Professional Documents
Culture Documents
RECOVERY
December 2016
Overview-
WE PURCHASED TRACKS 10, 11, and 12 DECLARING AS OUR TEXAS HOMESTEAD ON OR ABOUT 1999 (SEE
Mr. and Mrs. Bottorff APPENDIX A). THERE AFTER WE INVESTED GREATLY IN IMPROVEMENTS VIA THE
ADDITION OF A GUEST RESIDENCE HOUSE, A BOAT DOCK, AND CONSTRUCTION OF AN ALL WEATHER
GRADED GRAVEL, COMPOSITION EAST TO WEST BOUNDRY TRANS PROPERTY 10 FOOT WIDE 577 FEET
ACCESS FROM RANCHETTE ROAD WEST BOUNDRY TO EAST SIDE LAKES WATER EDGE 50 FOOT BOAT
DOCK. ALL THIS, WHILE ELIMINATING A MASSIVE EAST LAKE FRONT 600 FOOT LONG 15 FEET TALL
INFESTATION OF WILD BAMBOO, A TWO SUMMER TWO WINTER TORTUROUS ENDEAVOR.
AFTER A FEW YEARS OF OUR OWNERSHIP, ONE YOUNG, IVAN GARCIA IMPOSSED ON US VIA A POPULAR
LOCAL REALTOR TO PURCHASE A LAKESIDE VIEW OF WHICH I HAD JUST FINISHED THE MASSIVE CLEARING
VENTURE JUST DESCRIBED. THERE-BY WITH AN ASSURING LARGE DOWN PAYMENT AND REASSURING
PROMISORY NOTE AND, EVEN MORE ASSURING, A RIDGID CONTRACT WITH VENDORS LIEN THEREIN, SOLD
TRACT 12, THE FINAL VACANT LOT OF THE SMALL BUT QUIET AND REMOTE RESORT PROPERTY.
ATTACHED IS A DIAGRAM OF THE RESIDENTIAL GROUNDS OF THE TRACKS 11 AND 12 RESIDENCES. SERVICE TO THE
TRACKS ARE THROUFH TWO PRIVATE DRIVES AND. BACK UP DOUBLE WIDE ALL WEATHER ROAD SHARED AT THE
MUTUALY CONTIGUOUS NORTH/SOUTH BORDER LINE BEFORE SPLITTING TOWARD INDIVIDUAL TRACT BOAT DOCKS.
THE BEGINNING OF THE END
BEGINNING
IT IS AS THE PRESENT READER MUST HAVE GUESSED, THE COURTS RELINQUISHED MR. AND MRS. GARCIA
OF THEIR WEALTH, THEIR PROPETY AND HAVE ENGAGED THE NOW IRS OWNERS OF TRACK 12 VIA THEIR
SUBCONTRACTOR CONFISCATED PROPERTY MANAGERS IN READYING TRACK 12 FOR PUBLIC AUCTION.
PUBLIC AUCTION BEING DELAYED FOR LACK OF RELEASE OF VENDORS LIEN OWNED BY US, MR. AND MRS.
BOTTORFF. THIS DELAY AFFORDS US OPPORTUNITIES TO PERUSE CONTRACTUAL ISSUES PRESENTED IN
THE BEGINNING PARAGRAPH OF THIS TRETES.TO EXAMINE OUR RIGHT TO REDRESS ORIGINAL
TRASACTIONS THAT RELIEVED US OF OWNERSHIP OF TRACT 12 . TO THIS END I HAVE ENGAGED THE
COUNCIL OF MR. IRA LEVI TO DETERMIN IF SUCH ACTION IS A VIABLE ENDEAVOR.
OPTIONS PLAN
THIS SUBJECT IS UNDER STUDY BY MR. AND MRS BOTTORFF TO DETERMINE THE
BREADTH OF REPAIRS THAT CAN AND WILL BEINVOKED AS DETERMINED BY THE RESULTS
OF THE NEW START PARAGRAPH.
TEST
3
4
5
6
A1 and 12
1.
[Describe how this project came about, who is involved, and the purpose.]
Note: To delete any tip (such as this) just click it and start typing. If youre not yet ready to add your own text, just click a tip and
press spacebar to remove it.
3. Project Scope
[Project scope defines the boundaries of a project. Think of the scope as an imaginary box that will enclose all the project
elements/activities. It not only defines what you are doing (what goes into the box), but it sets limits for what will not be done as part
of the project (what doesnt fit in the box). Scope answers questions including what will be done, what wont be done, and what the
result will look like.]
4. High-Level Requirements
[Describe the high level requirements for the project. For example:]
Ability to allow both internal and external users to access the application without downloading any software
Ability to interface with the existing data warehouse application
Ability to incorporate automated routing and notifications based on business rules
5. Deliverables
[List agencies, stakeholders or divisions which will be impacted by this project and describe how they will be affected by the
project.]
6. Affected Parties
[List business processes or systems which will be impacted by this project and describe how they will be affected.]