458 237 -234 -2 3 -907 469 -0.11 0.02 0.23 -0.83 0.86 74.51
7.5 -332 361 207 -259 29 -52 -676 468 -0.17 -0.02 0.34 -0.85 0.92 68.20
8.0 -289 291 132 -160 2 -28 -587 313 0.07 -0.21 0.51 -0.83 0.97 58.43
8.5 -309 321 180 -221 12 -41 -622 415 -0.08 -0.14 0.44 -0.62 0.76 54.64
9.0 -452 460 109 -147 8 -38 -914 260 0.02 -0.04 0.52 -0.48 0.71 42.71
9.5 -454 459 -24 -18 5 -42 -915 -26 0.02 0.20 0.50 -0.44 0.67 41.35
10.0 -425 430 -142 145 5 3 -857 -280 0.02 -0.07 0.48 -0.64 0.80 53.13
10.5 -307 318 -9 -38 11 -47 -633 13 0.08 0.16 0.46 -0.57 0.73 51.10
11.0 -273 281 118 -156 8 -38 -556 281 0.02 -0.07 0.38 -0.73 0.82 62.50
11.5 -297 305 187 -218 8 -31 -604 408 0.02 -0.03 0.36 -0.66 0.75 61.39
12.0 -360 369 191 -226 9 -35 -731 413 0.02 0.04 0.34 -0.63 0.72 61.65
12.5 -388 395 174 -211 7 -37 -782 384 -0.01 0.01 0.32 -0.67 0.74 64.47
13.0 -395 400 197 -216 5 -19 -796 407 0.01 0.06 0.33 -0.68 0.76 64.11
13.5 -515 520 15 -46 5 -31 -1034 66 -0.01 -0.05 0.32 -0.74 0.81 66.61
14.0 -492 500 -93 50 8 -43 -991 -139 -0.01 -0.04 0.33 -0.69 0.76 64.44
14.5 -484 496 -121 75 12 -46 -981 -202 0.01 0.06 0.34 -0.65 0.73 62.39
15.0 -438 447 -174 134 9 -40 -891 -312 0.06 0.04 0.33 -0.71 0.78 65.07
15.5 -358 365 -238 203 7 -35 -724 -444 0.01 0.03 0.27 -0.75 0.80 70.20
16.0 -353 365 -236 200 12 -36 -716 -439 -0.02 0.03 0.26 -0.78 0.82 71.57
16.5 -319 326 -227 202 7 -25 -654 -427 0.09 -0.02 0.28 -0.81 0.86 70.93
17.0 -261 264 -241 207 3 -34 -525 -448 0.00 0.00 0.19 -0.79 0.81 76.48
17.5 -262 268 -250 220 6 -30 -533 -470 0.03 0.00 0.19 -0.79 0.81 76.48
18.0 -147 156 -311 277 9 -34 -305 -592 0.02 0.04 0.16 -0.79 0.81 78.55
18.5 -184 190 -190 173 6 -17 -373 -365 -0.01 0.02 0.14 -0.83 0.84 80.43
19.0 -339 351 20 -40 12 -20 -690 63 0.00 -0.03 0.15 -0.85 0.86 79.99
19.5 -115 112 92 -141 -3 -49 -224 231 -0.03 0.02 0.15 -0.82 0.83 79.63
INCLINOMETER READINGS

PROJECT: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

CLIENT: PUBLIC UTILITIES BOARD (PUB) Coordinate: N:0.000 E:0.000

Inclinometer No: IS20811 Report Date: 3-Feb-17 Report No: 348


DEPTH READING ZERO SUM INITIAL CHANGE DEFORMATION(mm) Deg. From
(m) A0 A180 B0 B180 A B A B A B A B R A0
20.0 -28 37 53 -73 9 -20 -66 124 0.01 0.02 0.18 -0.84 0.86 77.91
20.5 -151 163 -67 38 12 -29 -319 -118 0.05 0.13 0.17 -0.86 0.88 78.82
21.0 -221 228 -84 62 7 -22 -449 -147 0.00 0.01 0.12 -0.99 1.00 83.09
21.5 -156 161 85 -121 5 -36 -319 227 0.02 -0.21 0.12 -1.00 1.01 83.16
22.0 -368 369 592 -639 1 -47 -741 1254 0.04 -0.23 0.10 -0.79 0.80 82.79
22.5 -428 446 413 -414 18 -1 -865 823 -0.09 0.04 0.06 -0.56 0.56 83.88
23.0 -519 525 132 -140 6 -8 -1041 286 -0.03 -0.14 0.15 -0.60 0.62 75.96
23.5 -492 499 -26 -5 7 -31 -994 -11 0.03 -0.10 0.18 -0.46 0.49 68.63
24.0 -409 418 -70 40 9 -30 -832 -113 0.05 0.03 0.15 -0.36 0.39 67.38
24.5 -358 364 -31 19 6 -12 -738 -40 0.16 -0.10 0.10 -0.39 0.40 75.62
25.0 -419 424 -180 159 5 -21 -839 -335 -0.04 -0.04 -0.06 -0.29 0.30 101.69
25.5 -461 471 -77 32 10 -45 -933 -95 0.01 -0.14 -0.02 -0.25 0.25 94.57
26.0 -408 406 -134 108 -2 -26 -815 -245 0.01 0.03 -0.03 -0.11 0.11 105.26
26.5 -382 391 -75 36 9 -39 -773 -105 0.00 -0.06 -0.04 -0.14 0.15 105.95
27.0 -393 400 -81 70 7 -11 -787 -151 -0.06 0.00 -0.04 -0.08 0.09 116.57
27.5 -400 411 -179 160 11 -19 -813 -331 0.02 -0.08 0.02 -0.08 0.08 75.96
INCLINOMETER READINGS

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)


Inclinometer No: IS20811 Report Date: 3-Feb-17 Report No: 348
Location: Alert Level: +/- 46 mm
Installation Depth: 28.0 m Suspension Level: +/- 66 mm
Ground R.L. 0.0000 m Elapsed Time: 8 days
Date of Base Reading: 26-Jan-17 Date of Last Reading: 26-Jan-17

Displacement (mm) Displacement (mm)


A(180) <<<===============>>> A(0) B(180) <<<===============>>> B(0)

0.0 0.0
1.0 1.0
2.0 2.0
3.0 3.0
4.0 4.0
5.0 5.0
6.0 6.0
7.0 7.0
8.0 8.0
9.0 9.0
10.0 10.0
11.0 11.0
12.0 12.0
Depth (m)

Depth (m)
13.0 13.0
14.0 14.0
15.0 15.0
16.0 16.0
17.0 17.0
18.0 18.0
19.0 19.0
20.0 20.0
21.0 21.0
22.0 22.0
23.0 23.0
24.0 24.0
25.0 25.0
26.0 26.0
27.0 27.0
28.0 28.0
-70 -55 -40 -25 -10 5 20 35 50 65 -70 -55 -40 -25 -10 5 20 35 50 65

26-Jan-17 26-Jan-17 26-Jan-17 26-Jan-17

Alert Alert

Alert (-) Suspension Alert (-) Suspension

Suspension (-) Suspension (-)


INCLINOMETER READINGS

Excavation Recorded Max-Displacement in A Ditrction:

A0 (+) Date: 03-Feb-17


Depth of Max Deflection: 1.500

B180 (-) B0 (+) Max-Disp (mm): 0.670

Orientation: A Dir

A180 (-) (Clock-wise direction from A0)

75.0

60.0

45.0
Max Deflection (mm)

30.0

15.0

0.0

-15.0

-30.0

-45.0

-60.0

-75.0
10-Sep-16

30-Sep-16

9-Nov-16

29-Nov-16

19-Dec-16

8-Jan-17

17-Feb-17

9-Mar-17

29-Mar-17

18-Apr-17
20-Oct-16

28-Jan-17

8-May-17

28-May-17
A B Alert Alert (-) Suspension Suspension (-)
INCLINOMETER READINGS

PROJECT: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

CLIENT: PUBLIC UTILITIES BOARD (PUB) Coordinate: N:0.000 E:0.000

Inclinometer No: IS20812 Report Date: 3-Feb-17 Report No: 348


DEPTH READING ZERO SUM INITIAL CHANGE DEFORMATION(mm) Deg. From
(m) A0 A180 B0 B180 A B A B A B A B R A0
0.5 1585 -1577 863 -881 8 -18 3048 1599 1.14 1.45 24.93 9.38 26.64 339.38
1.0 1040 -1049 1043 -1067 -9 -24 2047 1933 0.42 1.77 23.39 8.47 24.88 340.09
1.5 531 -524 1141 -1164 7 -23 958 2123 0.97 1.82 22.53 6.98 23.59 342.79
2.0 474 -469 999 -1040 5 -41 861 1852 0.82 1.87 21.39 5.30 22.04 346.08
2.5 828 -807 701 -725 21 -24 1529 1295 1.06 1.31 20.48 3.53 20.78 350.22
3.0 1113 -1111 506 -524 2 -18 2096 962 1.28 0.68 19.26 2.38 19.41 352.96
3.5 1126 -1137 636 -643 -11 -7 2141 1245 1.22 0.34 17.78 1.94 17.89 353.77
4.0 1244 -1241 641 -659 3 -18 2372 1270 1.13 0.30 16.12 1.69 16.21 354.02
4.5 997 -1010 928 -934 -13 -6 1907 1824 1.00 0.38 14.29 1.68 14.39 353.29
5.0 948 -941 800 -836 7 -36 1805 1580 0.84 0.56 12.31 1.37 12.39 353.65
5.5 1012 -1008 735 -765 4 -30 1922 1439 0.98 0.61 11.13 0.73 11.15 356.25
6.0 864 -868 704 -727 -4 -23 1652 1417 0.80 0.14 9.77 0.19 9.77 358.89
6.5 316 -328 593 -636 -12 -43 621 1207 0.23 0.22 8.74 -0.01 8.74 0.07
7.0 700 -680 512 -552 20 -40 1259 1068 1.21 -0.04 8.40 0.01 8.40 359.93
7.5 1016 -1008 711 -742 8 -31 1918 1398 1.06 0.55 7.06 0.28 7.07 357.73
8.0 1040 -1041 609 -643 -1 -34 2004 1234 0.77 0.18 6.06 0.21 6.06 358.02
8.5 1062 -1047 678 -713 15 -35 2030 1379 0.79 0.12 4.98 -0.29 4.99 3.33
9.0 1062 -1060 763 -795 2 -32 2053 1563 0.69 -0.05 3.78 -0.76 3.86 11.37
9.5 876 -855 824 -865 21 -41 1701 1700 0.30 -0.11 2.96 -0.62 3.02 11.83
10.0 661 -649 831 -834 12 -3 1276 1632 0.34 0.33 2.63 -0.43 2.66 9.29
10.5 623 -648 598 -627 -25 -29 1236 1235 0.35 -0.10 2.17 -0.64 2.26 16.43
11.0 715 -716 606 -635 -1 -29 1413 1236 0.18 0.05 1.80 -0.55 1.88 16.99
11.5 762 -754 602 -628 8 -26 1489 1214 0.27 0.16 1.56 -0.58 1.66 20.39
12.0 904 -903 549 -581 1 -32 1739 1133 0.68 -0.03 1.29 -0.72 1.48 29.17
12.5 733 -731 484 -510 2 -26 1462 993 0.02 0.01 0.57 -0.62 0.84 47.41
13.0 675 -662 451 -453 13 -2 1329 925 0.08 -0.21 0.58 -0.64 0.86 47.82
13.5 591 -595 609 -644 -4 -35 1178 1241 0.08 0.12 0.48 -0.38 0.61 38.37
14.0 528 -523 610 -645 5 -35 1050 1259 0.01 -0.04 0.38 -0.49 0.62 52.21
14.5 509 -506 621 -655 3 -34 1007 1284 0.08 -0.08 0.35 -0.51 0.62 55.54
15.0 450 -449 619 -657 1 -38 895 1283 0.04 -0.07 0.26 -0.41 0.49 57.62
15.5 405 -400 632 -666 5 -34 802 1306 0.03 -0.08 0.15 -0.35 0.38 66.80
16.0 449 -450 646 -641 -1 5 897 1290 0.02 -0.03 0.13 -0.31 0.34 67.25
16.5 523 -524 433 -476 -1 -43 1039 920 0.08 -0.11 0.09 -0.34 0.35 75.17
17.0 489 -483 434 -473 6 -39 975 911 -0.03 -0.04 0.01 -0.30 0.30 88.09
17.5 371 -367 450 -484 4 -34 739 945 -0.01 -0.11 0.04 -0.30 0.30 82.41
18.0 299 -294 490 -514 5 -24 592 1008 0.01 -0.04 0.07 -0.17 0.18 67.62
18.5 298 -293 594 -620 5 -26 585 1217 0.06 -0.03 0.04 -0.14 0.15 74.05
19.0 360 -367 661 -681 -7 -20 722 1348 0.05 -0.06 -0.04 -0.11 0.12 109.98
19.5 525 -520 538 -581 5 -43 1043 1136 0.02 -0.17 -0.17 -0.03 0.17 169.99
INCLINOMETER READINGS

PROJECT: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

CLIENT: PUBLIC UTILITIES BOARD (PUB) Coordinate: N:0.000 E:0.000

Inclinometer No: IS20812 Report Date: 3-Feb-17 Report No: 348


DEPTH READING ZERO SUM INITIAL CHANGE DEFORMATION(mm) Deg. From
(m) A0 A180 B0 B180 A B A B A B A B R A0
20.0 547 -541 599 -632 6 -33 1085 1244 0.03 -0.13 -0.17 0.04 0.17 193.24
20.5 547 -540 692 -721 7 -29 1089 1415 -0.02 -0.02 -0.21 0.15 0.26 215.54
21.0 505 -497 792 -827 8 -35 1002 1623 0.00 -0.04 -0.21 0.15 0.26 215.54
21.5 497 -489 840 -874 8 -34 990 1713 -0.04 0.01 -0.20 0.07 0.21 199.29
22.0 508 -499 850 -859 9 -9 1018 1717 -0.11 -0.08 -0.12 0.05 0.13 202.62
22.5 396 -394 629 -627 2 2 779 1287 0.11 -0.31 0.00 0.08 0.08 270.00
23.0 478 -474 510 -517 4 -7 949 1038 0.03 -0.11 -0.13 0.48 0.50 254.85
23.5 459 -455 415 -453 4 -38 918 859 -0.04 0.09 -0.15 0.67 0.69 257.38
24.0 381 -380 486 -505 1 -19 764 989 -0.03 0.02 -0.08 0.52 0.53 261.25
24.5 350 -347 599 -623 3 -24 698 1207 -0.01 0.15 -0.10 0.50 0.51 258.69
25.0 315 -314 681 -693 1 -12 631 1373 -0.02 0.01 -0.05 0.36 0.36 262.09
25.5 228 -224 632 -675 4 -43 458 1286 -0.06 0.21 -0.02 0.31 0.31 266.31
26.0 339 -338 584 -616 1 -32 674 1196 0.03 0.04 0.02 0.18 0.18 276.34
26.5 396 -395 569 -598 1 -29 790 1165 0.01 0.02 0.06 0.19 0.20 287.53
27.0 413 -415 602 -627 -2 -25 826 1228 0.02 0.01 0.10 0.20 0.22 296.57
27.5 448 -448 616 -647 0 -31 891 1263 0.05 0.00 0.13 0.14 0.19 312.88
INCLINOMETER READINGS

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)


Inclinometer No: IS20812 Report Date: 3-Feb-17 Report No: 348
Location: Alert Level: +/- 46 mm
Installation Depth: 28.0 m Suspension Level: +/- 66 mm
Ground R.L. 111.6164 m Elapsed Time: 146 days
Date of Base Reading: 10-Sep-16 Date of Last Reading: 25-Jan-17

Displacement (mm) Displacement (mm)


A(180) <<<===============>>> A(0) B(180) <<<===============>>> B(0)

0.0 0.0
1.0 1.0
2.0 2.0
3.0 3.0
4.0 4.0
5.0 5.0
6.0 6.0
7.0 7.0
8.0 8.0
9.0 9.0
10.0 10.0
11.0 11.0
12.0 12.0
Depth (m)

Depth (m)
13.0 13.0
14.0 14.0
15.0 15.0
16.0 16.0
17.0 17.0
18.0 18.0
19.0 19.0
20.0 20.0
21.0 21.0
22.0 22.0
23.0 23.0
24.0 24.0
25.0 25.0
26.0 26.0
27.0 27.0
28.0 28.0
-70 -55 -40 -25 -10 5 20 35 50 65 -70 -55 -40 -25 -10 5 20 35 50 65

2-Feb-17 25-Jan-17 2-Feb-17 25-Jan-17

19-Jan-17 Alert 19-Jan-17 Alert

Alert (-) Suspension Alert (-) Suspension

Suspension (-) Suspension (-)


INCLINOMETER READINGS

Excavation Recorded Max-Displacement in A Ditrction:

A0 (+) Date: 03-Feb-17


Depth of Max Deflection: 0.500

B180 (-) B0 (+) Max-Disp (mm): 24.930

Orientation: A Dir

A180 (-) (Clock-wise direction from A0)

75.0

60.0

45.0
Max Deflection (mm)

30.0

15.0

0.0

-15.0

-30.0

-45.0

-60.0

-75.0
10-Sep-16

30-Sep-16

9-Nov-16

29-Nov-16

19-Dec-16

8-Jan-17

17-Feb-17

9-Mar-17

29-Mar-17

18-Apr-17
20-Oct-16

28-Jan-17

8-May-17

28-May-17
A B Alert Alert (-) Suspension Suspension (-)
INCLINOMETER READINGS

PROJECT: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

CLIENT: PUBLIC UTILITIES BOARD (PUB) Coordinate: N:0.000 E:0.000

Inclinometer No: IS20814 Report Date: 3-Feb-17 Report No: 348


DEPTH READING ZERO SUM INITIAL CHANGE DEFORMATION(mm) Deg. From
(m) A0 A180 B0 B180 A B A B A B A B R A0
0.5 527 -519 -400 377 8 -23 1046 -786 0.00 0.09 -0.66 1.78 1.90 249.66
1.0 513 -509 -426 392 4 -34 1022 -829 0.00 0.11 -0.66 1.69 1.81 248.67
1.5 527 -524 -437 410 3 -27 1049 -856 0.02 0.09 -0.66 1.58 1.71 247.33
2.0 499 -494 -392 361 5 -31 996 -757 -0.03 0.04 -0.68 1.49 1.64 245.47
2.5 393 -385 -348 312 8 -36 780 -669 -0.02 0.09 -0.65 1.45 1.59 245.85
3.0 342 -335 -378 344 7 -34 677 -726 0.00 0.04 -0.63 1.36 1.50 245.14
3.5 340 -336 -409 378 4 -31 676 -796 0.00 0.09 -0.63 1.32 1.46 244.49
4.0 348 -345 -513 497 3 -16 700 -1005 -0.07 -0.05 -0.63 1.23 1.38 242.88
4.5 228 -227 -643 615 1 -28 455 -1257 0.00 -0.01 -0.56 1.28 1.40 246.37
5.0 235 -238 -673 631 -3 -42 478 -1311 -0.05 0.07 -0.56 1.29 1.41 246.53
5.5 313 -311 -648 628 2 -20 618 -1290 0.06 0.14 -0.51 1.22 1.32 247.31
6.0 246 -244 -644 615 2 -29 496 -1264 -0.06 0.05 -0.57 1.08 1.22 242.18
6.5 69 -65 -647 618 4 -29 140 -1266 -0.06 0.01 -0.51 1.03 1.15 243.66
7.0 137 -126 -483 448 11 -35 263 -934 0.00 0.03 -0.45 1.02 1.11 246.19
7.5 168 -160 -335 321 8 -14 331 -652 -0.03 -0.04 -0.45 0.99 1.09 245.56
8.0 189 -183 -434 408 6 -26 366 -839 0.06 -0.03 -0.42 1.03 1.11 247.82
8.5 348 -339 -486 458 9 -28 682 -941 0.05 -0.03 -0.48 1.06 1.16 245.64
9.0 440 -433 -508 500 7 -8 875 -1006 -0.02 -0.02 -0.53 1.09 1.21 244.07
9.5 488 -478 -623 594 10 -29 963 -1219 0.03 0.02 -0.51 1.11 1.22 245.32
10.0 300 -282 -651 632 18 -19 596 -1274 -0.14 -0.09 -0.54 1.09 1.22 243.65
10.5 -239 255 -623 587 16 -36 -493 -1211 -0.01 0.01 -0.40 1.18 1.25 251.27
11.0 -96 93 -508 480 -3 -28 -207 -986 0.18 -0.02 -0.39 1.17 1.23 251.57
11.5 125 -127 -472 442 -2 -30 250 -913 0.02 -0.01 -0.57 1.19 1.32 244.41
12.0 307 -307 -353 321 0 -32 616 -676 -0.02 0.02 -0.59 1.20 1.34 243.82
12.5 177 -157 -299 270 20 -29 353 -569 -0.19 0.00 -0.57 1.18 1.31 244.22
13.0 -60 67 -253 235 7 -18 -117 -476 -0.10 -0.12 -0.38 1.18 1.24 252.15
13.5 -153 160 -382 350 7 -32 -313 -735 0.00 0.03 -0.28 1.30 1.33 257.85
14.0 -140 147 -450 425 7 -25 -285 -881 -0.02 0.06 -0.28 1.27 1.30 257.57
14.5 -88 93 -566 536 5 -30 -180 -1111 -0.01 0.09 -0.26 1.21 1.24 257.87
15.0 -26 32 -613 583 6 -30 -53 -1200 -0.05 0.04 -0.25 1.12 1.15 257.42
15.5 78 -66 -630 604 12 -26 150 -1235 -0.06 0.01 -0.20 1.08 1.10 259.51
16.0 196 -191 -641 607 5 -34 393 -1257 -0.06 0.09 -0.14 1.07 1.08 262.55
16.5 234 -233 -621 595 1 -26 468 -1215 -0.01 -0.01 -0.08 0.98 0.98 265.33
17.0 203 -201 -602 573 2 -29 405 -1179 -0.01 0.04 -0.07 0.99 0.99 265.96
17.5 136 -139 -543 516 -3 -27 278 -1060 -0.03 0.01 -0.06 0.95 0.95 266.39
18.0 105 -105 -555 527 0 -28 214 -1084 -0.04 0.02 -0.03 0.94 0.94 268.17
18.5 86 -82 -508 486 4 -22 167 -994 0.01 0.00 0.01 0.92 0.92 270.62
19.0 117 -112 -483 453 5 -30 232 -937 -0.03 0.01 0.00 0.92 0.92 270.00
19.5 192 -186 -485 455 6 -30 373 -940 0.05 0.00 0.03 0.91 0.91 271.89
INCLINOMETER READINGS

PROJECT: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

CLIENT: PUBLIC UTILITIES BOARD (PUB) Coordinate: N:0.000 E:0.000

Inclinometer No: IS20814 Report Date: 3-Feb-17 Report No: 348


DEPTH READING ZERO SUM INITIAL CHANGE DEFORMATION(mm) Deg. From
(m) A0 A180 B0 B180 A B A B A B A B R A0
20.0 222 -218 -524 499 4 -25 439 -1027 0.01 0.04 -0.02 0.91 0.91 268.74
20.5 186 -184 -560 529 2 -31 370 -1095 0.00 0.06 -0.03 0.87 0.87 268.03
21.0 122 -121 -566 537 1 -29 249 -1109 -0.06 0.06 -0.03 0.81 0.81 267.88
21.5 82 -78 -615 587 4 -28 160 -1210 0.00 0.08 0.03 0.75 0.75 272.29
22.0 53 -42 -653 617 11 -36 99 -1276 -0.04 0.06 0.03 0.67 0.67 272.56
22.5 -1 6 -561 537 5 -24 -8 -1109 0.01 0.11 0.07 0.61 0.61 276.55
23.0 31 -30 -541 511 1 -30 57 -1056 0.04 0.04 0.06 0.50 0.50 276.84
23.5 96 -94 -475 445 2 -30 193 -921 -0.03 0.01 0.02 0.46 0.46 272.49
24.0 79 -76 -416 388 3 -28 152 -814 0.03 0.10 0.05 0.45 0.45 276.34
24.5 32 -28 -494 468 4 -26 59 -974 0.01 0.12 0.02 0.35 0.35 273.27
25.0 84 -81 -475 453 3 -22 164 -923 0.01 -0.05 0.01 0.23 0.23 272.49
25.5 111 -106 -174 157 5 -17 214 -341 0.03 0.10 0.00 0.28 0.28 270.00
26.0 180 -174 -236 217 6 -19 355 -454 -0.01 0.01 -0.03 0.18 0.18 260.54
26.5 135 -131 -371 346 4 -25 263 -729 0.03 0.12 -0.02 0.17 0.17 263.29
27.0 81 -80 -472 451 1 -21 161 -931 0.00 0.08 -0.05 0.05 0.07 225.00
27.5 16 -9 -485 471 7 -14 30 -953 -0.05 -0.03 -0.05 -0.03 0.06 149.04
INCLINOMETER READINGS

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)


Inclinometer No: IS20814 Report Date: 3-Feb-17 Report No: 348
Location: Alert Level: +/- 46 mm
Installation Depth: 28.0 m Suspension Level: +/- 66 mm
Ground R.L. 0.0000 m Elapsed Time: 8 days
Date of Base Reading: 26-Jan-17 Date of Last Reading: 26-Jan-17

Displacement (mm) Displacement (mm)


A(180) <<<===============>>> A(0) B(180) <<<===============>>> B(0)

0.0 0.0
1.0 1.0
2.0 2.0
3.0 3.0
4.0 4.0
5.0 5.0
6.0 6.0
7.0 7.0
8.0 8.0
9.0 9.0
10.0 10.0
11.0 11.0
12.0 12.0
Depth (m)

Depth (m)
13.0 13.0
14.0 14.0
15.0 15.0
16.0 16.0
17.0 17.0
18.0 18.0
19.0 19.0
20.0 20.0
21.0 21.0
22.0 22.0
23.0 23.0
24.0 24.0
25.0 25.0
26.0 26.0
27.0 27.0
28.0 28.0
-70 -55 -40 -25 -10 5 20 35 50 65 -70 -55 -40 -25 -10 5 20 35 50 65

26-Jan-17 26-Jan-17 26-Jan-17 26-Jan-17

Alert Alert

Alert (-) Suspension Alert (-) Suspension

Suspension (-) Suspension (-)


INCLINOMETER READINGS

Excavation Recorded Max-Displacement in A Ditrction:

A0 (+) Date: 03-Feb-17


Depth of Max Deflection: 2.000

B180 (-) B0 (+) Max-Disp (mm): -0.680

Orientation: A Dir

A180 (-) (Clock-wise direction from A0)

75.0

60.0

45.0
Max Deflection (mm)

30.0

15.0

0.0

-15.0

-30.0

-45.0

-60.0

-75.0
10-Sep-16

30-Sep-16

9-Nov-16

29-Nov-16

19-Dec-16

8-Jan-17

17-Feb-17

9-Mar-17

29-Mar-17

18-Apr-17
20-Oct-16

28-Jan-17

8-May-17

28-May-17
A B Alert Alert (-) Suspension Suspension (-)
INCLINOMETER READINGS

PROJECT: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

CLIENT: PUBLIC UTILITIES BOARD (PUB) Coordinate: N:0.000 E:0.000

Inclinometer No: IS201 Report Date: 3-Feb-17 Report No: 348


DEPTH READING ZERO SUM INITIAL CHANGE DEFORMATION(mm) Deg. From
(m) A0 A180 B0 B180 A B A B A B A B R A0
0.5 145 -142 428 -476 3 -48 344 882 -0.57 0.22 0.08 0.23 0.24 289.18
1.0 74 -69 384 -412 5 -28 150 778 -0.07 0.18 0.65 0.01 0.65 359.12
1.5 27 -21 272 -305 6 -33 37 563 0.11 0.14 0.72 -0.17 0.74 13.28
2.0 -20 25 186 -222 5 -36 -51 409 0.06 -0.01 0.61 -0.31 0.68 26.94
2.5 -28 34 158 -198 6 -40 -68 358 0.06 -0.02 0.55 -0.30 0.63 28.61
3.0 -177 180 155 -183 3 -28 -363 333 0.06 0.05 0.49 -0.28 0.56 29.74
3.5 -273 276 109 -140 3 -31 -554 250 0.05 -0.01 0.43 -0.33 0.54 37.50
4.0 -219 227 34 -61 8 -27 -453 85 0.07 0.10 0.38 -0.32 0.50 40.10
4.5 -204 210 -14 -16 6 -30 -419 9 0.05 -0.07 0.31 -0.42 0.52 53.57
5.0 -174 180 -49 19 6 -30 -365 -45 0.11 -0.23 0.26 -0.35 0.44 53.39
5.5 -130 135 9 -28 5 -19 -270 44 0.05 -0.07 0.15 -0.12 0.19 38.66
6.0 -25 31 -77 16 6 -61 -60 -109 0.04 0.16 0.10 -0.05 0.11 26.57
6.5 -75 74 -176 141 -1 -35 -151 -307 0.02 -0.10 0.06 -0.21 0.22 74.05
7.0 -228 232 -151 122 4 -29 -463 -248 0.03 -0.25 0.04 -0.11 0.12 70.02
7.5 -163 175 -58 29 12 -29 -337 -92 -0.01 0.05 0.01 0.14 0.14 274.09
8.0 -44 52 -86 38 8 -48 -102 -145 0.06 0.21 0.02 0.09 0.09 282.53
8.5 25 -19 -151 113 6 -38 39 -256 0.05 -0.08 -0.04 -0.12 0.13 108.43
9.0 99 -85 -135 82 14 -53 186 -212 -0.02 -0.05 -0.09 -0.04 0.10 156.04
9.5 178 -171 -154 112 7 -42 345 -293 0.04 0.27 -0.07 0.01 0.07 188.13
10.0 179 -173 -239 207 6 -32 353 -446 -0.01 0.00 -0.11 -0.26 0.28 112.93
10.5 122 -107 -245 212 15 -33 238 -447 -0.09 -0.10 -0.10 -0.26 0.28 111.04
11.0 3 6 -183 148 9 -35 -3 -322 0.00 -0.09 -0.01 -0.16 0.16 93.58
11.5 -41 48 -101 66 7 -35 -88 -160 -0.01 -0.07 -0.01 -0.07 0.07 98.13
INCLINOMETER READINGS

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)


Inclinometer No: IS201 Report Date: 3-Feb-17 Report No: 348
Location: Irwell Bank Alert Level: +/- 40 mm
Installation Depth: 12.0 m Suspension Level: +/- 50 mm
Ground R.L. 116.7813 m Elapsed Time: 80 days
Date of Base Reading: 15-Nov-16 Date of Last Reading: 21-Jan-17

Displacement (mm) Displacement (mm)


A(180) <<<===============>>> A(0) B(180) <<<===============>>> B(0)

0.0 0.0
0.5 0.5
1.0 1.0
1.5 1.5
2.0 2.0
2.5 2.5
3.0 3.0
3.5 3.5
4.0 4.0
4.5 4.5
5.0 5.0
Depth (m)

5.5 5.5

Depth (m)
6.0 6.0

6.5 6.5

7.0 7.0

7.5 7.5

8.0 8.0

8.5 8.5

9.0 9.0

9.5 9.5

10.0 10.0

10.5 10.5

11.0 11.0

11.5 11.5

12.0 12.0
-70 -55 -40 -25 -10 5 20 35 50 65 -70 -55 -40 -25 -10 5 20 35 50 65
25-Jan-17 21-Jan-17 25-Jan-17 21-Jan-17
17-Jan-17 Alert 17-Jan-17 Alert
Alert (-) Suspension Alert (-) Suspension
Suspension (-) Suspension (-)
INCLINOMETER READINGS

Excavation Recorded Max-Displacement in A Ditrction:

A0 (+) Date: 03-Feb-17


Depth of Max Deflection: 1.500

B180 (-) B0 (+) Max-Disp (mm): 0.720

Orientation: A Dir

A180 (-) (Clock-wise direction from A0)

60.0

45.0

30.0
Max Deflection (mm)

15.0

0.0

-15.0

-30.0

-45.0

-60.0
15-Nov-16

5-Dec-16

25-Dec-16

3-Feb-17

23-Feb-17

15-Mar-17

4-Apr-17

24-Apr-17

3-Jun-17

13-Jul-17

2-Aug-17
14-Jan-17

14-May-17

23-Jun-17
A B Alert Alert (-) Suspension Suspension (-)
INCLINOMETER READINGS

PROJECT: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

CLIENT: PUBLIC UTILITIES BOARD (PUB) Coordinate: N:0.000 E:0.000

Inclinometer No: IS202 Report Date: 3-Feb-17 Report No: 348


DEPTH READING ZERO SUM INITIAL CHANGE DEFORMATION(mm) Deg. From
(m) A0 A180 B0 B180 A B A B A B A B R A0
0.5 472 -463 -517 486 9 -31 1092 -766 -1.57 -2.37 -2.18 -4.06 4.61 118.23
1.0 369 -365 -326 309 4 -17 788 -498 -0.54 -1.37 -0.61 -1.69 1.80 109.85
1.5 269 -259 -127 90 10 -37 483 -226 0.45 0.09 -0.07 -0.32 0.33 102.34
2.0 283 -281 83 -97 2 -14 483 113 0.81 0.67 -0.52 -0.41 0.66 141.75
2.5 307 -302 68 -93 5 -25 665 135 -0.56 0.26 -1.33 -1.08 1.71 140.92
3.0 330 -325 44 -68 5 -24 724 125 -0.69 -0.13 -0.77 -1.34 1.55 119.88
3.5 294 -284 54 -71 10 -17 572 126 0.06 -0.01 -0.08 -1.21 1.21 93.78
4.0 233 -225 42 -75 8 -33 458 127 0.00 -0.10 -0.14 -1.20 1.21 96.65
4.5 237 -236 62 -100 1 -38 474 172 -0.01 -0.10 -0.14 -1.10 1.11 97.25
5.0 322 -320 11 -49 2 -38 641 85 0.01 -0.25 -0.13 -1.00 1.01 97.41
5.5 259 -255 -13 -23 4 -36 517 19 -0.03 -0.09 -0.14 -0.75 0.76 100.57
6.0 218 -200 -33 2 18 -31 435 -29 -0.17 -0.06 -0.11 -0.66 0.67 99.46
6.5 171 -163 -39 8 8 -31 341 -49 -0.07 0.02 0.06 -0.60 0.60 84.29
7.0 125 -118 -6 -26 7 -32 248 16 -0.05 0.04 0.13 -0.62 0.63 78.16
7.5 227 -218 18 -38 9 -20 442 58 0.03 -0.02 0.18 -0.66 0.68 74.74
8.0 273 -266 27 -42 7 -15 535 70 0.04 -0.01 0.15 -0.64 0.66 76.81
8.5 199 -193 4 -37 6 -33 394 44 -0.02 -0.03 0.11 -0.63 0.64 80.10
9.0 155 -149 6 -29 6 -23 304 39 0.00 -0.04 0.13 -0.60 0.61 77.77
9.5 124 -117 -10 -17 7 -27 241 14 0.00 -0.07 0.13 -0.56 0.57 76.93
10.0 57 -47 -37 12 10 -25 113 -34 -0.09 -0.15 0.13 -0.49 0.51 75.14
10.5 37 -28 -57 41 9 -16 75 -90 -0.10 -0.08 0.22 -0.34 0.40 57.09
11.0 306 -302 34 -66 4 -32 592 89 0.16 0.11 0.32 -0.26 0.41 39.09
11.5 314 -310 19 -43 4 -24 615 65 0.09 -0.03 0.16 -0.37 0.40 66.61
12.0 289 -283 29 -63 6 -34 570 90 0.02 0.02 0.07 -0.34 0.35 78.37
12.5 261 -254 45 -75 7 -30 515 120 0.00 0.00 0.05 -0.36 0.36 82.09
13.0 230 -227 36 -49 3 -13 455 114 0.02 -0.29 0.05 -0.36 0.36 82.09
13.5 152 -161 -5 -31 -9 -36 322 36 -0.09 -0.10 0.03 -0.07 0.08 66.80
14.0 53 -42 -21 -8 11 -29 91 -19 0.04 0.06 0.12 0.03 0.12 345.96
14.5 76 -72 -51 25 4 -26 140 -64 0.08 -0.12 0.08 -0.03 0.09 20.56
15.0 101 -93 -97 32 8 -65 193 -156 0.01 0.27 0.00 0.09 0.09 270.00
15.5 6 9 -53 19 15 -34 -6 -70 0.03 -0.02 -0.01 -0.18 0.18 93.18
16.0 -131 144 10 -48 13 -38 -271 74 -0.04 -0.16 -0.04 -0.16 0.16 104.04
INCLINOMETER READINGS

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)


Inclinometer No: IS202 Report Date: 3-Feb-17 Report No: 348
Location: Irwell Bank Alert Level: +/- 40 mm
Installation Depth: 16.5 m Suspension Level: +/- 50 mm
Ground R.L. 116.4597 m Elapsed Time: 78 days
Date of Base Reading: 17-Nov-16 Date of Last Reading: 21-Jan-17

Displacement (mm) Displacement (mm)


A(180) <<<===============>>> A(0) B(180) <<<===============>>> B(0)

0.0 0.0
0.5 0.5
1.0 1.0
1.5 1.5
2.0 2.0
2.5 2.5
3.0 3.0
3.5 3.5
4.0 4.0
4.5 4.5
5.0 5.0
5.5 5.5
6.0 6.0
6.5 6.5
7.0 7.0
Depth (m)

7.5 7.5

Depth (m)
8.0 8.0
8.5 8.5
9.0 9.0
9.5 9.5
10.0 10.0
10.5 10.5
11.0 11.0
11.5 11.5
12.0 12.0
12.5 12.5
13.0 13.0
13.5 13.5
14.0 14.0
14.5 14.5
15.0 15.0
15.5 15.5
16.0 16.0
16.5 16.5
-70 -55 -40 -25 -10 5 20 35 50 65 -70 -55 -40 -25 -10 5 20 35 50 65
25-Jan-17 21-Jan-17 25-Jan-17 21-Jan-17

17-Jan-17 Alert 17-Jan-17 Alert

Alert (-) Suspension Alert (-) Suspension

Suspension (-) Suspension (-)


INCLINOMETER READINGS

Excavation Recorded Max-Displacement in A Ditrction:

A0 (+) Date: 03-Feb-17


Depth of Max Deflection: 0.500

B180 (-) B0 (+) Max-Disp (mm): -2.180

Orientation: A Dir

A180 (-) (Clock-wise direction from A0)

60.0

45.0

30.0
Max Deflection (mm)

15.0

0.0

-15.0

-30.0

-45.0

-60.0
15-Nov-16

5-Dec-16

25-Dec-16

3-Feb-17

23-Feb-17

15-Mar-17

4-Apr-17

24-Apr-17

3-Jun-17

13-Jul-17

2-Aug-17
14-Jan-17

14-May-17

23-Jun-17
A B Alert Alert (-) Suspension Suspension (-)
INCLINOMETER READINGS

PROJECT: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

CLIENT: PUBLIC UTILITIES BOARD (PUB) Coordinate: N:0.000 E:0.000

Inclinometer No: IS203 Report Date: 3-Feb-17 Report No: 348


DEPTH READING ZERO SUM INITIAL CHANGE DEFORMATION(mm) Deg. From
(m) A0 A180 B0 B180 A B A B A B A B R A0
0.5 -463 470 -29 -3 7 -32 -946 -172 0.13 1.46 -1.26 0.87 1.53 214.62
1.0 -376 377 -168 144 1 -24 -724 -389 -0.29 0.77 -1.39 -0.59 1.51 157.00
1.5 -280 280 -283 259 0 -24 -502 -558 -0.58 0.16 -1.10 -1.36 1.75 128.97
2.0 25 -20 -256 236 5 -20 89 -471 -0.44 -0.21 -0.52 -1.52 1.61 108.89
2.5 181 -175 -249 219 6 -30 345 -432 0.11 -0.36 -0.08 -1.31 1.31 93.49
3.0 224 -217 -258 222 7 -36 451 -465 -0.10 -0.15 -0.19 -0.95 0.97 101.31
3.5 239 -234 -247 221 5 -26 484 -451 -0.11 -0.17 -0.09 -0.80 0.81 96.42
4.0 249 -244 -213 188 5 -25 500 -398 -0.07 -0.03 0.02 -0.63 0.63 88.18
4.5 272 -269 -206 179 3 -27 550 -376 -0.09 -0.09 0.09 -0.60 0.61 81.47
5.0 411 -409 -236 220 2 -16 833 -442 -0.13 -0.14 0.18 -0.51 0.54 70.56
5.5 342 -335 -227 198 7 -29 682 -408 -0.05 -0.17 0.31 -0.37 0.48 50.04
6.0 183 -182 -284 254 1 -30 373 -527 -0.08 -0.11 0.36 -0.20 0.41 29.05
6.5 182 -177 -317 297 5 -20 369 -618 -0.10 0.04 0.44 -0.09 0.45 11.56
7.0 346 -344 -311 277 2 -34 698 -579 -0.08 -0.09 0.54 -0.13 0.56 13.54
7.5 265 -256 -348 316 9 -32 520 -668 0.01 0.04 0.62 -0.04 0.62 3.69
8.0 284 -280 -398 376 4 -22 566 -792 -0.02 0.18 0.61 -0.08 0.62 7.47
8.5 220 -211 -305 280 9 -25 433 -576 -0.02 -0.09 0.63 -0.26 0.68 22.43
9.0 118 -115 -347 326 3 -21 235 -672 -0.02 -0.01 0.65 -0.17 0.67 14.66
9.5 135 -129 -308 289 6 -19 261 -608 0.03 0.11 0.67 -0.16 0.69 13.43
10.0 187 -183 -230 210 4 -20 367 -438 0.03 -0.02 0.64 -0.27 0.69 22.87
10.5 149 -146 -279 260 3 -19 296 -527 -0.01 -0.12 0.61 -0.25 0.66 22.29
11.0 233 -227 -290 258 6 -32 463 -548 -0.03 0.00 0.62 -0.13 0.63 11.84
11.5 310 -302 -223 215 8 -8 608 -425 0.04 -0.13 0.65 -0.13 0.66 11.31
12.0 320 -314 -242 217 6 -25 629 -463 0.05 0.04 0.61 0.00 0.61 0.00
12.5 290 -282 -230 198 8 -32 569 -429 0.03 0.01 0.56 -0.04 0.56 4.09
13.0 264 -256 -136 114 8 -22 515 -254 0.05 0.04 0.53 -0.05 0.53 5.39
13.5 223 -215 -124 108 8 -16 431 -224 0.07 -0.08 0.48 -0.09 0.49 10.62
14.0 241 -236 -293 253 5 -40 465 -548 0.12 0.02 0.41 -0.01 0.41 1.40
14.5 285 -277 -309 284 8 -25 558 -596 0.04 0.03 0.29 -0.03 0.29 5.91
15.0 301 -289 -287 265 12 -22 590 -548 0.00 -0.04 0.25 -0.06 0.26 13.50
15.5 249 -244 -343 317 5 -26 491 -653 0.02 -0.07 0.25 -0.02 0.25 4.57
16.0 216 -209 -394 374 7 -20 414 -766 0.11 -0.02 0.23 0.05 0.24 347.74
16.5 199 -191 -376 346 8 -30 378 -729 0.12 0.07 0.12 0.07 0.14 329.74
INCLINOMETER READINGS

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)


Inclinometer No: IS203 Report Date: 3-Feb-17 Report No: 348
Location: Irwell Bank Alert Level: +/- 40 mm
Installation Depth: 17.0 m Suspension Level: +/- 50 mm
Ground R.L. 116.4168 m Elapsed Time: 69 days
Date of Base Reading: 26-Nov-16 Date of Last Reading: 21-Jan-17

Displacement (mm) Displacement (mm)


A(180) <<<===============>>> A(0) B(180) <<<===============>>> B(0)

0.0 0.0

1.0 1.0

2.0 2.0

3.0 3.0

4.0 4.0

5.0 5.0

6.0 6.0

7.0 7.0
Depth (m)

Depth (m)
8.0 8.0

9.0 9.0

10.0 10.0

11.0 11.0

12.0 12.0

13.0 13.0

14.0 14.0

15.0 15.0

16.0 16.0

17.0 17.0
-70 -55 -40 -25 -10 5 20 35 50 65 -70 -55 -40 -25 -10 5 20 35 50 65
25-Jan-17 21-Jan-17 25-Jan-17 21-Jan-17
17-Jan-17 Alert 17-Jan-17 Alert
Alert (-) Suspension Alert (-) Suspension
Suspension (-) Suspension (-)
INCLINOMETER READINGS

Excavation Recorded Max-Displacement in A Ditrction:

A0 (+) Date: 03-Feb-17


Depth of Max Deflection: 1.000

B180 (-) B0 (+) Max-Disp (mm): -1.390

Orientation: A Dir

A180 (-) (Clock-wise direction from A0)

60.0

45.0

30.0
Max Deflection (mm)

15.0

0.0

-15.0

-30.0

-45.0

-60.0
15-Nov-16

5-Dec-16

25-Dec-16

3-Feb-17

23-Feb-17

15-Mar-17

4-Apr-17

24-Apr-17

3-Jun-17

13-Jul-17

2-Aug-17
14-Jan-17

14-May-17

23-Jun-17
A B Alert Alert (-) Suspension Suspension (-)
INCLINOMETER READINGS

PROJECT: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

CLIENT: PUBLIC UTILITIES BOARD (PUB) Coordinate: N:0.000 E:0.000

Inclinometer No: IS204 Report Date: 3-Feb-17 Report No: 348


DEPTH READING ZERO SUM INITIAL CHANGE DEFORMATION(mm) Deg. From
(m) A0 A180 B0 B180 A B A B A B A B R A0
0.5 201 -184 814 -843 17 -29 267 1757 1.18 -1.00 2.74 1.95 3.36 324.56
1.0 160 -150 616 -645 10 -29 196 1292 1.14 -0.31 1.56 2.95 3.34 297.87
1.5 162 -154 349 -389 8 -40 289 704 0.27 0.34 0.42 3.26 3.29 277.34
2.0 170 -164 164 -198 6 -34 351 290 -0.17 0.72 0.15 2.92 2.92 272.94
2.5 154 -147 51 -93 7 -42 319 77 -0.18 0.67 0.32 2.20 2.22 278.28
3.0 170 -165 -73 38 5 -35 342 -153 -0.07 0.42 0.50 1.53 1.61 288.10
3.5 188 -179 -168 130 9 -38 377 -301 -0.10 0.03 0.57 1.11 1.25 297.18
4.0 249 -241 -199 163 8 -36 504 -367 -0.14 0.05 0.67 1.08 1.27 301.81
4.5 420 -413 -296 275 7 -21 849 -593 -0.16 0.22 0.81 1.03 1.31 308.18
5.0 423 -411 -370 328 12 -42 861 -703 -0.27 0.05 0.97 0.81 1.26 320.14
5.5 307 -297 -357 323 10 -34 617 -677 -0.13 -0.03 1.24 0.76 1.45 328.50
6.0 318 -307 -382 348 11 -34 637 -731 -0.12 0.01 1.37 0.79 1.58 330.03
6.5 223 -216 -352 320 7 -32 447 -684 -0.08 0.12 1.49 0.78 1.68 332.37
7.0 286 -279 -397 375 7 -22 575 -782 -0.10 0.10 1.57 0.66 1.70 337.20
7.5 331 -321 -232 201 10 -31 655 -430 -0.03 -0.03 1.67 0.56 1.76 341.46
8.0 265 -257 -111 71 8 -40 524 -186 -0.02 0.04 1.70 0.59 1.80 340.86
8.5 293 -286 -145 106 7 -39 578 -252 0.01 0.01 1.72 0.55 1.81 342.27
9.0 313 -305 -141 104 8 -37 614 -251 0.04 0.06 1.71 0.54 1.79 342.47
9.5 280 -276 -151 112 4 -39 551 -269 0.05 0.06 1.67 0.48 1.74 343.96
10.0 200 -191 -186 153 9 -33 380 -339 0.11 0.00 1.62 0.42 1.67 345.47
10.5 159 -156 -279 251 3 -28 307 -573 0.08 0.43 1.51 0.42 1.57 344.46
11.0 211 -204 -335 300 7 -35 404 -636 0.11 0.01 1.43 -0.01 1.43 0.40
11.5 231 -225 -299 266 6 -33 442 -569 0.14 0.04 1.32 -0.02 1.32 0.87
12.0 257 -251 -294 259 6 -35 496 -555 0.12 0.02 1.18 -0.06 1.18 2.91
12.5 236 -231 -295 263 5 -32 454 -560 0.13 0.02 1.06 -0.08 1.06 4.32
13.0 192 -184 -301 264 8 -37 363 -573 0.13 0.08 0.93 -0.10 0.94 6.14
13.5 271 -260 -292 262 11 -30 513 -544 0.18 -0.10 0.80 -0.18 0.82 12.68
14.0 385 -380 -273 239 5 -34 750 -512 0.15 0.00 0.62 -0.08 0.63 7.35
14.5 393 -392 -236 200 1 -36 776 -432 0.09 -0.04 0.47 -0.08 0.48 9.66
15.0 441 -437 -194 158 4 -36 861 -347 0.17 -0.05 0.38 -0.04 0.38 6.01
15.5 499 -492 -148 115 7 -33 979 -266 0.12 0.03 0.21 0.01 0.21 357.27
16.0 511 -507 -144 126 4 -18 1009 -268 0.09 -0.02 0.09 -0.02 0.09 12.53
INCLINOMETER READINGS

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)


Inclinometer No: IS204 Report Date: 3-Feb-17 Report No: 348
Location: Irwell Bank Alert Level: +/- 40 mm
Installation Depth: 16.5 m Suspension Level: +/- 50 mm
Ground R.L. 115.7925 m Elapsed Time: 69 days
Date of Base Reading: 26-Nov-16 Date of Last Reading: 21-Jan-17

Displacement (mm) Displacement (mm)


A(180) <<<===============>>> A(0) B(180) <<<===============>>> B(0)

0.0 0.0
0.5 0.5
1.0 1.0
1.5 1.5
2.0 2.0
2.5 2.5
3.0 3.0
3.5 3.5
4.0 4.0
4.5 4.5
5.0 5.0
5.5 5.5
6.0 6.0
6.5 6.5
7.0 7.0
Depth (m)

7.5 7.5

Depth (m)
8.0 8.0
8.5 8.5
9.0 9.0
9.5 9.5
10.0 10.0
10.5 10.5
11.0 11.0
11.5 11.5
12.0 12.0
12.5 12.5
13.0 13.0
13.5 13.5
14.0 14.0
14.5 14.5
15.0 15.0
15.5 15.5
16.0 16.0
16.5 16.5
-70 -55 -40 -25 -10 5 20 35 50 65 -70 -55 -40 -25 -10 5 20 35 50 65
25-Jan-17 21-Jan-17 25-Jan-17 21-Jan-17
17-Jan-17 Alert 17-Jan-17 Alert
Alert (-) Suspension Alert (-) Suspension
Suspension (-) Suspension (-)
INCLINOMETER READINGS

Excavation Recorded Max-Displacement in A Ditrction:

A0 (+) Date: 03-Feb-17


Depth of Max Deflection: 0.500

B180 (-) B0 (+) Max-Disp (mm): 2.740

Orientation: A Dir

A180 (-) (Clock-wise direction from A0)

60.0

45.0

30.0
Max Deflection (mm)

15.0

0.0

-15.0

-30.0

-45.0

-60.0
15-Nov-16

5-Dec-16

25-Dec-16

3-Feb-17

23-Feb-17

15-Mar-17

4-Apr-17

24-Apr-17

3-Jun-17

13-Jul-17

2-Aug-17
14-Jan-17

14-May-17

23-Jun-17
A B Alert Alert (-) Suspension Suspension (-)
INCLINOMETER READINGS

PROJECT: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

CLIENT: PUBLIC UTILITIES BOARD (PUB) Coordinate: N:0.000 E:0.000

Inclinometer No: IS205 Report Date: 3-Feb-17 Report No: 348


DEPTH READING ZERO SUM INITIAL CHANGE DEFORMATION(mm) Deg. From
(m) A0 A180 B0 B180 A B A B A B A B R A0
0.5 642 -632 102 -125 10 -23 1538 483 -2.64 -2.56 -3.04 -2.75 4.10 137.87
1.0 579 -571 -8 -16 8 -24 1237 96 -0.87 -0.88 -0.40 -0.19 0.44 154.59
1.5 390 -382 -86 59 8 -27 770 -177 0.02 0.32 0.47 0.69 0.83 304.26
2.0 125 -115 -156 134 10 -22 199 -343 0.41 0.53 0.45 0.37 0.58 320.57
2.5 60 -57 -373 347 3 -26 102 -703 0.15 -0.17 0.04 -0.16 0.16 75.96
3.0 133 -125 -529 495 8 -34 252 -1043 0.06 0.19 -0.11 0.01 0.11 185.19
3.5 130 -125 -594 573 5 -21 255 -1170 0.00 0.03 -0.17 -0.18 0.25 133.36
4.0 102 -96 -700 675 6 -25 199 -1377 -0.01 0.02 -0.17 -0.21 0.27 128.99
4.5 50 -40 -791 763 10 -28 86 -1551 0.04 -0.03 -0.16 -0.23 0.28 124.82
5.0 181 -173 -760 739 8 -21 353 -1497 0.01 -0.02 -0.20 -0.20 0.28 135.00
5.5 262 -251 -713 679 11 -34 514 -1393 -0.01 0.01 -0.21 -0.18 0.28 139.40
6.0 204 -199 -711 677 5 -34 409 -1387 -0.06 -0.01 -0.20 -0.19 0.28 136.47
6.5 166 -159 -731 708 7 -23 326 -1433 -0.01 -0.06 -0.14 -0.18 0.23 127.87
7.0 252 -241 -631 602 11 -29 487 -1221 0.06 -0.12 -0.13 -0.12 0.18 137.29
7.5 202 -192 -697 665 10 -32 396 -1367 -0.02 0.05 -0.19 0.00 0.19 180.00
8.0 64 -69 -962 939 -5 -23 144 -1903 -0.11 0.02 -0.17 -0.05 0.18 163.61
8.5 163 -157 -895 861 6 -34 324 -1735 -0.04 -0.21 -0.06 -0.07 0.09 130.60
9.0 145 -144 -800 768 1 -32 292 -1571 -0.03 0.03 -0.02 0.14 0.14 261.87
9.5 181 -179 -781 742 2 -39 357 -1520 0.03 -0.03 0.01 0.11 0.11 275.19
10.0 282 -280 -753 715 2 -38 561 -1470 0.01 0.02 -0.02 0.14 0.14 261.87
10.5 378 -376 -738 702 2 -36 754 -1443 0.00 0.03 -0.03 0.12 0.12 255.96
11.0 355 -344 -721 684 11 -37 700 -1409 -0.01 0.04 -0.03 0.09 0.09 251.57
11.5 300 -289 -682 637 11 -45 589 -1319 0.00 0.00 -0.02 0.05 0.05 248.20
12.0 282 -271 -644 603 11 -41 556 -1253 -0.03 0.06 -0.02 0.05 0.05 248.20
12.5 257 -247 -615 578 10 -37 503 -1195 0.01 0.02 0.01 -0.01 0.01 45.00
13.0 223 -215 -629 591 8 -38 437 -1222 0.01 0.02 0.00 -0.03 0.03 90.00
13.5 228 -217 -558 548 11 -10 441 -1107 0.04 0.01 -0.01 -0.05 0.05 101.31
14.0 310 -305 -489 449 5 -40 614 -938 0.01 0.00 -0.05 -0.06 0.08 129.81
14.5 344 -341 -515 476 3 -39 685 -990 0.00 -0.01 -0.06 -0.06 0.08 135.00
15.0 345 -341 -534 498 4 -36 687 -1024 -0.01 -0.08 -0.06 -0.05 0.08 140.19
15.5 338 -332 -482 442 6 -40 669 -920 0.01 -0.04 -0.05 0.03 0.06 210.96
16.0 293 -288 -464 431 5 -33 587 -902 -0.06 0.07 -0.06 0.07 0.09 229.40
INCLINOMETER READINGS

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)


Inclinometer No: IS205 Report Date: 3-Feb-17 Report No: 348
Location: Irwell Bank Alert Level: +/- 40 mm
Installation Depth: 16.5 m Suspension Level: +/- 50 mm
Ground R.L. 115.1061 m Elapsed Time: 62 days
Date of Base Reading: 03-Dec-16 Date of Last Reading: 21-Jan-17

Displacement (mm) Displacement (mm)


A(180) <<<===============>>> A(0) B(180) <<<===============>>> B(0)

0.0 0.0
0.5 0.5
1.0 1.0
1.5 1.5
2.0 2.0
2.5 2.5
3.0 3.0
3.5 3.5
4.0 4.0
4.5 4.5
5.0 5.0
5.5 5.5
6.0 6.0
6.5 6.5
7.0 7.0
Depth (m)

7.5 7.5

Depth (m)
8.0 8.0
8.5 8.5
9.0 9.0
9.5 9.5
10.0 10.0
10.5 10.5
11.0 11.0
11.5 11.5
12.0 12.0
12.5 12.5
13.0 13.0
13.5 13.5
14.0 14.0
14.5 14.5
15.0 15.0
15.5 15.5
16.0 16.0
16.5 16.5
-70 -55 -40 -25 -10 5 20 35 50 65 -70 -55 -40 -25 -10 5 20 35 50 65

25-Jan-17 21-Jan-17 25-Jan-17 21-Jan-17

17-Jan-17 Alert 17-Jan-17 Alert

Alert (-) Suspension Alert (-) Suspension

Suspension (-) Suspension (-)


INCLINOMETER READINGS

Excavation Recorded Max-Displacement in A Ditrction:

A0 (+) Date: 03-Feb-17


Depth of Max Deflection: 0.500

B180 (-) B0 (+) Max-Disp (mm): -3.040

Orientation: A Dir

A180 (-) (Clock-wise direction from A0)

60.0

45.0

30.0
Max Deflection (mm)

15.0

0.0

-15.0

-30.0

-45.0

-60.0
15-Nov-16

5-Dec-16

25-Dec-16

3-Feb-17

23-Feb-17

15-Mar-17

4-Apr-17

24-Apr-17

3-Jun-17

13-Jul-17

2-Aug-17
14-Jan-17

14-May-17

23-Jun-17
A B Alert Alert (-) Suspension Suspension (-)
INCLINOMETER READINGS

PROJECT: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

CLIENT: PUBLIC UTILITIES BOARD (PUB) Coordinate: N:0.000 E:0.000

Inclinometer No: IS206 Report Date: 3-Feb-17 Report No: 348


DEPTH READING ZERO SUM INITIAL CHANGE DEFORMATION(mm) Deg. From
(m) A0 A180 B0 B180 A B A B A B A B R A0
0.5 -402 384 232 -264 -18 -32 -1388 604 6.02 -1.08 4.66 0.11 4.66 358.65
1.0 -438 424 232 -273 -14 -41 -1189 525 3.27 -0.20 -1.36 1.19 1.81 221.19
1.5 -352 354 236 -258 2 -22 -792 462 0.86 0.32 -4.63 1.39 4.83 196.71
2.0 -159 195 195 -219 36 -24 -213 353 -1.41 0.61 -5.49 1.07 5.59 191.03
2.5 -154 167 197 -232 13 -35 -142 365 -1.79 0.64 -4.08 0.46 4.11 186.43
3.0 -122 142 215 -241 20 -26 -145 413 -1.19 0.43 -2.29 -0.18 2.30 175.51
3.5 -80 78 133 -159 -2 -26 -113 306 -0.45 -0.14 -1.10 -0.61 1.26 150.99
4.0 -58 66 51 -89 8 -38 -86 141 -0.38 -0.01 -0.65 -0.47 0.80 144.13
4.5 22 -33 -16 -6 -11 -22 46 1 0.09 -0.11 -0.27 -0.46 0.53 120.41
5.0 17 -17 -9 -16 0 -25 41 11 -0.07 -0.04 -0.36 -0.35 0.50 135.81
5.5 -111 117 58 -80 6 -22 -224 147 -0.04 -0.09 -0.29 -0.31 0.42 133.09
6.0 -217 225 122 -153 8 -31 -438 271 -0.04 0.04 -0.25 -0.22 0.33 138.65
6.5 -195 202 146 -164 7 -18 -393 316 -0.04 -0.06 -0.21 -0.26 0.33 128.93
7.0 -241 250 232 -255 9 -23 -488 497 -0.03 -0.10 -0.17 -0.20 0.26 130.36
7.5 -297 302 312 -341 5 -29 -595 662 -0.04 -0.09 -0.14 -0.10 0.17 144.46
8.0 -273 283 338 -375 10 -37 -555 717 -0.01 -0.04 -0.10 -0.01 0.10 174.29
8.5 -184 194 344 -378 10 -34 -381 720 0.03 0.02 -0.09 0.03 0.09 198.43
9.0 -86 93 313 -349 7 -36 -181 669 0.02 -0.07 -0.12 0.01 0.12 184.76
9.5 2 15 292 -329 17 -37 -22 624 0.09 -0.03 -0.14 0.08 0.16 209.74
10.0 68 -58 267 -299 10 -32 129 567 -0.03 -0.01 -0.23 0.11 0.25 205.56
10.5 -36 42 236 -260 6 -24 -82 489 0.04 0.07 -0.20 0.12 0.23 210.96
11.0 -234 238 167 -207 4 -40 -472 365 0.00 0.09 -0.24 0.05 0.25 191.77
11.5 -245 240 154 -186 -5 -32 -494 331 0.09 0.09 -0.24 -0.04 0.24 170.54
12.0 -261 275 137 -160 14 -23 -525 311 -0.11 -0.14 -0.33 -0.13 0.35 158.50
12.5 -261 266 170 -210 5 -40 -528 384 0.01 -0.04 -0.22 0.01 0.22 182.60
13.0 -264 270 195 -232 6 -37 -534 432 0.00 -0.05 -0.23 0.05 0.24 192.26
13.5 -272 298 190 -223 26 -33 -550 405 -0.20 0.08 -0.23 0.10 0.25 203.50
14.0 -258 266 148 -179 8 -31 -523 329 -0.01 -0.02 -0.03 0.02 0.04 213.69
14.5 -230 237 107 -141 7 -34 -468 248 0.01 0.00 -0.02 0.04 0.04 243.43
15.0 -272 281 110 -145 9 -35 -543 262 -0.10 -0.07 -0.03 0.04 0.05 233.13
15.5 -304 310 200 -225 6 -25 -617 425 0.03 0.00 0.07 0.11 0.13 302.47
16.0 -218 224 369 -424 6 -55 -446 782 0.04 0.11 0.04 0.11 0.12 289.98
INCLINOMETER READINGS

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)


Inclinometer No: IS206 Report Date: 3-Feb-17 Report No: 348
Location: Irwell Bank Alert Level: +/- 40 mm
Installation Depth: 16.5 m Suspension Level: +/- 50 mm
Ground R.L. 114.5659 m Elapsed Time: 62 days
Date of Base Reading: 03-Dec-16 Date of Last Reading: 21-Jan-17

Displacement (mm) Displacement (mm)


A(180) <<<===============>>> A(0) B(180) <<<===============>>> B(0)

0.0 0.0
0.5 0.5
1.0 1.0
1.5 1.5
2.0 2.0
2.5 2.5
3.0 3.0
3.5 3.5
4.0 4.0
4.5 4.5
5.0 5.0
5.5 5.5
6.0 6.0
6.5 6.5
7.0 7.0
Depth (m)

7.5 7.5

Depth (m)
8.0 8.0
8.5 8.5
9.0 9.0
9.5 9.5
10.0 10.0
10.5 10.5
11.0 11.0
11.5 11.5
12.0 12.0
12.5 12.5
13.0 13.0
13.5 13.5
14.0 14.0
14.5 14.5
15.0 15.0
15.5 15.5
16.0 16.0
16.5 16.5
-70 -55 -40 -25 -10 5 20 35 50 65 -70 -55 -40 -25 -10 5 20 35 50 65
25-Jan-17 21-Jan-17 25-Jan-17 21-Jan-17

17-Jan-17 Alert 17-Jan-17 Alert

Alert (-) Suspension Alert (-) Suspension

Suspension (-) Suspension (-)


INCLINOMETER READINGS

Excavation Recorded Max-Displacement in A Ditrction:

A0 (+) Date: 03-Feb-17


Depth of Max Deflection: 2.000

B180 (-) B0 (+) Max-Disp (mm): -5.490

Orientation: A Dir

A180 (-) (Clock-wise direction from A0)

60.0

45.0

30.0
Max Deflection (mm)

15.0

0.0

-15.0

-30.0

-45.0

-60.0
15-Nov-16

5-Dec-16

25-Dec-16

3-Feb-17

23-Feb-17

15-Mar-17

4-Apr-17

24-Apr-17

3-Jun-17

13-Jul-17

2-Aug-17
14-Jan-17

14-May-17

23-Jun-17
A B Alert Alert (-) Suspension Suspension (-)
INCLINOMETER READINGS

PROJECT: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

CLIENT: PUBLIC UTILITIES BOARD (PUB) Coordinate: N:0.000 E:0.000

Inclinometer No: IS207 Report Date: 3-Feb-17 Report No: 348


DEPTH READING ZERO SUM INITIAL CHANGE DEFORMATION(mm) Deg. From
(m) A0 A180 B0 B180 A B A B A B A B R A0
0.5 154 -97 38 -70 57 -32 -407 417 6.58 -3.09 7.78 -3.56 8.56 24.59
1.0 -21 23 -37 7 2 -30 -161 -114 1.17 0.70 1.20 -0.47 1.29 21.39
1.5 -17 23 -133 96 6 -37 -80 -241 0.40 0.12 0.03 -1.17 1.17 88.53
2.0 24 -24 -184 150 0 -34 49 -315 -0.01 -0.19 -0.37 -1.29 1.34 106.00
2.5 92 -89 -190 163 3 -27 191 -333 -0.10 -0.20 -0.36 -1.10 1.16 108.12
3.0 90 -116 -162 105 -26 -57 223 -289 -0.17 0.22 -0.26 -0.90 0.94 106.11
3.5 76 -128 -116 75 -52 -41 196 -182 0.08 -0.09 -0.09 -1.12 1.12 94.59
4.0 60 -65 -62 35 -5 -27 140 -50 -0.15 -0.47 -0.17 -1.03 1.04 99.37
4.5 44 -51 -46 9 -7 -37 93 -19 0.02 -0.36 -0.02 -0.56 0.56 92.05
5.0 117 -116 -138 107 1 -31 231 -257 0.02 0.12 -0.04 -0.20 0.20 101.31
5.5 127 -125 -208 168 2 -40 253 -375 -0.01 -0.01 -0.06 -0.32 0.33 100.62
6.0 119 -112 -174 143 7 -31 227 -310 0.04 -0.07 -0.05 -0.31 0.31 99.16
6.5 101 -96 -154 151 5 -3 201 -268 -0.04 -0.37 -0.09 -0.24 0.26 110.56
7.0 107 -98 -153 117 9 -36 227 -267 -0.22 -0.03 -0.05 0.13 0.14 248.96
7.5 106 -99 -166 136 7 -30 204 -297 0.01 -0.05 0.17 0.16 0.23 316.74
8.0 128 -120 -95 57 8 -38 251 -154 -0.03 0.02 0.16 0.21 0.26 307.30
8.5 115 -109 -109 76 6 -33 221 -195 0.03 0.10 0.19 0.19 0.27 315.00
9.0 70 -63 -142 107 7 -35 134 -261 -0.01 0.12 0.16 0.09 0.18 330.64
9.5 66 -60 -179 146 6 -33 125 -334 0.01 0.09 0.17 -0.03 0.17 10.01
10.0 68 -63 -216 181 5 -35 131 -406 0.00 0.09 0.16 -0.12 0.20 36.87
10.5 68 -61 -245 216 7 -29 130 -463 -0.01 0.02 0.16 -0.21 0.26 52.70
11.0 112 -105 -234 206 7 -28 216 -424 0.01 -0.16 0.17 -0.23 0.29 53.53
11.5 110 -104 -187 158 6 -29 215 -331 -0.01 -0.14 0.16 -0.07 0.17 23.63
12.0 99 -93 -146 116 6 -30 189 -260 0.03 -0.02 0.17 0.07 0.18 337.62
12.5 91 -85 -119 88 6 -31 176 -211 0.00 0.04 0.14 0.09 0.17 327.26
13.0 81 -75 -110 81 6 -29 155 -188 0.01 -0.03 0.14 0.05 0.15 340.35
13.5 63 -55 -119 87 8 -32 120 -206 -0.02 0.00 0.13 0.08 0.15 328.39
14.0 86 -81 -121 89 5 -32 155 -215 0.12 0.05 0.15 0.08 0.17 331.93
14.5 115 -113 -132 98 2 -34 224 -235 0.04 0.05 0.03 0.03 0.04 315.00
15.0 87 -78 -151 110 9 -41 168 -273 -0.03 0.12 -0.01 -0.02 0.02 116.57
15.5 52 -44 -148 114 8 -34 95 -249 0.01 -0.13 0.02 -0.14 0.14 81.87
16.0 -5 11 -58 18 6 -40 -17 -77 0.01 0.01 0.01 -0.01 0.01 45.00
16.5 25 -16 18 -48 9 -30 41 68 0.00 -0.02 0.00 -0.02 0.02 90.00
INCLINOMETER READINGS

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)


Inclinometer No: IS207 Report Date: 3-Feb-17 Report No: 348
Location: Irwell Bank Alert Level: +/- 40 mm
Installation Depth: 17.0 m Suspension Level: +/- 50 mm
Ground R.L. 112.5157 m Elapsed Time: 45 days
Date of Base Reading: 20-Dec-16 Date of Last Reading: 21-Jan-17

Displacement (mm) Displacement (mm)


A(180) <<<===============>>> A(0) B(180) <<<===============>>> B(0)

0.0 0.0
0.5 0.5
1.0 1.0
1.5 1.5
2.0 2.0
2.5 2.5
3.0 3.0
3.5 3.5
4.0 4.0
4.5 4.5
5.0 5.0
5.5 5.5
6.0 6.0
6.5 6.5
7.0 7.0
7.5 7.5
Depth (m)

Depth (m)
8.0 8.0
8.5 8.5
9.0 9.0
9.5 9.5
10.0 10.0
10.5 10.5
11.0 11.0
11.5 11.5
12.0 12.0
12.5 12.5
13.0 13.0
13.5 13.5
14.0 14.0
14.5 14.5
15.0 15.0
15.5 15.5
16.0 16.0
16.5 16.5
17.0 17.0
-70 -55 -40 -25 -10 5 20 35 50 65 -70 -55 -40 -25 -10 5 20 35 50 65

25-Jan-17 21-Jan-17 25-Jan-17 21-Jan-17


17-Jan-17 Alert 17-Jan-17 Alert
Alert (-) Suspension Alert (-) Suspension
Suspension (-) Suspension (-)
INCLINOMETER READINGS

Excavation Recorded Max-Displacement in A Ditrction:

A0 (+) Date: 03-Feb-17


Depth of Max Deflection: 0.500

B180 (-) B0 (+) Max-Disp (mm): 7.780

Orientation: A Dir

A180 (-) (Clock-wise direction from A0)

60.0

45.0

30.0
Max Deflection (mm)

15.0

0.0

-15.0

-30.0

-45.0

-60.0
15-Nov-16

5-Dec-16

25-Dec-16

3-Feb-17

23-Feb-17

15-Mar-17

4-Apr-17

24-Apr-17

3-Jun-17

13-Jul-17

2-Aug-17
14-Jan-17

14-May-17

23-Jun-17
A B Alert Alert (-) Suspension Suspension (-)
INCLINOMETER READINGS

PROJECT: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

CLIENT: PUBLIC UTILITIES BOARD (PUB) Coordinate: N:0.000 E:0.000

Inclinometer No: IS208 Report Date: 3-Feb-17 Report No: 348


DEPTH READING ZERO SUM INITIAL CHANGE DEFORMATION(mm) Deg. From
(m) A0 A180 B0 B180 A B A B A B A B R A0
0.5 -505 506 -44 15 1 -29 -1071 6 0.60 -0.65 0.97 -1.02 1.41 46.44
1.0 -293 303 -196 158 10 -38 -649 -319 0.53 -0.35 0.37 -0.37 0.52 45.00
1.5 -139 146 -327 295 7 -32 -300 -601 0.15 -0.21 -0.16 -0.02 0.16 172.87
2.0 -73 80 -331 295 7 -36 -162 -632 0.09 0.06 -0.31 0.19 0.36 211.50
2.5 -25 33 -288 254 8 -34 -62 -543 0.04 0.01 -0.40 0.13 0.42 198.00
3.0 -38 45 -244 212 7 -32 -87 -458 0.04 0.02 -0.44 0.12 0.46 195.26
3.5 -57 62 -218 178 5 -40 -120 -393 0.01 -0.03 -0.48 0.10 0.49 191.77
4.0 -10 16 -161 127 6 -34 -27 -298 0.01 0.10 -0.49 0.13 0.51 194.86
4.5 63 -58 -117 82 5 -35 122 -207 -0.01 0.08 -0.50 0.03 0.50 183.43
5.0 71 -67 -50 12 4 -38 140 -76 -0.02 0.14 -0.49 -0.05 0.49 174.17
5.5 -2 8 -2 -34 6 -36 -11 40 0.01 -0.08 -0.47 -0.19 0.51 157.99
6.0 25 -20 -95 58 5 -37 46 -151 -0.01 -0.02 -0.48 -0.11 0.49 167.09
6.5 33 -28 -57 21 5 -36 67 -88 -0.06 0.10 -0.47 -0.09 0.48 169.16
7.0 -72 74 -82 47 2 -35 -146 -122 0.00 -0.07 -0.41 -0.19 0.45 155.14
7.5 -43 51 -2 -36 8 -38 -89 10 -0.05 0.24 -0.41 -0.12 0.43 163.69
8.0 48 -41 11 -39 7 -28 91 37 -0.02 0.13 -0.36 -0.36 0.51 135.00
8.5 -13 20 -112 83 7 -29 -33 -207 0.00 0.12 -0.34 -0.49 0.60 124.76
9.0 -90 92 -18 -17 2 -35 -180 -6 -0.02 0.05 -0.34 -0.61 0.70 119.13
9.5 -65 70 -75 33 5 -42 -133 -105 -0.02 -0.03 -0.32 -0.66 0.73 115.87
10.0 90 -88 -144 98 2 -46 183 -244 -0.05 0.02 -0.30 -0.63 0.70 115.46
10.5 137 -132 -187 152 5 -35 274 -338 -0.05 -0.01 -0.25 -0.65 0.70 111.04
11.0 28 -26 -134 97 2 -37 46 -226 0.08 -0.05 -0.20 -0.64 0.67 107.35
11.5 -35 39 -84 40 4 -44 -69 -115 -0.05 -0.09 -0.28 -0.59 0.65 115.39
12.0 5 0 -45 6 5 -39 7 -49 -0.02 -0.02 -0.23 -0.50 0.55 114.70
12.5 11 -6 -48 3 5 -45 19 -50 -0.02 -0.01 -0.21 -0.48 0.52 113.63
13.0 -70 74 -97 59 4 -38 -139 -145 -0.05 -0.11 -0.19 -0.47 0.51 112.01
13.5 -172 178 -145 112 6 -33 -348 -256 -0.02 -0.01 -0.14 -0.36 0.39 111.25
14.0 -191 198 -148 105 7 -43 -384 -251 -0.05 -0.02 -0.12 -0.35 0.37 108.92
14.5 -177 182 -132 93 5 -39 -358 -222 -0.01 -0.03 -0.07 -0.33 0.34 101.98
15.0 -210 215 -137 97 5 -40 -423 -229 -0.02 -0.05 -0.06 -0.30 0.31 101.31
15.5 -199 203 -115 71 4 -44 -399 -186 -0.03 0.00 -0.04 -0.25 0.25 99.09
16.0 -75 72 -57 19 -3 -38 -146 -51 -0.01 -0.25 -0.01 -0.25 0.25 92.29
INCLINOMETER READINGS

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)


Inclinometer No: IS208 Report Date: 3-Feb-17 Report No: 348
Location: Irwell Bank Alert Level: +/- 40 mm
Installation Depth: 16.5 m Suspension Level: +/- 50 mm
Ground R.L. 111.2595 m Elapsed Time: 42 days
Date of Base Reading: 23-Dec-16 Date of Last Reading: 21-Jan-17

Displacement (mm) Displacement (mm)


A(180) <<<===============>>> A(0) B(180) <<<===============>>> B(0)

0.0 0.0
0.5 0.5
1.0 1.0
1.5 1.5
2.0 2.0
2.5 2.5
3.0 3.0
3.5 3.5
4.0 4.0
4.5 4.5
5.0 5.0
5.5 5.5
6.0 6.0
6.5 6.5
7.0 7.0
7.5 7.5
Depth (m)

Depth (m)
8.0 8.0
8.5 8.5
9.0 9.0
9.5 9.5
10.0 10.0
10.5 10.5
11.0 11.0
11.5 11.5
12.0 12.0
12.5 12.5
13.0 13.0
13.5 13.5
14.0 14.0
14.5 14.5
15.0 15.0
15.5 15.5
16.0 16.0
16.5 16.5
17.0 17.0
-70 -55 -40 -25 -10 5 20 35 50 65 -70 -55 -40 -25 -10 5 20 35 50 65

25-Jan-17 21-Jan-17 25-Jan-17 21-Jan-17


17-Jan-17 Alert 17-Jan-17 Alert
Alert (-) Suspension Alert (-) Suspension
Suspension (-) Suspension (-)
INCLINOMETER READINGS

Excavation Recorded Max-Displacement in A Ditrction:

A0 (+) Date: 03-Feb-17


Depth of Max Deflection: 0.500

B180 (-) B0 (+) Max-Disp (mm): 0.970

Orientation: A Dir

A180 (-) (Clock-wise direction from A0)

60.0

45.0

30.0
Max Deflection (mm)

15.0

0.0

-15.0

-30.0

-45.0

-60.0
15-Nov-16

5-Dec-16

25-Dec-16

3-Feb-17

23-Feb-17

15-Mar-17

4-Apr-17

24-Apr-17

3-Jun-17

13-Jul-17

2-Aug-17
14-Jan-17

14-May-17

23-Jun-17
A B Alert Alert (-) Suspension Suspension (-)
INCLINOMETER READINGS

PROJECT: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

CLIENT: PUBLIC UTILITIES BOARD (PUB) Coordinate: N:0.000 E:0.000

Inclinometer No: IS209 Report Date: 3-Feb-17 Report No: 348


DEPTH READING ZERO SUM INITIAL CHANGE DEFORMATION(mm) Deg. From
(m) A0 A180 B0 B180 A B A B A B A B R A0
0.5 249 -240 -481 452 9 -29 422 -931 0.67 -0.02 1.10 0.41 1.17 339.56
1.0 288 -286 -494 464 2 -30 515 -930 0.59 -0.28 0.43 0.43 0.61 315.00
1.5 286 -283 -526 496 3 -30 625 -1024 -0.56 0.02 -0.16 0.71 0.73 257.30
2.0 469 -461 -528 497 8 -31 944 -1029 -0.14 0.04 0.40 0.69 0.80 300.10
2.5 543 -538 -478 446 5 -32 1084 -926 -0.03 0.02 0.54 0.65 0.85 309.72
3.0 577 -572 -426 391 5 -35 1151 -825 -0.02 0.08 0.57 0.63 0.85 312.14
3.5 609 -605 -379 347 4 -32 1215 -729 -0.01 0.03 0.59 0.55 0.81 317.01
4.0 631 -629 -351 309 2 -42 1263 -658 -0.03 -0.02 0.60 0.52 0.79 319.09
4.5 637 -634 -338 304 3 -34 1274 -648 -0.03 0.06 0.63 0.54 0.83 319.40
5.0 491 -491 -404 372 0 -32 952 -789 0.30 0.13 0.66 0.48 0.82 323.97
5.5 357 -349 -433 407 8 -26 704 -839 0.02 -0.01 0.36 0.35 0.50 315.81
6.0 221 -216 -472 444 5 -28 438 -912 -0.01 -0.04 0.34 0.36 0.50 313.36
6.5 192 -192 -532 500 0 -32 379 -1030 0.05 -0.02 0.35 0.40 0.53 311.19
7.0 222 -213 -552 523 9 -29 431 -1074 0.04 -0.01 0.30 0.42 0.52 305.54
7.5 208 -202 -579 551 6 -28 406 -1153 0.04 0.23 0.26 0.43 0.50 301.16
8.0 268 -262 -614 590 6 -24 535 -1207 -0.05 0.03 0.22 0.20 0.30 317.73
8.5 256 -254 -693 661 2 -32 511 -1337 -0.01 -0.17 0.27 0.17 0.32 327.80
9.0 178 -179 -729 697 -1 -32 343 -1426 0.14 0.00 0.28 0.34 0.44 309.47
9.5 133 -128 -712 681 5 -31 258 -1392 0.03 -0.01 0.14 0.34 0.37 292.38
10.0 162 -160 -678 637 2 -41 316 -1317 0.06 0.02 0.11 0.35 0.37 287.45
10.5 216 -215 -677 649 1 -28 426 -1320 0.05 -0.06 0.05 0.33 0.33 278.62
11.0 252 -247 -522 471 5 -51 495 -998 0.04 0.05 0.00 0.39 0.39 270.00
11.5 195 -193 -392 358 2 -34 386 -752 0.02 0.02 -0.04 0.34 0.34 263.29
12.0 182 -183 -376 341 -1 -35 363 -719 0.02 0.02 -0.06 0.32 0.33 259.38
12.5 179 -182 -372 338 -3 -34 363 -712 -0.02 0.02 -0.08 0.30 0.31 255.07
13.0 181 -179 -384 348 2 -36 360 -737 0.00 0.05 -0.06 0.28 0.29 257.91
13.5 173 -176 -410 364 -3 -46 349 -782 0.00 0.08 -0.06 0.23 0.24 255.38
14.0 152 -146 -397 363 6 -34 298 -759 0.00 -0.01 -0.06 0.15 0.16 248.20
14.5 197 -194 -395 362 3 -33 394 -758 -0.03 0.01 -0.06 0.16 0.17 249.44
15.0 251 -249 -407 380 2 -27 506 -782 -0.06 -0.05 -0.03 0.15 0.15 258.69
15.5 297 -290 -426 397 7 -29 591 -822 -0.04 -0.01 0.03 0.20 0.20 278.53
16.0 240 -229 -488 452 11 -36 462 -961 0.07 0.21 0.07 0.21 0.22 288.43
INCLINOMETER READINGS

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)


Inclinometer No: IS209 Report Date: 3-Feb-17 Report No: 348
Location: Irwell Bank Alert Level: +/- 40 mm
Installation Depth: 16.5 m Suspension Level: +/- 50 mm
Ground R.L. 0.0000 m Elapsed Time: 38 days
Date of Base Reading: 27-Dec-16 Date of Last Reading: 21-Jan-17

Displacement (mm) Displacement (mm)


A(180) <<<===============>>> A(0) B(180) <<<===============>>> B(0)

0.0 0.0
0.5 0.5
1.0 1.0
1.5 1.5
2.0 2.0
2.5 2.5
3.0 3.0
3.5 3.5
4.0 4.0
4.5 4.5
5.0 5.0
5.5 5.5
6.0 6.0
6.5 6.5
7.0 7.0
7.5 7.5
Depth (m)

Depth (m)
8.0 8.0
8.5 8.5
9.0 9.0
9.5 9.5
10.0 10.0
10.5 10.5
11.0 11.0
11.5 11.5
12.0 12.0
12.5 12.5
13.0 13.0
13.5 13.5
14.0 14.0
14.5 14.5
15.0 15.0
15.5 15.5
16.0 16.0
16.5 16.5
17.0 17.0
-70 -55 -40 -25 -10 5 20 35 50 65 -70 -55 -40 -25 -10 5 20 35 50 65

25-Jan-17 21-Jan-17 25-Jan-17 21-Jan-17


17-Jan-17 Alert 17-Jan-17 Alert
Alert (-) Suspension Alert (-) Suspension
Suspension (-) Suspension (-)
INCLINOMETER READINGS

Excavation Recorded Max-Displacement in A Ditrction:

A0 (+) Date: 03-Feb-17


Depth of Max Deflection: 0.500

B180 (-) B0 (+) Max-Disp (mm): 1.100

Orientation: A Dir

A180 (-) (Clock-wise direction from A0)

60.0

45.0

30.0
Max Deflection (mm)

15.0

0.0

-15.0

-30.0

-45.0

-60.0
15-Nov-16

5-Dec-16

25-Dec-16

3-Feb-17

23-Feb-17

15-Mar-17

4-Apr-17

24-Apr-17

3-Jun-17

13-Jul-17

2-Aug-17
14-Jan-17

14-May-17

23-Jun-17
A B Alert Alert (-) Suspension Suspension (-)
INCLINOMETER READINGS

PROJECT: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

CLIENT: PUBLIC UTILITIES BOARD (PUB) Coordinate: N:0.000 E:0.000

Inclinometer No: IS210 Report Date: 3-Feb-17 Report No: 348


DEPTH READING ZERO SUM INITIAL CHANGE DEFORMATION(mm) Deg. From
(m) A0 A180 B0 B180 A B A B A B A B R A0
0.5 -106 110 -36 -8 4 -44 -252 -37 0.36 0.09 1.24 1.58 2.01 308.13
1.0 -103 107 -27 -9 4 -36 -191 -40 -0.19 0.22 0.88 1.49 1.73 300.57
1.5 -133 136 -1 -34 3 -35 -291 25 0.22 0.08 1.07 1.27 1.66 310.11
2.0 -120 121 -11 -26 1 -37 -271 5 0.30 0.10 0.85 1.19 1.46 305.54
2.5 -38 35 -73 28 -3 -45 -83 -121 0.10 0.20 0.55 1.09 1.22 296.77
3.0 62 -62 -124 87 0 -37 124 -201 0.00 -0.10 0.45 0.89 1.00 296.82
3.5 113 -104 -149 115 9 -34 211 -261 0.06 -0.03 0.45 0.99 1.09 294.44
4.0 116 -111 -158 115 5 -43 220 -282 0.07 0.09 0.39 1.02 1.09 290.92
4.5 120 -116 -174 141 4 -33 233 -312 0.03 -0.03 0.32 0.93 0.98 288.99
5.0 144 -140 -120 91 4 -29 282 -223 0.02 0.12 0.29 0.96 1.00 286.81
5.5 138 -133 -55 19 5 -36 271 -77 0.00 0.03 0.27 0.84 0.88 287.82
6.0 92 -91 -73 38 1 -35 181 -112 0.02 0.01 0.27 0.81 0.85 288.43
6.5 62 -58 -100 67 4 -33 120 -170 0.00 0.03 0.25 0.80 0.84 287.35
7.0 33 -29 -116 78 4 -38 59 -214 0.03 0.20 0.25 0.77 0.81 287.99
7.5 77 -71 -133 98 6 -35 146 -231 0.02 0.00 0.22 0.57 0.61 291.10
8.0 84 -77 -125 100 7 -25 160 -222 0.01 -0.03 0.20 0.57 0.60 289.33
8.5 81 -80 -31 -6 1 -37 159 -29 0.02 0.04 0.19 0.60 0.63 287.57
9.0 82 -79 0 -34 3 -34 159 29 0.02 0.05 0.17 0.56 0.59 286.89
9.5 73 -70 -10 -23 3 -33 144 12 -0.01 0.01 0.15 0.51 0.53 286.39
10.0 58 -55 -29 -5 3 -34 108 -29 0.05 0.05 0.16 0.50 0.52 287.74
10.5 20 -17 -51 19 3 -32 35 -76 0.02 0.06 0.11 0.45 0.46 283.74
11.0 47 -46 -21 -17 1 -38 84 -12 0.09 0.08 0.09 0.39 0.40 282.99
11.5 134 -131 2 -40 3 -38 264 37 0.01 0.05 0.00 0.31 0.31 270.00
12.0 134 -131 3 -38 3 -35 263 41 0.02 0.00 -0.01 0.26 0.26 267.80
12.5 120 -117 -4 -35 3 -39 236 28 0.01 0.03 -0.03 0.26 0.26 263.42
13.0 98 -94 -8 -24 4 -32 194 14 -0.02 0.02 -0.04 0.23 0.23 260.13
13.5 98 -87 -23 -12 11 -35 193 -10 -0.08 -0.01 -0.02 0.21 0.21 264.56
14.0 100 -100 -61 23 0 -38 205 -93 -0.05 0.09 0.06 0.22 0.23 285.26
14.5 56 -54 -109 76 2 -33 110 -189 0.00 0.04 0.11 0.13 0.17 310.24
15.0 35 -43 -113 80 -8 -33 70 -194 0.08 0.01 0.11 0.09 0.14 320.71
15.5 -16 17 -98 66 1 -32 -35 -163 0.02 -0.01 0.03 0.08 0.09 290.56
16.0 -35 40 -66 34 5 -32 -76 -109 0.01 0.09 0.01 0.09 0.09 276.34
INCLINOMETER READINGS

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)


Inclinometer No: IS210 Report Date: 3-Feb-17 Report No: 348
Location: Irwell Bank Alert Level: +/- 40 mm
Installation Depth: 16.5 m Suspension Level: +/- 50 mm
Ground R.L. 108.5546 m Elapsed Time: 34 days
Date of Base Reading: 31-Dec-16 Date of Last Reading: 21-Jan-17

Displacement (mm) Displacement (mm)


A(180) <<<===============>>> A(0) B(180) <<<===============>>> B(0)

0.0 0.0
0.5 0.5
1.0 1.0
1.5 1.5
2.0 2.0
2.5 2.5
3.0 3.0
3.5 3.5
4.0 4.0
4.5 4.5
5.0 5.0
5.5 5.5
6.0 6.0
6.5 6.5
7.0 7.0
7.5 7.5
Depth (m)

Depth (m)
8.0 8.0
8.5 8.5
9.0 9.0
9.5 9.5
10.0 10.0
10.5 10.5
11.0 11.0
11.5 11.5
12.0 12.0
12.5 12.5
13.0 13.0
13.5 13.5
14.0 14.0
14.5 14.5
15.0 15.0
15.5 15.5
16.0 16.0
16.5 16.5
17.0 17.0
-70 -55 -40 -25 -10 5 20 35 50 65 -70 -55 -40 -25 -10 5 20 35 50 65

25-Jan-17 21-Jan-17 25-Jan-17 21-Jan-17


17-Jan-17 Alert 17-Jan-17 Alert
Alert (-) Suspension Alert (-) Suspension
Suspension (-) Suspension (-)
INCLINOMETER READINGS

Excavation Recorded Max-Displacement in A Ditrction:

A0 (+) Date: 03-Feb-17


Depth of Max Deflection: 0.500

B180 (-) B0 (+) Max-Disp (mm): 1.240

Orientation: A Dir

A180 (-) (Clock-wise direction from A0)

60.0

45.0

30.0
Max Deflection (mm)

15.0

0.0

-15.0

-30.0

-45.0

-60.0
15-Nov-16

5-Dec-16

25-Dec-16

3-Feb-17

23-Feb-17

15-Mar-17

4-Apr-17

24-Apr-17

3-Jun-17

13-Jul-17

2-Aug-17
14-Jan-17

14-May-17

23-Jun-17
A B Alert Alert (-) Suspension Suspension (-)
INCLINOMETER READINGS

PROJECT: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

CLIENT: PUBLIC UTILITIES BOARD (PUB) Coordinate: N:0.000 E:0.000

Inclinometer No: IS211 Report Date: 3-Feb-17 Report No: 348


DEPTH READING ZERO SUM INITIAL CHANGE DEFORMATION(mm) Deg. From
(m) A0 A180 B0 B180 A B A B A B A B R A0
0.5 139 -126 -232 201 13 -31 281 -282 -0.16 -1.51 -1.23 -1.68 2.08 126.21
1.0 208 -207 -221 200 1 -21 408 -368 0.07 -0.53 -1.07 -0.17 1.08 170.97
1.5 254 -250 -264 231 4 -33 527 -536 -0.23 0.41 -1.14 0.36 1.20 197.53
2.0 193 -192 -304 283 1 -21 516 -599 -1.31 0.12 -0.91 -0.05 0.91 176.86
2.5 157 -153 -181 147 4 -34 303 -317 0.07 -0.11 0.40 -0.17 0.43 23.03
3.0 147 -140 -167 135 7 -32 290 -292 -0.03 -0.10 0.33 -0.06 0.34 10.30
3.5 149 -143 -164 129 6 -35 291 -289 0.01 -0.04 0.36 0.04 0.36 353.66
4.0 145 -141 -129 84 4 -45 287 -227 -0.01 0.14 0.35 0.08 0.36 347.12
4.5 131 -124 -76 41 7 -35 256 -112 -0.01 -0.05 0.36 -0.06 0.36 9.46
5.0 96 -93 -31 0 3 -31 183 -17 0.06 -0.14 0.37 -0.01 0.37 1.55
5.5 208 -201 -127 86 7 -41 404 -212 0.05 -0.01 0.31 0.13 0.34 337.25
6.0 210 -205 -149 112 5 -37 411 -252 0.04 -0.09 0.26 0.14 0.30 331.70
6.5 202 -198 -164 126 4 -38 396 -284 0.04 -0.06 0.22 0.23 0.32 313.73
7.0 202 -198 -180 141 4 -39 393 -315 0.07 -0.06 0.18 0.29 0.34 301.83
7.5 202 -196 -189 155 6 -34 406 -333 -0.08 -0.11 0.11 0.35 0.37 287.45
8.0 244 -237 -179 145 7 -34 478 -333 0.03 0.09 0.19 0.46 0.50 292.44
8.5 275 -269 -32 -3 6 -35 541 -28 0.03 -0.01 0.16 0.37 0.40 293.39
9.0 322 -318 -18 -21 4 -39 639 13 0.01 -0.10 0.13 0.38 0.40 288.89
9.5 332 -327 -7 -28 5 -35 653 18 0.06 0.03 0.12 0.48 0.49 284.04
10.0 303 -300 -41 -3 3 -44 600 -63 0.03 0.25 0.06 0.45 0.45 277.59
10.5 269 -263 -53 17 6 -36 531 -69 0.01 -0.01 0.03 0.20 0.20 278.53
11.0 241 -234 -84 49 7 -35 470 -132 0.05 -0.01 0.02 0.21 0.21 275.44
11.5 391 -384 -105 70 7 -35 776 -179 -0.01 0.04 -0.03 0.22 0.22 262.23
12.0 405 -401 -102 65 4 -37 802 -168 0.04 0.01 -0.02 0.18 0.18 263.66
12.5 406 -400 -123 84 6 -39 805 -213 0.01 0.06 -0.06 0.17 0.18 250.56
13.0 390 -385 -173 138 5 -35 777 -310 -0.02 -0.01 -0.07 0.11 0.13 237.53
13.5 357 -354 -231 198 3 -33 710 -421 0.01 -0.08 -0.05 0.12 0.13 247.38
14.0 319 -310 -270 233 9 -37 646 -505 -0.17 0.02 -0.06 0.20 0.21 253.30
14.5 87 -83 -300 270 4 -30 168 -575 0.02 0.05 0.11 0.18 0.21 301.43
15.0 86 -80 -272 235 6 -37 161 -509 0.05 0.02 0.09 0.13 0.16 304.70
15.5 173 -169 -54 5 4 -49 337 -38 0.05 -0.21 0.04 0.11 0.12 289.98
16.0 345 -344 337 -367 1 -30 690 672 -0.01 0.32 -0.01 0.32 0.32 268.21
INCLINOMETER READINGS

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)


Inclinometer No: IS211 Report Date: 3-Feb-17 Report No: 348
Location: Irwell Bank Alert Level: +/- 40 mm
Installation Depth: 16.5 m Suspension Level: +/- 50 mm
Ground R.L. 108.4354 m Elapsed Time: 34 days
Date of Base Reading: 31-Dec-16 Date of Last Reading: 21-Jan-17

Displacement (mm) Displacement (mm)


A(180) <<<===============>>> A(0) B(180) <<<===============>>> B(0)

0.0 0.0
0.5 0.5
1.0 1.0
1.5 1.5
2.0 2.0
2.5 2.5
3.0 3.0
3.5 3.5
4.0 4.0
4.5 4.5
5.0 5.0
5.5 5.5
6.0 6.0
6.5 6.5
7.0 7.0
7.5 7.5
Depth (m)

Depth (m)
8.0 8.0
8.5 8.5
9.0 9.0
9.5 9.5
10.0 10.0
10.5 10.5
11.0 11.0
11.5 11.5
12.0 12.0
12.5 12.5
13.0 13.0
13.5 13.5
14.0 14.0
14.5 14.5
15.0 15.0
15.5 15.5
16.0 16.0
16.5 16.5
17.0 17.0
-70 -55 -40 -25 -10 5 20 35 50 65 -70 -55 -40 -25 -10 5 20 35 50 65

25-Jan-17 21-Jan-17 25-Jan-17 21-Jan-17


17-Jan-17 Alert 17-Jan-17 Alert
Alert (-) Suspension Alert (-) Suspension
Suspension (-) Suspension (-)
INCLINOMETER READINGS

Excavation Recorded Max-Displacement in A Ditrction:

A0 (+) Date: 03-Feb-17


Depth of Max Deflection: 0.500

B180 (-) B0 (+) Max-Disp (mm): -1.230

Orientation: A Dir

A180 (-) (Clock-wise direction from A0)

60.0

45.0

30.0
Max Deflection (mm)

15.0

0.0

-15.0

-30.0

-45.0

-60.0
15-Nov-16

5-Dec-16

25-Dec-16

3-Feb-17

23-Feb-17

15-Mar-17

4-Apr-17

24-Apr-17

3-Jun-17

13-Jul-17

2-Aug-17
14-Jan-17

14-May-17

23-Jun-17
A B Alert Alert (-) Suspension Suspension (-)
WATER STANDPIPE READINGS

Project : CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)


Instrument No: GWS20804 Date: 3-Feb-17 Report No: 348
Elapsed Ground
Pipe Top Level Pipe Depth Change From Cumulative
Date Time Reading (m) Water Level Remark
(m) (m) Last Reading (m) Change (m)
(Days) (m)

4-Feb-16 0 1.55 106.9370 10.0 105.3870 - 0.00 Initial


1-Dec-16 301 2.35 106.9370 10.0 104.5870 0.01 -0.80
3-Dec-16 303 2.33 106.9370 10.0 104.6070 0.02 -0.78
6-Dec-16 306 2.32 106.9370 10.0 104.6170 0.01 -0.77
8-Dec-16 308 2.34 106.9370 10.0 104.5970 -0.02 -0.79
10-Dec-16 310 2.35 106.9370 10.0 104.5870 -0.01 -0.80
13-Dec-16 313 2.36 106.9370 10.0 104.5770 -0.01 -0.81
15-Dec-16 315 2.37 106.9370 10.0 104.5670 -0.01 -0.82
17-Dec-16 317 2.36 106.9370 10.0 104.5770 0.01 -0.81
20-Dec-16 320 2.35 106.9370 10.0 104.5870 0.01 -0.80
22-Dec-16 322 2.34 106.9370 10.0 104.5970 0.01 -0.79
24-Dec-16 324 2.33 106.9370 10.0 104.6070 0.01 -0.78
27-Dec-16 327 2.35 106.9370 10.0 104.5870 -0.02 -0.80
29-Dec-16 329 2.32 106.9370 10.0 104.6170 0.03 -0.77
31-Dec-16 331 2.34 106.9370 10.0 104.5970 -0.02 -0.79
3-Jan-17 334 2.34 106.9370 10.0 104.5970 0.00 -0.79
5-Jan-17 336 2.36 106.9370 10.0 104.5770 -0.02 -0.81
7-Jan-17 338 2.38 106.9370 10.0 104.5570 -0.02 -0.83
10-Jan-17 341 2.40 106.9370 10.0 104.5370 -0.02 -0.85
19-Jan-17 350 2.41 106.9370 10.0 104.5270 -0.01 -0.86
21-Jan-17 352 2.40 106.9370 10.0 104.5370 0.01 -0.85
25-Jan-17 356 2.44 106.9370 10.0 104.4970 -0.04 -0.89
26-Jan-17 357 2.45 106.9370 10.0 104.4870 -0.01 -0.90
2-Feb-17 364 2.44 106.9370 10.0 104.4970 0.01 -0.89

Ground Water Level Vs Date


109.0

108.0
Ground Water level (m)

107.0

106.0

105.0

104.0

103.0

102.0

101.0

100.0
1-Oct-16
4-Apr-16
14-Apr-16

24-Apr-16

12-Aug-16
22-Aug-16

11-Sep-16

21-Sep-16

10-Nov-16

20-Nov-16

30-Nov-16

10-Dec-16
20-Dec-16

30-Dec-16
3-Jun-16

13-Jul-16

23-Jul-16

9-Jan-17
11-Oct-16

21-Oct-16
31-Oct-16
4-May-16

2-Aug-16

1-Sep-16
14-Feb-16

24-Feb-16
5-Mar-16

3-Jul-16
4-Feb-16

15-Mar-16

25-Mar-16

14-May-16
24-May-16

13-Jun-16
23-Jun-16

19-Jan-17
29-Jan-17

18-Feb-17

28-Feb-17
8-Feb-17

GWS20804 PDL (-) Alert(-)

Initial Reading Date: 4-Feb-16 Trigger Level


Pipe Top Level 106.9370 m Alert
Installation Depth 10 m PDL -4.0 m
WATER STANDPIPE READINGS

Project : CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)


Instrument No: GWS20808 Date: 3-Feb-17 Report No: 348
Elapsed Ground
Pipe Top Level Pipe Depth Change From Cumulative
Date Time Reading (m) Water Level Remark
(m) (m) Last Reading (m) Change (m)
(Days) (m)

20-Oct-15 0 2.12 108.1380 10.0 106.0180 - 0.00 Initial


12-Apr-16 175 3.01 108.1380 10.0 105.1280 -0.02 -0.89
14-Apr-16 177 3.02 108.1380 10.0 105.1180 -0.01 -0.90
16-Apr-16 179 3.03 108.1380 10.0 105.1080 -0.01 -0.91
19-Apr-16 182 3.05 108.1380 10.0 105.0880 -0.02 -0.93
21-Apr-16 184 3.06 108.1380 10.0 105.0780 -0.01 -0.94
23-Apr-16 186 3.07 108.1380 10.0 105.0710 -0.01 -0.95
26-Apr-16 189 3.09 108.1380 10.0 105.0480 -0.02 -0.97
28-Apr-16 191 3.10 108.1380 10.0 105.0380 -0.01 -0.98
30-Apr-16 193 3.11 108.1380 10.0 105.0280 -0.01 -0.99
3-May-16 196 3.12 108.1380 10.0 105.0180 -0.01 -1.00
5-May-16 198 3.13 108.1380 10.0 105.0080 -0.01 -1.01
7-May-16 200 3.13 108.1380 10.0 105.0080 0.00 -1.01
10-May-16 203 3.14 108.1380 10.0 104.9980 -0.01 -1.02
12-May-16 205 3.15 108.1380 10.0 104.9880 -0.01 -1.03
14-May-16 207 3.16 108.1380 10.0 104.9780 -0.01 -1.04
17-May-16 210 3.17 108.1380 10.0 104.9680 -0.01 -1.05
19-May-16 212 3.18 108.1380 10.0 104.9580 -0.01 -1.06
20-May-16 213 3.19 108.1380 10.0 104.9480 -0.01 -1.07
24-May-16 217 3.20 108.1380 10.0 104.9380 -0.01 -1.08
26-May-16 219 3.21 108.1380 10.0 104.9280 -0.01 -1.09
28-May-16 221 3.22 108.1380 10.0 104.9180 -0.01 -1.10
31-May-16 224 3.23 108.1380 10.0 104.9080 -0.01 -1.11
2-Jun-16 226 3.24 108.1380 10.0 104.8980 -0.01 -1.12

Ground Water Level Vs Date


109.0

108.0
Ground Water level (m)

107.0

106.0

105.0

104.0

103.0

102.0

101.0

100.0
19-Nov-15

19-Dec-15

2-Apr-16

17-Apr-16

15-Aug-16
3-Jan-16

1-Jun-16

16-Jul-16

31-Jul-16
20-Oct-15

4-Nov-15

4-Dec-15

2-May-16

1-Jul-16
18-Jan-16

17-Feb-16

3-Mar-16
2-Feb-16

18-Mar-16

17-May-16

16-Jun-16

GWS20808 PDL (-) Alert(-)

Initial Reading Date: 20-Oct-15 Trigger Level


Pipe Top Level 108.1380 m Alert
Installation Depth 10 m PDL -4.0 m
WATER STANDPIPE READINGS

Project : CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)


Instrument No: GWS20809 Date: 3-Feb-17 Report No: 348
Elapsed Ground
Pipe Top Level Pipe Depth Change From Cumulative
Date Time Reading (m) Water Level Remark
(m) (m) Last Reading (m) Change (m)
(Days) (m)

10-Sep-16 0 6.55 110.9085 20.5 104.3585 - 0.00 Initial


13-Sep-16 3 6.52 110.9085 20.5 104.3885 0.03 0.03
12-Jan-17 124 6.59 110.9085 20.5 104.3185 -0.07 -0.04
14-Jan-17 126 6.60 110.9085 20.5 104.3085 -0.01 -0.05
17-Jan-17 129 6.61 110.9085 20.5 104.2985 -0.01 -0.06
19-Jan-17 131 6.62 110.9085 20.5 104.2885 -0.01 -0.07
25-Jan-17 137 6.61 110.9085 20.5 104.2985 0.01 -0.06
26-Jan-17 138 6.62 110.9085 20.5 104.2885 -0.01 -0.07
2-Feb-17 145 6.60 110.9085 20.5 104.3085 0.02 -0.05

Ground Water Level Vs Date


109.0

108.0
Ground Water level (m)

107.0

106.0

105.0

104.0

103.0

102.0

101.0

100.0
8-Apr-17
10-Sep-16

25-Sep-16

24-Nov-16

24-Dec-16

23-Apr-17
8-Jan-17

7-Jun-17
10-Oct-16

25-Oct-16

9-Nov-16

9-Dec-16

8-May-17
9-Mar-17
23-Jan-17

22-Feb-17
7-Feb-17

24-Mar-17

23-May-17

GWS20809 PDL (-) Alert(-)

Initial Reading Date: 10-Sep-16 Trigger Level


Pipe Top Level 110.9085 m Alert
Installation Depth 20.5 m PDL -4.0 m
WATER STANDPIPE READINGS

Project : CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)


Instrument No: GWS202 Date: 3-Feb-17 Report No: 348
Elapsed Ground
Pipe Top Level Pipe Depth Change From Cumulative
Date Time Reading (m) Water Level Remark
(m) (m) Last Reading (m) Change (m)
(Days) (m)

17-Nov-16 0 3.84 116.8951 9.0 113.0551 - 0.00 Initial


22-Nov-16 5 3.87 116.8951 9.0 113.0251 -0.03 -0.03
24-Nov-16 7 3.88 116.8951 9.0 113.0151 -0.01 -0.04
29-Nov-16 12 3.87 116.8951 9.0 113.0251 0.01 -0.03
1-Dec-16 14 3.88 116.8951 9.0 113.0151 -0.01 -0.04
6-Dec-16 19 3.89 116.8951 9.0 113.0051 -0.01 -0.05
10-Dec-16 23 3.92 116.8951 9.0 112.9751 -0.03 -0.08
13-Dec-16 26 3.94 116.8951 9.0 112.9551 -0.02 -0.10
17-Dec-16 30 3.98 116.8951 9.0 112.9151 -0.04 -0.14
20-Dec-16 33 4.01 116.8951 9.0 112.8851 -0.03 -0.17
24-Dec-16 37 4.06 116.8951 9.0 112.8351 -0.05 -0.22
27-Dec-16 40 4.07 116.8951 9.0 112.8251 -0.01 -0.23
31-Dec-16 44 4.09 116.8951 9.0 112.8051 -0.02 -0.25
3-Jan-17 47 4.06 116.8951 9.0 112.8351 0.03 -0.22
7-Jan-17 51 4.14 116.8951 9.0 112.7551 -0.08 -0.30
10-Jan-17 54 4.14 116.8951 9.0 112.7551 0.00 -0.30
14-Jan-17 58 4.17 116.8951 9.0 112.7251 -0.03 -0.33
17-Jan-17 61 4.18 116.8951 9.0 112.7151 -0.01 -0.34
21-Jan-17 65 4.20 116.8951 9.0 112.6951 -0.02 -0.36
25-Jan-17 69 4.23 116.8951 9.0 112.6651 -0.03 -0.39

Ground Water Level Vs Date

117.0
Ground Water level (m)

115.0

113.0

111.0

109.0

107.0

105.0
17-Nov-16

17-Dec-16

1-Apr-17

16-Apr-17
1-Jan-17
2-Dec-16

1-May-17
2-Mar-17
16-Jan-17

31-Jan-17

15-Feb-17

17-Mar-17

16-May-17

31-May-17

GWS202 PDL (-) Alert(-)

Initial Reading Date: 17-Nov-16 Trigger Level


Pipe Top Level 116.8951 m Alert
Installation Depth 9 m PDL -4.0 m
WATER STANDPIPE READINGS

Project : CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)


Instrument No: GWS205 Date: 3-Feb-17 Report No: 348
Elapsed Ground
Pipe Top Level Pipe Depth Change From Cumulative
Date Time Reading (m) Water Level Remark
(m) (m) Last Reading (m) Change (m)
(Days) (m)

29-Nov-16 0 3.85 115.4038 9.0 111.5538 - 0.00 Initial


1-Dec-16 2 3.86 115.4038 9.0 111.5438 -0.01 -0.01
6-Dec-16 7 3.85 115.4038 9.0 111.5538 0.01 0.00
10-Dec-16 11 3.90 115.4038 9.0 111.5038 -0.05 -0.05
13-Dec-16 14 3.93 115.4038 9.0 111.4738 -0.03 -0.08
17-Dec-16 18 3.97 115.4038 9.0 111.4338 -0.04 -0.12
20-Dec-16 21 3.99 115.4038 9.0 111.4138 -0.02 -0.14
24-Dec-16 25 4.03 115.4038 9.0 111.3738 -0.04 -0.18
27-Dec-16 28 4.04 115.4038 9.0 111.3638 -0.01 -0.19
31-Dec-16 32 4.07 115.4038 9.0 111.3338 -0.03 -0.22
3-Jan-17 35 4.06 115.4038 9.0 111.3438 0.01 -0.21
7-Jan-17 39 4.02 115.4038 9.0 111.3838 0.04 -0.17
10-Jan-17 42 4.02 115.4038 9.0 111.3838 0.00 -0.17
14-Jan-17 46 3.99 115.4038 9.0 111.4138 0.03 -0.14
17-Jan-17 49 3.97 115.4038 9.0 111.4338 0.02 -0.12
21-Jan-17 53 3.96 115.4038 9.0 111.4438 0.01 -0.11
25-Jan-17 57 3.94 115.4038 9.0 111.4638 0.02 -0.09

Ground Water Level Vs Date


116.0

115.0

114.0
Ground Water level (m)

113.0

112.0

111.0

110.0

109.0

108.0

107.0

106.0

105.0
17-Nov-16

17-Dec-16

1-Apr-17

16-Apr-17
1-Jan-17
2-Dec-16

1-May-17
16-Jan-17

31-Jan-17

15-Feb-17

2-Mar-17

17-Mar-17

16-May-17

31-May-17

GWS205 PDL (-) Alert(-)

Initial Reading Date: 29-Nov-16 Trigger Level


Pipe Top Level 115.4038 m Alert
Installation Depth 9 m PDL -4.0 m
WATER STANDPIPE READINGS

Project : CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)


Instrument No: GWS208 Date: 3-Feb-17 Report No: 348
Elapsed Ground
Pipe Top Level Pipe Depth Change From Cumulative
Date Time Reading (m) Water Level Remark
(m) (m) Last Reading (m) Change (m)
(Days) (m)

23-Dec-16 0 3.40 111.3772 9.0 107.9772 - 0.00 Initial


24-Dec-16 1 3.43 111.3772 9.0 107.9472 -0.03 -0.03
27-Dec-16 4 3.45 111.3772 9.0 107.9272 -0.02 -0.05
31-Dec-16 8 3.48 111.3772 9.0 107.8972 -0.03 -0.08
3-Jan-17 11 3.43 111.3772 9.0 107.9472 0.05 -0.03
7-Jan-17 15 3.47 111.3772 9.0 107.9072 -0.04 -0.07
10-Jan-17 18 3.47 111.3772 9.0 107.9072 0.00 -0.07
14-Jan-17 22 3.51 111.3772 9.0 107.8672 -0.04 -0.11
17-Jan-17 25 3.53 111.3772 9.0 107.8472 -0.02 -0.13
21-Jan-17 29 3.54 111.3772 9.0 107.8372 -0.01 -0.14
25-Jan-17 33 3.57 111.3772 9.0 107.8072 -0.03 -0.17

Ground Water Level Vs Date


111.0

110.0
Ground Water level (m)

109.0

108.0

107.0

106.0

105.0

104.0

103.0

102.0

101.0
17-Nov-16

17-Dec-16

1-Apr-17

16-Apr-17
1-Jan-17
2-Dec-16

1-May-17
2-Mar-17
16-Jan-17

31-Jan-17

15-Feb-17

17-Mar-17

16-May-17

31-May-17

GWS208 PDL (-) Alert(-)

Initial Reading Date: 23-Dec-16 Trigger Level


Pipe Top Level 111.3772 m Alert
Installation Depth 9 m PDL -3.0 m
VW PIEZOMETER

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)

Piezometer No: GWV20804 Date: 3-Feb-2017 Report No: 348


Elasped Pressure Pressure Piezometric
Chang from last Cumulative Pressure
Date Time Reading Temp. Reading Reading Level Remark
reading (Kpa) Change (Kpa)
(Days) (PSI) (kPa) R.L. (m)
04-Feb-16 0 8812.0 29.0 15.0588 103.8265 - 105.5434 0.00 Initial
01-Dec-16 303 8780.0 29.0 16.0569 110.7085 0.509 106.2457 6.88
03-Dec-16 305 8778.2 29.0 16.1123 111.0905 0.382 106.2847 7.26
06-Dec-16 308 8781.1 29.0 16.0200 110.4538 -0.637 106.2197 6.627
08-Dec-16 310 8784.7 29.0 15.9091 109.6897 -0.764 106.1417 5.863
10-Dec-16 312 8787.1 29.0 15.8352 109.1802 -0.510 106.0897 5.354
13-Dec-16 315 8789.4 29.0 15.7613 108.6706 -0.510 106.0377 4.844
15-Dec-16 317 8792.4 29.0 15.6689 108.0336 -0.637 105.9727 4.207
17-Dec-16 319 8796.6 29.0 15.5396 107.1415 -0.892 105.8817 3.315
20-Dec-16 322 8796.6 29.0 15.5396 107.1415 0.000 105.8817 3.315
22-Dec-16 324 8785.9 29.0 15.8722 109.4350 2.293 106.1157 5.608
24-Dec-16 326 8782.3 29.0 15.9830 110.1991 0.764 106.1937 6.373
27-Dec-16 329 8778.8 29.0 16.0939 110.9632 0.764 106.2717 7.137
29-Dec-16 331 8769.3 29.0 16.3893 112.9999 2.037 106.4795 9.173
31-Dec-16 333 8765.7 29.0 16.5000 113.7635 0.764 106.5574 9.937
03-Jan-17 336 8768.1 29.0 16.4262 113.2545 -0.509 106.5055 9.428
05-Jan-17 338 8762.8 29.0 16.5923 114.3996 1.145 106.6223 10.573
07-Jan-17 340 8772.3 29.0 16.2970 112.3636 -2.036 106.4146 8.537
10-Jan-17 343 8774.6 29.0 16.2231 111.8544 -0.509 106.3626 8.028
19-Jan-17 352 8782.9 29.0 15.9646 110.0718 -1.783 106.1807 6.245
21-Jan-17 354 8785.9 29.0 15.8722 109.4350 -0.637 106.1157 5.608
25-Jan-17 358 8800.1 29.0 15.4286 106.3768 -3.058 105.8037 2.550
26-Jan-17 359 8804.3 29.0 15.2992 105.4844 -0.892 105.7126 1.658
02-Feb-17 366 8798.9 29.0 15.4656 106.6317 1.147 105.8297 2.805

Piezometric Level Change Vs Time


110.0

109.0

108.0

107.0
Piezometric Lelve (m)

106.0

105.0

104.0

103.0

102.0

101.0

100.0

Cumulative Pressure Change AL PDL

R.L of Piezo Tip: 94.9489 (R.L. m) Serial No: 1512349


Ground R.L: 106.9489 (R.L. m) Alert 2.1m
Date of Installation 2-Feb-2016 PDL -40 Kpa -78 Kpa
VW PIEZOMETER

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)

Piezometer No: GWV20808 Date: 3-Feb-2017 Report No: 348


Elasped Pressure Pressure Piezometric
Chang from last Cumulative Pressure
Date Time Reading Temp. Reading Reading Level Remark
reading (Kpa) Change (Kpa)
(Days) (PSI) (kPa) R.L. (m)
20-Oct-15 0 8139.0 29.0 13.4792 92.9361 - 105.3213 0.00 Initial
12-Apr-16 175 8220.8 29.0 11.9009 82.0541 -1.373 104.2109 -10.88
14-Apr-16 177 8228.9 29.0 11.7460 80.9857 -1.068 104.1018 -11.95
16-Apr-16 179 8230.6 29.0 11.7128 80.7567 -0.229 104.0785 -12.179
19-Apr-16 182 8240.3 29.0 11.5245 79.4584 -1.298 103.9460 -13.478
21-Apr-16 184 8247.8 29.0 11.3804 78.4650 -0.993 103.8446 -14.471
23-Apr-16 186 8251.3 29.0 11.3139 78.0064 -0.459 103.7978 -14.930
26-Apr-16 189 8258.7 29.0 11.1697 77.0124 -0.994 103.6964 -15.924
28-Apr-16 191 8262.8 29.0 11.0920 76.4769 -0.535 103.6418 -16.459
30-Apr-16 193 8269.1 29.0 10.9700 75.6352 -0.842 103.5559 -17.301
03-May-16 196 8275.4 29.0 10.8478 74.7932 -0.842 103.4700 -18.143
05-May-16 198 8278.9 29.0 10.7812 74.3337 -0.459 103.4231 -18.602
07-May-16 200 8289.8 29.0 10.5701 72.8782 -1.456 103.2745 -20.058
10-May-16 203 8285.2 29.0 10.6590 73.4912 0.613 103.3371 -19.445
12-May-16 205 8290.9 29.0 10.5479 72.7249 -0.766 103.2589 -20.211
14-May-16 207 8295.6 29.0 10.4589 72.1117 -0.613 103.1963 -20.824
17-May-16 210 8298.4 29.0 10.4033 71.7283 -0.383 103.1572 -21.208
19-May-16 212 8308.8 29.0 10.2031 70.3477 -1.381 103.0163 -22.588
20-May-16 213 8302.5 29.0 10.3255 71.1915 0.844 103.1024 -21.745
24-May-16 217 8311.1 29.0 10.1586 70.0408 -1.151 102.9850 -22.895
26-May-16 219 8313.4 29.0 10.1140 69.7338 -0.307 102.9537 -23.202
28-May-16 221 8316.9 29.0 10.0472 69.2732 -0.461 102.9067 -23.663
31-May-16 224 8319.8 29.0 9.9916 68.8894 -0.384 102.8675 -24.047
02-Jun-16 226 8327.3 29.0 9.8468 67.8910 -0.998 102.7657 -25.045

Piezometric Level Change Vs Time


110.0

109.0

108.0

107.0
Piezometric Lelve (m)

106.0

105.0

104.0

103.0

102.0

101.0

100.0

Cumulative Pressure Change AL PDL

R.L of Piezo Tip: 95.8380 (R.L. m) Serial No: 1511227


Ground R.L: 107.8380 (R.L. m) Alert 2.1m
Date of Installation 20-Oct-2015 PDL -40 Kpa -78 Kpa
VW PIEZOMETER

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)

Piezometer No: GWV20809 Date: 3-Feb-2017 Report No: 348


Elasped Pressure Pressure Piezometric
Chang from last Cumulative Pressure
Date Time Reading Temp. Reading Reading Level Remark
reading (Kpa) Change (Kpa)
(Days) (PSI) (kPa) R.L. (m)
10-Sep-16 0 8722.0 29.0 14.7024 101.3694 - 103.2269 0.00 Initial
13-Sep-16 3 8725.5 29.0 14.6384 100.9281 -0.441 103.1819 -0.44
12-Jan-17 124 8701.9 29.0 15.0649 103.8686 2.941 103.4819 2.50
14-Jan-17 126 8693.7 29.0 15.2140 104.8970 1.028 103.5869 3.528
17-Jan-17 129 8688.9 29.0 15.2992 105.4845 0.587 103.6468 4.115
19-Jan-17 131 8690.1 29.0 15.2779 105.3376 -0.147 103.6318 3.968
25-Jan-17 137 8677.7 29.0 15.5015 106.8791 1.542 103.7891 5.510
26-Jan-17 138 8669.5 29.0 15.6505 107.9063 1.027 103.8939 6.537
02-Feb-17 145 8665.4 29.0 15.7250 108.4198 0.513 103.9463 7.050

Piezometric Level Change Vs Time


108.0

107.0

106.0

105.0
Piezometric Lelve (m)

104.0

103.0

102.0

101.0

100.0

99.0

98.0

Cumulative Pressure Change AL PDL

R.L of Piezo Tip: 92.8831 (R.L. m) Serial No: 147808


Ground R.L: 110.8831 (R.L. m) Alert 2.1m
Date of Installation 10-Sep-2016 PDL -40 Kpa -78 Kpa
VW PIEZOMETER

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)

Piezometer No: GWV202 Date: 3-Feb-2017 Report No: 348


Elasped Pressure Pressure Piezometric
Chang from last Cumulative Pressure
Date Time Reading Temp. Reading Reading Level Remark
reading (Kpa) Change (Kpa)
(Days) (PSI) (kPa) R.L. (m)
17-Nov-16 0 8680.1 29.0 7.5420 52.0003 - 112.7800 0.00 Initial
22-Nov-16 5 8685.4 29.0 7.4686 51.4943 -0.506 112.7283 -0.51
24-Nov-16 7 8692.5 29.0 7.3707 50.8193 -0.675 112.6594 -1.18
29-Nov-16 12 8704.9 29.0 7.1993 49.6374 -1.182 112.5388 -2.363
01-Dec-16 14 8712.5 29.0 7.0931 48.9054 -0.732 112.4641 -3.095
06-Dec-16 19 8724.3 29.0 6.9297 47.7786 -1.127 112.3492 -4.222
10-Dec-16 23 8742.1 29.0 6.6843 46.0869 -1.692 112.1765 -5.913
13-Dec-16 26 8752.1 29.0 6.5452 45.1275 -0.959 112.0787 -6.873
17-Dec-16 30 8762.8 29.0 6.3978 44.1111 -1.016 111.9749 -7.889
20-Dec-16 33 8771.1 29.0 6.2831 43.3202 -0.791 111.8942 -8.680
24-Dec-16 37 8780.6 29.0 6.1519 42.4158 -0.904 111.8019 -9.585
27-Dec-16 40 8786.5 29.0 6.0699 41.8503 -0.565 111.7442 -10.150
31-Dec-16 44 8796.6 29.0 5.9304 40.8886 -0.962 111.6461 -11.112
03-Jan-17 47 8784.1 29.0 6.1027 42.0765 1.188 111.7673 -9.924
07-Jan-17 51 8796.6 29.0 5.9304 40.8886 -1.188 111.6461 -11.112
10-Jan-17 54 8798.9 29.0 5.8976 40.6622 -0.226 111.6230 -11.338
14-Jan-17 58 8787.1 29.0 6.0617 41.7938 1.132 111.7385 -10.207
17-Jan-17 61 8790.6 29.0 6.0124 41.4544 -0.339 111.7038 -10.546
21-Jan-17 65 8791.8 29.0 5.9960 41.3412 -0.113 111.6923 -10.659
25-Jan-17 69 8801.3 29.0 5.8647 40.4358 -0.905 111.5999 -11.565

Piezometric Level Change Vs Time


115.0

114.0

113.0

112.0
Piezometric Lelve (m)

111.0

110.0

109.0

108.0

107.0

106.0

105.0

Cumulative Pressure Change AL PDL

R.L of Piezo Tip: 107.4738 (R.L. m) Serial No: 1447790


Ground R.L: 116.4738 (R.L. m) Alert 2.1m
Date of Installation 17-Nov-2016 PDL -40 Kpa -78 Kpa
VW PIEZOMETER

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)

Piezometer No: GWV205 Date: 3-Feb-2017 Report No: 348


Elasped Pressure Pressure Piezometric
Chang from last Cumulative Pressure
Date Time Reading Temp. Reading Reading Level Remark
reading (Kpa) Change (Kpa)
(Days) (PSI) (kPa) R.L. (m)
29-Nov-16 0 7909.0 29.0 7.8608 54.1984 - 111.6386 0.00 Initial
01-Dec-16 1 7915.2 29.0 7.7566 53.4798 -0.719 111.5652 -0.72
06-Dec-16 6 7929.3 29.0 7.5195 51.8453 -1.634 111.3984 -2.35
10-Dec-16 10 7949.0 29.0 7.1873 49.5545 -2.291 111.1647 -4.644
13-Dec-16 13 7959.2 29.0 7.0162 48.3751 -1.179 111.0443 -5.823
17-Dec-16 17 7971.6 29.0 6.8070 46.9326 -1.442 110.8971 -7.266
20-Dec-16 20 7976.1 29.0 6.7309 46.4078 -0.525 110.8436 -7.791
24-Dec-16 24 7985.7 29.0 6.5690 45.2920 -1.116 110.7297 -8.906
27-Dec-16 27 7989.1 29.0 6.5119 44.8980 -0.394 110.6895 -9.300
31-Dec-16 31 7998.1 29.0 6.3595 43.8469 -1.051 110.5823 -10.351
03-Jan-17 34 7985.7 29.0 6.5690 45.2920 1.445 110.7297 -8.906
07-Jan-17 38 7977.8 29.0 6.7023 46.2109 0.919 110.8235 -7.987
10-Jan-17 41 7964.2 29.0 6.9307 47.7852 1.574 110.9841 -6.413
14-Jan-17 45 7949.0 29.0 7.1873 49.5545 1.769 111.1647 -4.644
17-Jan-17 48 7941.7 29.0 7.3107 50.4057 0.851 111.2515 -3.793
21-Jan-17 52 7938.3 29.0 7.3677 50.7984 0.393 111.2916 -3.400
25-Jan-17 56 7925.4 29.0 7.5859 52.3031 1.505 111.4452 -1.895

Piezometric Level Change Vs Time


115.0

114.0

113.0

112.0
Piezometric Lelve (m)

111.0

110.0

109.0

108.0

107.0

106.0

105.0

Cumulative Pressure Change AL PDL

R.L of Piezo Tip: 106.1081 (R.L. m) Serial No: 147798


Ground R.L: 115.1081 (R.L. m) Alert 2.1m
Date of Installation 30-Nov-2016 PDL -40 Kpa -78 Kpa
VW PIEZOMETER

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)

Piezometer No: GWV208 Date: 3-Feb-2017 Report No: 348


Elasped Pressure Pressure Piezometric
Chang from last Cumulative Pressure
Date Time Reading Temp. Reading Reading Level Remark
reading (Kpa) Change (Kpa)
(Days) (PSI) (kPa) R.L. (m)
23-Dec-16 0 8266.8 29.0 9.5012 65.5083 - 109.0233 0.00 Initial
24-Dec-16 1 8273.7 29.0 9.3884 64.7309 -0.777 108.9440 -0.78
27-Dec-16 4 8278.3 29.0 9.3132 64.2124 -0.518 108.8911 -1.30
31-Dec-16 8 8284.0 29.0 9.2192 63.5641 -0.648 108.8249 -1.944
03-Jan-17 11 8280.0 29.0 9.2850 64.0179 0.454 108.8712 -1.490
07-Jan-17 15 8280.0 29.0 9.2850 64.0179 0.000 108.8712 -1.490
10-Jan-17 18 8280.0 29.0 9.2850 64.0179 0.000 108.8712 -1.490
14-Jan-17 22 8280.0 29.0 9.2850 64.0179 0.000 108.8712 -1.490
17-Jan-17 25 8280.0 29.0 9.2850 64.0179 0.000 108.8712 -1.490
21-Jan-17 29 8280.0 29.0 9.2850 64.0179 0.000 108.8712 -1.490
25-Jan-17 33 8280.0 29.0 9.2850 64.0179 0.000 108.8712 -1.490

Piezometric Level Change Vs Time


113.0

112.0

111.0

110.0
Piezometric Lelve (m)

109.0

108.0

107.0

106.0

105.0

104.0

103.0

Cumulative Pressure Change AL PDL

R.L of Piezo Tip: 102.3388 (R.L. m) Serial No: 148754


Ground R.L: 111.3388 (R.L. m) Alert 2.1m
Date of Installation 23-Dec-2016 PDL -40 Kpa -78 Kpa
STRAIN GAUGE READING

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)


Strut/SG Name: SG51 (1A-1HS6) Date: 18-Jun-16 Report No: 348
Elapsed SG51-1 SG51-2 Sum Strut Load Change from last
Date Time Remarks
Hz x102 -3 2
Hz x10 -3
uStrain (KN) Reading(KN)
(Days)
03-Mar-16 0 790.5 775.5 5872.5 0.0 - Initial
05-Apr-16 33 774.2 762.9 5764.1 278.8 9.65
09-Apr-16 37 774.1 762.6 5762.6 282.7 3.86
12-Apr-16 40 772.8 760.1 5748.4 319.3 36.66
16-Apr-16 44 770.1 758.7 5733.0 358.9 39.56
19-Apr-16 47 769.8 757.4 5727.0 374.3 15.44
23-Apr-16 51 768.4 756.1 5716.9 400.4 26.05
26-Apr-16 54 768.8 756.7 5720.6 390.7 -9.65
30-Apr-16 58 766.7 754.3 5703.8 434.2 43.42
03-May-16 61 765.3 753.6 5695.9 454.4 20.26
07-May-16 65 768.2 755.3 5713.1 410.0 -44.38
10-May-16 68 763.4 751.7 5681.6 491.1 81.04
14-May-16 72 761.2 749.5 5665.1 533.5 42.45
17-May-16 75 761.9 748.7 5664.8 534.5 0.96
20-May-16 78 761.8 747.9 5661.4 543.2 8.68
24-May-16 82 761.4 746.5 5654.6 560.5 17.37
28-May-16 86 760.8 745.9 5650.1 572.1 11.58
31-May-16 89 760.2 745.2 5645.3 584.7 12.54
04-Jun-16 93 759.2 744.4 5638.5 602.0 17.37
07-Jun-16 96 758.4 744.9 5637.4 604.9 2.89
11-Jun-16 100 757.9 743.6 5630.6 622.3 17.37
14-Jun-16 103 758.6 743.9 5634.4 612.6 -9.65
18-Jun-16 107 759.2 744.9 5640.4 597.2 -15.44

Load Vs Time
1200
1000
800
600
400
200
Load (KN)

0
-200
-400
-600
-800
-1000
14/Jul/16

21/Jul/16

28/Jul/16
3/Mar/16

10/Mar/16

17/Mar/16

24/Mar/16

31/Mar/16

7/Apr/16

14/Apr/16

21/Apr/16

28/Apr/16

5/May/16

12/May/16

19/May/16

26/May/16

2/Jun/16

9/Jun/16

16/Jun/16

23/Jun/16

30/Jun/16

7/Jul/16

4/Aug/16

11/Aug/16

18/Aug/16

SG51 Alert Suspension

Sign Convetion: (+) Cmp. / (-) Ten. Strut (S355) : 400x400x197 Kg/m Initial Date: 03-Mar-16

Cross section area 25100 mm2 Gauge Factor x Batch Factor 3.750 Alert 898 kN

Young Modulus 205 KN/mm2 Strut Level: 1st layer Suspension 1098 kN
STRAIN GAUGE READING

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)


Strut/SG Name: SG52 (1A-1HS6) Date: 18-Jun-16 Report No: 348
Elapsed SG52-1 SG52-2 Sum Strut Load Change from last
Date Time Remarks
Hz x10 2 -3 2
Hz x10 -3
uStrain (KN) Reading(KN)
(Days)
07-Apr-16 0 731.6 793.1 5717.6 0.0 - Initial
09-Apr-16 2 730.9 792.4 5712.4 19.4 19.4
12-Apr-16 5 728.3 790.5 5695.5 81.9 62.4
16-Apr-16 9 726.2 788.1 5678.6 144.3 62.4
19-Apr-16 12 724.9 786.6 5668.1 183.2 38.9
23-Apr-16 16 722.7 784.3 5651.3 245.6 62.4
26-Apr-16 19 721.7 783.2 5643.4 274.7 29.1

Load Vs Time
2600
2400
2200
2000
1800
1600
1400
Load (KN)

1200
1000
800
600
400
200
0
-200
-400
14/Jul/16

21/Jul/16

28/Jul/16
7/Apr/16

14/Apr/16

21/Apr/16

28/Apr/16

5/May/16

12/May/16

19/May/16

26/May/16

2/Jun/16

9/Jun/16

16/Jun/16

23/Jun/16

30/Jun/16

7/Jul/16

4/Aug/16

11/Aug/16

18/Aug/16

SG52 Alert Suspension

Sign Convetion: (+) Cmp. / (-) Ten. Strut Size: 400x400x283 Kg/m Initial Date: 07-Apr-16

Cross section area 36100 mm2 Gauge Factor x Batch Factor 3.750 Alert 1990 kN

Young Modulus 205 KN/mm2 Strut Level: 2nd layer Suspension 2577 kN
CRACK METER READINGS

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)

Crack Meter No: CM-01 ####### Date: 03-Feb-17 Report No: 348
Elasped Change Cumulative Change
Date X Reading of Y Reading of Cumulative
Time From Last Change From Last Remarks
Monitored CM CM Change (mm)
(Days) Reading (mm) Reading
17-May-16 0 31.18 0.00 0.00 0.00 0.00 0.00 Initial
31-Dec-16 228 31.48 0.00 0.30 0.00 0.00 0.00
03-Jan-17 231 31.48 0.00 0.30 0.00 0.00 0.00
04-Jan-17 232 31.49 0.01 0.31 0.00 0.00 0.00
05-Jan-17 233 31.50 0.01 0.32 0.00 0.00 0.00
06-Jan-17 234 31.49 -0.01 0.31 0.00 0.00 0.00
07-Jan-17 235 31.40 -0.09 0.22 0.00 0.00 0.00
10-Jan-17 238 31.49 0.09 0.31 0.00 0.00 0.00
11-Jan-17 239 31.50 0.01 0.32 0.00 0.00 0.00
12-Jan-17 240 31.51 0.01 0.33 0.00 0.00 0.00
13-Jan-17 241 31.49 -0.02 0.31 0.00 0.00 0.00
14-Jan-17 242 31.48 -0.01 0.30 0.00 0.00 0.00
16-Jan-17 244 31.50 0.02 0.32 0.00 0.00 0.00
17-Jan-17 245 31.49 -0.01 0.31 0.00 0.00 0.00
18-Jan-17 246 31.50 0.01 0.32 0.00 0.00 0.00
19-Jan-17 247 31.51 0.01 0.33 0.00 0.00 0.00
20-Jan-17 248 31.50 -0.01 0.32 0.00 0.00 0.00
21-Jan-17 249 31.50 0.00 0.32 0.00 0.00 0.00
23-Jan-17 251 31.51 0.01 0.33 0.00 0.00 0.00
25-Jan-17 253 31.50 -0.01 0.32 0.00 0.00 0.00
26-Jan-17 254 31.51 0.01 0.33 0.00 0.00 0.00
01-Feb-17 260 31.51 0.00 0.33 0.00 0.00 0.00
02-Feb-17 261 31.51 0.00 0.33 0.00 0.00 0.00
03-Feb-17 262 31.50 -0.01 0.32 0.00 0.00 0.00

CRACK METER READING DEVELOPMENT


10
Cumulative Change (mm)

8
6
4
2
0
-2
-4
-6
-8
-10
01-Feb-17

21-Feb-17
06-Jun-16

26-Jun-16

16-Jul-16

12-Jan-17

13-Mar-17
04-Oct-16

24-Oct-16

13-Nov-16

03-Dec-16

23-Dec-16
17-May-16

05-Aug-16

25-Aug-16

14-Sep-16

CM-01
CRACK METER READINGS

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)

Crack Meter No: CM-02 ####### Date: 03-Feb-17 Report No: 348
Elasped Change Cumulative Change
Date X Reading of Y Reading of Cumulative
Time From Last Change From Last Remarks
Monitored CM CM Change (mm)
(Days) Reading (mm) Reading
17-May-16 0 26.51 0.00 0.00 0.00 0.00 0.00 Initial
31-Dec-16 228 26.87 0.00 0.36 0.00 0.00 0.00
03-Jan-17 231 26.87 0.00 0.36 0.00 0.00 0.00
04-Jan-17 232 26.88 0.01 0.37 0.00 0.00 0.00
05-Jan-17 233 26.89 0.01 0.38 0.00 0.00 0.00
06-Jan-17 234 26.88 -0.01 0.37 0.00 0.00 0.00
07-Jan-17 235 26.88 0.00 0.37 0.00 0.00 0.00
10-Jan-17 238 26.88 0.00 0.37 0.00 0.00 0.00
11-Jan-17 239 26.89 0.01 0.38 0.00 0.00 0.00
12-Jan-17 240 26.90 0.01 0.39 0.00 0.00 0.00
13-Jan-17 241 26.89 -0.01 0.38 0.00 0.00 0.00
14-Jan-17 242 26.89 0.00 0.38 0.00 0.00 0.00
16-Jan-17 244 26.89 0.00 0.38 0.00 0.00 0.00
17-Jan-17 245 26.89 0.00 0.38 0.00 0.00 0.00
18-Jan-17 246 26.89 0.00 0.38 0.00 0.00 0.00
19-Jan-17 247 26.88 -0.01 0.37 0.00 0.00 0.00
20-Jan-17 248 26.87 -0.01 0.36 0.00 0.00 0.00
21-Jan-17 249 26.88 0.01 0.37 0.00 0.00 0.00
23-Jan-17 251 26.89 0.01 0.38 0.00 0.00 0.00
25-Jan-17 253 26.89 0.00 0.38 0.00 0.00 0.00
26-Jan-17 254 26.89 0.00 0.38 0.00 0.00 0.00
01-Feb-17 260 26.89 0.00 0.38 0.00 0.00 0.00
02-Feb-17 261 26.89 0.00 0.38 0.00 0.00 0.00
03-Feb-17 262 26.89 0.00 0.38 0.00 0.00 0.00

CRACK METER READING DEVELOPMENT


10
Cumulative Change (mm)

8
6
4
2
0
-2
-4
-6
-8
-10
01-Feb-17

21-Feb-17
06-Jun-16

26-Jun-16

16-Jul-16

12-Jan-17

13-Mar-17
04-Oct-16

24-Oct-16

13-Nov-16

03-Dec-16

23-Dec-16
17-May-16

05-Aug-16

25-Aug-16

14-Sep-16

CM-02
CRACK METER READINGS

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)

Crack Meter No: CM-03 ####### Date: 03-Feb-17 Report No: 348
Elasped Change Cumulative Change
Date X Reading of Y Reading of Cumulative
Time From Last Change From Last Remarks
Monitored CM CM Change (mm)
(Days) Reading (mm) Reading
17-May-16 0 36.13 0.00 0.00 0.00 0.00 0.00 Initial
31-Dec-16 228 36.22 0.00 0.09 0.00 0.00 0.00
03-Jan-17 231 36.20 -0.02 0.07 0.00 0.00 0.00
04-Jan-17 232 36.22 0.02 0.09 0.00 0.00 0.00
05-Jan-17 233 36.23 0.01 0.10 0.00 0.00 0.00
06-Jan-17 234 36.22 -0.01 0.09 0.00 0.00 0.00
07-Jan-17 235 36.22 0.00 0.09 0.00 0.00 0.00
10-Jan-17 238 36.22 0.00 0.09 0.00 0.00 0.00
11-Jan-17 239 36.22 0.00 0.09 0.00 0.00 0.00
12-Jan-17 240 36.21 -0.01 0.08 0.00 0.00 0.00
13-Jan-17 241 36.22 0.01 0.09 0.00 0.00 0.00
14-Jan-17 242 36.22 0.00 0.09 0.00 0.00 0.00
16-Jan-17 244 36.22 0.00 0.09 0.00 0.00 0.00
17-Jan-17 245 36.22 0.00 0.09 0.00 0.00 0.00
18-Jan-17 246 36.23 0.01 0.10 0.00 0.00 0.00
19-Jan-17 247 36.23 0.00 0.10 0.00 0.00 0.00
20-Jan-17 248 36.23 0.00 0.10 0.00 0.00 0.00
21-Jan-17 249 36.23 0.00 0.10 0.00 0.00 0.00
23-Jan-17 251 36.23 0.00 0.10 0.00 0.00 0.00
25-Jan-17 253 36.23 0.00 0.10 0.00 0.00 0.00
26-Jan-17 254 36.22 -0.01 0.09 0.00 0.00 0.00
01-Feb-17 260 36.24 0.02 0.11 0.00 0.00 0.00
02-Feb-17 261 36.25 0.01 0.12 0.00 0.00 0.00
03-Feb-17 262 36.25 0.00 0.12 0.00 0.00 0.00

CRACK METER READING DEVELOPMENT


10
Cumulative Change (mm)

8
6
4
2
0
-2
-4
-6
-8
-10
01-Feb-17

21-Feb-17
06-Jun-16

26-Jun-16

16-Jul-16

12-Jan-17

13-Mar-17
04-Oct-16

24-Oct-16

13-Nov-16

03-Dec-16

23-Dec-16
17-May-16

05-Aug-16

25-Aug-16

14-Sep-16

CM-03
CRACK METER READINGS

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)

Crack Meter No: CM-04 ####### Date: 03-Feb-17 Report No: 348
Elasped Change Cumulative Change
Date X Reading of Y Reading of Cumulative
Time From Last Change From Last Remarks
Monitored CM CM Change (mm)
(Days) Reading (mm) Reading
17-May-16 0 21.08 0.00 0.00 0.00 0.00 0.00 Initial
31-Dec-16 228 21.43 0.00 0.35 0.00 0.00 0.00
03-Jan-17 231 21.42 -0.01 0.34 0.00 0.00 0.00
04-Jan-17 232 21.43 0.01 0.35 0.00 0.00 0.00
05-Jan-17 233 21.44 0.01 0.36 0.00 0.00 0.00
06-Jan-17 234 21.43 -0.01 0.35 0.00 0.00 0.00
07-Jan-17 235 21.44 0.01 0.36 0.00 0.00 0.00
10-Jan-17 238 21.44 0.00 0.36 0.00 0.00 0.00
11-Jan-17 239 21.44 0.00 0.36 0.00 0.00 0.00
12-Jan-17 240 21.44 0.00 0.36 0.00 0.00 0.00
13-Jan-17 241 21.44 0.00 0.36 0.00 0.00 0.00
14-Jan-17 242 21.44 0.00 0.36 0.00 0.00 0.00
16-Jan-17 244 21.44 0.00 0.36 0.00 0.00 0.00
17-Jan-17 245 21.43 -0.01 0.35 0.00 0.00 0.00
18-Jan-17 246 21.44 0.01 0.36 0.00 0.00 0.00
19-Jan-17 247 21.44 0.00 0.36 0.00 0.00 0.00
20-Jan-17 248 21.44 0.00 0.36 0.00 0.00 0.00
21-Jan-17 249 21.44 0.00 0.36 0.00 0.00 0.00
23-Jan-17 251 21.44 0.00 0.36 0.00 0.00 0.00
25-Jan-17 253 21.45 0.01 0.37 0.00 0.00 0.00
26-Jan-17 254 21.45 0.00 0.37 0.00 0.00 0.00
01-Feb-17 260 21.44 -0.01 0.36 0.00 0.00 0.00
02-Feb-17 261 21.44 0.00 0.36 0.00 0.00 0.00
03-Feb-17 262 21.43 -0.01 0.35 0.00 0.00 0.00

CRACK METER READING DEVELOPMENT


10
Cumulative Change (mm)

8
6
4
2
0
-2
-4
-6
-8
-10
01-Feb-17

21-Feb-17
06-Jun-16

26-Jun-16

16-Jul-16

12-Jan-17

13-Mar-17
04-Oct-16

24-Oct-16

13-Nov-16

03-Dec-16

23-Dec-16
17-May-16

05-Aug-16

25-Aug-16

14-Sep-16

CM-04
CRACK METER READINGS

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)

Crack Meter No: CM-05 ####### Date: 03-Feb-17 Report No: 348
Elasped Change Cumulative Change
Date X Reading of Y Reading of Cumulative
Time From Last Change From Last Remarks
Monitored CM CM Change (mm)
(Days) Reading (mm) Reading
17-May-16 0 22.15 0.00 0.00 0.00 0.00 0.00 Initial
31-Dec-16 228 21.24 0.01 -0.91 0.00 0.00 0.00
03-Jan-17 231 21.23 -0.01 -0.92 0.00 0.00 0.00
04-Jan-17 232 21.23 0.00 -0.92 0.00 0.00 0.00
05-Jan-17 233 21.23 0.00 -0.92 0.00 0.00 0.00
06-Jan-17 234 21.23 0.00 -0.92 0.00 0.00 0.00
07-Jan-17 235 21.21 -0.02 -0.94 0.00 0.00 0.00
10-Jan-17 238 21.23 0.02 -0.92 0.00 0.00 0.00
11-Jan-17 239 21.23 0.00 -0.92 0.00 0.00 0.00
12-Jan-17 240 21.23 0.00 -0.92 0.00 0.00 0.00
13-Jan-17 241 21.23 0.00 -0.92 0.00 0.00 0.00
14-Jan-17 242 21.23 0.00 -0.92 0.00 0.00 0.00
16-Jan-17 244 21.24 0.01 -0.91 0.00 0.00 0.00
17-Jan-17 245 21.23 -0.01 -0.92 0.00 0.00 0.00
18-Jan-17 246 21.24 0.01 -0.91 0.00 0.00 0.00
19-Jan-17 247 21.24 0.00 -0.91 0.00 0.00 0.00
20-Jan-17 248 21.24 0.00 -0.91 0.00 0.00 0.00
21-Jan-17 249 21.24 0.00 -0.91 0.00 0.00 0.00
23-Jan-17 251 21.24 0.00 -0.91 0.00 0.00 0.00
25-Jan-17 253 21.24 0.00 -0.91 0.00 0.00 0.00
26-Jan-17 254 21.24 0.00 -0.91 0.00 0.00 0.00
01-Feb-17 260 21.24 0.00 -0.91 0.00 0.00 0.00
02-Feb-17 261 21.24 0.00 -0.91 0.00 0.00 0.00
03-Feb-17 262 21.24 0.00 -0.91 0.00 0.00 0.00

CRACK METER READING DEVELOPMENT


10
Cumulative Change (mm)

8
6
4
2
0
-2
-4
-6
-8
-10
01-Feb-17

21-Feb-17
06-Jun-16

26-Jun-16

16-Jul-16

12-Jan-17

13-Mar-17
04-Oct-16

24-Oct-16

13-Nov-16

03-Dec-16

23-Dec-16
17-May-16

05-Aug-16

25-Aug-16

14-Sep-16

CM-05
CRACK METER READINGS

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)

Crack Meter No: CM-06 ####### Date: 03-Feb-17 Report No: 348
Elasped Change Cumulative Change
Date X Reading of Y Reading of Cumulative
Time From Last Change From Last Remarks
Monitored CM CM Change (mm)
(Days) Reading (mm) Reading
17-May-16 0 18.18 0.00 0.00 0.00 0.00 0.00 Initial
31-Dec-16 228 18.24 0.00 0.06 0.00 0.00 0.00
03-Jan-17 231 18.24 0.00 0.06 0.00 0.00 0.00
04-Jan-17 232 18.25 0.01 0.07 0.00 0.00 0.00
05-Jan-17 233 18.25 0.00 0.07 0.00 0.00 0.00
06-Jan-17 234 18.25 0.00 0.07 0.00 0.00 0.00
07-Jan-17 235 18.25 0.00 0.07 0.00 0.00 0.00
10-Jan-17 238 18.25 0.00 0.07 0.00 0.00 0.00
11-Jan-17 239 18.26 0.01 0.08 0.00 0.00 0.00
12-Jan-17 240 18.26 0.00 0.08 0.00 0.00 0.00
13-Jan-17 241 18.26 0.00 0.08 0.00 0.00 0.00
14-Jan-17 242 18.27 0.01 0.09 0.00 0.00 0.00
16-Jan-17 244 18.26 -0.01 0.08 0.00 0.00 0.00
17-Jan-17 245 18.26 0.00 0.08 0.00 0.00 0.00
18-Jan-17 246 18.26 0.00 0.08 0.00 0.00 0.00
19-Jan-17 247 18.26 0.00 0.08 0.00 0.00 0.00
20-Jan-17 248 18.26 0.00 0.08 0.00 0.00 0.00
21-Jan-17 249 18.26 0.00 0.08 0.00 0.00 0.00
23-Jan-17 251 18.27 0.01 0.09 0.00 0.00 0.00
25-Jan-17 253 18.26 -0.01 0.08 0.00 0.00 0.00
26-Jan-17 254 18.25 -0.01 0.07 0.00 0.00 0.00
01-Feb-17 260 18.27 0.02 0.09 0.00 0.00 0.00
02-Feb-17 261 18.28 0.01 0.10 0.00 0.00 0.00
03-Feb-17 262 18.28 0.00 0.10 0.00 0.00 0.00

CRACK METER READING DEVELOPMENT


10
Cumulative Change (mm)

8
6
4
2
0
-2
-4
-6
-8
-10
01-Feb-17

21-Feb-17
06-Jun-16

26-Jun-16

16-Jul-16

12-Jan-17

13-Mar-17
04-Oct-16

24-Oct-16

13-Nov-16

03-Dec-16

23-Dec-16
17-May-16

05-Aug-16

25-Aug-16

14-Sep-16

CM-06
CRACK METER READINGS

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)

Crack Meter No: CM-07 ####### Date: 03-Feb-17 Report No: 348
Elasped Change Cumulative Change
Date X Reading of Y Reading of Cumulative
Time From Last Change From Last Remarks
Monitored CM CM Change (mm)
(Days) Reading (mm) Reading
17-May-16 0 22.16 0.00 0.00 0.00 0.00 0.00 Initial
31-Dec-16 228 21.09 0.01 -1.07 0.00 0.00 0.00
03-Jan-17 231 21.08 -0.01 -1.08 0.00 0.00 0.00
04-Jan-17 232 21.08 0.00 -1.08 0.00 0.00 0.00
05-Jan-17 233 21.09 0.01 -1.07 0.00 0.00 0.00
06-Jan-17 234 21.08 -0.01 -1.08 0.00 0.00 0.00
07-Jan-17 235 21.08 0.00 -1.08 0.00 0.00 0.00
10-Jan-17 238 21.09 0.01 -1.07 0.00 0.00 0.00
11-Jan-17 239 21.10 0.01 -1.06 0.00 0.00 0.00
12-Jan-17 240 21.10 0.00 -1.06 0.00 0.00 0.00
13-Jan-17 241 21.09 -0.01 -1.07 0.00 0.00 0.00
14-Jan-17 242 21.11 0.02 -1.05 0.00 0.00 0.00
16-Jan-17 244 21.09 -0.02 -1.07 0.00 0.00 0.00
17-Jan-17 245 21.09 0.00 -1.07 0.00 0.00 0.00
18-Jan-17 246 21.09 0.00 -1.07 0.00 0.00 0.00
19-Jan-17 247 21.10 0.01 -1.06 0.00 0.00 0.00
20-Jan-17 248 21.11 0.01 -1.05 0.00 0.00 0.00
21-Jan-17 249 21.10 -0.01 -1.06 0.00 0.00 0.00
23-Jan-17 251 21.10 0.00 -1.06 0.00 0.00 0.00
25-Jan-17 253 21.10 0.00 -1.06 0.00 0.00 0.00
26-Jan-17 254 21.10 0.00 -1.06 0.00 0.00 0.00
01-Feb-17 260 21.10 0.00 -1.06 0.00 0.00 0.00
02-Feb-17 261 21.10 0.00 -1.06 0.00 0.00 0.00
03-Feb-17 262 21.11 0.01 -1.05 0.00 0.00 0.00

CRACK METER READING DEVELOPMENT


10
Cumulative Change (mm)

8
6
4
2
0
-2
-4
-6
-8
-10
01-Feb-17

21-Feb-17
06-Jun-16

26-Jun-16

16-Jul-16

12-Jan-17

13-Mar-17
04-Oct-16

24-Oct-16

13-Nov-16

03-Dec-16

23-Dec-16
17-May-16

05-Aug-16

25-Aug-16

14-Sep-16

CM-07
CRACK METER READINGS

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)

Crack Meter No: CM-08 ####### Date: 03-Feb-17 Report No: 348
Elasped Change Cumulative Change
Date X Reading of Y Reading of Cumulative
Time From Last Change From Last Remarks
Monitored CM CM Change (mm)
(Days) Reading (mm) Reading
17-May-16 0 26.88 0.00 0.00 0.00 0.00 0.00 Initial
31-Dec-16 228 27.21 0.00 0.33 0.00 0.00 0.00
03-Jan-17 231 27.20 -0.01 0.32 0.00 0.00 0.00
04-Jan-17 232 27.21 0.01 0.33 0.00 0.00 0.00
05-Jan-17 233 27.22 0.01 0.34 0.00 0.00 0.00
06-Jan-17 234 27.21 -0.01 0.33 0.00 0.00 0.00
07-Jan-17 235 27.21 0.00 0.33 0.00 0.00 0.00
10-Jan-17 238 27.21 0.00 0.33 0.00 0.00 0.00
11-Jan-17 239 27.22 0.01 0.34 0.00 0.00 0.00
12-Jan-17 240 27.22 0.00 0.34 0.00 0.00 0.00
13-Jan-17 241 27.21 -0.01 0.33 0.00 0.00 0.00
14-Jan-17 242 27.22 0.01 0.34 0.00 0.00 0.00
16-Jan-17 244 27.22 0.00 0.34 0.00 0.00 0.00
17-Jan-17 245 27.22 0.00 0.34 0.00 0.00 0.00
18-Jan-17 246 27.22 0.00 0.34 0.00 0.00 0.00
19-Jan-17 247 27.22 0.00 0.34 0.00 0.00 0.00
20-Jan-17 248 27.22 0.00 0.34 0.00 0.00 0.00
21-Jan-17 249 27.22 0.00 0.34 0.00 0.00 0.00
23-Jan-17 251 27.22 0.00 0.34 0.00 0.00 0.00
25-Jan-17 253 27.22 0.00 0.34 0.00 0.00 0.00
26-Jan-17 254 27.22 0.00 0.34 0.00 0.00 0.00
01-Feb-17 260 27.23 0.01 0.35 0.00 0.00 0.00
02-Feb-17 261 27.23 0.00 0.35 0.00 0.00 0.00
03-Feb-17 262 27.23 0.00 0.35 0.00 0.00 0.00

CRACK METER READING DEVELOPMENT


10
Cumulative Change (mm)

8
6
4
2
0
-2
-4
-6
-8
-10
01-Feb-17

21-Feb-17
06-Jun-16

26-Jun-16

16-Jul-16

12-Jan-17

13-Mar-17
04-Oct-16

24-Oct-16

13-Nov-16

03-Dec-16

23-Dec-16
17-May-16

05-Aug-16

25-Aug-16

14-Sep-16

CM-08
CRACK METER READINGS

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)

Crack Meter No: CM-09 ####### Date: 03-Feb-17 Report No: 348
Elasped Change Cumulative Change
Date X Reading of Y Reading of Cumulative
Time From Last Change From Last Remarks
Monitored CM CM Change (mm)
(Days) Reading (mm) Reading
17-May-16 0 30.47 0.00 0.00 0.00 0.00 0.00 Initial
31-Dec-16 228 30.32 0.00 -0.15 0.00 0.00 0.00
03-Jan-17 231 30.33 0.01 -0.14 0.00 0.00 0.00
04-Jan-17 232 30.33 0.00 -0.14 0.00 0.00 0.00
05-Jan-17 233 30.32 -0.01 -0.15 0.00 0.00 0.00
06-Jan-17 234 30.33 0.01 -0.14 0.00 0.00 0.00
07-Jan-17 235 30.34 0.01 -0.13 0.00 0.00 0.00
10-Jan-17 238 30.33 -0.01 -0.14 0.00 0.00 0.00
11-Jan-17 239 30.33 0.00 -0.14 0.00 0.00 0.00
12-Jan-17 240 30.32 -0.01 -0.15 0.00 0.00 0.00
13-Jan-17 241 30.33 0.01 -0.14 0.00 0.00 0.00
14-Jan-17 242 30.33 0.00 -0.14 0.00 0.00 0.00
16-Jan-17 244 30.33 0.00 -0.14 0.00 0.00 0.00
17-Jan-17 245 30.33 0.00 -0.14 0.00 0.00 0.00
18-Jan-17 246 30.33 0.00 -0.14 0.00 0.00 0.00
19-Jan-17 247 30.33 0.00 -0.14 0.00 0.00 0.00
20-Jan-17 248 30.33 0.00 -0.14 0.00 0.00 0.00
21-Jan-17 249 30.33 0.00 -0.14 0.00 0.00 0.00
23-Jan-17 251 30.34 0.01 -0.13 0.00 0.00 0.00
25-Jan-17 253 30.33 -0.01 -0.14 0.00 0.00 0.00
26-Jan-17 254 30.34 0.01 -0.13 0.00 0.00 0.00
01-Feb-17 260 30.34 0.00 -0.13 0.00 0.00 0.00
02-Feb-17 261 30.35 0.01 -0.12 0.00 0.00 0.00
03-Feb-17 262 30.35 0.00 -0.12 0.00 0.00 0.00

CRACK METER READING DEVELOPMENT


10
Cumulative Change (mm)

8
6
4
2
0
-2
-4
-6
-8
-10
01-Feb-17

21-Feb-17
06-Jun-16

26-Jun-16

16-Jul-16

12-Jan-17

13-Mar-17
04-Oct-16

24-Oct-16

13-Nov-16

03-Dec-16

23-Dec-16
17-May-16

05-Aug-16

25-Aug-16

14-Sep-16

CM-09
CRACK METER READINGS

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)

Crack Meter No: CM-10 ####### Date: 03-Feb-17 Report No: 348
Elasped Change Cumulative Change
Date X Reading of Y Reading of Cumulative
Time From Last Change From Last Remarks
Monitored CM CM Change (mm)
(Days) Reading (mm) Reading
17-May-16 0 27.02 0.00 0.00 0.00 0.00 0.00 Initial
31-Dec-16 228 27.86 0.01 0.84 0.00 0.00 0.00
03-Jan-17 231 27.85 -0.01 0.83 0.00 0.00 0.00
04-Jan-17 232 27.85 0.00 0.83 0.00 0.00 0.00
05-Jan-17 233 27.85 0.00 0.83 0.00 0.00 0.00
06-Jan-17 234 27.85 0.00 0.83 0.00 0.00 0.00
07-Jan-17 235 27.86 0.01 0.84 0.00 0.00 0.00
10-Jan-17 238 27.85 -0.01 0.83 0.00 0.00 0.00
11-Jan-17 239 27.85 0.00 0.83 0.00 0.00 0.00
12-Jan-17 240 27.84 -0.01 0.82 0.00 0.00 0.00
13-Jan-17 241 27.85 0.01 0.83 0.00 0.00 0.00
14-Jan-17 242 27.85 0.00 0.83 0.00 0.00 0.00
16-Jan-17 244 27.85 0.00 0.83 0.00 0.00 0.00
17-Jan-17 245 27.84 -0.01 0.82 0.00 0.00 0.00
18-Jan-17 246 27.86 0.02 0.84 0.00 0.00 0.00
19-Jan-17 247 27.85 -0.01 0.83 0.00 0.00 0.00
20-Jan-17 248 27.84 -0.01 0.82 0.00 0.00 0.00
21-Jan-17 249 27.85 0.01 0.83 0.00 0.00 0.00
23-Jan-17 251 27.86 0.01 0.84 0.00 0.00 0.00
25-Jan-17 253 27.86 0.00 0.84 0.00 0.00 0.00
26-Jan-17 254 27.86 0.00 0.84 0.00 0.00 0.00
01-Feb-17 260 27.86 0.00 0.84 0.00 0.00 0.00
02-Feb-17 261 27.85 -0.01 0.83 0.00 0.00 0.00
03-Feb-17 262 27.85 0.00 0.83 0.00 0.00 0.00

CRACK METER READING DEVELOPMENT


10
Cumulative Change (mm)

8
6
4
2
0
-2
-4
-6
-8
-10
01-Feb-17

21-Feb-17
06-Jun-16

26-Jun-16

16-Jul-16

12-Jan-17

13-Mar-17
04-Oct-16

24-Oct-16

13-Nov-16

03-Dec-16

23-Dec-16
17-May-16

05-Aug-16

25-Aug-16

14-Sep-16

CM-10
CRACK METER READINGS

Project Name: CONSTRUCTION OF STAMFORD DIVERSION CANAL CONTRACT 2

Client: PUBLIC UTILITIES BOARD (PUB)

Crack Meter No: CM-11 ####### Date: 03-Feb-17 Report No: 348
Elasped Change Cumulative Change
Date X Reading of Y Reading of Cumulative
Time From Last Change From Last Remarks
Monitored CM CM Change (mm)
(Days) Reading (mm) Reading
17-May-16 0 32.08 0.00 0.00 0.00 0.00 0.00 Initial
31-Dec-16 228 32.07 -0.01 -0.01 0.00 0.00 0.00
03-Jan-17 231 32.07 0.00 -0.01 0.00 0.00 0.00
04-Jan-17 232 32.08 0.01 0.00 0.00 0.00 0.00
05-Jan-17 233 32.08 0.00 0.00 0.00 0.00 0.00
06-Jan-17 234 32.09 0.01 0.01 0.00 0.00 0.00
07-Jan-17 235 32.10 0.01 0.02 0.00 0.00 0.00
10-Jan-17 238 32.09 -0.01 0.01 0.00 0.00 0.00
11-Jan-17 239 32.09 0.00 0.01 0.00 0.00 0.00
12-Jan-17 240 32.09 0.00 0.01 0.00 0.00 0.00
13-Jan-17 241 32.09 0.00 0.01 0.00 0.00 0.00
14-Jan-17 242 32.09 0.00 0.01 0.00 0.00 0.00
16-Jan-17 244 32.09 0.00 0.01 0.00 0.00 0.00
17-Jan-17 245 32.09 0.00 0.01 0.00 0.00 0.00
18-Jan-17 246 32.09 0.00 0.01 0.00 0.00 0.00
19-Jan-17 247 32.09 0.00 0.01 0.00 0.00 0.00
20-Jan-17 248 32.09 0.00 0.01 0.00 0.00 0.00
21-Jan-17 249 32.10 0.01 0.02 0.00 0.00 0.00
23-Jan-17 251 32.10 0.00 0.02 0.00 0.00 0.00
25-Jan-17 253 32.10 0.00 0.02 0.00 0.00 0.00
26-Jan-17 254 32.10 0.00 0.02 0.00 0.00 0.00
01-Feb-17 260 32.10 0.00 0.02 0.00 0.00 0.00
02-Feb-17 261 32.10 0.00 0.02 0.00 0.00 0.00
03-Feb-17 262 32.10 0.00 0.02 0.00 0.00 0.00

CRACK METER READING DEVELOPMENT


10
Cumulative Change (mm)

8
6
4
2
0
-2
-4
-6
-8
-10
01-Feb-17

21-Feb-17
06-Jun-16

26-Jun-16

16-Jul-16

12-Jan-17

13-Mar-17
04-Oct-16

24-Oct-16

13-Nov-16

03-Dec-16

23-Dec-16
17-May-16

05-Aug-16

25-Aug-16

14-Sep-16

CM-11
EL
L
MATC

13 sheet of
BA 16
N K
BUILDING AND CONSTRUCTION AUTHORITY
APPROVED UNDER SECTION 5 / SECTION 5A OF THE
BUILDING CONTROL ACT (CHAPTER 29)
Project Reference No : E4027-00001-2013-ST303
R O
3.34 HO AD
O
ST
T for Commissioner of Building Control
RU
TS
@
6. 0
m K I
c/c
AM
R O
AD
0821
4.24
4. 8
LG2
2
4. 8
3
0811
LG2
0812
2 6-
01
LG2 ACCREDITED CHECKER
No: 1089
0781
-2
016
LG2
KOK KING MIN
0813
S TR 15
9-20 In AC Organisation
22-0
LG2
UT Registration No: A054
S
@ 26 BUILDING CONTROL ACT
6. -0
0m 1 SINGAPORE
0771
-2
0782
016
c/c
ST
RU
LG2 22-0
9-20
15
LG2 22-0
9-20
15
TS
2 6- c/c
0 m
@
1-
20
16
6. 0
@
0772
6. TS
0783
0m
RU
ST
LG2
c/c
LG2
15
9-20 9-20
15
22-0 22-0
08
08 08
15
0773
-20
S2V208
-10
4 20
LG2
.85
15
9-20
GW
22-0
GW
15
4.2 -20
03
-03 2 -10 15
20 -20
3.68 -10
-20
16 20
4.25
4.38 4.38
07 6
-0 1
4-2 20
0814
01 -2-
6 11
26
-0
1 -2
LG2
016
0815
26
-0
0784 LG2
LG2
1 -2
016 15
9-20
22-0
805 0816
LG2
16
IS20
2 STRUTS @ 1-20
0785
6-
01- 6.0m c/c 30-0
20
LG2
16
9-20
15 Water for All : Conserve, Value, Enjoy
0774
22-0
LG2076 LG2 22-0
9-20
15
4 22-1
0 -20
15
0786
LG2 9-20
15
0775
22-0
LG2 LG2 9-20
15
076 22-0
5 22-1
0-2
015
0776
LG2
076 LG2 22-0
9-20
15
6 22-1
0-2
015
CONSTRUCTION OF STAMFORD DIVERSION CANAL
CONTRACT 2, GRANGE ROAD TO RIVER VALLEY ROAD
INSTRUMENTATION LAYOUT PLAN
PART 1 OF 4
BA
N K
14 16
RO sheet of
AD LG BUILDING AND CONSTRUCTION AUTHORITY
R I 2 0
APPROVED UNDER SECTION 5 / SECTION 5A OF THE
W BUILDING CONTROL ACT (CHAPTER 29)
0831 EL 84
1
LG2
Project Reference No : E4027-00001-2013-ST303
L L G 2 08
0832 42
LG2 BA for Commissioner of Building Control
1.
93
0.
49 1.
N K L G
25
96
2 08
0833
2.
3. 43
LG2 L
67
0821 R G 2
LG2
03-0
5-20
16
O 08
51
5.
45
4. 7
2
AD
2.5

LG
0822 20
LG2
2.

16
5-20
85
57

03-0 6
2
L L
4.

0823 G G
89

2 2
LG2 03-0
5-20
16
3.89
08
53
08
61
c/c 3.89
3.89
6. 0
m 1.31
@ G LG
5.46

RU
TS
LG 4.8
8 W 2 0
ST
20 S2 86
84 08 2
4 18 LG LG
3.1

LG GW 20 20
20 86
4. 2

84 S2 91 ACCREDITED CHECKER
2

3
2.55

5 0 1 No: 1089
81
80 11

LG L
20 M 7
2. 8

LG 5 G KOK KING MIN


80

2
5

2.21 2 2 0 09 In AC Organisation
91 Registration No: A054
20
1. 5

0
C
6

21
5

84
01

1.62 BUILDING CONTROL ACT


-2

2
5

-6

1.98
23

SINGAPORE
LB

6
LG LG
5

0824
01

c/c
-2
-6
23

m
LG2 20 2
LG

6. 0
@ 5-20
16
91 092
2

TS STR
5

03-0
01

7
RU
-2

UT
2
80

-6

16
ST 5-20
3
23

S
80
03-0 @6
.0m
5
01

20
-2

c
LG
5

/c
-6

01

0825 20
23

-2

5
01
-6
23

-2
VM

-6
LG2
23
2
10

LG
03-0
5-20
16
16
092
CM

5-20
03-0
3
0836 ST

09
LG2
RU
0826
16
20 TS
6

0814
-2- 5-20
16
@
11

5
LG2

CM
01
03-0
80

6.0

-2
G

-6
LG2
16 m

23
5-20 c/c
W

8
03-0
S20
20

80
5
01

901
-2
-6
23
LB

20
5
01
-2

8
-6
0815

23
CM L G

80
LG2

20
5
LB08
01
-2
-6
23
5
01
-2
-6
23

0816
LG2

5
80
LG

20
20

5
01
-2
-6
92

23
LB
4

5
01
-2
-6
23
Water for All : Conserve, Value, Enjoy
L G 2

5
01
09

-2
-6
23
25
LG

4
2

80
092

MATCH LINE H - H

20
6

LB

1
80

91
20

20
LB

TM
CONSTRUCTION OF STAMFORD DIVERSION CANAL
0 CONTRACT 2, GRANGE ROAD TO RIVER VALLEY ROAD
91
20
TM INSTRUMENTATION LAYOUT PLAN
FOR C&C
PART 2 OF 4
L G2
LG 0 94
20 1
LG 93 L
2 09 2 G2 15 16
23 LG 0 94 LG sheet of
2 09 2 2 10 BUILDING AND CONSTRUCTION AUTHORITY
0

50.00
ST
RU
33 11
40.0

TS
@
6.0 LG APPROVED UNDER SECTION 5 / SECTION 5A OF THE
m c/c GW 2 09 L
BUILDING CONTROL ACT (CHAPTER 29)
C H-B1 -2

C H-B1 -3
S20 43 G2 Project Reference No : E4027-00001-2013-ST303
901 1 01
2

9 28.0
LG
2

0
B4 10

C H-B1 -3
20.0
5 for Commissioner of Building Control
3.9
13
11.47 IS20910

C H-B1 -3
60.52

4
3.9
3.94

C H-B1 -3
5.91 3.92 3.94
C H-B1 -2

L G2
90.00

0 GWS2
85.92

92 0905
0

4
80.0

C H-B1 -2
C H-B1 -2

L GWS2
C H-B1 -2

G2 0907
0 92
5
L G2
0 92
6
3

1
80

91
20

20
LB

TM

ACCREDITED CHECKER

N 30 2.480
57
No: 1089

957.5
75
KOK KING MIN

7
In AC Organisation

2
Registration No: A054
0

E
BUILDING CONTROL ACT
91

MATCH LINE J - J
SINGAPORE
20
TM

E
LIN
8
90

E
8

RV
20

92

SE
LB

20
9

RE
90 9 7

LB
90

AD
20 090 20

RO
TM B2 LB 6

0
L 90

93
20

20
LB

LB
5
90

7
20

92
LB

20
RO
4
90
AD

LB
20
RE
S
LB
ER
VE 3
LI
NE 90
20
LB 2
90
20
Water for All : Conserve, Value, Enjoy
LB 1
90
20
LB
0
91
20
LB
CONSTRUCTION OF STAMFORD DIVERSION CANAL
CONTRACT 2, GRANGE ROAD TO RIVER VALLEY ROAD
INSTRUMENTATION LAYOUT PLAN
FOR C&C
PART 2 OF 4
16 sheet of 16
BUILDING AND CONSTRUCTION AUTHORITY
APPROVED UNDER SECTION 5 / SECTION 5A OF THE
BUILDING CONTROL ACT (CHAPTER 29)
Project Reference No : E4027-00001-2013-ST303
for Commissioner of Building Control
3
0.4
6
3
B5

5
3

0.6

00
2.3
9

21
6

3
2.4

LB
3
2
1.5

4
00
6
00

21
21

LB
LB
05
10
/c
mc

IS2
6.0
@
TS
RU
ST

/c
mc
6.0
@
TS
RU
04

ST
L G2
10

1
0

00
94 IS2
1

21
LB
LG

03
2 09 L G2

10
42 1

2
01

IS2

00
1

21
2 09 L G2

LB
3.87
43
1.6
1 01
2
L

95
G2

3.
10 3.9
5
13

7
5.3
IS20910 3.9
4
3.94
5.91 3.92 3.94

4.2
S20907 Water for All : Conserve, Value, Enjoy
J-J
CONSTRUCTION OF STAMFORD DIVERSION CANAL
ACCREDITED CHECKER CONTRACT 2, GRANGE ROAD TO RIVER VALLEY ROAD
No: 1089
KOK KING MIN
In AC Organisation
Registration No: A054 INSTRUMENTATION LAYOUT PLAN
BUILDING CONTROL ACT PART 4 OF 4
SINGAPORE
8
97
40
16
20
SM212
IS212

SM211
IS211
SM201 SM210 GWS211
SM202 GWV211
SM203 SM209
SM204 SM208 IS210
IS202 IS203 SM205 SM206 SM207
IS201 IS209
GWS202
GWV202 IS204 IS208
IS205 IS207 GWS208
IS206
GWS205 GWV208
GWV205

You might also like