GOAL: IMPROVED
EDUCATION PERFORMANCE
IN SAGAY CITY
Purpose 1: PROVISION Elementary
OF ACCESS Increased enrolment by 0.25% E-BEIS
A. Improved Enrolment from 377 to 406 by 2016 SRC
Level Baseline 2014 2015 2016
Kindergarten 54 55 57 58
G1 64 66 67 69
G2 72 74 76 78
G3 57 58 60 61
G4 47 48 49 51
G5 35 36 37 38
G6 48 49 50 52
Total 377 386 396 406
High School
Increased enrolment by 0.25% E-BEIS
from 224 to 241 by 2016
Level Baseline 2014 2015 2016 SRC
G7 69 71 72 74
Y2 61 63 64 66
Y3 55 56 58 59
Y4 39 40 41 42
224 230 235 241
Out-of-School Youth
Enrolled at least 25 Out-of-School Youths
every year E-BEIS
ALS Program Baseline 2014 2015 2016 SRC
No. of Enrolee 25 25 25 25
CONTRIBUTORY FACTORS
A. Special Curricular Programs Attained approval/recognition
A.1. Opened the Senior High School of the programs from the Central Office by 2016
A.1.a. Established STVEP Tech-Voc Courses
Baseline 2014 2015 2016
PAP1: Titling of School Site Offering (Major)
Tasks: Junior HS
1. Confirm with CENRO the status of performed Crop Production x x x x
survey of the site. Comp. Hdwe Servicing x x x x
2. Seek assistance from DO for speedy approval. Commercial Cooking x x x x
3. Seek assistance from LGUs for speedy processes. Household Services x x x
4. Seek assistance from PTA/SGC for follow-ups. Senior HS
PAP2: Preparation of Pertinent Papers for approval Housekeeping x
Tasks: Food Processing x
1. Conduct an inventory of personnel. Horticulture x
Page 1 of 15
2. Conduct an inventory of facilities.
3. Prepare the school development plan.
4. Seek endorsement from DO.
5. Seek endorsement from the LGUs.
6. Esblish linkaging with potential stakeholders.
7. Update school stakeholders.
PAP3: Compliance of Physical Facilities Requirements Acquired 80% additional facilities by 2016
Tasks: Facilities Baseline 2014 2015 2016 Acknowledgment Receipt
1. Keep in touch with the Division Facilities Food Tech Lab 0 0 0 1 MR
Coordinator. Classrooms 0 0 0 3 Received papers
2. Do project proposals for buildings and laboratories. Equipment/Tools 10% 20% 50% 80%
3. Strengthen linkaging with potent stakeholders.
PAP4: Upgrade of teachers educational qualifications 9 of 9 of teachers earned at least 36 units in M.A TR
Tasks: by 2016 Certificates
1. Have an inventory of personnel. Facilities Baseline 2014 2015 2016
2. Encourage teachers to pursue their masteral educ. Full-fledged Doctoral 0 0 0 1
3. Seek help from persons in authority for facilitation. Full-fledged M.A 1 1 2 3
4. Have a religious followups. CAR 1 3 4 5
36-42 units 7 5 3 0
B. Personnel
B.1. Improved provision of teaching personnel
PAP1: Provision of 3 new teachers for STVEP classes Improved class-teacher ratio in High School
Tasks: from 1:1.1 to 1:1.6 by 2016 E-BEIS
1.Determine enrolment data. Teacher Specialist Baseline 2014 2015 2016 Appointments
2.Determine teacher need Agri-Crop Sci. 0 1 0 0
3.Submit request and justification to D.O. for follow up Agri-An Sci. 0 0 1 0
4. Orient the teachers on their designation /loads TLE-Food Processing 0 0 1 0
TLE-H.E 1 0 1 0
PAP2: Provision of Regular Kindergarten teacher TLE-ICT 0 0 0 1 Appointment
Tasks: Attained regular conduct of Kindergarten classes
1.Determine enrolment data. Baseline 2014 2015 2016
2.Determine teacher need Number of Teacher 0 0 1 1
3.Submit request and justification to D.O. for follow up
4. Orient the teachers on their designation /loads
PPA3: Provision of ALS Volunteer Teachers SRC
Tasks: Designated teacher-instructors for ALS Received copies of registration
1. Finalize the organization of the ALS classes. classes forms
2. Launch the program. Volunteer Baseline 2014 2015 Enrolment forms of ALS recipients
3. Coordinate with barangay council and the division office to Mobile Teacher 0 1 1 1 Designation of teachers
generate support. Skills Trainer Instructors 0 1 1 1 Appointment
4. Request for volunteer teachers.
A.2. Improved provision of
non- teaching personnel
PPA1: Provision of a school/teacher librarian. Students library logsheets
Tasks: Opened the library from 6:30 AM to
1.Write letter of request for a librarian to the Divisin Office. 5:50 PM daily by 2016
2.Recommended an applicant. Baseline 2014 2015 2016
Teacher Librarian
3.Follow up. Teacher Librarian whole
3hrs 3hrs 3hrs
4.Orient the hiree of her/his details of responsibility. day
5.Monitor / Evaluate the library functionality.
6.Prepare monthly report per requirement by donors and Division Office.
Precondition:
Page 2 of 15
Fund/volunteer is availble. Request is granted.
PPA2: Provision of school guard
Tasks: Curbed cutting of classes by pupils and School Guard's journal
1.Coordinate with the PTA. students to 4 percent
2.Call a PTA assembly. % age Pupils/Students Baseline 2014 2015 2016
3.Present the problem and need for a school guard. Cutting Classes Daily 10 8 6 4
4.Appeal for funding assistance.
5.Recommend an applicant.
6.Assist the PTA in making job order.
7.Orient the hired civilian guard.
8.Monitor/Evaluate performance.
9.Update the PTA of his performance.
Precondition:
Volunteer teachers are avilable and granted.
PAP3: Provision of Office staf Appointments
Improved promptness of submission of
1. Submit required report to DO on routine tasks in the office. reports to the Division Office
2. Follow-up and wait until further notice. % age of required reportsBaseline 2014 2015 2016
3. If granted follow DO protocol and processes. submitted on time 40% 75% 75% 99%
4. Orient the hiree of his/her tasks.
PPA4: Renew Designations of office staf Received copies of reports
Tasks: Improved promptness of submission of
1. Identify potential and desrving teaching personnel. reports to the Division Office
2. Ask their approval. % age of required reportsBaseline 2014 2015 2016
3. Orient them of their roles and accountability. submitted on time 40% 75% 75% 75%
4. Make a designation.
5. Seek their conformity/signature.
6. Train them of their tasks.
7. Entrust to but ask them of the tasks.
Precondition:
Requested teaching personnel is granted.
B. Physical and Ancillary Facilities
B.1. Improved provision of classrooms/laboratories
PAP1: Construction of classrooms Inspection/
PAP3: Construction of Food Tech Laboratory Acquired classroom for Kindergarten classes by 2016 Acceptance report
PAP4: Acquisition of Food Tech Lab equipment No. of Kindergarten Baseline 2014 2015 2016
Tasks: Classroom building 0 0 0 1
1. Coordinate with the Division Facilities Coordinator Complied facilities requirements for Senior HS
2. Make project proposals offering by 2016
3. Submit to the Division Facilities Coordinator Facilities for SHS Baseline 2014 2015 2016
4. Wait until further notice. Classroom building 0 0 3 0
Food Tech Lab. 0 0 0 1
PAP5: Provision of E-classroom for the elementary level Lab equipt package 0 0 0 1 Inspection/
Tasks: Established e-classroom at main building by 2016 Acceptance report
1. Make estimates / program of work. Requirements 2014 2015 2016
2. Call attention of GenPTA & SGC officers for help. Install.of grills at x
3. Allocate fund for some requirements. door & windows
4. Send out letters for donations. Repainting of e-rm x
Plastic chairs 25 25 15
Long Tables 2x4 12
Long Curtains 8 8
Comp.protectv coverg 7 7
Desk fans 2
Page 3 of 15
Dividers 2 1 1
Air-conditioner 1 Program of work
B.2. Improved facility in moving to and fro around the campus Provided school community with 85% facility in Inspection Report
PAP1: Provision of access walks going to and fro building to building/around Liquidation Report
PAP2: Provision of canopy over long walks Provision/Repair 2014 2015 2016
PAP3: Rehab. of crumbling floor of corridor Walk fr bldg 1- bldg 2 (1) x
PAP4: Repair of concrete front yard Walk fr Main Gate - Bldg 1 (2) x
PAP5: Enhance drainages Front yard of Bldg 1 x
Tasks: Front yard of Bldg 6 x x
1. Make program of work. Canopy over Walk1 x
2. Allocate fund. Canopy over Walk2 x
3. Request for approval. Corridor at Bldg 2 x
4. Implement the project. Drainage at main gate x
5. Liquidate expenses. Drainage from HS to elementary x
B.3. Improved condition of existing facilities Rehabilitated 90% the H. E. building by 2016
PAP1: Repair of Bldg 3-A and B (Office and Library) Repaired and maintained building 3-A and B
Tasks: Parts 2014 2015 2016 Program of work
1. Make program of work. Roofs x Inspection Report
2. Allocate fund. Ceiling x Liquidation Report
3. Request for approval. Lighting Facilities x x x
4. Implement the project. Fascia board x
5. Liquidate expenses. Windows x
Door knobs x x x
Furniture x x x
CR sink/lavatory
Repainting of walls/ceiling x
PAP2: Repair of H.E. Building Parts 2014 2015 2016
Tasks: Partition walls Program of work
1. Make program of work. Roofs x x Inspection Report
2. Allocate fund. Ceiling x x x Liquidation Report
3. Request for approval. Lighting Facilities x x x
4. Implement the project. Panel doors x
5. Liquidate expenses. Door jambs x x
Window glasses x x x
Furniture x x
Sink x
Repainting x x x
Roofs x
Ceiling x
External wall x
Internal wall x
Fascia board x x
PAP3: Rehabilitation of Bldg 2-A (Gr7 -A Classroom) Repaired and maintained building 2-A
Tasks: Parts 2014 2015 2016 Program of work
1. Make program of work. Roofs x Inspection Report
2. Allocate fund. Ceiling, internal x x x Liquidation Report
3. Request for approval. Ceiling, external x
4. Implement the project. Lighting Facilities x x
5. Liquidate expenses. Fascia board x x
Windows x x
Door knobs x x x
Furniture x x x
CR x x x
Page 4 of 15
Repainting of walls/ceiling x
PAP4: Maintenance of Bldg 2-B (Gr8-B Classroom) Repaired and maintained Building 2-B
Tasks: Parts 2014 2015 2016 Program of work
1. Make program of work. Roofs x Inspection Report
2. Allocate fund. Ceiling x Liquidation Report
3. Request for approval. Lighting Facilities x x
4. Implement the project. Partition wall x
5. Liquidate expenses. Fascia board x
Windows x
Door knobs x x x
Furniture x x x
Repainting of walls/ceiling x
Wrapping of extnl. back wall x
PAP5: Maintenance of Bldg 2-D (Year 3 Classroom) Repaired and maintained Building 2-D
Tasks: Parts 2014 2015 2016 Program of work
1. Make program of work. Roofs Inspection Report
2. Allocate fund. Ceiling x x Liquidation Report
3. Request for approval. Lighting Facilities x x x
4. Implement the project. Partition walls x x
5. Liquidate expenses. Fascia board x
Windows x x x
Door knobs x x x
Panel doors x
Door jambs x
Furniture x x x
Repainting of walls/ceiling x
Install.of window&door grills
Wrapping of extnl. back wall x
PAP6: Repair of Bldg 2-F (Comp. Lab) Repaired and maintained Building 2-F
Tasks: Parts 2014 2015 2016 Program of work
1. Make program of work. Roofs Inspection Report
2. Allocate fund. Ceiling x Liquidation Report
3. Request for approval. Lighting Facilities x x x
4. Implement the project. Fascia board x
5. Liquidate expenses. Windows x x x
Door knobs x x x
Panel doors x
Door jambs x
Furniture x x x
Computer coverings x
Repainting of walls/ceiling x
Wrapping of extnl. back wall x
PAP7: Repair of Bldg 1-A and B Repaired and maintained Building 1-A and B
Tasks: Parts 2014 2015 2016 Program of work
1. Make program of work. Roofs x Inspection Report
2. Allocate fund. Ceiling x x Liquidation Report
3. Request for approval. Lighting Facilities x x x
4. Implement the project. Partition walls x x
5. Liquidate expenses. Fascia board x
Windows x x x
Door knobs x x x
Panel doors x
Door jambs x
Page 5 of 15
CR x x x
Furniture x x x
Repainting of walls/ceiling x
Install.of window&door grills
PAP8: Repair of Bldg 7-A Repaired and maintained Building 7-A Program of work
Tasks: Parts 2014 2015 2016 Inspection Report
1. Make program of work. Roofs x x Liquidation Report
2. Allocate fund. Ceiling x
3. Request for approval. Lighting Facilities x x
4. Implement the project. Fascia board
5. Liquidate expenses. Windows x x
Door knobs x x x
Panel doors x
Door jambs x
CR x x x
Furniture x x x
Repainting of roof
Repainting of walls/ceiling
Install.of window&door grills
PAP9: Repair of Bldg 6-A Repaired and maintained Building 6-A
Tasks: Parts 2014 2015 2016 Program of work
1. Make program of work. Window Inspection Report
2. Allocate fund. Door jambs x Liquidation Report
3. Request for approval. Panel door x
4. Implement the project. Lighting facilities x x x
5. Liquidate expenses. External ceiling x
Comfort Room x x x
Repainting of walls x
Repainting of ceiling x
Repainting of furniture x
PAP10: Repair of Bldg 6-B Repaired and maintained Building 6-B
Tasks: Parts 2014 2015 2016 Program of work
1. Make program of work. Window Inspection Report
2. Allocate fund. Door jambs x Liquidation Report
3. Request for approval. Panel door x
4. Implement the project. Lighting facilities x x x
5. Liquidate expenses. External ceiling x
Comfort Room x x x
Repainting of walls x
Repainting of ceiling x
Repainting of furniture x
PAP11: Repair of Bldg 6-C Repaired and maintained Building 6-C
Tasks: Parts 2014 2015 2016 Program of work
1. Make program of work. Window Inspection Report
2. Allocate fund. Door jambs x Liquidation Report
3. Request for approval. Panel door x
4. Implement the project. Lighting facilities x x x
5. Liquidate expenses. External ceiling x
Comfort Room x x x
Repainting of walls x x
Repainting of ceiling x
Repainting of furniture x
Page 6 of 15
Year 2
Subject 2014 2015 2016
Science 1:2 1:1 1:1
Filipino 1:3 1:1 1:1
Aral.Pan. 1:2 1:1 1:1
MAPEH 1:2 1:1 1:1
Values 1: 0 1:1 1:1
TLE 1: 0 1:1 1:1
Year 3
Subject 2014 2015 2016
English 1: 2 1:1 1:1
Math 1:10 1:1 1:1
Filipino 1: 5 1:1 1:1
MAPEH 1: 0 1:1 1:1
Values 1: 0 1:1 1:1
TLE 1: 0 1:1 1:1
Year 4
Subject 2014 2015 2016
MAPEH 1: 0 1:1 1:1
Values 1: 0 1:1 1:1
TLE 1: 0 1:1 1:1
C.2. Improved availability of instructional and learning Procured learning tools, equip't & materials by 2016
materials and equipment Equipment/Tools/Materials 2014 2015 2016
APP 1 : Alloting budget from MOOE or SBM grants Sound box, portable 2 0 0
Tasks: Science Subjects 2014 2015 2016 Delivery receipts
1. Monitor monthly needs and requirements. Ammeter 1 3 3 Memorandum of agreement
2. Allot some amount from the MOOE/SBM Beaker 2 3 3
3. Indicate in the cash program/ proposal Compound microscope 0 0 1
4. Purchase. Concave lens 0 1 2
Precondition: Convex lens 0 1 2
Budget available. Purchases undergo proper procedure. Denatured alcohol 1 2 4
APP 2 : Lobbying to potential stakeholders/LGUs Gas stove, single portable 0 1 0
Tasks: Handlens 1 5 5
1. Identify potential donors. Lab thermometer 0 5 5
2. Prepare request letters. Magnetic compass 0 2 1
3. Send out the letters. Magnetic wire 0 2 1
4. Followup. Multi-tester 0 1 1
5. Make proper documentation. Prism glass 1 3 3
Precondition: Test tube 1 5 5
Requests are granted. U-magnet 1 3 3
APP 3 : Strengthening of Fund Raising Program Voltmeter 1 2 1
Tasks:
1. Review with the faculty the determination of the school to acquire Weighing scale 1 2 1
TLE/EPP
the equipment and its importance in the classroom. Home Economics
2. Let them brainstorm on how to raise the amount of price. Bachoy server, set 12 0 0
3. Refer the project to the PTA for support. Big carajay 0 0 1
4. Implement the project. Big cooking pot (for Fdg) 2 2 2
5. Account the proceeds. Burner, heavy duty 0 1 0
6. Assign 2 teachers for the canvass/purchase. Coasters 12 12 12
7. Keep the documents for future use. Curtain, set 2 7 7
Precondition: Cutlery, set 6 24 6
All teachers strongly advocate the fund drive. Display Cabinet 1 1 1
Gas range, electric 0 1 0
Page 11 of 15
Goblet 24 24 12
Ice crusher 1 0 0
Kettle, big 1 1 0
Kitchen knives, set 3 1 0
Kitchen wares, set 80 6 12
Meat Grinder 0 0 1
Placemats set 5 5 5
Platter 6 6 6
Soup bowls 12 12 12
Rice cooker, heavy duty 1 0 1
Serving dishes 3 3 3
Sewing clamp 0 0 1
Table napkin, cloth 24 24 12
Thermos, electric 0 1 1
Thermos, simple 2 1 1
Vanity mirror 2 2 2
Wine holder 1 1 0
Industrial Arts/EPP/Electricity
Chisel 2 0 2
Cross cut saw 2 0 0
Drill, electric 1 0 0
Electrical Tester 0 1 0
Hack saw 2 2 1
Hammer 2 0 0
Hand Drill, electric 0 1 0
Long nose 2 1 0
Planer, electric 1 0
Planer, manual 2 0 1
Pliers, set 2 0 0
Rotary tool kit 1 0 0
Screw drivers, set 2 0 0
Steel Grinder 1 0 1
Steel rule, 33' 1 1 0
STVEP
Agriculture: Crop Production & Horticulture
Back Pack Sprayer 1 0 0
Garden scale 0 1 0
Wheel Barrow 2 1 0
Sprinkler 10 5 5
Spading Fork 6 3 3
Hole digger 2 1 1
Chisel 1 2 1
Vise grip 1 0 0
Scythe 15 10 5
Grass cutters 2 2 0
Hand trowels 6 30 0
Hand forks 6 15 15
Spade 6 15 15
Shovel 6 15 15
Crowbar 1 5 5
Garden hoe 6 15 15
Spading Fork 6 15 15
Pruning shears 3 3 3
Page 12 of 15
Bolo 10 10 10
Axe 2 5 0
Soil testing kit 1 2 0
Weighing scale 1 0 0
Power srayer 1 1 0
Water hose (meter) 200 0
Picking/harvesting knives 10 10 10
Budding/grafting knives 10 10 10
Pick mattock 3 10 10
Draft carabao 2 1 0
Water pump 1 0 0
Technical Drawing
Tools & Equipment
T-square 36" wooden
body with graduated
plastic edge adjustable 10 10 10
Drawing table & stool 36" x 24" 10 10 10
Safety Equipment
Fire extinguisher, ABC 1 1
type, dry chem 5kg 0 2 0
Internet Computer
Fundamentals
Tools & Equipment
Broadband Tattoo stick 2 0 0
Kinder, Grade I, II, & III
Crayon 75 75 75
TV set 2 2 2
Wall clock 2 2 2
MAPEH/MSEP
Ball, basketball Mikasa 1 1 1
Ball, volleyball Mikasa 1 1 1
Lawn tennis set 1 2 2
Table tennis set 1 1 1
Volley ball net 1 0 0
Clinic
Digital thermometer 2 0 0
Forceps 1 1 0
BP Monitor 1 0 0
HEKASI/SIBIKA
Charts 2 4 4
Maps 2 4 4
Math
Compass, blackboard 1 1 1
Color chalk, box 10 10 10
Color pen 20 20 20
Ruler, blkbrd 1 1 1
Protractor, Blkbrd 1 1 1
Tringle, blkbrd 1 1 1
Computer Hdwe Servicing
Tools & Equipment
Multi-tester 5 5 5
Transformer multi-output with UPS 5 5 5
DC regulated power supply 4 4 4
Page 13 of 15
Connecting cords GA 22
w/ aligator clips both ends 10 20 10
Connecting cords GA 23
w/ banana clips both ends 10 20 10
Round nose pliers 5 5 10
Wire cutter 1 1 10
Philips head screw driver 6" (set) 6 4 5
Flat head screw driver 6" set 6 3 3
Connecting wire (solid gauge no.22) 10 10 20
Soldering iron 100w 2 5 5
Soldering lead (matrl) 5 5 10
Desoldering pump 1 0 10
Logic probe 1 0 10
IC remover, cutter 10 10 10
Tool Cabinet 1 1 1
Tools
Fire extinguisher ABC
type, Dry Chem 5kg 1 0 2
Screen protector 17 0 0
Automatic voltage rgulator 2 2 2
Big Books for Elementary
May Tatlong Palaka
Ang Pambihirang Buhok ni Raquel
A
AngThirsty Sparrow
Bisekleta ni
Momoy
Bakawan
Asul na Araw
Bilog na itlog
Ang Walong Baso ni Kuya Paquito
Ang Kamates ni Pele
Alamat ng Lanzones
Ang Mahiyaing Manok
Ang Mabait na Kalabaw
References
English-Filipino-
Hiligaynon Dictionary
Filipino-English
Filipino-Filipino Complete Dictionary
Guide
Completeto High School
Dictionary
Book Report
Maps
Globes
Books for STVEP
Filipino Books,secondary
Other References
Scrabble Board
Word Factory (Boggles)
Domino
Sungka
D. Others Scientific calculators
D.1. Enrolled all school age children and Enrolled 100% of school children and youth from feeder
youth in the catchment areas. schools around the catchment areas.
PPA1 : Survey of new entrants Level 2014 2015 2016 School Register
Tasks: From Daycare to Kindergarten 40 TBD TBD Form 3
1. Ensure 100% of promoted pupils and students are enrolled. From Kindergarten to Grade I 60 60 TBD
Page 14 of 15
2.Campaign for early enrolment From Grade 6 to Grade 7 45 38 45
3.Conductschool-to-school campaign for first Year within the catchment
4. Get help from the barangay for enrolment promotion.
5. Keep following up for enrolment at CDIS.
Precondition:
All graduates from Daycare, Kindergarten, and Grade 6 proceed to nex Brought CDIS drop-outs back to school by 2016
level. Level 2014 2015 2016 School Register
PPA2 : Tracing of drop-outs Kindergarten 2 TBD TBD Tracking Report
Tasks: Grade 1 4 TBD TBD Form 3
1. Check the tracklist of drop-outs. Grade 2 1 TBD TBD Form 20
2. Trace their whereabouts. Grade 3 3 TBD TBD
3 Campaign for enrolment. Grade 4 2 TBD TBD
4. Enrol the returnees. Grade 5 1 TBD TBD
Grade 6 2 TBD TBD
Precondition: Grade 7 3 TBD TBD
All drop-outs are willing to return back to school. Year 2 5 TBD TBD
Year 3 2 TBD TBD
Year 4 0 TBD TBD
Total 15 TBD TBD
Continued the Alternative Learning System
D.2. Promoted inclusive education of Education for the Out-of-School Youths SRC
PPA1 : Opening a BLP and A & E Programs No. of ALS Classes 2014 2015 2016 ALS reports
Tasks: Organized 1 1 1
1. Conduct survey of the OSYs in the barangay .
2. Coordinate with the barangay council to reach all these OSYs out.
4. Request for approval from the division office c/o ALS supervisor.
3. Hold an Advocay program.
4. Make an arrangement on the instruction and instructors.
5. Coordinate with Project CUEVA programs.
6. Seek assistance from the City Gov't for skills training integration.
7. Meet with recipients for final instruction and schedule of sessions.
8. Prepare modules.
9. Start classes.
Precondition:
All OSYs are highly interested.
PPA2 : Provision of Skills Training Program to ALS learners Provided Skills Training to ALS Learners
Tasks: Skills to Offer 2014 2015 2016
1. Determine the number of trinees. Baking x x x
2. Negotiate with propected triner. Organic Farming x x x
3. Make a project proposal. Welding x x x
4. Seek approval/endorsement from the division office.
5. Follow up.
6. Implement the program.
Precondition:
Approval is granted by the Mayor.
Page 15 of 15
Prepared:
ANALIE V. BUHAYAN
Principal I
ASSUMPTIONS AND RISKS
LS recipients
for Preschoolers
Disturbance of shortcutting through
the campus is minimized
Comfortable movement
in the classroom is improved.
p8
x 3T
5 10 10 9T 9T 9T
0 10 10 10T 10T 10T
Cookery 1 1 0 3.8T 4T 0
Bachoy server, set
Big carajay
Burner, heavy duty
Chafing dish 1 1.45T
Chair cloth
Coasters 75 75 75 2T 2T 2T
Coffe cups-saucer sets 2 2 14T 14T
Craters 2 2 2 1.4T 1.5T 1.7T
Dinner plates
Dish racks 1 1 1 2.4T 2.6T 2.8T
Double broiler 1 1 1 2.2T 2.4T 2.6T
Drinking glasses 1 2 2 1.4T 2.8T 3T
Fire extinguisher 1 1 1 1T 1.2T 1.4T
Food plastic cover 1 400
Fork, dessert
Fork, dinner 2 1 600 350
Fork, frying 1 1 180 200
Fork, serving dish 1 4.5T
Fork, serving spaghetti
Fruit rack 4 4 4 320 350 360
Frying pan 4 4 4 1T 1T 1T
Griller
Halo-halo glass 1 1 1 150 150 150
Hand towels 10 10 10 220 220 220
Hotdog cooking pan 20 20 20 900 900 900
Ice cream cup
Ice cream scoop, meduim
Ice cream scoop, small 1 1 1 150 150 150
Ingredients storage container 1 1 1 150 150 150
Kettle, big 1 1 1 150 150 150
Kitchen knives, set
Kitchen wares, set
Knife, cleaver
Meat Grinder
Mixing bowl, crystal big
Mixing bowl, crystal medium
Mixing bowl, crystal mini
Mixing bowl, crystal small
Mop squeezer
Mortal and pestle, marmol
Pails
Placemats set
Platter
Platter
Poster frames
Pot holders
Pot, cooking
Pot, stock
Rice cooker, heavy duty
Rice dispenser
Sauce holder
Sauce pans
Saucers
Scissors
Serving dishes
Serving trays
Shaker
Silverware racks
Soup bowls
Spice canister holders
Spice canisters
Spoon, dessert
Spoon, dinner
Spoon, serving
Spoon, soup
Stock pot
Storage boxes
Table cloth
Table knife
Table napkin, cloth
Wine holder
Wok, large
Wok, medium
Wok, small
Wooden laddles, varied sizes, set
Whisk
Electric beater, heavy duty
Measuring cup, glass
Measuring spoon, set
Computer Hdwe Servicing
Tools & Equipment
Multi-tester 1 1 1 5T 5.5T 6T
Transformer multi-output with UPS 1 1 1 4T 4T 4T
DC regulated power supply 2 2 2 8.4T 8.5T 8.6T
Connecting cords GA 22
w/ aligator clips both ends 10 20 10 1T 3T 3.2T
Connecting cords GA 23
w/ banana clips both ends 10 20 10 1.5T 3.4T 3.5T
Round nose pliers 5 5 10 1.4T 1.5T 3.5T
Wire cutter 1 1 10 200 200 2T
Philips head screw driver 6" (set) 6 4 5 600 450 600
Flat head screw driver 6" set 6 3 3 600 300 360
Connecting wire (solid gauge no.22) 10 10 20 1.6T 1.8T 3.2T
Soldering iron 100w 2 5 5 600 1.5T 1.5T
Soldering lead (matrl) 5 5 10 50 50 100
Desoldering pump 1 10 500 5T
Logic probe 1 10 500 5T
IC remover, cutter 10 10 10 1T 1T 1T
Tool Cabinet 1 1 1 4T 4T 4T
Fire extinguisher ABC type, Dry Chem 5kg 1 2 3.8 7T
17 3.4T
2 2 2 5T 5T 5T
1 500
1 500
1 500
1 500
1 500
1 500
1 500
1 500
1 500
1 500
1 500
1 500
1 1 2.8T 3T
1 1 1.6T 1.6T
1 1 1.6T 1.6T
1 1 345 360
10 5 2T 1T
1 1 1.5T 1.5T
5 3 3 3T 1.8T 1.8T
5 3 3 2.5T 1.2T 1.4T
4 TBD TBD
1 TBD TBD
3 TBD TBD
2 TBD TBD
1 TBD TBD
2 TBD TBD
3 TBD TBD
5 TBD TBD
2 TBD TBD
TBD TBD TBD
TBD TBD TBD
Prepared:
ANALIE V. BUHAYAN
Principal I
IMPORTANT ASSUMPTION
Attendance is sustained
BATO NATIONAL HIGH SCHOOL
Supplementary AIP 2015
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3
J F M A M J J A S OND J F M A M J J A S
B. Personnel
B.1. Improved provision of teaching personnel
(Refer to SHS Development Plan)
GOAL: IMPROVED
EDUCATION PERFORMANCE
IN SAGAY CITY
Purpose 1: PROVISION Elementary
CONTRIBUTORY FACTORS
A. Personnel
A.1. Improved provision of teaching
personnel.
PPA1: Provision of 3 new teachers Improved class-teacher ratio in High School E-BEIS
Tasks: from 1:1.2 to 1:1.6 by 2013
1.Determine enrolment data. Level Baseline 2012 2013
2.Determine teacher need G7 1 : 1.2 1 : 1.6 1 : 1.6
3.Submit request and justification to D.O. for follow up Y2 1 : 1.2 1 : 1.6 1 : 1.6
4. Orient the teachers on their designation /loads Y3 1 : 1.2 1 : 1.6 1 : 1.6
Precondition: Y4 1 : 1.2 1 : 1.6 1 : 1.6
Items or volunteers are available.
PPA2: Provision of Volunteer Teachers Designated teacher-instructors for ALS SRC
Tasks: classes Received copies of registration
1. Finalize the organization of the ALS classes. Level Baseline 2012 2013 forms
2. Launch the program. Mobile Teacher 0 1 1 Enrolment forms of ALS recipients
3. Coordinate with barangay council and the division office to Skills Training Instructors 0 2 2 Designation of teachers
generate support. Appointment
4. Request for volunteer teachers.
Precondition:
Items or volunteers are available.
A.2. Improved provision of
non- teaching personnel
PPA1: Provision of a school/teacher librarian. Opened the library from 6:30 AM to Students library logsheets
Tasks: 5:50 PM daily by 2012
1.Write letter of request for a librarian to the Divisin Office. Baseline 2012 2013
Teacher Librarian
2.Recommended an applicant. 0 1 1
3.Follow up.
4.Orient the hiree of her/his details of responsibility.
5.Monitor / Evaluate the library functionality.
6.Prepare monthly report per requirement by donors and Division Office.
Precondition:
Fund/volunteer is availble. Request is granted.
PPA2: Provision of school guard Curbed cutting of classes by pupils and School Guard's journal
Tasks: students to 10 percent
1.Coordinate with the PTA. % age Pupils/Students Baseline 2012 2013
2.Call a PTA assembly. Cutting Classes Daily 40 4 4
3.Present the problem and need for a school guard.
4.Appeal for funding assistance.
5.Recommend an applicant.
6.Assist the PTA in making job order.
7.Orient the hired civilian guard.
8.Monitor/Evaluate performance.
9.Update the PTA of his performance.
Precondition:
Volunteer teachers are avilable and granted.
PPA3: Designation of office staf Improved promptness of submission of Received copies of reports
Tasks: reports to the Division Office
1. Identify potential and desrving teaching personnel. % age of required reports Baseline 2012 2013
2. Ask their approval. submitted on time 40% 75% 90%
3. Orient them of their roles and accountability.
4. Make a designation.
5. Seek their conformity/signature.
6. Train them of their tasks.
7. Entrust to but ask them of the tasks.
Precondition:
Requested teaching personnel is granted.
B. Physical and Ancillary Facilities
B.1. Improved provision of classrooms
PAA: Construction of kindergarten classroom Acquired classroom for Kindergarten classes by 2013 Inspection/Acceptance report
Tasks: No. of Kindergarten CL
Baseline 2012 2013
1. Make program of wprk for the construction 0 0 1
2. Together with the request letter, submit request to the DO.
2. Followup.
3. When granted, implement.
4. Monitor the ongoing construction.
5. Comply the accomplishment report.
3.Learning materials and equipment
Precondition:
LGU provides fund.
B.2. Improved provision of furniture
PPA1: Requesting from the Deped or School Board. Furnished Kindergarten room with Delivery receipt
Tasks: classroom furniture Inventory report
1. Send request letter to the Division Office. Classroom Furniture Baseline 2012 2013
2. Follow up. Table-desk 0 0 12
3. Receive the delivery. Chairs 0 0 24
4. Indicate in the inventory report. Tchr's Table & Chair set 0 0 1
Precondition: Dividers/shelves 0 0 3
Division office mediates.
B.3. Improved provision of ancillary
services
PPA: Temporary conversion of excess academic classrooms to anci Designated offices for ancillary services Inspection/Acceptance report
offices Ancilliary of Services Baseline 2012 2013 Picture
Tasks: Library 0 x 0 Program of work
1.Ask permission to D.O for the conversion of vacant academic rooms. Clinic 0 x 0 Certificate of completion
2.Write a proposal and program work. Guidance Office 0 x 0
3.Request for approval. Supply office 0 x 0
4.Implement. Principal office 0 x 0
5.Submit accomplishment report.
Precondition:
Conversion is only temporary.
B.4. Improved condition of existing facilities
B.4.a. Repaired / maintained the classrooms
B.4.a.1. Executed major repair
PPA1 : Requesting for repair from the School Board or SMRMS Executed major repair of the dilapidated Received copy of Letter
Tasks: classroom of Bldg 8-A by 2013 Inspection report
1. Request for inspection and official declaration of status Major Repair of 2011 2012 2013 Program of work
of the building by the authoritative personnel. Bldg 8-A 0 0 x Certificate of completion
2. Indicate the status in the inventory report of the school. Acceptance report
3. Write a request letter for repair to the Division Office.
4. Followup.
5. Monitor the implementation.
6. Accept.
7. Make a report.
Precondition:
The project in given priority.
PPA2: Major repair of partition wall. Restored 100% functionality of the partition
Tasks: wall between classrooms of Bldg 1-A and
1.Inspect extent of repair needs. 1-B by 2013
2.Formulate proposal and program of work. Partition Wall 2011 2012 2013
3.Allocate fund from MOOE. Bldg 6-G & H x
4. Monitor implementation. Bldg 2-A & B x x
5.Liquidate the fund. Bldg 1-A & B x
Precondition:
Fund allows.
B.4.a.2. Executed minor repair
PPA1: Repair of leaking/ dripping roofs. Maintained satisfactorily the usability Inventory Report
Tasks: of the existing classrooms Program of work
1.Inspect extent of repair needs. Roofing Certificate of completion
2.Formulate proposal and program of work. Classroom 2011 2012 2013
3.Allocate fund from MOOE. Bldg 2-A x x
4. Monitor implementation. Bldg 2-B x x
5.Liquidate the fund. Bldg 2-C x x x
Precondition: Bldg 2-D x x x
Fund allows. Bldg 2-E x x x
Bldg 2-F x x x
Bldg 4-A x x
Bldg 6-D x x
Bldg 6-E x x
Bldg 6-F x x x
Bldg 6-G x x x
Bldg 6-H x x x
PPA2: Repair of decaying ceiling Ceiling
Tasks: Classroom 2011 2012 2013 Inventory Report
1.Inspect extent of repair needs. Bldg 1-A x Program of work
2.Formulate proposal and program of work. Bldg 1-B x Certificate of completion
3.Allocate fund from MOOE. Bldg 2-A x
4. Monitor implementation. Bldg 2-B x
5.Liquidate the fund. Bldg 2-C x
Precondition: Bldg 3-A x
Fund allows. Bldg 4-A x
Bldg 6-D x
Bldg 6-E x
Bldg 6-F x
Bldg 6-G x
Bldg 6-H x
Bldg 7-A x
PPA3: Repair of broken windows Window
Tasks: Classroom 2011 2012 2013 Inventory Report
1.Inspect extent of repair needs. Bldg 1-A x Program of work
2.Formulate proposal and program of work. Bldg 1-B x Certificate of completion
3.Allocate fund from MOOE. Bldg 2-B x
4. Monitor implementation. Bldg 2-C x
5.Liquidate the fund. Bldg 2-D x
Precondition: Bldg 6-A x
Fund allows. Bldg 6-B x
Bldg 6-C x x
Bldg 6-D x
Bldg 6-E x x
Bldg 6-F x
Bldg 6-G x
Bldg 6-H x
Bldg 7-A x
PPA4: Repair/Replacement of crumbling doorjamb. Doorjamb Inventory Report
Tasks: Classroom 2011 2012 2013 Program of work
1.Inspect extent of repair needs. Bldg 4-A 0 x Certificate of completion
2.Formulate proposal and program of work. Bldg 5-A 0 x
3.Allocate fund from MOOE. Bldg 6-A 0 x
4. Monitor implementation. Bldg 6-B 0 x
5.Liquidate the fund. Bldg 6-C 0 x
Precondition: Bldg 6-G 0 x
Fund allows. Bldg 6-H 0 x x
Tpyewriter 0 0 1
DVD cassette player 0 1 1
PPA: Repair of broken/damaged furniture Restored 100 percent usability of damaged/ Program of work
Tasks: broken furniture by 2013 Certificate Completion
1.Inspect repairs needs. Furniture 2011 2012 2013 Liquidation report
2.Makea proposal and program of work. Cabinet 40% 75% 100%
3.Allocate fund from MOOE. Chairs 40% 75% 100%
4. Monitor implementation. Shelves / Dividers 40% 75% 100%
5.Liquidate the fund. Graphing board 40% 75% 100%
Precondition: Sala Seats 40% 75% 100%
Fund allows. Computer tables 40% 75% 100%
Tennis Table 0 0 100%
Teacher's table 10% 75% 100%
Cupboards 10% 75% 100%
PPA : Acquisition and installation of an airconditioner. Set the required temperature of the Delivery receipt
Tasks: computer room from warm to cool Inventory Report
1. Send a follow-up the letter request to the governor. Room Temperature of 2011 2012 2013
2. Follow-up. the compputer room 37 10-20 10-20
3. Receive.
4. Install.
Precondition:
Request is granted.
C. Learning Materials
and Equipment
C.1. Improved the availability
of textbooks
PPA: Acquisition of additional textbook Improved the textbook-pupil/student ratio Inventory report
Tasks: to 1:1 in the following grades and subject
1.Prepare and submit textbook inventory areas
2.Submit request for additional textbook Grade 1
3.Follow-up request for additional textbook Subject 2011 2012 2013
4.When approved inspect delivery of textbook English 1: 2 1 : 1 1 : 1
5.Sign memorandum of receipts Math 1: 0 1 : 1 1 : 1
Pre-condition: Deped fund is available Filipino 1: 0 1 : 1 1 : 1
Char. Education 1: 0 1 : 1 1 : 1
Sibika 1: 0 1 : 1 1 : 1
Grade 2
Subject 2011 2012 2013
English 1: 3 1:1 1:1
Math 1: 4 1:1 1:1
Filipino 1: 3 1:1 1:1
Sibika 1: 2 1:1 1:1
Char. Education 1: 0 1:1 1:1
Grade 3
Subject 2011 2012 2013
English Language 1: 2 1:1 1:1
English Reading 1: 2 1:1 1:1
Science 1: 2 1:1 1:1
Math 1: 2 1:1 1:1
Filipino Pagbasa 1: 5 1:1 1:1
Filipino Wika 1: 3 1:1 1:1
Year 3
Subject 2011 2012 2013
English 1: 2 1:1 1:1
Math 1:10 1:1 1:1
Filipino 1: 5 1:1 1:1
MAPEH 1: 0 1:1 1:1
Values 1: 0 1:1 1:1
TLE 1: 0 1:1 1:1
Year 4
Subject 2011 2012 2013
MAPEH 1: 0 1:1 1:1
C.2. Improved availability of instructional and learning Values 1: 0 1:1 1:1
materials and equipment TLE 1: 0 1:1 1:1
APP 1 : Alloting budget from MOOE or SBM grants Procured the needed equipments by 2013 Delivery receipts
Tasks: Equipment 2011 2012 2013 Memorandum of agreement
1. Monitor monthly needs and requirements. Multimedia Projector 0 1 0
2. Allot some amount from the MOOE/SBM Sound box, portable 0 2 2
3. Indicate in the cash program/ proposal Science Subjects
4. Purchase. Ammeter 1 3 3
Precondition: Beaker 2 3 3
Budget available. Purchases undergo proper procedure. Compound microscope 0 0 1
APP 2 : Lobbying to potential stakeholders/LGUs Concave lens 0 1 2
Tasks: Convex lens 0 1 2
1. Identify potential donors. Denatured alcohol 1 2 4
2. Prepare request letters. Gas stove, single portable 0 1 0
3. Send out the letters. Handlens 1 5 5
4. Followup. Lab thermometer 0 5 5
5. Make proper documentation. Magnetic compass 0 2 1
Precondition: Magnetic wire 0 2 1
Requests are granted. Multi-tester 0 1 1
APP 3 : Strengthening of Fund Raising Program Prism glass 1 3 3
Tasks:
1. Review with the faculty the determination of the school to acquire Test tube 1 5 5
U-magnet 1 3 3
the equipment and its importance in the classroom. Voltmeter 1 2 1
2. Let them brainstorm on how to raise the amount of price. Weighing scale 1 2 1
3. Refer the project to the PTA for support. TLE/EPP
4. Implement the project. Home Economics
5. Account the proceeds. Big carajay 0 0 1
6. Assign 2 teachers for the canvass/purchase. Big cooking pot (for Fdg) 2 2 2
7. Keep the documents for future use. Burner, heavy duty 0 1 0
Precondition: Coasters 12 12 12
All teachers strongly advocate the fund drive. Curtain, set 0 7 7
Cutlery, set 6 24 6
Electric sewing machine 0 0 1
Ember tongs 1 2 3
Gas range, portable 0 1 0
Goblet 0 24 12
Ice tongs 0 1 1
Kettle 1 1 0
Kitchen knives, set 0 1 0
Kitchen wares, set 80 6 12
Meat Grinder 0 0 1
Placemats set 0 24 12
Platter 0 6 6
Pot, big 1 1 1
Pressure cooker 0 0 1
Rice cooker 0 0 1
Serving dishes 0 3 3
Sewing clamp 0 0 1
Sewing machine, simple 0 0 1
Sewing electric 0 0 1
Steamer 0 1 0
Table ice bucket 0 1 0
Table napkin, cloth 0 24 12
Thermos, electric 0 0 1
Thermos, simple 0 1 1
Tissue paper holder 2 0 2
TV Set 0 2 2
Vanity mirror 0 2 2
Wine holder 0 1 0
Industrial Arts/EPP/Electricity
Chisel 0 2 2
Cross cut saw 1 2 1
Drill, electric 0 0 1
Electrical Tester 0 0 1
Hack saw 0 1 1
Hammer 0 2 2
Hand Drill, electric 0 0 1
Long nose 0 1 0
Paint brush 2 5 5
Planer, electric 0 1 0
Planer, manual 0 1 1
Pliers, set 0 1 1
Rotary tool kit 0 0 1
Screw drivers, set 0 1 1
Steel Grinder 0 0 1
Steel rule, 33' 0 0 1
Welding machine, heavy dut 0 0 1
STVEP
Agriculture: Crop Production & Horticulturei
Back Pack Sprayer 0 1 0
Garden scale 0 1 0
Wheel Barrow 0 1 0
Sprinkler 3 4 4
Spading Fork 0 1 1
Hole digger 1 1 1
Chisel 1 2 1
Vise grip 0 0 1
Scythe 0 30 0
Grass cutters 1 2 0
Hand trowels 0 30 0
Hand forks 0 30 0
Spade 0 30 0
Shovel 0 30 0
Crowbar 0 10 0
Garden hoe 0 30 0
Spading Fork 0 30 0
Pruning shears 0 20 0
Bolo 0 30 0
Saw 0 5 0
Hammer 0 5 0
Axe 0 5 0
Sprayers 0 3 0
Sprinklers 0 15 0
Wheel Barrow 0 6 0
Steel tape 0 5 0
Soil testing kit 0 2 0
Weighing scale 0 1 0
Power srayer 0 1 0
Water hose (meter) 0 0 200
Hole digger 0 5 0
Picking/harvesting
knives 0 10 0
Budding/grafting
knives 0 30 0
Pick mattock 0 20 0
Draft carabao 0 1 0
Water pump 0 1 0
Fish Processing
Equipment
Pressure cooker 0 1 0
Can sealer 0 1 0
Plastic sealer 0 3 0
Horizontal freezer 0 1 0
Gas range 0 1 0
Smoke house 0 0 1
Vacuum pack machine 0 0 1
Electric mixers 0 0 2
(Heavy Duty) 0 0 0
Hot air blower 0 0 5
Stuffer/Linker 0 0 1
Tools and Supplies 0 0 0
Kettle 0 40 0
Frying pan 0 10 0
Measuring spoon 0 40 0
Mixing bowl-stainless 0 40 0
Mixing bowl-glass
(by set) 0 10 0
Apron 0 40 0
Basin-stainless 0 40 0
Knives 0 40 0
Steamer 0 10 0
Cap seal of diff.
sizes 0 5,000 0
Gloves 0 40 0
Laboratory gown 0 40 0
Weighing scale-
1000g 0 20 0
Weighing scale-
10kg 0 20 0
Paring knives 0 40 0
Peelers 0 40 0
Glass measuring cup 0 40 0
B-tin cans 0 40 0
Measuring cup for
solid (by set) 0 40 0
Safety Equipment
Fire Extinguisher 1 0 0
Fish Culture
Equipment
Surveying equipment 0 0 1
Paddle wheel 0 0 2
Water pump 0 0 1
Filled oxygen tank 0 0 1
Feed storage 0 0 1
Freezer 0 0 1
Tools
D.O. meters 0 2 0
Machine needle 0 24 0
(dozens, asstd) 0 0
Tracing wheel 0 24 0
Tailor's pin 0 24 0
Thimble 0 24 0
Hem marker 0 6 0
White Tetoran (yards) 0 50 0
Equipment
Sewing machine wl motor 0 7 0
Mannequin (full size,
junior size, boys & girls) 0 5 0
Sewing machines:
-Over edging Machine 0 1 0
Straight Ordinary
sewing Machine 0 6 0
-High speed Machine 0 2 0
Cutting tables 0 6 0
Lifesize mirror 0 2 0
Mannequin's Bust Forms
(male/female) 0 5 0
Computer Hdwe Servicing
Tools & Equipment
Multi-tester 0 0 10
Transformer multi-
output w/UPS 0 0 10
DC regulated power
supply 0 0 10
Connecting cords GA 22
w/ aligator clips both
ends 0 0 40
Connecting cords GA 23
w/ banana clips both
ends 0 0 40
Bread board 0 0 10
Round nose pliers 0 0 10
Wire cutter 0 0 10
Philips head screw
driver 6" (set) 0 0 10
Flat head screw driver
6" set 0 0 10
Connecting wire
(solid gauge no.22) 0 0 40
Soldering iron 100w 0 0 10
Soldering lead (matrl) 0 0 10
Desoldering pump 0 0 10
Logic probe 0 0 10
IC remover, cutter 0 0 10
Tool Cabinet 0 0 1
Router 0 0 5
Hardware:
Memory card 0 0 5
Expansion card 0 0 5
Hard disk 0 0 5
Mother board 0 0 5
Power supply (UPS) 0 0 5
Router 0 0 5
Tools
Fire extinguisher ABC
type, Dry Chem 5kg 0 0 2
Screen protector 0 0 5
Automatic voltage
regulator 0 0 5
Food Processing
Poly sealer 0 0 3
Soaking vats 0 0 2
Salinometer 0 0 6
Knives 0 0 25
Slicers (Tocino) 0 0 1
Peelers 0 0 6
Spatulas & rubber spatulas 0 0 12
Colanders 0 0 6
Food tongs 0 0 6
Strainers 0 0 6
Set of measuring spoons 0 0 12
Set of measuring cups for li 0 0 6
Set of measuring cups for dr 0 0 6
Hot lifter 0 0 2
Mixing Bowls (plastic) 0 0 40
Mixing bowls (stainless) 0 0 6
Utility trays (stainless) 0 0 6
Casseroles of various
sizes (Set) 0 0 10
Chopping boards 0 0 5
Saucepans (stainless) 0 0 4
Refractometer 0 0 1
Thermometer 0 0 1
Jelly thermometer 0 0 6
Osterizers 0 0 2
Juice extractors 0 0 2
Steamers 0 0 1
Can sealer 0 0 1
Bottle sealer 0 0 1
Gas tank (LPG) 0 0 3
Fermentation vats 0 0 1
Steam jacketed kettle 0 0 3
Hydrometer 0 0 1
Lifters 0 0 3
Kettles (varying capacities) 0 0 5
Ladles (stainless/wooden) 0 0 5
Fish scalers 0 0 5
Pulp finishers 0 0 3
Plastic protected cap
sealer 0 0 3
Electric sealer 0 0 1
Wire baskets 0 0 2
Exhaust boxes 0 0 2
Weighing scales (vary-
ing capacities and
sensitivities) 0 0 4
Stoves (double) 0 0 1
Smokehouse 0 0 1
Refrigerator 0 0 1
Freezer 0 0 1
Double burner stove w/
accessories 0 0 3
Technical Drawing
Tools & Equipment
T-square 36" wooden
body with graduated
plastic edge adjusta-
able 0 55 0
Drawing table & stool
36"x24" 0 55 0
Safety Equipment
Fire extinguisher, ABC
type, dry chem 5kg 0 2 0
Internet Computer
Fundamentals
Tools & Equipment
Smartbro modem 0 11 0
Chord 5 m 0 11 0
Kinder, Grade I, II, & III
Crayon 0 10 10
CD/DVD Player 1 1 1
TV set 0 3 3
Wall clock 0 4 4
MAPEH/MSEP
Ball, basketball Mikasa 1 2 2
Ball, volleyball Mikasa 1 2 2
Cassette Player 0 1 0
Lawn tennis set 0 2 2
Table tennis set 0 1 1
Volley ball net 0 0 1
Clinic
Digital thermometer 0 1 0
Forceps 0 1 0
Sphigmomanometer, digit 0 0 1
HEKASI/SIBIKA
Charts 2 4 4
Maps 2 4 4
Math
Compass 1 3 3
Color chalk, box 0 6 6
Crayon 10 10 10
Meterstick 10 10 10
Protractor 5 5 5
ALS
Modules, ALS 0 50 50
Modules/Handouts/
Grade I 100 390 390
Grade VII 0 440 440
Other Levels 150 150 150
Teacher's Guide 80 160 160
PPA: Repair and maintenance of the existing equipment Make dysfunctional learning equipment 100 Inventory Report
Tasks: percent usable by 2013 Program of work
1.Inspect repair/ maintenance needs. Equipment 2011 2012 2013 Certificate of completion
2.Makea proposal and program of work. Gas range 90% 50% 100%
3.Allocate fund from MOOE. Computer units 100% 75% 100%
4. Monitor implementation. Printers 73% 100% 100%
5.Liquidate the fund. Typewriter 90% 90% 100%
Precondition: Simple sewg machine 50% 100% 100%
Fund allows.
PPA: Repair of dysfunctional equipment Equipment Baseline 2012 2013
Tasks: Bundy Clock 40% 75% 100%
1. Check all equipment as to their functionality. Electric fans 40% 75% 100%
2. Determine the extent of repair need. Brush cutter 40% 75% 100%
3. Make program of work/job order. Printers 40% 75% 100%
4. Allot budget. Sound system 40% 75% 100%
5. Liquidate expenses.
Precondition:
Periodic checkup of equipment is done.
D. Others
D.1. Enrolled all school age children and
youth in the catchment areas. Enrolled 100% of school children and youth from feeder School
schools around
Register
PPA : Survey of new entrants the catchment areas. Form 3
Tasks: Level 2012 2013
1. Ensure 100% of promoted pupils and students are enrolled. From Daycare to Kindergarten 30 22
2.Campaign for early enrolment From Kindergarten to Grade I 42 30
3.Conductschool-to-school campaign for first Year within the catchment From Grade 6 to Grade 7 45 42
4. Get help from the barangay for enrolment promotion.
5. Keep following up for enrolment at CDIS.
Precondition:
All graduates from Daycare, Kindergarten, and Grade 6 proceed to next
level. Brought CDIS drop-outs back to school by School Register
PPA : Tracing of drop-outs 2013 Tracking Report
Tasks: Level 2012 2013 Form 3
1. Check the tracklist of drop-outs. Kindergarten 1 TBD Form 20
2. Trace their whereabouts. Grade 1 2 TBD
3 Campaign for enrolment. Grade 2 1 TBD
4. Enrol the returnees. Grade 3 3 TBD
Prepared:
ANALIE V. BUHAYAN
Principal I
50
325
325
Ammeter ICT
Beaker Computer cover
400 Compound microscope Computer monitor filter
250 Concave lens Computer table cloth
480 Convex lens Water hose
310 Denatured alcohol Bandage
Gas stove, single portable Band-aide
200 Handlens
250 Lab thermometer Betadine
Magnetic compass Cotton balls
Magnetic wire Dolfenol
Multi-tester Rubbing alcohol
Prism glass
Test tube Pencil
U-magnet
Voltmeter
ASSUMPTIONS AND RISKS
p8
Dozens
Piece
Piece
Piece
Piece
yards
Set
Piece
Unit
Unit
Unit
Unit
Piece
Piece
Teachers become more facilitative.
Tasks:
1.Inspect extent of repair needs.
2.Formulate proposal and program of work.
3.Allocate fund from MOOE.
4. Monitor implementation.
5.Liquidate the fund.
Precondition:
Fund allows.
PPA: Repainting of internal walls Repainted internal walls of 21 CLs Picture
Bldg 1-A Acceptance report 0 0 x 0
Bldg 1-B 0 0 x 0
Bldg 2-A 0 0 x 0
Bldg 2-B 0 0 x 0
Bldg 2-C 0 x 0 0
Bldg 2-D x 0 0 1.5T
Bldg 2-E x 0 0 1.5T
Bldg 2-F x 0 0 1.5T
Bldg 3-A x 0 0 1.5T
Bldg 3-B x 0 x 1.5T
Bldg 4-A 0 x 0 0
Bldg 5-A x 0 x 1.5T
Bldg 6-A x 0 x 1.5T
Bldg 6-B x 0 x 1.5T
Bldg 6-C x 0 x 1.5T
Bldg 6-D 0 x 0 0
Bldg 6-E 0 x 0 0
Bldg 6-F 0 x 0 0
Bldg 6-G x 0 0 1.5T
Bldg 6-H 0 x 0 0
Bldg 7-A 0 0 x 0
Tasks:
1.Inspect extent of repair needs.
2.Formulate proposal and program of work.
3.Allocate fund from MOOE.
4. Monitor implementation.
5.Liquidate the fund.
Precondition:
Fund allows.
PPA: Repainting of external walls Repainted external walls of 21 CL Pictures
Bldg 1-A Program of work 0 0 x 0
Bldg 1-B 0 0 x 0
Bldg 2-A Job order x 0 x 1.6T
Bldg 2-B Payroll 0 0 x 0
Bldg 2-C Receipts of Agreement 0 0 x 0
Bldg 2-D Certificate Completion x 0 x 1.6T
Bldg 2-E Liquidation report x 0 x 1.6T
Pre-condition:
Deped fund is available.
C.2. Improved availability of instructional and learning Procured the needed equipments Delivery receipts
materials, references and equipment Memorandum Receipt
Multi-media LCD Projector 0 1 0 0
Sound box, portable with tripod 0 1 1 0
Science Subjects 0 0 2 0
Ammeter 1 3 3 210
Beaker 2 3 3 170
Compound microscope 0 0 1 0
Concave lens 0 1 2 0
Convex lens 0 1 2 0
Denatured alcohol 1 2 4 75
Gas stove, single portable 0 1 0 0
Handlens 1 5 5 45
Lab thermometer 0 5 5 0
Magnetic compass 0 2 1 0
Magnetic wire 0 2 1 0
Multi-tester 0 1 1 0
Prism glass 1 3 3 0
Test tube 1 5 5 180
U-magnet 1 3 3 65
Voltmeter 1 2 1 485
Weighing scale 1 2 1 800
TLE/EPP
Home Economics
Big carajay 0 0 1 0
Big cooking pot (for Feeding) 0 3 2 0
Burner, heavy duty 0 1 1 0
Coasters 12 12 12 324
Curtain, set 6 8 6 2.3
Cutlery, set 6 24 6 450
Ember tongs 1 2 3 45
Gas range, portable 0 1 0 0
Prepared:
ANALIE V. BUHAYAN
Principal I
Page 1 of 19
NANCIAL TARGETS
IMPORTANT ASSUMPTION
Y2 Y3
Page 3 of 19
NANCIAL TARGETS
IMPORTANT ASSUMPTION
Y2 Y3
Page 4 of 19
NANCIAL TARGETS
IMPORTANT ASSUMPTION
Y2 Y3
0 3.5T
0 2.3T
0 4.1T
7.2T 1.3T
6.9T 1.2
7.1T 2.2T
2.2T 0
1.8T 2T
1.2T 0
1.6T 0
2.1T 0
4.3T 7.2T
Page 5 of 19
NANCIAL TARGETS
IMPORTANT ASSUMPTION
Y2 Y3
0 2.2T
3.1T 0
3.1T 0
0 2.4T
2.4T 0
0 5.1T
Page 5 of 19
NANCIAL TARGETS
IMPORTANT ASSUMPTION
Y2 Y3
x 3T
x 3T
x 3T
x 3T
x 3T
x 3T
x 3T
x 3T
x 3T
x 3T
0 2.2T
0 2.2T
0 2.2T
0 2.2T
0 2.2T
0 2.2T
0 2.2T
Page 7 of 19
NANCIAL TARGETS
IMPORTANT ASSUMPTION
Y2 Y3
0 2.2T
0 2.2T
0 2.2T
2.2T 0
2.2T 0
2.2T 0
2.2T 0
2.2T 0
2.2T 0
2.2T 0
2.2T 0
2.2T 0
2.2T 0
2.2T 0
3.2T 0
1.1T 0
1.1T 0
1.1T 0
1.1T 0
1.1T 0
1.1T 0
1.1T 0
1.1T 0
1.1T 0
1.1T 0
1.1T 0
1.1T 0
1.1T 0
1.1T 0
1.1T 0
1.1T 0
1.1T 0
1.1T 0
1.1T 0
1.1T 0
1.1T 0
Comfortable movement
0 0 in the classroom is improved.
0 0
2.6T 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Page 8 of 19
NANCIAL TARGETS
IMPORTANT ASSUMPTION
Y2 Y3
0 0
4.2T 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
10.5T 0
55T 70T
10T 10T
10T 9.8T
5.6T 5T
3T 3T
Welcoming ambence is improved.
10T 6.8T Security in the campus is ensured.
0 100T
10T 10T
4.5T 7.5T
10T 15T
7.5T 8T
3.5T 4T
1.6T 2T
14.7T 0
0 25T
Page 9 of 19
NANCIAL TARGETS
IMPORTANT ASSUMPTION
Y2 Y3
Page 10 of 19
NANCIAL TARGETS
IMPORTANT ASSUMPTION
Y2 Y3
3.9T 0
3.9T 0
3.9T 0
3.9T
0 3.9T
0 3.9T
0 3.9T
0 3.9T
0 3.9T
0 3.9T
0 3.9T
0 3.9T
3.1T 0
3.1T 0
3.1T 0
3.1T 0
3.1T 0
3.1T 0
3.1T 0
3.1T 0
0 3.1T
0 3.1T
0 3.1T
0 3.1T
0 3.1T
0 3.1T
0 3.1T
0 3.1T
3T 0
3T 0
1.4T 0
1.4T 0
3.1T 0
3.1T 0
1.6T 0
2.1T 0
440 0
440 0
0
2T 0
0
3.3T 0
3.3T 0
1.4T 0
1.6T 0
0
275 0
330 0
2.5T 0
715 0
Page 11 of 19
NANCIAL TARGETS
IMPORTANT ASSUMPTION
Y2 Y3
2.5T 0
2.5T 0
825 0
3.2T 0
165 0
0
880 0
1.9T 0
330 0
1.3T 0
1.1T 0
935 0
0 0
0 0
0 0
0 0
0 0
0 0
Instructional materials and
equipment are utilized well
28T 0 to facilitate teaching-learning
5.5T 6T process
127 0
690 720
285 330
0 37T
135 290
135 290
170 600
3T 0
275 325
975 1.1T
160 150
165 170
600 700
465 480
975 1.2T
210 240
1T 550
1.8T 1.1T
0 2.4
7.8T 4.8T
1.8 1.2T
420 480
3.2T 2.5T
1.9T 520
100 180
17T 0
Page 12 of 19
NANCIAL TARGETS
IMPORTANT ASSUMPTION
Y2 Y3
3.3T 1.8T
30 40
580 0
4.2T 450
2.1T 1.1T
1.5T 0
2.1T 1.2T
510 700
4.6T 0
0 3.4T
795 850
450 600
0 10T
0 18T
0 2.8T
580 0
1.6T 900
4.4T 0
385 495
30 50
30T 34T
1.1T 760
870 0
250 270
700 800
0 4.5T
0 10.6T
740 380
860 1T
760 840
350 480
3.8t 0
285 560
860 1.3T
0 3T
960 1T
0 1.8T
330 480
0 1.2T
0 18T
1.2T 0
800 0
2.4t 0
900 0
2.8T 3T
3.5T 900
180 90
0 450
2.5T 0
700 0
2.5T 0
2.5T 0
9T 0
9T 0
Page 13 of 19
NANCIAL TARGETS
IMPORTANT ASSUMPTION
Y2 Y3
3.5T 0
6T 0
6T 0
5T 0
4.8T 0
1.8T 0
1.8T 0
1.8T 0
3.9T 0
1.8T 0
10.8T 0
1T 0
4.5T 0
800 0
5T 0
12T
1.2T 0
4.5T 0
13.5T 0
5.2T 0
18T 0
5T 0
5.5T 0
2T 0
2.4T 0
28T 0
25T 0
0 100T
0 10T
0 11.5T
0 6T
0 4.2T
8T 0
4.5T 0
6.4T 0
14.4T 0
7T 0
6T 0
11.2 0
14T 0
12T 0
12.5T 0
6.4T 0
16T 0
7T 0
12T 0
5T 0
5T 0
7.2 0
12T 0
7.6T 0
7T 0
Page 14 of 19
NANCIAL TARGETS
IMPORTANT ASSUMPTION
Y2 Y3
12T
15T
6T
6T
4T
25T
5T 0
6T 0
16T 0
6T 0
13T 0
24T 0
3.8T 0
5T 0
1.3T 0
1.4T 0
14T 0
1.6T 0
16T 0
18T 0
2.4T 0
5T 0
6T 0
4T 0
1.8T 0
1.6T 0
600 0
7.2T 0
160 0
7.5T 0
1.2T 0
800 0
3.2T 0
900 0
1.2T 0
1.4T 0
1.5T 0
1.8T 0
5.6T 0
900 0
1.3T 0
1.5T 0
1.8T 0
1.4T 0
9.2T 0
9.5T 0
9.4T 0
10.2T 0
4T 0
3.8T 0
2T 0
Page 15 of 19
NANCIAL TARGETS
IMPORTANT ASSUMPTION
Y2 Y3
1.5T 0
800 0
1.7T 0
1.5T 0
500 0
250 0
1T 0
5.6T 0
70T 0
6T 0
12T 0
72T 0
36T 0
18T 0
2.5T 0
3.5T 0
0 100T
0 102T
0 102T
0 20T
0 20T
0 60T
0 4T
0 4T
0 T
0 6T
0 14T
0 12T
0 1.4T
0 20T
0 22T
0 12.2T
0 5T
0 15T
0 17.5T
0 15T
0 9T
0 22.5T
0 12.5T
0 15T
Page 16 of 19
NANCIAL TARGETS
IMPORTANT ASSUMPTION
Y2 Y3
0 12T
0 1.2T
0 12.5T
0 1.4T
0 2.4T
0 4.8T
0 11.3T
0 2.4T
0 1.2T
0 1.6T
0 960
0 690
0 1.1T
0 1.9T
0 870
0 900
0 300
0 1.4T
0 2.7
0 2.1T
0 21T
0 1.4T
0 2.8T
0 3.5T
0 380
0 9T
0 10.4T
0 600
0 3.5T
0 2.2T
0 150
0 4.5T
0 2T
0 4.2T
0 3.5T
0 1.8T
0 2.4T
0 1.4T
0 925
0 4.2t
0 9.6T
0 3.2T
0 800
0 2.4T
0 3.2T
0 1.6T
0 250T
0 25T
0 28T
Page 17 of 19
NANCIAL TARGETS
IMPORTANT ASSUMPTION
Y2 Y3
0 5.4T
52T 0
66T 0
14T 0
14.3T 0
4.4T 0
180 210
3.5T 4T
32t 35T
2.2T 2.5T
1.3T 1.4T
1.4T 1.5T
5.4T 0
2.1T 2.3T
400 550
0 450
2.6T 0
150 0
0 3.5T
195 210
330 380
225 260
96 110
360 380
250 270
230 250
3.6T 4.2T
8T 9T
10T 12T
4T 5T
3T 5T
600 700
Page 18 of 19
NANCIAL TARGETS
IMPORTANT ASSUMPTION
Y2 Y3
1T 1T
500 500
1T 1.3T
800 1T
200 300
300 600
600 700
Page 19 of 19
NANCIAL TARGETS
IMPORTANT ASSUMPTION
Y2 Y3
Community responds positively
to the program
100 100
300 300
2.5t 3T
70T 70T
COLONIA DIVINA INTEGRATED SCHOOL
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2012 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
A. Personnel
A.1. Improved provision of teaching
personnel.
PPA: Provision of new teachers E-BEIS 21T 21T 27T 21T 32.4T 21T 21T 21T 21T 21T 21T
Tasks: Appointment
1.Determine enrolment data. MOA x
2.Determine teacher need x
3.Submit request and justification to D.O. for follow up x
4.Orient the teachers on their designation /loads x
Precondition:
Items or volunteers are available.
PPA: Provision of Volunteer Teachers SRC 5T 5T 5T 5T 5T 5T 5T
PPA: Designation of regular teachers for assistance
in preparing review materials
PPA: Provision of skills training intructors Received copies of 10T
Tasks: registration forms
1.FinalizetheorganizationoftheALSclasses. Enrolment forms of ALS x
2. Launch the program. recipients x
3. Coordinate with barangay council and the division Designation of teachers x
office to generate support generate support.
4.Requestforvolunteerteachers. Appointment x
5. Start the sessions/classes x
6. Requested for skills training instructors x
Precondition:
Items or volunteers are available.
A.2. Improved provision of non- teaching personnel
PPA: Provision of a school/teacher librarian. Students library logsheets 6T 6T 6T 6T 6T 6T
Tasks:
1.Write letter of request for a librarian to the Divisin Office. x
2.Recommend an applicant. x
3.Follow up. x
4.Orient the hiree of her/his details of responsibility. x x x x x x x
5.Monitor / Evaluate the library functionality. x x x x x x x
6.Prepare monthly report per requirement by donors
and Division Office. x x x x x x x
Precondition:
Fund/volunteer is availble. Request is granted.
PPA: Provision of school guard School Guard's journal 2.5T 2.5T 2.5T 2.5T 2.5T 2.5T
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2012 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
Tasks:
1.Coordinate with the PTA. x x x x x x x
2.Call a PTA assembly. x
3.Present the problem and need for a school guard. x
4.Appeal for funding assistance. x
5.Recommend an applicant. x
6.Assist the PTA in making job order. x
7.Orient the hired civilian guard. x x x x x x x
8.Monitor/Evaluate performance. x x x x x x x
9.Update the PTA of his performance. x x x x x x x
Precondition:
Volunteer teachers are avilable and granted.
PPA: Designation of office staf Received copies of reports
Bookkeeper Conformed Designation
Disbursing Officer
Tasks:
1. Identify potential and deserving teaching personnel. x x
2. Ask their approval. x
3. Orient them of their roles and accountability. x
4. Make a designation. x
5. Seek their conformity/signature. x
6. Train them of their tasks. x x x x x
7. Entrust to but ask them of the tasks. x x x x x x x x
Precondition:
Requested teaching personnel is granted.
B. Physical and Ancillary Facilities
B.2 Improved provision of furniture for Kinder classes Delivery receipt
Table Inventory report 19.2T
Chairs MR 14.4T
Dividers/shelves 2.5T
PPA: Requesting from the Deped or School Board for fund
Tasks:
1. Send request letter to the Division Office g. x
2. Follow up. x x x x
4. Receive the delivery. x x
5. Update inventory report/record x x x x
Precondition:
Division office mediates.
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2012 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
B.4. Improved condition of existing facilities
B.4.a. Repaired / maintained the classrooms
PPA : Requesting for repair from the School Board Inventory Report
or SMRMS fund for repair of Bldg 8-A Program of work
Tasks: Certificate of completion
1. Request for inspection and official declaration of x
status of the building by an engineer. x
2. Indicate the status in the inventory report of the school. x
3. Write a request letter for repair to the Division Office. x
4. Followup. x x x
5. Receive the delivery. x 8T
6. Monitor the implementation. x x
7. Accept. x
8. Make a report. x
Precondition:
The project in given priority.
PPA: Repair of partition wall. Inventory Report
Between Bldg 6-G & H Program of work 800
Tasks: Certificate of completion
1.Inspect extent of repair needs. x x
2.Formulate proposal and program of work. x
3.Allocate fund from MOOE and implement the project. x x
4. Monitor implementation. x
5.Liquidate the fund. x
Precondition:
Fund allows.
B3.a.2. Executed minor repair
PPA: Repair of leaking/ dripping roofs. Inventory Report
Bldg 2-A Program of work 3.1T
Bldg 2-B Certificate of completion 4.7T
Bldg 2-C 5.6T
Bldg 2-D 5.3T
Bldg 2-E 3.4T
Bldg 2-F 3.6T
Tasks:
1.Inspect extent of repair needs.
2.Formulate proposal and program of work.
3.Allocate fund from MOOE.
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2012 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
4. Monitor implementation.
5.Liquidate the fund.
Precondition:
Fund allows.
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2012 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
4. Monitor implementation. x x
5.Liquidate the fund. x x
Precondition:
Fund allows.
PPA: Repair/Replacement of crumbling doorjamb.
Bldg 6-A Inventory Report 3T
Bldg 6-B Program of work 3T
Bldg 6-C Certificate of completion 3T
Bldg 6-G 3T
Bldg 2-D 3T
Tasks:
1.Inspect extent of repair needs. x x x
2.Formulate proposal and program of work. x
3.Allocate fund from MOOE. x
4. Monitor implementation. x
5.Liquidate the fund. x
Precondition:
Fund allows. Inventory Report
PPA: Replacement of rotting door panel Program of work
Bldg 6-A Certificate of completion 6.3T
Bldg 6-B 6.3T
Bldg 6-C 6.3T
Bldg 6-G 6.3T
Tasks:
1.Inspect extent of repair needs. x x x x x x x x x x x x
2.Formulate proposal and program of work. x
4. Implement the project. x x x x 400 400
5. Monitor implementation. x x x
6.Liquidate the fund. x x
Precondition:
Fund allows.
PPA: Repair/replacement of falling fascia board Inventory Report
Bldg 3-A Program of work
Bldg 3-B Certificate of completion
Bldg 6-D
Tasks:
1.Inspect extent of repair needs. x x x x x x x x x x x x
2.Prepare proposal and program of work. x
3.Allocate fund from MOOE. x
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2012 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
4. Implement the project. x 500
5. Monitor implementation. x
6.Liquidate the fund. x
Precondition:
Fund is available.
B.3.a.3. Repainted facilities
PPA: Repainting of roofs Inventory Report
Bldg 2 -A Program of work 3.2T
Bldg 2-B 3.2T
Bldg 2-C 3.2T
Bldg 2-D 3.2T
Bldg 2-E 3.2T
Bldg 2-F 3.2T
Bldg 3-A 3.2T
Bldg 4-A 3.2T
Bldg 6-G 3.2T
Bldg 6-H 3.2T
Bldg 7-A 3.2T
Tasks:
1.Inspect extent of repair needs. x x x x x x x x x x x x
2.Formulate proposal and program of work. x x
3.Allocate fund from MOOE. x x x
4. Implement the project. x x x
5. Monitor implementation. x x x
6.Liquidate the fund. x x
Precondition:
Fund allows.
PPA: Repainting of ceiling Inventory Report
Bldg 3-A Program of work 3T
Tasks: Certificate of completion
1.Inspect extent of repair needs. x x x
2.Preparethe proposal and program of work. x
3.Allocate fund from MOOE. x
4. Implement the project. x 200
5. Monitor implementation. x
6.Liquidate the fund. x
Precondition:
Fund allows.
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2012 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
PPA: Repainting of internal walls Picture
Bldg 2-C Acceptance report 1.6T
Bldg 4-A 1.6T
Bldg 6-D 1.6T
Bldg 6-E 1.6T
Bldg 6-F 1.6T
Bldg 6-H 1.6T
Tasks:
1.Inspect extent of repair needs. x x
2.Preparethe proposal and program of work. x x
3.Allocate fund from MOOE. x
4. Implement the project. x 300
5. Monitor implementation. x
6.Liquidate the fund. x
Precondition:
Fund allows.
PPA: Repainting of external walls Pictures
Bldg 4-A Program of work 2.2T
Bldg 5-A 2.2T
Bldg 6-A Job order 2.2T
Bldg 6-B Payroll 2.2T
Bldg 6-C Receipts of Agreement 2.2T
Bldg 6-D Certificate Completion 2.2T
Bldg 6-E Liquidation report 2.2T
Bldg 6-F 2.2T
Bldg 6-G 2.2T
Bldg 6-H 2.2T
Bldg 7-A 2.2T
H.E Building 3.2T
Tasks:
1.Inspect extent of repair needs. x x x
2.Preparethe proposal and program of work. x
3.Allocate fund from MOOE. x
4. Implement the project. x 400
5. Monitor the implementation. x
6.Liquidate the fund. x x
Precondition:
Fund allows.
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2012 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
PPA: Repainting of classroom furniture at:
Bldg 1-A 1.1T
Bldg 1-B 1.1T
Bldg 2-A 1.1T
Bldg 2-B 1.1T
Bldg 2-C 1.1T
Bldg 2-D 1.1T
Bldg 2-E 1.1T
Bldg 2-F 1.1T
Bldg 3-A 1.1T
Bldg 3-B 1.1T
Bldg 4-A 1.1T
Bldg 5-A 1.1T
Bldg 6-A 1.1T
Bldg 6-B 1.1T
Bldg 6-C 1.1T
Bldg 6-D 1.1T
Bldg 6-E 1.1T
Bldg 6-F 1.1T
Bldg 6-G 1.1T
Bldg 6-H 1.1T
Bldg 7-A 1.1T
Tasks:
1.Inspect extent of repair needs. x x x
2.Preparethe proposal and program of work. x
3.Allocate fund from MOOE. x
4. Implement the project. x
5. Monitor the implementation. x
6.Liquidate the fund. x
Precondition:
Fund allows.
PPA: Repainting of floor Inventory Report
Computer Laboratory Program of work 2.4T
Designated Office Delivery receipt 1.6T
Tasks:
1. Make an estimate. x
2. Do the program of work. x
3. Allocate budget. x
4. Implement. x
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2012 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
5. Liquidate expenses. x
Precondition:
Fund allows.
Proposal is approved by Division Office
PPA: Repair of handrail guard at the Elementary
4.2T
Department
Tasks:
1. Make an estimate. x
2. Do the program of work. x
3. Allocate budget. x
4. Implement. x
5. Liquidate expenses. x
Precondition:
Proposal is approved by Division Office
PPA: Repair of fishpond 4.2T
Tasks: x
1. Make an estimate. x
2. Do the program of work. x
3. Allocate budget. x
4. Implement. x
5. Liquidate expenses.
Precondition:
Proposal is approved by Division Office
PAA: Expansion of semi-concrete perimeter fence 55T
Tasks:
1. Write a letter to LGUs requesting for the construction. x
2. Follow-up. x x x x x
3. Monitor implementation. x
3. Accept. x
4. Report. x
Precondition:
Fund is granted.
PPA: Repair of the ancillary services
Canteen 10T
Feeding center 10T
SPG/SSG office 5.6T
Nursery 3T
Tasks:
1. Make an estimate. x
2. Do the program of work. x x
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2012 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
3. Allocate budget. x x x
4. Implement. x x
5. Liquidate expenses. x x
PPA: Repair of other facilities
Electrical lines x x x x 5.5T 5T 5T 6.8T
Footwalk 1.25T 1.25T 1.25T 1.25T 1.25T 1.25T 1.25T 1.25T 1.25T 1.25T 1.25T
Guard post 4.5T
Landscapes 1.25T 1.25T 1.25T 1.25T 1.25T 1.25T 1.25T 1.25T 1.25T 1.25T 1.25T
Handwashing sink 2.5T 2.5T 2.5T
Temporary perimeter fence 3.5T
Open well 800 800
Water line from irrigation to the fishpond 14.7T
Tasks:
1. Make an estimate. x x
2. Do the program of work. x
3. Allocate budget. x x x x x x x x
PPA: Repair of broken/damaged equipment
5 Computer units 2.5T
2 Printers 300
5 Electric fan 600
1 Simple sewing machine 1.6T
1 Sound system
1 Bundy clock 300
1 Gas range 1.5T
1 Refrigerator 500
1 DVD cassette player 300
Tasks:
1.Inspect extent of repair needs. x x x x x x x
2.Preparethe proposal and program of work. x x x
3.Allocate fund from MOOE. x x x
4. Implement the project. x x x
5. Monitor the implementation. x x x
6.Liquidate the fund. x x x
Precondition:
Fund allows.
PPA: Repair of broken/damaged furniture Delivery receipts
2 Cabinet Memorandum Receipt 1.5T 1.5T
10 Chairs 600
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2012 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
3 Dividers 2.5T
3 Graphing board 2.8T
1 rustrum 4.6T
55 Drawing table 9T 9T 9T 9T
3 Sala Seats 700
6 Computer tables 3.3T
Tasks:
1.Inspect extent of repair needs. x x x x x
2.Preparethe proposal and program of work. x x x x
3.Allocate fund from MOOE. x x x x
4. Implement the project. x x x x x x
5. Monitor the implementation. x x x x x x
6.Liquidate the fund. x x x x x
Precondition:
Fund allows.
PPA : Acquisition and installation of an airconditioner. Delivery receipts
Tasks: Memorandum Receipt
1. Send a follow-up the letter request to the governor. x
2. Follow-up. x x x x x x x x x
3. Receive. x
4. Install. x
Precondition:
Request is granted.
C. Learning Materials
and Equipment
C.1. Improved the availability of textbooks
PPA: Acquisition of additional textbook Inventory report
(New Curriculum)
Grade I
70 Mother Tongue 3.9T
70 Filipino 3.9T
70 English 3.9T
70 Mathematics 3.9T
70 Araling Panlipunan 3.9T
70 MAPEH 3.9T
70 Edukasyon sa Pagpapakatao 3.9T
Edukasyon sa Pagpapakatao
Grade 7
55 Filipino 3.1T
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2012 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
55 English 3.1T
55 Science 3.1T
55 Mathematics 3.1T
55 Araling Panlipunan 3.1T
55 TLE 3.1T
Grade 2
54 Pagdiriwang ng Wikang Pilipino 3T
54 Sibika at Kultura Serye 2 3T
Grade 3
25 Growing with Science and Health 1.4T
25 Bagong Pilipino sa Salita at Gawa (Pagbasa) 1.4T
55 Bagong Pilipino sa Salita at Gawa (Wika) 3.1T
55 (Sibika) Makabayang Pilipino 3: Masipag na Pilipino 3.1T
29 (Sibika) Ang Bagong Pilipino 1.6T
Grade 4
38 Science for Daily Use 2.1T
8 Hiyas sa Wika 440
8 Hiyas sa Pagbasa 440
37 Heograpiya, Kasaysayan, at Sibika 4 Makabayan; 2T
Kapaligirang Pilipino
Grade 5
59 English Expressways-Reading 3.3T
59 English Expressways-Language 3.3T
25 Science for Daily Use 1.4T
29 Heograpiya, Kasaysayan, at Sibika 4 Makabayan; 1.6T
Kapaligirang Pilipino
Grade 6
5 English for You and Me-Language 275
6 English for You and Me-Reading 330
45 Into the Future: Sciencce and Health 2.5T
13 Mathematics for Everyday Use 715
45 Landas sa Wika at Pagbasa - Wika 2.5T
45 Landas sa Wika at Pagbasa - Pagbasa 2.5T
Year 2
15 English Expressways 825
58 Sci & Tech: Biology (Revised Edition 2009) 3.2T
3 Asya: Pag-usbong ng Kabihasnan 165
Year 3
16 English Expressways 880
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2012 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
35 (Math) Geometry 3 (Reprinted 2009 1.9T
6 (MAPEH( Enjoy Life with Music and Arts 330
Year 4
24English Expressways 1.3T
20Sci & Tech: Physics (Revised Edition 2009) 1.1T
7
(MAPEH( Enjoy Life with Music and Arts 935
Tasks:
1.Prepare and submit textbook inventory x x x
2.Submit request for additional textbook x x x x
3.Follow-up request for additional textbook x
4.When approved inspect delivery of textbook x
5.Sign memorandum of receipts x
Pre-condition: Deped fund is available x
C.2. Improved availability of instructional materials, Delivery receipts
references and equipment Memorandum Receipt
1 Multi-media LCD Projector 28T
1 Sound box, portable with tripod 5.5T
Science Subjects
1 Ammeter 690
1 Beaker 285
1 Concave lens 135
1 Convex lens 135
2 Denatured alcohol 170
1 Gas stove, single portable 3T
5 Handlens 275
5 Lab thermometer 975
5 Magnetic compass 160
2 Magnetic wire 165
1 Multi-tester 600
3 Prism glass 465
5 Test tube 975
3 U-magnet 210
2 Voltmeter 1T
2 Weighing scale 1.8T
TLE/EPP
Home Economics
3 Big cooking pot (for Feeding) 7.8T
1 Burner, heavy duty 1.8
12 Coasters 420
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2012 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
8 Curtain, set 3.2T
24 Cutlery, set 1.9T
2 Ember tongs 100
1 Gas range, portable 17T
24 Goblet 3.3T
1 Meat Grinder 1.5T
24 Placemats 2.1T
6 Platter 510
1 Pressure cooker 4.6T
3 Serving dishes 795
3 Sewing clamp 450
1 Table ice bucket 580
24 Table napkin, cloth 1.6T
1 Thermos, electric
1 Thermos, simple
1 Tissue paper holder
2 TV Set
3 Vanity mirror
2 Wine holder
Industrial Arts/EPP/Electricity
1 Chisel 250
2 Cross cut saw 700
2 Hack saw 740
2 Hammer 860
2 Long nose flier 760
5 Paint brush 350
1 Planer, manual 285
2 Pliers, set 860
2 Screw drivers, set 960
2 Steel rule, 33' 330
1 Welding machine, heavy duty 20T
Agriculture
1 Back Pack Sprayer 1.2T
1 Garden scale 800
1 Wheel Barrow 2.4t
3 Sprinkler 900
4 Spading Fork 2.8T
6 Hole digger 3.5T
2 Chisel
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2012 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
30 Scythe
2 Grass cutters
30 Hand trowels
30 Hand forks
30 Spade
30 Shovel
10 Crowbar
30 Garden hoe
30 Spading Fork
20 Pruning shears
30 Bolo
5 Saw
5 Hammer
5 Axe
3 Sprayers
15 Sprinklers
6 Wheel Barrow
5 Steel tape
2 Soil testing kit
1 Weighing scale
1 Power srayer
5 Hole digger
10 Picking/harvesting knives
30 Budding/grafting knives
20 Pick mattock
1 Draft carabao
1 Water pump
Fish Processing
Equipment
1 Pressure cooker
1 Can sealer
3 Plastic sealer
1 Horizontal freezer
Tools and Supplies
40 Kettle
10 Frying pan
40 Measuring spoon
1 Gas range
40 Mixing bowl-stainless
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2012 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
10 Mixing bowl-glass (by set)
40 Apron
40 Basin-stainless
40 Knives
10 Steamer
5,000 Cap seal of different sizes
40 Gloves
40 Laboratory gown
20 Weighing scale-1000g
20 Weighing scale-10kg
40 Paring knives
40 Peelers
40 Glass measuring cup
40 B-tin cans
40 Measuring cup for solid (by set)
Safety Equipment
1 Fire Extinguisher
Fish Culture
Tools
2 D.O. meters
3 Flow rate meter
40 Lab. Thermometer
20 Shovel
40 Water depth guage
20 Digging blades
2 Masonry tools
20 Cultivator/rake
2 Net
2 P.E rope
100 Pail (plastic)
2 Weighing scale
40 Safety Shoes
15 Sinker
2 Eckman dredge
5 Secchi disc
2 Water qty. test kit
1 pH meter
5 Fish cage and accessories
10 Beaker
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2012 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
5 Netting needle
40 Water current meter
1 Plastic basin
40 Hand gloves
40 Face mask
40 Plastic bags
20 Bolo
2 Cast net
2 Current meter
5 Dissecting board
5 Dissecting tools
5 Fish grater
40 Forceps
2 Refractometer
1 Blower
1 Salinometer
5 Scoop net
1 Suspension net
Garments
Tools
24 Pinking shears 9.2T
Cutting shears
24 (genuine stainless) 9.5T
24 Buttonhole scissor 9.4T
24 Embroidery scissor 10.2T
24 L-square (Stainless) 4T
24 Hip curve (Stainless) 3.8T
24 French curve (plastic) 2T
24 Tape measure (plastic) 1.5T
6 Meter stick (wooden) 800
24 Machine needle
24 (dozens, asstd) 1.7T
24 Tracing wheel 1.5T
24 Tailor's pin 500
24 Thimble 250
6 Hem marker 1T
50 White Tetoran (yards) 5.6T
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2012 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
Equipment
7 Sewing machine wl motor 70T
5 Mannequin (full size,
junior size, boys & girls) 6T
Sewing machines:
5 -Over edging Machine 12T
Straight Ordinary
6 Sewing Machine 72T
2 -High speed Machine 36T
6 Cutting tables 18T
2 Lifesize mirror 2.5T
5 Mannequin's Bust Forms
(male/female) 3.5T
Computer Hdwe Servicing
Tools & Equipment
10 Multi-tester
10 Transformer multi-
output w/UPS
10 DC regulated power
supply
40 Connecting cords GA 22
w/ aligator clips both
ends
40 Connecting cords GA 23
w/ banana clips both
40 ends
10 Bread board
10 Round nose pliers
10 Wire cutter
10 Philips head screw
driver 6" (set)
10 Flat head screw driver 6" set
40 Connecting wire (solid gauge no.22)
10 Soldering iron 100w
10 Soldering lead (matrl)
10 Desoldering pump
10 Logic probe
10 IC remover, cutter
1 Tool Cabinet
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2012 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
5 Router
Hardware:
5 Memory card
5 Expansion card
5 Hard disk
5 Mother board
5 Power supply (UPS)
5 Router
Tools
2 Fire extinguisher ABC
type, Dry Chem 5kg
5 Screen protector
5 Automatic voltage
regulator
Food Processing
3 Poly sealer 12.5T
2 Soaking vats
6 Salinometer 1.4T
25 Knives 2.4T
1 Slicers (Tocino) 4.8T
6 Peelers 11.3T
12 Spatulas & rubber spatulas 2.4T
6 Colanders 1.2T
6 Food tongs 1.6T
6 Strainers 960
12 Set of measuring spoons 690
6 Set of measuring cups for liquid 1.1T
6 Set of measuring cups for drying ingredients 1.9T
2 Hot lifter 870
40 Mixing Bowls (plastic) 900
6 Mixing bowls (stainless) 300
6 Utility trays (stainless) 1.4T
10 Casseroles of various 2.7
sizes (Set)
5 Chopping boards 2.1T
4 Saucepans (stainless) 21T
1 Refractometer 1.4T
1 Thermometer 2.8T
6 Jelly thermometer 3.5T
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2012 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
2 Osterizers 3.8T
2 Juice extractors 9T
1 Steamers 10.4T
1 Can sealer 600
1 Bottle sealer 3.5T
3 Gas tank (LPG) 2.2T
1 Fermentation vats 150
3 Steam jacketed kettle 4.5T
1 Hydrometer 2T
3 Lifters 4.2T
5 Kettles (varying capacities) 3.5T
5 Ladles (stainless/wooden) 1.8T
5 Fish scalers 2.4T
3 Pulp finishers 1.4T
3 Plastic protected cap sealer 925
1 Electric sealer 4.2t
2 Wire baskets 9.6T
2 Exhaust boxes 3.2T
4 Weighing scales (varying capacities and 800
sensitivities) 3.2T
1 Stoves (double) 1.6T
1 Smokehouse 250T
1 Refrigerator 25T
1 Freezer 28T
3 Double burner stove w/ 5.4T
accessories
Technical Drawing
Tools & Equipment
55 T-square 36" wooden body with
graduated plastic edge adjustable
55 Drawing table & stool 36"x24"
Safety Equipment
Fire extinguisher, ABC type, dry chemical 5kg
Internet Computer Fundamentals
Tools & Equipment
11 Smartbro modem
11 Chord 5 m
Kinder, Grade I, II, & III
10 Crayon 180
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2012 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
1 CD/DVD Player 3.5T
2 TV set 32t
4 Wall clock 2.2T
MAPEH/MSEP
1 Ball, basketball Mikasa 1.3T
1 Ball, volleyball Mikasa 1.4T
1 Cassette Player 5.4T
2 Lawn tennis set 2.1T
1 Table tennis set 400
Clinic
1 Digital thermometer 2.6T
1 Forceps 150
HEKASI/SIBIKA
4 Charts 195
4 Maps 330
Math
3 Compass 225
6 Color chalk, box 96
10 Crayon 360
10 Meterstick 250
5 Protractor 230
ALS
200 Modules, ALS 600 600 600 600 600 600
APP 1 : Alloting budget from MOOE or SBM grants
Tasks:
1. Monitor monthly needs and requirements. x x x x x x x x x x x x
2. Allot some amount from the MOOE/SBM x x x x x x x x x x x x
3. Indicate in the cash program/ proposal x x x x x x x x x x x x
4. Purchase. x x x x x x x x x x x x
Precondition:
Budget is available. Purchases undergo proper procedure.
APP 2 : Lobbying to potential stakeholders x x x x x x 200 200 200 200 200
Tasks:
1. Identify potential donors. x
2. Prepare request letters. x
3. Send out the letters. x x x x
4. Followup. x x x x x x x
5. Make proper documentation. x x x x x x x
Precondition:
Requests are granted.
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2012 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
APP 3 : Strengthening of Fund Raising Program x x x x x x x
Tasks:
1. Review with the faculty the determination of the school to x
acquire the equipment and of their importance in the
classroom.
2. Let them brainstorm on how to raise the amount of price. x
3. Refer the project to the PTA for support. x
4. Implement the project. x x x x x x
5. Account the proceeds. x x x x x x
6. Assign 2 teachers for the canvass/purchase. x x x
7. Keep the documents for future use. x x x x x x
Precondition:
All teachers strongly advocate the fund drive.
PPA: Repair of dysfunctional equipment
1 Bundy Clock 2.4T 1.2T
10 Electric fans 1T 500
2 Brush cutter 800
1 3-in-1 printer 200
1 Sound system 300
Tasks:
1. Check all equipment as to their functionality. x
2. Determine the extent of repair need. x
3. Make program of work/job order. x
4. Allot budget. x
5. Liquidate expenses. x x
Precondition:
Periodic checkup of equipment is done.
D. Others
D.1. Enrolled all school age children and
youth in the catchment areas.
PPA : Survey of new entrants 500
25 From Daycare to Kindergarten
42 From Kindergarten to Grade I
38 From Grade 6 to Year I
Tasks:
1.Campaign for early enrolment x x x x x x
2.Conductschool-to-school campaign for first year x 600
within the catchment
3. Get help from the barangay for enrolment promotion.
4. Keep following up for enrolment at CDIS.
5. Ensure 100% of promoted pupils and students are enrolled.
Precondition:
All graduates from Daycare, Kindergarten, and
Grade 6 proceed to next level.
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2012 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
PPA : Tracing of drop-outs School Register 200
Tracking Report
3 Grade 1 Form 3
1 Grade 2 Form 20
3 Grade 3
1 Grade 4
1 Grade 6
4 Grade 7
1 Year 2
3 Year 3
1 Year 4
Tasks:
1. Check the tracklist of drop-outs. x x
2. Trace their whereabouts. x x
3 Campaign for enrolment. x x 600
4. Enrol the returnees. x
Precondition:
All drop-outs are willing to return back to school.
D.2. Promoted inclusive education
PPA : Opening a BLP and A & E Programs SRC
Tasks: ALS reports
1. Conduct survey of the OSYs in the barangay . x x x 100
2. Coordinate with the barangay council to reach x x x
all these OSYs out.
3. Request for approval from the division office x
c/o ALS supervisor.
4. Hold an Advocay program. x 300
5. Make an arrangement on the instruction and instructors. x
6. Coordinate with Project CUEVA programs. x x
7. Seek assistance from the City Government for skills x x x
training integration.
8. Meet with recipients for final instruction x
and schedule of sessions.
9. Prepare modules. x 2.5T
10. Start classes. x
Precondition:
All OSYs are highly interested.
PPA : Provision of Skills Training Program to ALS learners Approved Proposal 70T
Tasks: Attendance Sheet
1. Determine the number of trinees. Pictures x
2. Negotiate with propected trainers. Outputs x
3. Make a project proposal. x
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2012 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
PROGRAMS/PROJECTS/ACTIVITIES MOV's
J F M A M J J A S O N D J F M A M J J A S O N
4. Seek approval/endorsement from the division office. x
5. Follow up. x x
6. Implement the program. x
Precondition:
Approval is granted by the Mayor.
Prepared:
ANALIE V. BUHAYAN
Principal I
Page 1 of 24
SOURCESOTHE
Q4 LGU PTA DEPED TOTAL
D RS
35T 35T
10T 10T
Page 2 of 24
SOURCES
OTHE
Q4 LGU PTA DEPED TOTAL
RS
D
19.2T 19.2T
14.4T 14.4T
2.5T 2.5T
5.5T
Page 3 of 24
SOURCES
OTHE
Q4 LGU PTA DEPED TOTAL
RS
D
8T 8T
800 800
3.1T 3.1T
4.7T 4.7T
5.6T 5.6T
5.3T 5.3T
3.4T 3.4T
3.6T 3.6T
Page 4 of 24
SOURCES
OTHE
Q4 LGU PTA DEPED TOTAL
RS
D
3.6T 3.6T
12.5T 12.5T
15.9T 15.9T
18.2T 18.2T
13T 13T
1.2T 1.2T
1.4T 1.4T
1.5T 1.5T
3.1T 3.1T
8.4T 8.4T
7.2T
6.9T
7.1T
2.2T 2.2T
1.8T 1.8T
1.2T 1.2T
1.6T 1.6T
2.1T 2.1T
4.3T 4.3T
Page 5 of 24
SOURCES
OTHE
Q4 LGU PTA DEPED TOTAL
RS
D
3T 3T
3T 3T
3T 3T
3T 3T
3T 3T
6.3T 6.3T
6.3T 6.3T
6.3T 6.3T
6.3T 6.3T
800 800
3.1T 3.1T 3.1T
3.1T 3.1T 3.1T
2.4T 2.4T 2.4T
Page 6 of 24
SOURCES
OTHER
Q4 LGU PTA DEPED TOTAL
S
D
500 500
3.2T 3.2T
3.2T 3.2T
3.2T 3.2T
3.2T 3.2T
3.2T 3.2T
3.2T 3.2T
3.2T 3.2T
3.2T 3.2T
3.2T 3.2T
3.2T 3.2T
3.2T 3.2T
3T 3T
200 200
Page 7 of 24
SOURCES
OTHE
Q4 LGU PTA DEPED TOTAL
RS
D
1.6T 1.6T
1.6T 1.6T
1.6T 1.6T
1.6T 1.6T
1.6T 1.6T
1.6T 1.6T
300 300
2.2T 2.2T
2.2T 2.2T
2.2T 2.2T
2.2T 2.2T
2.2T 2.2T
2.2T 2.2T
2.2T 2.2T
2.2T 2.2T
2.2T 2.2T
2.2T 2.2T
2.2T 2.2T
3.2T 3.2T
400 400
Page 8 of 24
SOURCES
OTHE
Q4 LGU PTA DEPED TOTAL
RS
D
1.1T 1.1T
1.1T 1.1T
1.1T 1.1T
1.1T 1.1T
1.1T 1.1T
1.1T 1.1T
1.1T 1.1T
1.1T 1.1T
1.1T 1.1T
1.1T 1.1T
1.1T 1.1T
1.1T 1.1T
1.1T 1.1T
1.1T 1.1T
1.1T 1.1T
1.1T 1.1T
1.1T 1.1T
1.1T 1.1T
1.1T 1.1T
1.1T 1.1T
1.1T 1.1T
2.4T 2.4T
1.6T 1.6T
Page 9 of 24
SOURCES
OTHE
Q4 LGU PTA DEPED TOTAL
D RS
4.2T 4.2T
4.2T 4.2T
55T
10T 10T
10T 10T
5.6T 5.6T
3T 3T
Page 10 of 24
SOURCES
OTHER
Q4 LGU PTA DEPED
S
TOTAL
D
2.5T 2.5T
300 300
600 600
1.6T 300
500 500 500
300 300
1.5T 1.5T
500 500
300 300
3T 3T
600 600
Page 11 of 24
SOURCES
OTHE
Q4 LGU PTA DEPED TOTAL
RS
D
2.5T
2.8T
4.6T
9.2T 5T 35.2T 5T 45.2T
700 1.4T
3.3T
3.1T 3.1T
Page 12 of 24
SOURCES
OTHE
Q4 LGU PTA DEPED TOTAL
RS
D
3.1T 3.1T
3.1T 3.1T
3.1T 3.1T
3.1T 3.1T
3.1T 3.1T
3T 3T
3T 3T
1.4T 1.4T
1.4T 1.4T
3.1T 3.1T
3.1T 3.1T
1.6T 1.6T
2.1T 2.1T
440 440
440 440
2T 2T
3.3T 3.3T
3.3T 3.3T
1.4T 1.4T
1.6T 1.6T
275 275
330 330
2.5T 2.5T
715 715
2.5T 2.5T
2.5T 2.5T
825 825
3.2T 3.2T
165 165
880 880
Page 13 of 24
SOURCES
OTHE
Q4 LGU PTA DEPED TOTAL
RS
D
1.9T 1.9T
330 330
1.3T 1.3T
1.1T 1.1T
935 935
28T 28T
5.5T 5.5T
690 690
285 285
135 135
135 135
170 170
3T 3T
275 275
975 975
160 160
165 165
600 600
465 465
975 975
210 210
1T 1T
1.8T 1.8T
7.8T 7.8T
1.8 1.8
420 420
Page 14 of 24
SOURCES
OTHE
Q4 LGU PTA DEPED TOTAL
RS
D
3.2T 3.2T
1.9T 1.9T
100 100
17T 17T
3.3T 3.3T
1.5T 1.5T
2.1T 2.1T
510 510
4.6T 4.6T
795 795
450 450
580 580
1.6T 1.6T
4.4T 4.4T 4.4T
385 385 385
30 30 30
30T 30T 30T
1.1T 1.1T 1.1T
870 870 870
250 250
700 700
740 740
860 860
760 760
350 350
285 285
860 860
960 960
330 330
20T 20T
1.2T 1.2T
800 800
2.4t 2.4t
900 900
2.8T 2.8T
3.5T 3.5T
180 180 180
Page 15 of 24
SOURCES
OTHE
Q4 LGU PTA DEPED TOTAL
RS
D
2.5T 2.5T 2.5T
700 700 700
2.5T 2.5T 2.5T
2.5T 2.5T 2.5T
9T 9T 9T
9T 9T 9T
3.5T 3.5T 3.5T
6T 6T 6T
6T 6T 6T
5T 5T 5T
4.8T 4.8T 4.8T
1.8T 1.8T 1.8T
1.8T 1.8T 1.8T
1.8T 1.8T 1.8T
3.9T 3.9T 3.9T
1.8T 1.8T 1.8T
10.8T 10.8T 10.8T
1T 1T 1T
4.5T 4.5T 4.5T
800 800 800
5T 5T 5T
1.2T 1.2T 1.2T
4.5T 4.5T 4.5T
13.5T 13.5T 13.5T
5.2T 5.2T 5.2T
18T 18T 18T
5T 5T 5T
8T 8T 8T
4.5T 4.5T 4.5T
6.4T 6.4T 6.4T
25T 25T 25T
14.4T 14.4T 14.4T
Page 16 of 24
SOURCES
OTHER
Q4 LGU PTA DEPED TOTAL
S
D
7T 7T 7T
6T 6T 6T
11.2 11.2 11.2
14T 14T 14T
12T 12T 12T
12.5T 12.5T 12.5T
6.4T 6.4T 6.4T
16T 16T 16T
7T 7T 7T
12T 12T 12T
5T 5T 5T
5T 5T 5T
7.2 7.2 7.2
12T 12T 12T
7.6T 7.6T 7.6T
7T 7T 7T
5T 5T 5T
6T 6T 6T
16T 16T 16T
6T 6T 6T
13T 13T 13T
24T 24T 24T
3.8T 3.8T 3.8T
5T 5T 5T
1.3T 1.3T 1.3T
1.4T 1.4T 1.4T
14T 14T 14T
1.6T 1.6T 1.6T
16T 16T 16T
18T 18T 18T
2.4T 2.4T 2.4T
5T 5T 5T
6T 6T 6T
4T 4T 4T
1.8T 1.8T 1.8T
1.6T 1.6T 1.6T
Page 17 of 24
SOURCES
OTHE
Q4 LGU PTA DEPED TOTAL
RS
D
9.2T 9.2T
9.5T 9.5T
9.4T 9.4T
10.2T 10.2T
4T 4T
3.8T 3.8T
2T 2T
1.5T 1.5T
800 800
1.7T 1.7T
1.5T 1.5T
500 500
250 250
1T 1T
5.6T 5.6T
Page 18 of 24
SOURCES
OTHE
Q4 LGU PTA DEPED TOTAL
RS
D
70T 70T
6T 6T
12T 12T
72T 72T
36T 36T
18T 18T
2.5T 2.5T
3.5T 3.5T
20T 20T
T T T
6T 6T 6T
6T 6T 6T
14T 14T 14T
14T 14T 14T
12T 12T 12T
1.4T 1.4T 1.4T
20T 20T 20T
22T 22T 22T
Page 19 of 24
SOURCES
OTHE
Q4 LGU PTA DEPED TOTAL
RS
D
12.2T 12.2T 12.2T
5T 5T 5T
15T 15T 15T
17.5T 17.5T 17.5T
15T 15T 15T
9T 9T 9T
22.5T 22.5T 22.5T
12.5T 12.5T 12.5T
15T 15T 15T
12.5T 12.5T
1.4T 1.4T
2.4T 2.4T
4.8T 4.8T
11.3T 11.3T
2.4T 2.4T
1.2T 1.2T
1.6T 1.6T
960 960
690 690
1.1T 1.1T
1.9T 1.9T
870 870
900 900
300 300
1.4T 1.4T
2.7 2.7
2.1T
2.1T
21T 21T
1.4T 1.4T
2.8T 2.8T
3.5T 3.5T
Page 20 of 24
SOURCES
OTHER
Q4 LGU PTA DEPED TOTAL
S
D
3.8T 3.8T
9T 9T
10.4T 10.4T
600 600
3.5T 3.5T
2.2T 2.2T
150 150
4.5T 4.5T
2T 2T
4.2T 4.2T
3.5T 3.5T
1.8T 1.8T
2.4T 2.4T
1.4T 1.4T
925 925
4.2t 4.2t
9.6T 9.6T
3.2T 3.2T
800 800
3.2T 3.2T
1.6T 1.6T
250T 250T
25T 25T
28T 28T
5.4T 5.4T
10T 52T
5.4T 5.4T
66T 66T 66T
14.3T 14.3T
4.4T 4.4T
180 180
Page 21 of 24
SOURCES
OTHER
Q4 LGU PTA DEPED TOTAL
S
D
3.5T 3.5T
32t 32t
2.2T 2.2T
1.3T 1.3T
1.4T 1.4T
5.4T 5.4T
2.1T 2.1T
400 400
2.6T 2.6T
150 150
195
330
225 225
96 96
360 360
250 250
230 230
3.6T 3.6T
1T 1T
Page 22 of 24
SOURCES
OTHER
Q4 LGU PTA DEPED
S
TOTAL
D
1T 1T
1.2T 2.4T 2.4T
500 1T 1T
800 800
200 200
300 300
500 500
600 600
Page 23 of 24
SOURCES
OTHE
Q4 LGU PTA DEPED TOTAL
RS
D
200 200
600 600
100 100
300 300
2.5T 2.5T
70T 70T
Page 24 of 24
SOURCES
OTHE
Q4 LGU PTA DEPED TOTAL
RS
D
COLONIA DIVINA INTEGRATED SCHOOL
Annual Improvement Plan 2013 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
A. Personnel
A.1. Improved provision of teaching
personnel.
PPA: Provision of 2 volunteer classroom teachers E-BEIS x x x x x x x x x x 6t 6t 6t 12t 12t 12t 12t 12t 12t
Tasks: Appointment
1.Determine enrolment data. MOA x
2.Determine teacher need x
3.Submit request and justification to D.O. for follow up x
4.Orient the teachers on their designation /loads x
Precondition:
Items or volunteers are available.
PPA: Provision of Volunteer Mobile ALS Teachers SRC 5T 5T 5T 5T 5T 5T 5T
PPA: Designation of regular teachers for assistance
in preparing review materials
PPA: Provision of skills training intsructors Received copies of 10T
Tasks: registration forms
1.FinalizetheorganizationoftheALSclasses. Enrolment forms of ALS x
2. Launch the program. recipients x
3. Coordinate with barangay council and the division Designation of teachers x
office to generate support generate support.
4.Requestforvolunteerteachers. Appointment x
5. Start the sessions/classes x
6. Requested for skills training instructors x
Precondition:
Items or volunteers are available.
A.2. Improved provision of non- teaching personnel
PPA: Provision of a school/teacher librarian. Students library logsheets 6T 6T 6T 6T 6T 6T
Tasks:
1.Write letter of request for a librarian to the Divisin Office. x
2.Recommend an applicant. x
3.Follow up. x
4.Orient the hiree of her/his details of responsibility. x x x x x x x
5.Monitor / Evaluate the library functionality. x x x x x x x
6.Prepare monthly report per requirement by donors
and Division Office. x x x x x x x
Precondition:
Fund/volunteer is availble. Request is granted.
PPA: Provision of school guard School Guard's journal 2.5T 2.5T 2.5T 2.5T 2.5T 2.5T
Tasks:
1.Coordinate with the PTA for renewal of MOA. x x x x x x
2.Monitor/Evaluate performance. x x x x x x x
3 .Update the PTA of his performance. x x x x x x x
Precondition:
Volunteer teachers are avilable and granted.
B. Physical and Ancillary Facilities
B.2 Improved provision of furniture for Kinder classes Delivery receipt
Table Inventory report 19.2T
Chairs MR 14.4T
Dividers/shelves 2.5T
PPA: Requesting from the Deped or School Board for fund
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2013 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
Tasks:
1. Send request letter to the Division Office g. x
2. Follow up. x x x x
4. Receive the delivery. x x
5. Update inventory report/record x x x x
Precondition:
Division office mediates.
B.4. Improved condition of existing facilities
B.4.a. Repaired / maintained the classrooms
PPA : Requesting for repair from the School Board Inventory Report
or SMRMS fund for repair of Bldg 8-A Program of work
Tasks: Certificate of completion
1. Request for inspection and official declaration of x
status of the building by an engineer. x
2. Indicate the status in the inventory report of the school. x
3. Write a request letter for repair to the Division Office. x
4. Followup. x x x
5. Receive the delivery. x 8T
6. Monitor the implementation. x x
7. Accept. x
8. Make a report. x
Precondition:
The project in given priority.
PPA: Repair of partition wall. Inventory Report
Between Bldg 6-G & H Program of work 54t
Tasks: Certificate of completion
1.Inspect extent of repair needs. x x
2.Formulate proposal and program of work. x
3.Allocate fund from MOOE and implement the project. x x
4. Monitor implementation. x
5.Liquidate the fund. x
Precondition:
Fund allows.
B3.a.2. Executed minor repair
PPA: Repair of leaking/ dripping roofs. Inventory Report
Bldg 2-A Program of work 4.6t
Bldg 3-A Certificate of completion 3.1T
Bldg 6-H 22.2T
Tasks:
1.Inspect extent of repair needs. x
2.Formulate proposal and program of work. x
3.Allocate fund from MOOE. x
4. Monitor implementation. x
5.Liquidate the fund. x
Precondition:
Fund allows.
PPA: Repair of decaying ceiling Inventory Report
Bldg 1-A x
Bldg 1-B x
Bldg 2-A x
Bldg 4-A Program of work x x 2.5t
Bldg 5-A Certificate of completion x
Bldg 6-D x 1.2T
Bldg 6-E x 1.4T
Bldg 6-F x 1.5T
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2013 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
Bldg 6-H 3t
Bldg 7-A
Tasks:
1.Inspect extent of repair needs. x x x x x x x x x x x x
2.Formulate proposal and program of work. x x x x x
3.Allocate fund from MOOE. x x x x x
4. Implement the project. x x x x x x
5. Monitor implementation. x x x x x x x x
6.Liquidate the fund. x x x x x
Precondition:
Fund allows.
PPA: Repair of broken windows Inventory Report
Bldg 1-A x 3t
Bldg 1-B x 3t
Bldg 3-A x x 8t 8t
Bldg 6-A Program of work x 7.2T
Bldg 6-B Certificate of completion x 6.9T
Bldg 6-C x 7.1T
Bldg 6-D x 2.2T
Bldg 6-E x 1.8T
Bldg 6-F x 1.2T
Bldg 6-G x 1.6T
Bldg 6-H x 2.1T
Bldg 7-A x 7t
Tasks:
1.Inspect extent of repair needs. x x x
2.Formulate proposal and program of work. x x
3.Allocate fund from MOOE. x x x
4. Monitor implementation. x x
5.Liquidate the fund. x x
Precondition:
Fund allows.
PPA: Repair/Replacement of crumbling doorjamb.
Bldg 6-A Inventory Report x 3T
Bldg 6-B Program of work x 3T
Bldg 6-C Certificate of completion x 3T
Bldg 6-G x 3T
Bldg 2-D x 3T
Tasks:
1.Inspect extent of repair needs. x x x
2.Formulate proposal and program of work. x
3.Allocate fund from MOOE. x
4. Monitor implementation. x
5.Liquidate the fund. x
Precondition:
Fund allows. Inventory Report
PPA: Replacement of rotting door panel Program of work
Bldg 6-A Certificate of completion x 6.3T
Bldg 6-B x 6.3T
Bldg 6-C x 6.3T
Bldg 6-G x 6.3T
Tasks:
1.Inspect extent of repair needs. x x x x x x x x x x x x
2.Formulate proposal and program of work. x
4. Implement the project. x x x x 400 400
5. Monitor implementation. x x x
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2013 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
6.Liquidate the fund. x x
Precondition:
Fund allows.
PPA: Repair/replacement of falling fascia board Inventory Report
Bldg 3-A Program of work x
Bldg 3-B Certificate of completion x
Bldg 6-D x
H.E Building
Bldg 7-A
Information Bulletin Counter
Tasks:
1.Inspect extent of repair needs. x x x x x x x x x x x x
2.Prepare proposal and program of work. x
3.Allocate fund from MOOE. x
4. Implement the project. x 500
5. Monitor implementation. x
6.Liquidate the fund. x
Precondition:
Fund is available.
B.3.a.3. Repainted facilities
PPA: Repainting of roofs Inventory Report
Bldg 2 -A Program of work x 3.7t
Bldg 2-B x 3.7t
Bldg 2-C x 3.7t
Bldg 2-D x 3.7t
Bldg 2-E x 3.7t
Bldg 2-F x 3.7t
Bldg 3-A x 3.7t
Bldg 4-A x 3.7t
Bldg 6-G x 3.7t
Bldg 6-H x 3.7t
Bldg 7-A x 3.7t
Tasks:
1.Inspect extent of repair needs. x x x x x x x x x x x x
2.Allocate fund from MOOE. x x x
3. Implement the project. x x x
4. Monitor implementation. x x x
5.Liquidate the fund. x x
Precondition:
Fund allows.
PPA: Repainting of ceiling Inventory Report
Bldg 2-B Program of work x 3t
Bldg 2-C Certificate of completion x 3t
Bldg 3-A x 3t
Bldg 4-A x 3t
Tasks:
1.Inspect extent of repair needs. x x x
2.Allocate fund from MOOE. x
3. Implement the project. x 200
4. Monitor implementation. x
5.Liquidate the fund. x
Precondition:
Fund allows.
PPA: Repainting of internal walls Picture
Bldg 2-C Acceptance report x 1.6T
Bldg 4-A x 1.6T
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2013 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
Bldg 6-D x 1.6T
Bldg 6-E x 1.6T
Bldg 6-F x 1.6T
Bldg 6-H x 1.6T
Tasks:
1.Inspect extent of repair needs. x x
2.Preparethe proposal and program of work. x x
3.Allocate fund from MOOE. x
4. Implement the project. x 300
5. Monitor implementation. x
6.Liquidate the fund. x
Precondition:
Fund allows.
PPA: Repainting of external walls Pictures
Bldg 4-A Program of work x 2.2T
Bldg 5-A x 2.2T
Bldg 6-A Job order x 2.2T
Bldg 6-B Payroll x 2.2T
Bldg 6-C Receipts of Agreement x 2.2T
Bldg 6-D Certificate Completion x 2.2T
Bldg 6-E Liquidation report x 2.2T
Bldg 6-F x 2.2T
Bldg 6-G x 2.2T
Bldg 6-H x 2.2T
Bldg 7-A x 2.2T
H.E Building x 3.2T
Tasks:
1.Inspect extent of repair needs. x x x
2.Preparethe proposal and program of work. x
3.Allocate fund from MOOE. x
4. Implement the project. x 400
5. Monitor the implementation. x
6.Liquidate the fund. x x
Precondition:
Fund allows.
PPA: Repainting of classroom furniture at:
Bldg 1-A x 1.1T
Bldg 1-B x 1.1T
Bldg 2-A x 1.1T
Bldg 2-B x 1.1T
Bldg 2-C x 1.1T
Bldg 2-D x 1.1T
Bldg 2-E x 1.1T
Bldg 2-F x 1.1T
Bldg 3-A x 1.1T
Bldg 3-B x 1.1T
Bldg 4-A x 1.1T
Bldg 6-A x 1.1T
Bldg 6-B x 1.1T
Bldg 6-C x 1.1T
Bldg 6-D x 1.1T
Bldg 6-E x 1.1T
Bldg 6-F x 1.1T
Bldg 6-G x 1.1T
Bldg 6-H x 1.1T
Bldg 7-A x 1.1T
Tasks:
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2013 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
1.Inspect extent of repair needs. x x x
2.Preparethe proposal and program of work. x
3.Allocate fund from MOOE. x
4. Implement the project. x
5. Monitor the implementation. x
6.Liquidate the fund. x
Precondition:
Fund allows.
PPA: Repainting of floor Inventory Report
Computer Laboratory Program of work x 2.4T
Designated Office Delivery receipt x 1.6T
Tasks:
1. Make an estimate. x
2. Do the program of work. x
3. Allocate budget. x
4. Implement. x
5. Liquidate expenses. x
Precondition:
Fund allows.
PPA:Proposal
Repair of is approved
handrail by Division
guard Office
at the Elementary
4.2T
Department
Tasks:
1. Make an estimate. x
2. Do the program of work. x
3. Allocate budget. x
4. Implement. x
5. Liquidate expenses. x
Precondition:
Proposal is approved by Division Office
PPA: Repair of fishpond x 6.5t
Tasks: x
1. Make an estimate. x
2. Do the program of work. x
3. Allocate budget. x
4. Implement. x
5. Liquidate expenses.
Precondition:
Proposal is approved by Division Office
PAA: Expansion of semi-concrete perimeter fence x x 55T
Tasks:
1. Write a letter to LGUs requesting for the construction. x
2. Follow-up. x x x x x
3. Monitor implementation. x
3. Accept. x
4. Report. x
Precondition:
Fund is granted.
PPA: Repair of the ancillary services
Canteen x 10T
Feeding center x 10T
SPG/SSG office x 5.6T
Nursery x 3T
Tasks:
1. Make an estimate. x
2. Do the program of work. x x
3. Allocate budget. x x x
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2013 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
4. Implement. x x
5. Liquidate expenses. x x
PPA: Repair of other facilities
Electrical lines x x x x 5.5T 5T 5T 6.8T
Footwalk x x x x x x x x 1.25T 1.25T 1.25T 1.25T 1.25T 1.25T 1.25T 1.25T 1.25T 1.25T 1.25T
Guard post x 4.5T
Landscapes x x x x x x x x 1.25T 1.25T 1.25T 1.25T 1.25T 1.25T 1.25T 1.25T 1.25T 1.25T 1.25T
Handwashing sink x x x 2.5T 2.5T 2.5T
Temporary perimeter fence x 3.5T
Open well x x 800 800
Water line from irrigation to the fishpond x 14.7T
Tasks:
1. Make an estimate. x x
2. Do the program of work. x
3. Allocate budget. x x x x x x x x
PPA: Repair of the ancillary services Repaired 5 ancillary services
Canteen 9.8T 10T
Feeding center 5.6T 5T
SPG/SSG office 3T 3T
Nursery 7t
Tasks:
1.Inspect repairs needs. x
2.Formulate proposal and program of work. x
3.Allocate fund from MOOE. x x x xx
4. Monitor implementation.
5. Liquidate the fund.
Precondition:
Fund allows.
PPA: Repair of other facilities Repaired/maintained 7 other facilities
Electrical lines 10T 6.8T 0 100T
Entrance of main gate 10T 10T
Footwalk 4.5T 7.5T
Guard post 10T 15T
Landscapes 7.5T 8T
Handwashing sink 3.5T 4T
Temporary perimeter fence 1.6T 2T
Open well 14.7T 0
Water line from irrigation to the fishpond 0 25T
Stage
Tasks:
1.Inspect repairs needs. x
2.Makea proposal and program of work. x
3.Allocate fund from MOOE. x x
4. Monitor implementation. x x
PPA: Repair of broken/damaged equipment
5 Computer units x x x 2.5T
2 Printers x 300
5 Electric fan x 600
1 Simple sewing machine x 1.6T
1 Sound system x
1 Bundy clock x 300
1 Gas range x 1.5T
1 Refrigerator x 500
1 DVD cassette player x 300
Tasks:
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2013 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
1.Inspect extent of repair needs. x x x x x x x
2.Preparethe proposal and program of work. x x x
3.Allocate fund from MOOE. x x x
4. Implement the project. x x x
5. Monitor the implementation. x x x
6.Liquidate the fund. x x x
Precondition:
Fund allows.
PPA: Repair of broken/damaged furniture Delivery receipts
2 Cabinet Memorandum Receipt x x 1.5T 1.5T
10 Chairs x 600
3 Dividers x 2.5T
3 Graphing board x 2.8T
1 rustrum x 4.6T
55 Drawing table x x x x x 9T 9T 9T 9T
3 Sala Seats x x 700
6 Computer tables x 3.3T
Tasks:
1.Inspect extent of repair needs. x x x x x
2.Preparethe proposal and program of work. x x x x
3.Allocate fund from MOOE. x x x x
4. Implement the project. x x x x x x
5. Monitor the implementation. x x x x x x
6.Liquidate the fund. x x x x x
Precondition:
Fund allows.
PPA : Acquisition and installation of an airconditioner. Delivery receipts x
Tasks: Memorandum Receipt
1. Send a follow-up the letter request to the governor. x
2. Follow-up. x x x x x x x x x
3. Receive. x
4. Install. x
Precondition:
Request is granted.
C. Learning Materials
and Equipment
C.1. Improved the availability of textbooks
PPA: Acquisition of additional textbook Inventory report
(New Curriculum)
Grade I
70 Mother Tongue x 3.9T
70 Filipino x 3.9T
70 English x 3.9T
70 Mathematics x 3.9T
70 Araling Panlipunan x 3.9T
70 MAPEH x 3.9T
70 Edukasyon sa Pagpapakatao x 3.9T
Edukasyon sa Pagpapakatao
Grade 7
55 Filipino x 3.1T
55 English x 3.1T
55 Science x 3.1T
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2013 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
55 Mathematics x 3.1T
55 Araling Panlipunan x 3.1T
55 TLE x 3.1T
Grade 2
54 Pagdiriwang ng Wikang Pilipino x 3T
54 Sibika at Kultura Serye 2 x 3T
Grade 3
25 Growing with Science and Health x 1.4T
25 Bagong Pilipino sa Salita at Gawa (Pagbasa) x 1.4T
55 Bagong Pilipino sa Salita at Gawa (Wika) x 3.1T
55 (Sibika) Makabayang Pilipino 3: Masipag na Pilipino x 3.1T
29 (Sibika) Ang Bagong Pilipino x 1.6T
Grade 4
38 Science for Daily Use x 2.1T
8 Hiyas sa Wika x 440
8 Hiyas sa Pagbasa x 440
37 Heograpiya, Kasaysayan, at Sibika 4 Makabayan; x 2T
Kapaligirang Pilipino
Grade 5
59 English Expressways-Reading x 3.3T
59 English Expressways-Language x 3.3T
25 Science for Daily Use x 1.4T
29 Heograpiya, Kasaysayan, at Sibika 4 Makabayan; x 1.6T
Kapaligirang Pilipino
Grade 6
5 English for You and Me-Language x 275
6 English for You and Me-Reading x 330
45 Into the Future: Sciencce and Health x 2.5T
13 Mathematics for Everyday Use x 715
45 Landas sa Wika at Pagbasa - Wika x 2.5T
45 Landas sa Wika at Pagbasa - Pagbasa x 2.5T
Year 2
15 English Expressways x 825
58 Sci & Tech: Biology (Revised Edition 2009) x 3.2T
3 Asya: Pag-usbong ng Kabihasnan x 165
Year 3
16 English Expressways x 880
6 (MAPEH( Enjoy Life with Music and Arts x 330
Year 4
24 English Expressways x 1.3T
20 Sci & Tech: Physics (Revised Edition 2009) x 1.1T
7(MAPEH( Enjoy Life with Music and Arts x 935
Tasks:
1.Prepare and submit textbook inventory x x x
2.Submit request for additional textbook x x x x
3.Follow-up request for additional textbook x
4.When approved inspect delivery of textbook x
5.Sign memorandum of receipts x
Pre-condition: Deped fund is available x
C.2. Improved availability of instructional materials, Delivery receipts
references and equipment Memorandum Receipt
1 Multi-media LCD Projector x 28T
1 Sound box, portable with tripod x 5.5T
Science Subjects
1 Ammeter x 690
1 Beaker x 285
1 Concave lens x 135
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2013 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
1 Convex lens x 135
2 Denatured alcohol x 170
1 Gas stove, single portable x 3T
5 Handlens x 275
5 Lab thermometer x 975
5 Magnetic compass x 160
2 Magnetic wire x 165
1 Multi-tester x 600
3 Prism glass x 465
5 Test tube x 975
3 U-magnet x 210
2 Voltmeter x 1T
2 Weighing scale x 1.8T
TLE/EPP
Home Economics
3 Big cooking pot (for Feeding) x 7.8T
1 Burner, heavy duty x 1.8
12 Coasters x 420
8 Curtain, set x 3.2T
24 Cutlery, set x 1.9T
2 Ember tongs x 100
1 Gas range, portable x 17T
24 Goblet x 3.3T
1 Meat Grinder x 1.5T
24 Placemats x 2.1T
6 Platter x 510
1 Pressure cooker x 4.6T
3 Serving dishes x 795
3 Sewing clamp x 450
1 Table ice bucket x 580
24 Table napkin, cloth x 1.6T
1 Thermos, electric x
1 Thermos, simple x
1 Tissue paper holder x
2 TV Set x
3 Vanity mirror x
2 Wine holder x
Industrial Arts/EPP/Electricity
1 Chisel x 250
2 Cross cut saw x 700
2 Hack saw x 740
2 Hammer x 860
2 Long nose flier x 760
5 Paint brush x 350
1 Planer, manual x 285
2 Pliers, set x 860
2 Screw drivers, set x 960
2 Steel rule, 33' x 330
1 Welding machine, heavy duty x 20T
Agriculture
1 Back Pack Sprayer x 1.2T
1 Garden scale x 800
1 Wheel Barrow x 2.4t
3 Sprinkler x 900
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2013 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
4 Spading Fork x 2.8T
6 Hole digger x 3.5T
2 Chisel x
30 Scythe x
2 Grass cutters x
30 Hand trowels x
30 Hand forks x
30 Spade x
30 Shovel x
10 Crowbar x
30 Garden hoe x
30 Spading Fork x
20 Pruning shears x
30 Bolo x
5 Saw x
5 Hammer x
5 Axe x
3 Sprayers x
15 Sprinklers x
6 Wheel Barrow x
5 Steel tape x
2 Soil testing kit x
1 Weighing scale x
1 Power srayer x
5 Hole digger x
10 Picking/harvesting knives x
30 Budding/grafting knives x
20 Pick mattock x
1 Draft carabao x
1 Water pump x
Fish Processing
Equipment
1 Pressure cooker x
1 Can sealer x
3 Plastic sealer x
1 Horizontal freezer x
Tools and Supplies
40 Kettle x
10 Frying pan x
40 Measuring spoon x
1 Gas range x
40 Mixing bowl-stainless x
10 Mixing bowl-glass (by set) x
40 Apron x
40 Basin-stainless x
40 Knives x
10 Steamer x
5,000 Cap seal of different sizes x
40 Gloves x
40 Laboratory gown x
20 Weighing scale-1000g x
20 Weighing scale-10kg x
40 Paring knives x
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2013 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
40 Peelers x
40 Glass measuring cup x
40 B-tin cans x
40 Measuring cup for solid (by set) x
Safety Equipment x
1 Fire Extinguisher x
Fish Culture
Tools
2 D.O. meters
3 Flow rate meter
40 Lab. Thermometer
20 Shovel
40 Water depth guage
20 Digging blades
2 Masonry tools
20 Cultivator/rake
2 Net
2 P.E rope
100 Pail (plastic)
2 Weighing scale
40 Safety Shoes
15 Sinker
2 Eckman dredge
5 Secchi disc
2 Water qty. test kit
1 pH meter
5 Fish cage and accessories
10 Beaker
5 Netting needle x
40 Water current meter x
1 Plastic basin x
40 Hand gloves x
40 Face mask x
40 Plastic bags x
20 Bolo x
2 Cast net x
2 Current meter x
5 Dissecting board x
5 Dissecting tools x
5 Fish grater x
40 Forceps x
2 Refractometer x
1 Blower x
1 Salinometer x
5 Scoop net x
1 Suspension net x
Garments
Tools
24 Pinking shears x 9.2T
Cutting shears
24 (genuine stainless) x 9.5T
24 Buttonhole scissor x 9.4T
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2013 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
24 Embroidery scissor x 10.2T
24 L-square (Stainless) x 4T
24 Hip curve (Stainless) x 3.8T
24 French curve (plastic) x 2T
24 Tape measure (plastic) x 1.5T
6 Meter stick (wooden) x 800
24 Machine needle
24 (dozens, asstd) x 1.7T
24 Tracing wheel x 1.5T
24 Tailor's pin x 500
24 Thimble x 250
6 Hem marker x 1T
50 White Tetoran (yards) x 5.6T
Equipment
7 Sewing machine wl motor x 70T
5 Mannequin (full size,
junior size, boys & girls) x 6T
Sewing machines:
5 -Over edging Machine x 12T
Straight Ordinary
6 Sewing Machine x 72T
2 -High speed Machine x 36T
6 Cutting tables x 18T
2 Lifesize mirror x 2.5T
5 Mannequin's Bust Forms
(male/female) x 3.5T
Computer Hdwe Servicing
Tools & Equipment
10 Multi-tester x
10 Transformer multi-
output w/UPS x
10 DC regulated power
supply x
40 Connecting cords GA 22
w/ aligator clips both
ends x
40 Connecting cords GA 23
w/ banana clips both
40 ends x
10 Bread board x
10 Round nose pliers x
10 Wire cutter x
10 Philips head screw
driver 6" (set) x
10 Flat head screw driver 6" set x
40 Connecting wire (solid gauge no.22) x
10 Soldering iron 100w x
10 Soldering lead (matrl) x
10 Desoldering pump x
10 Logic probe x
10 IC remover, cutter x
1 Tool Cabinet x
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2013 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
5 Router x
Hardware:
5 Memory card x
5 Expansion card x
5 Hard disk x
5 Mother board x
5 Power supply (UPS) x
5 Router x
Tools
2 Fire extinguisher ABC
type, Dry Chem 5kg x
5 Screen protector x
5 Automatic voltage
regulator x
Food Processing
3 Poly sealer x 12.5T
2 Soaking vats x 5t
6 Salinometer x 1.4T
19 Knives x 2.4T
1 Slicers (Tocino) x 4.8T
6 Peelers x 11.3T
12 Spatulas & rubber spatulas x 2.4T
6 Colanders x 1.2T
6 Food tongs x 1.6T
6 Strainers x 960
12 Set of measuring spoons x 690
6 Set of measuring cups for liquid x 1.1T
6 Set of measuring cups for drying ingredients x 1.9T
2 Hot lifter x 870
40 Mixing Bowls (plastic) x 900
6 Mixing bowls (stainless) x 300
6 Utility trays (stainless) x 1.4T
10 Casseroles of various x 2.7
sizes (Set) x
5 Chopping boards x 2.1T
4 Saucepans (stainless) x 21T
1 Refractometer x 1.4T
1 Thermometer x 2.8T
6 Jelly thermometer x 3.5T
2 Osterizers x 3.8T
2 Juice extractors x 9T
1 Steamers x 10.4T
1 Can sealer x 600
1 Bottle sealer x 3.5T
3 Gas tank (LPG) x 2.2T
1 Fermentation vats x 150
3 Steam jacketed kettle x 4.5T
1 Hydrometer x 2T
3 Lifters x 4.2T
5 Kettles (varying capacities) x 3.5T
5 Ladles (stainless/wooden) x 1.8T
5 Fish scalers x 2.4T
3 Pulp finishers x 1.4T
3 Plastic protected cap sealer x 925
1 Electric sealer x 4.2t
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2013 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
2 Wire baskets x 9.6T
2 Exhaust boxes x 3.2T
4 Weighing scales (varying capacities and x 800
sensitivities) x 3.2T
1 Stoves (double) x 1.6T
1 Smokehouse x 250T
1 Refrigerator x 25T
1 Freezer x 28T
3 Double burner stove w/ x 5.4T
accessories
Technical Drawing
Tools & Equipment
55 T-square 36" wooden body with x
graduated plastic edge adjustable
55 Drawing table & stool 36"x24" x
Safety Equipment
Fire extinguisher, ABC type, dry chemical 5kg x
Internet Computer Fundamentals
Tools & Equipment
11 Smartbro/Broadband stick accessory x
11 Chord 5 m x
Kinder, Grade I, II, & III
10 Crayon x 180
1 CD/DVD Player x 3.5T
2 TV set x 32t
4 Wall clock x 2.2T
MAPEH/MSEP
1 Ball, basketball Mikasa x 1.3T
1 Cassette Player x 5.4T
2 Lawn tennis set x 2.1T
1 Table tennis set x 400
Clinic
1 Digital thermometer x 2.6T
1 Forceps x 150
HEKASI/SIBIKA
4 Charts x 195
4 Maps x 330
Math
3 Compass x 225
6 Color chalk, box x 96
10 Crayon x 360
10 Meterstick x 250
5 Protractor x 230
ALS
200 Modules, ALS x x x x x 600 600 600 600 600 600
APP 1 : Alloting budget from MOOE or SBM grants
Tasks:
1. Monitor monthly needs and requirements. x x x x x x x x x x x x
2. Allot some amount from the MOOE/SBM x x x x x x x x x x x x
3. Indicate in the cash program/ proposal x x x x x x x x x x x x
4. Purchase. x x x x x x x x x x x x
Precondition:
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2013 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
Budget is available. Purchases undergo proper procedure.
APP 2 : Lobbying to potential stakeholders 200 200 200 200 200
Tasks:
1. Identify potential donors. x
2. Prepare request letters. x
3. Send out the letters. x x x
4. Followup. x x x x x x x
5. Make proper documentation. x x x x x x x
Precondition:
Requests are granted.
APP 3 : Strengthening of Fund Raising Program
Tasks:
1. Review
acquire with the facultyand
the equipment the of
determination of theinschool
their importance the to x
classroom.
2. Let them brainstorm on how to raise the amount of price. x
3. Refer the project to the PTA for support. x
4. Implement the project. x x x x x x
5. Account the proceeds. x x x x x x
6. Assign 2 teachers for the canvass/purchase. x x x
7. Keep the documents for future use. x x x x x x
Precondition:
All teachers strongly advocate the fund drive.
PPA: Repair of dysfunctional equipment
1 Bundy Clock x x 2.4T 1.2T
10 Electric fans x x 1T 500
2 Brush cutter x 800
1 3-in-1 printer x 200
1 Sound system x 300
Tasks:
1. Check all equipment as to their functionality. x
2. Determine the extent of repair need. x
3. Make program of work/job order. x
4. Allot budget. x
5. Liquidate expenses. x x
Precondition:
Periodic checkup of equipment is done.
D. Others
D.1. Enrolled all school age children and
youth in the catchment areas.
PPA : Survey of new entrants 500
25 From Daycare to Kindergarten x
42 From Kindergarten to Grade I x
38 From Grade 6 to Year I x
Tasks:
1.Campaign for early enrolment x x x x x x
2.Conductschool-to-school campaign for first year x 600
within the catchment
3. Get help from the barangay for enrolment promotion.
4. Keep following up for enrolment at CDIS.
5. Ensure 100% of promoted pupils and students are enrolled.
Precondition:
All graduates from Daycare, Kindergarten, and
Grade 6 proceed to next level.
PPA : Tracing of drop-outs School Register x x x x 200
3 Grade 1 Tracking Report
1 Grade 2 Form 3
3 Grade 3 Form 20
CDIS Adjusted SIP 2012-13 Annual Improvement Plan 2013 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
J F M A M J J A S O N D J F M A M J J A S O N
1 Grade 4
1 Grade 6
4 Grade 7
1 Year 2
3 Year 3
1 Year 4
Tasks:
1. Check the tracklist of drop-outs. x x
2. Trace their whereabouts. x x
3 Campaign for enrolment. x x 600
4. Enrol the returnees. x
Precondition:
All drop-outs are willing to return back to school.
D.2. Promoted inclusive education
PPA : Opening a BLP and A & E Programs SRC
Tasks: ALS reports
1. Conduct survey of the OSYs in the barangay . x x x 100
2. Coordinate with the barangay council to reach x x x
all these OSYs out.
3. Request for approval from the division office x
c/o ALS supervisor.
4. Hold an Advocay program. x 300
5. Make an arrangement on the instruction and instructors. x
6. Coordinate with Project CUEVA programs. x x
7. Seek assistance from the City Government for skills x x x
training integration.
8. Meet with recipients for final instruction x
and schedule of sessions.
9. Prepare modules. x 2.5T
10. Start classes. x
Precondition:
All OSYs are highly interested.
PPA : Provision of Skills Training Program to ALS learners Approved Proposal 70T
Tasks: Attendance Sheet
1. Determine the number of trinees. Pictures x
2. Negotiate with propected trainers. Outputs x
3. Make a project proposal. x
4. Seek approval/endorsement from the division office. x
6. Implement the program. x
Precondition:
Approval is granted by the Mayor.
Prepared:
ANALIE V. BUHAYAN
Principal I
Page 1 of 17
SOURCESOTHE
Q4 LGU PTA DEPED TOTAL
D RS
35T 35T
10T 10T
19.2T 19.2T
14.4T 14.4T
2.5T 2.5T
5.5T
Page 2 of 17
SOURCESOTHE
Q4 LGU PTA DEPED TOTAL
D RS
8T 8T
54t 54t
4.6t 4.6t
3.1T 3.1T
22.2T 22.2T
Page 3 of 17
SOURCESOTHE
Q4 LGU PTA DEPED TOTAL
D RS
10t 10t 10t
22.5T 22.5T 22.5T
7.2T 7.2T
6.9T 6.9T
7.1T 7.1T
2.2T 2.2T
1.8T 1.8T
1.2T 1.2T
1.6T 1.6T
2.1T 2.1T
7t 7t
3T 3T
3T 3T
3T 3T
3T 3T
3T 3T
6.3T 6.3T
6.3T 6.3T
6.3T 6.3T
6.3T 6.3T
800 800
Page 4 of 17
SOURCESOTHE
Q4 LGU PTA DEPED TOTAL
D RS
500 500
3.7t 3.7t
3.7t 3.7t
3.7t 3.7t
3.7t 3.7t
3.7t 3.7t
3.7t 3.7t
3.7t 3.7t
3.7t 3.7t
3.7t 3.7t
3.7t 3.7t
3.7t 3.7t
3t 3t
3t 3t
3t 3t
3t 3t
200 200
1.6T 1.6T
1.6T 1.6T
Page 5 of 17
SOURCESOTHE
Q4 LGU PTA DEPED TOTAL
D RS
1.6T 1.6T
1.6T 1.6T
1.6T 1.6T
1.6T 1.6T
300 300
2.2T 2.2T
2.2T 2.2T
2.2T 2.2T
2.2T 2.2T
2.2T 2.2T
2.2T 2.2T
2.2T 2.2T
2.2T 2.2T
2.2T 2.2T
2.2T 2.2T
2.2T 2.2T
3.2T 3.2T
400 400
1.1T 1.1T
1.1T 1.1T
1.1T 1.1T
1.1T 1.1T
1.1T 1.1T
1.1T 1.1T
1.1T 1.1T
1.1T 1.1T
1.1T 1.1T
1.1T 1.1T
1.1T 1.1T
1.1T 1.1T
1.1T 1.1T
1.1T 1.1T
1.1T 1.1T
1.1T 1.1T
1.1T 1.1T
1.1T 1.1T
1.1T 1.1T
1.1T 1.1T
Page 6 of 17
SOURCESOTHE
Q4 LGU PTA DEPED TOTAL
D RS
2.4T 2.4T
1.6T 1.6T
4.2T 4.2T
55T
10T 10T
10T 10T
5.6T 5.6T
3T 3T
Page 7 of 17
SOURCESOTHE
Q4 LGU PTA DEPED TOTAL
D RS
Page 8 of 17
SOURCESOTHE
Q4 LGU PTA DEPED TOTAL
D RS
3T 3T
600 600
2.5T
2.8T
4.6T
9.2T 5T 35.2T 5T 45.2T
700 1.4T
3.3T
3.1T 3.1T
3.1T 3.1T
3.1T 3.1T
Page 9 of 17
SOURCESOTHE
Q4 LGU PTA DEPED TOTAL
D RS
3.1T 3.1T
3.1T 3.1T
3.1T 3.1T
3T 3T
3T 3T
1.4T 1.4T
1.4T 1.4T
3.1T 3.1T
3.1T 3.1T
1.6T 1.6T
2.1T 2.1T
440 440
440 440
2T 2T
3.3T 3.3T
3.3T 3.3T
1.4T 1.4T
1.6T 1.6T
275 275
330 330
2.5T 2.5T
715 715
2.5T 2.5T
2.5T 2.5T
825 825
3.2T 3.2T
165 165
880 880
330 330
1.3T 1.3T
1.1T 1.1T
935 935
28T 28T
5.5T 5.5T
690 690
285 285
135 135
Page 10 of 17
SOURCESOTHE
Q4 LGU PTA DEPED TOTAL
D RS
135 135
170 170
3T 3T
275 275
975 975
160 160
165 165
600 600
465 465
975 975
210 210
1T 1T
1.8T 1.8T
7.8T 7.8T
1.8 1.8
420 420
3.2T 3.2T
1.9T 1.9T
100 100
17T 17T
3.3T 3.3T
1.5T 1.5T
2.1T 2.1T
510 510
4.6T 4.6T
795 795
450 450
580 580
1.6T 1.6T
4.4T 4.4T 4.4T
385 385 385
30 30 30
30T 30T 30T
1.1T 1.1T 1.1T
870 870 870
250 250
700 700
740 740
860 860
760 760
350 350
285 285
860 860
960 960
330 330
20T 20T
1.2T 1.2T
800 800
2.4t 2.4t
900 900
Page 11 of 17
SOURCESOTHE
Q4 LGU PTA DEPED TOTAL
D RS
2.8T 2.8T
3.5T 3.5T
180 180 180
2.5T 2.5T 2.5T
700 700 700
2.5T 2.5T 2.5T
2.5T 2.5T 2.5T
9T 9T 9T
9T 9T 9T
3.5T 3.5T 3.5T
6T 6T 6T
6T 6T 6T
5T 5T 5T
4.8T 4.8T 4.8T
1.8T 1.8T 1.8T
1.8T 1.8T 1.8T
1.8T 1.8T 1.8T
3.9T 3.9T 3.9T
1.8T 1.8T 1.8T
10.8T 10.8T 10.8T
1T 1T 1T
4.5T 4.5T 4.5T
800 800 800
5T 5T 5T
1.2T 1.2T 1.2T
4.5T 4.5T 4.5T
13.5T 13.5T 13.5T
5.2T 5.2T 5.2T
18T 18T 18T
5T 5T 5T
8T 8T 8T
4.5T 4.5T 4.5T
6.4T 6.4T 6.4T
25T 25T 25T
14.4T 14.4T 14.4T
7T 7T 7T
6T 6T 6T
11.2 11.2 11.2
14T 14T 14T
12T 12T 12T
12.5T 12.5T 12.5T
6.4T 6.4T 6.4T
16T 16T 16T
7T 7T 7T
12T 12T 12T
5T 5T 5T
Page 12 of 17
SOURCESOTHE
Q4 LGU PTA DEPED TOTAL
D RS
5T 5T 5T
7.2 7.2 7.2
12T 12T 12T
7.6T 7.6T 7.6T
7T 7T 7T
5T 5T 5T
6T 6T 6T
16T 16T 16T
6T 6T 6T
13T 13T 13T
24T 24T 24T
3.8T 3.8T 3.8T
5T 5T 5T
1.3T 1.3T 1.3T
1.4T 1.4T 1.4T
14T 14T 14T
1.6T 1.6T 1.6T
16T 16T 16T
18T 18T 18T
2.4T 2.4T 2.4T
5T 5T 5T
6T 6T 6T
4T 4T 4T
1.8T 1.8T 1.8T
1.6T 1.6T 1.6T
600 600 600
7.2T 7.2T 7.2T
160 160 160
7.5T 7.5T 7.5T
1.2T 1.2T 1.2T
800 800 800
3.2T 3.2T 3.2T
900 900 900
1.2T 1.2T 1.2T
1.4T 1.4T 1.4T
1.5T 1.5T 1.5T
1.8T 1.8T 1.8T
5.6T 5.6T 5.6T
900 900 900
1.3T 1.3T 1.3T
1.5T 1.5T 1.5T
1.8T 1.8T 1.8T
1.4T 1.4T 1.4T
9.2T 9.2T
9.5T 9.5T
9.4T 9.4T
Page 13 of 17
SOURCESOTHE
Q4 LGU PTA DEPED TOTAL
D RS
10.2T 10.2T
4T 4T
3.8T 3.8T
2T 2T
1.5T 1.5T
800 800
1.7T 1.7T
1.5T 1.5T
500 500
250 250
1T 1T
5.6T 5.6T
70T 70T
6T 6T
12T 12T
72T 72T
36T 36T
18T 18T
2.5T 2.5T
3.5T 3.5T
20T 20T
3t 3t 3t
6T 6T 6T
6T 6T 6T
14T 14T 14T
14T 14T 14T
12T 12T 12T
1.4T 1.4T 1.4T
20T 20T 20T
22T 22T 22T
Page 14 of 17
SOURCESOTHE
Q4 LGU PTA DEPED TOTAL
D RS
12.2T 12.2T 12.2T
12.5T 12.5T
5t 5t
1.4T 1.4T
2.4T 2.4T
4.8T 4.8T
11.3T 11.3T
2.4T 2.4T
1.2T 1.2T
1.6T 1.6T
960 960
690 690
1.1T 1.1T
1.9T 1.9T
870 870
900 900
300 300
1.4T 1.4T
2.7 2.7
2.1T
2.1T
21T 21T
1.4T 1.4T
2.8T 2.8T
3.5T 3.5T
3.8T 3.8T
9T 9T
10.4T 10.4T
600 600
3.5T 3.5T
2.2T 2.2T
150 150
4.5T 4.5T
2T 2T
4.2T 4.2T
3.5T 3.5T
1.8T 1.8T
2.4T 2.4T
1.4T 1.4T
925 925
4.2t 4.2t
Page 15 of 17
SOURCES
DEPE OTHE
Q4 LGU PTA
D RS
TOTAL
D
9.6T 9.6T
3.2T 3.2T
800 800
3.2T 3.2T
1.6T 1.6T
250T 250T
25T 25T
28T 28T
5.4T 5.4T
10T 52T
5.4T 5.4T
66T 66T 66T
180 180
3.5T 3.5T
32t 32t
2.2T 2.2T
1.3T 1.3T
5.4T 5.4T
2.1T 2.1T
400 400
2.6T 2.6T
150 150
195
330
225 225
96 96
360 360
250 250
230 230
3.6T 3.6T
Page 16 of 17
SOURCES
DEPE OTHE
Q4 LGU PTA
D RS
TOTAL
D
1T 1T
1T 1T
1.2T 2.4T 2.4T
500 1T 1T
800 800
200 200
300 300
500 500
600 600
200 200
Page 17 of 17
SOURCES
DEPE OTHE
Q4 LGU PTA TOTAL
D D RS
600 600
100 100
300 300
2.5T 2.5T
70T 70T
COLONIA DIVINA INTEGRATED SCHOOL
School Improvement Plan 2014-16 Annual Improvement Plan 2014 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3
J F M A M J J A S OND J F M A M J J A S
* * * 5T 5T
* * * 5T 5T
* * * 5T 5T
PAP1: Titling of School Site
Travel expenses * * * * * * * * * * 500 500 500 500 500 500 500 500
Miscellaneous fees * 5T
Processing fee * * * 500 2T 12.5T
PAP2: Preparation of Pertinent Papers for approval
Reproduction of documents * 1T
Travel expenses * * 500 500
Courier 1T
PAP3: Compliance of Physical Facilities RequiremeAcquired 80% additional facilities by 2016
Equipment/Tools Acceptance Report *
B. Personnel
B.1. Improved provision of teaching personnel
PPA3: Provision of Volunteer Teacher
A.2. Improved provision of E-BEIS
non- teaching personnel Appointment
PPA1: Provision of a school/teacher librarian. MOA * * * * * * * 4T 4T 4T 4T
PPA2: Provision of school guard registration forms * * * * * * * * * * * * 2T 2.5T 2.5T 2.5T 2.5T 2.5T 2.5T 2.5T 2.5T
PPA4: Renewal of Designations of office staf
Bookkeeper * * * * * * * * * * * *
Disbursing Officer * * * * * * * * * * * *
Office CLerk * * * * * * * * * * * *
B. Physical and Ancillary Facilities
B.1. Improved provision of classrooms/laboratories
PAP5: Provision of furnishing of E-classroom
facilities for the elementary
Plastic chairs (25 pcs) * * 11T
Long Curtains
Comp.protectv coverg *
Desk fans * * 3.5T 3.5T
Dividers *
Eye Care/Screen Protector * 1.5T
B.2. Improved facility in moving to and fro Inventory report
around the campus MR
PAP2: Provision of canopy over long walks
PAP3: Rehab. of crumbling floor of corridor
PAP4: Repair of concrete front yard
PAP5: Enhance drainages
Canopy over Walk1
20 shts G.I corr. Sheet 3'X6'X0.4 * 4.6T
10 sht G.I flat sht 3'X6'X0.4 * 2.8T
8 bags cement * 1.9T
1 cu.m mixing sand * 890
0.5 cu.m cracked stone * 600
4 kg Umbrella nail * 440
3 kg C.W. Nail # 4 * 168
3 kg C.W Nail # 2 1/2 * 168
Labor * 3.5T
Hauling 1.5T
Corridor at Bldg 2
12 bag cement * 2.8T
2 cu.m mixing sand * 2.8T
1 cu.m cracked stone # 3/4 * 1.2T
8 pcs round bar 8mm * 760
100 pcs hollow blocks * 1.8T
2 kg tie wire * 120
Labor * 2.8T
Hauling * 1.5
Drainage at main gate *
2 RC pipe 12" * 1.2T
200 pcs hollow blocks * 3.6T
2 cu.m mixing sand * 1.8T
5 lgt round bar, 9mm * 650
1 kg tie wire * 70
Labor * 2.2T
Hauling * 1.5T
Drainage from HS to elementary Program of work
250 pcs hollow blocks Certificate of completion * 4.5T
2 cu.m. mixing sand * 1.8T
6 lgt round bar 9mm * 800
1 kg tie wire 70
B.3. Improved condition of existing facilities
PAP1: Repair of Bldg 3-A and B (Office and Library)
Roofs
14 sht corr GI sheet, 10' * 5.04T
5 lgth 2" x 3" 10' * 900
8 lgth 2" x 2"x 10' * 960
2 kg umbrella nail * 220
1 kg c.w. nail # 4 * 60
2 c.w. nail # 2 1/2 * 120
1 qt Vulca seal * 345
Labor * 2.3T
Hauling * 600
Lighting Facilities
8 pcs CFL bulb, GE * * * * 1.1T 220 220
Fascia board
6 lgth fascia board *
12 lgth 2" x 2" x 10' *
3 kg c.w. nail *
Door knobs * 1.4T
Furniture
Divider * 3.6T
Bookshelves * 3.8T
Principal's table * 4.5T
Hauling * 800
CR sink/lavatory
1 Porcelain sink *
40 pcs tiles 6" x 6" Tiles *
1 kg Tile Cement *
PVC elbow # 3/4 *
25 pcs Hollow Blocks *
1 lgth PVC pipe 3/4 *
Cement solvent *
2 bags cement *
2 lgth corr round bar 9mm *
Labor *
hauling *
PAP2: Repair of H.E. Building
Roofs
4 shts 10' GI corr. Sheet * 1.54T
4 lgth R/L 2"X4"X10' * 1T
6 lgth R/L 2"x2"x10' * 720
1 kg. C.W nail # 4 * 60
1 kg. C.W nail # 3 * 60
2 kg. C.W nail # 2 1/2 * 60
1 qt Vulca Seal * 370
Labor * 1.2T
Hauling * 400
Ceiling, external
12 sht Marine plywood, 4' x 8' x 1/4" * 4.4T
14 lgth R/L 2" x 2" x 10' * 2.2T
3 kg c.w. nail # 3 * 180
5 lgth fascia board * 1.7T
Labor * 4.4T
Hauling * 400
Lighting Facilities
12 pcs CFL bulb, GE * * * 1.32T 660
Panel door, back
1 unit panel door * 4.5T
Door jamb
3 lgth R/L 2" x 4" x 6' * 1.25T
1/2 kg c.w nail # 4 * 30
Furniture
Divider * * 3.5T 4T
Sink (CR) Inventory Report
1 Porcelain sink *
40 pcs tiles 6" x 6" Tiles *
1 kg Tile Cement *
PVC elbow # 3/4 *
25 pcs Hollow Blocks *
1 lgth PVC pipe 3/4 *
Cement solvent *
2 bags cement *
2 lgth corr round bar 9mm Program of work *
Labor Certificate of completion *
Hauling *
Repainting of roof *
6 gal roof paint * 3.66T
6 pcs paint brush # 4 * 180
1 gal paint thinner * 370
Transpo of materials * 100
Repainting of ceiling
3 gal flat wht, enamel * 1.38T
3 gal glossy wht, enamel * 1.68T
1 gal paint thinner * 370
2 sets rolling brush * 220
2 pcs paint brush #4 * 90
Labor * 1.2
Transpo of materials * 150
Grills
2 gal uniapple paint, enamel * 1.06T
1 bot paint thinner * 70
3 pcs paintbrush # 2 * 105
Labor * 500
Transpo of materials * 60
PAP3: Rehabilitation of Bldg 2-A (Gr7 -A Classroom)
Roofs
10 sht corr. GI shts 10' x 04 * 3.85t
12 lgth R/L 2" x 2" x 12' * 2.16T
3 kg umbrella nail * 360
1 qt Vulca seal * 345
3 kg c.w. nail # 3 * 180
Labor * 2T
Hauling * 250
Ceiling, internal
18 sht Marine plywood, 4' x 8' x 1/4" * 10T
14 lgth R/L 2" x 2" x 10' * 2.2T
3 kg c.w. nail # 3 * 180
5 lgth fascia board * 1.7T
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3
J F M A M J J A S OND J F M A M J J A S
Labor * 2.5T
Hauling * 400
Ceiling, external
14 sht Marine plywood, 4' x 8' x 1/4" * 5.39T
18 lgth R/L 2" x 2" x 10' * 2.88T
3 kg c.w. nail # 3 * 180
2 kg. c.w nail # 1 * 120
5 lgth fascia board * 1.7T
Labor * 3T
Hauling * 400
Lighting Facilities
40 m PDX # 12 * 1.92T
4 pcs CFL bulb, GE * 1.08T
4 pcs socket * 260
1 roll elctrical wire * 40
3 pcs 3-gang switch * 60
2 pcs 3 gang surface outlet * 60
Labor * 1T
Transportation of materials * 70
Fascia board
6 lgth fascia board * 2.07T
1 vulca seal * 170
8 pcs R/L 2" x 2" x 10" * 1.3T
1 kg c.w nail # 2 * 60
Labor * 1.1T
Transportation of Materials * 100
PAP4: Maintenance of Bldg 2-B (Gr8-B Classroom)
Ceiling, external
12 sht Marine plywood, 4' x 8' x 1/4" 4.4T
14 lgth R/L 2" x 2" x 10' 2.2T
3 kg c.w. nail # 3 180
5 lgth fascia board 1.7T
Labor 4.4T
Hauling 400
Repainting of Furniture
2 gal paint, enamel * 1.2T
3 ft sandpaper * 225
2 pcs paintbrush # 4 * 70
2 bot paint thinner * 130
Transportation of materials * 20
Wrapping of extnl. back wall
2 bag cement * 480
10 cans sand * 300
Labor * 250
Transportation of materials * 200
Lighting facilities
40 m PDX # 12 * 1.92T
4 pcs CFL bulb, GE * 1.08T
4 pcs socket * 260
1 roll elctrical wire * 40
3 pcs 3-gang switch * 225
2 pcs 3 gang surface outlet * 130
Labor * 1T
Transportation of materials * 100
Repainting of walls
4 gal paint, latex * 2.12T
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3
J F M A M J J A S OND J F M A M J J A S
1 set rolling brush * 110
2 pcs paintbrush #4 * 100
2 bot paint thinner * 140
3 ft sandpaper * 525
Repainting of ceiling
2 gal flat wht, enamel * 920
2 gal semi glossy bone wht, enamel * 1.12T
1 sets rolling brush * 110
1 pc paint brush # 4 * 45
2 bot paint thinner * 140
Labor * 700
Hauling * 200
Repainting of furniture
2 gal paint, enamel * 1.2T
3 ft sandpaper * 225
2 pcs paintbrush # 4 * 70
2 bot paint thinner * 130
Transportation of materials * 20
PAP19: Repair of Feeding Center (Elementary)
Wall
(Finishing)
4 bags cement * 940
1/2 cu.m sand * 445
Labor * 500
Transportation of materials * 150
Door (Job Order) * 2.8T
PAP20: Repair of Feeding Center (Secondary)
Lighting facilities
40 m PDX # 12 * 1.92T
4 pcs CFL bulb, GE * 1.08T
4 pcs socket * 260
1 roll elctrical wire * 40
3 pcs 3-gang switch * 225
2 pcs 3 gang surface outlet * 130
Labor * 1T
Transportation of materials * 100
Repainting of Wall
2 gal paint, enamel * 1.12T
1 set rolling brush * 110
2 pcs paintbrush #4 * 70
1 bot paint thinner * 65
Roof *
10 sht corr. GI shts 10' x 04 * 3.85t
12 lgth R/L 2" x 2" x 12' * 2.16T
3 kg umbrella nail * 360
1 qt Vulca seal * 345
3 kg c.w. nail # 3 * 180
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3
J F M A M J J A S OND J F M A M J J A S
Labor * 2T
Hauling * 250
Door jambs
3 lgth R/L 3" x 6" X 6' * 1T
1 bag cement * 240
5 cans mixing sand * 200
3 kg c.w nail # 4 * 180
Labor * 1T
Transportation of materials * 150
Door (Job Order) * 2.8T
Tables * 2.5T
Chairs * 2T
PAP21: Repair of Perimeter fence
25 bag cement * 6T
3 cu.m sand * 2.67T
1.5 cu.m cracked stone 1/4 * 1.8T
22 lgth round bar 12mm * 4.84T
2 kg tie wire * 140
5 rolls cyclone wire * 9T
3 kg welding rod * 300
3 lgth G.I pipe # 2 * 3.6T
Labor * 8.5T
Hauling of Materials * 3.5T
PAP22 Expansion of semi-concrete perimeter fence
20 pcs bamboo posts 8" * 600
4 rolls barbed wire * 1.35T
U nail * 350
Labor * 1T
Hauling * 200
PAP23: Repair of the ancillary services
Stage
4 sht corr GI sheet, 6' * 1.54T
1 kg umbrella nail * 110
3 lgth 2" x 2" x 10' * 480
1 kg c.w nail # 3 * 60
1 pt Vulca seal * 170
Labor * 700
Hauling * 100
PAP24: Repair of other facilities
Rehab of Elect connection from Bldg 1 to Bldg 2
80 m service drop * 3.6T
1 lgth GI pipe, # 2 * 800
1 bag cement * 240
3 can mixing sand * 100
2 cans cracked stone * 100
1 lgth round bar 10 mm * 195
1/2 kg welding rod * 55
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3
J F M A M J J A S OND J F M A M J J A S
Labor * 1.5T
Transportation * 500
Elect connection from Bldg 3 to Bldg 4
70 m service drop * 3.15T
1 lgth GI pipe, # 2 * 800
1 bag cement * 240
3 cans mixing sand * 100
2 cans cracked stone * 100
1 lgth round bar 10mm * 195
1/2 kg weding rod * 55
Labor * 1.4T
Transportation * 500
Main Gate Door hinges
1 kg welding rod * 100
Labor * 1.5T
Safety Lights to Main Gate
100 m service drop * 4.5T
12 pcs CFL lamp 25 w * 2.6T
12 pcs socket * 780
2 rolls electrical tape * 80
Landscape
( Front of Gr 4,5 & 6 )
300 pcs hollow blocks * 5.4T
10 bags cement * 2.4T
2 cu.m mixing sand * 1.8T
8 lgth round bar 8mm * 760
1/2 kg tie wire * 40
Labor * 3.1T
Hauling of Materials * 3T
PAP25: Repair of broken/damaged equipment
( Job Order)
15 Computer units * * 6.4T 5.6t
6 Printers * * * * * * * 1.75T 1.75T 1.75T 1.75T 1.75T
4 Electric fan * * * * 200 200 200
4 Sound system * * * * 500 500 500
3 Bundy clock * * * 300 300
3 Gas range * * * 200 200
2 Refrigerator * * 300 300
2 LCD Projector * * 300 300
2 Megaphone * * 300 300
2 TV sets * * 300 300
4 Brush cutter * * * * 300 300 300
1 Laminating Machine * * * * 300 300 300
PAP26: Repair of broken/damaged furniture
6 Cabinet * * 1.8T
30 Armchairs * * 1.5t
6 Shelves / Dividers * * 1.5
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3
J F M A M J J A S OND J F M A M J J A S
4 Graphing board * * 200
1 Sala Seats * * 1T
6 Computer tables * * 1.2
1 Tennis Table * * 3T
5 Teacher's table * * 2.5T
1 Cupboards * * 3T
20 Stool * * 800
C. Learning Materials and Equipment
C.1. Improved the availability of textbooks and
other Learning Materials
Science Subjects
1 Ammeter * 210
2 Beaker * 170
1 Denatured alcohol * 75
1 Handlens * 45
1 Test tube * 180
1 U-magnet * 65
1 Voltmeter * 485
1 Weighing scale * 800
TLE/EPP *
Home Economics *
12 Bachoy server, set * 2.8T
1 Big cooking pot (for Fdg) * 7T
6 Curtain, set * 4.5T
2 Cutlery, set * 2.4T
1 Display cabinet/closet * 3.T
45 Goblet * 2.8T
1 Ice crusher *
1 Kettle, large * 1.2T
3 Kitchen knives, set * 2.4T
80 Kitchen wares, set * 4T
5 Placemats set * 1.8T
6 Platter * 1.9T
12 Soup bowls * 780
3 Serving dishes * 1.2T
24 Table napkin, cloth * 1.8T
2 Vanity mirror *
1 Wine holder *
Industrial Arts/EPP/Electricity
1 Chisel * 360
2 Cross cut saw * 760
2 Hack saw * 180
2 Hammer *
1 Hand Drill, electric *
2 Long nose * 700
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3
J F M A M J J A S OND J F M A M J J A S
1 Planer, manual * 320
2 Pliers, set * 800
1 Rotary tool kit *
1 Screw drivers, set *
1 Steel Grinder * 4.2T
1 Steel rule, 33' * 280
STVEP
1 roll measuring tape * 560
2 Axe * 500
1 Back Pack Sprayer * 1.8
10 Bolo * 2T
3 Budding/grafting knives * 2T
1 Crowbar * 800
2 Draft carabao *
6 Garden hoe *
2 Grass cutters * 800
6 Hand forks *
6 Hand trowels * 510
2 Hole digger * 2.4T
3 Pick mattock * 2.5T
10 Picking/harvesting knives * 1T
1 Power sprayer * 3T
3 Pruning shears * 1.2T
15 Scythe * 1.8T
6 Shovel * 3.6
1 Soil testing kit * 5T
6 Spade *
6 Spading Fork * 2.4T
6 Sprinkler *
1 Vise grip * 2.4
200 Water hose (meter) *
2 Wheel Barrow * * 3.5T 3.5T
Technical Drawing
Tools & Equipment
5 T-square 36" wooden body with graduated
plastic edge adjustable * 4.3T
Safety Equipment
1 Fire extinguisher, ABC type, dry chem 5kg *
Internet Computer Fundamentals
Tools & Equipment
1 Broadband Tattoo stick * 1.45T
Kinder, Grade I, II, & III
75 Crayon * 2T
1 Wall clock * 800
MAPEH/MSEP
1 Ball, basketball Mikasa * 3.6T
1 Ball, volleyball Mikasa * 2.3T
1 Lawn tennis set * 1.3T
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3
J F M A M J J A S OND J F M A M J J A S
1 Table tennis set * 600
1 Volley ball net * 370
Clinic
1 BP Monitor * 4.5T
HEKASI/SIBIKA
4 Charts * 500
4 Maps * 1T
Math
1 Compass, blackboard * 150
1 Color chalk, box * 160
1 Ruler, blackboard * 150
1 Protractor, blackboard * 150
1 Triangle, blackboard * 150
Computer Hdwe Servicing
Tools & Equipment
1 Multi-tester *
1 Transformer multi-output with UPS *
10 Connecting cords GA 22
w/ aligator clips both ends *
10 Connecting cords GA 23
w/ banana clips both ends *
5 Round nose pliers *
1 Wire cutter *
6 Philips head screw driver 6" (set) *
6 Flat head screw driver 6" set *
10 Connecting wire (solid gauge no.22) *
2 Soldering iron 100w *
5 Soldering lead (matrl) *
10 IC remover, cutter *
1 Tool Cabinet *
Tools
References
1 English-Filipino-Hiligaynon Dictionary * 2.8T
1 Filipino-English Complete Dictionary * * 1.6T 1.6T
TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2 Q3 Q4 Q1 Q2 Q3
PROGRAMS/PROJECTS/ACTIVITIES MOV's
J F M A M J J A S O N D J F M A M J J A S
1 Filipino-Filipino Complete Dictionary * 1.6T
1 Guide to High School Book Report * * 345
10 Maps * * 2T
1 Globes * * 1.5T
5 Books for STVEP * * 3T
5 Filipino Books, secondary * * 2.5T
Other References
10 Scrabble Board * 2.2T
6 Word Factory (Boggles) * 3T
6 Domino * 960
2 Sungka * 520
10 Scientific calculators * 13T
D. Others
D.1. Enrolled all school age children and
youth in the catchment areas.
PPA1 : Survey of new entrants / campaign * 500 500
From Daycare to Kindergarten * * *
From Kindergarten to Grade I * * *
From Grade 6 to Grade 7 * * *
PPA2 : Tracing of drop-outs * 200 200
Kindergarten * *
Grade 1 * *
Grade 2 * *
Grade 3 * *
Grade 4 * *
Grade 5 * *
Grade 6 * *
Grade 7 * *
Grade 8 * *
Year 3/rade 9 * *
Year 4/Grade 10 * *
Grade 11
Prepared:
ANALIE V. BUHAYAN
Principal I
MENTS SOURCES
DEPE OTHE
Q4 LGU PTA D RS
TOTAL
O N D
5T 15T 15T
5T 15T 15T
5T 15T 15T
15T 15T
5T 15T 15T
5T 15T 15T
5T 15T 15T
500 500 5T 5T
3T 2T 5T
12.5T 2.5T 15T
1T 1T
1T 1T
1T 1T
2M
4T 4T 4T 28T 28T
2.5T 2.5T 2.5T 24T 5.5T 29.5T
11T 11T 11T 22T
7T 7T
1.5T 1.5T
15T 15T
13.8T 13.8T
9.2T 9.2T
7.17T
11.5T 11.5T
2.1T
1.92T
175 4.2T 4.2T
1.4T 1.4T
12.7T 12.7T
1.6T
800
60
35
450
80
45
460
260
1.2T
400 4.2T 4.2T
5.5T 5.5T
13.28T 13.28T
4.5T 4.5T
1.28T 1.28T
7.5T 7.5T
1.6T
800
60
35
450
80
45
460
260
1.2T
400 4.2T 4.2T
4.41T 4.41T
4.99T 4.99T
1.8T 1.8T
88T 88T
MENTS SOURCES
DEPE OTHE
Q4 LGU PTA D RS
TOTAL
O N D
11.5T 11.5T
13.8T 13.8T
4.5T 4.5T
4.78T 4.78T
1.7T 1.7T
1.23T 1.23T
MENTS SOURCES
DEPE OTHE
Q4 LGU PTA D RS
TOTAL
O N D
8.8T 8.8T
6.4T 6.4T
1.44T
1.4T
260
40
50
800
3.47T 3.47T
2.77T 2.77T
1.23T 1.23T
15.8T 15.8T
MENTS SOURCES
DEPE OTHE
Q4 LGU PTA D RS
TOTAL
O N D
1.23T 1.23T
8.8T 8.8T
3T
1.6T
120
1.2T
1.8T
200 7.9T 7.9T
840 840
9.2T 9.2T
8.8T 8.8T
MENTS SOURCES
DEPE OTHE
Q4 LGU PTA D RS
TOTAL
O N D
21.2T 21.2T
4.5T 4.5T
5.5T 5.5T
680
2.5T 3.2T
2.1T 2.1T
5.4T
2.7T 8.1T
MENTS SOURCES
DEPE OTHE
Q4 LGU PTA D RS
TOTAL
O N D
2.77T
1.2T 1.2T
4T 4T
1.7T 1.7T
2.77T
1.2T 1.2T
MENTS SOURCES
DEPE OTHE
Q4 LGU PTA D RS
TOTAL
O N D
2.6T 2.6T
2.5T 2.5T
500 1.5T
1.7T 1.7T
2.77T 2.77T
3.8T 3.8T
1.2T 1.2T
1.06T 1.06T
MENTS SOURCES
DEPE OTHE
Q4 LGU PTA D RS
TOTAL
O N D
2.5T 2.5T
1.7T 1.7T
2.15T 2.15T
1.7T
2.4T 2.4T
11.T 11.T
MENTS SOURCES
DEPE OTHE
Q4 LGU PTA D RS
TOTAL
O N D
2.5T 2.5T
1.7T
4.3T 4.3T
1.18T 1.18T
2.15T 2.15T
2.22T 2.22T
4.5T 4.5T
800 800
4.84T 4.84T
MENTS SOURCES
DEPE OTHE
Q4 LGU PTA D RS
TOTAL
O N D
3.3T 3.3T
1.7T 1.7T
MENTS SOURCES
DEPE OTHE
Q4 LGU PTA D RS
TOTAL
O N D
2.5T 2.5T
3.3T 3.3T
4.5T 4.5T
1.7T 1.7T
4.7T 4.7T
4.12T 4.12T
2.28T 2.28T
MENTS SOURCES
DEPE OTHE
Q4 LGU PTA D RS
TOTAL
O N D
3.1T 3.1T
2.15T 2.15T
2.9T 2.9T
4.5T 4.5T
1.7T 1.7T
2.05T 2.05T
3.09T 3.09T
4.7T 4.7T
MENTS SOURCES
DEPE OTHE
Q4 LGU PTA D RS
TOTAL
O N D
3T 3T
3.3T 3.3T
4.5T 4.5T
1.7T
1.1T 1.1T
4.7T 4.7T
1.37T 1.37T
MENTS SOURCES
DEPE OTHE
Q4 LGU PTA D RS
TOTAL
O N D
8.8T 8.8T
2.77T 2.77T
40.35T 40.35T
3.5T 3.5T
MENTS SOURCES
DEPE OTHE
Q4 LGU PTA D RS
TOTAL
O N D
7.2T 7.2T
6.59T 6.59T
1.6T 1.6T
7.96T 7.96T
16.5T 16.5T
1.75T
200
500
300
200
300
300
1.8T 3.6T
1.5t 3T
1.5 3T
MENTS SOURCES
DEPE OTHE
Q4 LGU PTA D RS
TOTAL
O N D
200 400
1.2
2.5T
3T
800
2.03T 2.03T
4.5T
1.5T
1.5T 48.78T
760
3.8T
MENTS SOURCES
DEPE OTHE
Q4 LGU PTA D RS
TOTAL
O N D
1.2T
460
12.12
12.12T
T
2.5T
1T
510
3.6
1.6
4.2T
55.2T 55.2T
4.3T 4.3T
3.8T 3.8T
1.45T 1.45T
2.8T 2.8T
MENTS SOURCES
DEPE OTHE
Q4 LGU PTA D RS
TOTAL
O N D
8.2T 8.2T
4.5T 4.5T
1.5T 1.5T
760 760
4.5T
300
640
720
850
340
470
450
320
180
85
350
2.4T 11.6T 11.6T
5T 5T
MENTS SOURCES
OTHER
Q4 LGU PTA DEPED
S
TOTAL
O N D
15.35T 15.35T
19.68T 19.68T
1T
400
pared:
V. BUHAYAN
ncipal I
PPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : Provis
School Improvement Plan 2014-16 COLONIA DIVINA INTEGRATED SCHOOL
GOAL AND OBJECTIVES CHART: Quality and Relevenace
MEANS OF
NARRATIVE SUMMARY OBJECTIVELY VERIFIABLE INDICATOR
VERIFICATION
A.1. Established STVEP
AND RELEVANCE
A. Improved academic performance NAT
of the learners Improved NAT Grade 3 MPS to at least 75% by 2016 NAT Results
Improved NAT Grade 6 MPS to at least 75% by 2016
Improved NAT Year 4 MPS to at least 75% by 2016
Level Baseline 2014 2015 2016
Grade 3 60.80 65.00 70.00 75.00
Organic Agriculture Production Grade 6 67.63 70.00 72.25 75.00
Year 4 64.10 68.00 71.00 75.00
ALS
Achieved at least 5 ALS learners to pass the A & E Test by 2013 A & E Test Results
ALS Program Baseline 2014 2015 2016
A&E 2 3 4 5
Page 3 of 7
Tasks:
1. PELC Monitoring Checklist/PELC Log
2. Functional Testing Program
Precondition: Availability of PELC
B. Improved Provision of Innovative Curricular Continuous Integration of Special Topics in Regular Curriculum
Programs
PAPs: Integration of Special Topics Reading Level Baseline 2014 2015 2016 Lesson Plans
Drug Addiction x x x x Lesson Logs
Gender Sensitivity/GAD VAWC x x x x
Disaster Risk Reduction x x x x
Anti-Graft and Corruption x x x x
Moral Recovery x x x x
Environment Protection x x x x
Peace x x x x
Child Abuse x x x x
Child Friendly System x x x x
C. Enhanced Curriculum Materials
PAPs:
1. Curriculum Indigenization Program
2. Development of IMS
3. Learning Guide Development
4. Develop MTBL Material per quarter
Tasks:
a. Orient teachers
b. Make Action Plan
c. Implement/Develop Material, etc.
Panel door, back
1 unit panel door 4.5T
effective teaching
D. Improved Instructional Delivery
Improved Teachers Instructional Delivery
4. LEARNERS' HEALTH AND NUTRITION
A. Improved pupils nutritional status
PAPs: Feeding Program
Gulayan sa Eskwelahan
Page 5 of 7
Tasks:
1. Measure height & weigh pupils (baseline)
2. Evaluate & classify pupils (Identify wasted &severely wasted)
3. Implement feeding program
4. Measure height & weigh pupils (endline)
5. Analyze/evaluate results
Precondition: Impelementation of Feeding Program
for wasted & severely wasted pupils
5. STUDENT SERVICES
A. Improved pupils participation to various co-curricular
activities
Tasks:
1. Orient pupils
2. Let them lead elections/programs in various co-
curricular activities
3. Guide & monitor programs of pupils organization
Precondition: Pupils Participation in Co-Curricular
Activities
B. Improved provision of student services in the campus
PAP: Organization/establishment of pupils services in campus
Tasks:
1. Orient pupils about their roles and responsibilities
2. Organize committee
3. Monitor
Precondition: 100% implementation
C. Improved pupils performance in competitions
PAPs:
a. Training Program in Journalism
b. Training Program in Sports
c. Review Program for Tourism/Super Quiz, MTAP, etc.
Tasks:
1. Send teachers to training
2. Train potential pupils in School
3. Participate in Competitions
4. Follow-up Skills
Precondition: 100% participation in competitions
D. Improved pupils attendance
18 sht Marine plywood, 4' x 8' x 1/4"
Tasks:
1. Daily checking of attendance
2. Call for Homeroom PTA Meeting
3. Inform parents abut the status of their children
4. Monitor performance
Page 6 of 7
6. INTERNAL EFFECIENCY
A. Improved school internal efficiency along EFA Goals
PAPs: Improved performance indicators to PS by 2016.
1. Feeding Program ELEMENTARY
2. Tracking System Indicators Baseline 2014 2015 2016 Form 20
3. Project BEST Drop-out 6.67% 4% 2% 0.00
Tasks: Repetition 10.34% 7% 3% 0.48%
1. Implement Feeding Program Promotion 84.67% 88% 94% 100%
2. Implement Tracking System Completion 68.24% 74% 83% 90%
3. Implement Project BEST SECONDARY
Pre-Condition: 100% implementation of Programs Indicators Baseline 2014 2015 2016 Form 20
7. RESEARCH Drop-out 4.89% 2% 1% 0.00
A. Improved research output of the school Repetition 4.75% 3% 2% 0.48%
PAP: School Based Action Research Program Promotion 93.85% 95% 97.5% 100%
Tasks: Completion 89.83% 92% 93% 95%
1. Orient teachers
2. Develop action research based on NAT LLS of Low
MPS subjects
3. Implement interventions
4. Evaluate results
5. Make/submit success stories
Precondition: Approved Action Reasearch Proposals
A.2. Produced competent STVEP
Junior High School Graduates Graduated at least 45 STVEP students with NC grants from TESDA
PAPs: in the Junior High School level by 2016
a. Recommend quality teachers to be hired for vacant Course Baseline 2014 2015 2016
teaching items fpr STVEP. Comm. Cooking x x x 17
b. Establish strong linkaging with potential donors Comp Hdwe Srvg x x x 10
for the needed facilities Crop Production x x x 18
c. Work out for the papers for the program Household Srvcs 0 x x x
d. Work out for the Land Title of the School site
e. Work out for the papers for the demo farm lot.
Tasks:
1. Keep connected with the lead stakeholders of the school
2. Keep all the stkeholders of Colonia Divina updated
of the endeavor
3. Keep in touch with Division Office always on the endeavor
4. Keep asking from the alumni and other stakes for
equipments and other tools and materials
Page 7 of 7
Prepared by:
ANALIE V. BUHAYAN
Principal I
40 m PDX # 12
Panel Door
Page 7 of 7
Prepared by:
ANALIE V. BUHAYAN
Principal I
12 sets Jalousie frame
8 sht GI corr sheet 10' x .04
1 kg umbrella nail
1 kg c.w. nail # 2 1/2
Main Door
Door panel
Door jamb
Comfort Room
Door jamb
Panel Door
Repainting of walls
Repair of external ceiling
ASSUMPTIONS AND RISKS
4.5T
11.7T
2013
14.5T
2013
2013
2013
4.5T
COLONIA DIVINA INTEGRATED SCHOOL
School Improvement Plan 2014-16 3-YEAR MASTER PLAN: Quality and Relevance
MEANS OF PHYSICAL TARGETS FINANCIAL TARGETS
PROGRAMS/PROJECTS/ACTIVITIES INDICATOR (Output Level)
VERIFICATION Yr1 Yr2 Yr3 Year 1
1. LEARNERS PERFORMANCE
A. Improved Learner's achievement
PPA 1: Project SAVE (All Subjects) Increased NAT Grade 3 from 59.44 MPS NAT G3 Results x x x 3T
Tasks: to 75 by 2016
1. Orient teachers Increased NAT Grade 6 from 67.67 NAT G6 Results
2. Evaluate/analyze Nat 3 Results to 75 by 2016
3. Identify mastered and un-mastered skills Increased NAT MPS in NAT Year 4 from 64.00 NAT Yr 4 Results
4. Develop/enrich test for review to 75.00 by 2016
Precondition: Test items used in review classes
PPA 2: Project KADI-Lubos na (Filipino) x x x 3T
Tasks:
1. Orient Teachers
2. Develop HOTs questions on least learned skills
3. Conduct review classes
Precondition: Review class schedule implementation
PPA 3: Project MILLS (Math) x x x 3T
Tasks:
1. Get frequency of errors
2. Identify Least Learned Skills
3. Provide intervention to improve least learned skills
4. Organize review class for the least learned skills
5. Organize a team to develop parallel item
to the least learned identified
6. M & E results of review class
7. Spot tests
8. Log of skills taken up in the review class
9. Percentage of pupils who got 75% of the
test item to measure achievement, re: LLS
10. Post review class assessment (include all LLS in the test
Precondition: Implemented review/remedial class
utilization of test results
PPA 4: Project PELC Monitoring x x x 1T
Tasks:
1. Prepare checklist
2. Monitor skills covered every quarter/whole year
Precondition: PELC Utilization
PPA 5: Reproduction of NSTIC improvised Mat. x x x 1T
Page 1 of 7
Tasks:
1. Re-orient teachers
2. Workshop on improvised science mat.
3. Utilize the materials
4. Monitor & evaluate results
Precondition: Utilization of Materials
PAP 6: Project SHAP-UP x x
Tasks:
1. Train teachers (based on IPPD)
2. Monitor application of training
3. Improve learners performance
4. Attendance/participation in Memorandized
contests
Precondition: Application of skils from the
training and pupils participation in contests
B. Improved Reading Proficiency level of pupils Increased number of pupils who are at PHIL-IRI Results x x x 800
PAPs: Independent reading level by 2016 (Pre-Test & Post
a. Attain 100% readers and 0% non-reader in Grade (Oral & Silent) Test) x x x
b. Increased number of pupils who are at instructional
level from 24 to 50 in Grade 2
c. Attain 100% Instructional Level in Grade 3 x x x
d. Increased number of pupils who are independent x x x
level from 6 to 30 in Grade 4
e. Increased number of pupils who are independent
in Grade 5 x x x
f. Attain 100% independent level in Grade 6 x x x
Tasks:
1. Re-orient teachers on how to conduct PHIL-IRI (O & S)
2. Observe in conducting
3. Monitor and evaluate reading results
4. Intervention (Remedial Reading, Home Reading,
Project GARAY)
Precondition: Phil-Iri Implemntation
C. Improved Numeracy Skills of Pupils
PAP: Project SMILE Increased number of pupil who have mastered MATH Inventory x x x 2T
Tasks: the basic factsin math to at least 85% by 2016 Results (Pre-test &
1. Re-orientation on the mechanics of the Conduct of Post Test)
Math Inventory Tool
2. Conduct First Exposure based on the Mechanics
of the conduct
3. Analyze results:
a. Identify the basic facts combination missed by
each pupil in SMILE form provided
b. Teacher provides intervention using the results.
Page 2 of 7
Use strategies such as:
b.1 games (math bingo, etc.)
b.2 drills (math hataw, etc.)
c. M & E results of intervention
- spot testing
- mid-year assessment and year-end assessment
(math inventory)
Precondition: Implement Intervention
D. Improved Reading Readiness of Grade 1
PAP: PHIL-IRI Pre-test and Post Test Increased number of pupils who are ready SReYA x x x 3T
Tasks: in Grade 1 to atleast 75% by 2016 (SReYA) PHIL-IRI
1. Re-orient teachers on how to conduct Phil-iri
(Oral & Silent)
2. Observe in conducting
3. Monitor and evaluate reading results
4. Intervention (Remedial Reading, Home Reading,
Project GARAY)
Precondition: PHIL-IRI Implementation
E. Improved reparedness of Grade 3, 6 & 4 pupils/students for NAT Improved number of pupils who are prepared NAT Preparedness
PAP: Project Nat Preparedness Assessment for NAT 3 to at least 75% by 2016 Assessment x x x 500
Tasks: Results
1. Analyze Results Increased number of pupils who are prepared
2. Get Frequency of Errors for NAT 6 to at least 75% by 2016
3. Identify LLS
4. Provide intervention to improve LLS Increased number of pupils who are prepared
5. Organize review classes for NAT 6 to at least 75% by 2016
6. Implement review classes
7. Monitor
8. Evaluate results
2. STAFF DEVELOPMENT
A. Improved Teachers' KSA's
a. Improved teachers pedagogical skills (based on S Increased number of teachers attaining P / PH CB-Past Forms x x x 300
& IPPD of teachers) attaining P/HP in pedagogy under the IM
PAPs: QMM, SLAC, INSET observation to 100% by 2016
Tasks:
1. Pre-Conference
2. Observe Classes
3. Post Conference
4. SLAC Session
5. Customized Teacher Dev't Approach
Precondition: QMM Validation
b. Improved subject knowledge of teachers Increased no.of teachers who attained CB-PAST Forms x x x 300
PAP: Instructional Supervision/QMM 75% MPS in the subjects taught in quarter exam
Page 3 of 7
Tasks:
1. Enhanced competencies of teachers in IPPD's
Precondition: Schedule of Supervision is strictly
followed
3. CURRICULUM IMPLEMENTATION/INSTRUCTIONAL Achieved 100% coverage of PELC annually PELC Monitoring x x x 500
DELIVERY in all subject areas by all teachers Checklist
a. Improved Curriculum Implementation
PAP: Quarterly Skills Monitoring
Tasks:
1. PELC Monitoring Checklist/PELC Log
2. Functional Testing Program
Precondition: Availability of PELC
b. Improved Provision of Innovative Curricular Increased no.of teachers integrating special Log/modules of x x x
Programs topics/content areas in the curriculum integrated topics
PAP: Integration of Special Topics
a. Drug Addiction
b. Gender Sensitivity/GAD VAWC
c. Disaster Risk Reduction
d. Anti-Graft and Corruption
e. Moral Recovery
f. Environment Protection
g. Peace
h. Child Abuse
i. Child Friendly System
c. Enhanced Curriculum Materials Increased no. of teachers adapting IMS IMS
PAPs: and activities to indigenize curriculum
a. Curriculum Indigenization Program x x x 4T
b. Development of IMS Develop at least 1 instructional material x x x 5T
c. Learning Guide Development developed by teacher per year per subject, IMS x x x 5T
d. Develop MTBL Material per quarter per quarter, per grade and year level x x x 7T
Tasks:
1. Orient teachers
2. Make Action Plan
3. Implement/Develop Material, etc.
4. Monitor/check
Precondition: Utilization of developed materials for
effective teaching
d. Improved Instructional Delivery
PAP: Methodologies/Approaches Checklist Increased number of teachers who Lesson Plans x x x 200
Tasks: are using methodologies/are using
1. Orient teachers methodologies/approaches
2. Prepare checklist for methodologies/approaches
used in lessons
3. Check Lesson Plan/Observe classes
Page 4 of 7
Precondition: LPs used methodologies/approaches
4. LEARNERS' HEALTH AND NUTRITION
A. Improved pupils nutritional status
PAP: Feeding Program Increased number of pupils in Normal Nutritional x x x 50T
Gulayan sa Eskwelahan Nutritional Status to100% by 2016 Status Report x x x 7T
Tasks:
1. Measure height & weigh pupils (baseline)
2. Evaluate & classify pupils (Identify wasted & severely w Reduced number of severely wasted
3. Implement feeding program Nutritional Status to by 2016
4. Measure height & weigh pupils (endline)
5. Analyze/evaluate results
Precondition: Impelementation of Feeding Program
for wasted & severely wasted pupils
5. STUDENT SERVICES
A. Improved pupils participation to various co-curri-
cular activities
PAP: Active participation to higher level co-curr activities x x x 40T
Tasks: Increased number of pupils participation List of officers
1. Orient pupils to various co-curricular activities Programs &
2. Let them lead elections/programs in various Projects
co-curricular activities
3. Guide & monitor programs of pupils organization
Precondition: Pupils Participation in Co-Curricular
Activities
B. Improved provision of student services in the campus
PAP: Organization/establishment of pupils services on
campus Increased number of functional pupils Log book/atten- x x x 3T
Tasks: services established in the campus dance schedule of
1. Orient pupils about their roles and responsibilities pupils services
2. Organize committee (assignment)
3. Monitor
Precondition: 100% implementation
C. Improved pupils performance in competition
PAPs:
a. Training Program in Journalism Increased number of pupils participation List of Partici- x x x 3T
b. Training Program in Sports /winners in competitions outside the school pants & winners x x x 3T
c. Review Program for Tourism/Super Quiz, MTAP, etc. Certificate of Recog- x x x 500
Tasks: nition & Appear-
1. Send teachers to training ances
2. Train potential pupils in School
3. Participate in Competitions
4. Follow-up Skills
Precondition: 100% participation in competitions
d. Improved pupils attendance
Page 5 of 7
PPA: Form 1
Tasks: Reduced absenteeism to 2% Form 1 x x x
1. Daily checking of attendance
2. Call for Homeroom PTA Meeting
3. Inform parents abut the status of their children
4. Monitor performance
6. INTERNAL EFFECIENCY Elementary
A. Improved school internal efficiency along EFA Goa Reduced drop-out rate from 6.67 % to 0%
a. Reduced drop-out rate by 2016
b. Reduced repetition rate Reduced repetition rate from 10.34% to 0.48%
c. Increased promotion rate by 2016 Efficiency
d. Increased completion rate Increased promotion rate from 86.67% to 100% Indicators
e. Increased graduation rate by 2016
f. increased cohort survival rate Increased completion rate from 68.24% to 90%
PAPs: by 2016
a. Feeding Program Secondary x x x 45T
b. Tracking System Reduced drop-out rate from 4.89 % to 0 x x x 3T
Tasks: by 2016
1. Implement Feeding Program Reduced repetition rate from 4.75% to 0.48%
2. Implement Tracking System by 2016
3. Implement Project BEST Increased promotion rate from 93.85% to 100%
Pre-Condition: 100% implementation of Programs by 2016
Increased completion rate from 89.83% to 95%
7. RESEARCH by 2016
A. Improved research output of the school Increased number of researches from 6 to 15 Research Propo-
PPA: School Based Action Research Program by 2016 (based on NAT 3, 6, and 4 Results) sals
Tasks: (Success stories)
a. Orient teachers
b. Develop action research based on NAT LLS of Low
MPS subjects
c. Implement interventions
d. Evaluate results
e. Make/submit success stories
Precondition: Approved Action Reasearch Proposals
A.2. Produced competent STVEP Graduated at least 45 STVEP students
Junior High School Graduates with NC grants from TESDA
Commercial Cooking in the Junior High School level by 2016 x x x
Computer Hardware Servicing x x x
Crop Production x x x
Household Services x x
PAPs:
a. Recommend quality teachers to be hired for vacant x x x 2T
teaching items fpr STVEP.
Page 6 of 7
b. Establish strong linkaging with potential donors x x x 2T
for the needed facilities
c. Work out for the papers for the program x 3T
d. Work out for the Land Title of the School site x 5T
e. Work out for the papers for the demo farm lot. x 2T
Tasks:
1. Keep connected with the lead stakeholders of the school
2. Keep all the stkeholders of Colonia Divina updated
of the endeavor
3. Keep in touch with Division Office always on the endeavor
4. Keep asking from the alumni and other stakes for
equipments and other tools and materials
Page 7 of 7
Prepared:
ANALIE V. BUHAYAN
Principal I
INDICATOR (Output Level)
PROGRAMS/PROJECTS/ACTIVITIES
INDICATOR (Output Level)
PROGRAMS/PROJECTS/ACTIVITIES
INDICATOR (Output Level)
PROGRAMS/PROJECTS/ACTIVITIES
INDICATOR (Output Level)
PHYSICAL TARGETS FINANCIAL TARGETS
MEANS OF Year 1 Year 2 Year 3 Year 1
VERIFICATION
PROGRAMS/PROJECTS/ACTIVITIES
ANCIAL TARGETS IMPORTANT
Year 2 Year 3 ASSUMPTION
Review of least
learned skills
sustained
3T 3T
3T 3T
1T 1T
1T 1T
of 7
1T 1T
2T 2T Improved Numeracy
Skills of pupils
(Mastered the
basic facts)
of 7
3T 3T Developed reading
ability & compre-
hension skills of
pupils
of 7
Integration of
Special topics in
the curriculum
of 7
Implemented 100%
feeding program for
wasted & severely
wasted pupils
40T 40T
1005 participation
of pupils in co-
curricular activities
2T 2T Established pupils
in Campus
2T 2T 100% participation
2T 2T in contests
500 500 Wins increase
of 7
Absenteeism of pupils
were reduced/mini-
mized
100% Implementa-
tion of Action
Research
2T 2T
of 7
2T 2T
of 7
NANCIAL TARGETS
Year 2 Year 3
IMPORTANT ASSUMPTION
NANCIAL TARGETS
Year 2 Year 3
IMPORTANT ASSUMPTION
NANCIAL TARGETS
Year 2 Year 3
IMPORTANT ASSUMPTION
NANCIAL TARGETS
Year 2 Year 3
IMPORTANT ASSUMPTION
COLONIA DIVINA INTEGRATED SCHOOL
School Improvement Plan 2014-16 ANNUAL IMPROVEMENT PLAN 2015: Quality and Relevance
TIME FRAME RESOURCE REQUIREMENTS
MEANS OF Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
PROGRAMS/PROJECTS/ACTIVITIES VERIFICATION J F M A M J J A S O N D J F M A M J J A S O
1. LEARNERS PERFORMANCE
A. Improved Learner's achievement
PPA 1: Project SAVE (All Subjects) NAT G3 Results x x x x x x x x x x x x 750 750 750
PPA 2: Project KADI-Lubos na (Filipino) NAT G6 Results x x x x x x x x x x x x 750 750 750
PPA 3: Project MILLS (Math) NAT Y4 x x x x x x x x x x x x 750 750 750
PPA 4: Project PELC Monitoring x x x x 250 250 250
PPA 5: Reproduction of NSTIC improvised Mat.
PPA 6: Project SHAP-UP x x x 1T 1T 1T
B. Improved Reading Proficiency level of pupils PHIL-IRI Results x x x x x x x x x x 200 200 200 200 200 200 200
PAPs: (Pre-Test & Post
a. Attain 100% readers and 0% non-reader in Grad Test)
b. Increased number of pupils who are at instructional
level from 24 to 50 in Grade 2
c. Attain 100% Instructional Level in Grade 3
d. Increased number of pupils who are independent x x x x
level from 6 to 30 in Grade 4 x x x x x x x x x x
e. Increased number of pupils who are independent
in Grade 5
f. Attain 100% independent level in Grade 6
C. Improved Numeracy Skills of Pupils MATH Inventory
PAP: Project SMILE Results (Pre-test & x x x x x x x x x x 1T 1T
D. Improved Reading Readiness of Grade 1 Post Test)
PAP: PHIL-IRI Pre-test and Post Test SReYA, Phil-IRI x x 1.5T 1.5T
PHIL-IRI
PAP: Project Nat Preparedness Assessment NAT Preparedness
Assessment Results x x 500
2. STAFF DEVELOPMENT
A. Improved Teachers' KSA's
a. Improved teachers pedagogical skills (based on CB-Past Forms
& IPPD of teachers)
PAPs: SLAC, INSET x x x x x x x x x x
b. Improved subject knowledge of teachers CB-PAST Forms
PAP: Instructional Supervision x x x x x x x x x x 300
3. CURRICULUM IMPLEMENTATION/INSTRUCTIONAL PELC Monitoring
DELIVERY Checklist
a. Improved Curriculum Implementation
PAP: Quarterly Skills Monitoring Log/modules of x x x x 500
PAP: Integration of Special Topics integrated topics
a. Drug Addiction x x x x x x x x x x
b. Gender Sensitivity/GAD VAWC x x x x x x x x x x
c. Disaster Risk Reduction x x x x x x x x x x
d. Anti-Graft and Corruption x x x x x x x x x x
e. Moral Recovery x x x x x x x x x x
f. Environment Protection x x x x x x x x x x
g. Peace x x x x x x x x x x
h. Child Abuse x x x x x x x x x x
i. Child Friendly System
c. Enhanced Curriculum Materials IMS
PAPs:
a. Curriculum Indigenization Program x x x x x x x x 1T 1T 1T
b. Development of IMS x x x x x x x x 1.5T 1.5T 1.5T
c. Learning Guide Development IMS x x 1.5T 1.5T
d. Develop MTBL Material per quarter x x 1.5T 1.5T 1.5T
d. Improved Instructional Delivery
PAP: Methodologies/Approaches Checklist Lesson Plans x x x x x x x x x x
Precondition: LPs used methodologies/approaches
4. LEARNERS' HEALTH AND NUTRITION
A. Improved pupils nutritional status
PAP: Feeding Program Nutritional x x x x x x x 50T
Gulayan sa Eskwelahan Status Report x x x x x x x x x x x x 4T 3T
5. STUDENT SERVICES
A. Improved pupils participation to various co-curr List of officers
cular activities Programs &
PAP: Active participation to higher level co-curr acti Projects x x x x x x x x x x 4T 4T 4T 4T 4T 4T 6T
B. Improved provision of student services in the campus
PAP: Organization/establishment of pupils services Log book/atten- x x x 1T 1T 1T
campus dance schedule of
C. Improved pupils performance in competition
PAPs: List of Partici-
a. Training Program in Journalism pants & winners x x 1.5T
b. Training Program in Sports Certificate of Recog- x x x 1T 1T 1T
c. Review Program for Tourism/Super Quiz, MTAP, nition & Appear- x 500
d. Improved pupils attendance ances
PPA: SF 2 SF2
6. INTERNAL EFFECIENCY
A. Improved school internal efficiency along EFA Goals
a. Reduced drop-out rate
b. Reduced repetition rate
c. Increased promotion rate Efficiency
d. Increased completion rate Indicators
e. Increased graduation rate
f. increased cohort survival rate
PAP:
a. Feeding Program x x x x x x x x x x x x 45T
b. Tracking System x x x x x x x x x x x x 3T
7. RESEARCH
A. Improved research output of the school Research Proposals
PPA: School Based Action Research Program (Success stories)
750 3T 3T
750 3T 3T
750 3T 3T
250 1T 1T
1T 4T 4T
200 800 800
2T 2T
3T 3T
500 500
300
300 300
500 500
1T 4T 4T
1.5T 5T 5T
1.5T 5T 5T
1.5T 7T 7T
200
50T 50T
7T 7T
4T 2T 15 3T 22T 40T
3T 3T
1.5T 3T 3T
3T 3T
500 500
45T
3T
2T 2T
2T 2T
3T 3T
1T 5T 5T
2T 2T
RESOURCE REQUIREMENTS
Q1 Q2
J F M A M J
OURCE REQUIREMENTS SOURCES
Q3 Q4 PROGRAMS/PROJECTS/ACTIVITIES
LGU PTA DEP.ED OTHERS TOTAL
J A S O N D
MEANS
TIME FRAME
OF
Q1 Q2 Q3 Q4
VERIFICA J F M A M J J A S O N D
TION
RESOURCE REQUIREMENTS SOURCES
Q1 Q2 Q3 Q4
LGU
J F M A M J J A S O N D
MEANS
SOURCES TIME FRAME
OF
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2
PTA DEP.ED OTHERS TOTAL VERIFICA J F M A M J
TION
TIME FRAME RESOURCE REQUIREMENTS
Q3 Q4 Q1 Q2 Q3
J A S O N D J F M A M J J
MEANS
QUIREMENTS SOURCES
OF
Q3 Q4 PROGRAMS/PROJECTS/ACTIVITIES
LGU PTA DEP.ED OTHERS TOTAL VERIFICA
A S O N D
TION
TIME FRAME
Q1 Q2 Q3 Q4 Q1
J F M A M J J A S O N D J
RESOURCE REQUIREMENTS SOURCES
Q1 Q2 Q3 Q4
LGU PTA
F M A M J J A S O N D
MEANS
SOURCES TIME FRAME
OF
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
DEP.ED OTHERS TOTAL VERIFICA J F M A M J J
TION
RAME RESOURCE REQUIREMENTS
Q3 Q4 Q1 Q2 Q3
A S O N D J F M A M J J A
MEANS
TS SOURCES
OF
Q3 Q4 PROGRAMS/PROJECTS/ACTIVITIES Q1
LGU PTA DEP.ED OTHERS TOTAL VERIFICA
S O N D J
TION
TIME FRAME
Q1 Q2 Q3 Q4 Q1
F M A M J J A S O N D J F
RESOURCE REQUIREMENTS SOURCES
Q1 Q2 Q3 Q4
LGU PTA DEP.ED
M A M J J A S O N D
MEANS
SOURCES TIME FRAME
OF
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
OTHERS TOTAL VERIFICA J F M A M J J A
TION
RESOURCE REQUIREMENTS
Q3 Q4 Q1 Q2 Q3
S O N D J F M A M J J A S
MEANS
SOURCES
OF
Q4 PROGRAMS/PROJECTS/ACTIVITIES Q1
LGU PTA DEP.ED OTHERS TOTAL VERIFICA
O N D J F
TION
TIME FRAME RE
Q1 Q2 Q3 Q4 Q1
M A M J J A S O N D J F M
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4
LGU PTA DEP.ED OTHERS
A M J J A S O N D
MEANS
TIME FRAME
OF
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
TOTAL VERIFICA J F M A M J J A S
TION
RESOURCE REQUIREMENTS
Q4 Q1 Q2 Q3 Q4
O N D J F M A M J J A S O
MEANS
SOURCES
OF
Q4 PROGRAMS/PROJECTS/ACTIVITIES Q1
LGU PTA DEP.ED OTHERS TOTAL VERIFICA
N D J F M
TION
TIME FRAME RESOURCE R
Q2 Q3 Q4 Q1 Q2
A M J J A S O N D J F M A
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4
LGU PTA DEP.ED OTHERS TOTAL
M J J A S O N D
MEANS
TIME FRAME
OF
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4
VERIFICA J F M A M J J A S O
TION
RESOURCE REQUIREMENTS
Q4 Q1 Q2 Q3 Q4
N D J F M A M J J A S O N
MEANS
SOURCES TIME
OF
Q4 PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2
LGU PTA DEP.ED OTHERS TOTAL VERIFICA
D J F M A
TION
TIME FRAME RESOURCE REQUIREME
Q2 Q3 Q4 Q1 Q2
M J J A S O N D J F M A M
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4 PROGRAMS/PROJECTS/ACTIVITIES
LGU PTA DEP.ED OTHERS TOTAL
J J A S O N D
MEANS
TIME FRAME
OF
AMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4
VERIFICA J F M A M J J A S O N
TION
RESOURCE REQUIREMENTS
Q4 Q1 Q2 Q3 Q4
D J F M A M J J A S O N D
MEANS
SOURCES TIME FRAME
OF
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2
LGU PTA DEP.ED OTHERS TOTAL VERIFICA J F M A M
TION
TIME FRAME RESOURCE REQUIREMENTS
Q2 Q3 Q4 Q1 Q2
J J A S O N D J F M A M J
OURCE REQUIREMENTS SOURCES
Q3 Q4 PROGRAMS/PROJECTS/ACTIVITIES
LGU PTA DEP.ED OTHERS TOTAL
J A S O N D
MEANS
TIME FRAME
OF
Q1 Q2 Q3 Q4
VERIFICA J F M A M J J A S O N D
TION
RESOURCE REQUIREMENTS SOURCES
Q1 Q2 Q3 Q4
LGU
J F M A M J J A S O N D
MEANS
SOURCES TIME FRAME
OF
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2
PTA DEP.ED OTHERS TOTAL VERIFICA J F M A M J
TION
TIME FRAME RESOURCE REQUIREMENTS
Q3 Q4 Q1 Q2 Q3
J A S O N D J F M A M J J
MEANS
QUIREMENTS SOURCES
OF
Q3 Q4 PROGRAMS/PROJECTS/ACTIVITIES
LGU PTA DEP.ED OTHERS TOTAL VERIFICA
A S O N D
TION
TIME FRAME
Q1 Q2 Q3 Q4 Q1
J F M A M J J A S O N D J
RESOURCE REQUIREMENTS SOURCES
Q1 Q2 Q3 Q4
LGU PTA
F M A M J J A S O N D
MEANS
SOURCES TIME FRAME
OF
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
DEP.ED OTHERS TOTAL VERIFICA J F M A M J J
TION
RAME RESOURCE REQUIREMENTS
Q3 Q4 Q1 Q2 Q3
A S O N D J F M A M J J A
MEANS
TS SOURCES
OF
Q3 Q4 PROGRAMS/PROJECTS/ACTIVITIES Q1
LGU PTA DEP.ED OTHERS TOTAL VERIFICA
S O N D J
TION
TIME FRAME
Q1 Q2 Q3 Q4 Q1
F M A M J J A S O N D J F
RESOURCE REQUIREMENTS SOURCES
Q1 Q2 Q3 Q4
LGU PTA DEP.ED
M A M J J A S O N D
MEANS
SOURCES TIME FRAME
OF
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
OTHERS TOTAL VERIFICA J F M A M J J A
TION
RESOURCE REQUIREMENTS
Q3 Q4 Q1 Q2 Q3
S O N D J F M A M J J A S
MEANS
SOURCES
OF
Q4 PROGRAMS/PROJECTS/ACTIVITIES Q1
LGU PTA DEP.ED OTHERS TOTAL VERIFICA
O N D J F
TION
TIME FRAME RE
Q1 Q2 Q3 Q4 Q1
M A M J J A S O N D J F M
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4
LGU PTA DEP.ED OTHERS
A M J J A S O N D
MEANS
TIME FRAME
OF
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
TOTAL VERIFICA J F M A M J J A S
TION
RESOURCE REQUIREMENTS
Q4 Q1 Q2 Q3 Q4
O N D J F M A M J J A S O
MEANS
SOURCES
OF
Q4 PROGRAMS/PROJECTS/ACTIVITIES Q1
LGU PTA DEP.ED OTHERS TOTAL VERIFICA
N D J F M
TION
TIME FRAME RESOURCE R
Q2 Q3 Q4 Q1 Q2
A M J J A S O N D J F M A
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4
LGU PTA DEP.ED OTHERS TOTAL
M J J A S O N D
MEANS
TIME FRAME
OF
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4
VERIFICA J F M A M J J A S O
TION
RESOURCE REQUIREMENTS
Q4 Q1 Q2 Q3 Q4
N D J F M A M J J A S O N
MEANS
SOURCES TIME
OF
Q4 PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2
LGU PTA DEP.ED OTHERS TOTAL VERIFICA
D J F M A
TION
TIME FRAME RESOURCE REQUIREME
Q2 Q3 Q4 Q1 Q2
M J J A S O N D J F M A M
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4 PROGRAMS/PROJECTS/ACTIVITIES
LGU PTA DEP.ED OTHERS TOTAL
J J A S O N D
MEANS
TIME FRAME
OF
AMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4
VERIFICA J F M A M J J A S O N
TION
RESOURCE REQUIREMENTS
Q4 Q1 Q2 Q3 Q4
D J F M A M J J A S O N D
MEANS
SOURCES TIME FRAME
OF
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2
LGU PTA DEP.ED OTHERS TOTAL VERIFICA J F M A M
TION
TIME FRAME RESOURCE REQUIREMENTS
Q2 Q3 Q4 Q1 Q2
J J A S O N D J F M A M J
OURCE REQUIREMENTS SOURCES
Q3 Q4 PROGRAMS/PROJECTS/ACTIVITIES
LGU PTA DEP.ED OTHERS TOTAL
J A S O N D
MEANS
TIME FRAME
OF
Q1 Q2 Q3 Q4
VERIFICA J F M A M J J A S O N D
TION
RESOURCE REQUIREMENTS SOURCES
Q1 Q2 Q3 Q4
LGU
J F M A M J J A S O N D
MEANS
SOURCES TIME FRAME
OF
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2
PTA DEP.ED OTHERS TOTAL VERIFICA J F M A M J
TION
TIME FRAME RESOURCE REQUIREMENTS
Q3 Q4 Q1 Q2 Q3
J A S O N D J F M A M J J
MEANS
QUIREMENTS SOURCES
OF
Q3 Q4 PROGRAMS/PROJECTS/ACTIVITIES
LGU PTA DEP.ED OTHERS TOTAL VERIFICA
A S O N D
TION
TIME FRAME
Q1 Q2 Q3 Q4 Q1
J F M A M J J A S O N D J
RESOURCE REQUIREMENTS SOURCES
Q1 Q2 Q3 Q4
LGU PTA
F M A M J J A S O N D
MEANS
SOURCES TIME FRAME
OF
PROGRAMS/PROJECTS/ACTIVITIES Q1
DEP.ED OTHERS TOTAL VERIFICA J F
TION
COLONIA DIVINA INTEGRATED SCHOOL
School Improvement Plan 2014-16 ANNUAL IMPROVEMENT PLAN 2014: Quality and Relevance
TIME FRAME RESOURCE REQUIREMENTS
MEANS OF Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
PROGRAMS/PROJECTS/ACTIVITIES VERIFICATION J F M A M J J A S O N D J F M A M J J A S O N D
1. LEARNERS PERFORMANCE
A. Improved Learner's achievement
PPA 1: Project SAVE (All Subjects) NAT G3 Results * * * * * * * * * * * * 750 750 750 750
Tasks: NAT G6 Results
1. Orient teachers NAT Y4 *
2. Evaluate/analyze Nat 3 Results *
3. Identify mastered and un-mastered *
skills *
4. Develop/enrich test for review *
Precondition: *
Test items are used in review classses.
PPA 2: Project KADI-Lubos na (Filipino) * * * * * * * * * * * * 750 750 750 750
Tasks:
1. Orient Teachers *
2. Develop HOTs questions on least *
learned skills *
3. Conduct review classes *
Precondition: Review class schedule *
implementation *
PPA 3: Project MILLS (Math) * * * * * * * * * * * * 750 750 750 750
Tasks:
1. Get frequency of errors *
2. Identify Least Learned Skills *
3. Provide intervention to improve least *
learned skills *
4. Organize review class for the lesat learned *
skills *
5. Organize a team to develop parallel item
to the least learned identified
6. M & E results of review class
7. Spot tests
8. Log of skills taken up in the review class
9. Percentage of pupils who got 75% of the
test item to measure achievement, re: LLS
10. Post review class assessment (include all
LLS in the test
Precondition: Implemented review/remedial
class, utilization of test results
PPA 4: Project PELC Monitoring * * * * 250 250 250 250
Tasks:
1. Prepare checklist
2. Monitor skills covered every quarter/whole year
Page 1 of 6
Precondition: PELC Utilization
PPA 5: Reproduction of NSTIC improvised Mat. * * * 1T 1T 1T 1T
Tasks:
1. Re-orient teachers *
2. Workshop on improvised science materials
3. Utilize the materials * * * * * * * * * *
4. Monitor & evaluate results
Precondition: Utilization of Materials
PPA 6: Project SHAP-UP 5T 5T
Tasks:
1. Train teachers (based on IPPD) * *
2. Monitor application of training * * * * * * * * * *
3. Improve learners performance * * * * * * * * * *
4. Attendance/participation in Memorandized * * * * * * * * * *
contests
Precondition: Application of skils from the
training and pupils participation in contests
B. Improved Reading Proficiency level of pupils PHIL-IRI Results * * * * * * * * * * 200 200 200 200 200 200 200 200
PAPs: (Pre-Test & Post
a. Attain 100% readers and 0% non-reader in Grad Test)
b. Increased number of pupils who are at instructional
level from 24 to 50 in Grade 2
c. Attain 100% Instructional Level in Grade 3
d. Increased number of pupils who are independent * * * *
level from 6 to 30 in Grade 4 * * * * * * * * * *
e. Increased number of pupils who are independent
in Grade 5
f. Attain 100% independent level in Grade 6
Tasks:
1. Re-orient teachers on how to conduct PHIL-IRI (O & S)
2. Observe in conducting
3. Monitor and evaluate reading results
4. Intervention (Remedial Reading, Home Reading,
Project GARAY)
Precondition: Phil-Iri Implemntation
C. Improved Numeracy Skills of Pupils
PAP: Project SMILE MATH Inventory * * * * * * * * * * 1T 1T
Tasks: Results (Pre-test &
1. Re-orientation on the mechanics of the Conduct of Post Test)
Math Inventory Tool
2. Conduct First Exposure based on the Mechanics
of the conduct
3. Analyze results:
a. Identify the basic facts combination missed by
each pupil in SMILE form provided
b. Teacher provides intervention using the results.
Use strategies such as:
b.1 games (math bingo, etc.)
Page 2 of 6
b.2 drills (math hataw, etc.)
c. M & E results of intervention
- spot testing
- mid-year assessment and year-end assessment
(math inventory)
Precondition: Implement Intervention
D. Improved Reading Readiness of Grade 1
PAP: PHIL-IRI Pre-test and Post Test SReYA * * 1.5T 1.5T
Tasks: PHIL-IRI
1. Re-orient teachers on how to conduct Phil-iri * *
(Oral & Silent)
2. Observe in conducting * * * *
3. Monitor and evaluate reading results * *
4. Intervention (Remedial Reading, Home Reading, * * * * * * * *
Project GARAY)
Precondition: PHIL-IRI Implementation
E. Improved reparedness of Grade 3, 6 & 4 pupils/students for NAT Preparedness
PAP: Project Nat Preparedness Assessment Assessment * * 500
Tasks: Results
1. Analyze Results * *
2. Get Frequency of Errors * *
3. Identify LLS * *
4. Provide intervention to improve LLS * * * *
5. Organize review classes *
6. Implement review classes * * * *
7. Monitor * * * *
8. Evaluate results *
2. STAFF DEVELOPMENT
A. Improved Teachers' KSA's
a. Improved teachers pedagogical skills (based on CB-Past Forms
& IPPD of teachers)
PAPs: QMM, SLAC, INSET * * * * * * * * * *
Tasks:
1. Pre-Conference
2. Observe Classes
3. Post Conference
4. SLAC Session
5. Customized Teacher Dev't Approach
Precondition: QMM Validation
b. Improved subject knowledge of teachers CB-PAST Forms
PAP: Instructional Supervision/QMM * * * * * * * * * * 300
Tasks:
1. Enhanced competencies of teachers in IPPD's
Precondition: Schedule of Supervision is strictly
followed
3. CURRICULUM IMPLEMENTATION/INSTRUCTIONAL PELC Monitoring
DELIVERY Checklist
a. Improved Curriculum Implementation
PAP: Quarterly Skills Monitoring * * * * 500
Page 3 of 6
Tasks:
1. PELC Monitoring Checklist/PELC Log
2. Functional Testing Program
Precondition: Availability of PELC
b. Improved Provision of Innovative Curricular Log/modules of
Programs integrated topics
PAP: Integration of Special Topics * * * * * * * * * *
a. Drug Addiction * * * * * * * * * *
b. Gender Sensitivity/GAD VAWC * * * * * * * * * *
c. Disaster Risk Reduction * * * * * * * * * *
d. Anti-Graft and Corruption * * * * * * * * * *
e. Moral Recovery * * * * * * * * * *
f. Environment Protection * * * * * * * * * *
g. Peace * * * * * * * * * *
h. Child Abuse * * * * * * * * * *
i. Child Friendly System * * * * * * * * * *
c. Enhanced Curriculum Materials IMS
PAPs:
a. Curriculum Indigenization Program * * * * * * * * 1T 1T 1T 1T
b. Development of IMS * * * * * * * * 1.5T 1.5T 1.5T 1.5T
c. Learning Guide Development IMS * * 1.5T 1.5T 1.5T
d. Develop MTBL Material per quarter * * 1.5T 1.5T 1.5T 1.5T
Tasks:
1. Orient teachers
2. Make Action Plan
3. Implement/Develop Material, etc.
4. Monitor/check
Precondition: Utilization of developed materials for
effective teaching
d. Improved Instructional Delivery
PAP: Methodologies/Approaches Checklist Lesson Plans * * * * * * * * * *
Tasks:
1. Orient teachers
2. Prepare checklist for methodologies/approaches
used in lessons
3. Check Lesson Plan/Observe classes
Precondition: LPs used methodologies/approaches
4. LEARNERS' HEALTH AND NUTRITION
A. Improved pupils nutritional status
PAP: Feeding Program Nutritional * * * * * * * * * * * * 50T
Gulayan sa Eskwelahan Status Report * * * * * * * * * * * * 4T 3T
Tasks:
1. Measure height & weigh pupils (baseline)
2. Evaluate & classify pupils (Identify wasted & severely wasted
3. Implement feeding program
4. Measure height & weigh pupils (endline)
5. Analyze/evaluate results
Precondition: Impelementation of Feeding Program
for wasted & severely wasted pupils
Page 4 of 6
5. STUDENT SERVICES
A. Improved pupils participation to various co-curri-
cular activities
PAP: Active participation to higher level co-curr activities * * * * * * * * * * 4T 4T 4T 4T 4T 4T 6T 4T 2T
Tasks: List of officers
1. Orient pupils Programs &
2. Let them lead elections/programs in various Projects
co-curricular activities
3. Guide & monitor programs of pupils organization
Precondition: Pupils Participation in Co-Curricular
Activities
B. Improved provision of student services in the campus
PAP: Organization/establishment of pupils services on * * * 1T 1T 1T
campus Log book/atten-
Tasks: dance schedule of
1. Orient pupils about their roles and responsibilities pupils services
2. Organize committee (assignment)
3. Monitor
Precondition: 100% implementation
C. Improved pupils performance in competition
PAPs:
a. Training Program in Journalism List of Partici- * * 1.5T 1.5T
b. Training Program in Sports pants & winners * * * 1T 1T 1T
c. Review Program for Tourism/Super Quiz, MTAP, Certificate of Recog- * 500
Tasks: nition & Appear-
1. Send teachers to training ances
2. Train potential pupils in School
3. Participate in Competitions
4. Follow-up Skills
Precondition: 100% participation in competitions
d. Improved pupils attendance
PPA: Form 1
Tasks: Form 1
1. Daily checking of attendance
2. Call for Homeroom PTA Meeting
3. Inform parents abut the status of their children
4. Monitor performance
6. INTERNAL EFFECIENCY
A. Improved school internal efficiency along EFA Goals
a. Reduced drop-out rate
b. Reduced repetition rate
c. Increased promotion rate Efficiency
d. Increased completion rate Indicators
e. Increased graduation rate
f. increased cohort survival rate
PAPs:
a. Feeding Program * * * * * * * * * * * * 45T
b. Tracking System * * * * * * * * * * 3T
Page 5 of 6
Tasks:
1. Implement Feeding Program
2. Implement Tracking System
3. Implement Project BEST
Pre-Condition: 100% implementation of Programs
7. RESEARCH
A. Improved research output of the school Research Propo-
PPA: School Based Action Research Program sals
Tasks: (Success stories)
a. Orient teachers
b. Develop action research based on NAT LLS of Low
MPS subjects
c. Implement interventions
d. Evaluate results
e. Make/submit success stories
Precondition: Approved Action Reasearch Proposals
A.2. Produced competent STVEP
Junior High School Graduates
Commercial Cooking
Computer Hardware Servicing
Crop Production
Household Services
PAPs:
a. Recommend quality teachers to be hired for vacant * * * x 1T 2T 2T
teaching items fpr STVEP.
b. Establish strong linkaging with potential donors * * * x 1T 2T 2T
for the needed facilities
c. Work out for the papers for the program * * * x 1T 3T 3T
d. Work out for the Land Title of the School site * * * * * x 500 500 500 1.5T 1T
e. Work out for the papers for the demo farm lot. * * * x 1T 2T 2T
Tasks:
1. Keep connected with the lead stakeholders of the school
2. Keep all the stkeholders of Colonia Divina updated
of the endeavor
3. Keep in touch with Division Office always on the endeavor
4. Keep asking from the alumni and other stakes for
equipments and other tools and materials
Page 6 of 6
Prepared by:
ANALIE V. BUHAYAN
Principal I
SOURCES
OTHER
LGU PTA DEP.ED TOTAL
S
3T 3T
3T 3T
3T 3T
1T 1T
of 6
4T 4T
10T 10T
800 800
2T 2T
of 6
3T 3T
500 500
300
300 300
500 500
4T 4T
5T 5T
5T 5T
7T 7T
200
50T 50T
7T 7T
of 6
15 3T 22T 40T
3T 3T
3T 3T
3T 3T
500 500
45T
3T
2T 2T
2T 2T
3T 3T
5T 5T
2T 2T
of 6
RESOURCE REQUIREMENTS
Q1 Q2 Q3 Q4
J F M A M J J A S O
MEANS
SOURCES OF T
Q4
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2
N D
DEP.ED OTHERS TOTAL VERIFICA J F M A
TION
TIME FRAME RESOURCE REQUIREMENTS
Q2 Q3 Q4 Q1 Q2
M J J A S O N D J F M A M J
MEANS
REQUIREMENTS SOURCES OF
Q3 Q4
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES
J A S O N D
DEP.ED OTHERS TOTAL VERIFICA
TION
TIME FRAME
Q1 Q2 Q3 Q4 Q1
J F M A M J J A S O N D J F
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4
LGU PTA DEP.ED OTHERS
M A M J J A S O N D
MEANS
OF TIME FRAME
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4
TOTAL VERIFICA J F M A M J J A S O
TION
RESOURCE REQUIREMENTS
Q4 Q1 Q2 Q3 Q4
N D J F M A M J J A S O N D
MEANS
SOURCES OF TIME FRAME
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2
DEP.ED OTHERS TOTAL VERIFICA J F M A M J
TION
ME FRAME RESOURCE REQUIREMENTS
Q3 Q4 Q1 Q2 Q3
J A S O N D J F M A M J J A
MEANS
SOURCES OF
Q4
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES Q1
S O N D
DEP.ED OTHERS TOTAL VERIFICA J F
TION
TIME FRAME RESOURC
Q2 Q3 Q4 Q1 Q2
M A M J J A S O N D J F M A
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4
LGU PTA DEP.ED OTHERS
PROGRAMS/PROJECTS/ACTIVITIES
TOTAL
M J J A S O N D
MEANS
OF TIME FRAME
ROJECTS/ACTIVITIES Q1 Q2 Q3 Q4
VERIFICA J F M A M J J A S O N D
TION
RESOURCE REQUIREMENTS SOURCES
Q1 Q2 Q3 Q4
LGU PTA
J F M A M J J A S O N D
MEANS
SOURCES OF TIME FRAME
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
DEP.ED OTHERS TOTAL VERIFICA J F M A M J J A
TION
RESOURCE REQUIREMENTS
Q4 Q1 Q2 Q3 Q4
S O N D J F M A M J J A S O
MEANS
SOURCES OF T
Q4
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2
N D
DEP.ED OTHERS TOTAL VERIFICA J F M A
TION
TIME FRAME RESOURCE REQUIREMENTS
Q2 Q3 Q4 Q1 Q2
M J J A S O N D J F M A M J
MEANS
REQUIREMENTS SOURCES OF
Q3 Q4
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES
J A S O N D
DEP.ED OTHERS TOTAL VERIFICA
TION
TIME FRAME
Q1 Q2 Q3 Q4 Q1
J F M A M J J A S O N D J F
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4
LGU PTA DEP.ED OTHERS
M A M J J A S O N D
MEANS
OF TIME FRAME
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4
TOTAL VERIFICA J F M A M J J A S O
TION
RESOURCE REQUIREMENTS
Q4 Q1 Q2 Q3 Q4
N D J F M A M J J A S O N D
MEANS
SOURCES OF TIME FRAME
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2
DEP.ED OTHERS TOTAL VERIFICA J F M A M J
TION
ME FRAME RESOURCE REQUIREMENTS
Q3 Q4 Q1 Q2 Q3
J A S O N D J F M A M J J A
MEANS
SOURCES OF
Q4
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES Q1
S O N D
DEP.ED OTHERS TOTAL VERIFICA J F
TION
TIME FRAME RESOURC
Q2 Q3 Q4 Q1 Q2
M A M J J A S O N D J F M A
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4
LGU PTA DEP.ED OTHERS
PROGRAMS/PROJECTS/ACTIVITIES
TOTAL
M J J A S O N D
MEANS
OF TIME FRAME
ROJECTS/ACTIVITIES Q1 Q2 Q3 Q4
VERIFICA J F M A M J J A S O N D
TION
RESOURCE REQUIREMENTS SOURCES
Q1 Q2 Q3 Q4
LGU PTA
J F M A M J J A S O N D
MEANS
SOURCES OF TIME FRAME
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
DEP.ED OTHERS TOTAL VERIFICA J F M A M J J A
TION
RESOURCE REQUIREMENTS
Q4 Q1 Q2 Q3 Q4
S O N D J F M A M J J A S O
MEANS
SOURCES OF T
Q4
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2
N D
DEP.ED OTHERS TOTAL VERIFICA J F M A
TION
TIME FRAME RESOURCE REQUIREMENTS
Q2 Q3 Q4 Q1 Q2
M J J A S O N D J F M A M J
MEANS
REQUIREMENTS SOURCES OF
Q3 Q4
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES
J A S O N D
DEP.ED OTHERS TOTAL VERIFICA
TION
TIME FRAME
Q1 Q2 Q3 Q4 Q1
J F M A M J J A S O N D J F
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4
LGU PTA DEP.ED OTHERS
M A M J J A S O N D
MEANS
OF TIME FRAME
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4
TOTAL VERIFICA J F M A M J J A S O
TION
RESOURCE REQUIREMENTS
Q4 Q1 Q2 Q3 Q4
N D J F M A M J J A S O N D
MEANS
SOURCES OF TIME FRAME
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2
DEP.ED OTHERS TOTAL VERIFICA J F M A M J
TION
ME FRAME RESOURCE REQUIREMENTS
Q3 Q4 Q1 Q2 Q3
J A S O N D J F M A M J J A
MEANS
SOURCES OF
Q4
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES Q1
S O N D
DEP.ED OTHERS TOTAL VERIFICA J F
TION
TIME FRAME RESOURC
Q2 Q3 Q4 Q1 Q2
M A M J J A S O N D J F M A
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4
LGU PTA DEP.ED OTHERS
PROGRAMS/PROJECTS/ACTIVITIES
TOTAL
M J J A S O N D
MEANS
OF TIME FRAME
ROJECTS/ACTIVITIES Q1 Q2 Q3 Q4
VERIFICA J F M A M J J A S O N D
TION
RESOURCE REQUIREMENTS SOURCES
Q1 Q2 Q3 Q4
LGU PTA
J F M A M J J A S O N D
MEANS
SOURCES OF TIME FRAME
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
DEP.ED OTHERS TOTAL VERIFICA J F M A M J J A
TION
RESOURCE REQUIREMENTS
Q4 Q1 Q2 Q3 Q4
S O N D J F M A M J J A S O
MEANS
SOURCES OF T
Q4
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2
N D
DEP.ED OTHERS TOTAL VERIFICA J F M A
TION
TIME FRAME RESOURCE REQUIREMENTS
Q2 Q3 Q4 Q1 Q2
M J J A S O N D J F M A M J
MEANS
REQUIREMENTS SOURCES OF
Q3 Q4
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES
J A S O N D
DEP.ED OTHERS TOTAL VERIFICA
TION
TIME FRAME
Q1 Q2 Q3 Q4 Q1
J F M A M J J A S O N D J F
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4
LGU PTA DEP.ED OTHERS
M A M J J A S O N D
MEANS
OF TIME FRAME
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4
TOTAL VERIFICA J F M A M J J A S O
TION
RESOURCE REQUIREMENTS
Q4 Q1 Q2 Q3 Q4
N D J F M A M J J A S O N D
MEANS
SOURCES OF TIME FRAME
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2
DEP.ED OTHERS TOTAL VERIFICA J F M A M J
TION
ME FRAME RESOURCE REQUIREMENTS
Q3 Q4 Q1 Q2 Q3
J A S O N D J F M A M J J A
MEANS
SOURCES OF
Q4
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES Q1
S O N D
DEP.ED OTHERS TOTAL VERIFICA J F
TION
TIME FRAME RESOURC
Q2 Q3 Q4 Q1 Q2
M A M J J A S O N D J F M A
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4
LGU PTA DEP.ED OTHERS
PROGRAMS/PROJECTS/ACTIVITIES
TOTAL
M J J A S O N D
MEANS
OF TIME FRAME
ROJECTS/ACTIVITIES Q1 Q2 Q3 Q4
VERIFICA J F M A M J J A S O N D
TION
RESOURCE REQUIREMENTS SOURCES
Q1 Q2 Q3 Q4
LGU PTA
J F M A M J J A S O N D
MEANS
SOURCES OF TIME FRAME
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
DEP.ED OTHERS TOTAL VERIFICA J F M A M J J A
TION
RESOURCE REQUIREMENTS
Q4 Q1 Q2 Q3 Q4
S O N D J F M A M J J A S O
MEANS
SOURCES OF T
Q4
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2
N D
DEP.ED OTHERS TOTAL VERIFICA J F M A
TION
TIME FRAME RESOURCE REQUIREMENTS
Q2 Q3 Q4 Q1 Q2
M J J A S O N D J F M A M J
MEANS
REQUIREMENTS SOURCES OF
Q3 Q4
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES
J A S O N D
DEP.ED OTHERS TOTAL VERIFICA
TION
TIME FRAME
Q1
J F
COLONIA DIVINA INTEGRATED SCHOOL
CDIS Adjusted SIP 2012-2013 GOAL AND OBJECTIVES CHART
NARRATIVE SUMMARY OBJECTIVELY VERIFIABLE INDICATOR
Purpose 2: QUALITY
AND RELEVANCE
Improved academic performance of the learners Improved NAT Grade 3 from 42.53 MPS to at least 75% by 2013
Improved NAT Grade 6 from 57.65 MPS to at least 75% by 2013
Achieved at least 75% mastery level in NAT Y4 by 2013
Level Baseline 2012 2013
Grade 3 42.53 58.77 75.00
Grade 6 57.65 66.33 75.00
Year 4 N.A 45.00 75.00
Improved performance indicators by 2013.
ELEMENTARY
Indicators Baseline 2012 2013
Drop-out 3.40% 0 0
Repetition 6.10% 0.48% 0.48%
Promotion 87.44% 98% 100%
Completion
SECONDARY
Indicators Baseline 2012 2013
Drop-out 0.47% 0 0
Repetition 0.12% 0 0
Promotion 95.56% 98% 100%
Completion
ALS
Achieved at least 10 ALS learners to pass the A & E Test by 2013
Achieved at least 15 ALS learners to pass the BLP program by 2013
ALS Program Baseline 2012 2013
A&E N.A 6 10
BLP N.A. 10 15
Adjusted SIP 2011-2013 GOAL AND OBJECTIVES CHART
CONTRIBUTORY FACTORS
A. Learners' Performance
A.1. Improved learners' Performance Increased MPS in the following subjects of NAT
PPA1 : Project Save Grade 3 to at least 75% or 5 MPS in subjects with
Tasks: 75% by 2013
1. Orient teachers. Subject 2011 2012 2013
2. Analyze RAT results. English Reading
3. Identify the mastered/not mastered skills. English Grammar
4. Develop/enrich test items for review. Filipino Reading
5. Implement review program. Filipino Grammar 0.47% 0 0
6. Monitor. Repetition 0.12% 0 0
Precondition: Promotion 95.56% 98% 100%
Test bitems for review are focused on least learned skills. Completion
PPA : Project KADI-lubos na! Indicators Baseline 2012 2013
Tasks: Drop-out 0.47% 0 0
1. Orient teachers Repetition 0.12% 0 0
2. Develop questions on least learned skills Promotion 95.56% 98% 100%
3. Organize/conduct review class Completion
4. Monitor review classes Indicators Baseline 2012 2013
Precondition: Drop-out 0.47% 0 0
Review program is religiously implemented Repetition 0.12% 0 0
Promotion 95.56% 98% 100%
Completion
Get frequency of error
Identify LLS
Provide intervention to improve LLS
Organize review class for the LLS
Organize a team to develop parallel test items to the LLS identified
Monitor skills covered every quarter/whole year
Pre-condition: Religious implementation of review class
*PPA: Project MILLS (Math)
Tasks:
Prepair checklist
Monitor Skills covered every quarter/whole year
Pre-condition: PELC/PSSLC is utilized well
*PPA: SHAP-UP
Tasks:
Train teachers based on IPPD results *Improved level of mastery in the Unified Test to at least 75% in every
Monitor apllication of training quarter exam
Attendance/participation in memorandized contest a. Improved MPS in English to at least 75% in every quarter exam by 2013
Pre-condition: Skills learned from trainings are applied Baseline 2012 2013
Grade/Year Level
in teaching-learning process 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th
G1
G2
PPA 3: Project MILLS (Math) G3
Tasks: G4
1. Get frequency of errors G5
2. Identify Least Learned Skills G6
3. Provide intervention to improve least Y1
Learned skills Y2
4. Organize review class for the least Y3
Learned skills Y4
5. Organize a team to develop parallel PPA : Project SAVE
Item to the least learned identified Tasks:
6. M & E results of review class 1
7. Spot tests 2
3
b. Improved MPS in Math to at least 75% in every quarter exam by 2013
Baseline 2012 2013
Grade/Year Level
1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th
G1
G2
G3
G4
G5
G6
Y1
Y2
Y3
Y4
PPA : Project MILLS
Tasks:
1
2
3
c. Improved MPS in Science to at least 75% in every quarter exam by 2013
Baseline 2012 2013
Grade/Year Level
1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th
G1
G2
G3
G4
G5
G6
Y1
Y2
Y3
Y4
PPA : Reproduction of NSTIC Improvised materials
Tasks:
1
2
3
d. Improved MPS in Filipino to at least 75% in every quarter exam by 2013
Baseline 2012 2013
Grade/Year Level
1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th
G1
G2
G3
G4
G5
G6
Y1
Y2
Y3
Y4
PPA : Project KADI-lubos na!
Tasks:
1
2
3
e. Improved MPS in MSEPP/MAPEH to at least 75% in every quarter exam by 2013
Baseline 2012 2013
Grade/Year Level
1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th
G1
G2
G3
G4
G5
G6
Y1
Y2
Y3
Y4
Science
Grade/Year Level Baseline 2012 2013
G1
G2
G3
G4
G5
G6
Y1
Y2
Y3
Y4
Filipino
Grade/Year Level Baseline 2012 2013
G1
G2
G3
G4
G5
G6
Y1
Y2
Y3
Y4
SIBIKA/HEKASI/Araling Panlipunan
Grade/Year Level Baseline 2012 2013
G1
G2
G3
G4
G5
G6
Y1
Y2
Y3
Y4
MSEPP/MAPEH
Grade/Year Level Baseline 2012 2013
G1
G2
G3
G4
G5
G6
Y1
Y2
Y3
EPP/TLE
Grade/Year Level Baseline 2012 2013
G1
G2
G3
G4
G5
G6
Y1
Y2
Y3
PPA : Project SAVE
Tasks:
1 Orient teacher
2 Analyze NAT results
3 Identify the mastered/not mastered skills
4 Develop/enrich test items for review
5 Implement review program
6 Monitor
Pre-condition : Test bitems for review are focused on least learned skills
: Review program is religiously imlplemented
NAT Results
Form 20
Form 20
m by 2013
ter exam by 2013
subejct areas
2013
2013
2013
QT by 2013
2013
2013
2013
ered skills 2013
ed skills
lemented
Increased number of pupils who got 75% MPS in Attained at least 75% MPS Unified Test x x x
Unified test in all subject areas in every quarter exam by 2013 Results
PPA 1: Project SAVE (All Subjects) per subject area x x 0 600
Tasks: TRPTR
1. Orient teachers
2. Evaluate/analyze Nat 3 Results
3. Identify mastered and un-mastered
skills
4. Develop/enrich test for review
Precondition: Test itemssed in review
classses
PPA 2: Project KADI-Lubos na (Filipino) x x 0 500
ANALIE V. BUHAYAN
Principal I
MEANS OF PHYSICAL TARGETS FINANCIAL TARGETS
PROGRAMS/PROJECTS/ACTIVITIES INDICATOR (Output Level)
VERIFICATION Year 1 Year 2 Year 3 Year 1 Year 2
MEANS OF PHYSICAL TARGETS FINANCIAL TARGETS
PROGRAMS/PROJECTS/ACTIVITIES INDICATOR (Output Level)
VERIFICATION Year 1 Year 2 Year 3 Year 1 Year 2
MEANS OF PHYSICAL TARGETS FINANCIAL TARGETS
PROGRAMS/PROJECTS/ACTIVITIES INDICATOR (Output Level)
VERIFICATION Year 1 Year 2 Year 3 Year 1 Year 2
MEANS OF PHYSICAL TARGETS FINANCIAL TARGETS
PROGRAMS/PROJECTS/ACTIVITIES INDICATOR (Output Level)
VERIFICATION Year 1 Year 2 Year 3 Year 1 Year 2
MEANS OF PHYSICAL TARGETS FINANCIAL TARGETS
PROGRAMS/PROJECTS/ACTIVITIES
VERIFICATION Year 1 Year 2 Year 3 Year 1 Year 2
Review of least
learned skills sus-
tained
500
Page 2 0f 10
AL TARGETS IMPORTANT
Year 3 ASSUMPTION
1T
1T
1T
Page 3 0f 10
AL TARGETS IMPORTANT
Year 3 ASSUMPTION
500
500
1T
Page 4 0f 10
AL TARGETS IMPORTANT
Year 3 ASSUMPTION
1T
500
500
Page 5 0f 10
AL TARGETS IMPORTANT
Year 3 ASSUMPTION
500
1T
1T
2T Improved Numeracy
Skills of pupils
(Mastered the
basic facts)
Page 7 0f 10
AL TARGETS IMPORTANT
Year 3 ASSUMPTION
500 Intervention
conducted
300
500 100% coverage of
PELC in a year
Page 8 0f 10
AL TARGETS IMPORTANT
Year 3 ASSUMPTION
Integration of
Special topics in
the curriculum
2T Developed
instructional mat.
Page 9 0f 10
AL TARGETS IMPORTANT
Year 3 ASSUMPTION
Implemented 100%
feeding program for
wasted & severely
wasted pupils
1005 participation
of pupils in co-
curricular activities
Established pupils
in Campus
2T 100% participation
in contests
Page 10 0f 10
AL TARGETS IMPORTANT
Year 3 ASSUMPTION
Absenteeism of pupils
were reduced/mini-
mized
100% Implementa-
tion of Action
Research
pared:
V. BUHAYAN
cipal I
AL TARGETS
Year 3 IMPORTANT ASSUMPTION
AL TARGETS
Year 3 IMPORTANT ASSUMPTION
AL TARGETS
Year 3 IMPORTANT ASSUMPTION
AL TARGETS
Year 3 IMPORTANT ASSUMPTION
AL TARGETS
Year 3 IMPORTANT ASSUMPTION
COLONIA DIVINA IN
School Improvement Plan 2014-16 Annual Improvement Plan 2
TIME FRAM
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2
J F M A
A. Special Curricular Programs
A. Opened the Senior High School
A.1. Established STVEP Attained approval/recognition of the
Junior HS programs from the Central Office by 2016
Comp. Hdwe Servicing *
Commercial Cooking
Crop Production
Senior HS
Housekeeping *
Food Processing
Horticulture
PAP1: Titling of School Site
Travel expenses * * *
Miscellaneous fees *
Processing fee *
PAP2: Preparation of Pertinent Papers for approval
Reproduction of documents
Travel expenses
Courier
PAP3: Compliance of Physical Facilities Requireme Acquired 80% additional facilities by 2016
Equipment/Tools Acceptance Report
B. Personnel
B.1. Improved provision of teaching personnel
PAP1: Provision of new teacher specialists for STVEP classes
Agriculture-Crop Science
Transpo of materials
Grills
2 gal uniapple paint, enamel
1 bot paint thinner
3 pcs paintbrush # 2
Labor
Transpo of materials
PAP3: Rehabilitation of Bldg 2-A (Gr7 -A Classroom)
Roofs
10 sht corr. GI shts 10' x 04 *
12 lgth R/L 2" x 2" x 12' *
3 kg umbrella nail *
1 qt Vulca seal *
3 kg c.w. nail # 3 *
Labor *
Hauling *
Ceiling, internal
12 sht Marine plywood, 4' x 8' x 1/4" *
14 lgth R/L 2" x 2" x 10' *
3 kg c.w. nail # 3 *
5 lgth fascia board *
TIME FRAM
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2
J F M A
Labor *
Hauling *
Ceiling, external
14 sht Marine plywood, 4' x 8' x 1/4" *
18 lgth R/L 2" x 2" x 10' *
3 kg c.w. nail # 3 *
2 kg. c.w nail # 1 *
5 lgth fascia board *
Labor *
Hauling *
Lighting Facilities
40 m PDX # 12
4 pcs CFL bulb, GE
4 pcs socket
1 roll elctrical wire
3 pcs 3-gang switch
2 pcs 3 gang surface outlet
Labor
Transportation of materials
Fascia board
6 lgth fascia board
1 vulca seal
8 pcs R/L 2" x 2" x 10"
1 kg c.w nail # 2
Labor
Transportation of Materials
PAP4: Maintenance of Bldg 2-B (Gr8-B Classroom)
Ceiling, external
12 sht Marine plywood, 4' x 8' x 1/4"
14 lgth R/L 2" x 2" x 10'
3 kg c.w. nail # 3
5 lgth fascia board
Labor
Hauling
Repainting of Furniture
2 gal paint, enamel
3 ft sandpaper
2 pcs paintbrush # 4
2 bot paint thinner
Transportation of materials
Wrapping of extnl. back wall
2 bag cement *
10 cans sand *
Labor *
Transportation of materials *
TIME FRAM
PROGRAMS/PROJECTS/ACTIVITIES MOV's
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2
J F M A
PAP5: Maintenance of Bldg 2-D (Year 3 Classroom)
Roofs
10 sht corr. GI shts 10' x 04
12 lgth R/L 2" x 2" x 12'
3 kg umbrella nail
1 qt Vulca seal
3 kg c.w. nail # 3
Labor
Hauling
Ceiling
6 sht Marine plywood, 4' x 8' x 1/4"
14 lgth R/L 2" x 2" x 10'
3 kg c.w. nail # 3
1 kg c.w nail # 1
Labor
Hauling
Lighting Facilities
30 m PDX # 12
4 pcs CFL bulb, GE
4 pcs socket
1 roll elctrical wire
Transportation of materials
Labor
Door jambs
3 lgth R/L 3" x 6" X 6'
1 bag cement
5 cans mixing sand
3 kg c.w nail # 4
Labor
Transportation of materials *
Wrapping of extrnl. back wall
2 bag cement *
10 cans sand *
Labor *
Transportation of materials *
PAP6: Repair of Bldg 2-F (Comp. Lab)
Roofs
20 sht corr. GI shts 10' x 04 *
18 lgth R/L 2" x 2" x 12' *
4 kg umbrella nail *
1 qt Vulca seal *
4 kg c.w. nail # 3 *
Labor *
Hauling *
Lighting Facilities
4 pcs CFL bulb, GE *
TIME FRAM
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2
J F M A
Windows
20 pcs jalousie blade
Furniture
1 divider (Job Order) *
Computer coverings
11 y cloth *
2 spool thread *
labor *
Wrapping of extnl. back wall
2 bag cement
10 cans sand
Labor
Transportation of materials
PAP7: Repair of Bldg 1-A and B
Roofs
10 sht corr. GI shts 10' x 04
12 lgth R/L 2" x 2" x 12'
3 kg umbrella nail
1 qt Vulca seal
3 kg c.w. nail # 3
Labor
Hauling
Ceiling
8 sht Marine plywood, 4' x 8' x 1/4"
10 lgth R/L 2" x 2" x 10'
2 kg c.w. nail # 3
3 lgth fascia board
Labor
Hauling
Lighting Facilities
4 pcs CFL bulb, GE
Window
30 Jalousie blades
Door knobs
Door jambs
CR
Furniture
PAP8: Repair of Bldg 7-A
Roofs
10 sht corr. GI shts 10' x 04
12 lgth R/L 2" x 2" x 12'
3 kg umbrella nail
1 qt Vulca seal
3 kg c.w. nail # 3
Labor
Hauling
TIME FRAM
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2
J F M A
Ceiling
20 sht Marine plywood, 4' x 8' x 1/4"
36 lgth R/L 2" x 2" x 10'
2 kg c.w. nail # 3
2 kg c.w. nail # 4
3 kg c.w. nail # 1
3 lgth fascia board
Labor
Hauling
Lighting Facilities
40 m PDX # 12
4 pcs CFL bulb, GE
4 pcs socket
1 roll elctrical wire
3 pcs 3-gang switch
2 pcs 3 gang surface outlet
Labor
Transportation of materials
Windows
8 sets Jalousie frame
78 pcs Blade
Labor
Transportation of Materials
Door knobs *
Door jambs *
3 lgth R/L 3" x 6" X 6'
3 kg c.w nail # 4
Labor
Transportation of materials
Furniture
(8 pcs mini table 2' x 4')
8 pcs 2" x 2" x 6'
8 pcs 2" x 2" x 8'
8 pcs 2" x 2" x 10'
2 sht Marine P/W 1/2" x 4' x 8"
2 kg c.w nail # 2 1/2
2 kg c.w nail # 1
1 kg calsumine
Labor
45 pcs. wooden stool (Job order)
TIME FRAM
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2
J F M A
PAP15: Repair of Bldg 6-G
Window
20 jalousie blade * *
Lighting Facilities
40 m PDX # 12 *
4 pcs CFL bulb, GE *
4 pcs socket *
1 roll elctrical wire *
3 pcs 3-gang switch *
2 pcs 3 gang surface outlet *
Labor *
Transportation of materials *
Repainting of walls
3 gal paint, latex *
1 set rolling brush *
2 pcs paintbrush #4 *
3 ft sandpaper *
Repainting of ceiling
2 gal flat wht, enamel *
2 gal semi glossy bone wht, enamel *
1 sets rolling brush *
1 pc paint brush # 4 *
2 bot paint thinner *
Labor *
Hauling *
Repainting of furniture
2 gal paint, enamel *
3 ft sandpaper *
2 pcs paintbrush # 4 *
2 bot paint thinner *
Transportation of materials *
Comfort Room
PAP16: Repair of Bldg 6-H
Window
20 jalousie blade * *
Lighting facilities
40 m PDX # 12 *
4 pcs CFL bulb, GE *
4 pcs socket *
1 roll elctrical wire *
3 pcs 3-gang switch *
2 pcs 3 gang surface outlet *
Labor *
Transportation of materials *
Repainting of walls
3 gal paint, latex *
1 set rolling brush *
TIME FRAM
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2
J F M A
2 pcs paintbrush #4 *
2 bot paint thinner *
3 ft sandpaper *
Repainting of ceiling
2 gal flat wht, enamel *
2 gal semi glossy bone wht, enamel *
1 sets rolling brush *
1 pc paint brush # 4 *
2 bot paint thinner *
Labor *
Hauling *
Repainting of furniture
2 gal paint, enamel *
3 ft sandpaper *
2 pcs paintbrush # 4 *
2 bot paint thinner *
Transportation of materials *
PAP17: Repair of Bldg 5-A ( Kindergarten Room)
Lighting facilities
40 m PDX # 12
4 pcs CFL bulb, GE
4 pcs socket
1 roll elctrical wire
3 pcs 3-gang switch
2 pcs 3 gang surface outlet
Labor
Transportation of materials
Furniture
(5pcs mini table 2' x 4')
5 pcs 2" x 2" x 6' *
5 pcs 2" x 2" x 8' *
5 pcs 2" x 2" x 10' *
2 sht Marine P/W 1/2" x 4' x 8" *
1 kg c.w nail # 2 1/2 *
1 kg c.w nail # 1 *
2 kg calsumine *
Labor *
Blackboard
2 sht Marine plywood 1/4" x 4" x 8" *
6 pcs 2" x 2" x 6' R/L *
1/2 kg c.w. nail # 1 1/2" *
1/2 kg concrete nail # 3 *
1 gal slating paint *
1 bot paint thinner *
2 ft sanding paper # 70 *
1 pc paintbrush # 4 *
1 pc paintbrush # 2 *
TIME FRAM
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2
J F M A
Labor *
Transportation of materials *
Repainting of walls
2 gal flat wht, latex *
2 gal glossy wht, latex *
1 set rolling brush *
1 pc paint brush # 4 *
Transportation of materials *
Repainting of ceiling
3 gal flat wht, enamel *
2 gal glossy wht, enamel *
2 bot paint thinner *
1 set rolling brush *
3 pc paint brush #4 *
Repainting of furniture
2 gal paint, enamel *
3 ft sandpaper *
2 pcs paintbrush # 4 *
2 bot paint thinner *
Transportation of materials *
Roof
2 sht corr. GI shts 10' x 04 *
3 lgth R/L 2" x 2" x 12' *
1/2 kg umbrella nail # 1 *
1 pt Vulca seal *
1/2 kg c.w. nail # 3 *
Labor *
Hauling *
Ceiling *
4 sht Marine plywood, 4' x 8' x 1/4" *
6 lgth R/L 2" x 2" x 10' *
1/2 kg c.w. nail # 3 *
1/2 kg c.w. nail # 1 *
Labor *
Hauling *
PAP18: Repair of Bldg 4-A ( Grade III-2 Room)
Lighting facilities
40 m PDX # 12
4 pcs CFL bulb, GE
4 pcs socket
1 roll elctrical wire
3 pcs 3-gang switch
2 pcs 3 gang surface outlet
Labor
Transportation of materials
Repainting of walls
4 gal paint, latex *
TIME FRAM
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2
J F M A
1 set rolling brush *
2 pcs paintbrush #4 *
2 bot paint thinner *
3 ft sandpaper *
Repainting of ceiling
2 gal flat wht, enamel *
2 gal semi glossy bone wht, enamel *
1 sets rolling brush *
1 pc paint brush # 4 *
2 bot paint thinner *
Labor *
Hauling *
Repainting of furniture
2 gal paint, enamel *
3 ft sandpaper *
2 pcs paintbrush # 4 *
2 bot paint thinner *
Transportation of materials *
PAP19: Repair of Feeding Center (Elementary)
Wall
(Finishing)
4 bags cement *
1/2 cu.m sand *
Labor *
Transportation of materials *
Door (Job Order)
PAP20: Repair of Feeding Center (Secondary)
Lighting facilities
40 m PDX # 12 *
4 pcs CFL bulb, GE *
4 pcs socket *
1 roll elctrical wire *
3 pcs 3-gang switch *
2 pcs 3 gang surface outlet *
Labor *
Transportation of materials *
Repainting of Wall
2 gal paint, enamel *
1 set rolling brush *
2 pcs paintbrush #4 *
1 bot paint thinner *
Roof *
10 sht corr. GI shts 10' x 04 *
12 lgth R/L 2" x 2" x 12' *
3 kg umbrella nail *
1 qt Vulca seal *
3 kg c.w. nail # 3 *
TIME FRAM
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2
J F M A
Labor *
Hauling *
Door jambs
3 lgth R/L 3" x 6" X 6'
1 bag cement
5 cans mixing sand
3 kg c.w nail # 4
Labor
Transportation of materials
Door (Job Order)
Tables *
Chairs *
PAP21: Repair of Perimeter fence
25 bag cement *
3 cu.m sand *
1.5 cu.m cracked stone 1/4 *
22 lgth round bar 12mm *
2 kg tie wire *
5 rolls cyclone wire *
3 kg welding rod *
3 lgth G.I pipe # 2 *
Labor *
Hauling of Materials *
PAP22 Expansion of semi-concrete perimeter fence
20 pcs bamboo posts 8"
4 rolls barbed wire
U nail
Labor
Hauling
PAP23: Repair of the ancillary services
Stage
4 sht corr GI sheet, 6'
1 kg umbrella nail
3 lgth 2" x 2" x 10'
1 kg c.w nail # 3
1 pt Vulca seal
Labor
Hauling
PAP24: Repair of other facilities
80 m service drop
1 lgth GI pipe, # 2
1 bag cement
3 can mixing sand
2 cans cracked stone
1 lgth round bar 10 mm
1/2 kg welding rod
TIME FRAM
PROGRAMS/PROJECTS/ACTIVITIES MOV's
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2
J F M A
Labor
Transportation
Elect connection from Bldg 3 to Bldg 4
70 m service drop *
1 lgth GI pipe, # 2 *
1 bag cement *
3 cans mixing sand *
2 cans cracked stone *
1 lgth round bar 10mm *
1/2 kg weding rod *
Labor *
Transportation *
Main Gate Door hinges
1 kg welding rod *
Labor *
Safety Lights to Main Gate
100 m service drop *
12 pcs CFL lamp 25 w *
12 pcs socket *
2 rolls electrical tape *
Landscape
( Front of Gr 4,5 & 6 )
300 pcs hollow blocks
10 bags cement
2 cu.m mixing sand
8 lgth round bar 8mm
1/2 kg tie wire
Labor
Hauling of Materials
PAP25: Repair of broken/damaged equipment
( Job Order)
15 Computer units
6 Printers * * *
4 Electric fan *
4 Sound system *
3 Bundy clock *
3 Gas range *
2 Refrigerator *
2 LCD Projector *
2 Megaphone *
2 TV sets *
4 Brush cutter *
1 Laminating Machine *
PAP26: Repair of broken/damaged furniture
6 Cabinet
30 Armchairs
6 Shelves / Dividers
TIME FRAM
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2
J F M A
4 Graphing board
1 Sala Seats
6 Computer tables
1 Tennis Table
5 Teacher's table
1 Cupboards
20 Stool
C. Learning Materials and Equipment
C.1. Improved the availability of textbooks and
other Learning Materials
Science Subjects
1 Ammeter
2 Beaker
1 Denatured alcohol
1 Handlens
1 Test tube
1 U-magnet
1 Voltmeter
1 Weighing scale
TLE/EPP *
Home Economics *
12 Bachoy server, set *
1 Big cooking pot (for Fdg) *
12 Coasters
6 Curtain, set *
2 Cutlery, set *
1 Display cabinet/closet
12 Goblet
1 Ice crusher
1 Kettle, big
3 Kitchen knives, set
80 Kitchen wares, set
5 Placemats set *
6 Platter *
12 Soup bowls
3 Serving dishes
24 Table napkin, cloth
3 Thermos, simple *
2 Vanity mirror
1 Wine holder
Industrial Arts/EPP/Electricity
1 Chisel *
2 Cross cut saw
2 Hack saw *
2 Hammer
1 Hand Drill, electric
2 Long nose
TIME FRAM
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2
J F M A
1 Planer, manual *
2 Pliers, set *
1 Rotary tool kit
1 Screw drivers, set
1 Steel Grinder *
1 Steel rule, 33'
STVEP
2 Axe *
1 Back Pack Sprayer *
10 Bolo *
3 Budding/grafting knives *
1 Crowbar
2 Draft carabao
6 Garden hoe
2 Grass cutters *
6 Hand forks
6 Hand trowels
2 Hole digger
3 Pick mattock
10 Picking/harvesting knives
1 Power sprayer
3 Pruning shears
15 Scythe
6 Shovel *
1 Soil testing kit
6 Spade
6 Spading Fork
6 Sprinkler *
1 Vise grip
200 Water hose (meter)
2 Wheel Barrow * *
Technical Drawing
Tools & Equipment
5 T-square 36" wooden body with graduated
plastic edge adjustable
Safety Equipment
1 Fire extinguisher, ABC type, dry chem 5kg
Internet Computer Fundamentals
Tools & Equipment
1 Broadband Tattoo stick *
Kinder, Grade I, II, & III
75 Crayon
1 Wall clock
MAPEH/MSEP
1 Ball, basketball Mikasa
1 Ball, volleyball Mikasa
1 Lawn tennis set
TIME FRAM
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2
J F M A
1 Table tennis set
1 Volley ball net
Clinic
1 BP Monitor *
HEKASI/SIBIKA
4 Charts
4 Maps
Math
1 Compass, blackboard
1 Color chalk, box
1 Ruler, blackboard
1 Protractor, blackboard
1 Triangle, blackboard
Computer Hdwe Servicing
Tools & Equipment
1 Multi-tester
1 Transformer multi-output with UPS
10 Connecting cords GA 22
w/ aligator clips both ends
10 Connecting cords GA 23
w/ banana clips both ends
5 Round nose pliers
1 Wire cutter
6 Philips head screw driver 6" (set)
6 Flat head screw driver 6" set
10 Connecting wire (solid gauge no.22)
2 Soldering iron 100w
5 Soldering lead (matrl)
10 IC remover, cutter
1 Tool Cabinet
Tools
Big Books for Elementary
1 May Tatlong Palaka *
1 Ang Pambihirang Buhok ni Raquel *
1 A Thirsty Sparrow *
1 Ang Bisekleta ni Momoy *
1 Bakawan *
1 Asul na Araw *
1 Bilog na itlog *
1 Ang Walong Baso ni Kuya Paquito *
1 Ang Kamates ni Pele *
1 Alamat ng Lanzones *
1 Ang Mahiyaing Manok *
1 Ang Mabait na Kalabaw *
References
1 English-Filipino-Hiligaynon Dictionary *
1 Filipino-English Complete Dictionary *
TIME FRAME
PROGRAMS/PROJECTS/ACTIVITIES MOV's Q1 Q2
J F M A
1 Filipino-Filipino Complete Dictionary *
1 Guide to High School Book Report *
10 Maps *
1 Globes *
5 Books for STVEP *
5 Filipino Books, secondary *
Other References
10 Scrabble Board
6 Word Factory (Boggles)
6 Domino *
2 Sungka *
10 Scientific calculators *
D. Others
D.1. Enrolled all school age children and
youth in the catchment areas.
PPA1 : Survey of new entrants / campaign *
From Daycare to Kindergarten * * *
From Kindergarten to Grade I * * *
From Grade 6 to Grade 7 * * *
PPA2 : Tracing of drop-outs *
Kindergarten *
Grade 1 *
Grade 2 *
Grade 3 *
Grade 4 *
Grade 5 *
Grade 6 *
Grade 7 *
Grade 8 *
Year 3/rade 9 *
Year 4/Grade 10 *
Grade 11
PPA2 : Provision of Skills Training Program to ALS learners
1 Baking * *
1 Organic Farming * *
1 Welding * *
OLONIA DIVINA INTEGRATED SCHOOL
vement Plan 2014 - Provision of Access
TIME FRAME RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4 Q1 Q2 Q3 Q4 LGU
M J J A S OND J F M A M J J A S O N D
* * 5T 5T 5T
* * * 5T 5T 5T
* * * 5T 5T 5T
* * 5T 5T 5T
* * * 5T 5T 5T
* * * 5T 5T 5T
* * * * * * * 500 500 500 500 500 500 500 500 500 500
* 5T
* * 12.5T
500 2T 12.5T
* 1T
* * 500 500
1T
* 2M
* * * * * * * 5T 5T 5T 5T 5T 5T 5T 5T 40T
* * * * * * * 18T 18T
* * * * * * * 4T 4T 4T 4T 4T 4T 4T 28T
* * * * * * * * 2T 2.5T 2.5T 2.5T 2.5T 2.5T 2.5T 2.5T 2.5T 2.5T 2.5T 2.5T
* * * * * * * *
* * * * * * * *
* * * * * * * *
4.55T
330
1.6T
460
500
1.44T
1.12T
1T
1.68T
270
140
370
1.5T
200
* 2.7T
* 52
* 1.5T
*
* 720
* 28
* 400
* * 3.5T 3.5T
*
* 4T
* 1.5T
6.5T
2.7T
2.4T
* 3.5T
2.5T
* 4.6T
* 2.8T
* 1.9T
* 600
* 440
* 168
* 168
* 3.5T
1.5T
* 2.8T
* 2.8T
* 1.2T
* 760
* 1.8T
* 120
* 2.8T
* 1.5
*
1.2T
3.6T
1.8T
650
70
2.2T
1.5T
* 4.5T
* 1.8T
* 800
70
5.04T
900
960
220
60
120
345
2.3T
600
* 2.1T
* 1.92T
* 175
3.6T
3.8T
4.5T
800
* 1.6T
* 800
* 60
* 35
* 450
* 80
* 45
* 460
* 260
* 1.2T
* 400
* 1.54T
* 1T
* 720
* 60
* 60
* 60
* 370
* 1.2T
* 400
* 4.4T
* 2.2T
* 180
* 1.7T
* 4.4T
* 400
* 3.5T
1.25T
30
3.5T
* 500 112
790
* 3.5T 4T
* 1.6T
* 800
* 60
* 35
* 450
* 80
* 45
* 460
* 260
* 1.2T
* 400
*
* 3.66T
* 180
* 370
* 100
* 1.38T
* 1.68T
* 370
* 220
* 90
* 1.2
* 150
* 1.06T
* 70
* 105
* 500
* 60
3.85t
2.16T
360
345
180
2T
250
4.4T
2.2T
180
1.7T
5.39T
2.88T
180
120
1.7T
3T
400
* 1.92T
* 1.08T
* 260
* 40
* 60
* 60
* 1T
* 70
* 2.07T
* 170
* 1.3T
* 60
* 1.1T
* 100
4.4T
2.2T
180
1.7T
4.4T
400
* 1.2T
* 225
* 70
* 130
* 20
480
300
250
200
* 3.85t
* 2.16T
* 360
* 345
* 180
* 2T
* 250
* 2.31T
* 2.2T
* 180
* 60
* 1.5T
* 200
* 1.44T
* 880
* 260
* 40
* 50
* 800
* 1T
240
200
* 180
* 1T
150
480
300
250
200
7.7T
3.24T
440
345
240
3.6T
250
560
3.5T
1T
75
600
* 480
* 300
* 250
* 200
* 3.85T
* 2.16T
* 360
* 345
* 180
* 2T
* 250
* 3T
* 1.6T
* 120
* 1.2T
* 1.8T
* 200
880
840
* 1.2T
* 2.5T
* 2T
* 3.5T
* 3.85T
* 2.16T
* 360
* 345
* 180
* 2T
* 250
* 7.7T
* 5.7T
* 120
* 120
* 180
* 1.2T
* 4.5T
* 1.5T
* 1.92T
* 1.08T
* 260
* 40
* 60
* 60
* 1T
* 70
* 1.8T
* 2.1T
* 1.2T
* 400
680
2.5T
* 1.3
* 180
* 555
* 60
* 600
* 770
* 960
* 1.5T
* 120
* 120
* 80
* 1.25T
* 2.7T
840
1.77T
800
150
* 1T
* 240
* 200
* 180
* 1T
* 150
* 3.8T
880
260
40
1.5T
960
60
60
1.2T
1.2T
200
* 1.2T
* 225
* 70
* 130
* 20
840
1.77T
800
150
* 1T
* 240
* 200
* 180
* 1T
150
3.8T
880
260
40
1.2T
640
1.59T
110
100
140
525
840
1.77T
800
300
* 1T
* 240
* 200
* 180
* 1T
* 150
* 3.8T
880
260
40
1.2T
480
60
30
550
70
1.59T
110
100
* 1.2T
* 225
* 70
* 130
* 20
* 170
* 560
* 720
* 580
* 65
* 40
1.12T
1.2T
225
70
130
20 1.7T
170
1.54T
55
30
550
50
880
260
40
4.6T
1.7T
180
1.8T
2.5T
400
1.59T
110
100
140
525
1.2T
225
70
130
20 1.7T
1.54T
1.2T
55
170
30
30
1T
250
880
260
40
960
1.06T
95
35
960
1.06T
65
95
35
800
3.66T
90
1T
90
1.92T
1.08T
260
40
225
130
1T
100
1.59T
110
100
525
920
1.12T
110
45
140
700
200
1.2T
225
70
130
20 1.7T
* * 140 40 140 140
1.92T
1.08T
260
40
225
130
1T
70
1.59T
110
920
1.12T
110
45
140
700
200
1.2T
225
70
130
20
* 1.92T
* 1.08T
* 260
* 40
* 225
* 130
* 1T
* 70
360
480
600
1.47T
60
60
180
1T
790
500
30
45
600
70
170
45
30
TIME FRAME RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4 Q1 Q2 Q3 Q4 LGU
M J J A S OND J F M A M J J A S O N D
700
120
960
1.06T
95
35
200
1.44T
1.06T
140
120
135
1.2T
225
70
130
20
770
432
55
190
30
500
50
1.54T
720
30
30
700
70
* 1.92T
* 1.08T
* 260
* 40
* 225
* 130
* 1T
* 100
2.12T
920
1.12T
110
45
140
700
200
1.2T
225
70
130
20 1.7T
940
445
500
150
* 2.8T
1.92T
1.08T
260
40
225
130
1T
100
1.12T
110
70
65
3.85t
2.16T
360
345
180
* 1T
* 240
* 200
* 180
* 1T
* 150
* 2.8T
2.5T
2T
6T
2.67T
1.8T
4.84T
140
9T
300
3.6T
8.5T
3.5T
* 600
* 1.35T
* 350
* 1T
* 200
* 1.54T
* 110
* 480
* 60
* 170
* 700
* 100
* 3.6T
* 800
* 240
* 100
* 100
* 195
* 55
* 500
3.15T
800
240
100
100
195
55
1.4T
500
100
1.5T
4.5T
2.6T
780
80
* 5.4T
* 2.4T
* 1.8T
* 760
* 40
* 3.1T
* 3T
* * 6.4T 5.6t
* 300 300
* 300 300
* 300 300
* 300 300
* * * 300 300 300 300
* * 1.8T 1.8T
* * 1.5t 1.5t
* * 1.5 1.5
* * 1T
* * 1.2 1.2
* * 3T
* * 2.5T 2.5T
* * 3T 3T
* * 800 800
* 210
* 170
* 75
* 45
* 180
* 65
* 485
* 800
2.8T
7T
* 2.3T
4.5T
2.4T
* 3.T
* 2.8T
* 4.8T
* 1.2T
* 2.4T
* 4T
1.8T
1.9T
* 780
* 1.2T
* 1.8T
1.2T
* 1.5T
* 1.5T 48.78T
360
* 760
180
* 760
* 3.8T
* 700
TIME FRAME RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4 Q1 Q2 Q3 Q4 LGU
M J J A S OND J F M A M J J A S O N D
320
800
* 1.2T
* 460
2.5T
* 280
500
1.8
2T
2T
* 800
* 2.5T
* 1T
800
* 510
* 510
* 2.4T
* 2.5T
* 1T
* 3T
* 1.2T
* 1.8T
3.6
* 5T
* 3.6
* 2.4T
1.6
* 2.4
* 4.2T
* 4.3T
* 3.8T
1.45T
* 2T
* 800
* 3.6T
* 2.3T
* 1.3T
4.5T
* 500
* 1T
* 150
* 160
* 150
* 150
* 150
* 4.5T
* 300
* 640
* 720
* 850
* 340
* 470
* 450
* 320
* 180
* 85
* 350
* 2.4T
500
500
500
500
500
500
500
500
500
500
500
500
2.8T
* 1.6T 1.6T
* 345
* 2T
* 1.5T
* 3T
* 2.5T
* 2.2T
* 3T
960
520
13T
500 500 1T
10T
* * * * * *
10T
* * * * * *
* * * * * * 10T 30T
Prepared:
ANALIE V. BUHAYAN
Principal I
SOURCES
DEPE OTHE
PTA D RS
TOTAL
15T 15T
15T 15T
15T 15T
15T 15T
15T 15T
15T 15T
15T 15T
5T 5T
3T 2T 5T
2.5T 15T
1T 1T
1T 1T
1T 1T
2.065
2.065M
M
40T
18T
28T
24T 5.5T 29.5T
SOURCES
DEPE OTHE
PTA D RS
TOTAL
18.4T 18.4T
5T 5T
11T 22T
4.3T 4.3T
1.2T 1.2T
7T 7T
4T 4T
1.5T 1.5T
17.6T
SOURCES
DEPE OTHE
PTA D RS
TOTAL
15T 15T
13.8T 13.8T
9.2T 9.2T
7.17T
11.5T 11.5T
1.98T 1.98T
4.2T 4.2T
SOURCES
DEPE OTHE
PTA D RS
TOTAL
1.4T 1.4T
12.7T 12.7T
4.2T 4.2T
5.5T 5.5T
13.28T 13.28T
2.2T 2.2T
3.5T 3.5T
1.28T 1.28T
3.5T 3.5T
612
1.4T 2.12T
SOURCES
DEPE OTHE
PTA D RS
TOTAL
7.5T 7.5T
4.2T 4.2T
4.41T 4.41T
4.99T 4.99T
1.8T 1.8T
88T 88T
SOURCES
DEPE OTHE
PTA D RS
TOTAL
11.5T 11.5T
13.8T 13.8T
4.5T 4.5T
4.78T 4.78T
1.7T 1.7T
1.23T 1.23T
SOURCES
DEPE OTHE
PTA D RS
TOTAL
8.8T 8.8T
6.4T 6.4T
3.47T 3.47T
2.77T 2.77T
1.23T 1.23T
15.8T 15.8T
480 480
SOURCES
DEPE OTHE
PTA D RS
TOTAL
1.7T 1.7T
1.23T 1.23T
8.8T 8.8T
7.9T 7.9T
880 880
840 840
9.2T 9.2T
8.8T 8.8T
SOURCES
DEPE OTHE
PTA D RS
TOTAL
21.2T 21.2T
4.5T 4.5T
5.5T 5.5T
680
2.5T 3.2T
2.1T 2.1T
5.4T
2.7T 8.1T
3.55T 3.55T
SOURCES
DEPE OTHE
PTA D RS
TOTAL
2.77T
3.8T 6.57T
1.2T 1.2T
4T 4T
1.7T 1.7T
3.55T 3.55T
2.77T
3.8T 6.57T
1.2T 1.2T
SOURCES
DEPE OTHE
PTA D RS
TOTAL
2.6T 2.6T
2.5T 2.5T
1.5T
1.7T
3.71T 3.71T
2.77T 2.77T
3.8T 3.8T
1.2T 1.2T
1.06T 1.06T
SOURCES
DEPE OTHE
PTA D RS
TOTAL
2.5T 2.5T
1.7T 1.7T
2.15T 2.15T
2.4T 2.4T
560 560
11.T 11.T
SOURCES
DEPE OTHE
PTA D RS
TOTAL
2.5T 2.5T
4.3T 4.3T
1.18T 1.18T
560 560
2.15T 2.15T
2.22T 2.22T
4.5T 4.5T
800 800
4.84T 4.84T
SOURCES
DEPE OTHE
PTA D RS
TOTAL
560 560
4.7T 4.7T
2.36T 2.36T
3.3T 3.3T
1.7T
560 560
4.7T 4.7T
SOURCES
DEPE OTHE
PTA D RS
TOTAL
2.5T 2.5T
3.3T 3.3T
4.5T 4.5T
1.7T 1.7T
4.7T 4.7T
4.12T 4.12T
2.28T 2.28T
SOURCES
DEPE OTHE
PTA D RS
TOTAL
3.1T 3.1T
2.15T 2.15T
2.9T 2.9T
4.5T 4.5T
1.7T 1.7T
2.05T 2.05T
3.09T 3.09T
4.7T 4.7T
SOURCES
DEPE OTHE
PTA D RS
TOTAL
3T 3T
3.3T 3.3T
4.5T 4.5T
1.1T 1.1T
4.7T 4.7T
1.37T 1.37T
SOURCES
DEPE OTHE
PTA D RS
TOTAL
8.8T 8.8T
2.77T 2.77T
40.35T 40.35T
3.5T 3.5T
SOURCES
DEPE OTHE
PTA D RS
TOTAL
7.2T 7.2T
6.59T 6.59T
1.6T 1.6T
7.96T 7.96T
16.5T 16.5T
3.6T
3T
3T
SOURCES
DEPE OTHE
PTA D RS
TOTAL
400
2.03T 2.03T
SOURCES
DEPE OTHE
PTA D RS
TOTAL
12.12
12.12T
T
55.2T
4.3T 4.3T
3.8T
1.45T 1.45T
2.8T 2.8T
SOURCES
DEPE OTHE
PTA D RS
TOTAL
8.2T 8.2T
4.5T 4.5T
1.5T 1.5T
760 760
11.6T 11.6T
6T 6T
5T 5T
SOURCES
OTHER
PTA DEPED
S
TOTAL
15.35T 15.35T
19.68T 19.68T
30T
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : ProvisPPA2 : Provis
PPA2 : Provis
COLONIA DIVINA INTEGRATED SCHOOL
Adjusted SIP 2011-2013 ANNUAL IMPROVEMENT PLAN 2012: Quality and Relevance
TIME FRAME RESOURCE REQUIREMENTS
MEANS OF
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
VERIFICATION
J F M A M J J A S O N D J F M A M J J A S O
1. LEARNERS PERFORMANCE
A. Improved Learner's achievement
PPA 1: Project SAVE (All Subjects) NAT G3 Results x x x x x x x x x x 125 125 125
Tasks: NAT G6 Results
1. Orient teachers NAT Y4
2. Evaluate/analyze Nat 3 Results
3. Identify mastered and un-mastered
skills
4. Develop/enrich test for review 1.4T
Precondition:
Test items are used in review classses.
PPA 2: Project KADI-Lubos na (Filipino)
Tasks:
1. Orient Teachers
2. Develop HOTs questions on least
learned skills
3. Conduct review classes
Precondition: Review class schedule
implementation
PPA 3: Project MILLS (Math) 125 125 125
Tasks:
1. Get frequency of errors
2. Identify Least Learned Skills
3. Provide intervention to improve least
learned skills
4. Organize review class for the lesat learned
skills
5. Organize a team to develop parallel item
to the least learned identified
6. M & E results of review class
7. Spot tests
8. Log of skills taken up in the review class
9. Percentage of pupils who got 75% of the
test item to measure achievement, re: LLS
10. Post review class assessment (include all
LLS in the test
Precondition: Implemented review/remedial
class, utilization of test results
Tasks:
1. Orient Teachers
2. Develop HOTs questions on least
learned skills
6. INTERNAL EFFECIENCY
Improved school internal efficiency along EFA Goals List of Participants x x x x x x x x x x x x x x x x x
a. Reduced drop-out rate and winners
b. Reduced repetition rate
c. Increased promotion rate Certificate of Recognition
d. Increased completion rate and appearances
e. Increased graduation rate
f. increased cohort survival rate
PPA's:
1. Feeding Program 105T
2. Tracking System
Prepared:
ANALIE V. BUHAYAN
Principal I
Page 1 of 10
TS SOURCES
Q4 OTHER
LGU PTA DEP.ED
S
TOTAL
N D
1.4T 1.4T
1T 1T 1T
500 1T 1T
Page 5 of 10
TS SOURCES
Q4 OTHER
LGU PTA DEP.ED
S
TOTAL
N D
Page 6 of 10
TS SOURCES
Q4 OTHER
LGU PTA DEP.ED
S
TOTAL
N D
300 300
300 300
500 500
4T 4T
Page 8 of 10
TS SOURCES
Q4 OTHER
LGU PTA DEP.ED TOTAL
N D S
2T 2T
2T 2T
x x
105T 105T
200 200 200
Page 10 of 10
TS SOURCES
Q4 OTHER
LGU PTA DEP.ED TOTAL
N D S
UHAYAN
RESOURCE REQUIREMENTS
Q1 Q2
J F M A M
RESOURCE REQUIREMENTS SOURCES
2 Q3 Q4
LGU PTA DEP.ED OTHERS
PROGRAMS/PROJECTS/ACTIVITIES
TOTAL
J J A S O N D
MEANS
TIME FRAME
OF Q1 Q2 Q3 Q4 Q1
VERIFICA J F M A M J J A S O N D J
TION
RESOURCE REQUIREMENTS SOURCES
Q1 Q2 Q3 Q4
LGU PTA DEP.ED
F M A M J J A S O N D
SOURCES
LGU PTA DEP.ED
MEANS
RCES TIME FRAME
OF
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
OTHERS TOTAL VERIFICA J F M A M J J A S
TION
MEANS
RCES TIME FRAME
OF
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
OTHERS TOTAL VERIFICA J F M A M J J A S
TION
RESOURCE REQUIREMENTS
Q4 Q1 Q2 Q3 Q4
O N D J F M A M J J A S O N
RESOURCE REQUIREMENTS
Q4 Q1 Q2 Q3 Q4
O N D J F M A M J J A S O N
MEANS
SOURCES TIME FRAME
OF
4 PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2
D
LGU PTA DEP.ED OTHERS TOTAL VERIFICA J F M A M
TION
MEANS
SOURCES TIME FRAME
OF
4 PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2
D
LGU PTA DEP.ED OTHERS TOTAL VERIFICA J F M A M
TION
TIME FRAME RESOURCE REQUIREMENTS
Q2 Q3 Q4 Q1 Q2 Q3
J J A S O N D J F M A M J J
TIME FRAME RESOURCE REQUIREMENTS
Q2 Q3 Q4 Q1 Q2 Q3
J J A S O N D J F M A M J J
MEANS
REMENTS SOURCES
OF
Q3 Q4 PROGRAMS/PROJECTS/ACTIVITIES Q1
A S O N D
LGU PTA DEP.ED OTHERS TOTAL VERIFICA J
TION
MEANS
REMENTS SOURCES
OF
Q3 Q4 PROGRAMS/PROJECTS/ACTIVITIES Q1
A S O N D
LGU PTA DEP.ED OTHERS TOTAL VERIFICA J
TION
TIME FRAME RESOU
Q1 Q2 Q3 Q4 Q1
F M A M J J A S O N D J F M
TIME FRAME RESOU
Q1 Q2 Q3 Q4 Q1
F M A M J J A S O N D J F M
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4
LGU PTA DEP.ED OTHERS TOTAL
A M J J A S O N D
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4
LGU PTA DEP.ED OTHERS TOTAL
A M J J A S O N D
MEANS
TIME FRAME
OF
ROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4
VERIFICA J F M A M J J A S O N
TION
MEANS
TIME FRAME
OF
ROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4
VERIFICA J F M A M J J A S O N
TION
RESOURCE REQUIREMENTS SOURCES
4 Q1 Q2 Q3 Q4
LGU
D J F M A M J J A S O N D
RESOURCE REQUIREMENTS SOURCES
4 Q1 Q2 Q3 Q4
LGU
D J F M A M J J A S O N D
MEANS
SOURCES TIME FRAME
OF
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
PTA DEP.ED OTHERS TOTAL VERIFICA J F M A M J J
TION
MEANS
SOURCES TIME FRAME
OF
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
PTA DEP.ED OTHERS TOTAL VERIFICA J F M A M J J
TION
ME RESOURCE REQUIREMENTS
Q3 Q4 Q1 Q2 Q3
A S O N D J F M A M J J A S
ME RESOURCE REQUIREMENTS
Q3 Q4 Q1 Q2 Q3
A S O N D J F M A M J J A S
MEANS
SOURCES
OF
Q4 PROGRAMS/PROJECTS/ACTIVITIES Q1
O N D
LGU PTA DEP.ED OTHERS TOTAL VERIFICA J F M
TION
MEANS
SOURCES
OF
Q4 PROGRAMS/PROJECTS/ACTIVITIES Q1
O N D
LGU PTA DEP.ED OTHERS TOTAL VERIFICA J F M
TION
TIME FRAME RESOURCE REQUIREMENTS
Q2 Q3 Q4 Q1 Q2
A M J J A S O N D J F M A M
TIME FRAME RESOURCE REQUIREMENTS
Q2 Q3 Q4 Q1 Q2
A M J J A S O N D J F M A M
RESOURCE REQUIREMENTS SOURCES
2 Q3 Q4
LGU PTA DEP.ED OTHERS
PROGRAMS/PROJECTS/ACTIVITIES
TOTAL
J J A S O N D
RESOURCE REQUIREMENTS SOURCES
2 Q3 Q4
LGU PTA DEP.ED OTHERS
PROGRAMS/PROJECTS/ACTIVITIES
TOTAL
J J A S O N D
MEANS
TIME FRAME
OF Q1 Q2 Q3 Q4 Q1
VERIFICA J F M A M J J A S O N D J
TION
MEANS
TIME FRAME
OF Q1 Q2 Q3 Q4 Q1
VERIFICA J F M A M J J A S O N D J
TION
RESOURCE REQUIREMENTS SOURCES
Q1 Q2 Q3 Q4
LGU PTA DEP.ED
F M A M J J A S O N D
RESOURCE REQUIREMENTS SOURCES
Q1 Q2 Q3 Q4
LGU PTA DEP.ED
F M A M J J A S O N D
MEANS
RCES TIME FRAME
OF
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
OTHERS TOTAL VERIFICA J F M A M J J A S
TION
MEANS
RCES TIME FRAME
OF
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
OTHERS TOTAL VERIFICA J F M A M J J A S
TION
RESOURCE REQUIREMENTS
Q4 Q1 Q2 Q3 Q4
O N D J F M A M J J A S O N
RESOURCE REQUIREMENTS
Q4 Q1 Q2 Q3 Q4
O N D J F M A M J J A S O N
MEANS
SOURCES TIME FRAME
OF
4 PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2
D
LGU PTA DEP.ED OTHERS TOTAL VERIFICA J F M A M
TION
MEANS
SOURCES TIME FRAME
OF
4 PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2
D
LGU PTA DEP.ED OTHERS TOTAL VERIFICA J F M A M
TION
TIME FRAME RESOURCE REQUIREMENTS
Q2 Q3 Q4 Q1 Q2 Q3
J J A S O N D J F M A M J J
TIME FRAME RESOURCE REQUIREMENTS
Q2 Q3 Q4 Q1 Q2 Q3
J J A S O N D J F M A M J J
MEANS
REMENTS SOURCES
OF
Q3 Q4 PROGRAMS/PROJECTS/ACTIVITIES Q1
A S O N D
LGU PTA DEP.ED OTHERS TOTAL VERIFICA J
TION
MEANS
REMENTS SOURCES
OF
Q3 Q4 PROGRAMS/PROJECTS/ACTIVITIES Q1
A S O N D
LGU PTA DEP.ED OTHERS TOTAL VERIFICA J
TION
TIME FRAME RESOU
Q1 Q2 Q3 Q4 Q1
F M A M J J A S O N D J F M
TIME FRAME RESOU
Q1 Q2 Q3 Q4 Q1
F M A M J J A S O N D J F M
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4
LGU PTA DEP.ED OTHERS TOTAL
A M J J A S O N D
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4
LGU PTA DEP.ED OTHERS TOTAL
A M J J A S O N D
MEANS
TIME FRAME
OF
ROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4
VERIFICA J F M A M J J A S O N
TION
MEANS
TIME FRAME
OF
ROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4
VERIFICA J F M A M J J A S O N
TION
RESOURCE REQUIREMENTS SOURCES
4 Q1 Q2 Q3 Q4
LGU
D J F M A M J J A S O N D
RESOURCE REQUIREMENTS SOURCES
4 Q1 Q2 Q3 Q4
LGU
D J F M A M J J A S O N D
MEANS
SOURCES TIME FRAME
OF
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
PTA DEP.ED OTHERS TOTAL VERIFICA J F M A M J J
TION
MEANS
SOURCES TIME FRAME
OF
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
PTA DEP.ED OTHERS TOTAL VERIFICA J F M A M J J
TION
ME RESOURCE REQUIREMENTS
Q3 Q4 Q1 Q2 Q3
A S O N D J F M A M J J A S
ME RESOURCE REQUIREMENTS
Q3 Q4 Q1 Q2 Q3
A S O N D J F M A M J J A S
MEANS
SOURCES
OF
Q4 PROGRAMS/PROJECTS/ACTIVITIES Q1
O N D
LGU PTA DEP.ED OTHERS TOTAL VERIFICA J F M
TION
MEANS
SOURCES
OF
Q4 PROGRAMS/PROJECTS/ACTIVITIES Q1
O N D
LGU PTA DEP.ED OTHERS TOTAL VERIFICA J F M
TION
TIME FRAME RESOURCE REQUIREMENTS
Q2 Q3 Q4 Q1 Q2
A M J J A S O N D J F M A M
TIME FRAME RESOURCE REQUIREMENTS
Q2 Q3 Q4 Q1 Q2
A M J J A S O N D J F M A M
RESOURCE REQUIREMENTS SOURCES
2 Q3 Q4
LGU PTA DEP.ED OTHERS
PROGRAMS/PROJECTS/ACTIVITIES
TOTAL
J J A S O N D
RESOURCE REQUIREMENTS SOURCES
2 Q3 Q4
LGU PTA DEP.ED OTHERS
PROGRAMS/PROJECTS/ACTIVITIES
TOTAL
J J A S O N D
MEANS
TIME FRAME
OF Q1 Q2 Q3 Q4 Q1
VERIFICA J F M A M J J A S O N D J
TION
MEANS
TIME FRAME
OF Q1 Q2 Q3 Q4 Q1
VERIFICA J F M A M J J A S O N D J
TION
RESOURCE REQUIREMENTS SOURCES
Q1 Q2 Q3 Q4
LGU PTA DEP.ED
F M A M J J A S O N D
RESOURCE REQUIREMENTS SOURCES
Q1 Q2 Q3 Q4
LGU PTA DEP.ED
F M A M J J A S O N D
MEANS
RCES TIME FRAME
OF
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
OTHERS TOTAL VERIFICA J F M A M J J A S
TION
MEANS
RCES TIME FRAME
OF
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
OTHERS TOTAL VERIFICA J F M A M J J A S
TION
RESOURCE REQUIREMENTS
Q4 Q1 Q2 Q3 Q4
O N D J F M A M J J A S O N
RESOURCE REQUIREMENTS
Q4 Q1 Q2 Q3 Q4
O N D J F M A M J J A S O N
MEANS
SOURCES TIME FRAME
OF
4 PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2
D
LGU PTA DEP.ED OTHERS TOTAL VERIFICA J F M A M
TION
MEANS
SOURCES TIME FRAME
OF
4 PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2
D
LGU PTA DEP.ED OTHERS TOTAL VERIFICA J F M A M
TION
TIME FRAME RESOURCE REQUIREMENTS
Q2 Q3 Q4 Q1 Q2 Q3
J J A S O N D J F M A M J J
TIME FRAME RESOURCE REQUIREMENTS
Q2 Q3 Q4 Q1 Q2 Q3
J J A S O N D J F M A M J J
MEANS
REMENTS SOURCES
OF
Q3 Q4 PROGRAMS/PROJECTS/ACTIVITIES Q1
A S O N D
LGU PTA DEP.ED OTHERS TOTAL VERIFICA J
TION
MEANS
REMENTS SOURCES
OF
Q3 Q4 PROGRAMS/PROJECTS/ACTIVITIES Q1
A S O N D
LGU PTA DEP.ED OTHERS TOTAL VERIFICA J
TION
TIME FRAME RESOU
Q1 Q2 Q3 Q4 Q1
F M A M J J A S O N D J F M
TIME FRAME RESOU
Q1 Q2 Q3 Q4 Q1
F M A M J J A S O N D J F M
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4
LGU PTA DEP.ED OTHERS TOTAL
A M J J A S O N D
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4
LGU PTA DEP.ED OTHERS TOTAL
A M J J A S O N D
MEANS
TIME FRAME
OF
ROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4
VERIFICA J F M A M J J A S O N
TION
MEANS
TIME FRAME
OF
ROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4
VERIFICA J F M A M J J A S O N
TION
RESOURCE REQUIREMENTS SOURCES
4 Q1 Q2 Q3 Q4
LGU
D J F M A M J J A S O N D
RESOURCE REQUIREMENTS SOURCES
4 Q1 Q2 Q3 Q4
LGU
D J F M A M J J A S O N D
MEANS
SOURCES TIME FRAME
OF
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
PTA DEP.ED OTHERS TOTAL VERIFICA J F M A M J J
TION
MEANS
SOURCES TIME FRAME
OF
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
PTA DEP.ED OTHERS TOTAL VERIFICA J F M A M J J
TION
ME RESOURCE REQUIREMENTS
Q3 Q4 Q1 Q2 Q3
A S O N D J F M A M J J A S
ME RESOURCE REQUIREMENTS
Q3 Q4 Q1 Q2 Q3
A S O N D J F M A M J J A S
MEANS
SOURCES
OF
Q4 PROGRAMS/PROJECTS/ACTIVITIES Q1
O N D
LGU PTA DEP.ED OTHERS TOTAL VERIFICA J F M
TION
MEANS
SOURCES
OF
Q4 PROGRAMS/PROJECTS/ACTIVITIES Q1
O N D
LGU PTA DEP.ED OTHERS TOTAL VERIFICA J F M
TION
TIME FRAME RESOURCE REQUIREMENTS
Q2 Q3 Q4 Q1 Q2
A M J J A S O N D J F M A M
TIME FRAME RESOURCE REQUIREMENTS
Q2 Q3 Q4 Q1 Q2
A M J J A S O N D J F M A M
RESOURCE REQUIREMENTS SOURCES
2 Q3 Q4
LGU PTA DEP.ED OTHERS
PROGRAMS/PROJECTS/ACTIVITIES
TOTAL
J J A S O N D
RESOURCE REQUIREMENTS SOURCES
2 Q3 Q4
LGU PTA DEP.ED OTHERS
PROGRAMS/PROJECTS/ACTIVITIES
TOTAL
J J A S O N D
MEANS
TIME FRAME
OF Q1 Q2 Q3 Q4 Q1
VERIFICA J F M A M J J A S O N D J
TION
MEANS
TIME FRAME
OF Q1 Q2 Q3 Q4 Q1
VERIFICA J F M A M J J A S O N D J
TION
RESOURCE REQUIREMENTS SOURCES
Q1 Q2 Q3 Q4
LGU PTA DEP.ED
F M A M J J A S O N D
RESOURCE REQUIREMENTS SOURCES
Q1 Q2 Q3 Q4
LGU PTA DEP.ED
F M A M J J A S O N D
MEANS
RCES TIME FRAME
OF
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
OTHERS TOTAL VERIFICA J F M A M J J A S
TION
MEANS
RCES TIME FRAME
OF
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
OTHERS TOTAL VERIFICA J F M A M J J A S
TION
RESOURCE REQUIREMENTS
Q4 Q1 Q2 Q3 Q4
O N D J F M A M J J A S O N
RESOURCE REQUIREMENTS
Q4 Q1 Q2 Q3 Q4
O N D J F M A M J J A S O N
MEANS
SOURCES TIME FRAME
OF
4 PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2
D
LGU PTA DEP.ED OTHERS TOTAL VERIFICA J F M A M
TION
MEANS
SOURCES TIME FRAME
OF
4 PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2
D
LGU PTA DEP.ED OTHERS TOTAL VERIFICA J F M A M
TION
TIME FRAME RESOURCE REQUIREMENTS
Q2 Q3 Q4 Q1 Q2 Q3
J J A S O N D J F M A M J J
TIME FRAME RESOURCE REQUIREMENTS
Q2 Q3 Q4 Q1 Q2 Q3
J J A S O N D J F M A M J J
MEANS
REMENTS SOURCES
OF
Q3 Q4 PROGRAMS/PROJECTS/ACTIVITIES Q1
A S O N D
LGU PTA DEP.ED OTHERS TOTAL VERIFICA J
TION
MEANS
REMENTS SOURCES
OF
Q3 Q4 PROGRAMS/PROJECTS/ACTIVITIES Q1
A S O N D
LGU PTA DEP.ED OTHERS TOTAL VERIFICA J
TION
TIME FRAME RESOU
Q1 Q2 Q3 Q4 Q1
F M A M J J A S O N D J F M
TIME FRAME RESOU
Q1 Q2 Q3 Q4 Q1
F M A M J J A S O N D J F M
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4
LGU PTA DEP.ED OTHERS TOTAL
A M J J A S O N D
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4
LGU PTA DEP.ED OTHERS TOTAL
A M J J A S O N D
MEANS
TIME FRAME
OF
ROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4
VERIFICA J F M A M J J A S O N
TION
MEANS
TIME FRAME
OF
ROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4
VERIFICA J F M A M J J A S O N
TION
RESOURCE REQUIREMENTS SOURCES
4 Q1 Q2 Q3 Q4
LGU
D J F M A M J J A S O N D
RESOURCE REQUIREMENTS SOURCES
4 Q1 Q2 Q3 Q4
LGU
D J F M A M J J A S O N D
MEANS
SOURCES TIME FRAME
OF
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
PTA DEP.ED OTHERS TOTAL VERIFICA J F M A M J J
TION
MEANS
SOURCES TIME FRAME
OF
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
PTA DEP.ED OTHERS TOTAL VERIFICA J F M A M J J
TION
ME RESOURCE REQUIREMENTS
Q3 Q4 Q1 Q2 Q3
A S O N D J F M A M J J A S
ME RESOURCE REQUIREMENTS
Q3 Q4 Q1 Q2 Q3
A S O N D J F M A M J J A S
MEANS
SOURCES
OF
Q4 PROGRAMS/PROJECTS/ACTIVITIES Q1
O N D
LGU PTA DEP.ED OTHERS TOTAL VERIFICA J F M
TION
MEANS
SOURCES
OF
Q4 PROGRAMS/PROJECTS/ACTIVITIES Q1
O N D
LGU PTA DEP.ED OTHERS TOTAL VERIFICA J F M
TION
TIME FRAME RESOURCE REQUIREMENTS
Q2 Q3 Q4 Q1 Q2
A M J J A S O N D J F M A M
TIME FRAME RESOURCE REQUIREMENTS
Q2 Q3 Q4 Q1 Q2
A M J J A S O N D J F M A M
RESOURCE REQUIREMENTS SOURCES
2 Q3 Q4
LGU PTA DEP.ED OTHERS
PROGRAMS/PROJECTS/ACTIVITIES
TOTAL
J J A S O N D
RESOURCE REQUIREMENTS SOURCES
2 Q3 Q4
LGU PTA DEP.ED OTHERS
PROGRAMS/PROJECTS/ACTIVITIES
TOTAL
J J A S O N D
MEANS
TIME FRAME
OF Q1 Q2 Q3 Q4 Q1
VERIFICA J F M A M J J A S O N D J
TION
MEANS
TIME FRAME
OF Q1 Q2 Q3 Q4 Q1
VERIFICA J F M A M J J A S O N D J
TION
RESOURCE REQUIREMENTS SOURCES
Q1 Q2 Q3 Q4
LGU PTA DEP.ED
F M A M J J A S O N D
RESOURCE REQUIREMENTS SOURCES
Q1 Q2 Q3 Q4
LGU PTA DEP.ED
F M A M J J A S O N D
RCES
OTHERS TOTAL
RCES
OTHERS TOTAL
COLONIA DIVINA INTEGRATED SCHOOL
ANNUAL IMPROVEMENT PLAN 2013: Quality and Relevance
MEANS OF TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
VERIFICATION J F M A M J J A S O N D J F M A M J J A S O N
1. LEARNERS PERFORMANCE
A. Improved Learner's achievement
PPA 1: Project SAVE (All Subjects) NAT G3 Results 125 125 125
Tasks: NAT G6 Results
1. Orient/Reorient teachers NAT Y4 x x
2. Monitor Nat 3 Results review sessions. x x x x x x
3. Identify mastered and un-mastered
skills
4. Develop/enrich test for review 1.4T
Precondition:
Test items are used in review classses.
PPA 2: Project KADI-Lubos na (Filipino)
Tasks:
1. Oreint/Reorient Teachers
2. Develop HOTs questions on least
learned skills
3. Conduct review classes
Precondition: Review class schedule
implementation
PPA 3: Project MILLS (Math) 125 125 125
Tasks:
1. Get frequency of errors x
2. Identify Least Learned Skills x
3. Provide intervention to improve least x
learned skills x
4. Organize review class for the lesat learned
skills
5. Organize a team to develop parallel item x
to the least learned identified
6. M & E results of review class x x x x x x x
7. Spot tests x
8. Log of skills taken up in the review class x x x x x x x x
9. Percentage of pupils who got 75% of the x x
test item to measure achievement, re: LLS x
10. Post review class assessment (include all
LLS in the test
Precondition: Implemented review/remedial
class, utilization of test results
PPA 4: Project PELC Monitoring 1T
Tasks:
1. Prepare checklist x x x x x
2. Monitor skills covered every quarter/whole
year
Precondition: PELC Utilization
PPA 5: Reproduction of NSTIC improvised Mat. 1T
Adjusted SIP 2011-2013 ANNUAL IMPROVEMENT PLAN 2013: Quality and Relevance
MEANS OF TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
VERIFICATION J F M A M J J A S O N D J F M A M J J A S O N
Tasks:
1. Re-orient teachers x
2. Workshop on improvised science mat. x
3. Utilize the materials x x x x x x x
4. Monitor & evaluate results x x x x x x
Precondition: Utilization of Materials
PPA 6: Project SHAP-UP 500
Tasks:
1. Train teachers (based on IPPD) x
2. Monitor application of training x x x x x x x
3. Improve learners performance
4. Attendance/participation in Memorandized x x x x x
contests
Precondition: Application of skils from the
training and pupils participation in contests
Increased number of pupils who got 75% MPS in
Unified test in all subject areas
PPA 1: Project SAVE (All Subjects) 200 200
Tasks:
1. Orient teachers
2. Evaluate/analyze Nat 3 Results
3. Identify mastered and un-mastered Unified Test Results x x x x x x x x
skills (per quarter) x x x x x x x x x x
4. Develop/enrich test for review
Precondition: Test itemssed in review
classses
PPA 2: Project KADI-Lubos na (Filipino) 125 125 125
Tasks:
1. Get frequency of errors x
2. Identify Least Learned Skills x
3. Provide intervention to improve least x x
learned skills x
4. Organize review class for the lesat learned skills x
5. Organize a team to develop parallel item
to the least learned identified x x x x x x x
6. M & E results of review class
7. Spot tests x x
8. Log of skills taken up in the review class x x
9. Percentage of pupils who got 75% of the
test item to measure achievement, re: LLS
10. Post review class assessment (include all x x x
LLS in the test
Prcondition: Implemented review/remedial
class, utilization of test results
PPA 4: Project PELC Monitoring 125 125 125
Tasks:
1. Prepare checklist x x x
Adjusted SIP 2011-2013 ANNUAL IMPROVEMENT PLAN 2013: Quality and Relevance
MEANS OF TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
VERIFICATION J F M A M J J A S O N D J F M A M J J A S O N
2. Monitor skills covered every quarter/whole year x x x
Precondition: PELC Utilization
PPA 5: Reproduction of NSTIC improvised Mat. 500
Tasks:
1. Re-orient teachers
2. Workshop on improvised science mat.
3. Utilize the materials
4. Monitor & evaluate results x x x x x x x x x x
Precondition: Utilization of Materials
PPA 6: Project SHAP-UP 250 250 250
Tasks:
1. Train teachers (based on IPPD)
2. Monitor application of training
3. Improve learners performance
4. Attendance/participation in Memorandized
contests
Pre-Condition: Application of skils from the
training and pupils participation in contests
B. Improved Reading Proficiency level of pupils 100 100 100 100 100 100 100
PPA: PHIL-IRI
1. Attain 100% readers and 0% non-reader in Grade 1
2. Increased number of pupils who are at instructional
level from 24 to 50 in Grade 2
3. Attain 100% Instructional Level in Grade 3
4. Increased number of pupils who are independent
level from 6 to 30 in Grade 4
5. Increased number of pupils who are independent
in Grade 5
6. Attain 100% independent level in Grade 6 PHIL-IRI Results x x x x x x x x x x
Tasks: (Pre-Test & Post Test)
a. Re-orient teachers on how to conduct PHIL-IRI x x x x x x x x x x
(Oral & Silent)
b. Observe in conducting x x x x x x x x x x
c. Monitor and evaluate reading results x x x x x x x x x x
d. Intervention (Remedial Reading, Home Reading,
Project Garay) x x x x x x x x x x
Precondition: Phil-Iri Implemntation
C. Improved Numeracy Skills of Pupils x x x x x x x x x x
PPA: Project SMILE 200 200 200 200 200 200 200 200 200
Tasks:
1. Re-orientation on the mechanics of the Conduct of x x
Math Inventory Tool x
2. Conduct First Exposure based on the Mechanics x
of the conduct
3. Analyze results: x
Adjusted SIP 2011-2013 ANNUAL IMPROVEMENT PLAN 2013: Quality and Relevance
MEANS OF TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
VERIFICATION J F M A M J J A S O N D J F M A M J J A S O N
Tasks:
1. Re-orientation on the mechanics of the Conduct of x x
Math Inventory Tool x
2. Conduct First Exposure based on the Mechanics x
of the conduct
3. Analyze results: x
a. Identify the basic facts combination missed by x
each pupil in SMILE form provided x
b. Teacher provides intervention using the results. MATH Inventory Results x x x x x x x x x x
Use strategies such as: (Pre-Test & Post Test)
b.1 games (math bingo, etc.) x x x x x x x x x x
b.2 drills (math hataw, etc.) x x x x x x x x x x
c. M & E results of intervention x x x x x x x x x x
- spot testing x x x x x x x x x x
- mid-year assessment and year-end assessment x x x x x x x x x x
(math inventory) x x x x x x x x x x
Precondition: Implement Intervention x x x x x x x x x x
D. Improved Reading Readiness of Grade 1
PPA: PHIL-IRI Pre-test and Post Test 300
Tasks:
a. Re-orient teachers on how to conduct Phil-iri x x
(Oral & Silent)
b. Observe in conducting x x
c. Monitor and evaluate reading results x
d. Intervention (Remedial Reading, Home Reading, x x x x
Project Garay)
Precondition: PHIL-IRI Implementation
E. Improved reparedness of Grade 3, 6 & 4 pupils/students for NAT
PPA: Project Nat Preparedness Assessment 200 100
Tasks: SREA Results
1. Analyze Results PHIL-IRI Results x
2. Get Frequency of Errors x
3. Identify LLS x x
4. Provide intervention to improve LLS x
5. Organize review classes x
6. Implement review classes x x x x x x x
7. Monitor x x x x x x
8. Evaluate results x x x x
2. STAFF DEVELOPMENT
Improved Teachers' KSA's NAT Preparedness x x x x x x x x x x
a. Improved teachers pedagogical skills (based on Assessment Results 150 150
& IPPD of teachers)
PPA's: QMM, SLAC
Adjusted SIP 2011-2013 ANNUAL IMPROVEMENT PLAN 2013: Quality and Relevance
MEANS OF TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
VERIFICATION J F M A M J J A S O N D J F M A M J J A S O N
Tasks:
1. Pre-Conference x x x x x x x x x x
2. Observe Classes x x x x x x x x x x
3. Post Conference x x x x x x x x x x
4. SLAC Session x x x x
5. Customized Teacher Dev't Approach x x x x x x x x x x
Precondition: QMM Validation
b. Improved subject knowledge of teachers
PPA1: Instructional Supervision/QMM 150 150
Tasks:
1. Enhance competencies of teachers in IPPD's x x x x x x x x x x x
Precondition: Schedule of Supervision is strictly
followed
PPA2: In-service Training for Teachers and SH x x 20t 20t
Tasks:
1. Assess teachers' need using TSNA tool. x
2. Let teachers make their IPP x
3. Formulate the SPPD. x
4. Conduct school-based training. x x
Precondition: DO allows
PPA3: Higher level trainings and seminars for tchrs/SH
1. Seek approval from the DO. x x x x x x x x x x x x
2. Allot budget/ Allow teachers at own expense. x x x x x x x x x x x x
Precondition: Availability of Fundfor the month
3. CURRICULUM IMPLEMENTATION/INSTRUCTIONAL x x x x x x x x x x
DELIVERY CB-PAST Forms
a. Improved Curriculum Implementation x x x x x x x x x x
PPA: Quarterly Skills Monitoring x x x
Tasks:
1. PELC Monitoring Checklist/PELC Log
2. Functional Testing Program
Precondition: Availability of PELC CB-PAST Forms x x x x x x x x x x
b. Improved Provision of Innovative Curricular
Programs
PPA's: Integration of Special Topics 3t 3t
1. Drug Addiction x x x x x x x x x x
2. Gender Sensitivity/GAD VAWC x x x x x x x x x x
3. Disaster Risk Reduction x x x x x x x x x x
4. Anti-Graft and Corruption x x x x x x x x x x
5. Moral Recovery PELC Monitoring x x x x x x x x x x
6. Environment Protection Checklists x x x x x x x x x x
7. Peace x x x x x x x x x x
8. Child Abuse x x x x x x x x x x
9. Child Friendly System x x x x x x x x x x
Tasks:
1. Orient teachers, furnish them lists of topics.
2. Purchase references for the topics
3. Issue to teachers with MR.
4. Monitor the utilization.
c. Enhanced Curriculum Materials
PPAs:
Adjusted SIP 2011-2013 ANNUAL IMPROVEMENT PLAN 2013: Quality and Relevance
MEANS OF TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
VERIFICATION J F M A M J J A S O N D J F M A M J J A S O N
1. Curriculum Indigenization Program Log/Modules of Integrated x x x x x x x x x x
2. Development of IMS Topics 2T 2T
3. Learning Guide Development 1T 1T
4. Develop MTBL Material per quarter
Tasks:
a. Orient teachers x
b. Make Action Plan x
c. Implement/Develop Material, etc. x
d. Monitor/check x x x x x x x x x
Precondition: Utilization of developed materials for
effective teaching
d. Improved Instructional Delivery
Improved Teachers Instructional Delivery
PPA: Methodologies/Approaches Checklist 100 100 100
Tasks:
1. Orient teachers x x
2. Prepare checklist for methodologies/approaches x x
used in lessons IMS
3. Check Lesson Plan/Observe classes x x x x x x x x x x
Precondition: LP's used methodologies/approaches IMS x x x x x x x x x x
4. LEARNERS' HEALTH AND NUTRITION x x x x x x x x x x
a. Improved pupils' and students' nutritional status MTBL Mat. x x x x x x x x x x
PPA 1: Feeding Program 30T
Tasks:
1. Measure height & weigh pupils (baseline) x
2. Evaluate & classify pupils (Identify wasted & Lesson Plans x x x x x x
severely wasted pupils)
3. Implement feeding programs x 45t 45t
4. Measure height & weigh pupils (endline) x
5. Analyze/evaluate results x
Precondition: Implementation of Feeding Program
for wasted & severely wasted pupils
PPA 2: Strenghening Gulayan sa Eskwelahan
Tasks:
1. Reorient the Gulayan coordinators
2. Ask from the coordinators their actions for the Gulayan.
3. Ask support/assistance from the City Agri Office
Precondition: Coordinators have initiatives; office support is given
5. LEARNERS' SAFEGUARD
a. Improved pupils' and students' safety in the campus
PPA: Active implementation of Disasters Program
Tasks:
1. Strengthen school guard's vigilance to pupil/students x x x x x x x x x x
2. Cut down extremely tall trees/branches that pose x x x x x x x x x x
hazard.
Adjusted SIP 2011-2013 ANNUAL IMPROVEMENT PLAN 2013: Quality and Relevance
MEANS OF TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
VERIFICATION J F M A M J J A S O N D J F M A M J J A S O N
3. Save storm toppled trees for school consumption/use. x x x x x x x x x x
6. STUDENT SERVICES
a. Improved pupils participation to various co-curri- x x x x x x
cular activities
Tasks:
1. Orient pupils x x
2. Let them lead elections/programs in various co- x x
curricular activities
3. Guide & monitor programs of pupils organization Nutritional Status x x x
Precondition: Pupils Participation in Co-Curricular Reports
Activities
b. Improved provision of student services in the campus
PPA: Organization/establishment of pupils services in
campus
Tasks:
1. Orient pupils about their roles and responsibilities x
2. Organize committee x
3. Monitor x x x x x x
Precondition: 100% implementation
c. Improved pupils performance in competition 400 400 400 400 400
PPA's:
a. Training Program in Journalism List of Officers Prog.
b. Training Program in Sports & Projects
c. Review Program for Tourism/Super Quiz, MTAP, etc.
Tasks:
1. Send teachers to training
2. Train potential pupils in School x x x x x x x
3. Participate in Competitions
4. Follow-up Skills
Precondition: 100% participation in competitions Log book/attendance
d. Improved pupils attendance schedule of pupils
PPA: Form 1 services (assignment)
Tasks:
1. Daily checking of attendance x x x x x x x x x x
2. Call for Homeroom PTA Meeting x x x x
3. Inform parents abut the status of their children x x x x
4. Monitor performance x x x x x x x x x x
6. INTERNAL EFFECIENCY
Improved school internal efficiency along EFA Goals List of Participants
a. Reduced drop-out rate and winners x
b. Reduced repetition rate x
c. Increased promotion rate Certificate of Recognition x
d. Increased completion rate and appearances x
Adjusted SIP 2011-2013 ANNUAL IMPROVEMENT PLAN 2013: Quality and Relevance
MEANS OF TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
VERIFICATION J F M A M J J A S O N D J F M A M J J A S O N
e. Increased graduation rate x
f. increased cohort survival rate x
PPAs:
1. Feeding Program 105T
2. Tracking System 200
3. Project BEST
Tasks:
1. Implement Feeding Program Form 1 x x x x x
2. Implement Tracking System x x x x x x x x x x x
3. Implement Project BEST x x x x x x
Precondition:
100% implementation of Programs
7. RESEARCH
Improved research output of the school
PPA: School Based Action Research Program
Tasks: Efficiency Indicators
a. Orient teachers x x x
b. Develop action research based on NAT LLS of Low x x x x
MPS subjects
c. Implement interventions x x x x x x x
d. Evaluate results x x
e. Make/submit success stories x x x x
Precondition: Approved Action Reasearch Proposals
Prepared:
ANALIE V. BUHAYAN
Principal I
Page 1 of 8
TS SOURCES
Q4 OTHER
LGU PTA DEP.ED TOTAL
D S
1.4T 1.4T
1T 1T
1T 1T
Page 2 of 8
TS SOURCES
Q4 OTHER
LGU PTA DEP.ED TOTAL
D S
500 1T 1T
Page 3 of 8
TS SOURCES
Q4 OTHER
LGU PTA DEP.ED TOTAL
D S
200 1T 1T 2T
Page 4 of 8
TS SOURCES
Q4 OTHER
LGU PTA DEP.ED TOTAL
D S
300 300
Page 5 of 8
TS SOURCES
Q4 OTHER
LGU PTA DEP.ED TOTAL
D S
300 300
40t
30t
500 500
3t 9t
Page 6 of 8
TS SOURCES
Q4 OTHER
LGU PTA DEP.ED TOTAL
D S
4T 4T
2T 2T
300 300
30T 30T
90t
20t
Page 7 of 8
TS SOURCES
Q4 OTHER
LGU PTA DEP.ED TOTAL
D S
50t
2T 2T
Page 8 of 8
TS SOURCES
Q4 OTHER
LGU PTA DEP.ED TOTAL
D S
105T 105T
200 200
RESOURCE R
Q1 Q2
J F M A M
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4
LGU PTA DEP.ED OTHERS
PROGRAMS/PROJECTS/ACTIVITIES
TOTAL
J J A S O N D
MEANS
OF TIME FRAME
Q1 Q2 Q3 Q4 Q1
VERIFICA J F M A M J J A S O N D J
TION
RESOURCE REQUIREMENTS SOURCES
Q1 Q2 Q3 Q4
LGU PTA DEP.ED
F M A M J J A S O N D
SOURCES
LGU PTA DEP.ED
MEANS
SOURCES OF TIME FRAME
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
OTHERS TOTAL VERIFICA J F M A M J J A S
TION
MEANS
SOURCES OF TIME FRAME
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
OTHERS TOTAL VERIFICA J F M A M J J A S
TION
RESOURCE REQUIREMENTS
Q4 Q1 Q2 Q3 Q4
O N D J F M A M J J A S O N
RESOURCE REQUIREMENTS
Q4 Q1 Q2 Q3 Q4
O N D J F M A M J J A S O N
MEANS
SOURCES OF TIME
Q4
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2
D
DEP.ED OTHERS TOTAL VERIFICA J F M A M
TION
MEANS
SOURCES OF TIME
Q4
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2
D
DEP.ED OTHERS TOTAL VERIFICA J F M A M
TION
TIME FRAME RESOURCE REQUIREMENTS
Q2 Q3 Q4 Q1 Q2 Q3
J J A S O N D J F M A M J J
TIME FRAME RESOURCE REQUIREMENTS
Q2 Q3 Q4 Q1 Q2 Q3
J J A S O N D J F M A M J J
MEANS
QUIREMENTS SOURCES OF
Q3 Q4
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES Q1
A S O N D
DEP.ED OTHERS TOTAL VERIFICA J
TION
MEANS
QUIREMENTS SOURCES OF
Q3 Q4
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES Q1
A S O N D
DEP.ED OTHERS TOTAL VERIFICA J
TION
TIME FRAME
Q1 Q2 Q3 Q4 Q1
F M A M J J A S O N D J F M
TIME FRAME
Q1 Q2 Q3 Q4 Q1
F M A M J J A S O N D J F M
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4
LGU PTA DEP.ED OTHERS TOTAL
A M J J A S O N D
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4
LGU PTA DEP.ED OTHERS TOTAL
A M J J A S O N D
MEANS
OF TIME FRAME
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4
VERIFICA J F M A M J J A S O N
TION
MEANS
OF TIME FRAME
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4
VERIFICA J F M A M J J A S O N
TION
RESOURCE REQUIREMENTS
Q4 Q1 Q2 Q3 Q4
LGU
D J F M A M J J A S O N D
RESOURCE REQUIREMENTS
Q4 Q1 Q2 Q3 Q4
LGU
D J F M A M J J A S O N D
MEANS
SOURCES OF TIME FRAME
PTA PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
DEP.ED OTHERS TOTAL VERIFICA J F M A M J J
TION
MEANS
SOURCES OF TIME FRAME
PTA PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
DEP.ED OTHERS TOTAL VERIFICA J F M A M J J
TION
RAME RESOURCE REQUIREMENTS
Q3 Q4 Q1 Q2 Q3
A S O N D J F M A M J J A S
RAME RESOURCE REQUIREMENTS
Q3 Q4 Q1 Q2 Q3
A S O N D J F M A M J J A S
MEANS
SOURCES OF
Q4
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES Q1
O N D
DEP.ED OTHERS TOTAL VERIFICA J F M
TION
MEANS
SOURCES OF
Q4
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES Q1
O N D
DEP.ED OTHERS TOTAL VERIFICA J F M
TION
TIME FRAME RESOURCE R
Q2 Q3 Q4 Q1 Q2
A M J J A S O N D J F M A M
TIME FRAME RESOURCE R
Q2 Q3 Q4 Q1 Q2
A M J J A S O N D J F M A M
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4
LGU PTA DEP.ED OTHERS
PROGRAMS/PROJECTS/ACTIVITIES
TOTAL
J J A S O N D
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4
LGU PTA DEP.ED OTHERS
PROGRAMS/PROJECTS/ACTIVITIES
TOTAL
J J A S O N D
MEANS
OF TIME FRAME
Q1 Q2 Q3 Q4 Q1
VERIFICA J F M A M J J A S O N D J
TION
MEANS
OF TIME FRAME
Q1 Q2 Q3 Q4 Q1
VERIFICA J F M A M J J A S O N D J
TION
RESOURCE REQUIREMENTS SOURCES
Q1 Q2 Q3 Q4
LGU PTA DEP.ED
F M A M J J A S O N D
RESOURCE REQUIREMENTS SOURCES
Q1 Q2 Q3 Q4
LGU PTA DEP.ED
F M A M J J A S O N D
MEANS
SOURCES OF TIME FRAME
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
OTHERS TOTAL VERIFICA J F M A M J J A S
TION
MEANS
SOURCES OF TIME FRAME
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
OTHERS TOTAL VERIFICA J F M A M J J A S
TION
RESOURCE REQUIREMENTS
Q4 Q1 Q2 Q3 Q4
O N D J F M A M J J A S O N
RESOURCE REQUIREMENTS
Q4 Q1 Q2 Q3 Q4
O N D J F M A M J J A S O N
MEANS
SOURCES OF TIME
Q4
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2
D
DEP.ED OTHERS TOTAL VERIFICA J F M A M
TION
MEANS
SOURCES OF TIME
Q4
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2
D
DEP.ED OTHERS TOTAL VERIFICA J F M A M
TION
TIME FRAME RESOURCE REQUIREMENTS
Q2 Q3 Q4 Q1 Q2 Q3
J J A S O N D J F M A M J J
TIME FRAME RESOURCE REQUIREMENTS
Q2 Q3 Q4 Q1 Q2 Q3
J J A S O N D J F M A M J J
MEANS
QUIREMENTS SOURCES OF
Q3 Q4
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES Q1
A S O N D
DEP.ED OTHERS TOTAL VERIFICA J
TION
MEANS
QUIREMENTS SOURCES OF
Q3 Q4
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES Q1
A S O N D
DEP.ED OTHERS TOTAL VERIFICA J
TION
TIME FRAME
Q1 Q2 Q3 Q4 Q1
F M A M J J A S O N D J F M
TIME FRAME
Q1 Q2 Q3 Q4 Q1
F M A M J J A S O N D J F M
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4
LGU PTA DEP.ED OTHERS TOTAL
A M J J A S O N D
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4
LGU PTA DEP.ED OTHERS TOTAL
A M J J A S O N D
MEANS
OF TIME FRAME
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4
VERIFICA J F M A M J J A S O N
TION
MEANS
OF TIME FRAME
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4
VERIFICA J F M A M J J A S O N
TION
RESOURCE REQUIREMENTS
Q4 Q1 Q2 Q3 Q4
LGU
D J F M A M J J A S O N D
RESOURCE REQUIREMENTS
Q4 Q1 Q2 Q3 Q4
LGU
D J F M A M J J A S O N D
MEANS
SOURCES OF TIME FRAME
PTA PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
DEP.ED OTHERS TOTAL VERIFICA J F M A M J J
TION
MEANS
SOURCES OF TIME FRAME
PTA PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
DEP.ED OTHERS TOTAL VERIFICA J F M A M J J
TION
RAME RESOURCE REQUIREMENTS
Q3 Q4 Q1 Q2 Q3
A S O N D J F M A M J J A S
RAME RESOURCE REQUIREMENTS
Q3 Q4 Q1 Q2 Q3
A S O N D J F M A M J J A S
MEANS
SOURCES OF
Q4
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES Q1
O N D
DEP.ED OTHERS TOTAL VERIFICA J F M
TION
MEANS
SOURCES OF
Q4
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES Q1
O N D
DEP.ED OTHERS TOTAL VERIFICA J F M
TION
TIME FRAME RESOURCE R
Q2 Q3 Q4 Q1 Q2
A M J J A S O N D J F M A M
TIME FRAME RESOURCE R
Q2 Q3 Q4 Q1 Q2
A M J J A S O N D J F M A M
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4
LGU PTA DEP.ED OTHERS
PROGRAMS/PROJECTS/ACTIVITIES
TOTAL
J J A S O N D
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4
LGU PTA DEP.ED OTHERS
PROGRAMS/PROJECTS/ACTIVITIES
TOTAL
J J A S O N D
MEANS
OF TIME FRAME
Q1 Q2 Q3 Q4 Q1
VERIFICA J F M A M J J A S O N D J
TION
MEANS
OF TIME FRAME
Q1 Q2 Q3 Q4 Q1
VERIFICA J F M A M J J A S O N D J
TION
RESOURCE REQUIREMENTS SOURCES
Q1 Q2 Q3 Q4
LGU PTA DEP.ED
F M A M J J A S O N D
RESOURCE REQUIREMENTS SOURCES
Q1 Q2 Q3 Q4
LGU PTA DEP.ED
F M A M J J A S O N D
MEANS
SOURCES OF TIME FRAME
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
OTHERS TOTAL VERIFICA J F M A M J J A S
TION
MEANS
SOURCES OF TIME FRAME
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
OTHERS TOTAL VERIFICA J F M A M J J A S
TION
RESOURCE REQUIREMENTS
Q4 Q1 Q2 Q3 Q4
O N D J F M A M J J A S O N
RESOURCE REQUIREMENTS
Q4 Q1 Q2 Q3 Q4
O N D J F M A M J J A S O N
MEANS
SOURCES OF TIME
Q4
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2
D
DEP.ED OTHERS TOTAL VERIFICA J F M A M
TION
MEANS
SOURCES OF TIME
Q4
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2
D
DEP.ED OTHERS TOTAL VERIFICA J F M A M
TION
TIME FRAME RESOURCE REQUIREMENTS
Q2 Q3 Q4 Q1 Q2 Q3
J J A S O N D J F M A M J J
TIME FRAME RESOURCE REQUIREMENTS
Q2 Q3 Q4 Q1 Q2 Q3
J J A S O N D J F M A M J J
MEANS
QUIREMENTS SOURCES OF
Q3 Q4
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES Q1
A S O N D
DEP.ED OTHERS TOTAL VERIFICA J
TION
MEANS
QUIREMENTS SOURCES OF
Q3 Q4
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES Q1
A S O N D
DEP.ED OTHERS TOTAL VERIFICA J
TION
TIME FRAME
Q1 Q2 Q3 Q4 Q1
F M A M J J A S O N D J F M
TIME FRAME
Q1 Q2 Q3 Q4 Q1
F M A M J J A S O N D J F M
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4
LGU PTA DEP.ED OTHERS TOTAL
A M J J A S O N D
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4
LGU PTA DEP.ED OTHERS TOTAL
A M J J A S O N D
MEANS
OF TIME FRAME
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4
VERIFICA J F M A M J J A S O N
TION
MEANS
OF TIME FRAME
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4
VERIFICA J F M A M J J A S O N
TION
RESOURCE REQUIREMENTS
Q4 Q1 Q2 Q3 Q4
LGU
D J F M A M J J A S O N D
RESOURCE REQUIREMENTS
Q4 Q1 Q2 Q3 Q4
LGU
D J F M A M J J A S O N D
MEANS
SOURCES OF TIME FRAME
PTA PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
DEP.ED OTHERS TOTAL VERIFICA J F M A M J J
TION
MEANS
SOURCES OF TIME FRAME
PTA PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
DEP.ED OTHERS TOTAL VERIFICA J F M A M J J
TION
RAME RESOURCE REQUIREMENTS
Q3 Q4 Q1 Q2 Q3
A S O N D J F M A M J J A S
RAME RESOURCE REQUIREMENTS
Q3 Q4 Q1 Q2 Q3
A S O N D J F M A M J J A S
MEANS
SOURCES OF
Q4
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES Q1
O N D
DEP.ED OTHERS TOTAL VERIFICA J F M
TION
MEANS
SOURCES OF
Q4
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES Q1
O N D
DEP.ED OTHERS TOTAL VERIFICA J F M
TION
TIME FRAME RESOURCE R
Q2 Q3 Q4 Q1 Q2
A M J J A S O N D J F M A M
TIME FRAME RESOURCE R
Q2 Q3 Q4 Q1 Q2
A M J J A S O N D J F M A M
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4
LGU PTA DEP.ED OTHERS
PROGRAMS/PROJECTS/ACTIVITIES
TOTAL
J J A S O N D
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4
LGU PTA DEP.ED OTHERS
PROGRAMS/PROJECTS/ACTIVITIES
TOTAL
J J A S O N D
MEANS
OF TIME FRAME
Q1 Q2 Q3 Q4 Q1
VERIFICA J F M A M J J A S O N D J
TION
MEANS
OF TIME FRAME
Q1 Q2 Q3 Q4 Q1
VERIFICA J F M A M J J A S O N D J
TION
RESOURCE REQUIREMENTS SOURCES
Q1 Q2 Q3 Q4
LGU PTA DEP.ED
F M A M J J A S O N D
RESOURCE REQUIREMENTS SOURCES
Q1 Q2 Q3 Q4
LGU PTA DEP.ED
F M A M J J A S O N D
MEANS
SOURCES OF TIME FRAME
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
OTHERS TOTAL VERIFICA J F M A M J J A S
TION
MEANS
SOURCES OF TIME FRAME
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
OTHERS TOTAL VERIFICA J F M A M J J A S
TION
RESOURCE REQUIREMENTS
Q4 Q1 Q2 Q3 Q4
O N D J F M A M J J A S O N
RESOURCE REQUIREMENTS
Q4 Q1 Q2 Q3 Q4
O N D J F M A M J J A S O N
MEANS
SOURCES OF TIME
Q4
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2
D
DEP.ED OTHERS TOTAL VERIFICA J F M A M
TION
MEANS
SOURCES OF TIME
Q4
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2
D
DEP.ED OTHERS TOTAL VERIFICA J F M A M
TION
TIME FRAME RESOURCE REQUIREMENTS
Q2 Q3 Q4 Q1 Q2 Q3
J J A S O N D J F M A M J J
TIME FRAME RESOURCE REQUIREMENTS
Q2 Q3 Q4 Q1 Q2 Q3
J J A S O N D J F M A M J J
MEANS
QUIREMENTS SOURCES OF
Q3 Q4
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES Q1
A S O N D
DEP.ED OTHERS TOTAL VERIFICA J
TION
MEANS
QUIREMENTS SOURCES OF
Q3 Q4
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES Q1
A S O N D
DEP.ED OTHERS TOTAL VERIFICA J
TION
TIME FRAME
Q1 Q2 Q3 Q4 Q1
F M A M J J A S O N D J F M
TIME FRAME
Q1 Q2 Q3 Q4 Q1
F M A M J J A S O N D J F M
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4
LGU PTA DEP.ED OTHERS TOTAL
A M J J A S O N D
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4
LGU PTA DEP.ED OTHERS TOTAL
A M J J A S O N D
MEANS
OF TIME FRAME
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4
VERIFICA J F M A M J J A S O N
TION
MEANS
OF TIME FRAME
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4
VERIFICA J F M A M J J A S O N
TION
RESOURCE REQUIREMENTS
Q4 Q1 Q2 Q3 Q4
LGU
D J F M A M J J A S O N D
RESOURCE REQUIREMENTS
Q4 Q1 Q2 Q3 Q4
LGU
D J F M A M J J A S O N D
MEANS
SOURCES OF TIME FRAME
PTA PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
DEP.ED OTHERS TOTAL VERIFICA J F M A M J J
TION
MEANS
SOURCES OF TIME FRAME
PTA PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3
DEP.ED OTHERS TOTAL VERIFICA J F M A M J J
TION
RAME RESOURCE REQUIREMENTS
Q3 Q4 Q1 Q2 Q3
A S O N D J F M A M J J A S
RAME RESOURCE REQUIREMENTS
Q3 Q4 Q1 Q2 Q3
A S O N D J F M A M J J A S
MEANS
SOURCES OF
Q4
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES Q1
O N D
DEP.ED OTHERS TOTAL VERIFICA J F M
TION
MEANS
SOURCES OF
Q4
LGU PTA PROGRAMS/PROJECTS/ACTIVITIES Q1
O N D
DEP.ED OTHERS TOTAL VERIFICA J F M
TION
TIME FRAME RESOURCE R
Q2 Q3 Q4 Q1 Q2
A M J J A S O N D J F M A M
TIME FRAME RESOURCE R
Q2 Q3 Q4 Q1 Q2
A M J J A S O N D J F M A M
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4
LGU PTA DEP.ED OTHERS
PROGRAMS/PROJECTS/ACTIVITIES
TOTAL
J J A S O N D
RESOURCE REQUIREMENTS SOURCES
Q2 Q3 Q4
LGU PTA DEP.ED OTHERS
PROGRAMS/PROJECTS/ACTIVITIES
TOTAL
J J A S O N D
MEANS
OF TIME FRAME
Q1 Q2 Q3 Q4 Q1
VERIFICA J F M A M J J A S O N D J
TION
MEANS
OF TIME FRAME
Q1 Q2 Q3 Q4 Q1
VERIFICA J F M A M J J A S O N D J
TION
RESOURCE REQUIREMENTS SOURCES
Q1 Q2 Q3 Q4
LGU PTA DEP.ED
F M A M J J A S O N D
RESOURCE REQUIREMENTS SOURCES
Q1 Q2 Q3 Q4
LGU PTA DEP.ED
F M A M J J A S O N D
SOURCES
OTHERS TOTAL
SOURCES
OTHERS TOTAL
COLONIA DIVINA INTEG
School Improvement Plan 2014-16
GOAL AND OBJECTIVES CHART: Manag
NARRATIVE SUMMARY
Purpose 3 : MANAGEMENT
OF EDUCATIONAL SERVICES
Improved SBM practices to ensure continuous
school improvement
CONTRIBUTORY FACTORS
A.Stakeholders' Participation
A.1. Strengthened stakeholders participation in
school programs, projects and activities
PAP : Conduct of PTA Summit, Project BEST, Organization
of SGC, PTA, SPG and Teacher Organization,
Project BEST
Tasks:
1.Involve the internal and external stakeholders
in any school development.
2.Present to them the school programs, projects
and activities found in the School
Improvement Plan.
3.Engage them in planning, revision and
implementation of the improvement plan.
4.Monitor the implementation.
5.Evaluate the result.
Precondition:
Stakeholders give ample time for their childrens
education. Principal has established harmonious relationship
with the community
A.1.1. Organized rewards and incentives system
for students/pupils, teachers and parents
PAP: Creation of Incentives and Rewards Committee
Strengthening I and R Syatem
Tasks:
1.Identify potential members of the Incentives and Rewards
System.
2.Organize them.
3.Orient them of their functions.
4.Let them formulate guidelines and rules to follow.
5.Have them made plans.
6.Activate functionality.
Precondition:
Existing system is enhanced.
B. Instructional Supervision
B.1. Improved school head's instructional supervision
to teachers
PAP: Quality Management and Monitoring (QMM);
Technical Assistance (TA)
Tasks:
1.Reorient the teachers on CB-PAST -based
instructional supervision
2.Hold regular feedbacking.
3.Follow up.
4. Recognize improvement.
Precondition:
Teachers are all submissive.
PAP: Intensified checking of Lesson Plans
Tasks:
1.Remind teachers of the importance of lesson plans.
2.Provide each one with checklist of lesson plan.
3.Provide them , too, with monitoring sheet of LC
taken daily.
4.Monitor compliance.
5.Evaluate the effect of the lesson to the teaching-
learning process.
6.Give feedback and recommendations.
Precondition:
The teachers submit their Lesson plan book to the office
either at p.m. before going home or a.m.before classes begin.
B.2. Improved PSDS' instructional supervision
of teachers
PAP: Quality Management and Monitoring (QMM);
Technical Assistance (TA)
Tasks:
1. Keep the teachers updated on the educational issues
transpired by the division office.
2. Always follow instruction from the superiors.
3. Keep in touch with teachers for their technical
assistance needs.
3. Remind them to be always prepared and ready.
Precondition:
The PSDS has a regular QMM/TA schedule for the school.
B.3. Improved school EPSs' instructional supervision
of teachers
PAP: Quality Management and Monitoring (QMM);
Technical Assistance (TA)
Tasks:
1. Keep the teachers updated on the educational issues
transpired by the division office.
Tasks:
1.Impose warnings and precautionary measures.
2.Implement school rules and regulations.
3.Do the routinely checkup of facilities.
4. Have a school/barangay blotter report.
5.Immediately call the attention of all involved.
6.Settle the matter and resolve.
7.For recurrent acts by students and pupils,
impose suspension accordingly.
Precondition:
Concerns submit themselves for settlement; admit faults
when guilty and swear avoidance for recurrence
of wrongdoings.
E. Management and Administration
E.1. Improved provision of non-teaching personnel
to support management and administration
PPA : Designation of teachers to perform non-teaching
functions
Tasks:
1. Select potential teachers.
2. Designate and train teachers to their add-on assignments.
3. Seek conformity letting them sign the designations.
4. Trust but ask them.
5. Define their function in he office.
Precondition:
Teacher assigned accept designation.
E.2. Leveled up SBM practice
PPA: Proper implementation of SBM
Tasks:
1. Always follow the SBM way of managing the school.
2. Keep track of the implementation of the programs,
projects and activities.
3. Keep all the documents of PPAs intact and updated.
4. Make a monthly school SBM assessment by stakeholders.
5. Keep in touch with the Division Office for update
of assessment.
6. Level up the practices.
Precondition:
Every stakeholder gets involved.
E.2.1. Improved promtpness of submission of
reports
E.2.2. Improved organization of documents
in the office
PAP : Aquisition of 1 unit Steel Cabinet
Tasks:
1. Send request letter to the SDS.
2. Follow-up
PAPs:
a. National Greening Program
b. Barangay Fiesta
c. Linis Walis
d. Drug Abuse Prevention Campaign
Tasks:
1.Keep in touch with the barangay/city authorities.
2.Update with their activities and schedule.
3.Get involved.
4.Document involvement.
Precondition:
Classes are not significantly disrupted.
COLONIA DIVINA INTEGRATED SCHOOL
tinuous
Prepared by:
ANALIE V. BUHAYAN
Principal I
ional Services
MEANS OF VERIFICATION ASSUMPTIONS AND RISKS
Page 1 of 8
Observation Forms
CB PAST forms Records of TA
Supervisory report
LC log Teachers acknowledge the
importance of daily LC log
Page 2 of 8
Page 3 of 8
Designation
with conformity
SBM Assessment
Results
Answered survey forms Childrens self-confidence
Validated consolidated is boosted
results
Page 6 of 8
Time card Risk:
Attendance Teacher has become indifferent
Checklist Strict and consistent
implementation make
sarisfactory compliance.
Delivery reciepts
Inventory reports
Pictures Participation in community
Page 7 of 8
Page 8 of 8
COLONIA DIVINA INTEGRATED SCHOOL
School Improvement Plan 2014-16
3-YEAR MASTER PLAN: Management of Educational Services
MEANS OF PHYSICAL TARGETS FINANCIAL TARGETS
PROGRAMS/PROJECTS/ACTIVITIES INDICATOR (Output Level)
VERIFICATION Year 1 Year 2 Year 3 Year 1 Year 2
A.Stakeholders' Participation
A.1. Strengthened stakeholders participation in Increased number of stakeholder Attendance Records
school programs, projects and activities participation by 10% annually
PPA : Conduct of PTA Summit, Project BEST, Organization in theprograms, projects x x x
of SGC, PTA, SPG and Teacher Organization, and activities
Project BEST
Brigada Eskwela 68% 76% 85% 600 1T
Parent-Teacher Conference 73% 80% 85% 0 500
PTA. Gen Assembly 77% 80% 85% 500 1T
Homeroom PTA Meeting 75% 85% 85% 300 300
SGC Meeting 65% 75% 85% 0 8T
Tasks:
1.Involve the internal and external stakeholders
in any school development.
2.Present to them the school programs, projects
and activities found in the School
Improvement Plan.
3.Engage them in planning, revision and
implementation of the improvement plan.
4.Monitor the implementation.
5.Evaluate the result.
Precondition:
Stakeholders give ample time for their childrens
education. Principal has established harmonious relationship
with the community
A.1.1. Organized rewards and incentives system Awards and incentives NAT/DAT results
for students/pupils, teachers and parents provided to deserving teachers, Certificates
PPA: Creation of Incentives and Rewards Committee parents, pupils and students Phil-IRI x x x
Strengthening I and R Syatem and other stakeholders DepEd Forms
10 MPS increase in Standardized Test Teacher PTA Records 0 1 2 200 300
75 & above MPS in NAT, P/S 0 2 3 500 1.5T
First placer in higher academic 1 2 3 500 1T
competition (Div. Regional, etc) P/S
0 Non- reader Adviser 0 1 2 250 250
0 Drop-out Adviser 2 3 5 500 750
Outstanding parent 6 8 10 200 300
Tasks:
1.Identify potential members of the Incentives
Page 1 of 10
MEANS PHYSICAL TARGETS FINANCIAL TARGETS
PROGRAMS/PROJECTS/ACTIVITIES INDICATOR (Output Level) Year 1 Year 2 Year 3 Year 1 Year 2
VERIFICATION
and Rewards System.
2.Organize them.
3.Orient them of their functions.
4.Let them formulate guidelines and rules to follow.
5.Have them made plans.
6.Activate functionality.
Precondition:
Existing system is enhanced.
B. Instructional Supervision
B.1. Improved school head's instructional supervision
to teachers
PPA: Quality Management and Monitoring (QMM); Achieved at least 20 Observation Forms x x x
Technical Assistance (TA) observations per month CB PAST forms Records
Number of Observation for a total of 200 per year of TA 60 130 200 100 100
Instructional Supervision Achieved at least supervisions Supervisory report 100 180 300 200 200
Tasks: per month for a total
1.Reorient the teachers on CB-PAST -based of 300 observations per year
instructional supervision
2.Hold regular feedbacking.
3.Follow up.
4. Recognize improvement.
Precondition:
Teachers are all submissive.
PPA: Intensified checking of Lesson Plans Achieved 100 percent checking LP Monitoring x x x 50 50
% of Lesson plan checked daily of daily lesson plans
Tasks:
1.Remind teachers of the importance of lesson plans.
2.Provide each one with checklist of lesson plan.
3.Provide them , too, with monitoring sheet of LC
taken daily.
4.Monitor compliance.
5.Evaluate the effect of the lesson to the teaching-
learning process.
6.Give feedback and recommendations.
Precondition:
The teachers submit their Lesson plan book to the office
either at p.m. before going home or a.m.before classes begin.
B.2. Improved PSDS' instructional supervision
of teachers Achieved at least 2 Observation Forms
PPA: Quality Management and Monitoring (QMM); observation per month for a total CB PAST forms Records x x x
Technical Assistance (TA) of 20 observations per year of TA
Number of Class Observation 6 8 20 50 50
Page 2 of 10
Page 5 of 10
Page 7 of 10
Pag 10 of 10
Prepared by:
ANALIE V. BUHAYAN
Principal I
TARGETS IMPORTANT Efficiency indicators
Year 3 ASSUMPTION improve.
Parent continue to
actively support
the school
1T
500 Parents have prio-
1T rities other then
300 the school
10T Parents/stakehol-
ders has unfroseen
concerns for prog-
rams & projects
Parents continue
to support the sch.
500
1.25T
400
ARGETS IMPORTANT
Year 3 ASSUMPTIONS
100
200
50
Teachers acknowl.
the importance
of daily LC log
Teachers sustain
compliance.
IS and TA from
EPSs improve
teacher's
performance
50
ARGETS IMPORTANT
Year 3 ASSUMPTIONS
Parents involved
become receptive
and compliant More programs and projects
Risk: Parents/stake- are implemented.
holders become
500 indiferent
100
100 Strengthened
stakeholders part- More programs and projects
icipation are implemented
200
IMPORTANT
ARGETS ASSUMPTION
Year 3 ASSUMPTIONS
Willingness of
teachers to receive
and accept tech-
nical assistance
Gulayan yields
2T augment
5T feeding supply.
Availability of
teachers LP's
School and com-
munity partnership
5T develop/sustained
35T Risk: Monitoring
10T schedule if followed
10T stakeholders has
unforseen concerns
for programs and
Projects
ARGETS IMPORTANT
Year 3 ASSUMPTIONS
Stakeholders
support/
participation
2T Childrens self-
confidence is boosted
Improved School
Procurement
Process
2T
Continuous
150 improvement
is noted without
stealing
ARGETS IMPORTANT
Year 3 ASSUMPTIONS
and vandalism
Everyone in school is
vigilant.
School continuously
improves.
Risks:
No budget/time
available
Teachers/staff &
Pupils compliance/
acceptance
5T
15T
IMPORTANT
ARGETS ASSUMPTION
Year 3 ASSUMPTIONS
Teachers, pupils,
students and parents
are concern about
0 environmental
protection
50T
Teacher acceptance/cooperation
ARGETS IMPORTANT
Year 3 ASSUMPTIONS
100
700
Teacher has become
indifferent
Strict and consistent
implementation make
sarisfactory compliance.
ARGETS IMPORTANT
Year 3 ASSUMPTIONS
Approved SIP/AIP
ARGETS IMPORTANT
Year 3 ASSUMPTIONS
from the experts
800
COLONIA DIVINA INTEGRATED SCHOOL
School Improvement Plan 2014-16
ANNUAL IMPROVEMENT PLAN 2015: Governance
MEANS OF TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
VERIFICATION J F M A M J J A S O N D J F M A M J J A S O
A.Stakeholders' Participation
A.1. Strengthened stakeholders participation in Attendance Records
school programs, projects and activities
PPA : Conduct of PTA Summit, Project BEST, Organization x x x x
functions
1 Office Clerk
1 Disbursing Officer
1 Bookkeepper
1 Record Custodian
1 EBEIS Coordinator
E.2. Leveled up SBM practice
PPA: Proper implementation of SBM Memorandum x x x x x x x x x x x xx
100% Level I SBM Assessment 5T
50% Level II results 10T 10T
E.2.1. Improved promtpness of submission of Answered survey
reports forms
E.2.2. Improved organization of documents Validated
in the office consolidated results
PPA : Aquisition of 1 unit Steel Cabinet * * * 14T
1 Organization of Documents in the Office
PPA: Supply the office with materials x x 20T 20T
1. Make purchase request. x
1T
500 500
1T
100 300
3T 8T
300 300
1.5T 1.5T
300 300
250 250
750 750
300 300
100 100
200 200
50 50
20 50 50 50
200 200
2T 2T
4T 4T
150 300 300
100 100
5T 5T
20T 20T
14T 14T
40T 40T
1T 2T 3T
COLONIA DIVINA INTEGRATED SCHOOL
School Improvement Plan 2014-16
ANNUAL IMPROVEMENT PLAN 2014: Management of Educational Services
MEANS OF TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
VERIFICATION J F M A M J J A S O N D J F M A M J J A S O
A.Stakeholders' Participation
A.1. Strengthened stakeholders participation in Attendance Records
school programs, projects and activities
PPA : Conduct of PTA Summit, Project BEST, Organization * * * *
of SGC, PTA, SPG and Teacher Organization,
Project BEST
Brigada Eskwela * * * * * * * * 1T
Parent-Teacher Conference * * * *
PTA. Gen Assembly * * 500 500
Homeroom PTA Meeting * * * * 50 50 100
SGC Meeting 3T 2T
Tasks:
1.Involve the internal and external stakeholders
in any school development.
2.Present to them the school programs, projects
and activities found in the School
Improvement Plan.
3.Engage them in planning, revision and
implementation of the improvement plan.
4.Monitor the implementation.
5.Evaluate the result.
Precondition:
Stakeholders give ample time for their childrens
education. Principal has established harmonious relationship
with the community
A.1.1. Organized rewards and incentives system NAT results
for students/pupils, teachers and parents Certificates *
PPA: Creation of Incentives and Rewards Committee Phil-IRI
Strengthening I and R Syatem DepEd Forms
1 10 MPS increase in Standardized Test Teacher PTA Records * 300
2 75 & above MPS in NAT, P/S * * 1.5T
2 First placer in higher academic * 300
competition (Div. Regional, etc) P/S
1 0 Non- reader Adviser * 250
3 0 Drop-out Adviser * 750
8 Outstanding parent * 300
Tasks:
1.Identify potential members of the Incentives * * * *
MEANS OF TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
VERIFICATION J F M A M J J A S O N D J F M A M J J A S O
and Rewards System. * * * *
2.Organize them. * *
3.Orient them of their functions. * *
4.Let them formulate guidelines and rules to follow. * *
5.Have them made plans. * *
6.Activate functionality. * *
Precondition:
Existing system is enhanced.
B. Instructional Supervision
B.1. Improved school head's instructional supervision
to teachers
PPA: Quality Management and Monitoring (QMM); Observation Forms
Technical Assistance (TA) CB PAST forms
130 Number of Observation Records of TA * * * * * * * * * * * * 100
180 Instructional Supervision Supervisory report * * * * * * * * * * * * 200
Tasks:
1.Reorient the teachers on CB-PAST -based * *
instructional supervision * *
2.Hold regular feedbacking. * * * * * * *
3.Follow up. * * * * * * *
4. Recognize improvement. * * * * * * *
Precondition:
Teachers are all submissive.
PPA: Intensified checking of Lesson Plans LP Monitoring * * * * * * * * * * * * 50
% of Lesson plan checked daily
Tasks:
1.Remind teachers of the importance of lesson plans. *
2.Provide each one with checklist of lesson plan. *
3.Provide them , too, with monitoring sheet of LC *
taken daily. *
4.Monitor compliance. * * * * * * *
5.Evaluate the effect of the lesson to the teaching- * * * * * * *
learning process. * * * * * * *
6.Give feedback and recommendations. * * * * * * *
Precondition:
The teachers submit their Lesson plan book to the office
either at p.m. before going home or a.m.before classes begin.
B.2. Improved PSDS' instructional supervision
of teachers Observation Forms
PPA: Quality Management and Monitoring (QMM); CB PAST forms Records
Technical Assistance (TA) of TA
8 Number of Class Observation 6
Page 10 of 10
Prepared by:
ANALIE V. BUHAYAN
Principal I
SOURCES
Q4 OTHER
LGU PTA DEP.ED TOTAL
N D S
1T
500 500
1T
100 300
3T 8T
300 300
1.5T 1.5T
300 300
250 250
750 750
300 300
Page 1 of 10
SOURCES
Q4 OTHER
LGU PTA DEP.ED TOTAL
N D S
100 100
200 200
50 50
20 50 50 50
Page 2 of 10
SOURCES
Q4 OTHER
LGU PTA DEP.ED TOTAL
N D S
50 50
Page 3 of 10
SOURCES
Q4 OTHER
LGU PTA DEP.ED TOTAL
N D S
2T 2T
4T 4T
150 300 300
Page 4 of 10
SOURCES
Q4 OTHER
LGU PTA DEP.ED TOTAL
N D S
100 100
Page 5 of 10
SOURCES
Q4 OTHER
LGU PTA DEP.ED TOTAL
N D S
5T 5T
20T 20T
Page 6 of 10
SOURCES
Q4 OTHER
LGU PTA DEP.ED TOTAL
N D S
14T 14T
40T 40T
Page 7 of 10
SOURCES
Q4 OTHER
LGU PTA DEP.ED TOTAL
N D S
Page 8 of 10
SOURCES
Q4 OTHER
LGU PTA DEP.ED TOTAL
S
N D
Page 9 of 10
SOURCES
Q4 OTHER
LGU PTA DEP.ED TOTAL
N D S
1T 2T 3T
Page 10 of 10
COLONIA DIVINA INTEGRATED SCHOOL
School Improvement Plan 2014-16
GOAL AND OBJECTIVES CHART: Management of Educational Services
NARRATIVE SUMMARY OBJECTIVELY VERIFIABLE INDICATOR
Purpose 3 : MANAGEMENT
OF EDUCATIONAL SERVICES
Improved SBM practices to ensure continuous
school improvement
CONTRIBUTORY FACTORS
A.Stakeholders' Participation
A.1. Strengthened stakeholders participation in Increased number of stakeholder participation by 10% annually
school programs, projects and activities in the following programs, projects and activities
PAP : Conduct of PTA Summit, Project BEST, Organization Activities 2014 2015 2016
of SGC, PTA, SPG and Teacher Organization, Brigada Eskwela 68% 76% 85%
Project BEST Parent-Teacher Conference 73% 80% 85%
Tasks: PTA. Gen Assembly 77% 80% 85%
1.Involve the internal and external stakeholders Homeroom PTA Meeting 75% 85% 85%
in any school development. SGC Meeting 65% 75% 85%
2.Present to them the school programs, projects
and activities found in the School
Improvement Plan.
3.Engage them in planning, revision and
implementation of the improvement plan.
4.Monitor the implementation.
5.Evaluate the result.
Precondition:
Stakeholders give ample time for their childrens
education. Principal has established harmonious relationship
with the community
A.1.1. Organized rewards and incentives system Awards and incentives provided to deserving teachers,
for students/pupils, teachers and parents parents, pupils and students and other stakeholders
PAP: Creation of Incentives and Rewards Committee Particulars 2014 2015 2016
Strengthening I and R Syatem 10 MPS increase in Standardized Test Teacher 0 1 2
Tasks: 75 & above MPS in NAT, P/S 0 2 3
1.Identify potential members of the Incentives and Rewards First placer in higher academic 1 2 3
System. competition (Div. Regional, etc) P/S
2.Organize them. 0 Non- reader Adviser 0 1 2
3.Orient them of their functions. 0 Drop-out Adviser 2 3 5
4.Let them formulate guidelines and rules to follow. Outstanding parent 6 8 10
5.Have them made plans.
6.Activate functionality.
Precondition:
Existing system is enhanced.
B. Instructional Supervision
B.1. Improved school head's instructional supervision Achieved at least 20 observations per month for a total
to teachers of 200 observations per year
PAP: Quality Management and Monitoring (QMM); 2014 2015 2016
Number of Observation
Technical Assistance (TA) 60 130 200
Tasks:
1.Reorient the teachers on CB-PAST -based Achieved at least supervisions per month for a total
instructional supervision of 300 observations per year
2.Hold regular feedbacking. 2014 2015 2016
Instructional Supervision
3.Follow up. 100 180 300
4. Recognize improvement.
Precondition:
Teachers are all submissive.
PAP: Intensified checking of Lesson Plans Achieved 100 percent checking of daily lesson plans
Tasks: 2014 2015 2016
% of Lesson plan checked daily
1.Remind teachers of the importance of lesson plans. 80% 85% 100%
2.Provide each one with checklist of lesson plan.
3.Provide them , too, with monitoring sheet of LC
taken daily.
4.Monitor compliance.
5.Evaluate the effect of the lesson to the teaching-
learning process.
6.Give feedback and recommendations.
Precondition:
The teachers submit their Lesson plan book to the office
either at p.m. before going home or a.m.before classes begin.
B.2. Improved PSDS' instructional supervision Achieved at least 2 observation per month for a total of
of teachers 20 observations peryear
PAP: Quality Management and Monitoring (QMM); 2014 2015 2016
Total Number of Class Observation
Technical Assistance (TA) 6 8 20
Tasks:
1. Keep the teachers updated on the educational issues
transpired by the division office.
2. Always follow instruction from the superiors.
3. Keep in touch with teachers for their technical
assistance needs.
3. Remind them to be always prepared and ready.
Precondition:
The PSDS has a regular QMM/TA schedule for the school.
B.3. Improved school EPSs' instructional supervision Achieved at least 2 class observation per month for a total of
of teachers 20 observations per year
PAP: Quality Management and Monitoring (QMM); 2014 2015 2016
Number of Class Observation
Technical Assistance (TA) 6 8 20
Tasks:
1. Keep the teachers updated on the educational issues
transpired by the division office.
PAP: Public and private partnership, Brigada Eskwela, Increased amount generated from other sources
Adopt-a-school program and IGPs Potential Resources 2014 2015 2016
Tasks: Public/private partnership 3T 4T 5T
1. Disseminate to stakeholders the accomplishment Brigada Eskwela 18T 25T 35T
of programs. Adopt- a- school program 1.5T 5T 10T
2. Lobby for more support and in-kind resources Income Generating Projts 6T 8T 10T
and donations.
3. Invite them for volunteer facilitation of the implementation
of the projects.
4. Monitor and the implementation of the projects.
Tasks:
1.Impose warnings and precautionary measures. Decreased prevalence of incidence of theft and vandalism
2.Implement school rules and regulations. to 5 by year 2016
3.Do the routinely checkup of facilities. Incidence 2014 2015 2016
4. Have a school/barangay blotter report. Stealing 16 10 5
5.Immediately call the attention of all involved. Vandalism 32 18 5
6.Settle the matter and resolve.
7.For recurrent acts by students and pupils,
impose suspension accordingly.
Precondition:
Concerns submit themselves for settlement; admit faults
when guilty and swear avoidance for recurrence
of wrongdoings.
E. Management and Administration
E.1. Improved provision of non-teaching personnel Designated teachers to perform non-teaching
to support management and administration functions
PPA : Designation of teachers to perform non-teaching Non-Teaching Functions 2014 2015 2016
functions Office Clerk 0 1 1
Tasks: Disbursing Officer 1 1 1
1. Select potential teachers. Bookkeepper 1 1 1
2. Designate and train teachers to their add-on assignments. Record Custodian 1 1 1
3. Seek conformity letting them sign the designations. EBEIS Coordinator 0 1 1
4. Trust but ask them.
5. Define their function in he office.
Precondition:
Teacher assigned accept designation.
E.2. Leveled up SBM practice Achieved at 100% level II SBM practices by 2016
PPA: Proper implementation of SBM SBM Level 2014 2015 2016
Tasks: Level I 95% 100% 100%
1. Always follow the SBM way of managing the school. Level II 35% 50% 100%
2. Keep track of the implementation of the programs,
projects and activities.
3. Keep all the documents of PPAs intact and updated.
4. Make a monthly school SBM assessment by stakeholders.
5. Keep in touch with the Division Office for update
of assessment.
6. Level up the practices.
Precondition:
Every stakeholder gets involved.
E.2.1. Improved promtpness of submission of
reports
E.2.2. Improved organization of documents
in the office
PAP : Aquisition of 1 unit Steel Cabinet Submitted on time 90% of reports
Tasks: 2014 2015 2016
1. Send request letter to the SDS. 50% 75% 90%
2. Follow-up
3. Deposit organized SBM forlders and update Organized documents in the office 100% systematic by 2016
the documents for assessment. Organization of Documents in the 2014 2015 2016
Precondition : Office 60% 80% 100%
Request is granted.
PAP: Supply the office with materials
1. Make purchase request.
2. Follow purchase procedure.
3. Liquidate fund.
Precondition:
Release of SBM grants, MOOE is updated.
E.3. Improved conflict management
PAP: Establishment of grievance committee; Achieved at least 90% client satisfaction on school
Immediate settlement of conflict structure and improvement processes annually based on survey
Tasks: 2014 2015 2016
Client Satisfaction 80% 85% 90%
1.Organize the school Grievance committee.
2.Orient the Committee members of their duties
and responsibilities.
3.Monitor their performance.
4.Evaluate the performance
5.Recognize accomplishments.
Precondition:
Concerns submit themselves for settlement;
admit faults when guilty and swear avoidance for
recurrence of wrongdoings.
PAP: Careful settlement of conflicts in the school level. Sustained 0 or decreased conflict to at least 30% annually
Tasks: Conflict 2014 2015 2016
1. Summon both of involved parties in the conflict. Pupil-Pupil 15 9 6
2. Call the presence of all concern people. Teacher-pupil 1 1 0
3. Talk about the matter in a peaceful manner. Teacher-teacher 3 2 0
4. Settle for an agreement. Teacher-Principal 0 0 0
5. Take note of the agreement. Teacher-Community 0 1 0
6. Keep the anecdotal record on file.
Precondition:
Grievance committee founds a fair decision.
F. SCHOOL PERFORMANCE MANAGEMENT 100% of teachers evaluated using CB-PAST
F.1. Improved Performance Management of Teachers 2014 2015 2016
PAPs: CB-PAST (teacher performance) 60% 80% 100%
a. Evaluation of Teachers Performance
b. Improved M & E of:
- AIP Achieved 100% monitoring and evaluation of the
- Dep. Ed Programs & Projects the following
Tasks: Particulars 2014 2015 2016
1. Organized tracking system for teachers AIP/SIP 60% 75% 80%
Performance DEP.ED Programs & Projects 60% 75% 80%
2. Orient the teachers of the tracking system Other Programs 60% 75% 80%
3. Implement
4. Monitor and evaluate its effect
5. Give feedback and recommendation
PPA: Consistent implementation of the school policies Average of 18 out of 20 teachers adhere compliance by 2016
Tasks: of the following school policies.
1.Revisit the school rules for teachers Particulars 2014 2015 2016
2. Review compliance. Attendance in the Flag ceremony 16 17 18
3. Renew commitment. Punctuality to hold classes 16 17 18
4. Religiously follow the rules. Wearing of School uniform 16 17 18
5. Keep track of the teachers behavior. Attendance in school programs and activities 16 17 18
6. Do step to resolve any conflict and problem if any. Committing absences 16 17 18
Precondition: Submission of required reports 16 17 18
Consistent monitoring isimplemented.
G. IMPROVED SCHOOL PROCUREMENT PROCESS Achieved 100% Implementation of the following
PPAs: programs:
a. Development of School Procurement Flow Chart Programs 2014 2015 2016
b. Organization of School Procurement Team/BAC APP Implementation 70% 80% 100%
c. Orientation of RA 9184 Org of School BAC 70% 80% 100%
Tasks: Orientation of RA 9184 70% 80% 100%
1.Orient teachers the importance of the APP
2.Prepare the Annual Procurement Plan
3.Organize the School BAC
4.Implement APP
5.Monitor and evaluate the implementation of APP
6.Give feedback and recommendation to improve
the implementation of the APP
Pre-Condition:
APP is developed; School BAC is organized;
RA 9184 is observed.
H. SCHOOL PLANNING
H.1. Improved School Planning Process
PPAs: Achieved 100% completion of AIP/SIP by 2016
a. AIP/SIP Preparation 2014 2015 2016
SIP/AIP (Completion)
b. Review of AIP/SIP Cycle 40% 70% 100%
Tasks:
1.Organize school committee to review
the accomplishment of the AIP/SIP
2.Make revisions on AIP/SIP
3.Present the revised AIP/SIP to the internal
and external stakeholders for recommendations
and approval
4.Implement the AIP/SIP
5.Monitor and evaluate the implementation
6.Give feedback and recommendations
Pre-condition:
SIP/AIP revisions approved by Division Office.
H. OTHERS
H.1. Improved involvement in Civic and Community Increased number of participation in the community activities
Outreach Activities to at least 75 % by 2016
PAPs:
a. National Greening Program Community Activities 2014 2015 2016
b. Barangay Fiesta NGP 40% 70% 75%
c. Linis Walis Fiesta celebrations 40% 70% 80%
d. Drug Abuse Prevention Campaign Linis Walis 40% 70% 80%
Tasks: Drug Abuse Prevention Campaign 40% 70% 80%
1.Keep in touch with the barangay/city authorities.
2.Update with their activities and schedule.
3.Get involved. Increased number of pupils, students, teachers and parents
4.Document involvement. participation in community outreach programs
Precondition: Participants 2014 2015 2016
Classes are not significantly disrupted. Pupil 40% 60% 75%
Students 60% 60% 75%
Teacher 70% 60% 75%
Parents 30% 60% 75%
Prepared by:
ANALIE V. BUHAYAN
Principal I
al Services
MEANS OF VERIFICATION ASSUMPTIONS AND RISKS
Observation Forms
CB PAST forms Records of TA
Supervisory report
Designation
with conformity
SBM Assessment
Results
Page 6 of 8
Time card Risk:
Attendance Teacher has become indifferent
Checklist Strict and consistent
implementation make
sarisfactory compliance.
Delivery reciepts
Inventory reports
Pictures Participation in community
Page 7 of 8
Page 8 of 8
COLONIA DIVINA INTEGRATED SCHOOL
Adjusted SIP 2011-2013 3-YEAR MASTER PLAN: Management of Educational Services
MEANS OF
PHYSICAL TARGETS FINANCIAL TARGETS
PROGRAMS/PROJECTS/ACTIVITIES INDICATOR (Output Level) VERIFICATION
VERIFICATION Year 1 Year 2 Year 3 Year 1
A.Stakeholders' Participation
A.1. Strengthened stakeholders participation in Increased number of stakeholder Attendance Records
school programs, projects and activities participation by 10% annually
PPA : Conduct of PTA Summit, Project BEST, Organization in theprograms, projects x x x
of SGC, PTA, SPG and Teacher Organization, and activities
Project BEST
Brigada Eskwela 68% 76% 85% 600
Parent-Teacher Conference 73% 80% 85% 0
PTA. Gen Assembly 77% 80% 85% 500
Homeroom PTA Meeting 75% 85% 85% 300
SGC Meeting 65% 75% 85% 0
Tasks:
1.Involve the internal and external stakeholders
in any school development.
2.Present to them the school programs, projects
and activities found in the School
Improvement Plan.
3.Engage them in planning, revision and
implementation of the improvement plan.
4.Monitor the implementation.
5.Evaluate the result.
Precondition:
Stakeholders give ample time for their childrens
education. Principal has established harmonious relationship
with the community
A.1.1. Organized rewards and incentives system Awards and incentives NAT/DAT results
for students/pupils, teachers and parents provided to deserving teachers, Certificates
PPA: Creation of Incentives and Rewards Committee parents, pupils and students Phil-IRI x x x
Strengthening I and R Syatem and other stakeholders DepEd Forms
10 MPS increase in Standardized Test Teacher PTA Records 0 1 2 200
75 & above MPS in NAT/RAT/DAT P/S 0 2 3 500
First placer in higher academic 1 2 3 500
competition (Div. Regional, etc) P/S
0 Non- reader Adviser 0 1 2 250
0 Drop-out Adviser 2 3 5 500
Outstanding parent 6 8 10 200
Tasks:
1.Identify potential members of the Incentives
PPA: Quality Management and Monitoring (QMM); observation per month for a total CB PAST forms Records x x x
Technical Assistance (TA) of 20 observations per year of TA
Number of Class Observation 6 8 20 50
Tasks:
1. Keep the teachers updated on the educational issues
transpired by the division office.
2. Always follow instruction from the superiors.
3. Keep in touch with teachers for their technical
assistance needs.
3. Remind them to be always prepared and ready.
Precondition:
The PSDS has a regular QMM/TA schedule for the school.
B.3. Improved school EPSs' instructional supervision Achieved at least 2 class Observation Forms
of teachers observation per month for a total
PPA: Quality Management and Monitoring (QMM); of 20 observations per year x x x
Technical Assistance (TA)
Number of Class Observation
Tasks: 6 8 20 50
1. Keep the teachers updated on the educational issues
transpired by the division office.
2. Always follow instruction from the superiors.
3. Keep in touch with teachers for their TA needs.
3. Remind them to be always prepared and ready.
Precondition:
The EPS have regular QMM/TA schedule for the school.
C. Public Expenditure and Resource
Mobilization
C.1. Improved efficiency in the utilization of school Sustained 100% utilization Liquidation reports,
resources and liquidation of grants Cash Disbursement
PPA : Updated submission of financial reports. Report x x x
SBM 100% 100% 100% 500
SEF 100% 100% 100% 100
Other Donations 100% 100% 100% 100
Tasks:
1. Consistently coordinate with the Division Accounting
Office.
2. Submit regularly the Cash Program.
3. Submit regularly the liquidation report.
MEANS OF
PHYSICAL TARGETS FINANCIAL TARGETS
PROGRAMS/PROJECTS/ACTIVITIES INDICATOR (Output Level) VERIFICATION
VERIFICATION Year 1 Year 2 Year 3 Year 1
4. Trust but ask them.
5. Define their function in he office.
Precondition:
Teacher assigned accept designation.
E.2. Leveled up SBM practice Achieved at 100% level II
PPA: Proper implementation of SBM SBM practices by 2013 Memorandum x x x
Level I SBM Assessment 95% 100% 100%
Level II results 35% 50% 100%
Tasks: Received copies of
1. Always follow the SBM way of managing the school. submitted report
2. Keep track of the implementation of the programs, indicating due dates
projects and activities.
3. Keep all the documents of PPAs intact and updated. SBM Assessment
4. Make a monthly school SBM assessment by stakeholders. Results
5. Keep in touch with the Division Office for update
of assessment.
6. Level up the practices.
Precondition:
Every stakeholder gets involved.
E.2.1. Improved promtpness of submission of Submitted on time 90% Answered survey
reports of reports forms
E.2.2. Improved organization of documents Organized documents in the Validated
in the office office 100% systematic by 2013 consolidated results
PPA : Aquisition of 1 unit Steel Cabinet 0 1 0 0
Organization of Documents in the Office
Tasks:
1. Send request letter to the SDS.
2. Follow-up
3. Deposit organized SBM forlders and update
the documents for assessment.
Precondition :
Request is granted.
PPA: Supply the office with materials x x x 30T
1. Make purchase request.
2. Follow purchase procedure.
3. Liquidate fund.
Precondition:
Release of SBM grants, MOOE is updated.
Prepared by:
ANALIE V. BUHAYAN
Principal I
IMPORTANT
Page 1 of 10
FINANCIAL TARGETS ASSUMPTION Efficiency indicators
Year 2 Year 3 ASSUMPTIONS improve.
Parent continue to
actively support
the school
1T 1T
500 500 Parents have prio-
1T 1T rities other then
300 300 the school
8T 10T Parents/stakehol-
ders has unfroseen
concerns for prog-
rams & projects
Parents continue
to support the sch.
250 500
750 1.25T
300 400
Page 2 of 10
FINANCIAL TARGETS IMPORTANT
Year 2 Year 3 ASSUMPTIONS
100 100
200 200
50 50
Teachers acknowl.
the importance
of daily LC log
Teachers sustain
compliance.
IS and TA from
EPSs improve
Page 3 of 10
FINANCIAL TARGETS IMPORTANT
Year 2 Year 3 ASSUMPTIONS
teacher's
performance
50 50
Parents involved
become receptive
and compliant More programs and projects
Risk: Parents/stake- are implemented.
holders become
200 200
Willingness of
teachers to receive
and accept tech-
nical assistance
Gulayan yields
2T 2T augment
4T 5T feeding supply.
Availability of
teachers LP's
School and com-
munity partnership
4T 5T develop/sustained
25T 35T Risk: Monitoring
5T 10T schedule if followed
8T 10T stakeholders has
unforseen concerns
for programs and
Projects
Page 5 of 10
FINANCIAL TARGETS IMPORTANT
Year 2 Year 3 ASSUMPTIONS
Teachers sustain compliance.
Stakeholders
support/
participation
2T 2T Childrens self-
confidence is boosted
Improved School
Procurement
Process
2T 2T
Page 6 of 10
FINANCIAL TARGETS IMPORTANT
Year 2 Year 3 ASSUMPTIONS
Continuous
100 150 improvement
is noted without
stealing
and vandalism
Everyone in school is
vigilant.
School continuously
improves.
Risks:
No budget/time
available
Office work are parts
of load.
Teachers/staff &
Pupils compliance/
acceptance
IMPORTANT
Page 7 of 10
FINANCIAL TARGETS ASSUMPTION
Year 2 Year 3 ASSUMPTIONS
5T 5T
20T 15T
Teachers, pupils,
students and parents
are concern about
14T 0 environmental
protection
40T 50T
Page 8 of 10
FINANCIAL TARGETS IMPORTANT
Year 2 Year 3 ASSUMPTIONS
Teacher acceptance/cooperation
100 100
500 700
Page 9 of 10
FINANCIAL TARGETS IMPORTANT
Year 2 Year 3 ASSUMPTIONS
Approved SIP/AIP
from the experts
600 800
Prepared by:
ANALIE V. BUHAYAN
Principal I
Page 1 0f 10
SOURCES
LGU PTA DEP.ED OTHERS TOTAL
1T
500
1T
300
8T
300 300
1.5T 1.5T
300 300
250 250
750 750
300 300
Page 2 0f 10
SOURCES
LGU PTA DEP.ED OTHERS TOTAL
100 100
200 200
50 50
50 50 50
Page 3 0f 10
SOURCES
LGU PTA DEP.ED OTHERS TOTAL
50 50
500 500
100 100
100
200 200
Page 4 0f 10
SOURCES
LGU PTA DEP.ED OTHERS TOTAL
2T 2T
4T 4T
300 300
Page 5 0f 10
SOURCES
LGU PTA DEP.ED OTHERS TOTAL
100 100
Page 6 0f 10
SOURCES
LGU PTA DEP.ED OTHERS TOTAL
5T 5T
20T 20T
Page 7 0f 10
SOURCES
LGU PTA DEP.ED OTHERS TOTAL
14T 14T
40T 40T
Page 8 0f 10
SOURCES
LGU PTA DEP.ED OTHERS TOTAL
Page 9 0f 10
SOURCES
LGU PTA DEP.ED OTHERS TOTAL
1T 2T 3T
Page 10 0f 10
SOURCES
LGU PTA DEP.ED OTHERS TOTAL
COLONIA DIVINA INTEGRATED SCHOOL
ANNUAL IMPROVEMENT PLAN 2013: Management of Educational Services
MEANS OF TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
VERIFICATION J F M A M J J A S O N D J F M A M J J A S O N
A.Stakeholders' Participation
A.1. Strengthened stakeholders participation in Attendance Records
school programs, projects and activities
PPA : Conduct of Stakes Assembly/Summit, Project BEST, Organization
of SGC, PTA, SPG, Alumni Ass'n and Teacher Organization,
Brigada Eskwela x x x x x x x x 1T
Parent-Teacher Conference x x x x
PTA. Gen Assembly x x 500 500
Homeroom PTA Meeting x x x x 50 50 100 100
SGC Meeting x x x 3T 2T 3T
General Alumni Homecoming x 1.5t
Tasks:
1. Publish in streamers the scheduled information for activities
2.Involve the internal and external stakeholders
in any school development.
3.Present to them the school programs, projects
and activities found in the School
Improvement Plan.
4.Engage them in planning, revision and
implementation of the improvement plan.
5.Monitor the implementation.
6.Evaluate the result.
Precondition:
Stakeholders give ample time for their childrens
education. Principal has established harmonious relationship
with the community
A.1.1. Organized rewards and incentives system NAT/DAT results
for students/pupils, teachers and parents Certificates
PPA: Creation of Incentives and Rewards Committee Phil-IRI
Strengthening I and R Syatem DepEd Forms
1 10 MPS increase in Standardized Test Teacher PTA Records x 300
2 75 & above MPS in NAT/RAT/DAT P/S x x 1.5T
2 First placer in higher academic x 300
competition (Div. Regional, etc) P/S
1 0 Non- reader Adviser x 250
3 0 Drop-out Adviser x 750
8 Outstanding parent x 300
Tasks:
1.Identify potential members of the Incentives x x x x
and Rewards System. x x x x
2.Organize them. x x
3.Orient them of their functions. x x
4.Let them formulate guidelines and rules to follow. x x
5.Have them made plans. x x
6.Activate functionality. x x
Adjusted SIP 2011-2013 ANNUAL IMPROVEMENT PLAN 2013: Management of Educational Services
MEANS OF TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
VERIFICATION J F M A M J J A S O N D J F M A M J J A S O N
Precondition:
Existing system is enhanced.
B. Instructional Supervision
B.1. Improved school head's instructional supervision
to teachers
PPA: Quality Management and Monitoring (QMM); Observation Forms
Technical Assistance (TA) CB PAST forms
130 Number of Observation Records of TA x x x x x x x x x x x x 100
180 Instructional Supervision Supervisory report x x x x x x x x x x x x 200
Tasks:
1.Reorient the teachers on CB-PAST -based x x
instructional supervision x x
2.Hold regular feedbacking. x x x x x x x
3.Follow up. x x x x x x x
4. Recognize improvement. x x x x x x x
Precondition:
Teachers are all submissive.
PPA: Intensified checking of Lesson Plans LP Monitoring 50
% of Lesson plan checked daily
Tasks:
1.Remind teachers of the importance of lesson plans. x
2.Provide each one with checklist of lesson plan. x
3.Provide them , too, with monitoring sheet of LC x
taken daily. x
4.Monitor compliance. x x x x x x x
5.Evaluate the effect of the lesson to the teaching- x x x x x x x
learning process. x x x x x x x
6.Give feedback and recommendations. x x x x x x x
Precondition:
The teachers submit their Lesson plan book to the office
either at p.m. before going home or a.m.before classes begin.
B.2. Improved PSDS' instructional supervision
of teachers Observation Forms
PPA: Quality Management and Monitoring (QMM); CB PAST forms Records
Technical Assistance (TA) of TA
8 Number of Class Observation 6
Tasks:
1. Keep the teachers updated on the educational issues x x x x x x x x x x x x
transpired by the division office.
2. Always follow instruction from the superiors. x x x x x x x x x x x x
3. Keep in touch with teachers for their technical asst. needs x x x x x x x x x x
3. Remind them to be always prepared and ready. x x x x x x x x x x x x
Precondition:
The PSDS has a regular QMM/TA schedule for the school.
B.3. Improved school EPSs' instructional supervision Observation Forms
of teachers
Adjusted SIP 2011-2013 ANNUAL IMPROVEMENT PLAN 2013: Management of Educational Services
MEANS OF TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
VERIFICATION J F M A M J J A S O N D J F M A M J J A S O N
PPA: Quality Management and Monitoring (QMM);
Technical Assistance (TA)
8 Number of Class Observation
Tasks: 50
1. Keep the teachers updated on the educational issues x x x x x x x x x x x x
transpired by the division office.
2. Always follow instruction from the superiors. x x x x x x x x x x x x
3. Keep in touch with teachers for their TA needs. x x x x x x x x x x
3. Remind them to be always prepared and ready. x x x x x x x x x x
Precondition:
The EPS have regular QMM/TA schedule for the school.
C. Public Expenditure and Resource
Mobilization
C.1. Improved efficiency in the utilization of school Liquidation reports,
resources Cash Disbursement
PPA : Updated submission of financial reports. Report
100% SBM x x x x x x x 500
100% SEF x x x x x x x 100
100% Other Donations x x x x x x x 100
Tasks:
1. Consistently coordinate with the Division Accounting x x x x x x x x x x x x
Office.
2. Submit regularly the Cash Program. x x x x x x x x x x x x
3. Submit regularly the liquidation report. x x x x x x x x x x x x
Precondition:
Requirements are promptly complied.
PPA : Adherence to auditing guidelines and policies Liquidation reports,
90% Utilization Cash Disbursement
90% Liquidation Report 200
Tasks: Financial reports
1. Keep monitoring of school needs in the SIP. Acknowledgment x x x x x x x x x x x x
2. Submit request to the authoritative personnel. receipts x x x x x x x x x x x x
3. Be alert for an opportunity. x x x x x x x x x x x x
4. Submit immediately the requirement. x x x x x x x x x x x x
5. Follow-up. x x x x x x x x x x x x
6. Liquidate immediately. x x x x x x x x x x x x
Precondition:
of requests granted.
C.2. Improved generation of resources for school Pictures
programs, projects and activities Receipts of fertilizer
PPA: Strengthening of school IGPs purchased
Eelementary Department Journal of agril x x x x x x x x x x x x 1T 1T
High School Department activities x x x x x x x x x x x x 2T 2T
Tasks: Journal of daily
1. Renew designations of coordinators with coformity. harvest/income x
2. Monitor managements. x x x x x x x
Adjusted SIP 2011-2013 ANNUAL IMPROVEMENT PLAN 2013: Management of Educational Services
TIME FRAME RESOURCE REQUIREMENTS
MEANS OF Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
PROGRAMS/PROJECTS/ACTIVITIES
VERIFICATION J F M A M J J A S O N D J F M A M J J A S O N
3. Evaluate performance. x
Precondition:
The designated coordinators selfless.
PPA: Public and private partnership, Brigada Eskwela, Acknowledgment
Adopt-a-school program and IGPs receipts
4T Public/private partnership letter of request x x x x x x x x x x x
25T Brigada Eskwela BE Forms x x x x x x x x
5T Adopt- a- school program Sales Journal x x x x x x
8T Income Generating Projects Financial reports x x x x x x x x x x x x
Tasks:
1. Disseminate to stakeholders the accomplishment x x
of programs. x x
2. Lobby for more support and in-kind resources x x x x x
and donations.
3. Invite them for volunteer facilitation of the x x x
implementation of the projects. x x x
4. Monitor and the implementation of the projects. x x x x x
5. Recognize efforts exerted. x
Precondition:
Donors are strong afvocates of educations.
C.3. Improved level of public/stakeholder
support to school programs, projects
and activiies
PPA : Strengthening linkages Attendance records 150 150
Tasks: Acknowledgment
1. Disseminate to stakeholders the accomplishment receipt x x x
of projects and programs. Letter request
2.Lobby for more support and in-kind resources x x x x x x x x x x x x
and donations.
3.Invite them to volunteer facilitation of the x x x x x x x x
implementation of the projects.
4.Monitor the implementation of the projects. x x x x x x x x
5.Evaluate the implemented projects and the financial x x x x x x x x
records of expenditures.
6.Recognize efforts exerted. x x
Pre-condition:
Donors are strong advocates of education.
D. Learning Environment
D.1. Enhanced school learning environment
PPA : CFSS Programs and Projects Records of Eco-friendly x x x x x x x x x x x x
70% Sustainable Eco- Friendly Programs indicators evaluation
Tasks: results
1. Conduct an orientation on CFSS Records of CFSS x
2. Organize and plan the school CFSS, School clubs indicators x
and organizations, YES-O, BSP to help implement
the sustainable and Eco-Friendly Programs
Adjusted SIP 2011-2013 ANNUAL IMPROVEMENT PLAN 2013: Management of Educational Services
MEANS OF TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
VERIFICATION J F M A M J J A S O N D J F M A M J J A S O N
3. Monitor the implementation of these organs. x x x
4. Evaluate the implementation and the impact to the CFSS x x x x x x x
5. Recognize deserving efforts. x x x x x
Precondition:
School organizations are actively involved
in the implementation of the programs.
PPA : Eco-Friendly School Programs and Projects
Tasks:
1.Conduct an orientation on the program.
2. Organize and plan the school CFSS, School clubs School / barangay
and organizations, YES-O, BSP to help implement blotter report
the sustainable and Eco-Friendly Programs Anecdotal record
3.Monitor the implementation of these organs.
4.Evaluate the implementation and the impact to the CFSS
5.Recognize deserving efforts.
Pre-condition:
School organizations are actively involved
in the implementation of the programs.
PPA: Establishment of grievance committee; Anecdotal record 100
Immediate settlement of conflict
10 Stealing
18 Vandalism
Tasks: Designation
1.Impose warnings and precautionary measures. with conformity x
2.Implement school rules and regulations. x x
3.Do the routinely checkup of facilities. x x x x x
4. Have a school/barangay blotter report. x x x x x x
5.Immediately call the attention of all involved. x x x x x x
6.Settle the matter and resolve. x x x x
7.For recurrent acts by students and pupils, x x x x x x x
impose suspension accordingly.
4. Have a school/barangay blotter report. x x x x x x
4. Have a school/barangay blotter report. x x x x x x
5.Immediately call the attention of all involved. x x x x x x
6.Settle the matter and resolve. x x x x
E. Management and Administration
E.1. Improved provision of non-teaching personnel
to support management and administration
PPA : Designation of teachers to perform non-teaching
functions
1 Office Clerk
1 Disbursing Officer
1 Bookkeepper
1 Record Custodian
1 EBEIS Coordinator
Adjusted SIP 2011-2013 ANNUAL IMPROVEMENT PLAN 2013: Management of Educational Services
MEANS OF TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
VERIFICATION J F M A M J J A S O N D J F M A M J J A S O N
Tasks:
1. Select potential teachers. x x
2. Designate and train teachers to their add-on assignments. x
3. Seek conformity letting them sign the designations. x
4. Trust but ask them.
5. Define their function in he office.
Precondition:
Teacher assigned accept designation.
E.2. Leveled up SBM practice
PPA: Proper implementation of SBM Memorandum
100% Level I SBM Assessment 5T
50% Level II results 10T 10T
Tasks: Received copies of
1. Always follow the SBM way of managing the school. submitted report x x x x x x x x x x x x
2. Keep track of the implementation of the programs, indicating due dates x x x x x x x x x x
projects and activities.
3. Keep all the documents of PPAs intact and updated. SBM Assessment x x x x x x x x x x x x
4. Make a monthly school SBM assessment by stakeholders. Results x x x x x x x x x x x
5. Keep in touch with the Division Office for update x x x x x x x x x x x x
of assessment.
6. Level up the practices. x x
Precondition:
Every stakeholder gets involved.
E.2.1. Improved promtpness of submission of Answered survey
reports forms
E.2.2. Improved organization of documents Validated
in the office consolidated results
PPA : Delegation of Report-making to office designates 14T
Tasks:
1. Orient office personnel/designates x
2. Supervise them in the making of reports. x x
3. Edit the works. x x x
4. Submit the reports. x x x x x x x x x x x x
Precondition :
Request is granted.
PPA: Supply the office with materials 20T 20T
1. Make purchase request. x
2. Follow purchase procedure. x x x
3. Liquidate fund. x x x
Precondition:
Release of SBM grants, MOOE is updated.
E.3. Improved conflict management
Adjusted SIP 2011-2013 ANNUAL IMPROVEMENT PLAN 2013: Management of Educational Services
MEANS OF TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
VERIFICATION J F M A M J J A S O N D J F M A M J J A S O N
PPA: Establishment of grievance committee; Anecdotal record
Immediate settlement of conflict Acknowledgment
9 Pupil-Pupil of settlement
1 Teacher-pupil
2 Teacher-teacher
0 Teacher-Principal
1 Teacher-Community
Tasks: CB PAST
1.Organize the school Grievance committee. x
2.Orient the Committee members of their duties x
and responsibilities.
3.Monitor their performance. x x
4.Evaluate the performance x x
5.Recognize accomplishments. x x
Precondition:
Concerns submit themselves for settlement;
admit faults when guilty and swear avoidance for
recurrence of wrongdoings.
PPA: Careful settlement of conflicts in the school level.
Tasks:
1. Summon both of involved parties in the conflict. x
2. Call the presence of all concern people. x
3. Talk about the matter in a peaceful manner. x
4. Settle for an agreement. x
5. Take note of the agreement. x
6. Keep the anecdotal record on file. x
Precondition:
Grievance committee founds a fair decision.
F. SCHOOL PERFORMANCE MANAGEMENT
F.1. Improved Performance Management of Teachers
PPAs:
a. Evaluation of Teachers Performance
CB-PAST (teacher performance)
b. Improved M & E of:
- AIP Delivery reciepts
- Dep. Ed Programs & Projects Inventory reports
75% AIP/SIP
75% DEP.ED Programs & Projects
75% Other Programs
Tasks:
1. Organized tracking system for teachers
Performance
2. Orient the teachers of the tracking system
3. Implement
4. Monitor and evaluate its effect
5. Give feedback and recommendation
Adjusted SIP 2011-2013 ANNUAL IMPROVEMENT PLAN 2013: Management of Educational Services
MEANS OF TIME FRAME RESOURCE REQUIREMENTS
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
VERIFICATION J F M A M J J A S O N D J F M A M J J A S O N
PPA: Consistent implementation of the school policies
17 Attendance in the Flag ceremony Time card
17 Punctuality to hold classes Attendance
17 Wearing of School uniform Checklist
17 Attendance in school programs and activities
17 Committing absences
17 Submission of required reports
Tasks:
1.Revisit the school rules for teachers x x x x x x x x x x x x
2. Review compliance. x x x x x x x x x x x x
3. Renew commitment. x x x x x x x x x x x x
4. Religiously follow the rules. x x x x x x x x x x x x
5. Keep track of the teachers behavior. x x x x x x x x x x x x
6. Do step to resolve any conflict and problem if any. x x x x x x x x x x x x
Precondition:
Consistent monitoring isimplemented.
G. IMPROVED SCHOOL PROCUREMENT PROCESS
PPAs:
Development of School Procurement Flow Chart
80% APP Implementation
80% Org of School BAC
80% Orientation of RA 9184
Tasks:
1.Orient teachers the importance of the APP x x x x x x
2.Prepare the Annual Procurement Plan x x x x x
3.Organize the School BAC x x x x
4.Implement APP x x x x x x x x x x x x
5.Monitor and evaluate the implementation of APP x x x x x x x x x x x x
6.Give feedback and recommendation to improve
the implementation of the APP
Pre-Condition:
APP is developed; School BAC is organized;
RA 9184 is observed.
H. SCHOOL PLANNING
H.1. Improved School Planning Process
PPAs:
a. AIP/SIP Preparation Pictures
b. Review of AIP/SIP Cycle Attendance Records
Precondition:
Planning committee members are actively
involving in the planning.
Tasks:
1.Organize school committee to review x x x
the accomplishment of the AIP/SIP
2.Make revisions on AIP/SIP x x x x x
Adjusted SIP 2011-2013 ANNUAL IMPROVEMENT PLAN 2013: Management of Educational Services
TIME FRAME RESOURCE REQUIREMENTS
MEANS OF
PROGRAMS/PROJECTS/ACTIVITIES Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
VERIFICATION
J F M A M J J A S O N D J F M A M J J A S O N
3.Present the revised AIP/SIP to the internal
and external stakeholders for recommendations
and approval
4. Implement the AIP/SIP x x x x x x
5.Monitor and evaluate the implementation x x x x x x x
6.Give feedback and recommendations x x x x x
Pre-condition:
SIP/AIP revisions approved by Division Office.
H.1. Improved involvement in Civic and Community
Outreach Activities
PPA: Participation in community activities 1T 500 1T 500
National Greening Programs
Fiesta celebrations
Linis Walis
Drug Abuse Prevention Campaign
PPA: Involvement in community outreach programs
Pupil
Students
Teacher
Parents
Tasks:
1. Keep in touch with the barangay/city authorities. x x x x x x x x x x x x
2 .Update with their activities and schedule. x x x x x x x x x x x x
3.Get involved. x x x x x x x x x x x x
4.Document involvement. x x x x x x x x x x x x
Precondition:
Classes are not significantly disrupted.
Prepared by:
ANALIE V. BUHAYAN
Principal I
Page 1 of 9
TS SOURCES
Q4 OTHER
LGU PTA DEP.ED TOTAL
D S
1T
500 500
1T
300
8T
1.5t
300 300
1.5T 1.5T
300 300
250 250
750 750
300 300
Page 2 of 9
TS SOURCES
Q4 OTHER
LGU PTA DEP.ED TOTAL
D S
100 100
200 200
50 50
20 50 50 50
Page 3 of 9
TS SOURCES
Q4 OTHER
LGU PTA DEP.ED TOTAL
D S
50 50
500 500
100 100
100
200 200
2T 2T
4T 4T
Page 4 of 9
TS SOURCES
Q4 OTHER
LGU PTA DEP.ED TOTAL
D S
300 300
Page 5 of 9
TS SOURCES
Q4 OTHER
LGU PTA DEP.ED TOTAL
D S
100 100
Page 6 of 9
TS SOURCES
Q4 OTHER
LGU PTA DEP.ED TOTAL
D S
5T 5T
20T 20T
14T 14T
40T 40T
Page 7 of 9
TS SOURCES
Q4 OTHER
LGU PTA DEP.ED TOTAL
D S
Page 8 of 9
TS SOURCES
Q4 OTHER
LGU PTA DEP.ED TOTAL
D S
Page 9 of 9
TS SOURCES
Q4 OTHER
LGU PTA DEP.ED TOTAL
S
D
1T 2T 3T
V. BUHAYAN
COLON
AN
Ist Quarter 2nd Quarter 3rd Quarter
Item Description Unit Total Total Unit Unit Total Total Unit Unit Total
Price Price Qty. Price Price Qty. Price Price
1. OFFICE SUPPLIES AND
MATERIALS
0
0 0 0
0 0 0 0
0 0 0
Prepared by:
ANALIE V. BUHAYAN
Principal I
Noted:
Approved:
NENITA P. GAMAO
PSDS I, OIC
Accepted by:
LORLINIE M. ORTILLO
Schools Division Superintendent
Officer-in-charge
D QUARTER 4TH QUARTER
Amount Qty. Amount
390.00 2 156.00
210.00 2 140.00
140.00
65.00 1 65.00
240.00 3 90.00
365.00 2 730.00
400.00 3 240.00
2 90.00
1,810.00 P 1,511.00
MIE J. OSAL
trative Officer IV
T. VISABELLA
Officer Designate
TA P. GAMAO
SDS I, OIC
ANNUAL PROCUREMENT PROGRAM 2012
Ist Quarter 2nd Quarter 3rd Quarter 4th Quarter
Item Description Unit Total Total Unit Total Total Unit Total Total Unit
Unit Unit Unit
Price Price Qty. Price Price Qty. Price Price Qty. Price
1. OFFICE SUPPLIES AND
MATERIALS
2. LEARNING MATERIALS
AND EQUIPMENT
3. OTHERS
Prepared by :
Reviewed by :
Name of Coach
Accepted by :
4th Quarter 1st Quarter 2nd Quarter 3rd Quarter
Total Total
Unit MOOE LGU OTHERS TOTAL MOOE LGU OTHERS TOTAL MOOE LGU OTHERS TOTAL
Price Qty.
Checked by :
Noted :
PSDS
Accepted by :
PSDS
mmmmmmmmmmmmmmmmmmmmmmmmmmmmmm
REPAIR & MAINTENANCE
PPAs:
Repair of Handrail at
Grade 1 to Grade 3 CLs
Corrogated round bar 8mm 90.00 540.00 6 lgth
G.I pain sheet #34 224.00 448.00 2 sht
Cement, premuim, Portland 250.00 2,000.00 8 bag
Mixing sand 850.00 850.00 1 cu.m.
Cracked stone 1,200.00 300.00 1/4 cu.m.
Tie wire 98.00 98.00 1 kg
4,236.00
Repair of Fish P
Department)
Corrogated round bar 8mm 90.00 900.00 10 lgth
Cement, premuim, Portland 250.00 3,000.00 12 bag
Mixing sand 850.00 2,550.00 3 cu.m
Cracked stone 1,200.00 1,800.00 1 1/2 cu.m
Tie wire 98.00 147.00 1 1/2 kg
Hollow blocks 17.00 2,108.00 124 pc
10,505.00
Repair of Leaking Roofs at:
Grade I-1 (Bldg 6-H)
G.I corrogated sheet 26x10, 0.4 , 6' 268.00 1,072.00 4 sht
Umbrella nail 100.00 50.00 1/2 kg
Vulca seal 365.00 365.00 1 L
Metal Primer 210.00 210.00 1 L
R/L 2"x4"x12' 360.00 720.00 2 lgth
R/L 2"x2"x10' 180.00 2,160.00 12 lgth
Common nail 5 1/2" 145.00 290.00 2 kg
Common nail 3 1/2" 130.00 65.00 1/2 kg
4,867.00
Grade I-2 (Bldg 6-G)
G.I corrogated sheet 26x10, 0.4 , 12' 580.00 1,160.00 2 sht
Umbrella nail 100.00 150.00 1 1/2 kg
Vulca seal 365.00 1,460.00 4 Qrts
Metal Primer 210.00 210.00 1 Qrt
Paint Brush 5" 110.00 110.00 1 pc
R/L 2"x4"x12' 360.00 2,880.00 8 lgth
R/L 2"x2"x10' 180.00 3,060.00 17 lgt
Common nail 5 1/2" 145.00 580.00 4 kg
Common nail 3 1/2" 130.00 390.00 3 kg
10,000.00
Grade II-1 (Bldg 6-F
G.I corrogated sheet 26x10, 0.4 , 8' 368.00 1,840.00 5 lgth
Umbrella nail 100.00 50.00 1/2 kg
Vulca seal 365.00 365.00 1 L
Metal Primer 210.00 210.00 1 L
R/L 2"x4"x12' 360.00 360.00 1 lgth
R/L 2"x2"x10' 180.00 1,080.00 6 lgth
Common nail 5 1/2" 145.00 72.50 1/2 kg
Common nail 3 1/2" 130.00 65.00 1/2 kg
4,042.50
Grade II-2 (Bldg 6-E)
G.I corrogated sheet 26x10, 0.4 , 8' 368.00 1,472.00 4 lgt
Umbrella nail 100.00 50.00 1/2 kg
Vulca seal 365.00 365.00 1 L
Metal Primer 210.00 210.00 1 L
R/L 2"x4"x12' 360.00 360.00 1 lgth
R/L 2"x2"x10' 180.00 900.00 5 lgth
Common nail 5 1/2" 145.00 72.50 1/2 kg
Common nail 3 1/2" 130.00 65.00 1/2
3,429.50
Grade III (Bldg 6-D)
G.I corrogated sheet 26x10, 0.4 , 8' 368.00 1,472.00 4 sht
Umbrella nail 100.00 50.00 1/2 kg
Vulca seal 365.00 365.00 1 L
Metal Primer 210.00 210.00 1 L
R/L 4"x6"x10' 360.00 720.00 2 lgth
R/L 2"x2"x10' 180.00 2,160.00 12 lgth
Common nail 5 1/2" 145.00 72.50 1/2 kg
Common nail 3 1/2" 130.00 130.00 1 kg
5,179.50
Grade IV-2 (Bldg 4-A)
R/L 2"x4"x12' 360.00 720.00 2 lgth
R/L 2"x2"x10' 180.00 1,440.00 8 lgth
G.I corrogated sheet 26x10, 0.4 , 8' 368.00 1,472.00 4 sht
Umbrella nail 100.00 50.00 1/2 kg
Metal Primer 210.00 210.00 1 L
Common nail 5 1/2" 145.00 72.50 1/2 kg
Common nail 3 1/2" 130.00 65.00 1/2 kg
4,029.50
Year I-1 (Bldg 2-A)
G.I corrogated sheet 26x10, 0.4 , 8' 368.00 2,208.00 6 sht
Umbrella nail 100.00 50.00 1/2 kg
Vulca seal 365.00 365.00 1 L
Metal Primer 210.00 420.00 2 L
3,043.00
Year I-2 (Bldg 2-B)
G.I corrogated sheet 26x10, 0.4 , 12' 580.00 2,320.00 4 sht
R/L 2"x2"x10' 180.00 1,440.00 8 lgth
Common nail 3 1/2" 130.00 130.00 1 kg
Vulca seal 365.00 365.00 1 L
Umbrella nail 100.00 50.00 1/2 kg
Metal Primer 210.00 420.00 2 L
4,725.00
Year II (Bldg 2-C)
G.I corrogated sheet 26x10, 0.4 , 8' 368.00 2,208.00 6 sht
R/L 2"x4"x12' 360.00 360.00 1 lgth
R/L 2"x2"x10' 180.00 1,800.00 10 lgth
Common nail 3 1/2" 130.00 130.00 1 kg
Vulca seal 365.00 365.00 1 L
Umbrella nail 100.00 50.00 1/2 kg
Metal Primer 210.00 420.00 2 L
Roof paint, Baguio green 180.00 360.00 2 L
5,693.00
Year III-1 (Bldg 2-D)
G.I corrogated sheet 26x10, 0.4 , 8' 368.00 2,208.00 6 sht
R/L 2"x4"x12' 360.00 360.00 1 lgth
R/L 2"x2"x10' 180.00 1,800.00 10 lgth
Common nail 3 1/2" 130.00 130.00 1 kg
Vulca seal 365.00 365.00 1 L
Umbrella nail 100.00 50.00 1/2 kg
Metal Primer 210.00 210.00 1 L
Roof paint, Baguio green 180.00 180.00 1 L
5,303.00
Computer Room (Bldg 2-EF)
G.I corrogated sheet 26x10, 0.4 , 8' 368.00 2,944.00 8 sht
R/L 2"x2"x10' 180.00 2,160.00 12 lgth
Common nail 3 1/2" 130.00 195.00 1 1/2 kg
Vulca seal 365.00 365.00 1 L
Umbrella nail 100.00 150.00 1 1/2 kg
Metal Primer 210.00 420.00 2 L
Roof paint, Baguio green 180.00 360.00 2 L
6,594.00
Industrial Arts Room
G.I corrogated sheet 26x10, 0.4 , 8' 368.00 2,208.00 6 sht
R/L 2"x4"x12' 360.00 360.00 1 lgth
R/L 2"x2"x10' 180.00 1,800.00 10 lgth
Common nail 3 1/2" 130.00 130.00 1 kg
Vulca seal 365.00 365.00 1 L
Umbrella nail 100.00 50.00 1/2 kg
Metal Primer 210.00 420.00 2 L
Roof paint, Baguio green 180.00 360.00 2 L
5,693.00
REPAIR OF EQUIPMENT
Computer units
TBD 2,500.00
Oven
TBD 500.00
Ceiling/Electric Fans
TBD 300.00
Sound system
TBD 100.00
TV Set
TBD 400.00
Printer
TBD 300.00
Bundy Clock
TBD 400.00
UPS
TBD 1,000.00
6,300.00
REPAIR & MAINTENANCE- Ceiling
PPAs:
Major Repair of Ceiling
at Grade 1-2 CL, Bldg 6-G (Continuation)
8 Ordinary plywood 1/4"x4'x8' 345.00 2,760.00 8 sht
Common nail # 1 65.00 260.00 4 kg
3,020.00
Painting of Newly Installed Ceiling
at Grade 1-2 CL
Enamel Paint, wht 585.00 1,755.00 3 gal
Latex Paint, wht 445.00 890.00 2 gal
Patching compound 23.50 117.50 5 kg
Paint thinner 325.00 325.00 1 gal
Paint brush # 4 95.00 285.00 3 pcs
Paint brush # 2 40.00 120.00 3 pcs
Paint brush # 1.5 25.00 100.00 4 pcs
Roller brush 72.00 72.00 1 pc
3,664.50
Major Repair of Entire Ceiling at:
Indus. Room, Bldg 7-A (int & ext)
Marine plywood 1/4"x4'x8' 520.00 13,520.00 26 sht
R/L 2"x2"x12' 180.00 10,800.00 60 lgth
R/L 2"x4"x12' 360.00 2,160.00 6 lgth
Common nail # 3 1/2 130.00 260.00 2 kg
Common nail # 3 130.00 390.00 3 kg
Common nail # 1 100.00 400.00 4 kg
27,530.00
Major Repair (Entire Ceiling)
Designated Office, Bldg 3-A (Interior)
Marine plywood 1/4"x4'x8' 520.00 7,280.00 14 sht
R/L 2"x2"x12' 180.00 6,840.00 38 lgth
R/L 2"x4"x12' 360.00 3,600.00 10 lgth
Common nail # 3 1/2 130.00 130.00 1 kg
Common nail # 3 130.00 325.00 2 1/2 kg
Common nail # 1 100.00 250.00 2 1/2 kg
18,425.00
Major Repair of Ceiling Part at:
Year II, Bldg 2-C (Interior)
Marine plywood 1/4"x4'x8' 520.00 6,240.00 12 sht
R/L 2"x2"x12' 180.00 6,120.00 34 lgth
R/L 2"x4"x12' 360.00 2,880.00 8 lgth
Common nail # 3 1/2 130.00 195.00 1 1/2 kg
Common nail # 3 130.00 260.00 2 kg
Common nail # 1 100.00 200.00 2 kg
15,895.00
Year IV, Bldg 1-B (Interior)
Marine plywood 1/4"x4'x8' 520.00 4,160.00 8 sht
R/L 2"x2"x12' 180.00 5,040.00 28 lgth
R/L 2"x4"x12' 360.00 1,440.00 4 lgth
Common nail # 3 1/2 130.00 130.00 1 kg
Common nail # 3 130.00 130.00 1 kg
Common nail # 1 100.00 100.00 1 kg
11,000.00
Year I-1, Bldg 2-1 (Exterior around)
Hardiflex 1/4"x4'x8' 620.00 6,200.00 10 sht
Marine plywood 520.00 2,080.00 4 sht
R/L 2"x2"x12' 180.00 4,320.00 24 lgth
Common nail # 3 1/2 130.00 325.00 2 1/2 kg
Common nail # 1 130.00 130.00 1 kg
Hardiflex nail 145.00 435.00 3 kg
13,490.00
Grade IV-2, Bldg 4-A
(Interior and Exterior)
Marine plywood 1/4"x4'x8' 520.00 5,200.00 10 sht
R/L 2"x2"x12' 180.00 5,760.00 32 lgth
R/L 2"x4"x12' 360.00 1,440.00 4 lgth
Common nail # 3 1/2 130.00 260.00 2 kg
Common nail # 3 130.00 260.00 2 kg
Common nail # 1 100.00 150.00 1 1/2 kg
13,070.00
Minor Repair of Ceiling at:
Grade I-1, Bldg 6-H
Marine plywood 1/4"x4'x8' 520.00 3,120.00 6 sht
R/L 2"x2"x12' 180.00 2,880.00 16 lgth
R/L 2"x4"x12' 360.00 720.00 2 lgth
Common nail # 3 130.00 130.00 1 kg
Common nail # 1 100.00 50.00 1/2 kg
6,900.00
Grade II-1, Bldg 6-F
Marine plywood 1/4"x4'x8' 520.00 2,600.00 5 sht
R/L 2"x2"x12' 180.00 1,440.00 8 lgth
R/L 2"x4"x12' 360.00 360.00 1 lgth
Common nail # 3 130.00 32.50 0 kg
Common nail # 1 100.00 50.00 1/2 kg
4,482.50
Grade II-2, Bldg 6-E
Marine plywood 1/4"x4'x8' 520.00 2,080.00 4 sht
R/L 2"x2"x12' 180.00 1,440.00 8 lgth
R/L 2"x4"x12' 360.00 360.00 1 lgth
Common nail # 3 130.00 32.50 0 kg
Common nail # 1 100.00 25.00 0 kg
3,937.50
Grade III, Bldg , Bldg 6-D
(Interior and Exterior)
Marine plywood 1/4"x4'x8' 520.00 3,120.00 6 sht
R/L 2"x2"x12' 180.00 1,800.00 10 lgth
R/L 2"x4"x12' 360.00 360.00 1 lgth
Common nail # 3 130.00 32.50 0 kg
Common nail # 1 100.00 100.00 1 kg
5,412.50
Year I-2, Bldg 2-B
(Interior)
Marine plywood 1/4"x4'x8' 520.00 3,120.00 6 sht
R/L 2"x2"x12' 180.00 1,800.00 10 lgth
R/L 2"x4"x12' 360.00 360.00 1 lgth
Common nail # 3 130.00 32.50 0 kg
Common nail # 1 100.00 100.00 1 kg
5,412.50
Repair of Partition Wall
Between Gr 1-1 and Gr 1-2
Plywood
R/L 2"x2"x12' 180.00 720.00 4 lgth
Common nail # 2 1/2 130.00 65.00 0 kg
Common nail # 1 100.00 50.00 1/2 kg
#REF!
Repair of Stage
Hollow block 17.00 5,100.00 300 pc
Cement, premium portland 250.00 5,000.00 20 bg
Mixing sand 850.00 2,125.00 2 1/2 cu.m
Cracked stone 1,200.00 600.00 1/2 cu.m
Corrogated round bar 140.00 2,100.00 15 lgth
Tie wire 98.00 147.00 1 1/2 kg
Marine plywood 520.00 1,040.00 2 sht
R/L 2"x2"x12' 180.00 1,800.00 10 lgth
R/L 2"x4"x12' 360.00 2,160.00 6 lgth
Common nail # 2 1/2" 130.00 130.00 1 kg
20,202.00
Rehabilitation of Canteen
Hollowblock 18.00 3,240.00 180 pc
Cement, premium Portland 270.00 5,400.00 20 bg
Mixing sand 1,000.00 3,000.00 3 cu.m.
Cracked stone 1,400.00 2,800.00 2 cu.m
Tie wire 120.00 240.00 2 kg
Corrogated round bar 9mm 190.00 3,800.00 20 lgth
G.I plain sheet 26x10, 0.4 , 8' 355.00 2,840.00 8 sht
G.I corrogated sheet 26x10, 0.4 , 8' 368.00 368.00 1 sht
R/L 2"x2"x10' 160.00 1,920.00 12 lgth
R/L 2"x2"x8' 170.00 2,380.00 14 lgth
R/L 2"x3"x8' 280.00 1,120.00 4 lgth
R/l 2"x3"x10' 300.00 1,800.00 6 lgth
Common nail #3 1/2 140.00 140.00 1 kg
Common nail # 2 1/2 140.00 140.00 1 kg
Common nail # 1 120.00 60.00 1/2 kg
Umbrella nail 125.00 187.50 1 1/2 kg
Vulca seal 330.00 330.00 1 L
Hardiflex 550.00 2,200.00 4 sht
Plywood 490.00 1,960.00 4 sht
33,925.50
Repair of School Nursery
G.I. Pipe 2 1/2 1,300.00 15,600.00 12 lgth
Cyclone wire 10' 1,300.00 9,100.00 7 roll
Welding rod 160.00 480.00 3 kg
Corrogated bar 9mm 150.00 450.00 3 lgth
25,630.00
Repainting of Floor
Computer Laboratory
Floor paint 1,450.00 4,350.00 3 gal
Roller brush 140.00 140.00 1 pc
Paint brush #5 70.00 140.00 2 pc
4,630.00
Designated Office
Floor paint 1,450.00 2,900.00 2 gal
Roller brush 140.00 140.00 1 pc
Paint brush #5 70.00 140.00 2 pc
3,180.00
Home Economics Building
Floor paint 1,450.00 4,350.00 3 gal
Roller brush 140.00 140.00 1 pc
Paint brush #5 70.00 140.00 2 pc
4,630.00
Repair of Sink
Office CR
Sink set 3,400.00 3,400.00 1 unit
White cement 160.00 320.00 2 kg
3,720.00
Clinic
Sink set 3,400.00 3,400.00 1 unit
Cement premium Portland 260.00 780.00 3 bg
Corrogated round bar 9mm 150.00 450.00 3 lgth
Mixing sand 900.00 225.00 1/4 cu.m.
Cracked stone 1,300.00 162.50 1/8 cu.m.
Repair of Cabinet
Science Room
Plywood 1/4"x4"x8' 460.00 1,380.00 3 lgth
Common nail # 1 0.00 1/2 kg
Common nail # 3 130.00 130.00 1 kg
Cove molding 125.00 375.00 3 lgth
Sand paper 25 100.00 4 sht
Handle 45 180.00 4 pcs
R/L 2"x2"x8' 130.00 1,950.00 15 lgth
Glass 450.00 1,800.00 4 pc
Stikwel 235.00 235.00 1 cn
Plastic Varnish 85.00 340.00 4 bot
Lacquer thinner 60.00 120.00 2 bot
6,610.00
Repair of Divider
Office
45,110.00
COLONIA DIVINA INTEGR
Annual Procurement P
Distribution: QUARTER 1
Item Description Unit Total Total
Price Price Qnty
I. Office Supplies and Materials
Ballpen 7.00 21.00 3
Battery, AA 25.00 50.00 2
Betadine 240.00 240.00 1
Bookpaper 150.00 750.00 5
Bowl liquid cleaner 300.00 300.00 1
Call bell 195.00
Cartolina 10.00 2,000.00 200
Carton paper, set 140.00 140.00 1
Cartridge, LX-300+II 190.00 190.00 1
Cartridge, Lexmark Prntr 1,360.00 5,440.00 4
CD-R, blank 15.00 75.00 5
Cleaning tools, set 580.00 580.00 1
Computer ink, Epson L210 295.00 2,950.00 10
Correction tape 55.00 165.00 3
Cotton balls, sterilized 45.00 45.00 1
File bag 355.00 355.00 1
Key tag 10's 65.00 195.00 3
Mini sorter 195.00 195.00 1
Pencil sharpener, Carl 450.00 450.00 1
Pen holder 175.00 175.00 1
Stick file, big 73.00 73.00 1
Streamers 300.00 600.00 2
Tie straw 75.00 75.00 1
Time card 210.00 210.00 1
Tracing Tube 130.00 130.00 2
2. Learning Materials and Equipment
Ammeter 138.00 276.00 2
Beaker 57.00 114.00 2
Coasters 35.00 70.00 2
Compass, blackboard 140.00 420.00 3
Concave lens 68.00 68.00 1
Convex lens 68.00 68.00 1
Cutlery, set 380.00 380.00 1
Denatured alcohol 57.00 57.00 1
Dictionary, English-Visayan-Hiligayn 2,600.00 2,600.00 1
Dictionary, Filipino-Filipino 1,800.00 1,800.00 1
Dictionary, Filipino-English 1,800.00 1,800.00 1
Easel Stand 642.00 1,284.00 2
Handlens 55.00 110.00 2
Maps, political regional 340.00 4,760.00 14
Maps, political Neg Occ 340.00 340.00 1
Periodic table of elements, modern 145.00 145.00 1
Placemats set 88.00 528.00 6
Potractor, blackboard 140.00 420.00 3
Pruning knife 450.00 1,350.00 3
Ruler, blackboard 140.00 420.00 3
Scrap booking 142.00 710.00 5
Silkscreen with frame, varied size 138.00 552.00 4
Streamers 300.00 1,800.00 6
Table napkin, cloth 67.00 402.00 6
0.00
Test tube 195.00 390.00 2
Triangle, blackboard 140.00 420.00 3
T-square 36" 780.00 7,800.00 10
TOTAL
Distribution: QUARTER 2
Item Description Unit Total Total
Price Price Qnty
I. Office Supplies and Materials
Cartridge, Lexmark Prntr 1,360.00 5,440.00 4
CD-R, blank 15.00 75.00 5
Cleaning tools, set 580.00 580.00 1
Correction tape 55.00 165.00 3
Cotton balls, sterilized 45.00 45.00 1
Cutter 65.00 65.00 1
Cutter blade 30.00 30.00 1
DepEd Form 137 7.00 140.00 20
DepEd Form 138 6.00 90.00 15
DepEd Form 18A 6.00 120.00 20
DepEd Form 18E 6.00 180.00 30
Drill bit 230.00 230.00 1
DVD-RW, blank 35.00 175.00 5
Electrical tape 15.00 15.00 1
Envelope, plastic 5.00 500.00 100
Floor wax 320.00 320.00 1
Folder, long, ordinary 4.20 420.00 100
Handwashing supplies 200.00 1,000.00 5
Ink, bro 3-in-1 2,400.00 2,400.00 1
Masking tape 1 1/2" 26.00 130.00 5
Mighty bond 140.00 140.00 1
Mirror 350.00 1,050.00 3
Paint brushes 38.00 114.00 3
Pencil sharpener 15.00 15.00 1
Push pins 45.00 45.00 1
Ribbon cartridge, printer 190.00 190.00 1
SD card 480.00 480.00 1
Sign pen 75.00 75.00 1
Streamers 300.00 900.00 3
Tie straw 75.00 75.00 1
Time card 210.00 210.00 1
2. Learning Materials and Equipment
Cutlery, set 380.00 2,660.00 7
Goblet 138.00 828.00 6
Kitchen wares, set 350.00 350.00 1
Placemats set 88.00 528.00 6
Platter 185.00 370.00 2
Table napkin, cloth 67.00 402.00 6
TOTAL
Distribution: QUARTER 3
Item Description Unit Total Total
Price Price Qnty
I. Office Supplies and Materials
Beddings (clinic, h.e) 350.00 700.00 2
Betadine 240.00 240.00 1
Big cooking pot (for Fdg) 2,900.00 2,900.00 1
Bondpaper, long s-20 165.00 1,650.00 10
Bondpaper, A4 s-20 155.00 1,550.00 10
Bondpaper, long s-18 150.00 1,500.00 10
Bondpaper, A4 s-18 145.00 1,450.00 10
Bondpaper, whtwove, short 120.00 1,200.00 10
Bondpaper, whtwove, long 100.00 1,000.00 10
Bookpaper 150.00 750.00 5
Broadband tattoo 1,300.00 1,300.00 1
Bundy clock ribbon 1,300.00 1,300.00 1
Cartolina 6.00 1,200.00 200
Cash Voucher 18.00 36.00 2
Cleaning tools, set 580.00 1,160.00 2
Computer eyecare 280.00 3,360.00 12
Cooking stove burner, heavy duty 1,800.00 1,800.00 1
Correction pen 28.00 588.00 21
Correction tape 55.00 275.00 5
Cotton balls, sterilized 45.00 45.00 1
Curtain 400.00 4,000.00 10
Cutter 80.00 160.00 2
Cutter blade 30.00 60.00 2
Drill bit 230.00 230.00 1
DVD-RW, Maxell 13.00 650.00 50
Elmer's glue 250.00 500.00 2
Envelope, letter 17.00 170.00 10
Envelope, exp, with handle trans 35.00 70.00 2
Envelope, expanded, asstd color 8.00 800.00 100
Envelope, plastic 4.00 2,400.00 600
Envelope with compartment 80.00 80.00 1
Epson LX300+II ribbon in cartridge 100.00 500.00 5
Faber Castel Marker 68.00 136.00 2
Floor wax 439.00 1,317.00 3
Folder, long colored 4.20 2,100.00 500
Folder, long wht 3.50 2,100.00 600
Folder, long expanded 12.00 600.00 50
TOTAL
Distribution: QUARTER 4
Item Description Unit Total Total
Price Price Qnty
Balloon (dcor ) 1.00 400.00 400
Battery, AA 25.00 50.00 2
Beddings (clinic, h.e) 350.00 700.00 2
Betadine 240.00 240.00 1
Big cooking pot (for Fdg) 2,900.00 2,900.00 1
Bondpaper, reams 190.00 950.00 5
Bookpaper 150.00 750.00 5
Cartolina 10.00 1,000.00 100
Cleaning tools, set 580.00 1,160.00 2
Computer eyecare 280.00 3,360.00 12
Cooking stove burner, heavy duty 1,800.00 1,800.00 1
Correction tape 55.00 275.00 5
Cotton balls, sterilized 45.00 45.00 1
Curtain 400.00 4,000.00 10
Drill bit 230.00 230.00 1
Envelope, letter 1.00 100.00 100
Envelope, plastic 5.00 500.00 100
Fine wire 60.00 60.00 1
Floor wax 320.00 320.00 1
Handwashing supplies 200.00 1,000.00 5
Ink, bro 3-in-1 2,400.00 7,200.00 3
Linolium, yard 90.00 1,350.00 15
Mighty bond 140.00 140.00 1
Mirror 165.00 495.00 3
Multivitamins 200.00 1,000.00 5
Paint 56.00 448.00 8
Paint brushes 38.00 304.00 8
Pencil 80.00 240.00 3
Pencil lead refill 25.00 25.00 1
Pencil sharpener 15.00 15.00 1
Push pins 45.00 90.00 2
Ribbon, decoration 8.00 80.00 10
Scissors 300.00 2,100.00 7
Rugby 55.00 55.00 1
SD card 480.00 480.00 1
Seat cover 300.00 1,800.00 6
Sign pen 75.00 75.00 1
Silver dust 22.00 88.00 4
Staple wire 160.00 160.00 1
TOTAL
GRAND TOTAL
NIA DIVINA INTEGRATED SCHOOL
Annual Procurement Plan 2014
pc 21.00 21.00
pc 50.00 50.00
bot 240.00 240.00
rm 750.00 750.00
bot 300.00 300.00
pc 68.00 68.00
pc 68.00 68.00
u 380.00 380.00
mL 57.00 57.00
pc 2,600.00 2,600.00
pc 1,800.00 1,800.00
pc 1,800.00 1,800.00
pc
pc 110.00 110.00
4,760.00 4,760.00
340.00 340.00
145.00 145.00
set 528.00 528.00
420.00 420.00
1,350.00 1,350.00
420.00 420.00
set 402.00 402.00
pc 390.00 390.00
pc 5,440.00 5,440.00
pc 75.00 75.00
set 580.00 580.00
pc 165.00 165.00
pk 45.00 45.00
pc 65.00 65.00
set 30.00 30.00
sht 140.00 140.00
pc 90.00 90.00
sht 120.00 120.00
sht 180.00 180.00
pc 230.00 230.00
pc 175.00 175.00
roll 15.00 15.00
pc 500.00 500.00
can 320.00 320.00
pc 420.00 420.00
set 1,000.00 1,000.00
set 2,400.00 2,400.00
roll 130.00 130.00
mL 140.00 140.00
pc 1,050.00 1,050.00
pc 114.00 114.00
pc 15.00 15.00
box 45.00 45.00
crtdg 190.00 190.00
pc 480.00 480.00
pc 75.00 75.00
cut 900.00 900.00
roll 75.00 75.00
pk 210.00 210.00
15,414.00 0.00 0.00 15,414.00
u 2,660.00 2,660.00
u 825.00 828.00
u 350.00 350.00
set 128.00 528.00
u 370.00 370.00
set 400.00 402.00
498.00 0.00 4,235.00 5,138.00
15,912.00 0.00 4,235.00 20,552.00
RTER 3 Distribution: QUARTER 3
pk 420.00 420.00
pc 780.00 780.00
pc 1,200.00 1,200.00
51,092.25 0.00 29,928.00 81,020.25
pc 342.00 342.00
u 1,200.00 1,200.00
pc 2,700.00 2,700.00
pc 2,400.00 2,400.00
pc 171.00 171.00
pc 1,080.00 1,080.00
pc 680.00 680.00
pc 970.00 970.00
pcs 7,800.00 7,800.00
pc 12,000.00 12,000.00
u 2,500.00 2,500.00
cd 2,800.00 2,500.00 5,300.00
pc 68.00 68.00 136.00
pc 68.00 68.00 136.00
pc 220.00 220.00 440.00
u 3,040.00 3,040.00
mL 113.00 113.00
u 825.00 825.00
pc 165.00 165.00
u 350.00 350.00
pc 585.00 585.00
0.00
pc 160.00 160.00
pc 166.00 166.00
u 28,000.00 28,000.00
pc 600.00 600.00
pc 380.00 380.00
set 528.00 528.00
u 370.00 370.00
set 200.00 200.00
y 2,040.00 2,040.00
pc 585.00 585.00
u 280.00 280.00
u 900.00 900.00
36,261.00 0.00 40,881.00 77,142.00
87,353.25 0.00 70,809.00 158,162.25
pc 200.00 200.00
pc 50.00 50.00
set 700.00 700.00
bot 240.00 240.00
u 2,900.00 2,900.00
rm 950.00 950.00
rm 750.00 750.00
sht 1,000.00 1,000.00
set 1,160.00 1,160.00
pc 3,360.00 3,360.00
pc 1,800.00 1,800.00
pc 275.00 275.00
pack 45.00 45.00
pc 4,000.00 4,000.00
pc 230.00 230.00
pc 100.00 100.00
pc 500.00 500.00
roll 60.00 60.00
can 320.00 320.00
set 1,000.00 1,000.00
set 7,200.00 7,200.00
y 1,350.00 1,350.00
mL 140.00 140.00
pc 495.00 495.00
bot 1,000.00 1,000.00
q/g 448.00 448.00
pc 304.00 304.00
box 240.00 240.00
set 25.00 25.00
pc 15.00 15.00
box 90.00 90.00
y 80.00 80.00
prs 2,100.00 2,100.00
bot 55.00 55.00
pc 480.00 480.00
set 1,800.00 1,800.00
pc 75.00 75.00
pk 88.00 88.00
box 160.00 160.00
pc 350.00 350.00
set 390.00 390.00
cut 900.00 900.00
pc 46.00 46.00
pc 860.00 860.00
pc 1,200.00 1,200.00
39,410.00 0.00 121.00 39,531.00
pc 343.00 343.00
pc 6,400.00 6,400.00
u 1,800.00 1,800.00
pc 3,600.00 10,800.00 14,400.00
pc 5,000.00 5,000.00
u 5,600.00 5,600.00
u 4,800.00 4,800.00
980.00 980.00
840.00 840.00
700.00 700.00
pc 1,500.00 10,500.00 12,000.00
pr 9,504.00 9,504.00
u 5,500.00 5,500.00
pc 1,100.00 53,900.00 55,000.00
u 5,400.00 5,400.00
lgth 900.00 900.00
u 3,500.00 3,500.00
u 196.00 196.00
u 250.00 250.00
lgth 4,400.00 4,400.00
u 96.00 96.00
u 225.00 225.00
u 360.00 360.00
u 700.00 700.00
u 3,500.00 3,500.00
pc 5,000.00 5,000.00
u 1,200.00 1,200.00
pr 9,192.00 9,192.00
u 36,000.00 36,000.00
u 5,000.00 5,000.00
pc 24,000.00 24,000.00
u 2,600.00 2,600.00
pc 1,300.00 1,300.00
u 2,100.00 2,100.00
pc 18,000.00 18,000.00
u 380.00 380.00
pc 950.00 8,300.00 9,250.00
doz 792.00 792.00
160.00 160.00
u 2,600.00 58,800.00 61,400.00
u 2,500.00 2,500.00
u 332.00 332.00
set 3,800.00 3,800.00
set ,5,950 6,650.00 6,650.00
set 1,300.00 3,900.00 5,200.00
pc 1,500.00 1,500.00
u 250.00 250.00
set 2,250.00 2,250.00 4,500.00
set 2,000.00 6,000.00 8,000.00
u 600.00 3,000.00 3,600.00
lgth 1,300.00 1,300.00
pc 600.00 600.00
u 4,050.00 4,050.00
roll 1,400.00 1,400.00
pc 12,600.00 1,400.00 14,000.00
u 285.00 285.00
pc 1,250.00 3,750.00 5,000.00
pc 625.00 3,750.00 4,375.00
u 4,000.00 4,000.00
set 4,400.00 4,400.00
pr 766.00 8,426.00 9,192.00
set 525.00 525.00
u 860.00 860.00
pc 800.00 800.00
set 1,600.00 1,600.00
u 2,001.00 2,001.00
u 370.00 370.00
u 960.00 960.00
u 4,600.00 4,600.00
u 5,000.00 5,000.00
u 5,000.00 5,000.00
pc 165.00 165.00
u 1,800.00 1,800.00
pr 16,000.00 16,000.00
u 900.00 900.00
u 1,800.00 1,800.00
pc 1,300.00 1,300.00
u 660.00 660.00
u 2,490.00 2,490.00
u 5,000.00 5,000.00
u 450.00 450.00
u 48,000.00 8,000.00 56,000.00
u 72,000.00 72,000.00
u 6,000.00 6,000.00
u 12,000.00 12,000.00
u 9,000.00 9,000.00
pc 6,000.00 6,000.00
pc 18,000.00 18,000.00
pc 14,300.00 14,300.00
u 4,500.00 4,500.00
u 9,000.00 9,000.00
u 2,800.00 2,800.00
u 6,000.00 6,000.00
u 3,900.00 3,900.00
u 900.00 900.00
u 1,800.00 1,800.00
pc 1,300.00 10,400.00 1,300.00 13,000.00
u 1,000.00 1,000.00
lgth 1,500.00 1,500.00
u 600.00 600.00
set 400.00 800.00 1,200.00
u 1,800.00 1,800.00
pc 63.00 63.00
pc 83.00 83.00
u 19.00 19.00
pc 504.00 504.00
pc 1,704.00 1,704.00
pc 12,000.00 42,000.00 54,000.00
u 2,200.00 2,200.00
u 7,200.00 7,200.00
u 13,000.00 13,000.00
u 18,000.00 18,000.00
set 6,000.00 6,000.00
u 900.00 900.00
u 8,000.00 8,000.00
Prepared by:
ANALIE V. BUHAYAN
Principal I
GRAND TOTAL
13,831.00
20,552.00
158,162.25
1,258,691.00
1,437,405.25
I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
COLONIA DIVINA INTEGR
Annual Procurement P
Distribution: QUARTER 1
Item Description Unit Total Total
Price Price Qnty
I. Office Supplies and Materials
Ballpen 7.00 21.00 3
Battery, AA 25.00 50.00 2
Betadine 240.00 240.00 1
Bookpaper 150.00 750.00 5
Bowl liquid cleaner 300.00 300.00 1
Call bell 195.00
Cartolina 10.00 2,000.00 200
Carton paper, set 140.00 140.00 1
Cartridge, LX-300+II 190.00 190.00 1
Cartridge, Lexmark Prntr 1,360.00 5,440.00 4
CD-R, blank 15.00 75.00 5
Cleaning tools, set 580.00 580.00 1
Computer ink, Epson L210 295.00 2,950.00 10
Correction tape 55.00 165.00 3
Cotton balls, sterilized 45.00 45.00 1
File bag 355.00 355.00 1
Key tag 10's 65.00 195.00 3
Mini sorter 195.00 195.00 1
Pencil sharpener, Carl 450.00 450.00 1
Pen holder 175.00 175.00 1
Stick file, big 73.00 73.00 1
Streamers 300.00 600.00 2
Tie straw 75.00 75.00 1
Time card 210.00 210.00 1
Tracing Tube 130.00 130.00 2
2. Learning Materials and Equipment
Ammeter 138.00 276.00 2
Beaker 57.00 114.00 2
Coasters 35.00 70.00 2
Compass, blackboard 140.00 420.00 3
Concave lens 68.00 68.00 1
Convex lens 68.00 68.00 1
Cutlery, set 380.00 380.00 1
Denatured alcohol 57.00 57.00 1
Dictionary, English-Visayan-Hiligayn 2,600.00 2,600.00 1
Dictionary, Filipino-Filipino 1,800.00 1,800.00 1
Dictionary, Filipino-English 1,800.00 1,800.00 1
Easel Stand 642.00 1,284.00 2
Handlens 55.00 110.00 2
Maps, political regional 340.00 4,760.00 14
Maps, political Neg Occ 340.00 340.00 1
Periodic table of elements, modern 145.00 145.00 1
Placemats set 88.00 528.00 6
Potractor, blackboard 140.00 420.00 3
Pruning knife 450.00 1,350.00 3
Ruler, blackboard 140.00 420.00 3
Scrap booking 142.00 710.00 5
Silkscreen with frame, varied size 138.00 552.00 4
Streamers 300.00 1,800.00 6
Table napkin, cloth 67.00 402.00 6
0.00
Test tube 195.00 390.00 2
Triangle, blackboard 140.00 420.00 3
T-square 36" 780.00 7,800.00 10
TOTAL
Distribution: QUARTER 2
Item Description Unit Total Total
Price Price Qnty
I. Office Supplies and Materials
Cartridge, Lexmark Prntr 1,360.00 5,440.00 4
CD-R, blank 15.00 75.00 5
Cleaning tools, set 580.00 580.00 1
Correction tape 55.00 165.00 3
Cotton balls, sterilized 45.00 45.00 1
Cutter 65.00 65.00 1
Cutter blade 30.00 30.00 1
DepEd Form 137 7.00 140.00 20
DepEd Form 138 6.00 90.00 15
DepEd Form 18A 6.00 120.00 20
DepEd Form 18E 6.00 180.00 30
Drill bit 230.00 230.00 1
DVD-RW, blank 35.00 175.00 5
Electrical tape 15.00 15.00 1
Envelope, plastic 5.00 500.00 100
Floor wax 320.00 320.00 1
Folder, long, ordinary 4.20 420.00 100
Handwashing supplies 200.00 1,000.00 5
Ink, bro 3-in-1 2,400.00 2,400.00 1
Masking tape 1 1/2" 26.00 130.00 5
Mighty bond 140.00 140.00 1
Mirror 350.00 1,050.00 3
Paint brushes 38.00 114.00 3
Pencil sharpener 15.00 15.00 1
Push pins 45.00 45.00 1
Ribbon cartridge, printer 190.00 190.00 1
SD card 480.00 480.00 1
Sign pen 75.00 75.00 1
Streamers 300.00 900.00 3
Tie straw 75.00 75.00 1
Time card 210.00 210.00 1
2. Learning Materials and Equipment
Cutlery, set 380.00 2,660.00 7
Goblet 138.00 828.00 6
Kitchen wares, set 350.00 350.00 1
Placemats set 88.00 528.00 6
Platter 185.00 370.00 2
Table napkin, cloth 67.00 402.00 6
TOTAL
Distribution: QUARTER 3
Item Description Unit Total Total
Price Price Qnty
I. Office Supplies and Materials
Beddings (clinic, h.e) 350.00 700.00 2
Betadine 240.00 240.00 1
Big cooking pot (for Fdg) 2,900.00 2,900.00 1
Bondpaper, long s-20 165.00 1,650.00 10
Bondpaper, A4 s-20 155.00 1,550.00 10
Bondpaper, long s-18 150.00 1,500.00 10
Bondpaper, A4 s-18 145.00 1,450.00 10
Bondpaper, whtwove, short 120.00 1,200.00 10
Bondpaper, whtwove, long 100.00 1,000.00 10
Bookpaper 150.00 750.00 5
Broadband tattoo 1,300.00 1,300.00 1
Bundy clock ribbon 1,300.00 1,300.00 1
Cartolina 6.00 1,200.00 200
Cash Voucher 18.00 36.00 2
Cleaning tools, set 580.00 1,160.00 2
Computer eyecare 280.00 3,360.00 12
Cooking stove burner, heavy duty 1,800.00 1,800.00 1
Correction pen 28.00 588.00 21
Correction tape 55.00 275.00 5
Cotton balls, sterilized 45.00 45.00 1
Curtain 400.00 4,000.00 10
Cutter 80.00 160.00 2
Cutter blade 30.00 60.00 2
Drill bit 230.00 230.00 1
DVD-RW, Maxell 13.00 650.00 50
Elmer's glue 250.00 500.00 2
Envelope, letter 17.00 170.00 10
Envelope, exp, with handle trans 35.00 70.00 2
Envelope, expanded, asstd color 8.00 800.00 100
Envelope, plastic 4.00 2,400.00 600
Envelope with compartment 80.00 80.00 1
Epson LX300+II ribbon in cartridge 100.00 500.00 5
Faber Castel Marker 68.00 136.00 2
Floor wax 439.00 1,317.00 3
Folder, long colored 4.20 2,100.00 500
Folder, long wht 3.50 2,100.00 600
Folder, long expanded 12.00 600.00 50
TOTAL
Distribution: QUARTER 4
Item Description Unit Total Total
Price Price Qnty
Balloon (dcor ) 1.00 400.00 400
Battery, AA 25.00 50.00 2
Beddings (clinic, h.e) 350.00 700.00 2
Betadine 240.00 240.00 1
Big cooking pot (for Fdg) 2,900.00 2,900.00 1
Bondpaper, reams 190.00 950.00 5
Bookpaper 150.00 750.00 5
Cartolina 10.00 1,000.00 100
Cleaning tools, set 580.00 1,160.00 2
Computer eyecare 280.00 3,360.00 12
Cooking stove burner, heavy duty 1,800.00 1,800.00 1
Correction tape 55.00 275.00 5
Cotton balls, sterilized 45.00 45.00 1
Curtain 400.00 4,000.00 10
Drill bit 230.00 230.00 1
Envelope, letter 1.00 100.00 100
Envelope, plastic 5.00 500.00 100
Fine wire 60.00 60.00 1
Floor wax 320.00 320.00 1
Handwashing supplies 200.00 1,000.00 5
Ink, bro 3-in-1 2,400.00 7,200.00 3
Linolium, yard 90.00 1,350.00 15
Mighty bond 140.00 140.00 1
Mirror 165.00 495.00 3
Multivitamins 200.00 1,000.00 5
Paint 56.00 448.00 8
Paint brushes 38.00 304.00 8
Pencil 80.00 240.00 3
Pencil lead refill 25.00 25.00 1
Pencil sharpener 15.00 15.00 1
Push pins 45.00 90.00 2
Ribbon, decoration 8.00 80.00 10
Scissors 300.00 2,100.00 7
Rugby 55.00 55.00 1
SD card 480.00 480.00 1
Seat cover 300.00 1,800.00 6
Sign pen 75.00 75.00 1
Silver dust 22.00 88.00 4
Staple wire 160.00 160.00 1
TOTAL
GRAND TOTAL
NIA DIVINA INTEGRATED SCHOOL
Annual Procurement Plan 2014
pc 21.00 21.00
pc 50.00 50.00
bot 240.00 240.00
rm 750.00 750.00
bot 300.00 300.00
pc 68.00 68.00
pc 68.00 68.00
u 380.00 380.00
mL 57.00 57.00
pc 2,600.00 2,600.00
pc 1,800.00 1,800.00
pc 1,800.00 1,800.00
pc
pc 110.00 110.00
4,760.00 4,760.00
340.00 340.00
145.00 145.00
set 528.00 528.00
420.00 420.00
1,350.00 1,350.00
420.00 420.00
set 402.00 402.00
pc 390.00 390.00
pc 5,440.00 5,440.00
pc 75.00 75.00
set 580.00 580.00
pc 165.00 165.00
pk 45.00 45.00
pc 65.00 65.00
set 30.00 30.00
sht 140.00 140.00
pc 90.00 90.00
sht 120.00 120.00
sht 180.00 180.00
pc 230.00 230.00
pc 175.00 175.00
roll 15.00 15.00
pc 500.00 500.00
can 320.00 320.00
pc 420.00 420.00
set 1,000.00 1,000.00
set 2,400.00 2,400.00
roll 130.00 130.00
mL 140.00 140.00
pc 1,050.00 1,050.00
pc 114.00 114.00
pc 15.00 15.00
box 45.00 45.00
crtdg 190.00 190.00
pc 480.00 480.00
pc 75.00 75.00
cut 900.00 900.00
roll 75.00 75.00
pk 210.00 210.00
15,414.00 0.00 0.00 15,414.00
u 2,660.00 2,660.00
u 825.00 828.00
u 350.00 350.00
set 128.00 528.00
u 370.00 370.00
set 400.00 402.00
498.00 0.00 4,235.00 5,138.00
15,912.00 0.00 4,235.00 20,552.00
RTER 3 Distribution: QUARTER 3
pk 420.00 420.00
pc 780.00 780.00
pc 1,200.00 1,200.00
51,092.25 0.00 29,928.00 81,020.25
pc 342.00 342.00
u 1,200.00 1,200.00
pc 2,700.00 2,700.00
pc 2,400.00 2,400.00
pc 171.00 171.00
pc 1,080.00 1,080.00
pc 680.00 680.00
pc 970.00 970.00
pcs 7,800.00 7,800.00
pc 12,000.00 12,000.00
u 2,500.00 2,500.00
cd 2,800.00 2,500.00 5,300.00
pc 68.00 68.00 136.00
pc 68.00 68.00 136.00
pc 220.00 220.00 440.00
u 3,040.00 3,040.00
mL 113.00 113.00
u 825.00 825.00
pc 165.00 165.00
u 350.00 350.00
pc 585.00 585.00
0.00
pc 160.00 160.00
pc 166.00 166.00
u 28,000.00 28,000.00
pc 600.00 600.00
pc 380.00 380.00
set 528.00 528.00
u 370.00 370.00
set 200.00 200.00
y 2,040.00 2,040.00
pc 585.00 585.00
u 280.00 280.00
u 900.00 900.00
36,261.00 0.00 40,881.00 77,142.00
87,353.25 0.00 70,809.00 158,162.25
pc 200.00 200.00
pc 50.00 50.00
set 700.00 700.00
bot 240.00 240.00
u 2,900.00 2,900.00
rm 950.00 950.00
rm 750.00 750.00
sht 1,000.00 1,000.00
set 1,160.00 1,160.00
pc 3,360.00 3,360.00
pc 1,800.00 1,800.00
pc 275.00 275.00
pack 45.00 45.00
pc 4,000.00 4,000.00
pc 230.00 230.00
pc 100.00 100.00
pc 500.00 500.00
roll 60.00 60.00
can 320.00 320.00
set 1,000.00 1,000.00
set 7,200.00 7,200.00
y 1,350.00 1,350.00
mL 140.00 140.00
pc 495.00 495.00
bot 1,000.00 1,000.00
q/g 448.00 448.00
pc 304.00 304.00
box 240.00 240.00
set 25.00 25.00
pc 15.00 15.00
box 90.00 90.00
y 80.00 80.00
prs 2,100.00 2,100.00
bot 55.00 55.00
pc 480.00 480.00
set 1,800.00 1,800.00
pc 75.00 75.00
pk 88.00 88.00
box 160.00 160.00
pc 350.00 350.00
set 390.00 390.00
cut 900.00 900.00
pc 46.00 46.00
pc 860.00 860.00
pc 1,200.00 1,200.00
39,410.00 0.00 121.00 39,531.00
pc 343.00 343.00
pc 6,400.00 6,400.00
u 1,800.00 1,800.00
pc 3,600.00 10,800.00 14,400.00
pc 5,000.00 5,000.00
u 5,600.00 5,600.00
u 4,800.00 4,800.00
980.00 980.00
840.00 840.00
700.00 700.00
pc 1,500.00 10,500.00 12,000.00
pr 9,504.00 9,504.00
u 5,500.00 5,500.00
pc 1,100.00 53,900.00 55,000.00
u 5,400.00 5,400.00
lgth 900.00 900.00
u 3,500.00 3,500.00
u 196.00 196.00
u 250.00 250.00
lgth 4,400.00 4,400.00
u 96.00 96.00
u 225.00 225.00
u 360.00 360.00
u 700.00 700.00
u 3,500.00 3,500.00
pc 5,000.00 5,000.00
u 1,200.00 1,200.00
pr 9,192.00 9,192.00
u 36,000.00 36,000.00
u 5,000.00 5,000.00
pc 24,000.00 24,000.00
u 2,600.00 2,600.00
pc 1,300.00 1,300.00
u 2,100.00 2,100.00
pc 18,000.00 18,000.00
u 380.00 380.00
pc 950.00 8,300.00 9,250.00
doz 792.00 792.00
160.00 160.00
u 2,600.00 58,800.00 61,400.00
u 2,500.00 2,500.00
u 332.00 332.00
set 3,800.00 3,800.00
set ,5,950 6,650.00 6,650.00
set 1,300.00 3,900.00 5,200.00
pc 1,500.00 1,500.00
u 250.00 250.00
set 2,250.00 2,250.00 4,500.00
set 2,000.00 6,000.00 8,000.00
u 600.00 3,000.00 3,600.00
lgth 1,300.00 1,300.00
pc 600.00 600.00
u 4,050.00 4,050.00
roll 1,400.00 1,400.00
pc 12,600.00 1,400.00 14,000.00
u 285.00 285.00
pc 1,250.00 3,750.00 5,000.00
pc 625.00 3,750.00 4,375.00
u 4,000.00 4,000.00
set 4,400.00 4,400.00
pr 766.00 8,426.00 9,192.00
set 525.00 525.00
u 860.00 860.00
pc 800.00 800.00
set 1,600.00 1,600.00
u 2,001.00 2,001.00
u 370.00 370.00
u 960.00 960.00
u 4,600.00 4,600.00
u 5,000.00 5,000.00
u 5,000.00 5,000.00
pc 165.00 165.00
u 1,800.00 1,800.00
pr 16,000.00 16,000.00
u 900.00 900.00
u 1,800.00 1,800.00
pc 1,300.00 1,300.00
u 660.00 660.00
u 2,490.00 2,490.00
u 5,000.00 5,000.00
u 450.00 450.00
u 48,000.00 8,000.00 56,000.00
u 72,000.00 72,000.00
u 6,000.00 6,000.00
u 12,000.00 12,000.00
u 9,000.00 9,000.00
pc 6,000.00 6,000.00
pc 18,000.00 18,000.00
pc 14,300.00 14,300.00
u 4,500.00 4,500.00
u 9,000.00 9,000.00
u 2,800.00 2,800.00
u 6,000.00 6,000.00
u 3,900.00 3,900.00
u 900.00 900.00
u 1,800.00 1,800.00
pc 1,300.00 10,400.00 1,300.00 13,000.00
u 1,000.00 1,000.00
lgth 1,500.00 1,500.00
u 600.00 600.00
set 400.00 800.00 1,200.00
u 1,800.00 1,800.00
pc 63.00 63.00
pc 83.00 83.00
u 19.00 19.00
pc 504.00 504.00
pc 1,704.00 1,704.00
pc 12,000.00 42,000.00 54,000.00
u 2,200.00 2,200.00
u 7,200.00 7,200.00
u 13,000.00 13,000.00
u 18,000.00 18,000.00
set 6,000.00 6,000.00
u 900.00 900.00
u 8,000.00 8,000.00
Prepared by:
ANALIE V. BUHAYAN
Principal I
GRAND TOTAL
13,831.00
20,552.00
158,162.25
1,258,691.00
1,437,405.25
I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
COLONIA DIVINA INTEGRATED SCHOOL
Annual Procurement Plan 2012
GRAND TOTAL
Prepared by:
ANALIE V. BUHAYAN
Principal I
ER 1
GRAND TOTAL
TOTAL
21.00
50.00
240.00
750.00
300.00
2,000.00
140.00
190.00
5,440.00
75.00
580.00
165.00
45.00
600.00
75.00
210.00
10,881.00
276.00
114.00
70.00
68.00
68.00
380.00
57.00
110.00
528.00
402.00
390.00
2,463.00
13,344.00 13,344.00
ER 2
TOTAL
5,440.00
75.00
580.00
165.00
45.00
65.00
30.00
140.00
90.00
120.00
180.00
230.00
175.00
15.00
500.00
320.00
420.00
1,000.00
2,400.00
130.00
140.00
165.00
114.00
15.00
45.00
190.00
480.00
75.00
900.00
75.00
210.00
14,529.00
2,660.00
828.00
350.00
528.00
370.00
402.00
5,138.00
19,667.00 19,667.00
ER 3
TOTAL
700.00
240.00
2,900.00
1,650.00
1,550.00
1,500.00
1,450.00
1,200.00
1,000.00
750.00
1,300.00
1,300.00
1,200.00
36.00
1,160.00
3,360.00
1,800.00
588.00
275.00
45.00
4,000.00
80.00
60.00
230.00
650.00
500.00
170.00
70.00
800.00
2,400.00
80.00
500.00
136.00
1,317.00
2,100.00
2,100.00
600.00
1,000.00
1,625.00
9,600.00
5,440.00
950.00
450.00
1,200.00
1,100.00
24.00
5,100.00
840.00
336.00
43.25
54.00
66.00
25.00
15.00
200.00
30.00
390.00
1,700.00
125.00
265.00
480.00
175.00
75.00
380.00
80.00
800.00
228.00
925.00
58.00
88.00
90.00
1,450.00
66.00
480.00
1,200.00
1,200.00
320.00
150.00
420.00
780.00
1,200.00
81,020.25
342.00
1,200.00
2,700.00
2,400.00
171.00
1,080.00
680.00
970.00
7,800.00
12,000.00
2,500.00
5,300.00
136.00
136.00
440.00
3,040.00
113.00
825.00
165.00
350.00
585.00
0.00
160.00
166.00
28,000.00
600.00
380.00
528.00
370.00
200.00
2,040.00
585.00
280.00
900.00
77,142.00
158,162.25 158,162.25
ER4
TOTAL
200.00
50.00
700.00
240.00
2,900.00
950.00
750.00
1,000.00
1,160.00
3,360.00
1,800.00
275.00
45.00
4,000.00
230.00
100.00
500.00
60.00
320.00
1,000.00
7,200.00
1,350.00
140.00
495.00
1,000.00
448.00
304.00
240.00
25.00
15.00
90.00
80.00
2,100.00
55.00
480.00
1,800.00
75.00
88.00
160.00
350.00
390.00
900.00
46.00
860.00
1,200.00
39,531.00
343.00
6,400.00
1,800.00
14,400.00
5,000.00
5,600.00
4,800.00
980.00
840.00
700.00
12,000.00
9,504.00
5,500.00
55,000.00
5,400.00
900.00
3,500.00
196.00
250.00
4,400.00
96.00
225.00
360.00
700.00
3,500.00
5,000.00
1,200.00
9,192.00
36,000.00
5,000.00
24,000.00
2,600.00
1,300.00
12,500.00
66,000.00
2,400.00
100.00
9,408.00
1,200.00
1,800.00
1,400.00
6,000.00
1,520.00
150.00
3,792.00
5,500.00
6,000.00
800.00
28,000.00
12,000.00
800.00
8,400.00
12,000.00
825.00
8,190.00
10,120.00
700.00
860.00
760.00
1,800.00
2,490.00
7,520.00
2,490.00
252.00
1,670.00
3,500.00
4,500.00
2,400.00
20,000.00
350.00
22,400.00
975.00
16,000.00
12,520.00
2,100.00
18,000.00
380.00
9,250.00
792.00
160.00
61,400.00
2,500.00
332.00
3,800.00
6,650.00
5,200.00
1,500.00
250.00
4,500.00
8,000.00
3,600.00
1,300.00
600.00
4,050.00
1,400.00
14,000.00
285.00
5,000.00
4,375.00
4,000.00
4,400.00
9,192.00
525.00
860.00
800.00
1,600.00
2,001.00
370.00
960.00
4,600.00
5,000.00
5,000.00
165.00
1,800.00
16,000.00
900.00
1,800.00
1,300.00
660.00
2,490.00
5,000.00
450.00
56,000.00
72,000.00
6,000.00
12,000.00
9,000.00
6,000.00
18,000.00
14,300.00
4,500.00
9,000.00
2,800.00
6,000.00
3,900.00
900.00
1,800.00
13,000.00
1,000.00
1,500.00
600.00
1,200.00
1,800.00
63.00
83.00
19.00
504.00
1,704.00
54,000.00
2,200.00
7,200.00
13,000.00
18,000.00
6,000.00
900.00
8,000.00
16,000.00
10,800.00
4,250.00
1,219,160.00
1,258,691.00 1,258,691.00
1,436,520.25
COLONIA DIVINA INTEGRATED SCHOOL
Annual Procurement Plan 2013
ANALIE V. BUHAYAN
Principal I
Distribution: QUARTER 1
OTHERS TOTAL
45.00
21.00
50.00
240.00
60.00
540.00
750.00
300.00
1,000.00
180.00
120.00
200.00
140.00
2,880.00
380.00
5,440.00
750.00
600.00
1,500.00
2,160.00
330.00
45.00
4,000.00
3,900.00
2,400.00
24.00
120.00
180.00
180.00
480.00
500.00
280.00
320.00
1,500.00
175.00
450.00
160.00
840.00
160.00
135.00
110.00
2,800.00
660.00
675.00
2,000.00
120.00
725.00
150.00
210.00
720.00
270.00
76.00
36.00
1,170.00
400.00
450.00
360.00
1,250.00
45.00
3,000.00
432.00
360.00
1,800.00
340.00
90.00
96.00
900.00
75.00
65.00
210.00
680.00
276.00
114.00
1,300.00
70.00
68.00
1,380.00
68.00
380.00
57.00
110.00
2,250.00
528.00
350.00
3,800.00
4,800.00
600.00
1,500.00
3,000.00
402.00
3,375.00
870.00
390.00
0.00 79,498.00
Distribution: QUARTER 2
OTHERS TOTAL
3,500.00
3,200.00
600.00
3,360.00
840.00
24.00
140.00
90.00
230.00
15.00
500.00
500.00
3,500.00
640.00
420.00
9,600.00
1,920.00
5,440.00
220.00
2,400.00
220.00
2,800.00
1,500.00
130.00
270.00
114.00
350.00
990.00
900.00
2,660.00 2,660.00
825.00 828.00
350.00 350.00
528.00
402.00 402.00
3,200.00
47,741.00
Distribution: QUARTER 3
OTHERS TOTAL
700.00
2,900.00
1,155.00 2,805.00
1,085.00 1,550.00
1,000.00 1,450.00
1,015.00 1,450.00
840.00 1,200.00
700.00 1,000.00
750.00 750.00
1,300.00 1,300.00
1,300.00
120.00
1,200.00 1,200.00
600.00 600.00
1,160.00 1,160.00
1,800.00
588.00 588.00
275.00
45.00
4,000.00
60.00 60.00
230.00
650.00 650.00
500.00 500.00
170.00 170.00
70.00 70.00
800.00 800.00
2,400.00 2,400.00
80.00 80.00
500.00 500.00
136.00
1,317.00
2,100.00 2,100.00
1,050.00 2,100.00
600.00
1,625.00 1,625.00
9,600.00
1,920.00
5,440.00
2,800.00
950.00 950.00
360.00 450.00
1,200.00
1,100.00
5,100.00
840.00 840.00
336.00
43.25
54.00
66.00
25.00
15.00
390.00
1,700.00 1,700.00
125.00 125.00
265.00
480.00 480.00
175.00
75.00
380.00
80.00
800.00
228.00
925.00
58.00 58.00
88.00
1,450.00
66.00 66.00
480.00 480.00
1,200.00 1,200.00
1,200.00
320.00
780.00
342.00
1,200.00
2,700.00
171.00
1,080.00
680.00
970.00
7,800.00
12,000.00
2,500.00 2,500.00
2,500.00 5,300.00
68.00 136.00
68.00 136.00
220.00 440.00
3,040.00 3,040.00
113.00
825.00 825.00
165.00
350.00 350.00
585.00
0.00
160.00
166.00
600.00
528.00
200.00
2,040.00 2,040.00
585.00
900.00 900.00
40,168.00 126,447.25
Distribution: QUARTER 4
OTHERS TOTAL
200.00
50.00
700.00
2,900.00
950.00
750.00
1,000.00
600.00
60.00
320.00
1,000.00
1,625.00 1,625.00
9,600.00
1,920.00
5,440.00
7,200.00
140.00
775.00
1,000.00
448.00
304.00
25.00
15.00
90.00
240.00
55.00
1,800.00
75.00 75.00
390.00
900.00
46.00 46.00
1,200.00
6,400.00 6,400.00
1,800.00
5,000.00
5,600.00
4,800.00
980.00
840.00
700.00
12,000.00
9,504.00
5,500.00
55,000.00
5,400.00
900.00 900.00
3,500.00
196.00
250.00 250.00
4,400.00
96.00
225.00
360.00
700.00 700.00
3,500.00
5,000.00
1,200.00
9,192.00
36,000.00
5,000.00
24,000.00
2,600.00
1,300.00 1,300.00
12,500.00
54,000.00
2,400.00
100.00 100.00
9,408.00
1,200.00 1,200.00
1,800.00
1,400.00 1,400.00
1,300.00
6,000.00
150.00
3,792.00
5,500.00
6,000.00
800.00 800.00
12,000.00
800.00
8,400.00
12,000.00 12,000.00
825.00 825.00
8,190.00
10,120.00
700.00
860.00 860.00
760.00 760.00
2,490.00
7,520.00 7,520.00
2,490.00
252.00
1,670.00
4,500.00
2,400.00
1,000.00 20,000.00
350.00 350.00
560.00 22,400.00
16,000.00
12,520.00 12,520.00
2,100.00
1,800.00
380.00 380.00
9,250.00
792.00
160.00
61,400.00
2,500.00
332.00
3,800.00
6,650.00
5,200.00
1,500.00
250.00
4,500.00
8,000.00
3,600.00
600.00
4,050.00
1,400.00
1,400.00 14,000.00
285.00 285.00
5,000.00
4,375.00
4,000.00
4,400.00
9,192.00
525.00
860.00 860.00
800.00 800.00
1,600.00
2,001.00
370.00
960.00 960.00
4,600.00 4,600.00
5,000.00
5,000.00
165.00
1,800.00
16,000.00
900.00
1,800.00
1,300.00
660.00
2,490.00
5,000.00
8,000.00 56,000.00
72,000.00
6,000.00
12,000.00
18,000.00
4,500.00
9,000.00
11,400.00
3,900.00
1,800.00
1,300.00 13,000.00
1,000.00
1,500.00
600.00 600.00
800.00 1,200.00
1,800.00
63.00
83.00
504.00
1,704.00
54,000.00
2,200.00 2,200.00
7,200.00
13,000.00
18,000.00
6,000.00
8,000.00
800.00 16,000.00
10,800.00
4,250.00 4,250.00
78,426.00 1,074,209.00
LIE V. BUHAYAN
I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
COLONIA DIVINA INTEGRATED SCHOOL
Annual Procurement Plan 2013 - SUPPLEMENTARY
Prepared:
ANALIE V. BUHAYAN
Principal I
UARTERS
RD QUARTER 4TH QUARTER
Amount Qty. Amount
1,380.00 3 1,380.00
2,040.00 3 2,040.00
1,060.00 2 1,060.00
1,400.00
180.00
1 1,200.00
1,800.00 20 600.00
800.00 2 800.00
3,400.00 5 3,400.00
265.00 1 265.00
2,175.00 15 2,175.00
390.00 2 260.00
3,200.00
80.00
55.00
I. Office Supp I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
COLONIA D
Annu
COMMODITY- ( ) SUPPLIES ( ) DISTRIBUTION BY QUARTER
EQUIPMENT UNIT TOTAL TOTAL
UNIT 1st Quarter 2nd Quarter
(Nomenclation and Complete PRICE COST QNTY
Qnty Amt Qnty Amt
Specialization/Description
I. Office Supplies and Materials
Balloon (dcor on some occasion) 1 500 500 pc
Ballpen 7 42 6 pc 3 21
Battery, AA 25 100 4 pc 2 50
Beddings (clinic, h.e) 350 1,400 4 set 0
Betadine 240 480 2 bot 1 240
Big cooking pot (for Fdg) 2,900 8,700 3 u 0
Bondpaper, reams 190 2,850 15 rm 0
Bookpaper 150 2,250 15 rm 5 750
Bundy clock ribbon 1,300 1,300 1 roll 0
Bowl liquid cleaner 300 600 2 bot 1 300
Cartolina 10 5,000 500 sht 200 2,000
Carton paper, set 140 700 5 set 1 140
Cartridge, LX-300+II 190 570 3 pc 1 190
Cartridge, Lexmark Prntr 1,360 10,880 8 pc 4 5,440 2 2,720
CD-R, blank 15 300 20 pc 5 75 5 75
Cleaning tools, set 580 2,320 4 set 1 580 1 580
Computer cover 380 4,560 12 set
Computer eyecare 280 3,360 12 pc
Cooking stove burner, heavy duty 1,800 3,600 2 pc
Correction tape 55 550 10 pc 3 165 2 110
Cotton balls, sterilized 45 180 4 pack 1 45 1 45
Curtain 400 4,000 10 pc
Cutter 65 130 2 pc 1 65 1 65
Cutter blade 30 60 2 set 1 30
DepEd Form 137 7 1,400 200 sht 20 140
DepEd Form 138 6 3,300 550 pc 15 90
DepEd Form 18A 6 120 20 sht 20 120
DepEd Form 18E 6 180 30 sht 30 180
Drill bit 230 690 3 pc 1 230 1 230
DVD-RW, blank 35 875 25 pc 5 175 5 175
Electrical tape 15 90 6 roll 1 15 1 15
Elmer's glue 410 1,230 3 bot 1 410
Envelope, brown 5 2,400 500 pc 200 960
Envelope, expanded 13 390 30 pc 10 130
Envelope, letter 100 20,000 200 pc 100 10,000
Envelope, plastic 5 2,500 500 pc 100 500 100 500
Feltpaper 18 180 10 sht
Fine wire 60 120 2 roll 1 60
Floor wax 320 1,280 4 can 1 320 1 320
Folder, long, ordinary 4 2,100 500 pc 100 420 100 420
Folder, long, expanded 12 600 50 pc
Handwashing supplies 200 4,000 20 set 5 1,000 5 1,000
Ink, pentel pen 10 500 50 pc 25 250
Ink, bro 3-in-1 2,400 12,000 5 set 2 4,800 1 2,400
Linolium, yard 90 1,350 15 y
Manila paper 4 3,200 800 sht 200 800
Masking tape 1 1/2" 26 910 35 roll 5 130 5 130
Medicine 12 1,200 100 tab
Mighty bond 140 420 3 mL 1 140 1 140
Mineographing paper 110 1,100 10 rm 0
Mirror 165 660 4 pc 1 165
Multivitamins 200 1,000 5 bot
Organizer, document 510 5,100 10 pc
Packing tape 70 420 6 roll
Paint 56 1,120 20 q/g 6 336
Paint brushes 38 570 15 pc 4 152 3 114
Paper clips 18 90 5 box 2 36
Paper fastener 22 88 4 box 1 22
Pencil 80 400 5 box 2 160
Pencil lead refill 25 75 3 set 1 25
Pencil sharpener 15 60 4 pc 1 15 1 15
Pentel pen, Pilot 45 2,025 45 pc 20 900
Photopaper 120 1,200 10 set 4 480
Plastic roll 1,800 1,800 1 roll
Puncher 265 265 1 pc
Push pins 45 180 4 box 1 45 1 45
Ribbon cartridge, printer 190 760 4 crtdg 1 190 1 190
Ribbon, decoration 8 256 32 y 12 96
Rope 800 800 1 roll
Rubbing alcohol, 250 mL 76 380 5 bot 2 152
Rugby 55 165 3 bot 2 110
Scissors 185 925 5 pr 0
SD card 480 960 2 pc 0 1 480
Seat cover 300 1,800 6 set 0
Sign pen 75 225 3 pc 1 75 1 75
Silver dust 22 264 12 pk 4 88
Soap 45 90 2 pc
Special paper 145 2,900 20 set 10 1,450
Staple wire 160 160 1 box
Stapler, heavy duty 350 350 1 pc
Sticker paper 130 650 5 set 2 260
Streamers 300 3,600 12 cut 2 600 3 900
Styropor 20 400 20 sht 4 80
Table cloth 170 1,020 6 cut
Tie straw 75 300 4 roll 1 75 1 75
Time card 210 630 3 pk 1 210 1 210
USB flashdrive 420 1,260 3 pc
Wall decor 300 2,400 8 pc
2. Learning Materials, Tools
Equipment
Ammeter 138 690 5 pc 2 276
Apron 160 6,400 40 pc
Axe 360 1,800 5 u
Back Pack Sprayer 1,200 1,200 1 u
Ball, basketball Mikasa 650 1,300 2 u
Ball, volleyball Mikasa 700 1,400 2 u
Basin-stainless 360 14,400 40 pc
Beaker 57 285 5 pc 2 114
Beaker 500 5,000 10 pc
Blower 5,600 5,600 1 u
Bolo 160 4,800 30 u
B-tin cans 300 12,000 40 pc
Burner, heavy duty 2,500 2,500 1 u
Buttonhole scissor 396 9,500 24 pr
Can sealer 5,500 5,500 1 u
Cap seal of diffirent size 11 55,000 5,000 pc
Cassette Player 5,400 5,400 1 u
Cast net 450 900 2 lgth
CD/DVD Player 3,500 3,500 1 u
Charts 49 195 4 u
Chisel 125 250 2 u
Chord 5 m 400 4,400 11 lgth
Coasters 35 420 12 set 2 70
Color chalk, box 16 96 6 u
Compass 75 225 3 u
Concave lens 68 135 2 pc 1 68
Convex lens 68 135 2 pc 1 68
Crayon 36 360 10 u
Cross cut saw 350 700 2 u
Crowbar 350 3,500 10 u
Cultivator/rake 250 5,000 20 pc
Current meter 600 1,200 2 u
Curtain, set 460 3,220 7 u
Cutlery, set 380 9,120 24 u 1 380 7 2,660
Cutting shears (genuine stainless) 383 9,200 24 pr
Cutting tables 6,000 36,000 6 u
D.O. meters 2,500 5,000 2 u
Denatured alcohol 57 170 3 mL 1 57
Digging blades 1,200 24,000 20 pc
Digital thermometer 2,600 2,600 1 u
Dissecting board 260 1,300 5 pc
Dissecting tools 2,500 12,500 5 set
Drawing table & stool 36"x24" 1,200 66,000 55 u
Eckman dredge 1,200 2,400 2 u
Ember tongs 50 100 2 u
Embroidery scissor 392 9,400 24 pr
Face mask 30 1,200 40 pc
Fish cage and accessories 360 1,800 5 u
Fish grater 280 1,400 5 pc
Flow rate meter 2,000 6,000 3 u
Forceps 38 1,500 40 pr
Forceps 150 150 1 u
French curve (plastic) 158 3,800 24 pc
Frying pan 550 5,500 10 pc
Garden hoe 200 6,000 30 u
Garden scale 800 800 1 u
Gas range 28,000 28,000 1 u
Gas range, portable 12,000 12,000 1 u
Gas stove, single portable 800 1,600 2 pc
Glass measuring cup 210 8,400 40 pc
Gloves 300 12,000 40 pr
Goblet 138 3,300 24 u 6 828 6 828
Grade I 21 8,000 390 u
Grade VII 23 10,000 440 u
Grass cutters 350 700 2 u
Hack saw 860 860 1 u
Hammer 380 760 2 u
Hammer 360 1,800 5 u
Hand forks 83 2,500 30 u
Hand gloves 188 7,500 40 pr
Hand trowels 83 2,500 30 u
Handlens 55 275 5 pc 2 110
Hem marker 42 250 6 pc
Hip curve (Stainless) 167 4,000 24 pc
Hole digger 3,500 3,500 1 u
Hole digger 900 4,500 5 u
Horizontal freezer 2,400 2,400 1 u
Ice tongs 30 30 1 u 0 0
Kettle 580 580 1 u 0 0
Kettle 500 20,000 40 pc
Kitchen knives, set 4,200 4,200 1 u 0 0
Kitchen wares, set 350 2,100 6 u 3 1,050 1 350
Knives 520 5,200 10 u
Knives 175 7,000 40 pc
Lab thermometer 195 975 5 pc 2 390
Lab. Thermometer 400 16,000 40 u
Laboratory gown 313 12,500 40 set
Lawn tennis set 1,050 2,100 2 u
Lifesize mirror 9,000 18,000 2 pc
Long nose 380 380 1 u
L-square (Stainless) 425 10,200 24 pc
Machine needle (doz., asstd) 33 800 24 doz
Magnetic compass 80 160 2 pc
Magnetic wire 83 165 2 pc
Mannequin (full size, 2,600 62,400 24 u
Mannequin's Bust Forms 500 2,500 5 u
Maps 83 330 4 u
Masonry tools 1,900 3,800 2 set
Measuring cup for solid (by set) 190 7,600 40 set
Measuring spoon 130 5,200 40 set
Meter stick (wooden) 250 1,500 6 pc
Meterstick 25 250 10 u
Mixing bowl-glass (by set) 450 4,500 10 set
Mixing bowl-stainless 200 8,000 40 set
Modules, ALS 72 3,600 50 u
Multimedia Projector 28,000 28,000 1 u
Multi-tester 600 600 1 pc
Net 650 1,300 2 lgth
Netting needle 120 600 5 pc
Other Levels 27 4,000 150 u
P.E rope 700 1,400 2 roll
Pail (plastic) 140 14,000 100 pc
Paint brush 57 285 5 u
Paring knives 125 5,000 40 pc
Peelers 125 5,000 40 pc
pH meter 4,000 4,000 1 u
Picking/harvesting knives 2,200 13,500 2 set
Pinking shears 383 9,200 24 pr
Placemats set 88 2,100 24 set 6 528 6 528
Planer, electric 860 860 1 u
Plastic bags 20 800 40 pc
Plastic basin 160 160 1 set
Plastic sealer 667 2,000 3 u
Platter 185 510 6 u 2 370
Pliers, set 960 960 1 u
Pot, big 4,600 4,600 1 u
Power srayer 5,000 5,000 1 u
Pressure cooker 5,000 5,000 1 u
Prism glass 155 465 3 pc 1 155
Protractor 46 230 5 u
Pruning shears 250 5,000 20 u
Refractometer 900 1,800 2 u
Safety Shoes 400 16,000 40 pr
Salinometer 900 900 1 u
Saw 360 1,800 5 u
Scoop net 260 1,300 5 pc
Screw drivers, set 660 660 1 u
Scythe 83 2,500 30 u
Secchi disc 1,000 5,000 5 u
Serving dishes 150 450 3 u
Sewing machine wl motor 8,000 56,000 7 u
Sewing machine, high speed 36,000 72,000 2 u
Sewing machine, over edging 6,000 6,000 1 u
Sewing machine, straight Ord. 2,000 12,000 6 u
Shovel 300 9,000 30 u
Shovel 300 6,000 20 pc
Sinker 1,200 18,000 15 pc
Smartbro modem 1,300 14,300 11 pc
Soil testing kit 2,250 4,500 2 u
Spade 300 9,000 30 u
Spading Fork 2,800 2,800 1 u
Spading Fork 200 6,000 30 u
Sprayers 1,300 3,900 3 u
Sprinkler 225 900 4 u
Sprinklers 120 1,800 15 u
Steamer 1,300 13,000 10 pc
Steel tape 200 1,000 5 u
Suspension net 1,500 1,500 1 lgth
Table ice bucket 1,600 1,600 1 u
Table napkin, cloth 67 1,600 24 set 6 402 6 402
Table tennis set 1,800 1,800 1 u
Tailor's pin 63 1,500 24 pc
Tape measure (plastic) 83 2,000 24 pc
Teacher's Guide 19 3,000 160 u
Test tube 195 975 5 pc 2 390
Thermos, simple 280 280 1 u
Thimble 21 500 24 pc
Tracing wheel 71 1,700 24 pc
T-square 36" adjustable 945 52,000 55 pc
TV Set 12,500 12,500 1 u
U-magnet 42 210 5 pc 2 84
Voltmeter 200 1,000 5 u 2 400
Wall clock 550 2,200 4 u
Water current meter 180 7,200 40 u
Water depth gauge 325 13,000 40 u
Water pump 18,000 18,000 1 u
Water qty. test kit 3,000 6,000 2 set
Weighing scale 900 1,800 2 u
Weighing scale-1000g 400 8,000 20 u
Weighing scale-10kg 800 16,000 20 u
Wheel Barrow 1,800 10,800 6 u
White Tetoran 20 1,000 50 y
3. Repair and Maintenance
REPAIR & MAINTENANCE
PPAs:
Repair of Handrail at
Grade 1 to Grade 3 CLs
Corrogated round bar 8mm
G.I pain sheet #34
Cement, premuim, Portland
Mixing sand
Cracked stone
Tie wire
REPAIR OF EQUIPMENT
Computer units
TBD
Simple sewing machine
TBD
Oven
TBD
Ceiling/Electric Fans
TBD
Sound system
TBD
TV Set
TBD
Printer
TBD
Bundy Clock
TBD
UPS
TBD
Bldg 2-F
Fascia
R/L 2"x2"x12'
Vulca seal
Common nail # 3
Common nail # 2 1/2
Bldg 7-A
Fascia
R/L 2"x2"x12'
Vulca seal
Common nail # 3
Common nail # 2 1/2
Repair/Replacement of Door
Panel
Grade I-2, Bldg 6-G
Panel door
Hinge, 3"x4"
Doorklock
Repair of Doorjamb
Grade I-2, Bldg 6-G Main Door
R/L 4"x6"x8'
Common nail # 4
Common nail # 3
Sand paper # 120
Calsumine
Cement, premium Portland
Mixing sand
Repainting of Roofs
Bldg I-A
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg I-B
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 2-A
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 2-B
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 2-C
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 2-D
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 2-E
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 2-F
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 3-A
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 3-B
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 4-A
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 5-A
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 6-A
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 6-B
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 6-C
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 6-D
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 6-E
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 6-F
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 6-G
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 6-H
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 7-A
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Grade IV-1
Jalousie frame
Jalousie glass
Repair of Footwalk
Main walk at Elementary Department
Cement premium Portland
Mixing sand
Cracked stone
Corrogated round bar 9mm
Bldg I to Bldg 2
Cement premium Portland
Mixing sand
Cracked stone
Repair of Landscapes
Grade IV-2
Hollowblock
Cement premium portland
Mixing sand
Kindergarten
Hollowblock
Cement premium portland
Mixing sand
Grade VI
Hollowblock
Cement premium portland
Mixing sand
Grade V
Hollowblock
Cement premium portland
Mixing sand
Grade IV-1
Hollowblock
Cement premium portland
Mixing sand
Grade III
Hollowblock
Cement premium portland
Mixing sand
Grade II
Hollowblock
Cement premium portland
Mixing sand
Grade I
Hollowblock
Cement premium portland
Mixing sand
Repair of Clogged up CR
Kindergarten
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Grade I-1
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Grade I-2
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Grade II-1
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Grade II-2
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Grade III
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Grade IV-1
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Grade IV-2
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Grade V
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Grade VI
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Year I-1
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Year III-1
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Year III-2
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Year IV
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Designated Library
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Designated Office
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Grade I-1
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Grade I-2
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Grade II-1
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Grade II-2
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Grade III
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Grade IV-1
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Grade IV-2
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Grade V
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Grade VI
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Year I-1
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Year III-1
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Year III-2
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Year IV
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Grade I-1
Uniapple Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Grade I-2
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Grade II-1
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Grade II-2
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Grade III
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Grade IV-1
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Grade IV-2
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Grade V
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Grade VI
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Year I-1
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Year I-2
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Year II
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Year III-1
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Year III-2
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Year IV
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Computer Room
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Repainting of Ceiling
Kindergarten
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Grade I-1
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Grade I-2
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Grade II-1
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Grade II-2
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Grade III
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Grade IV-1
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Grade IV-2
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Grade V
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Grade VI
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Year I-1
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Year III-1
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Year III-2
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Year IV
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Indus. Arts Room
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Computer Room
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Bldg 2
Sagay wht paint, latex Davies
Palmera green, latex Davies
Roller brush and basin set
Paint brush
Bldg 3
Sagay wht paint, latex Davies
Palmera green, latex Davies
Roller brush and basin set
Paint brush
Bldg 4
Sagay wht paint, latex Davies
Palmera green, latex Davies
Roller brush and basin set
Paint brush
Bldg 5
Sagay wht paint, latex Davies
Palmera green, latex Davies
Roller brush and basin set
Paint brush
Bldg 6
Sagay wht paint, latex Davies
Palmera green, latex Davies
Roller brush and basin set
Paint brush
Bldg 7
Sagay wht paint, latex Davies
Palmera green, latex Davies
Roller brush and basin set
Paint brush
Repair of Stage
Hollow block
Cement, premium portland
Mixing sand
Cracked stone
Corrogated round bar
Tie wire
Marine plywood
R/L 2"x2"x12'
R/L 2"x4"x12'
Common nail # 2 1/2"
Rehabilitation of Canteen
Hollowblock
Cement, premium Portland
Mixing sand
Cracked stone
Tie wire
Corrogated round bar 9mm
G.I plain sheet 26x10, 0.4 , 8'
G.I corrogated sheet 26x10, 0.4 , 8'
R/L 2"x2"x10'
R/L 2"x2"x8'
R/L 2"x3"x8'
R/l 2"x3"x10'
Common nail #3 1/2
Common nail # 2 1/2
Common nail # 1
Umbrella nail
Vulca seal
Hardiflex
Plywood
Repainting of Floor
Computer Laboratory
Floor paint
Roller brush
Paint brush #5
Designated Office
Floor paint
Roller brush
Paint brush #5
Repair of Sink
Office CR
Sink set
White cement
Clinic
Sink set
Cement premium Portland
Corrogated round bar 9mm
Mixing sand
Cracked stone
Repair of Cabinet
Science Room
Plywood 1/4"x4"x8'
Common nail # 1
Common nail # 3
Cove molding
Sand paper
Handle
R/L 2"x2"x8'
Glass
Stikwel
Plastic Varnish
Lacquer thinner
Repair of Divider
Office
R/L 1"x10"x8'
R/L 1"x10"x6'
R/L 2"x2"x8"
Sandpaper
Caramel brown paint Davies, enamel
114 342 3 pc
160 6,400 40 pc
360 1,800 5 u
1,200 1,200 1 u
650 1,300 2 u
700 1,400 2 u
360 14,400 40 pc
57 171 3 pc
500 5,000 10 pc
5,600 5,600 1 u
160 4,800 30 u
300 12,000 40 pc
2,500 2500 1 u
396 9,504 24 pr
5,500 5,500 1 u
11 55,000 5,000 pc
5,400 5,400 1 u
450 900 2 lgth
3,500 3,500 1 u
49 196 4 u
125 250 2 u
400 4,400 11 lgth
35 350 10 set
16 96 6 u
75 225 3 u
68 68 1 pc
68 68 1 pc
36 360 10 u
350 700 2 u
350 3,500 10 u
250 5,000 20 pc
600 1,200 2 u
460 3,220 7 u
7 u 380 3040 8 u 380 3,040 8 u
383 9,192 24 pr
6,000 36,000 6 u
2,500 5,000 2 u
57 114 2 mL
1,200 24,000 20 pc
2,600 2,600 1 u
260 1,300 5 pc
2,500 12,500 5 set
1,200 66,000 55 u
1,200 2,400 2 u
50 100 2 u
392 9,408 24 pr
30 1,200 40 pc
360 1,800 5 u
280 1,400 5 pc
2,000 6,000 3 u
38 1,520 40 pr
150 150 1 u
158 3,792 24 pc
550 5,500 10 pc
200 6,000 30 u
800 800 1 u
28,000 28,000 1 u
12,000 12,000 1 u
800 800 1 pc
210 8,400 40 pc
300 12,000 40 pr
6 u 138 828 6 u 138 828 6 u
21 8,190 390 u
23 10,120 440 u
350 700 2 u
860 860 1 u
380 760 2 u
360 1,800 5 u
83 2,490 30 u
188 7,520 40 pr
83 2,490 30 u
55 165 3 pc
42 252 6 pc
167 4,008 24 pc
3,500 3,500 1 u
900 4,500 5 u
2,400 2,400 1 u
30 30 1 u
580 580 1 u
500 20,000 40 pc
4,200 4,200 1 u
1 u 350 350 1 u 350 350 1 u
520 5,200 10 u
175 7,000 40 pc
195 585 3 pc
400 16,000 40 u
313 12,520 40 set
1,050 2,100 2 u
9,000 18,000 2 pc
380 380 1 u
425 10,200 24 pc
33 792 24 doz
80 160 2 pc
83 166 2 pc
2,600 62,400 24 u
500 2,500 5 u
83 332 4 u
1,900 3,800 2 set
190 7,600 40 set
130 5,200 40 set
250 1,500 6 pc
25 250 10 u
450 4,500 10 set
200 8,000 40 set
72 3,600 50 u
28,000 28000 1 u
600 600 1 pc
650 1,300 2 lgth
120 600 5 pc
27 4,050 150 u
700 1,400 2 roll
140 14,000 100 pc
57 285 5 u
125 5,000 40 pc
125 5,000 40 pc
4,000 4,000 1 u
2,200 4,400 2 set
383 9,192 24 pr
6 set 88 528 6 set 88 528 6 set
860 860 1 u
20 800 40 pc
160 160 1 set
667 2,001 3 u
2 u 185 370 2 u 185 370 2 u
960 960 1 u
4,600 4,600 1 u
5,000 5,000 1 u
5,000 5,000 1 u
155 310 2 pc
46 230 5 u
250 5,000 20 u
900 1,800 2 u
400 16,000 40 pr
900 900 1 u
360 1,800 5 u
260 1,300 5 pc
660 660 1 u
83 2,490 30 u
1,000 5,000 5 u
150 450 3 u
8,000 56,000 7 u
36,000 72,000 2 u
6,000 6,000 1 u
2,000 12,000 6 u
300 9,000 30 u
300 6,000 20 pc
1,200 18,000 15 pc
1,300 14,300 11 pc
2,250 4,500 2 u
300 9,000 30 u
2,800 2,800 1 u
200 6,000 30 u
1,300 3,900 3 u
225 900 4 u
120 1,800 15 u
1,300 13,000 10 pc
200 1,000 5 u
1,500 1,500 1 lgth
1,600 1,600 1 u
6 set 67 402 6 set 67 402 6 set
1,800 1,800 1 u
63 1,512 24 pc
83 1,992 24 pc
19 3,040 160 u
195 585 3 pc
280 280 1 u
21 504 24 pc
71 1,704 24 pc
945 51,975 55 pc
12,500 25,000 2 u
42 126 3 pc
200 600 3 u
550 2,200 4 u
180 7,200 40 u
325 13,000 40 u
18,000 18,000 1 u
3,000 6,000 2 set
900 900 1 u 900 900 1 u
400 8,000 20 u
800 16,000 20 u
1,800 10,800 6 u
20 1,000 50 y
COLONIA DIVINA INTEGRATED SCHOOL
Annual Procurement Plan 2012
Ist Quarter 2nd Quarter 3rd Quarter 4th Quarter 1st Quarter 2nd Quarter 3rd Quarter
Item Description Unit Total Total Unit Total Total Unit Total Total Unit Total Total
Unit Unit Unit Unit MOOE LGU OTHERS TOTAL MOOE LGU OTHERS TOTAL MOOE
Price Price Qty. Price Price Qty. Price Price Qty. Price Price Qty.
Ist Quarter 2nd Quarter 3rd Quarter 4th Quarter 1st Quarter 2nd Quarter 3rd Quarter
Item Description Unit Total Total Unit Total Total Unit Total Total Unit Total Total
Unit Unit Unit Unit MOOE LGU OTHERS TOTAL MOOE LGU OTHERS TOTAL MOOE
Price Price Qty. Price Price Qty. Price Price Qty. Price Price Qty.
Envelope, letter 1 100 100 pc 1 100 100 pc 0 0
Envelope, plastic 5 500 100 pc 5 500 100 pc 5 500 100 pc 5 500 100 pc 0 500 500 500
Feltpaper 18 180 10 sht 0 0 180
Fine wire 60 60 1 roll 60 60 1 roll 0 0
Floor wax 320 320 1 can 320 320 1 can 320 320 1 can 320 320 1 can 0 320 320 320
Folder, long, ordinary 4 420 100 pc 4 420 100 pc 4 840 200 pc 0 420 420 840
Folder, long, expanded 12 600 50 pc 0 0 600
Handwashing supplies 200 1,000 5 set 200 1000 5 set 200 1000 5 set 200 1,000 5 set 0 1,000 1000 1,000
Ink, pentel pen 10 250 25 pc 10 250 25 pc 0 0 250
Ink, bro 3-in-1 2,400 4,800 2 set 2,400 2400 1 set 2,400 2,400 1 set 2,400 2,400 1 set 4,800 4,800 2,400 2400 2,400
Linolium, yard 90 1,350 15 y 0 0
Manila paper 4 800 200 sht 4 1200 300 sht 0 0 1,200
Masking tape 1 1/2" 26 130 5 roll 26 130 5 roll 26 650 25 roll 0 130 130 650
Medicine 12 1200 100 tab 0 0 1,200
Mighty bond 140 140 1 mL 140 140 1 mL 140 140 1 mL 0 140 140
Mineographing paper 110 1100 10 rm 0 0 1,100
Mirror 165 165 1 pc 165 495 3 pc 0 165 165
Multivitamins 200 1,000 5 bot 0 0
Organizer, document 510 5100 10 pc 0 0 5,100
Packing tape 70 420 6 roll 0 0 420
Paint 56 336 6 q/g 56 336 6 q/g 56 448 8 q/g 0 0 336
Paint brushes 38 152 4 pc 38 114 3 pc 38 304 8 pc 0 114 114
Paper clips 18 36 2 box 18 54 3 box 0 0 54
Paper fastener 22 22 1 box 22 66 3 box 0 0 66
Pencil 80 160 2 box 80 240 3 box 0 0
Pencil lead refill 25 25 1 set 25 25 1 set 25 25 1 set 0 0 25
Pencil sharpener 15 15 1 pc 15 15 1 pc 15 15 1 pc 15 15 1 pc 0 15 15 15
Pentel pen, Pilot 45 900 20 pc 45 1125 25 pc 0 0 1,125
Photopaper 120 480 4 set 120 720 6 set 0 0 720
Plastic roll 1,800 1800 1 roll 0 0 1,800
Puncher 265 265 1 pc 0 0 265
Push pins 45 45 1 box 45 45 1 box 45 90 2 box 0 45 45
Ribbon cartridge, printer 190 190 1 crtdg 190 190 1 crtdg 190 380 2 ctdg 0 190 190 380
Ribbon, decoration 8 96 12 y 8 80 10 y 8 80 10 y 0 0 80
Rope 800 800 1 roll 0 0 800
Rubbing alcohol, 250 mL 76 152 2 bot 76 228 3 bot 0 0 228
Rugby 55 110 2 bot 55 55 1 bot 0 0
Scissors 185 925 5 pr 0 0 925
Ist Quarter 2nd Quarter 3rd Quarter 4th Quarter 1st Quarter 2nd Quarter 3rd Quarter
Item Description Unit Total Total Unit Total Total Unit Total Total Unit Total Total
Unit Unit Unit Unit MOOE LGU OTHERS TOTAL MOOE LGU OTHERS TOTAL MOOE
Price Price Qty. Price Price Qty. Price Price Qty. Price Price Qty.
SD card 480 480 1 pc 480 480 1 pc 0 480 480
Seat cover 300 1,800 6 set 0 0
Sign pen 75 75 1 pc 75 75 1 pc 75 75 1 pc 75 75 1 pc 0 75 75 75
Silver dust 22 88 4 pk 22 88 4 pk 22 88 4 pk 0 0 88
Soap 45 90 2 pc 0 0 90
Special paper 145 1,450 10 set 145 1450 10 set 0 0 1,450
Staple wire 160 160 1 box 0 0
Stapler, heavy duty 350 350 1 pc 0 0
Sticker paper 130 260 2 set 130 390 3 set 0 0
Streamers 300 600 2 cut 300 900 3 cut 300 1200 4 cut 300 900 3 cut 600 600 900 900 1,200
Styropor 20 80 4 sht 20 320 16 sht 0 0 320
Table cloth 0 0
Tie straw 75 75 1 roll 75 75 1 roll 75 150 2 roll 75 75 75 75 150
Time card 210 210 1 pk 210 210 1 pk 210 210 1 pk 210 210 210 210 210
USB flashdrive 430 430 1 pc 430 860 2 pc 0 0 420
Wall decor 300 1200 4 pc 300 1,200 4 pc 0 0 1,200
2. Learning Materials,
and Equipment
Ammeter 138 276 2 pc 114 342 3 pc 276 276 0 414
Apron 160 6,400 40 pc 0 0
Axe 360 1,800 5 u 0 0
Back Pack Sprayer 1,200 1,200 1 u 0 0
Ball, basketball Mikasa 2,700 2,700 1 pc 0 0 2,700
Ball, volleyball Mikasa 2,400 2,400 1 pc 0 0 2,400
Basin-stainless 360 14,400 40 pc 0 0
Beaker 57 114 2 pc 57 171 3 pc 114 114 0 171
Beaker 500 5,000 10 pc 0 0
Blower 5,600 5,600 1 u 0 0
Bolo 160 4,800 30 u 0 0
Books, ref Fili reading 360 1,080 3 pc 490 980 2 1,080
Books, ref Fili language 340 680 2 pc 280 840 3 680
Books, ref other subjects 485 970 2 pc 350 700 2 970
B-tin cans 300 12,000 40 pc 0 0
Burner, heavy duty 2,500 2500 1 u 0 0
Buttonhole scissors 396 9,504 24 pr 0 0
Can sealer 5,500 5,500 1 u 0 0
Cap seal of diffirent size 11 55,000 5,000 pc 0 0
Cassette Player 5,400 5,400 1 u 0 0
Ist Quarter 2nd Quarter 3rd Quarter 4th Quarter 1st Quarter 2nd Quarter 3rd Quarter
Item Description Unit Total Total Unit Total Total Unit Total Total Unit Total Total
Unit Unit Unit Unit MOOE LGU OTHERS TOTAL MOOE LGU OTHERS TOTAL MOOE
Price Price Qty. Price Price Qty. Price Price Qty. Price Price Qty.
Cast net 450 900 2 lgth 0 0
CD/DVD Player 3,500 3,500 1 u 0 0
Charts 49 196 4 u 0 0
Chisel 125 250 2 u 0 0
Chord 5 m 400 4,400 11 lgth 0 0
Coasters 35 70 2 set 35 350 10 set 70 70 0
Color chalk, box 16 96 6 u 0 0
Compass 75 225 3 u 0 0
Computer anti-virus 2,800 2,800 1 cd 2,800
Concave lens 68 68 1 pc 68 68 1 pc 68 68 0 68
Convex lens 68 68 1 pc 68 68 1 pc 68 68 0 68
Cooling pad 220 220 1 pc 220
Crayon 36 360 10 u 0 0
Cross cut saw 350 700 2 u 0 0
Crowbar 350 3,500 10 u 0 0
Cultivator/rake 250 5,000 20 pc 0 0
Current meter 600 1,200 2 u 0 0
Curtain, set 460 3,220 7 u 0 0
Cutlery, set 380 380 1 u 380 2660 7 u 380 3040 8 u 380 3,040 8 u 380 380 2,660 2660
Cutting shears (genuine stainl 383 9,192 24 pr 0 0
Cutting tables 6,000 36,000 6 u 0 0
D.O. meters 2,500 5,000 2 u 0 0
Denatured alcohol 57 57 1 mL 57 114 2 mL 57 57 0 113
Digging blades 1,200 24,000 20 pc 0 0
Digital thermometer 2,600 2,600 1 u 0 0
Dissecting board 260 1,300 5 pc 0 0
Dissecting tools 2,500 12,500 5 set 0 0
Drawing table & stool 36"x24" 1,200 66,000 55 u 0 0
Eckman dredge 1,200 2,400 2 u 0 0
Ember tongs 50 100 2 u 0 0
Embroidery scissors 392 9,408 24 pr 0 0
Face mask 30 1,200 40 pc 0 0
Fish cage and accessories 360 1,800 5 u 0 0
Fish grater 280 1,400 5 pc 0 0
Flow rate meter 2,000 6,000 3 u 0 0
Forceps 38 1,520 40 pr 0 0
Forceps 150 150 1 u 0 0
French curve (plastic) 158 3,792 24 pc 0 0
Ist Quarter 2nd Quarter 3rd Quarter 4th Quarter 1st Quarter 2nd Quarter 3rd Quarter
Item Description Unit Total Total Unit Total Total Unit Total Total Unit Total Total
Unit Unit Unit Unit MOOE LGU OTHERS TOTAL MOOE LGU OTHERS TOTAL MOOE
Price Price Qty. Price Price Qty. Price Price Qty. Price Price Qty.
Frying pan 550 5,500 10 pc 0 0
Garden hoe 200 6,000 30 u 0 0
Garden scale 800 800 1 u 0 0
Gas range 28,000 28,000 1 u 0 0
Gas range, portable 12,000 12,000 1 u 0 0
Gas stove, single portable 800 800 1 pc 0 0
Glass measuring cup 210 8,400 40 pc 0 0
Gloves 300 12,000 40 pr 0 0
Goblet 138 828 6 u 138 828 6 u 138 828 6 u 138 828 6 u 825 825 825 825
Grade I 21 8,190 390 u 0 0
Grade VII 23 10,120 440 u 0 0
Grass cutters 350 700 2 u 0 0
Hack saw 860 860 1 u 0 0
Hammer 380 760 2 u 0 0
Hammer 360 1,800 5 u 0 0
Hand forks 83 2,490 30 u 0 0
Hand gloves 188 7,520 40 pr 0 0
Hand trowels 83 2,490 30 u 0 0
Handlens 55 110 2 pc 55 165 3 pc 110 110 0 165
Hem marker 42 252 6 pc 0 0
Hip curve (Stainless) 167 4,008 24 pc 0 0
Hole digger 3,500 3,500 1 u 0 0
Hole digger 900 4,500 5 u 0 0
Horizontal freezer 2,400 2,400 1 u 0 0
Ice tongs 30 30 1 u 0 0
Kettle 580 580 1 u 0 0
Kettle 500 20,000 40 pc 0 0
Kitchen knives, set 4,200 4,200 1 u 0 0
Kitchen wares, set 350 1,050 3 u 350 350 1 u 350 350 1 u 350 350 1 u 350 0 350 0
Knives 520 5,200 10 u 0 0
Knives 560 22,400 40 pc 0 0
Lab thermometer (sci) 195 390 2 pc 195 585 3 pc 0 0 585
Lab. Thermometer 400 16,000 40 u 0 0
Laboratory gown 313 12,520 40 set 0 0
Lawn tennis set 1,050 2,100 2 u 0 0
Lifesize mirror 9,000 18,000 2 pc 0 0
Long nose 380 380 1 u 0 0
L-square (Stainless) 425 10,200 24 pc 0 0 850
Ist Quarter 2nd Quarter 3rd Quarter 4th Quarter 1st Quarter 2nd Quarter 3rd Quarter
Item Description Unit Total Total Unit Total Total Unit Total Total Unit Total Total
Unit Unit Unit Unit MOOE LGU OTHERS TOTAL MOOE LGU OTHERS TOTAL MOOE
Price Price Qty. Price Price Qty. Price Price Qty. Price Price Qty.
Machine needle (doz., asstd) 33 792 24 doz 0 0
Magnetic compass 80 160 2 pc 0 0 160
Magnetic wire 83 166 2 pc 0 0 166
Mannequin (full size, 2,600 62,400 24 u 0 0
Mannequin's Bust Forms 500 2,500 5 u 0 0
Maps 83 332 4 u 0 0
Masonry tools 1,900 3,800 2 set 0 0
Measuring cup for solid (by set 190 7,600 40 set 0 0
Measuring spoon 130 5,200 40 set 0 0
Meter stick (wooden) 250 1,500 6 pc 0 0
Meterstick 25 250 10 u 0 0
Mixing bowl-glass (by set) 450 4,500 10 set 0 0
Mixing bowl-stainless 200 8,000 40 set 0 0
Modules, ALS 72 3,600 50 u 0 0
Multimedia Projector 28,000 28000 1 u 0 0
Multi-tester 600 600 1 pc 0 0
Net 650 1,300 2 lgth 0 0
Netting needle 120 600 5 pc 0 0
Optical mouse for comptr 380 380 1 pc 380 380 1 380
Other Levels 27 4,050 150 u 0 0
P.E rope 700 1,400 2 roll 0 0
Pail (plastic) 140 14,000 100 pc 0 0
Paint brush 57 285 5 u 0 0
Paring knives 125 5,000 40 pc 0 0
Peelers 125 5,000 40 pc 0 0
pH meter 4,000 4,000 1 u 0 0
Picking/harvesting knives 2,200 4,400 2 set 0 0
Pinking shears 383 9,192 24 pr 0 0
Placemats set 88 525 6 set 88 528 6 set 88 528 6 set 88 528 6 set 525 525 525 525 525
Planer, electric 860 860 1 u 0 0
Plastic bags 20 800 40 pc 0 0
Plastic basin 160 160 1 set 0 0
Plastic sealer 667 2,001 3 u 0 0
Platter 185 370 2 u 185 370 2 u 185 370 2 u 0 370 370
Pliers, set 960 960 1 u 0 0
Pot, big 4,600 4,600 1 u 0 0
Power srayer 5,000 5,000 1 u 0 0
Pressure cooker 5,000 5,000 1 u 0 0
Ist Quarter 2nd Quarter 3rd Quarter 4th Quarter 1st Quarter 2nd Quarter 3rd Quarter
Item Description Unit Total Total Unit Total Total Unit Total Total Unit Total Total
Unit Unit Unit Unit MOOE LGU OTHERS TOTAL MOOE LGU OTHERS TOTAL MOOE
Price Price Qty. Price Price Qty. Price Price Qty. Price Price Qty.
Record notebook 55 165 3 pc 0 0
Refractometer 900 1,800 2 u 0 0
Safety Shoes 400 16,000 40 pr 0 0
Salinometer 900 900 1 u 0 0
Saw 360 1,800 5 u 0 0
Scoop net 260 1,300 5 pc 0 0
Screw drivers, set 660 660 1 u 0 0
Scythe 83 2,490 30 u 0 0
Secchi disc 1,000 5,000 5 u 0 0
Serving dishes 150 450 3 u 0 0
Sewing machine wl motor 8,000 56,000 7 u 0 0
Sewing machine, high speed 36,000 72,000 2 u 0 0
Sewing machine, over edging 6,000 6,000 1 u 0 0
Sewing machine, straight Ord. 2,000 12,000 6 u 0 0
Shovel 300 9,000 30 u 0 0
Shovel 300 6,000 20 pc 0 0
Sinker 1,200 18,000 15 pc 0 0
Smartbro modem 1,300 14,300 11 pc 0 0
Soil testing kit 2,250 4,500 2 u 0 0
Spade 300 9,000 30 u 0 0
Spading Fork 2,800 2,800 1 u 0 0
Spading Fork 200 6,000 30 u 0 0
Sprayers 1,300 3,900 3 u 0 0
Sprinkler 225 900 4 u 0 0
Sprinklers 120 1,800 15 u 0 0
Steamer 1,300 13,000 10 pc 0 0
Steel tape 200 1,000 5 u 0 0
Suspension net 1,500 1,500 1 lgth 0 0
Table cloth 170 2,040 12 y
Table ice bucket 600 600 1 u 0 0
Table napkin, cloth 67 402 6 set 67 402 6 set 67 402 6 set 67 402 6 set 400 400 400 400
Table tennis set 1,800 1,800 1 u 0 0
Tailor's pin 63 1,512 24 pc 0 0
Tape measure (plastic) 83 1,992 24 pc 0 0
Teacher's Guide 19 3,040 160 u 0 0
Test tube 195 390 2 pc 195 585 3 pc 390 390 0 585
Thermos, simple 280 280 1 u 0 0 280
Thimble 21 504 24 pc 0 0
Tracing wheel 71 1,704 24 pc 0 0
Ist Quarter 2nd Quarter 3rd Quarter 4th Quarter 1st Quarter 2nd Quarter 3rd Quarter
Item Description Unit Total Total Unit Total Total Unit Total Total Unit Total Total
Unit Unit Unit Unit MOOE LGU OTHERS TOTAL MOOE LGU OTHERS TOTAL MOOE
Price Price Qty. Price Price Qty. Price Price Qty. Price Price Qty.
T-square 36" adjustable 945 51,975 55 pc 0 0
Wall clock 550 2,200 4 u 0 0
Water current meter 180 7,200 40 u 0 0
Water depth gauge 325 13,000 40 u 0 0
Water pump 18,000 18,000 1 u 0 0
Water qty. test kit 3,000 6,000 2 set 0 0
Weighing scale 900 900 1 u 900 900 1 u 0 0
Weighing scale-1000g 400 8,000 20 u 0 0
Weighing scale-10kg 800 16,000 20 u 0 0
Wheel Barrow 1,800 10,800 6 u 0 0
White Tetoran 20 1,000 50 y 0 0
NICANOR A. ALPARITO
Coach ,
Accepted by:
LORLINIE M. ORTILLO
Schools Division Superintendent
Officer-in-charge
REPAIR OF EQUIPMENT
Computer units
REPAIR OF EQUIPMENT TBD
Oven
TBD
Ceiling/Electric Fans
TBD
Sound system
TBD
TV Set
TBD
Printer
TBD
Bundy Clock
TBD
UPS
TBD
Bldg 2-F
Fascia
R/L 2"x2"x12'
Vulca seal
Common nail # 3
Common nail # 2 1/2
Bldg 7-A
Fascia
R/L 2"x2"x12'
Vulca seal
Common nail # 3
Common nail # 2 1/2
Repair/Replacement of Door
Panel
Repair/Replacement of Door Grade I-2, Bldg 6-G
Panel door
Hinge, 3"x4"
Doorklock
Repair of Doorjamb
Grade I-2, Bldg 6-G Main Door
Repair of Doorjamb R/L 4"x6"x8'
Common nail # 4
Common nail # 3
Sand paper # 120
Calsumine
Cement, premium Portland
Mixing sand
Repainting of Roofs
Bldg I-A
Repainting of Roofs Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg I-B
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 2-A
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 2-B
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 2-C
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 2-D
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 2-E
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 2-F
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 3-A
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 3-B
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 4-A
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 5-A
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 6-A
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 6-B
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 6-C
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 6-D
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 6-E
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 6-F
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 6-G
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 6-H
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 7-A
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Grade IV-1
Jalousie frame
Jalousie glass
Bldg I to Bldg 2
Cement premium Portland
Mixing sand
Cracked stone
Repair of Landscapes
Grade IV-2
Repair of Landscapes Hollowblock
Cement premium portland
Mixing sand
Kindergarten
Hollowblock
Cement premium portland
Mixing sand
Grade VI
Hollowblock
Cement premium portland
Mixing sand
Grade V
Hollowblock
Cement premium portland
Mixing sand
Grade IV-1
Hollowblock
Cement premium portland
Mixing sand
Grade III
Hollowblock
Cement premium portland
Mixing sand
Grade II
Hollowblock
Cement premium portland
Mixing sand
Grade I
Hollowblock
Cement premium portland
Mixing sand
Repair of Clogged up CR
Kindergarten
Repair of Clogged up CR PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Grade I-1
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Grade I-2
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Grade II-1
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Grade II-2
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Grade III
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Grade IV-1
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Grade IV-2
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Grade V
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Grade VI
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Year I-1
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Year III-1
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Year III-2
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Year IV
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Designated Library
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Designated Office
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Grade I-1
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Grade I-2
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Grade II-1
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Grade II-2
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Grade III
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Grade IV-1
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Grade IV-2
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Grade V
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Grade VI
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Year I-1
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Year III-1
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Year III-2
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Year IV
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Grade I-1
Uniapple Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Grade I-2
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Grade II-1
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Grade II-2
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Grade III
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Grade IV-1
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Grade IV-2
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Grade V
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Grade VI
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Year I-1
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Year I-2
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Year II
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Year III-1
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Year III-2
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Year IV
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Repainting of Ceiling
Kindergarten
Repainting of Ceiling Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Grade I-1
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Grade I-2
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Grade II-1
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Grade II-2
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Grade III
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Grade IV-1
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Grade IV-2
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Grade V
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Grade VI
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Year I-1
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Year III-1
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Year III-2
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Year IV
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Computer Room
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Bldg 2
Sagay wht paint, latex Davies
Palmera green, latex Davies
Roller brush and basin set
Paint brush
Bldg 3
Sagay wht paint, latex Davies
Palmera green, latex Davies
Roller brush and basin set
Paint brush
Bldg 4
Sagay wht paint, latex Davies
Palmera green, latex Davies
Roller brush and basin set
Paint brush
Bldg 5
Sagay wht paint, latex Davies
Palmera green, latex Davies
Roller brush and basin set
Paint brush
Bldg 6
Sagay wht paint, latex Davies
Palmera green, latex Davies
Roller brush and basin set
Paint brush
Bldg 7
Sagay wht paint, latex Davies
Palmera green, latex Davies
Roller brush and basin set
Paint brush
Repair of Stage
Hollow block
Repair of Stage Cement, premium portland
Mixing sand
Cracked stone
Corrogated round bar
Tie wire
Marine plywood
R/L 2"x2"x12'
R/L 2"x4"x12'
Common nail # 2 1/2"
Rehabilitation of Canteen
Hollowblock
Rehabilitation of Canteen Cement, premium Portland
Mixing sand
Cracked stone
Tie wire
Corrogated round bar 9mm
G.I plain sheet 26x10, 0.4 , 8'
G.I corrogated sheet 26x10, 0.4 , 8'
R/L 2"x2"x10'
R/L 2"x2"x8'
R/L 2"x3"x8'
R/l 2"x3"x10'
Common nail #3 1/2
Common nail # 2 1/2
Common nail # 1
Umbrella nail
Vulca seal
Hardiflex
Plywood
Repainting of Floor
Computer Laboratory
Repainting of Floor Floor paint
Roller brush
Paint brush #5
Designated Office
Floor paint
Roller brush
Paint brush #5
Repair of Sink
Office CR
Repair of Sink Sink set
White cement
Clinic
Sink set
Cement premium Portland
Corrogated round bar 9mm
Mixing sand
Cracked stone
Repair of Cabinet
Science Room
Repair of Cabinet Plywood 1/4"x4"x8'
Common nail # 1
Common nail # 3
Cove molding
Sand paper
Handle
R/L 2"x2"x8'
Glass
Stikwel
Plastic Varnish
Lacquer thinner
Repair of Divider
Office
Repair of Divider
R/L 1"x10"x8'
R/L 1"x10"x6'
R/L 2"x2"x8"
Sandpaper
Caramel brown paint Davies, enamel
3rd Quarter 4th Quarter Ist Quarter 2nd Quarter 3rd Quarter 4th Quarter
Unit Total Total Unit Total Total Unit Total Total Unit Total Total
LGU OTHERS TOTAL MOOE LGU OTHERS TOTAL Unit Unit Unit Unit
Price Price Qty. Price Price Qty. Price Price Qty. Price Price Qty.
0 100 100 5 500 100 pc 5 500 100 pc 5 500 100 pc 5 500 100 pc
500 500 500 18 180 10 sht
180 0 60 60 1 roll 60 60 1 roll
0 60 60 320 320 1 can 320 320 1 can 320 320 1 can 320 320 1 can
320 320 320 4 420 100 pc 4 420 100 pc 4 840 200 pc
840 840 840 12 600 50 pc
600 600 600 200 1,000 5 set 200 1000 5 set 200 1000 5 set 200 1,000 5 set
1,000 1,000 1,000 10 250 25 pc 10 250 25 pc
250 0 2,400 4,800 2 set 2,400 2400 1 set 2,400 4,800 2 set
2,400 4,800 4,800 90 1,350 15 y
0 1,350 1,350 4 800 200 sht 4 1200 300 sht
1,200 0 26 130 5 roll 26 130 5 roll 26 650 25 roll
650 0 12 1200 100 tab
1,200 0 140 140 1 mL 140 140 1 mL 140 140 1 mL
0 140 140 110 1100 10 rm
1,100 0 165 165 1 pc 165 495 3 pc
0 495 495 200 1,000 5 bot
0 1,000 1,000 510 5100 10 pc
5,100 0 70 420 6 roll
420 0 0 56 336 6 q/g 56 336 6 q/g 56 448 8 q/g
336 448 448 38 152 4 pc 38 114 3 pc 38 304 8 pc
0 304 304 18 36 2 box 18 54 3 box
54 0 22 22 1 box 22 66 3 box
66 0 80 160 2 box 80 240 3 box
0 240 240 25 25 1 set 25 25 1 set 25 25 1 set
25 25 25 15 15 1 pc 15 15 1 pc 15 15 1 pc 15 15 1 pc
15 15 15 45 900 20 pc 45 1125 25 pc
1,125 0 120 480 4 set 120 720 6 set
720 0 1,800 1800 1 roll
1,800 0 265 265 1 pc
265 0 45 45 1 box 45 45 1 box 45 90 2 box
0 90 90 190 190 1 crtdg 190 190 1 crtdg 190 380 2 crtdg
380 0 8 96 12 y 8 80 10 y 8 80 10 y
80 80 80 800 800 1 roll
800 0 76 152 2 bot 76 228 3 bot
228 0 55 110 2 bot 55 55 1 bot
0 55 55 185 925 5 pr
925 0 480 480 1 pc 480 480 1 pc
3rd Quarter 4th Quarter Ist Quarter 2nd Quarter 3rd Quarter 4th Quarter
Unit Total Total Unit Total Total Unit Total Total Unit Total Total
LGU OTHERS TOTAL MOOE LGU OTHERS TOTAL Unit Unit Unit Unit
Price Price Qty. Price Price Qty. Price Price Qty. Price Price Qty.
0 480 480 300 1,800 6 set
0 1,800 1,800 75 75 1 pc 75 75 1 pc 75 75 1 pc 75 75 1 pc
75 75 75 22 88 4 pk 22 88 4 pk 22 88 4 pk
88 88 88 45 90 2 pc
90 0 145 1,450 10 set 145 1450 10 set
1,450 0 160 160 1 box
0 160 160 350 350 1 pc
0 350 350 130 260 2 set 130 390 3 set
0 390 390 300 600 2 cut 300 900 3 cut 300 1200 4 cut 300 900 3 cut
1,200 900 900 20 80 4 sht 20 320 16 sht
320 0
0 0 75 75 1 roll 75 75 1 roll 75 150 2 roll
150 0 210 210 1 pk 210 210 1 pk 210 210 1 pk
210 0 420 420 1 pc 420 840 2 pc
420 840 840 300 1200 4 pc 300 1,200 4 pc
1,200 1,200 1,200
3rd Quarter 4th Quarter Ist Quarter 2nd Quarter 3rd Quarter 4th Quarter
Unit Total Total Unit Total Total Unit Total Total Unit Total Total
LGU OTHERS TOTAL MOOE LGU OTHERS TOTAL Unit Unit Unit Unit
Price Price Qty. Price Price Qty. Price Price Qty. Price Price Qty.
0 900 900 3,500 3,500 1 u
0 3,500 3,500 49 196 4 u
0 196 195 125 250 2 u
0 250 250 400 4,400 11 lgth
0 4,400 4,400 35 70 2 set 35 350 10 set
0 0 16 96 6 u
0 96 96 75 225 3 u
0 225 225 68 68 1 pc 68 68 1 pc
2,900
68 0 68 68 1 pc 68 68 1 pc
68 0 36 360 10 u
220
0 360 360 350 700 2 u
0 700 700 350 3,500 10 u
0 3,500 3,500 250 5,000 20 pc
0 5,000 5,000 600 1,200 2 u
0 1,200 1,200 460 3,220 7 u
0 0 380 380 1 u 380 2660 7 u 380 3040 8 u 380 3,040 8 u
3,040 3,040 3,040 3,040 383 9,192 24 pr
0 9,192 9,200 6,000 36,000 6 u
0 36,000 36,000 2,500 5,000 2 u
0 5,000 5,000 57 57 1 mL 57 114 2 mL
113 0 1,200 24,000 20 pc
0 24,000 24,000 2,600 2,600 1 u
0 2,600 2,600 260 1,300 5 pc
0 1,300 1,300 2,500 12,500 5 set
0 12,500 12,500 1,200 66,000 55 u
0 66,000 66,000 1,200 2,400 2 u
0 2,400 2,400 50 100 2 u
0 100 100 392 9,408 24 pr
0 784 8,624 9,400 30 1,200 40 pc
0 1,200 1,200 360 1,800 5 u
0 1,800 1,800 280 1,400 5 pc
0 1,400 1,400 2,000 6,000 3 u
0 6,000 6,000 38 1,520 40 pr
0 1,520 1,520 150 150 1 u
0 150 150 158 3,792 24 pc
0 1,580 2,212 3,800 550 5,500 10 pc
3rd Quarter 4th Quarter Ist Quarter 2nd Quarter 3rd Quarter 4th Quarter
Unit Total Total Unit Total Total Unit Total Total Unit Total Total
LGU OTHERS TOTAL MOOE LGU OTHERS TOTAL Unit Unit Unit Unit
Price Price Qty. Price Price Qty. Price Price Qty. Price Price Qty.
0 1,050 4,450 5,500 200 6,000 30 u
0 6,000 6,000 800 800 1 u
0 800 800 28,000 28,000 1 u
0 28,000 28,000 12,000 12,000 1 u
0 12,000 12,000 800 800 1 pc
1 800 800 210 8,400 40 pc
0 1050 7,350 8,400 300 12,000 40 pr
0 12,000 12,000 138 828 6 u 138 828 6 u 138 828 6 u 138 828 6 u
825 825 825 825 21 8,190 390 u
0 8,190 8,000 23 10,120 440 u
0 10,120 10,000 350 700 2 u
0 700 700 860 860 1 u
0 860 860 380 760 2 u
0 760 760 360 1,800 5 u
0 1,800 1,800 83 2,490 30 u
0 2,490 2,490 188 7,520 40 pr
0 7,520 7,520 83 2,490 30 u
0 2,490 2,490 55 110 2 pc 55 165 3 pc
165 0 42 252 6 pc
0 252 250 167 4,008 24 pc
0 4,008 4,000 3,500 3,500 1 u
0 3,500 3,500 900 4,500 5 u
0 4,500 4,500 2,400 2,400 1 u
0 2,400 2,400 30 30 1 u
0 0 580 580 1 u
0 0 500 20,000 40 pc
0 1,000 18,000 1,000 20,000 4,200 4,200 1 u
0 0 350 1,050 3 u 350 350 1 u 350 350 1 u 350 350 1 u
350 350 1 u 350 350 1 u 520 5,200 10 u
0 5,200 5,200 175 7,000 40 pc
0 1,680 20,160 560 22,400 195 390 2 pc 195 585 3 pc
585 975 975 400 16,000 40 u
0 16,000 16,000 313 12,520 40 set
0 12,520 12,520 1,050 2,100 2 u
0 2,100 2,100 9,000 18,000 2 pc
0 18,000 18,000 380 380 1 u
0 380 380 425 10,200 24 pc
850 850 8,400 10,200 33 792 24 doz
3rd Quarter 4th Quarter Ist Quarter 2nd Quarter 3rd Quarter 4th Quarter
Unit Total Total Unit Total Total Unit Total Total Unit Total Total
LGU OTHERS TOTAL MOOE LGU OTHERS TOTAL Unit Unit Unit Unit
Price Price Qty. Price Price Qty. Price Price Qty. Price Price Qty.
0 792 800 80 160 2 pc
160 160 160 83 166 2 pc
166 0 2,600 62,400 24 u
0 2,600 62,400 62,400 500 2,500 5 u
0 2,500 2,500 83 332 4 u
0 332 330 1,900 3,800 2 set
0 3,800 3,800 190 7,600 40 set
0 950 6,650 7,600 130 5,200 40 set
0 1,300 3,900 5,200 250 1,500 6 pc
0 1,500 1,500 25 250 10 u
0 250 250 450 4,500 10 set
0 2,250 2,250 4,500 200 8,000 40 set
0 2,000 6,000 8,000 72 3,600 50 u
0 600 3,000 3,600 28,000 28000 1 u
28,000 28,000 28,000 600 600 1 pc
0 0 650 1,300 2 lgth
0 1,300 1,300 120 600 5 pc
0 600 600 27 4,050 150 u
380
0 4,050 4,000 700 1,400 2 roll
0 1,400 1,400 140 14,000 100 pc
0 12,600 1,400 14,000 57 285 5 u
0 285 285 125 5,000 40 pc
0 1,250 3,750 5,000 125 5,000 40 pc
0 625 3,750 4,375 4,000 4,000 1 u
0 4,000 4,000 2,200 4,400 2 set
0 4,400 4,400 383 9,192 24 pr
0 766 8,26 9,200 88 528 6 set 88 528 6 set 88 528 6 set 88 528 6 set
525 525 525 860 860 1 u
0 860 860 20 800 40 pc
0 800 800 160 160 1 set
0 160 160 667 2,001 3 u
0 2,001 2,001 185 370 2 u 185 370 2 u 185 370 2 u
370 370 370 370 960 960 1 u
0 960 960 4,600 4,600 1 u
0 4,600 4,600 5,000 5,000 1 u
0 5,000 5,000 5,000 5,000 1 u
0 5,000 5,000 155 155 1 pc 155 310 2 pc
3rd Quarter 4th Quarter Ist Quarter 2nd Quarter 3rd Quarter 4th Quarter
Unit Total Total Unit Total Total Unit Total Total Unit Total Total
LGU OTHERS TOTAL MOOE LGU OTHERS TOTAL Unit Unit Unit Unit
Price Price Qty. Price Price Qty. Price Price Qty. Price Price Qty.
0 165 165
0 1,800 1,800 400 16,000 40 pr
0 16,000 16,000 900 900 1 u
0 900 900 360 1,800 5 u
0 1,800 1,800 260 1,300 5 pc
0 1,300 1,300 660 660 1 u
0 660 660 83 2,490 30 u
0 2,490 2,490 1,000 5,000 5 u
0 5,000 5,000 150 450 3 u
0 450 450 8,000 56,000 7 u
0 48,000 8,000 56,000 36,000 72,000 2 u
0 72,000 72,000 6,000 6,000 1 u
0 6,000 6,000 2,000 12,000 6 u
0 12,000 12,000 300 9,000 30 u
0 9,000 9,000 300 6,000 20 pc
0 6,000 6,000 1,200 18,000 15 pc
0 18,000 18,000 1,300 14,300 11 pc
0 14,300 14,300 2,250 4,500 2 u
0 4,500 4,500 300 9,000 30 u
0 9,000 9,000 2,800 2,800 1 u
0 2,800 2,800 200 6,000 30 u
0 6,000 6,000 1,300 3,900 3 u
0 3,900 3,900 225 900 4 u
0 900 900 120 1,800 15 u
0 1,800 1,800 1,300 13,000 10 pc
0 1,300 10,400 1,300 13,000 200 1,000 5 u
0 1,000 1,000 1,500 1,500 1 lgth
0 1,500 1,500 1,600 1,600 1 u
2,040 2,040
0 600 600 67 402 6 set 67 402 6 set 67 402 6 set 67 402 6 set
400 400 400 800 1,200 1,800 1,800 1 u
0 1,800 1,800 63 1,512 24 pc
0 1,512 1,500 83 1,992 24 pc
0 1,992 2,000 19 3,040 160 u
0 3,040 3,000 195 390 2 pc 195 585 3 pc
585 0 280 280 1 u
280 0 21 504 24 pc
0 504 500 71 1,704 24 pc
0 1,704 1,700
3rd Quarter 4th Quarter Ist Quarter 2nd Quarter 3rd Quarter 4th Quarter
Unit Total Total Unit Total Total Unit Total Total Unit Total Total
LGU OTHERS TOTAL MOOE LGU OTHERS TOTAL Unit Unit Unit Unit
Price Price Qty. Price Price Qty. Price Price Qty. Price Price Qty.
0 12,000 42,000 52,000
0 2,200 2,200 180 7,200 40 u
0 7,200 7,200 325 13,000 40 u
0 13,000 13,000 18,000 18,000 1 u
0 18,000 18,000 3,000 6,000 2 set
0 6,000 6,000 900 900 1 u 900 900 1 u
900 900 900 900 400 8,000 20 u
0 8,000 8,000 800 16,000 20 u
0 800 14,400 800 16,000 1,800 10,800 6 u
0 10,800 10,800 20 1,000 50 y
0 1,000 1,000
by:
JERRY T. VISABELLA
Supply Officer Designate
NENITA P. GAMAO
PSDS I, OIC
COLONIA DIVINA INTEGRATED SCHOOL
ANNUAL PROCUREMENT PROGRAM 2012 - Repair and Maintenance
UNIT TOTAL TOTAL DISTRIBUTION BY QUARTERS
Item Description PRICE COST QUANTITY UNIT 1ST QUARTER 2ND QUARTER 3RD QUARTER
Qty. Amount Qty. Amount Qty.
REPAIR & MAINTENANCE
Repair of Handrail at
Grade 1 to Grade 3 CLs
Corrogated round bar 8mm 90.00 1,440.00 16 lgth
G.I plain sheet #34 224.00 448.00 2 sht
Cement, premuim, Portland 250.00 2,500.00 10 bag
Mixing sand 1,200.00 1,200.00 1 cu.m.
Cracked stone 1,800.00 1,800.00 1 cu.m.
Tie wire 98.00 98.00 1 kg
7,486.00
Repair of Fish Pond (at Elementary
Department)
Corrogated round bar 8mm 90.00 900.00 10 lgth
Cement, premuim, Portland 250.00 3,000.00 12 bag
Mixing sand 850.00 2,550.00 3 cu.m
Cracked stone 1,200.00 1,800.00 1 1/2 cu.m
Tie wire 98.00 147.00 1 1/2 kg
Hollow blocks 17.00 2,108.00 124 pc
10,505.00
Repair of Leaking Roofs at:
Grade I-1 (Bldg 6-H)
G.I corrogated sheet 26x10x0.4x6' 300.00 3,000.00 10 sht
Umbrella nail 100.00 400.00 4 kg
Vulca seal 365.00 365.00 1 L
Metal Primer 400.00 1,200.00 3 gal
R/L 2"x4"x12' 360.00 2,160.00 6 lgth
R/L 2"x2"x10' 140.00 2,240.00 16 lgth
Common nail 4" 145.00 60.00 4 kg
Common nail 3" 130.00 520.00 4 kg
9,425.00
Grade II-1 (Bldg 6-F
G.I corrogated sheet 26x10x 0.4x 8' 368.00 1,840.00 5 lgth
Umbrella nail 100.00 50.00 1/2 kg
Vulca seal 365.00 365.00 1 L
Metal Primer 210.00 210.00 1 L
R/L 2"x4"x12' 360.00 360.00 1 lgth
Designated Office
Floor paint 1,450.00 2,900.00 2 gal 2
Roller brush 140.00 140.00 1 pc 1
Paint brush #5 70.00 140.00 2 pc 2
3,180.00
Home Economics Building
Floor paint 1,450.00 4,350.00 3 gal 3
Roller brush 140.00 140.00 1 pc 1
Paint brush #5 70.00 140.00 2 pc 2
4,630.00
Repair of Sink
Office CR
Sink set 3,400.00 3,400.00 1 unit
White cement 160.00 320.00 2 kg
REPAIR OF EQUIPMENT
Prepared by: Checked by:
LORLINIE M. ORTILLO
Schools Division Superintendent
Officer-in-charge
Modules, ALS
Multi-media LCD projector
Oven
Paint
Paint brush
Physicians scale
Placemats set
Planer, electric
Planer, manual
Pliers set
Protective table glass
Protractor
Screwdriver set
Serving dishes set
Set of Knives
Spoon
Sprinkler
Steel rule
Table knife
Teasepoon
Tissue paper
TV set
Volley ball
Volley ball net
Weighing scale
Welding machine, heavy duty
Wheel Barrow
3. Others
Y QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
16 1,440.00
2 448.00
10 2,500.00
1 1,200.00
1 1,800.00
1 98.00
7,486.00
10 900.00
12 3,000.00
3 2,550.00
2 1,800.00
2 147.00
124 2,108.00
10,505.00
10 3,000.00
4 400.00
1 365.00
3 1,200.00
6 2,160.00
16 2,240.00
4 60.00
4 520.00
9,425.00
5 1,840.00
1 50.00
1 365.00
1 210.00
1 360.00
Y QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
6 1,080.00
1 72.50
1 65.00
4,042.50
4 1,472.00
1 50.00
1 365.00
1 210.00
1 360.00
5 900.00
1 72.50
1 65.00
3,429.50
4 1,472.00
1 50.00
1 365.00
1 210.00
2 720.00
12 2,160.00
1 72.50
1 130.00
5,179.50
2,208.00
50.00
365.00
420.00
3,043.00
2,320.00
1,440.00
130.00
365.00
50.00
420.00
4,725.00
Y QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
2,208.00
360.00
1,800.00
130.00
365.00
50.00
420.00
360.00
5,693.00
2,208.00
360.00
1,800.00
130.00
365.00
50.00
210.00
5,123.00
180.00
10,426.00
2,944.00
2,160.00
195.00
365.00
150.00
420.00
360.00
6,594.00
6 2,208.00
1 360.00
10 1,800.00
1 130.00
1 365.00
1 50.00
2 420.00
Y QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
5,333.00
26 13,520.00
60 10,800.00
6 2,160.00
2 260.00
3 390.00
4 400.00
27,530.00
7,280.00
6,840.00
3,600.00
130.00
325.00
250.00
18,425.00
Y QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
6,240.00
6,120.00
2,880.00
195.00
260.00
200.00
15,895.00
8 4,160.00
28 5,040.00
4 1,440.00
1 130.00
1 130.00
1 100.00
11,000.00
10 6,200.00
4 2,080.00
24 4,320.00
2 1/2 325.00
1 130.00
3 435.00
13,490.00
5,200.00
5,760.00
1,440.00
260.00
260.00
150.00
13,070.00
Y QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
3,120.00
1,800.00
360.00
32.50
100.00
5,412.50
Y QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
8 5,360.00
10 1,800.00
1 460.00
1 32.50
1 130.00
7,782.50
2,010.00
720.00
230.00
32.50
32.50
3,025.00
5 3,350.00
8 1,440.00
1 230.00
1 65.00
1 65.00
5,150
1,340.00
720.00
230.00
65.00
65.00
2,420.00
Y QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
1 4,200.00
3 330.00
1 1,800.00
6,330.00
4,200.00
330.00
1,800.00
6,330.00
1 4,200.00
3 330.00
1 1,800.00
6,330.00
4,200.00
330.00
1,800.00
6,330.00
4,200.00
330.00
1,800.00
6,330.00
2,160.00
140.00
130.00
75.00
17.50
250.00
212.50
2,985.00
Y QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
3 2160
1 140
1 130
3 75
1 17.5
1 250
0 212.5
2,985
2,160.00
140.00
130.00
75.00
17.50
250.00
212.50
2,985.00
2,160.00
140.00
130.00
75.00
17.50
250.00
212.50
2,985.00
2,160.00
140.00
130.00
75.00
17.50
250.00
212.50
2,985.00
Y QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
2,160.00
140.00
130.00
75.00
17.50
250.00
212.50
2,985.00
3 2160
1 140
1 130
3 75
1 17.5
1 250
0 212.5
2985
2,160.00
780.00
330.00
3,270.00
2,040.00
780.00
330.00
Y QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
3,150.00
2,040.00
780.00
330.00
3,150.00
2,040.00
780.00
330.00
3,150.00
2,040.00
780.00
330.00
3,150.00
2,040.00
780.00
330.00
3,150.00
2,040.00
780.00
330.00
3,150.00
Y QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
2,040.00
780.00
330.00
3,150.00
2,040.00
780.00
330.00
3,150.00
2,040.00
780.00
330.00
3,150.00
2,040.00
780.00
330.00
3,150.00
2,040.00
780.00
330.00
3,150.00
2,040.00
780.00
330.00
3,150.00
2,040.00
780.00
330.00
3,150.00
2,040.00
890.00
330.00
3,260.00
2,040.00
780.00
330.00
3,150.00
2,040.00
780.00
330.00
Y QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
3,150.00
2,040.00
780.00
330.00
3,150.00
2,040.00
780.00
330.00
3,150.00
2,040.00
780.00
330.00
3,150.00
2,040.00
780.00
330.00
3,150.00
12 5,940.00
35 1,225.00
7,165.00
12 5,940.00
28 980.00
6,920.00
12 5,940.00
32 1,120.00
7,060.00
6 2,970.00
16 560.00
Y QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
3,530.00
4 1,980.00
10 350.00
2,330.00
7 3,465.00
18 630.00
4,095.00
8 3,960.00
32 1,120.00
5,080.00
6 2,970.00
20 700.00
3,670.00
1 250.00
3 150.00
1 100.00
1 145.00
0 645.00
0 0.00
13 3,250.00
1 850.00
1 600.00
4,700.00
1,000.00
425.00
300.00
1,725.00
Y QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
8 2,000.00
1 850.00
1 600.00
3,450.00
5,940.00
145.00
568.00
240.00
2,000.00
850.00
3,400.00
980.00
600.00
14,723.00
2,000.00
10,800.00 2 2,700.00
100.00 1 100.00
13,300.00 2,800.00
80 1,360.00
8 1,120.00
5 1,250.00
1 425.00
10 1,800.00
9 2,700.00
1 130.00
Y QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
2 1,240.00
1 108.75
10,133.75
1,656.00
2,210.00
2,100.00
2,500.00
520.00
1,800.00
600.00
1,700.00
900.00
100.00
590.00
195.00
130.00
370.00
1,600.00
1,040.00
95.00
98.00
90.00
1,450.00
19,744.00
Y QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
680.00
500.00
212.50
1,392.50
0.00
680.00
500.00
212.50
1,392.50
0.00
680.00
500.00
212.50
1,392.50
Y QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
685.00
110.00
125.00
0.00
685.00
110.00
125.00
920.00
0.00
685.00
110.00
125.00
920.00
1 685.00
1 110.00
1 125.00
920.00
1 685.00
1 110.00
1 125.00
920.00
1 685.00
1 110.00
1 125.00
920.00
Y QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
1 685.00
1 110.00
1 125.00
920.00
1 685.00
1 110.00
1 125.00
920.00
0.00
1 685.00
1 110.00
1 125.00
920.00
1 685.00
1 110.00
1 125.00
920.00
1 685.00
1 110.00
1 125.00
920.00
1 685.00
1 110.00
1 125.00
920.00
1 685.00
1 110.00
1 125.00
920.00
1 685.00
Y QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
1 110.00
1 125.00
920.00
1 685.00
1 110.00
1 125.00
920.00
1 685.00
1 110.00
1 125.00
920.00
1 685.00
1 110.00
1 125.00
920.00
2 1,520.00
2 110.00
2 130.00
4 100.00
1,860.00
2 1,520.00
2 110.00
2 130.00
4 100.00
1,860.00
2 1,520.00
2 110.00
2 130.00
4 100.00
1,860.00
Y QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
2 1,520.00
2 110.00
2 130.00
4 100.00
1,860.00
0
2 1,520.00
2 110.00
2 130.00
4 100.00
1,860.00
2 1,520.00
2 110.00
2 130.00
4 100.00
1,860.00
2 1,520.00
2 110.00
2 130.00
4 100.00
1,860.00
2 1,520.00
2 110.00
2 130.00
4 100.00
1,860.00
2 1,520.00
2 110.00
2 130.00
4 100.00
1,860.00
Y QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
2 1,520.00
2 110.00
2 130.00
4 100.00
1,860.00
2 1,520.00
2 110.00
2 130.00
4 100.00
1,860.00
2 1,520.00
2 110.00
2 130.00
4 100.00
1,860.00
2 1,520.00
2 110.00
2 130.00
4 100.00
1,860.00
2 1,520.00
2 110.00
2 130.00
4 100.00
1,860.00
2 1,520.00
2 110.00
2 130.00
4 100.00
1,860.00
Y QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
2,190.00
360.00
330.00
130.00
780.00
3,790.00
0.00
2,190.00
360.00
330.00
130.00
780.00
3,790.00
0.00
2,190.00
360.00
330.00
130.00
780.00
3,790.00
0.00
1,390.00
360.00
330.00
130.00
780.00
2,990.00
0.00
1,390.00
360.00
330.00
130.00
780.00
2,990.00
1,390.00
Y QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
360.00
330.00
130.00
780.00
2,990.00
0.00
1,460.00
360.00
330.00
130.00
780.00
3,060.00
0.00
1,460.00
360.00
330.00
130.00
780.00
3,060.00
0.00
1,460.00
360.00
330.00
130.00
780.00
3,060.00
0.00
1,460.00
360.00
330.00
130.00
780.00
3,060.00
3 2,190.00
2 360.00
2 330.00
Y QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
2 130.00
6 780.00
3,790.00
3 2,190.00
2 360.00
2 330.00
2 130.00
6 780.00
3,790.00
2,190.00
360.00
330.00
130.00
780.00
3,790.00
3 2,190.00
2 360.00
2 330.00
2 130.00
6 780.00
Y QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
3,790.00
3 2,190.00
2 360.00
2 330.00
2 130.00
6 780.00
3,790.00
4 2,920.00
2 360.00
2 330.00
2 130.00
6 780.00
4,520.00
1,460.00
360.00
330.00
130.00
780.00
3,060.00
3 2,190.00
1 395.00
2 130.00
1 65.00
2,780.00
Y QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
2,190.00
395.00
130.00
65.00
2,780.00
2,190.00
395.00
130.00
65.00
2,780.00
2,190.00
395.00
130.00
65.00
2,780.00
Y QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
2,190.00
395.00
130.00
65.00
2,780.00
2,190.00
395.00
130.00
65.00
2,780.00
Y QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
2,190.00
395.00
130.00
65.00
2,780.00
3 2,190.00
1 395.00
2 130.00
1 65.00
2,780.00
3 2,190.00
1 395.00
2 130.00
1 65.00
2,780.00
3 2,190.00
1 395.00
2 130.00
1 65.00
2,780.00
2 1,460.00
1 395.00
2 130.00
1 65.00
2,050.00
Y QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
Y QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
4 2,920.00
2 1,520.00
2 290.00
2 130.00
4,860.00
2 5,000.00
30 25,500.00
18 21,600.00
55 13,750.00
18 8,730.00
5 490.00
75,070.00
300 5,100.00
20 5,000.00
3 2,125.00
1 600.00
15 2,100.00
2 147.00
2 1,040.00
10 1,800.00
6 2,160.00
1 130.00
20,202.00
600 10,800.00
20 5,400.00
3 3,000.00
2 2,800.00
2 240.00
20 3,800.00
20 7,100.00
3 1,104.00
Y QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
12 1,920.00
14 2,380.00
4 1,120.00
6 1,800.00
1 140.00
1 140.00
1 60.00
2 187.50
1 330.00
4 2,200.00
4 1,960.00
46,481.50
4,350.00
140.00
140.00
4,630.00
2,900.00
140.00
140.00
3,180.00
4,350.00
140.00
140.00
4,630.00
1 3,400.00
2 320.00
Y QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
3,720.00
3 1,380.00
1 0.00
1 130.00
3 375.00
4 100.00
4 180.00
15 1,950.00
4 1,800.00
1 235.00
4 340.00
2 120.00
6,610.00
540.00
1,560.00
1,360.00
100.00
750.00
4,310.00
1,060.00
420.00
900.00
2,380.00
150 9,300.00
Y QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
17 1,326.00
17 1,105.00
35 10,430.00
30 2,040.00
4 220.00
1 530.00
1 360.00
1 970.00
2 770.00
27,051.00
7 11,200
3 390
3 1,050
11 1,980
15 1,200
1 390
16,210
2640 3 8,800.00
9450 70 37,800.00
960 8 3,600.00
240 3 960.00
75 1 300.00
540 4 2,160.00
1120 2 4,480.00
120 2 480.00
58,580.00
Y QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
cked by:
JERRY T. VISABELLA
Supply Officer Designate
Sch
NENITA P. GAMAO
PSDS I, OIC
School Governing Council Secretary
,
COLONIA DIVINA INTEGRATED SCHOOL
ANNUAL PROCUREMENT PROGRAM 2013 - Repair and Maintenance
UNIT TOTAL TOTAL DISTRIBUTION BY QUARTERS
Item Description PRICE COST QUANTITY UNIT 1ST QUARTER 2ND QUARTER 3RD QUARTER
Qty. Amount Qty. Amount Qty.
REPAIR & MAINTENANCE
Elementary
Repair of Handrail at
Grade 1 to Grade 3 CLs
Corrogated round bar 8mm 90.00 1,440.00 16 lgth
RepairG.I plain sheet #34 224.00 448.00 2 sht
Cement, premuim, Portland 250.00 2,500.00 10 bag
Mixing sand 1,200.00 1,200.00 1 cu.m.
Cracked stone 1,800.00 1,800.00 1 cu.m.
Tie wire 98.00 98.00 1 kg
7,486.00
Repair of Fish Pond
Elementary
Corrogated round bar 8mm 90.00 900.00 10 lgth
Cement, premuim, Portland 250.00 3,000.00 12 bag
Mixing sand 850.00 2,550.00 3 cu.m
Cracked stone 1,200.00 2,400.00 2 cu.m
Tie wire 98.00 98.00 1 kg
Hollow blocks 17.00 2,108.00 124 pc
11,056.00
Secondary
Bamboo posts 30.00 1,500.00 50 pcs 25 750.00 25 750.00
Bamboo slats 100.00 3,000.00 30 bunch 15 1,500.00 1,500.00
Whole bamboo 30.00 600.00 20 lgth 10 10.00 10.00
C.W nails 3" 60.00 420.00 7 kg 4 4.00 4.00
C.W nails 2 1/2" 60.00 900.00 15 kg 8 8.00 8.00
6,420.00 2,272.00 2,272.00
Repair of Leaking Roofs:
ELEMENTARY
Grade I-1 (Bldg 6-H)
G.I corrogated sheet 26x10x0.4x6' 300.00 3,000.00 10 sht
Umbrella nail 100.00 400.00 4 kg
Vulca seal 365.00 365.00 1 L
Metal Primer 400.00 1,200.00 3 gal
R/L 2"x4"x12' 360.00 2,160.00 6 lgth
R/L 2"x2"x10' 140.00 2,240.00 16 lgth
Common nail 4" 145.00 60.00 4 kg
Common nail 3" 130.00 520.00 4 kg
9,425.00
CDIS APP 2013 Repair and Maintenance
UNIT TOTAL TOTAL DISTRIBUTION BY QUARTERS
Item Description PRICE COST QUANTITY UNIT 1ST QUARTER 2ND QUARTER 3RD QUARTER
Qty. Amount Qty. Amount Qty.
Grade II-1 (Bldg 6-F
G.I corrogated sheet 26x10x 0.4x 8' 368.00 3,680.00 10 lgth
Umbrella nail 100.00 100.00 1 kg
Vulca seal 365.00 365.00 1 L
Metal Primer 210.00 210.00 1 L
R/L 2"x4"x12' 360.00 360.00 1 lgth
R/L 2"x2"x10' 180.00 1,080.00 6 lgth
Common nail 4" 145.00 145.00 1 kg
Common nail 3" 130.00 130.00 1 kg
6,070.00
SECONDARY
Year 7-1 (Bldg 2-A)
G.I corrogated sheet 26x10x 0.4x 8' 368.00 2,208.00 6 sht 6
Umbrella nail 100.00 50.00 1/2 kg 1
Vulca seal 365.00 365.00 1 L 1
Metal Primer 210.00 420.00 2 L 2
3,043.00
Year 7-2 (Bldg 2-B)
G.I corrogated sheet 26x10, 0.4 , 12' 580.00 2,320.00 4 sht 4
R/L 2"x2"x10' 180.00 1,440.00 8 lgth 8
Common nail 3 1/2" 130.00 130.00 1 kg 1
Vulca seal 365.00 365.00 1 L 1
Umbrella nail 100.00 50.00 1/2 kg 1
Metal Primer 210.00 420.00 2 L 2
4,725.00 0
Year II (Bldg 2-C) 0
G.I corrogated sheet 26x10, 0.4 , 8' 368.00 2,208.00 6 sht 6
R/L 2"x4"x12' 360.00 360.00 1 lgth 1
R/L 2"x2"x10' 180.00 1,800.00 10 lgth 10
Common nail 3 1/2" 130.00 130.00 1 kg 1
Vulca seal 365.00 365.00 1 L 1
Umbrella nail 100.00 50.00 1/2 kg 1
Metal Primer 210.00 420.00 2 L 2
Roof paint, Baguio green 180.00 360.00 2 L 2
5,693.00
Year III-1 (Bldg 2-D)
G.I corrogated sheet 26x10, 0.4 , 8' 368.00 2,208.00 6 sht 6
R/L 2"x4"x12' 360.00 360.00 1 lgth 1
R/L 2"x2"x10' 180.00 1,800.00 10 lgth 10
Common nail 3 1/2" 130.00 130.00 1 kg 1
Vulca seal 365.00 365.00 1 L 1
Designated Office
Floor paint 1,450.00 2,900.00 2 gal 2
Roller brush 140.00 140.00 1 pc 1
Modules, ALS
Multi-media LCD projector
Oven
Paint
Paint brush
Physicians scale
Placemats set
Planer, electric
Planer, manual
Pliers set
Protective table glass
Protractor
Screwdriver set
Serving dishes set
Set of Knives
Spoon
Sprinkler
Steel rule
Table knife
Teasepoon
Tissue paper
TV set
Volley ball
Volley ball net
Weighing scale
Welding machine, heavy duty
Wheel Barrow
3. Others
BY QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
16 1,440.00
2 448.00
10 2,500.00
1 1,200.00
1 1,800.00
1 98.00
7,486.00
10 900.00
12 3,000.00
3 2,550.00
2 2,400.00
1 98.00
124 2,108.00
11,056.00
10 3,000.00
4 400.00
1 365.00
3 1,200.00
6 2,160.00
16 2,240.00
4 60.00
4 520.00
9,425.00
Page 2 of 31
BY QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
10 3,680.00
1 100.00
1 365.00
1 210.00
1 360.00
6 1,080.00
1 145.00
1 130.00
6,070.00
2,208.00
50.00
365.00
420.00
3,043.00
2,320.00
1,440.00
130.00
365.00
50.00
420.00
4,725.00
0.00
2,208.00
360.00
1,800.00
130.00
365.00
50.00
420.00
360.00
5,693.00
2,208.00
360.00
1,800.00
130.00
365.00
Page 3 of 31
BY QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
50.00
210.00
180.00
5,303.00
2,944.00
2,160.00
195.00
365.00
150.00
420.00
360.00
6,594.00
6 2,208.00
1 360.00
10 1,800.00
1 130.00
1 365.00
1 50.00
2 420.00
5,333.00
Page 4 of 31
BY QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
10,010.00
10,800.00
2,160.00
260.00
390.00
400.00
24,020.00
14 8,680.00
4 2,080.00
34 6,120.00
3 180.00
2 130.00
2 290.00
17,480.00
Page 5 of 31
BY QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
2,070.00
1,800.00
360.00
130.00
100.00
4,460.00
12 3,420.00
10 1,800.00
1 460.00
1 130.00
1 130.00
Page 6 of 31
BY QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
5,940.00
2,010.00
720.00
460.00
130.00
32.50
3,352.50
5 3,350.00
8 1,440.00
1 460.00
1 65.00
1 65.00
5,150
1,340.00
720.00
460.00
65.00
65.00
2,650.00
1 4,200.00
3 330.00
1 1,800.00
6,330.00
1 4,200.00
3 330.00
1 1,800.00
6,330.00
1 4,200.00
3 330.00
1 1,800.00
6,330.00
1 4,200.00
3 330.00
Page 7 of 31
BY QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
1 1,800.00
6,330.00
1 4,200.00
3 330.00
1 1,800.00
6,330.00
2,160.00
140.00
130.00
75.00
35.00
250.00
850.00
3,640.00
3 2160
1 140
1 130
3 75
1 35
1 250
0 850
2,985
2,160.00
140.00
130.00
75.00
35.00
250.00
850.00
3,640.00
2,160.00
140.00
130.00
75.00
35.00
Page 8 of 31
BY QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
250.00
850.00
3,640.00
2,160.00
140.00
130.00
75.00
35.00
250.00
850.00
3,640.00
2,160.00
140.00
130.00
75.00
35.00
250.00
850.00
3,640.00
3 2160
1 140
1 130
3 75
1 35
1 250
1 850
3640
Page 9 of 31
BY QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
Page 10 of 31
BY QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
330.00
3,260.00
2,040.00
780.00
330.00
3,150.00
2,040.00
780.00
330.00
3,150.00
2,040.00
780.00
330.00
3,150.00
2,040.00
780.00
330.00
Page 11 of 31
BY QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
3,150.00
2,040.00
780.00
330.00
3,150.00
2,040.00
780.00
330.00
3,150.00
Page 12 of 31
BY QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
0.00 1 250.00
0.00 3 150.00
0.00 1 100.00
0.00 1 145.00
0.00 0 645.00
0 0.00
0.00
0.00
0.00
0.00 1 600.00
0.00 9,850.00
0.00
425.00
300.00
1,725.00
8 2,000.00
1 850.00
1 600.00
3,450.00
5,940.00
145.00
568.00
Page 13 of 31
BY QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
240.00
2,000.00
850.00
3,400.00
980.00
600.00
14,723.00
2,000.00
10,800.00 2 2,700.00
100.00 1 100.00
12,900.00 2,800.00
80 1,360.00
8 1,120.00
5 1,250.00
1 425.00
10 1,800.00
9 2,700.00
1 130.00
2 1,240.00
1 108.75
10,133.75
1,656.00
2,210.00
2,100.00
2,500.00
520.00
1,800.00
600.00
1,700.00
900.00
100.00
590.00
195.00
130.00
370.00
1,600.00
1,040.00
Page 14 of 31
BY QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
95.00
98.00
90.00
1,450.00
19,744.00
1,870.00
1,250.00
300.00
3,420.00
680.00
500.00
300.00
1,480.00
Page 15 of 31
BY QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
680.00
500.00
300.00
1,480.00
685.00
110.00
125.00
0.00
685.00
110.00
125.00
920.00
0.00
685.00
110.00
125.00
920.00
1 685.00
1 110.00
1 125.00
920.00
1 685.00
Page 16 of 31
BY QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
1 110.00
1 125.00
920.00
1 685.00
1 110.00
1 125.00
920.00
1 685.00
1 110.00
1 125.00
920.00
1 685.00
1 110.00
1 125.00
920.00
0.00
1 685.00
1 110.00
1 125.00
920.00
1 685.00
1 110.00
1 125.00
920.00
1 685.00
1 110.00
1 125.00
920.00
1 685.00
1 110.00
1 125.00
920.00
1 685.00
1 110.00
1 125.00
920.00
Page 17 of 31
BY QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
1 685.00
1 110.00
1 125.00
920.00
1 685.00
1 110.00
1 125.00
920.00
1 685.00
1 110.00
1 125.00
920.00
1 685.00
1 110.00
1 125.00
920.00
Page 18 of 31
BY QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
Page 19 of 31
BY QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
Page 20 of 31
BY QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
2,190.00
360.00
330.00
130.00
780.00
3,790.00
0.00
2,190.00
360.00
330.00
130.00
780.00
3,790.00
0.00
2,190.00
360.00
330.00
130.00
780.00
3,790.00
0.00
1,390.00
360.00
330.00
130.00
780.00
2,990.00
0.00
1,390.00
360.00
330.00
130.00
780.00
Page 21 of 32
BY QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
2,990.00
1,390.00
360.00
330.00
130.00
780.00
2,990.00
0.00
1,460.00
360.00
330.00
130.00
780.00
3,060.00
0.00
1,460.00
360.00
330.00
130.00
780.00
3,060.00
0.00
1,460.00
360.00
330.00
130.00
780.00
3,060.00
0.00
1,460.00
360.00
330.00
130.00
780.00
3,060.00
3 2,190.00
2 360.00
2 130.00
6 780.00
Page 22 of 31
BY QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
3,460.00
3 2,190.00
2 330.00
2 360.00
2 330.00
2 130.00
6 780.00
4,120.00
2,190.00
360.00
330.00
130.00
780.00
3,790.00
3 2,190.00
2 360.00
2 330.00
2 130.00
6 780.00
3,790.00
3 2,190.00
2 360.00
2 330.00
2 130.00
Page 23 of 31
BY QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
6 780.00
3,790.00
4 2,920.00
2 360.00
2 330.00
2 130.00
6 780.00
4,520.00
1,460.00
360.00
330.00
130.00
780.00
3,060.00
3 2,190.00
1 395.00
2 130.00
780.00
3,495.00
780.00
780.00
Page 24 of 31
BY QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
2,190.00
395.00
130.00
780.00
3,495.00
780.00
780.00
780.00
780.00
1 395.00
2 130.00
780.00
2,190.00
3 2,190.00
1 395.00
2 130.00
780.00
3 2,190.00
3,495.00
Page 25 of 31
BY QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
3 2,190.00
1 395.00
2 130.00
780.00
3,495.00
3 2,190.00
1 395.00
2 130.00
780.00
3,495.00
3 2,190.00
1 395.00
2 130.00
780.00
3,495.00
3 2,190.00
1 395.00
2 130.00
780.00
3,495.00
3 2,190.00
1 395.00
2 130.00
780.00
3,495.00
3 2,190.00
1 395.00
2 130.00
780.00
3,495.00
3 2,190.00
1 395.00
2 130.00
780.00
Page 26 of 31
BY QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
3,495.00
780.00
Page 27 of 31
BY QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
75,070.00
300 5,100.00
20 5,000.00
3 2,125.00
1 600.00
15 2,100.00
2 147.00
2 1,040.00
10 1,800.00
6 2,160.00
1 130.00
20,202.00
600 10,800.00
20 5,400.00
3 3,000.00
2 2,800.00
2 240.00
Page 28 of 31
BY QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
20 3,800.00
20 7,100.00
3 1,104.00
12 1,920.00
14 2,380.00
4 1,120.00
6 1,800.00
1 140.00
1 140.00
1 60.00
2 187.50
1 330.00
4 2,200.00
4 1,960.00
46,481.50
2,430.00
1,450.00
2,040.00
120.00
120.00
120.00
120.00
6,400.00
4,350.00
140.00
140.00
4,630.00
2,900.00
140.00
Page 29 of 31
BY QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
140.00
3,180.00
4,350.00
140.00
140.00
4,630.00
1 3,400.00
2 320.00
3,720.00
1,380.00
0.00
130.00
375.00
100.00
4 180.00
15 1,950.00
4 1,800.00
1 235.00
4 340.00
2 120.00
6,610.00
Page 30 of 31
BY QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
540.00
1,560.00
1,360.00
100.00
750.00
4,310.00
2,480.00 40 2,480.00
4,400.00 80 4,400.00
425.00 4 425.00
380.00 1 95.00
312.00 5 390.00
260.00 5 325.00
2,384.00 11 3,278.00
476.00 9 612.00
55.00 1 55.00
530.00
360.00
12,062.00 12,060.00
7 11,200
3 390
3 1,050
11 1,980
15 1,200
1 390
16,210
2,640.00 3 8,800.00
9,450.00 70 37,800.00
960.00 8 3,600.00
240.00 3 960.00
Page 31 of 31
BY QUARTERS
3RD QUARTER 4TH QUARTER
Amount Qty. Amount
540.00 4 2,160.00
1,120.00 2 4,480.00
120.00 2 480.00
75.00 1 300.00
15,145.00 58,580.00
400.00 1 400.00
2,400.00 4 2,400.00
1,600.00 2 1,600.00
300.00 3 300.00
600.00
1 400.00
1,500.00 1 1,500.00
900.00 3 900.00
1,500.00
1 300.00
1 300.00
School Governing Council Secretary
,
COLONIA DI
Oven
TBD
Ceiling/Electric Fans
TBD
Sound system
TBD
TV Set
TBD
Printer
TBD
Bundy Clock
TBD
UPS
TBD
Bldg 2-F
Fascia
R/L 2"x2"x12'
Vulca seal
Common nail # 3
Common nail # 2 1/2
Bldg 7-A
Fascia
R/L 2"x2"x12'
Vulca seal
Common nail # 3
Common nail # 2 1/2
Repair/Replacement of Door
Panel
Grade I-2, Bldg 6-G
Panel door
Hinge, 3"x4"
Doorklock
Repair of Doorjamb
Grade I-2, Bldg 6-G Main Door
R/L 4"x6"x8'
Common nail # 4
Common nail # 3
Sand paper # 120
Calsumine
Cement, premium Portland
Mixing sand
Repainting of Roofs
Bldg I-A
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg I-B
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 2-A
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 2-B
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 2-C
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 2-D
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 2-E
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 2-F
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 3-A
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 3-B
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 4-A
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 5-A
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 6-A
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 6-B
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 6-C
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 6-D
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 6-E
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 6-F
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 6-G
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 6-H
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Bldg 7-A
Roof paint, Baguio green, Davies
Paint thinner
Paint brush 4"
Grade IV-1
Jalousie frame
Jalousie glass
Repair of Footwalk
Main walk at Elementary Department
Cement premium Portland
Mixing sand
Cracked stone
Corrogated round bar 9mm
Access Gate to Bldg I
Cement premium Portland
Mixing sand
Cracked stone
Bldg I to Bldg 2
Cement premium Portland
Mixing sand
Cracked stone
Repair of Landscapes
Grade IV-2
Hollowblock
Cement premium portland
Mixing sand
Kindergarten
Hollowblock
Cement premium portland
Mixing sand
Grade VI
Hollowblock
Cement premium portland
Mixing sand
Grade V
Hollowblock
Cement premium portland
Mixing sand
Grade IV-1
Hollowblock
Cement premium portland
Mixing sand
Grade III
Hollowblock
Cement premium portland
Mixing sand
Grade II
Hollowblock
Cement premium portland
Mixing sand
Grade I
Hollowblock
Cement premium portland
Mixing sand
Repair of Clogged up CR
Kindergarten
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Grade I-1
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Grade I-2
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Grade II-1
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Grade II-2
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Grade III
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Grade IV-1
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Grade IV-2
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Grade V
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Grade VI
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Year I-1
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Year III-1
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Year III-2
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Year IV
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Designated Library
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Designated Office
PVC pipe # 4
PVC elbow # 4
Solvent cement 100g
Grade I-1
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Grade I-2
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Grade II-1
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Grade II-2
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Grade III
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Grade IV-1
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Grade IV-2
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Grade V
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Grade VI
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Year I-1
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Year III-1
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Year III-2
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Year IV
Palmera green enamel gloss Davies
Paint thinner
Paint brush, 5"
Sand paper # 120
Grade I-1
Uniapple Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Grade I-2
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Grade II-1
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Grade II-2
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Grade III
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Grade IV-1
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Grade IV-2
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Grade V
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Grade VI
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Year I-1
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Year I-2
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Year II
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Year III-1
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Year III-2
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Year IV
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Computer Room
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Home Economics Building
Sagay wht latex, gloss Davies
Palmera green latex, Davies
Roller brush and basin set
Paint brush, 5"
Sand paper
Repainting of Ceiling
Kindergarten
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Grade I-1
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Grade I-2
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Grade II-1
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Grade II-2
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Grade III
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Grade IV-1
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Grade IV-2
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Grade V
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Grade VI
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Year I-1
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Year III-1
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Year III-2
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Year IV
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Computer Room
Sagay wht enamel, gloss Davies
Paint thinner
Paint brush, 5"
Paint brush, 5"
Bldg 2
Sagay wht paint, latex Davies
Palmera green, latex Davies
Roller brush and basin set
Paint brush
Bldg 3
Sagay wht paint, latex Davies
Palmera green, latex Davies
Roller brush and basin set
Paint brush
Bldg 4
Sagay wht paint, latex Davies
Palmera green, latex Davies
Roller brush and basin set
Paint brush
Bldg 5
Sagay wht paint, latex Davies
Palmera green, latex Davies
Roller brush and basin set
Paint brush
Bldg 6
Sagay wht paint, latex Davies
Palmera green, latex Davies
Roller brush and basin set
Paint brush
Bldg 7
Sagay wht paint, latex Davies
Palmera green, latex Davies
Roller brush and basin set
Paint brush
Repair of Stage
Hollow block
Cement, premium portland
Mixing sand
Cracked stone
Corrogated round bar
Tie wire
Marine plywood
R/L 2"x2"x12'
R/L 2"x4"x12'
Common nail # 2 1/2"
Rehabilitation of Canteen
Hollowblock
Cement, premium Portland
Mixing sand
Cracked stone
Tie wire
Corrogated round bar 9mm
G.I plain sheet 26x10, 0.4 , 8'
G.I corrogated sheet 26x10, 0.4 , 8'
R/L 2"x2"x10'
R/L 2"x2"x8'
R/L 2"x3"x8'
R/l 2"x3"x10'
Common nail #3 1/2
Common nail # 2 1/2
Common nail # 1
Umbrella nail
Vulca seal
Hardiflex
Plywood
Repainting of Floor
Computer Laboratory
Floor paint
Roller brush
Paint brush #5
Designated Office
Floor paint
Roller brush
Paint brush #5
Repair of Sink
Office CR
Sink set
White cement
Clinic
Sink set
Cement premium Portland
Corrogated round bar 9mm
Mixing sand
Cracked stone
Repair of Cabinet
Science Room
Plywood 1/4"x4"x8'
Common nail # 1
Common nail # 3
Cove molding
Sand paper
Handle
R/L 2"x2"x8'
Glass
Stikwel
Plastic Varnish
Lacquer thinner
Repair of Divider
Office
R/L 1"x10"x8'
R/L 1"x10"x6'
R/L 2"x2"x8"
Sandpaper
Caramel brown paint Davies, enamel
0 275 275
45 45 45
0 4,000 4,000
0 0
30 0
1,260 0
3,210 0
0 0
0 0
0 230 230
525 0
60 0
820 0
1,440 0
195 0
0 10,000 10,000
500 500 500
180 0
0 60 60
320 320 320
0 840 840
0 600 600
1,000 1,000 1,000
250 0
0 4,800 4,800
0 1,350 1,350
1,200 0
650 0
1,200 0
0 140 140
1,100 0
0 495 495
0 1,000 1,000
5,100 0
420 0 0
336 448 448
0 304 304
54 0
66 0
0 240 240
25 25 25
15 15 15
1,125 0
720 0
1,800 0
265 0
0 90 90
380 0
80 80 80
800 0
228 0
0 55 55
925 0
0 480 480
0 1,800 1,800
75 75 75
88 88 88
90 0
1,450 0
0 160 160
0 350 350
0 390 390
1,200 900 900
320 0
0 0
150 0
210 0
420 840 840
1,200 1,200 1,200
414 0
0 6,400 6,400
0 1,800 1,800
0 1,200 1,200
0 1,300 1,300
0 1,400 1,400
0 3,600 10,800 14,400
171 0
0 5,000 5,000
0 5,600 5,600
0 4,800 4,800
0 1500 10,500 12,000
2,500 2,500 0
0 9,500 9,500
0 5,500 5,500
0 1,100 53,900 55,000
0 5,400 5,400
0 900 900
0 3,500 3,500
0 195 195
0 250 250
0 4,400 4,400
0 0
0 96 96
0 225 225
68 0
68 0
0 360 360
0 700 700
0 3,500 3,500
0 5,000 5,000
0 1,200 1,200
0 0
3,040 3,040 0
0 9,200 9,200
0 36,000 36,000
0 5,000 5,000
113 0
0 24,000 24,000
0 2,600 2,600
0 1,300 1,300
0 12,500 12,500
0 66,000 66,000
0 2,400 2,400
0 100 100
0 9,400 9,400
0 1,200 1,200
0 1,800 1,800
0 1,400 1,400
0 6,000 6,000
0 1,500 1,500
0 150 150
0 3,800 3,800
0 1,050 4,450 5,500
0 6,000 6,000
0 800 800
0 28,000 28,000
0 12,000 12,000
1 800 800
0 1050 7,350 8,400
0 12,000 12,000
825 825 825 825
0 8,000 8,000
0 10,000 10,000
0 700 700
0 860 860
0 760 760
0 1,800 1,800
0 2,500 2,500
0 7,500 7,500
0 2,500 2,500
165 0
0 250 250
0 4,000 4,000
0 3,500 3,500
0 4,500 4,500
0 2,400 2,400
0 0
0 0
0 1,000 18,000 1,000 20,000
0 0
0 0
0 5,200 5,200
0 1,750 5,250 7,000
0 975 975
0 16,000 16,000
0 12,500 12,500
0 2,100 2,100
0 18,000 18,000
0 380 380
0 10,200 10,200
0 800 800
0 160 160
0 0
0 2,600 62,400 62,400
0 2,500 2,500
0 330 330
0 3,800 3,800
0 950 6,650 7,600
0 1,300 3,900 5,200
0 1,500 1,500
0 250 250
0 2,250 2,250 4,500
0 2,000 6,000 8,000
0 600 3,000 3,600
28,000 28,000 28,000
0 0
0 1,300 1,300
0 600 600
0 4,000 4,000
0 1,400 1,400
0 12,600 1,400 14,000
0 285 285
0 1,250 3,750 5,000
0 625 4,375 5,000
0 4,000 4,000
0 4,400 4,400
0 9,200 9,200
525 525 525
0 860 860
0 800 800
0 160 160
0 2,000 2,000
0 510 510
0 960 960
0 0
0 5,000 5,000
0 5,000 5,000
310 0
0 230 230
0 5,000 5,000
0 1,800 1,800
0 16,000 16,000
0 900 900
0 1,800 1,800
0 1,300 1,300
0 660 660
0 2,500 2,500
0 5,000 5,000
0 450 450
0 48,000 8,000 56,000
0 72,000 72,000
0 6,000 6,000
0 12,000 12,000
0 9,000 9,000
0 6,000 6,000
0 18,000 18,000
0 14,300 14,300
0 4,500 4,500
0 9,000 9,000
0 2,800 2,800
0 6,000 6,000
0 3,900 3,900
0 900 900
0 1,800 1,800
0 1,300 10,400 1,300 13,000
0 1,000 1,000
0 1,500 1,500
0 0
400 400 400 800 1,200
0 1,800 1,800
0 1,500 1,500
0 2,000 2,000
0 3,000 3,000
585 0
280 0
0 500 500
0 1,700 1,700
0 12,000 42,000 52,000
0 12,500 12,500
126 0
600 0
0 2,200 2,200
0 7,200 7,200
0 13,000 13,000
0 18,000 18,000
0 6,000 6,000
900 900 900 900
0 8,000 8,000
0 800 14,400 800 16,000
0 10,800 10,800
0 1,000 1,000
DISTRIBUTION BY QUARTER
1st Quarter 2nd Quarter 3rd Quarter 4th Quarter 1st Quartar
Item Description
Unit Total Total Unit Total Total Unit Total Total Unit Total Total
Unit Unit Unit Unit MOOE LGU
Price Price Qnty Price Price Qnty Price Price Qnty Price Price Qnty
I. Office Supplies and
Materials
Balloon 0 0 0 0.75 253.13 337.5
Ballpen 0 25 300 12 0 0
Battery, AA
Beddings
Betadine
Bondpaper, reams 190 950 5 rm 0 0 0
Bookpaper 0 165 495 3 0 0
Bowl liquid cleaner
Cartolina 0 0 0 0
Carton paper, set 0 0 0 0 5
CD-R, blank 15 150 10 0 0 0
Cleaning tools 0 0 0 0
Computer cover 0 0 0 0
Computer eyecare 0 0 0
Cooking stove burner, heavy duty 0 0 0
Correction tape
Cotton balls, sterilized
Curtain 0 0 0
Cutter 0 0 0
Cutter blade 0 0 0
DepEd Form 137 0 0 0
DepEd Form 138 0 0 0
DepEd Form 18A 0 0 0
DepEd Form 18E 0 0 0
DVD-RW, blank 0 0 0
Electrical tape
Elmer's glue 0 0
Envelope, brown 0 0
Envelope, expanded 0 0
Envelope, letter 0 0
Envelope, plastic 0 0
Feltpaper 0 0
Fine wire 0
Floor wax 320 320 1
Folder 4.2 3,150 750
Handwashing supplies 0
Ink, pentel pen 0
Ink, printer, set 2,240 2,240 1
Linolium, yard 0
Manila paper 0
Masking tape
Medicine 0
Mighty bond 0
Mineographing paper 0
Mirror 0
Multivitamins 0
Organizer 0
Packing tape
Paint 0
Paint brushes 0
Paper clips 0
Paper fastener 0
Pencil 0
Pencil lead refill 0
Pencil sharpener 0
Photopaper 0
Plastic roll 0
Puncher 0
Push pins 0
Ribbon cartridge, printer 0
Ribbon, decoration 0
Rope 600 600 1
Rubber band 0
Rubbing alcohol 0
Rugby 0
Scissors 0
Scotch tape
SD card 0
Seat cover 0
Sign pen 0
Silver dust 0
Soap 0
Special paper 0
Staple wire 0
Stapler, heavy duty 0
Sticker paper 0
Streamers 300 600 2
Styropor 0
Table cloth 0
Tie straw 0
Time card 0 210 1
USB flashdrive 0
Wall decor 0
2. Learning Materials, Tools 0
Equipment 0
0
Back Pack Sprayer 0
Balance beam 0
Basket ball 0
Big carajay 0
Big cooking pot 0
Charts 0
Coasters 0
Compass 0
Compass 0
Compound microscope 0
Crayon 0
Cross Cut Saw 0
DVD player 0
Electric sewing machine 0
Electrical Tester 0
Garden scale 0
Hammer 0
Hand Drill, electric 0
Kitchen wares 0
Maps 0
Meat Grinder 0
Meterstick 0
Modules, ALS 0
Multi-media LCD projector 0
Oven 0
Paint 0
Paint brush 0
Physicians scale 0
Placemats set 0
Planer, electric 0
Planer, manual 0
Pliers set 0
Protective table glass 0
Protractor 0
Screwdriver set 0
Serving dishes set 0
Set of Knives 0
Spoon 0
Sprinkler 0
Steel rule 0
Table knife 0
Teasepoon 0
Tissue paper
TV set 0
Volley ball 0
Volley ball net 0
Weighing scale 0
Welding machine, heavy duty 0
Wheel Barrow 0
3. Others 0
H.E 0
Burner, heavy duty
Curtain
Cutlery
Dessert fork
Fork
Knife
Spoon
Teaspoon
Electric thermos
Ember tongs
Goblet
Ice tongs
Kettle
Kitchen knives
Oven
Place mat
Platter
Pot, big
Pressure cooker
Rice cooker
Serving dishes
Sewing machine
Electric
Simple
Shut glass
Steamer
Table bucket
Table napkin, cloth
Table skirt
Table skirt accesories
Vanity mirror
Wall clock
Wine holder
Industrial Arts
Carpentry tools
Cross cut saw
Drill, electric
Grider
Hack saw
Hammer
Planer, electric
Planer, manual
Pliers
Combination
Long nose
Rotary tool kit
Screw drivers
Steel rule, 33'
Welding machine, semi heavy
Agricultute
Garden scale
Sprinkler
Water hose
Preschool
Chairs and table
Teachers table set
Wall clock
Library
Wall clock
Comp Lab
Screen filter
Computer cover set
Clinic
Digital thermometer
Forceps
Glass storage
Rubbing alcohol
Sterilized cotton balls
Plaster
Bandage
Band-aide
Betadine
Science
U-magnet 250
Multi-tester 480
Concave lens 325
Convex lens 325
Magnetic compass 400
Magnetic wire 250
Ammeter 40
Voltmeter 200
Prism glass 310
handlens 5 pc
lab thermometer 4 pc
test tube 5 pc
denatured alcohol 2 bot
Weighing scale
Beaker
Portable gas stove
Math
Multi-media LCD Projector 0 1 0
Sound box, portable 0 2 2
Science Subjects
Ammeter 1 3 3
Beaker 2 3 3
Compound microscope 0 0 1
Concave lens 0 1 2
Convex lens 0 1 2
Denatured alcohol 1 2 4
Gas stove, single portable 0 1 0
Handlens 1 5 5
Lab thermometer 0 5 5
Magnetic compass 0 2 1
Magnetic wire 0 2 1
Multi-tester 0 1 1
Prism glass 1 3 3
Test tube 1 5 5
U-magnet 1 3 3
Voltmeter 1 2 1
Weighing scale 1 2 1
TLE/EPP
Home Economics
Big carajay 0 0 1
Big cooking pot (for Fdg) 2 2 2
Burner, heavy duty 0 1 0
Coasters 12 12 12
Curtain, set 0 7 7
Cutlery, set 6 24 6
Electric sewing machine 0 0 1
Ember tongs 1 2 3
Gas range, portable 0 1 0
Goblet 0 24 12
Ice tongs 0 1 1
Kettle 1 1 0
Kitchen knives, set 0 1 0
Kitchen wares, set 80 6 12
Meat Grinder 0 0 1
Placemats set 0 24 12
Platter 0 6 6
Pot, big 1 1 1
Pressure cooker 0 0 1
Rice cooker 0 0 1
Serving dishes 0 3 3
Sewing clamp 0 0 1
Sewing machine, simple 0 0 1
Sewing electric 0 0 1
Steamer 0 1 0
Table ice bucket 0 1 0
Table napkin, cloth 0 24 12
Thermos, electric 0 0 1
Thermos, simple 0 1 1
Tissue paper holder 2 0 2
TV Set 0 2 2
Vanity mirror 0 2 2
Wine holder 0 1 0
Industrial Arts/EPP/Electricity
Chisel 0 2 2
Cross cut saw 1 2 1
Drill, electric 0 0 1
Electrical Tester 0 0 1
Hack saw 0 1 1
Hammer 0 2 2
Hand Drill, electric 0 0 1
Long nose 0 1 0
Paint brush 2 5 5
Planer, electric 0 1 0
Planer, manual 0 1 1
Pliers, set 0 1 1
Rotary tool kit 0 0 1
Screw drivers, set 0 1 1
Steel Grinder 0 0 1
Steel rule, 33' 0 0 1
Welding machine, heavy duty 0 0 1
Agrculture
Back Pack Sprayer 0 1 0
Garden scale 0 1 0
Wheel Barrow 0 1 0
Sprinkler 3 4 4
Spading Fork 0 1 1
Hole digger 1 1 1
Chisel 1 2 1
Vise grip 0 0 1
Scythe 0 30 0
Grass cutters 1 2 0
Hand trowels 0 30 0
Hand forks 0 30 0
Spade 0 30 0
Shovel 0 30 0
Crowbar 0 10 0
Garden hoe 0 30 0
Spading Fork 0 30 0
Pruning shears 0 20 0
Bolo 0 30 0
Saw 0 5 0
Hammer 0 5 0
Axe 0 5 0
Sprayers 0 3 0
Sprinklers 0 15 0
Wheel Barrow 0 6 0
Steel tape 0 5 0
Soil testing kit 0 2 0
Weighing scale 0 1 0
Power srayer 0 1 0
Water hose (meter) 0 0 200
Hole digger 0 5 0
Picking/harvesting
knives 0 10 0
Budding/grafting
knives 0 30 0
Pick mattock 0 20 0
Draft carabao 0 1 0
Water pump 0 1 0
Fish Processing
Equipment
Pressure cooker 0 1 0
Can sealer 0 1 0
Plastic sealer 0 3 0
Horizontal freezer 0 1 0
Gas range 0 1 0
Smoke house 0 0 1
Vacuum pack machine 0 0 1
Electric mixers 0 0 2
(Heavy Duty) 0 0 0
Hot air blower 0 0 5
Stuffer/Linker 0 0 1
Tools and Supplies 0 0 0
Kettle 0 40 0
Frying pan 0 10 0
Measuring spoon 0 40 0
Mixing bowl-stainless 0 40 0
Mixing bowl-glass
(by set) 0 10 0
Apron 0 40 0
Basin-stainless 0 40 0
Knives 0 40 0
Steamer 0 10 0
Cap seal of diff.
sizes 0 5,000 0
Gloves 0 40 0
Laboratory gown 0 40 0
Weighing scale-
1000g 0 20 0
Weighing scale-
10kg 0 20 0
Paring knives 0 40 0
Peelers 0 40 0
Glass measuring cup 0 40 0
B-tin cans 0 40 0
Measuring cup for
solid (by set) 0 40 0
Safety Equipment
Fire Extinguisher 1 0 0
Fish Culture
Equipment
Surveying equipment 0 0 1
Paddle wheel 0 0 2
Water pump 0 0 1
Filled oxygen tank 0 0 1
Feed storage 0 0 1
Freezer 0 0 1
Tools
D.O. meters 0 2 0
Flow rate meter 0 3 0
Lab. Thermometer 0 40 0
Shovel 0 20 0
Water depth guage 0 40 0
Digging blades 0 20 0
Masonry tools 0 2 0
Cultivator/rake 0 20 0
Net 0 2 0
P.E rope 0 2 0
Pail (plastic) 0 100 0
Weighing scale 0 2 0
Safety Shoes 0 40 0
Sinker 0 15 0
Eckman dredge 0 2 0
Secchi disc 0 5 0
Water qty. test kit 0 2 0
pH meter 0 1 0
Fish cage and 0 5 0
accessories 0 0
Beaker 0 10 0
Netting needle 0 5 0
Water current meter 0 40 0
Plastic basin 0 1 0
Hand gloves 0 40 0
Face mask 0 40 0
Plastic bags 0 40 0
Bolo 0 20 0
Cast net 0 2 0
Current meter 0 2 0
Dissecting board 0 5 0
Dissecting tools 0 5 0
Fish grater 0 5 0
Forceps 0 40 0
Refractometer 0 2 0
Blower 0 1 0
Salinometer 0 1 0
Scoop net 0 5 0
Suspension net 0 1 0
Technical Drawing
Tools & Equipment
T-square 36" wooden
body with graduated
plastic edge adjusta-
able 0 55 0
Drawing table & stool
36"x24" 0 55 0
Safety Equipment
Fire extinguisher, ABC
type, dry chem 5kg 0 2 0
Internet Computer
Fundamentals
Tools & Equipment
Smartbro modem 11 0
Chord 5 m 11 0
Kinder, Grade I, II, & III
Crayon 0 10 10
CD/DVD Player 1 1 1
TV set 0 3 3
Wall clock 0 4 4
MAPEH/MSEP
Ball, basketball Mikasa 1 2 2
Ball, volleyball Mikasa 1 2 2
Cassette Player 0 1 0
Lawn tennis set 0 2 2
Table tennis set 0 1 1
Volley ball net 0 0 1
Clinic
Digital thermometer 0 1 0
Forceps 0 1 0
Sphigmomanometer, digit 0 0 1
HEKASI/SIBIKA
Charts 2 4 4
Maps 2 4 4
Math
Compass 1 3 3
Color chalk, box 0 6 6
Crayon 10 10 10
Meterstick 10 10 10
Protractor 5 5 5
ALS
Modules, ALS 0 50 50
Modules/Handouts/
Grade I 100 390 390
Grade VII 0 440 440
Other Levels 150 150 150
Teacher's Guide 80 160 160
RESOURCE REQUIREMENT PER QUARTER
artar 2nd Quarter 3rd Quarter 4th Quarter
OTHERS TOTAL MOOE LGU OTHERS TOTAL MOOE LGU OTHERS TOTAL MOOE LGU OTHERS TOTAL
DISTRIBUTION BY QUARTER RESOURCE REQUIREMEN
1st Quarter 2nd Quarter 3rd Quarter 4th Quarter 1st Quartar 2nd Quarter
Item Description
Unit Total Total Unit Total Total Unit Unit Total Total Unit Total Total
Unit Unit Unit MOOE LGU OTHERSTOTAL MOOE
Price Price Qnty Price Price Qnty Price Price Qnty Price Price Qnty
I. Office Supplies and
Materials
Balloon (dcor on some occasion) 1 0 0 0 0.75 253.13 337.5
Ballpen 0 25 300 12 0 0
Battery, AA
Beddings (clinic, h.e)
Betadine
Bondpaper, reams 190 950 5 rm 0 0 0
Bookpaper 0 165 495 3 0 0
Bowl liquid cleaner
Cartolina 0 0 0 0
Carton paper, set 0 0 0 0 5
CD-R, blank 15 150 10 0 0 0
Cleaning tools 0 0 0 0
Computer cover 0 0 0 0
Computer eyecare 0 0 0
Cooking stove burner, heavy duty 0 0 0
Correction tape
Cotton balls, sterilized
Curtain 0 0 0
Cutter 0 0 0
Cutter blade 0 0 0
DepEd Form 137 0 0 0
DepEd Form 138 0 0 0
DepEd Form 18A 0 0 0
DepEd Form 18E 0 0 0
DVD-RW, blank 0 0 0
Electrical tape
Elmer's glue 0 0
Envelope, brown 0 0
Envelope, expanded 0 0
Envelope, letter 0 0
Envelope, plastic 0 0
Feltpaper 0 0
Fine wire 0
Floor wax 320 320 1
Folder, long, ordinary
Folder, long, expanded 4.2 3,150 750
Handwashing supplies 0
Ink, pentel pen 0
Ink, computer printer, set 2,240 2,240 1
Linolium, yard 0
Manila paper 0
Masking tape
Medicine 0
Mighty bond 0
Mineographing paper 0
Mirror 0
Multivitamins 0
Organizer 0
Packing tape
Paint 0
Paint brushes 0
Paper clips 0
Paper fastener 0
Pencil 0
Pencil lead refill 0
Pencil sharpener 0
Pentel pen, Pilot
Photopaper 0
Plastic roll 0
Puncher 0
Push pins 0
Ribbon cartridge, printer 0
Ribbon, decoration 0
Rope 600 600 1
Rubber band 0
Rubbing alcohol 0
Rugby 0
Scissors 0
Scotch tape
SD card 0
Seat cover 0
Sign pen 0
Silver dust 0
Soap 0
Special paper 0
Staple wire 0
Stapler, heavy duty 0
Sticker paper 0
Streamers 300 600 2
Styropor 0
Table cloth 0
Tie straw 0
Time card 0 210 1
USB flashdrive 0
Wall decor 0
2. Learning Materials, Tools 0
Equipment 0
Multimedia Projector 1 28T
Sound box, portable 2 5.5T
Science Subjects
Ammeter 3 690
Beaker 3 285
Concave lens 1 135
Convex lens 1 135
Denatured alcohol 2 170
Gas stove, single portable 1 3T
Handlens 5 275
Lab thermometer 5 975
Magnetic compass 2 160
Magnetic wire 2 165
Multi-tester 1 600
Prism glass 3 465
Test tube 5 975
U-magnet 3 210
Voltmeter 2 1T
Weighing scale 2 1.8T
TLE/EPP
Home Economics
Big cooking pot (for Fdg) 2 7.8T
Burner, heavy duty 1 1.8
Coasters 12 420
Curtain, set 7 3.2T
Cutlery, set 24 1.9T
Electric sewing machine 0
Ember tongs 2 100
Gas range, portable 1 17T
Goblet 24 3.3T
Ice tongs 1 30
Kettle 1 580
Kitchen knives, set 1 4.2T
Kitchen wares, set 6 2.1T
5T 5T 5T
5.5T 5.5T 5.5T
2T 2T 2T
2.4T 2.4T 2.4T
28T 28T 28T
52T 52T
66T 66T 66T
14T 14T 14T
14.3T 14.3T
4.4T 4.4T
195 195
330 330
Distribution: QUARTER 1
Item Description Unit Total Total
Price Price Qnty
I. Office Supplies and Materials
Ballpen 7.00 21.00 3
Battery, AA 25.00 50.00 2
Betadine 240.00 240.00 1
Bookpaper 150.00 750.00 5
Bowl liquid cleaner 300.00 300.00 1
Cartolina 10.00 2,000.00 200
Carton paper, set 140.00 140.00 1
Cartridge, LX-300+II 190.00 190.00 1
Cartridge, Lexmark Prntr 1,360.00 5,440.00 4
CD-R, blank 15.00 75.00 5
Cleaning tools, set 580.00 580.00 1
Correction tape 55.00 165.00 3
Cotton balls, sterilized 45.00 45.00 1
Streamers 300.00 600.00 2
Tie straw 75.00 75.00 1
Time card 210.00 210.00 1
2. Learning Materials and Equipment
Ammeter 138.00 276.00 2
Beaker 57.00 114.00 2
Coasters 35.00 70.00 2
Concave lens 68.00 68.00 1
Convex lens 68.00 68.00 1
Cutlery, set 380.00 380.00 1
Denatured alcohol 57.00 57.00 1
Handlens 55.00 110.00 2
Placemats set 88.00 528.00 6
Table napkin, cloth 67.00 402.00 6
Tarpaulin
Test tube 195.00 390.00 2
White Board 2,700.00
TOTAL
Distribution: QUARTER 2
Item Description Unit Total Total
Price Price Qnty
I. Office Supplies and Materials
Cartridge, Lexmark Prntr 1,360.00 5,440.00 4
CD-R, blank 15.00 75.00 5
Cleaning tools, set 580.00 580.00 1
Correction tape 55.00 165.00 3
Cotton balls, sterilized 45.00 45.00 1
Cutter 65.00 65.00 1
Cutter blade 30.00 30.00 1
DepEd Form 137 7.00 140.00 20
DepEd Form 138 6.00 90.00 15
DepEd Form 18A 6.00 120.00 20
DepEd Form 18E 6.00 180.00 30
Drill bit 230.00 230.00 1
DVD-RW, blank 35.00 175.00 5
Electrical tape 15.00 15.00 1
Envelope, plastic 5.00 500.00 100
Floor wax 320.00 320.00 1
Folder, long, ordinary 4.20 420.00 100
Handwashing supplies 200.00 1,000.00 5
Ink, bro 3-in-1 2,400.00 2,400.00 1
Masking tape 1 1/2" 26.00 130.00 5
Mighty bond 140.00 140.00 1
Mirror 165.00 165.00 1
Paint brushes 38.00 114.00 3
Pencil sharpener 15.00 15.00 1
Push pins 45.00 45.00 1
Ribbon cartridge, printer 190.00 190.00 1
SD card 480.00 480.00 1
Sign pen 75.00 75.00 1
Streamers 300.00 900.00 3
Tie straw 75.00 75.00 1
Time card 210.00 210.00 1
2. Learning Materials anquipment
Cutlery, set 380.00 2,660.00 7
Goblet 138.00 828.00 6
Kitchen wares, set 350.00 350.00 1
Placemats set 88.00 528.00 6
Platter 185.00 370.00 2
Table napkin, cloth 67.00 402.00 6
TOTAL
Distribution: QUARTER 3
Item Description Unit Total Total
Price Price Qnty
I. Office Supplies and Materials
Beddings (clinic, h.e) 350.00 700.00 2
Betadine 240.00 240.00 1
Big cooking pot (for Fdg) 2,900.00 2,900.00 1
Bondpaper, long s-20 165.00 1,650.00 10
Bondpaper, A4 s-20 155.00 1,550.00 10
Bondpaper, long s-18 150.00 1,500.00 10
Bondpaper, A4 s-18 145.00 1,450.00 10
Bondpaper, whtwove, short 120.00 1,200.00 10
Bondpaper, whtwove, long 100.00 1,000.00 10
Bookpaper 150.00 750.00 5
Broadband tattoo 1,300.00 1,300.00 1
Bundy clock ribbon 1,300.00 1,300.00 1
Cartolina 6.00 1,200.00 200
Cash Voucher 18.00 36.00 2
Cleaning tools, set 580.00 1,160.00 2
Computer eyecare 280.00 3,360.00 12
Cooking stove burner, heavy duty 1,800.00 1,800.00 1
Correction pen 28.00 588.00 21
Correction tape 55.00 275.00 5
Cotton balls, sterilized 45.00 45.00 1
Curtain 400.00 4,000.00 10
Cutter 80.00 160.00 2
Cutter blade 30.00 60.00 2
Drill bit 230.00 230.00 1
DVD-RW, Maxell 13.00 650.00 50
Elmer's glue 250.00 500.00 2
Envelope, letter 17.00 170.00 10
Envelope, exp, with handle trans 35.00 70.00 2
Envelope, expanded, asstd color 8.00 800.00 100
Envelope, plastic 4.00 2,400.00 600
Envelope with compartment 80.00 80.00 1
Epson LX300+II ribbon in cartridge 100.00 500.00 5
Faber Castel Marker 68.00 136.00 2
Floor wax 439.00 1,317.00 3
Folder, long colored 4.20 2,100.00 500
Folder, long wht 3.50 2,100.00 600
Folder, long expanded 12.00 600.00 50
TOTAL
Distribution: QUARTER 4
Item Description Unit Total Total
Price Price Qnty
Balloon (dcor ) 1.00 400.00 400
Battery, AA 25.00 50.00 2
Beddings (clinic, h.e) 350.00 700.00 2
Betadine 240.00 240.00 1
Big cooking pot (for Fdg) 2,900.00 2,900.00 1
Bondpaper, reams 190.00 950.00 5
Bookpaper 150.00 750.00 5
Cartolina 10.00 1,000.00 100
Cleaning tools, set 580.00 1,160.00 2
Computer eyecare 280.00 3,360.00 12
Cooking stove burner, heavy duty 1,800.00 1,800.00 1
Correction tape 55.00 275.00 5
Cotton balls, sterilized 45.00 45.00 1
Curtain 400.00 4,000.00 10
Drill bit 230.00 230.00 1
Envelope, letter 1.00 100.00 100
Envelope, plastic 5.00 500.00 100
Fine wire 60.00 60.00 1
Floor wax 320.00 320.00 1
Handwashing supplies 200.00 1,000.00 5
Ink, bro 3-in-1 2,400.00 7,200.00 3
Linolium, yard 90.00 1,350.00 15
Mighty bond 140.00 140.00 1
Mirror 165.00 495.00 3
Multivitamins 200.00 1,000.00 5
Paint 56.00 448.00 8
Paint brushes 38.00 304.00 8
Pencil 80.00 240.00 3
Pencil lead refill 25.00 25.00 1
Pencil sharpener 15.00 15.00 1
Push pins 45.00 90.00 2
Ribbon, decoration 8.00 80.00 10
Scissors 300.00 2,100.00 7
Rugby 55.00 55.00 1
SD card 480.00 480.00 1
Seat cover 300.00 1,800.00 6
Sign pen 75.00 75.00 1
Silver dust 22.00 88.00 4
Staple wire 160.00 160.00 1
TOTAL
GRAND TOTAL
NIA DIVINA INTEGRATED SCHOOL
Annual Procurement Plan 2012
pc 21.00 21.00
pc 50.00 50.00
bot 240.00 240.00
rm 750.00 750.00
bot 300.00 300.00
sht 2,000.00 2,000.00
set 140.00 140.00
pc 190.00 190.00
pc 5,440.00 5,440.00
pc 75.00 75.00
set 580.00 580.00
pc 165.00 165.00
pk 45.00 45.00
cut 600.00 600.00
roll 75.00 75.00
pk 210.00 210.00
10,881.00 0.00 0.00 10,881.00
pc 276.00 276.00
pc 114.00 114.00
set 70.00 70.00
pc 68.00 68.00
pc 68.00 68.00
u 380.00 380.00
mL 57.00 57.00
pc 110.00 110.00
set 528.00 528.00
set 402.00 402.00
pc 390.00 390.00
2,463.00 0.00 0.00 2,463.00
13,344.00 0.00 0.00 13,344.00
pc 5,440.00 5,440.00
pc 75.00 75.00
set 580.00 580.00
pc 165.00 165.00
pk 45.00 45.00
pc 65.00 65.00
set 30.00 30.00
sht 140.00 140.00
pc 90.00 90.00
sht 120.00 120.00
sht 180.00 180.00
pc 230.00 230.00
pc 175.00 175.00
roll 15.00 15.00
pc 500.00 500.00
can 320.00 320.00
pc 420.00 420.00
set 1,000.00 1,000.00
set 2,400.00 2,400.00
roll 130.00 130.00
mL 140.00 140.00
pc 165.00 165.00
pc 114.00 114.00
pc 15.00 15.00
box 45.00 45.00
crtdg 190.00 190.00
pc 480.00 480.00
pc 75.00 75.00
cut 900.00 900.00
roll 75.00 75.00
pk 210.00 210.00
14,529.00 0.00 0.00 14,529.00
u 2,660.00 2,660.00
u 825.00 828.00
u 350.00 350.00
set 128.00 528.00
u 370.00 370.00
set 400.00 402.00
498.00 0.00 4,235.00 5,138.00
15,027.00 0.00 4,235.00 19,667.00
pk 420.00 420.00
pc 780.00 780.00
pc 1,200.00 1,200.00
51,092.25 0.00 29,928.00 81,020.25
pc 342.00 342.00
u 1,200.00 1,200.00
pc 2,700.00 2,700.00
pc 2,400.00 2,400.00
pc 171.00 171.00
pc 1,080.00 1,080.00
pc 680.00 680.00
pc 970.00 970.00
pcs 7,800.00 7,800.00
pc 12,000.00 12,000.00
u 2,500.00 2,500.00
cd 2,800.00 2,500.00 5,300.00
pc 68.00 68.00 136.00
pc 68.00 68.00 136.00
pc 220.00 220.00 440.00
u 3,040.00 3,040.00
mL 113.00 113.00
u 825.00 825.00
pc 165.00 165.00
u 350.00 350.00
pc 585.00 585.00
0.00
pc 160.00 160.00
pc 166.00 166.00
u 28,000.00 28,000.00
pc 600.00 600.00
pc 380.00 380.00
set 528.00 528.00
u 370.00 370.00
set 200.00 200.00
y 2,040.00 2,040.00
pc 585.00 585.00
u 280.00 280.00
u 900.00 900.00
36,261.00 0.00 40,881.00 77,142.00
87,353.25 0.00 70,809.00 158,162.25
pc 200.00 200.00
pc 50.00 50.00
set 700.00 700.00
bot 240.00 240.00
u 2,900.00 2,900.00
rm 950.00 950.00
rm 750.00 750.00
sht 1,000.00 1,000.00
set 1,160.00 1,160.00
pc 3,360.00 3,360.00
pc 1,800.00 1,800.00
pc 275.00 275.00
pack 45.00 45.00
pc 4,000.00 4,000.00
pc 230.00 230.00
pc 100.00 100.00
pc 500.00 500.00
roll 60.00 60.00
can 320.00 320.00
set 1,000.00 1,000.00
set 7,200.00 7,200.00
y 1,350.00 1,350.00
mL 140.00 140.00
pc 495.00 495.00
bot 1,000.00 1,000.00
q/g 448.00 448.00
pc 304.00 304.00
box 240.00 240.00
set 25.00 25.00
pc 15.00 15.00
box 90.00 90.00
y 80.00 80.00
prs 2,100.00 2,100.00
bot 55.00 55.00
pc 480.00 480.00
set 1,800.00 1,800.00
pc 75.00 75.00
pk 88.00 88.00
box 160.00 160.00
pc 350.00 350.00
set 390.00 390.00
cut 900.00 900.00
pc 46.00 46.00
pc 860.00 860.00
pc 1,200.00 1,200.00
39,410.00 0.00 121.00 39,531.00
pc 343.00 343.00
pc 6,400.00 6,400.00
u 1,800.00 1,800.00
pc 3,600.00 10,800.00 14,400.00
pc 5,000.00 5,000.00
u 5,600.00 5,600.00
u 4,800.00 4,800.00
980.00 980.00
840.00 840.00
700.00 700.00
pc 1,500.00 10,500.00 12,000.00
pr 9,504.00 9,504.00
u 5,500.00 5,500.00
pc 1,100.00 53,900.00 55,000.00
u 5,400.00 5,400.00
lgth 900.00 900.00
u 3,500.00 3,500.00
u 196.00 196.00
u 250.00 250.00
lgth 4,400.00 4,400.00
u 96.00 96.00
u 225.00 225.00
u 360.00 360.00
u 700.00 700.00
u 3,500.00 3,500.00
pc 5,000.00 5,000.00
u 1,200.00 1,200.00
pr 9,192.00 9,192.00
u 36,000.00 36,000.00
u 5,000.00 5,000.00
pc 24,000.00 24,000.00
u 2,600.00 2,600.00
pc 1,300.00 1,300.00
u 2,100.00 2,100.00
pc 18,000.00 18,000.00
u 380.00 380.00
pc 950.00 8,300.00 9,250.00
doz 792.00 792.00
160.00 160.00
u 2,600.00 58,800.00 61,400.00
u 2,500.00 2,500.00
u 332.00 332.00
set 3,800.00 3,800.00
set ,5,950 6,650.00 6,650.00
set 1,300.00 3,900.00 5,200.00
pc 1,500.00 1,500.00
u 250.00 250.00
set 2,250.00 2,250.00 4,500.00
set 2,000.00 6,000.00 8,000.00
u 600.00 3,000.00 3,600.00
lgth 1,300.00 1,300.00
pc 600.00 600.00
u 4,050.00 4,050.00
roll 1,400.00 1,400.00
pc 12,600.00 1,400.00 14,000.00
u 285.00 285.00
pc 1,250.00 3,750.00 5,000.00
pc 625.00 3,750.00 4,375.00
u 4,000.00 4,000.00
set 4,400.00 4,400.00
pr 766.00 8,426.00 9,192.00
set 525.00 525.00
u 860.00 860.00
pc 800.00 800.00
set 1,600.00 1,600.00
u 2,001.00 2,001.00
u 370.00 370.00
u 960.00 960.00
u 4,600.00 4,600.00
u 5,000.00 5,000.00
u 5,000.00 5,000.00
pc 165.00 165.00
u 1,800.00 1,800.00
pr 16,000.00 16,000.00
u 900.00 900.00
u 1,800.00 1,800.00
pc 1,300.00 1,300.00
u 660.00 660.00
u 2,490.00 2,490.00
u 5,000.00 5,000.00
u 450.00 450.00
u 48,000.00 8,000.00 56,000.00
u 72,000.00 72,000.00
u 6,000.00 6,000.00
u 12,000.00 12,000.00
u 9,000.00 9,000.00
pc 6,000.00 6,000.00
pc 18,000.00 18,000.00
pc 14,300.00 14,300.00
u 4,500.00 4,500.00
u 9,000.00 9,000.00
u 2,800.00 2,800.00
u 6,000.00 6,000.00
u 3,900.00 3,900.00
u 900.00 900.00
u 1,800.00 1,800.00
pc 1,300.00 10,400.00 1,300.00 13,000.00
u 1,000.00 1,000.00
lgth 1,500.00 1,500.00
u 600.00 600.00
set 400.00 800.00 1,200.00
u 1,800.00 1,800.00
pc 63.00 63.00
pc 83.00 83.00
u 19.00 19.00
pc 504.00 504.00
pc 1,704.00 1,704.00
pc 12,000.00 42,000.00 54,000.00
u 2,200.00 2,200.00
u 7,200.00 7,200.00
u 13,000.00 13,000.00
u 18,000.00 18,000.00
set 6,000.00 6,000.00
u 900.00 900.00
u 8,000.00 8,000.00
Prepared by:
ANALIE V. BUHAYAN
Principal I
GRAND TOTAL
13,344.00
19,667.00
158,162.25
1,258,691.00
1,436,520.25
I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup
I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup I. Office Sup