You are on page 1of 3

1

ACKNOWLEDGEMENT
This Report is the outcome of laborious and fruitful Survey carried by
the
Group3
in Survey Camp 2070 from Baishak 6 to 18
th
organized by the Department of Civil Engineering, Thapathali
Engineering College, Thapathali, Kathmandu. The purpose of this
fieldwork was to make the each Student independent to carry outthe
work in real problem. We think, the purpose is fruitful and which make
us to produce the report of the fieldwork in time.We are sincerely
indebted to Department of Civil Engineering, ThapathaliCampus, for
providing opportunity to consolidate our theoretical and
practicalknowledge in engineering surveying. We would like to express
our sinceregratitude to Camp coordinator and sub coordinator
Er.Bharat dhakal

& E r . Tor a n P r a s a d B h a t t a
for their helpful suggestions and instructions, during thefieldwork, with
out which it was very difficult to do the work in the field and to produce
the report. We are equally indebted to our respected teachers
cuminstructors ,
Er.,Er.,Er,Mr. ,Mrs.Durga Adhikari
for their valuable instructions;friendly behavior and guiding any time
during the field work and also providing prompt comments and
rectification necessary before finalization of the report. Wecannot
proceed further without thanking to Mr Prakash
Pudashainee(account/logistics),storekeeper Raju Bhandari and others for
providing the instrument onneedy.
2
PREFACE
This Report on Survey Camp is the brief Description of the works that were done
in the Campsite duringthe Period of 12 days. The Materials in this report
are the outcomes of the unbelievable works of each andevery member of
Group 3, who gave their valuable time and knowledge for this report.
This report iscompilation of great efforts from the group members.The
main objective of this Survey Camp is to provide an opportunity to
consolidate and update the practical knowledge in engineering
Surveying in the actual field condition and habituate to work indifferent
environment with different people. In this Survey Camp, We are supposed to
survey a given plotin all its aspect and work on road and bridge alignment
with proper cross-section and profile and itstopography fulfilling all
technical requirements.This Report includes the entire description of the
practical carried out during the Survey Camp. Thisreport includes the
Topographic Map of the area which we surveyed. It also includes the profile
andcross-sections at different points of the Road Alignment and Bridge Site
Survey. Also, this report includesthe determination of various orientations and
curve fitting problems. This Report helps us in our further Engineering Practice.
The number of problems and calculations done in this report helps us to deal
withthe similar problems in our further Engineering practice.Every effort
has been taken to ensure the accuracy in this report. However some errors might
haveoccurred. We will be very much grateful to the viewers who go through this
report for bringing sucherrors in our notice. Furthermore we would be very
thankful for the examiners or viewers for their suggestions in improving this
report.
Survey Camp 2070IOE ThapathaliGROUP: 3
Arjan Wagle 53/BCE/2067Bhola Nath Silwal 61/BCE/2067Manoj
Adhikari 69/BCE/2067Prajjwal Neupane 77/BCE/2067Salina Maharjan
85/BCE/2067Subash Adhikari 93/BCE/2067

You might also like