Line No. See Below Project Title GR
Location ETP Train 2 Client
Surface Preparation Bonding Cement Fit Layer Main lamination
Joint Lamination
No. Line No. NPS Date RFI No. Date Date Date RFI No.
No. Laminator Laminator Laminator Laminator Status
Initiated Initiated Initiated Initiated

1 300-2W836002-17012Q3-N 517 DN 300 10-Nov-16 QL-012 193 10-Nov-16 QL-018 11-Nov-16 QL-018/012 11-Nov-16 QL-018/012 Completed 194

2 300-2W836002-17012Q3-N 520 DN 300 23-Nov-16 QL-012 193 23-Nov-16 QL-005 24-Nov-16 QL-008/005 24-Nov-16 QL-008/005 Completed 194

3 300-2W836002-17012Q3-N 521A DN 300 12-Nov-16 QL-012 193 12-Nov-16 QL-018 12-Nov-16 QL-018/012 12-Nov-16 QL-018/012 Completed 194

4 300-2W836002-17012Q3-N 526 DN 300 12-Nov-16 QL-012 193 12-Nov-16 QL-012 12-Nov-16 QL-018/012 13-Nov-16 QL-018/012 Completed 194

5 300-2W836002-17012Q3-N 533 DN 300 2-Oct-16 QL-016 193 4-Oct-16 QL-018 4-Oct-16 QL-018/012 5-Oct-16 QL-018/012 Completed 142

6 300-2W836002-17012Q3-N 535 DN 300 2-Oct-16 QL-016 193 5-Oct-16 QL-018 5-Oct-16 QL-018/012 5-Oct-16 QL-018/012 Completed 142

7 300-2W836002-17012Q3-N 540 DN 300 8-Oct-16 QL-016 141 8-Oct-16 QL-018 8-Oct-16 QL-018/012 8-Oct-16 QL-018/012 Completed 142

8 300-2W836002-17012Q3-N 551 DN 300 8-Oct-16 QL-013 141 8-Oct-16 QL-018 9-Oct-16 QL-018/012 9-Oct-16 QL-018/012 Completed 142

9 300-2W836002-17012Q3-N 555 DN 300 4-Oct-16 QL-007 141 5-Oct-16 QL-017 5-Oct-16 QL-013/007 6-Oct-16 QL-013/007 Completed 142

10 300-2W836002-17012Q3-N 558 DN 300 5-Oct-16 QL-012 146 5-Oct-16 QL-007 6-Oct-16 QL-013/007 6-Oct-16 QL-013/007 Completed 147

11 300-2W836002-17012Q3-N 561 DN 300 8-Oct-16 QL-013 146 8-Oct-16 QL-007 8-Oct-16 QL-007/012 9-Oct-16 QL-007/013 Completed 147

12 300-2W836002-17012Q3-N 563 DN 300 9-Oct-16 QL-013 146 9-Oct-16 QL-007 9-Oct-16 QL-007/012 10-Oct-16 QL-007/013 Completed 147

13 300-2W836002-17012Q3-N 565 DN 300 12-Oct-16 QL-016 146 13-Oct-16 QL-018 13-Oct-16 QL-018/012 15-Oct-16 QL-018/012 Completed 147

14 300-2W836002-17012Q3-N 568 DN 300 27-Oct-16 QL-016 163 27-Oct-16 QL-018 27-Oct-16 QL-018/012 29-Oct-16 QL-018/012 Completed 164

15 300-2W836002-17012Q3-N 572 DN 300 30-Oct-16 QL-012 163 30-Oct-16 QL-018 30-Oct-16 QL-018/012 30-Oct-16 QL-018/012 Completed 164

16 300-2W836002-17012Q3-N 575 DN 300 31-Oct-16 QL-016 163 31-Oct-16 QL-018 1-Nov-16 QL-018/013 1-Nov-16 QL-018/013 Completed 164

17 300-2W836002-17012Q3-N 579 DN 300 1-Nov-16 QL-013 206 1-Nov-16 QL-018 1-Nov-16 QL-003/008 1-Nov-16 QL-003/008 Completed 207

18 300-2W836002-17012Q3-N 582 DN 300 5-Nov-16 QL-013 163 5-Nov-16 QL-018 5-Nov-16 QL-018/012 6-Nov-16 QL-005/018 Completed 164

19 300-2W836002-17012Q3-N 585 DN 300 5-Nov-16 QL-016 163 5-Nov-16 QL-018 6-Nov-16 QL-005/013 6-Nov-16 QL-005/018 Completed 164

20 300-2W836002-17012Q3-N 602 DN 200 4-Nov-16 QL-016 163 4-Nov-16 QL-018 4-Nov-16 QL-018/012 4-Nov-16 QL-018/012 Completed 164
PETROL & GAS CONSTRUCTION CO. WLL
Line No. See Below Project Title GR
Location ETP Train 2 Client
Surface Preparation Bonding Cement Fit Layer Main lamination
Joint Lamination
No. Line No. NPS Date RFI No. Date Date Date RFI No.
No. Laminator Laminator Laminator Laminator Status
Initiated Initiated Initiated Initiated

21 300-2W836002-17012Q3-N 606 DN 200 26-Oct-16 QL-012 163 27-Oct-16 QL-018 27-Oct-16 QL-018/012 29-Oct-16 QL-018/012 Completed 164

22 300-2W836002-17012Q3-N 610 DN 200 4-Nov-16 QL-016 163 4-Nov-16 QL-018 5-Nov-16 QL-018/012 5-Nov-16 QL-018/012 Completed 164

23 300-2W836002-17012Q3-N 612A DN 200 2-Nov-16 QL-013 206 2-Nov-16 QL-009 2-Nov-16 QL-009 / 013 2-Nov-16 QL-009 / 013 Completed 207

24 300-2W836002-17012Q3-N 613 DN 200 19-Oct-16 QL-016 155 19-Oct-16 QL-012 19-Oct-16 QL-018/012 20-Oct-16 QL-018/012 Completed 156

25 300-2W836002-17012Q3-N 618A DN 200 3-Nov-16 QL-016 155 3-Nov-16 QL-012 3-Nov-16 QL-018/012 3-Nov-16 QL-018/012 Completed 156

26 300-2W836002-17012Q3-N 620 DN 200 19-Oct-16 QL-016 155 19-Oct-16 QL-012 19-Oct-16 QL-018/012 20-Oct-16 QL-018/012 Completed 156

27 200-2W836003-17012Q3-N 661 DN 200 13-Oct-16 QL-013 149 13-Oct-16 QL-007 13-Oct-16 QL-013/007 15-Oct-16 QL-013/007 Completed 157

28 200-2W836003-17012Q3-N 660 DN 200 13-Oct-16 QL-016 149 13-Oct-16 QL-018 13-Oct-16 QL-018/012 15-Oct-16 QL-018/012 Completed 157

29 200-2W836003-17012Q3-N 657 DN 200 15-Oct-16 QL-016 149 15-Oct-16 QL-018 15-Oct-16 QL-018/012 16-Oct-16 QL-018/012 Completed 157

30 200-2W836003-17012Q3-N 652 DN 200 16-Oct-16 QL-016 149 16-Oct-16 QL-012 16-Oct-16 QL-018/012 17-Oct-16 QL-018/012 Completed 157

31 200-2W836003-17012Q3-N 647A DN 200 17-Oct-16 QL-016 155 17-Oct-16 QL-018 17-Oct-16 QL-018/012 17-Oct-16 QL-018/012 Completed 156

32 200-2W836003-17012Q3-N 646 DN 200 17-Oct-16 QL-016 155 17-Oct-16 QL-018 18-Oct-16 QL-018/012 18-Oct-16 QL-018/012 Completed 156

33 200-2W836003-17012Q3-N 642 DN 200 18-Oct-16 QL-016 155 19-Oct-16 QL-012 19-Oct-16 QL-018/012 19-Oct-16 QL-018/012 Completed 156

34 200-2W836003-17012Q3-N 641A DN 200 2-Nov-16 QL-013 206 2-Nov-16 QL-009 2-Nov-16 QL-009 / 013 2-Nov-16 QL-009 / 013 Completed 207

35 200-2W836003-17012Q3-N 637 DN 200 27-Oct-16 QL-016 206 27-Oct-16 QL-012 29-Oct-16 QL-018/012 30-Oct-16 QL-018/012 Completed 207

36 200-2W836003-17012Q3-N 638A DN 200 25-Oct-16 QL-016 206 25-Oct-16 QL-012 25-Oct-16 QL-018/012 27-Oct-16 QL-018/012 Completed 207

37 200-2W836003-17012Q3-N 638B DN 200 24-Oct-16 QL-016 206 24-Oct-16 QL-018 25-Oct-16 QL-018/012 26-Oct-16 QL-018/012 Completed 207

38 200-2W836003-17012Q3-N 634 DN 200 27-Oct-16 QL-012 206 27-Oct-16 QL-018 27-Oct-16 QL-018/012 27-Oct-16 QL-018/012 Completed 207

39 200-2W836003-17012Q3-N 631 DN 200 5-Nov-16 QL-016 206 6-Nov-16 QL-005 6-Nov-16 QL-018/005 6-Nov-16 QL-018/005 Completed 207

40 200-2W836004-17012Q3-N 672 DN 200 8-Nov-16 QL-012 193 8-Nov-16 QL-018 8-Nov-16 018/005 8-Nov-16 018/005 Completed 194

41 200-2W836004-17012Q3-N 676 DN 200 8-Nov-16 QL-012 193 8-Nov-16 QL-005 8-Nov-16 018/005 9-Nov-16 018/005 Completed 194
PETROL & GAS CONSTRUCTION CO. WLL
Line No. See Below Project Title GR
Location ETP Train 2 Client
Surface Preparation Bonding Cement Fit Layer Main lamination
Joint Lamination
No. Line No. NPS Date RFI No. Date Date Date RFI No.
No. Laminator Laminator Laminator Laminator Status
Initiated Initiated Initiated Initiated

42 200-2W836004-17012Q3-N 674A DN 200 1-Nov-16 QL-012 193 2-Nov-16 QL-018 2-Nov-16 QL-018/012 2-Nov-16 QL-018/012 Completed 194

43 350-2W836005-17012Q3-N 468 DN 350 8-Dec-16 QL-016 242 8-Dec-16 QL-018 10-Dec-16 018/009 10-Dec-16 018/009 Completed 243

44 350-2W836005-17012Q3-N 466 DN 350 10-Dec-16 QL-016 242 10-Dec-16 QL-009 10-Dec-16 008/009 10-Dec-16 018/009 Completed 243

45 350-2W836005-17012Q3-N 460 DN 350 13-Dec-16 QL-016 242 13-Dec-16 QL-009 13-Dec-16 008/009 13-Dec-16 018/008 Completed 243

46 300-2W836006-17012Q3-N 754 DN 300 7-Nov-16 QL-016 172 7-Nov-16 QL-017 7-Nov-16 QL-005/009 8-Nov-16 QL-013/019 Completed 173
47 300-2W836006-17012Q3-N 762 DN 100 12-Nov-16 QL-016 172 12-Nov-16 QL-017 - - 12-Nov-16 017/009 Completed 173
48 300-2W836006-17012Q3-N 767 DN 100 12-Nov-16 QL-016 172 12-Nov-16 QL-017 - - 12-Nov-16 017/009 Completed 173
49 300-2W836006-17012Q3-N 766A DN 100 12-Nov-16 QL-016 172 12-Nov-16 QL-017 - - 12-Nov-16 017/009 Completed 173
50 300-2W836006-17012Q3-N 770 DN 100 10-Nov-16 QL-016 172 QL-017 - - 10-Nov-16 017/009 Completed 173
51 300-2W836006-17012Q3-N 776 DN 300 5-Nov-16 QL-017 172 5-Nov-16 QL-009 5-Nov-16 QL-009 6-Nov-16 QL-018/012 Completed 173
52 300-2W836006-17012Q3-N 780 DN 300 6-Nov-16 QL-013 172 6-Nov-16 QL-005 7-Nov-16 QL-018/012 7-Nov-16 QL-018/012 Completed 173
53 300-2W836007-17012Q3-N 735 DN 300 6-Nov-16 QL-012 172 6-Nov-16 QL-009 6-Nov-16 QL-009 7-Nov-16 QL-009 Completed 173
54 300-2W836007-17012Q3-N 739 DN 300 7-Nov-16 QL-012 172 7-Nov-16 QL-009 7-Nov-16 QL-009 7-Nov-16 QL-009 Completed 173
55 300-2W836007-17012Q3-N 748A DN 300 7-Nov-16 QL-012 172 7-Nov-16 QL-009 8-Nov-16 QL-009 8-Nov-16 QL-009 Completed 173
56 300-2W836007-17012Q3-N 748B DN 300 8-Nov-16 QL-012 172 8-Nov-16 QL-009 8-Nov-16 QL-009 8-Nov-16 QL-009 Completed 173

57 300-2W836007-17012Q3-N 732A DN 300 15-Dec-16 QL-013 248 15-Dec-16 QL-008 17-Dec-16 QL-008/018 17-Dec-16 QL-008/018 Completed 249

58 150-2W836008-17012Q3-N 723 DN 150 15-Oct-16 QL-013 150 15-Oct-16 QL-017 16-Oct-16 QL-017/007 16-Oct-16 QL-017/007 Complete 157
59 150-2W836008-17012Q3-N 718 DN 150 16-Oct-16 QL-013 150 16-Oct-16 QL-007 17-Oct-16 QL-013/017 17-Oct-16 QL-017/007 Complete 157
60 150-2W836008-17012Q3-N 700 DN 150 20-Oct-16 QL-003 150 20-Oct-16 QL-003 20-Oct-16 QL-017/003 22-Oct-16 QL-017/003 Complete 157
61 150-2W836008-17012Q3-N 697 DN 150 18-Oct-16 QL-013 150 18-Oct-16 QL-007 18-Oct-16 QL-013/017 18-Oct-16 QL-017/007 Complete 157
62 150-2W836008-17012Q3-N 692 DN 150 20-Oct-16 QL-013 150 20-Oct-16 QL-007 20-Oct-16 QL-017/007 22-Oct-16 QL-017/003 Complete 157
63 150-2W836008-17012Q3-N 688 DN 150 25-Oct-16 QL-013 150 25-Oct-16 QL-017 25-Oct-16 QL-017/007 26-Oct-16 QL-017/003 Complete 157

Prepared by: Approved by:

(Signature over printed name) (Signature over printed name)

8
56
PETROL & GAS CONSTRUCTION CO. WLL
Line No. See Below Project Title GR
Location ETP Train 2 Client
Surface Preparation Bonding Cement Fit Layer Main lamination
Joint Lamination
No. Line No. NPS Date RFI No. Date Date Date RFI No.
No. Laminator Laminator Laminator Laminator Status
Initiated Initiated Initiated Initiated
46
12
9

131
GRVE Lamination - ETP Cluster NON TA scope
Black Cat Engineering & Construction
Barcol
Lamination
Hardness RFI No. Result RFI No. Remark(s)
Size
Test

20-Nov-16 47 184 327 10.41 153 Hydrotest done FIELD JOINT 1800

30-Nov-16 46 218 331 10.54 217 Hydrotest done FIELD JOINT 1800

20-Nov-16 46 184 331 10.54 153 Hydrotest done ADDITIONAL FIELD JOINT 1800

20-Nov-16 52 184 330 10.50 153 Hydrotest done FIELD JOINT 1800

16-Oct-16 43 154 327 10.41 153 Hydrotest done FIELD JOINT 1800

16-Oct-16 41 154 328 10.44 153 Hydrotest done FIELD JOINT 1800

16-Oct-16 46 154 328 10.44 153 Hydrotest done FIELD JOINT 1800

16-Oct-16 41 154 327 10.41 153 Hydrotest done FIELD JOINT 1800

16-Oct-16 41 154 330 10.50 153 Hydrotest done FIELD JOINT 1800

16-Oct-16 48 154 332 10.57 153 Hydrotest done FIELD JOINT 1800

16-Oct-16 40 154 332 10.57 153 Hydrotest done FIELD JOINT 1800

16-Oct-16 49 154 331 10.54 153 Hydrotest done FIELD JOINT 1800

16-Oct-16 46 154 331 10.54 153 Hydrotest done FIELD JOINT 1800

20-Nov-16 48 184 328 10.44 183 Hydrotest done FIELD JOINT 1800

20-Nov-16 45 184 330 10.50 183 Hydrotest done FIELD JOINT 1800

20-Nov-16 48 184 331 10.54 183 Hydrotest done FIELD JOINT 1800

20-Nov-16 43 184 330 10.50 183 Hydrotest done FIELD JOINT 1800

20-Nov-16 48 184 330 10.50 183 Hydrotest done FIELD JOINT 1800

20-Nov-16 46 184 331 10.54 183 Hydrotest done FIELD JOINT 1800

20-Nov-16 45 184 228 7.26 183 Hydrotest done FIELD JOINT 1200
GRVE Lamination - ETP Cluster NON TA scope
Black Cat Engineering & Construction
Barcol
Lamination
Hardness RFI No. Result RFI No. Remark(s)
Size
Test

20-Nov-16 48 184 227 7.23 183 Hydrotest done FIELD JOINT 1200

20-Nov-16 47 184 228 7.26 183 Hydrotest done FIELD JOINT 1200

20-Nov-16 45 184 228 7.26 183 Hydrotest done ADDITIONAL FIELD JOINT 1200

20-Nov-16 44 184 227 7.23 183 Hydrotest done FIELD JOINT 1200

20-Nov-16 47 184 228 7.26 183 Hydrotest done ADDITIONAL FIELD JOINT 1200

20-Nov-16 49 184 227 7.23 183 Hydrotest done FIELD JOINT 1200

16-Nov-16 54 184 228 7.3 183 Hydrotest done FIELD JOINT 1200

16-Nov-16 46 184 227 7.2 183 Hydrotest done FIELD JOINT 1200

16-Nov-16 48 184 228 7.3 183 Hydrotest done FIELD JOINT 1200

16-Nov-16 47 184 227 7.2 183 Hydrotest done FIELD JOINT 1200

16-Nov-16 45 184 227 7.2 183 Hydrotest done ADDITIONAL FIELD JOINT 1200

16-Nov-16 49 184 227 7.2 183 Hydrotest done FIELD JOINT 1200

16-Nov-16 48 184 227 7.2 183 Hydrotest done FIELD JOINT 1200

16-Nov-16 46 184 227 7.2 183 Hydrotest done ADDITIONAL FIELD JOINT 1200

16-Nov-16 48 184 228 7.3 183 Hydrotest done FIELD JOINT 1200

16-Nov-16 50 184 228 7.3 183 Hydrotest done ADDITIONAL FIELD JOINT 1200

16-Nov-16 48 184 228 7.3 183 Hydrotest done ADDITIONAL FIELD JOINT 1200

16-Nov-16 47 184 228 7.3 183 Hydrotest done FIELD JOINT 1200

16-Nov-16 48 184 228 7.3 183 Hydrotest done FIELD JOINT 1200

16-Nov-16 43.5 183 227 7.2 184 Hydrotest done FIELD JOINT 1200

16-Nov-16 45.8 183 228 7.3 184 Hydrotest done FIELD JOINT 1200
GRVE Lamination - ETP Cluster NON TA scope
Black Cat Engineering & Construction
Barcol
Lamination
Hardness RFI No. Result RFI No. Remark(s)
Size
Test

16-Nov-16 40.6 183 229 7.3 184 Hydrotest done ADDITIONAL FIELD JOINT 1200

15-Dec-16 47 262 373 12 261 Hydrotest done FIELD JOINT 2100

15-Dec-16 46 262 374 12 261 Hydrotest done FIELD JOINT 2100

15-Dec-16 46 262 373 12 261 Hydrotest done FIELD JOINT 2100

15-Nov-16 200 44.3 330 10.5 199 Hydrotest done FIELD JOINT 1800
15-Nov-16 200 44 130 4.14 199 Hydrotest done FIELD JOINT 600
15-Nov-16 200 48 130 4.14 199 Hydrotest done FIELD JOINT 600
15-Nov-16 200 42 130 4.14 199 Hydrotest done ADDITIONAL FIELD JOINT 600
15-Nov-16 200 50 133 4.23 199 Hydrotest done FIELD JOINT 600
15-Nov-16 200 48 331 10.5 199 Hydrotest done FIELD JOINT 1800
15-Nov-16 200 48 331 10.5 199 Hydrotest done FIELD JOINT 1800
13-Nov-16 48 186 331 10.5 186 Hydrotest done FIELD JOINT 1800
13-Nov-16 43 186 330 10.5 186 Hydrotest done FIELD JOINT 1800
13-Nov-16 45 186 330 10.5 186 Hydrotest done ADDITIONAL FIELD JOINT 1800
13-Nov-16 48 186 331 10.5 186 Hydrotest done ADDITIONAL FIELD JOINT 1800

22-Dec-16 44 274 331 10.5 273 Hydrotest done ADDITIONAL FIELD JOINT 1800

5-Nov-16 171 Acceptable 174 5.54 170 Hydrotest done FIELD JOINT 900
5-Nov-16 171 Acceptable 170 5.41 170 Hydrotest done FIELD JOINT 900
5-Nov-16 171 Acceptable 169 5.38 170 Hydrotest done FIELD JOINT 900
5-Nov-16 171 Acceptable 171 5.44 170 Hydrotest done FIELD JOINT 900
5-Nov-16 171 Acceptable 168 5.35 170 Hydrotest done FIELD JOINT 900
5-Nov-16 171 Acceptable 170 5.41 170 Hydrotest done FIELD JOINT 900

84900
GRVE Lamination - ETP Cluster NON TA scope
Black Cat Engineering & Construction
Barcol
Lamination
Hardness RFI No. Result RFI No. Remark(s)
Size
Test
PETROL & GAS CONSTRUCTION CO. WLL
Line No. See Below Project Title GRVE
Location ETP Train 1 Client B
Surface Preparation Bonding Cement Fit Layer Main lamination
Lamination
No. Line No. Joint No. NPS Date Date Date Date
Laminator RFI No. Laminator Laminator Laminator Status
Initiated Initiated Initiated Initiated

1 300-1W836002-17012Q3-N 36 DN 300 20-Nov-16 QL-016 197 20-Nov-16 QL-018 21-Nov-16 QL-012/018 21-Nov-16 QL-012/018 Completed
2 300-1W836002-17012Q3-N 42 DN 300 20-Nov-16 QL-016 197 20-Nov-16 QL-018 21-Nov-16 QL-012/018 21-Nov-16 QL-012/018 Completed
3 300-1W836002-17012Q3-N 44 DN 300 19-Nov-16 QL-016 197 19-Nov-16 QL-009 20-Nov-16 QL-008/009 20-Nov-16 QL-008/009 Completed
4 300-1W836002-17012Q3-N 46 DN 300 19-Nov-16 QL-016 197 19-Nov-16 QL-009 20-Nov-16 QL-008/009 20-Nov-16 QL-008/009 Completed
5 300-1W836002-17012Q3-N 50 DN 300 16-Nov-16 QL-016 197 16-Nov-16 QL-017 16-Nov-16 QL-003/009 16-Nov-16 QL-003/009 Completed
6 300-1W836002-17012Q3-N 52A DN 300 16-Nov-16 QL-016 197 16-Nov-16 QL-017 16-Nov-16 QL-003/009 16-Nov-16 QL-003/009 Completed
7 300-1W836002-17012Q3-N 54 DN 300 15-Nov-16 QL-016 197 15-Nov-16 QL-017 15-Nov-16 QL-003/009 15-Nov-16 QL-005/015 Completed
8 300-1W836002-17012Q3-N 55 DN 300 15-Nov-16 QL-016 197 15-Nov-16 QL-017 15-Nov-16 QL-003/009 15-Nov-16 QL-005/015 Completed
9 300-1W836002-17012Q3-N 56 DN 300 14-Nov-16 QL-015 197 15-Nov-16 QL-003 15-Nov-16 QL-003/008 15-Nov-16 QL-003/008 Completed
10 300-1W836002-17012Q3-N 60 DN 300 14-Nov-16 QL-015 197 14-Nov-16 QL-003 14-Nov-16 QL-003/008 14-Nov-16 QL-003/008 Completed
11 300-1W836002-17012Q3-N 61 DN 300 10-Nov-16 QL-015 197 10-Nov-16 QL-005 12-Nov-16 QL-008/005 12-Nov-16 QL-008/005 Completed
12 300-1W836002-17012Q3-N 67 DN 300 10-Nov-16 QL-015 197 10-Nov-16 QL-003 10-Nov-16 QL-003/008 10-Nov-16 QL-003/008 Completed
13 300-1W836002-17012Q3-N 69 DN 300 12-Nov-16 QL-013 197 12-Nov-16 QL-003 12-Nov-16 QL-003/008 12-Nov-16 QL-003/008 Completed
14 300-1W836002-17012Q3-N 71 DN 300 14-Nov-16 QL-013 197 15-Nov-16 QL-018 15-Nov-16 QL-013/018 15-Nov-16 QL-013/018 Completed
15 300-1W836002-17012Q3-N 72 DN 300 15-Nov-16 QL-013 197 15-Nov-16 QL-018 16-Nov-16 QL-012/018 16-Nov-16 QL-012/018 Completed
16 300-1W836002-17012Q3-N 77 DN 300 16-Nov-16 QL-013 197 16-Nov-16 QL-018 17-Nov-16 QL-012/013 17-Nov-16 QL-012/013 Completed
17 300-1W836002-17012Q3-N 80 DN 300 17-Nov-16 QL-018 197 17-Nov-16 QL-018 17-Nov-16 QL-012/018 17-Nov-16 QL-012/018 Completed
18 300-1W836002-17012Q3-N 84 DN 300 17-Nov-16 QL-018 197 17-Nov-16 QL-018 17-Nov-16 QL-012/018 17-Nov-16 QL-012/018 Completed
19 300-1W836002-17012Q3-N 87 DN 300 15-Nov-16 QL-013 197 16-Nov-16 QL-018 16-Nov-16 QL-012/013 16-Nov-16 QL-012/013 Completed
20 300-1W836002-17012Q3-N 91 DN 300 16-Nov-16 QL-013 197 16-Nov-16 QL-018 16-Nov-16 QL-012/013 17-Nov-16 QL-012/013 Completed
21 300-1W836002-17012Q3-N 109 DN 200 8-Nov-16 QL-015 209 8-Nov-16 QL-003 9-Nov-16 QL-003/008 9-Nov-16 QL-003/008 Completed
22 300-1W836002-17012Q3-N 112 DN 200 6-Nov-16 QL-015 209 6-Nov-16 QL-003 7-Nov-16 QL-003/008 7-Nov-16 QL-008/003 Completed
23 300-1W836002-17012Q3-N 116 DN 200 6-Nov-16 QL-015 209 6-Nov-16 QL-003 6-Nov-16 QL-003/008 7-Nov-16 QL-008/003 Completed
24 300-1W836002-17012Q3-N 115A DN 200 6-Nov-16 QL-015 209 6-Nov-16 QL-003 6-Nov-16 QL-003/008 7-Nov-16 QL-008/003 Completed
25 300-1W836002-17012Q3-N 119 DN 200 31-Oct-16 QL-013 209 31-Oct-16 QL-003 31-Oct-16 QL-003/008 31-Oct-16 QL-003/008 Completed
26 300-1W836002-17012Q3-N 118 DN 200 1-Nov-16 QL-013 209 1-Nov-16 QL-003 1-Nov-16 QL-003/008 1-Nov-16 QL-003/008 Completed
27 300-1W836002-17012Q3-N 118A DN 200 1-Nov-16 QL-013 209 1-Nov-16 QL-003 1-Nov-16 QL-003/008 1-Nov-16 QL-003/008 Completed
28 300-1W836002-17012Q3-N 122A DN 200 7-Nov-16 QL-013 209 7-Nov-16 QL-003 7-Nov-16 QL-003/008 7-Nov-16 QL-003/008 Completed
29 300-1W836002-17012Q3-N 126 DN 200 7-Nov-16 QL-013 209 7-Nov-16 QL-003 7-Nov-16 QL-003/008 7-Nov-16 QL-003/008 Completed
30 200-1W836003-17012Q3-N 823 DN 200 26-Oct-16 QL-009 158 26-Oct-16 QL-003 26-Oct-16 QL-008/003 26-Oct-16 QL-008/003 Complete
31 200-1W836003-17012Q3-N 821 DN 200 27-Oct-16 QL-009 158 27-Oct-16 QL-003 27-Oct-16 QL-008/003 27-Oct-16 QL-008/003 Complete
32 200-1W836003-17012Q3-N 819 DN 200 27-Oct-16 QL-009 158 27-Oct-16 QL-003 27-Oct-16 QL-008/003 27-Oct-16 QL-008/003 Complete
33 200-1W836003-17012Q3-N 813 DN 200 29-Oct-16 QL-009 158 29-Oct-16 QL-008 29-Oct-16 QL-008/003 29-Oct-16 QL-008/003 Complete
34 200-1W836003-17012Q3-N 810A DN 200 29-Oct-16 QL-009 209 29-Oct-16 QL-008 29-Oct-16 QL-008/003 29-Oct-16 QL-008/003 Complete
35 200-1W836003-17012Q3-N 808 DN 200 31-Oct-16 QL-008 209 31-Oct-16 QL-009 31-Oct-16 QL-009/003 31-Oct-16 QL-009/003 Complete
36 200-1W836003-17012Q3-N 804 DN 200 1-Nov-16 QL-009 209 1-Nov-16 QL-003 1-Nov-16 QL-009/003 1-Nov-16 QL-009/003 Complete
37 200-1W836003-17012Q3-N 801A DN 200 1-Nov-16 QL-009 209 1-Nov-16 QL-003 1-Nov-16 QL-009/003 1-Nov-16 QL-009/003 Complete
38 200-1W836003-17012Q3-N 800A DN 200 1-Nov-16 QL-009 209 1-Nov-16 QL-003 1-Nov-16 QL-009/003 1-Nov-16 QL-009/003 Complete
39 200-1W836003-17012Q3-N 799 DN 200 1-Nov-16 QL-009 209 1-Nov-16 QL-003 1-Nov-16 QL-009/003 1-Nov-16 QL-009/003 Complete
40 200-1W836003-17012Q3-N 797 DN 200 1-Nov-16 QL-009 209 1-Nov-16 QL-003 1-Nov-16 QL-009/003 1-Nov-16 QL-009/003 Complete
41 200-1W836003-17012Q3-N 793 DN 200 2-Nov-16 QL-009 209 2-Nov-16 QL-003 2-Nov-16 003/008 2-Nov-16 003/008 Complete
42 200-1W836004-17012Q3-N 134 DN 200 10-Nov-16 QL-013 209 11-Nov-16 005 11-Nov-16 003/008 11-Nov-16 003/008 Completed
43 200-1W836004-17012Q3-N 138 DN 200 10-Nov-16 QL-013 209 11-Nov-16 005 12-Nov-16 005/015 12-Nov-16 005/015 Completed
44 350-1W836005-17012Q3-N 334A DN 350 6-Dec-16 QL-016 244 6-Dec-16 QL-009 7-Dec-16 QL-018/009 7-Dec-16 QL-018/009 Completed
45 350-1W836005-17012Q3-N 332A DN 350 11-Dec-16 QL-013 244 11-Dec-16 QL-018 19-Dec-16 QL-018/008 19-Dec-16 QL-018/008 Completed
46 350-1W836005-17012Q3-N 330A DN 350 11-Dec-16 QL-013 244 11-Dec-16 QL-009 20-Dec-16 QL-013/008 21-Dec-16 QL-013/008 Completed
47 350-1W836005-17012Q3-N 328A DN 350 20-Dec-16 QL-016 244 20-Dec-16 QL-008 20-Dec-16 QL-018/008 20-Dec-16 QL-018/008 Completed
48 350-1W836005-17012Q3-N 327 DN 350 21-Dec-16 QL-016 244 21-Dec-16 QL-018 21-Dec-16 QL-018/008 21-Dec-16 QL-018/008 Completed
49 300-1W836006-17012Q3-N 348 DN 300 6-Dec-16 QL-013 230 7-Dec-16 QL-008 7-Dec-16 QL-012/008 7-Dec-16 QL-012/008 Completed
50 300-1W836006-17012Q3-N 357 DN 100 8-Dec-16 QL-013 230 8-Dec-16 QL-017 8-Dec-16 QL-017 8-Dec-16 QL-017 Completed
51 300-1W836006-17012Q3-N 362 DN 100 10-Dec-16 QL-013 230 10-Dec-16 QL-012 10-Dec-16 QL-017 10-Dec-16 QL-017 Completed
52 300-1W836006-17012Q3-N 365 DN 100 10-Dec-16 QL-013 230 10-Dec-16 QL-012 10-Dec-16 QL-017 10-Dec-16 QL-017 Completed
53 300-1W836006-17012Q3-N 371 DN 300 6-Dec-16 QL-013 230 6-Dec-16 QL-012 6-Dec-16 QL-012/008 6-Dec-16 QL-012/008 Completed
54 300-1W836006-17012Q3-N 375 DN 300 7-Dec-16 QL-013 230 8-Dec-16 QL-008 8-Dec-16 QL-012/008 8-Dec-16 QL-012/008 Completed
55 300-1W836006-17012Q3-N 361A DN 100 13-Dec-16 QL-013 230 13-Dec-16 QL-017 13-Dec-16 QL-017 13-Dec-16 QL-017 Completed
56 300-1W836006-17012Q3-N 361B DN 100 13-Dec-16 QL-013 230 13-Dec-16 QL-017 13-Dec-16 QL-017 13-Dec-16 QL-017 Completed
57 300-1W836006-17012Q3-N 371A DN 300 12-Dec-16 QL-013 230 12-Dec-16 QL-008 13-Dec-16 QL-012/008 13-Dec-16 QL-012/008 Completed
58 300-1W836007-17012Q3-N 386 DN 300 11-Dec-16 QL-013 248 11-Dec-16 QL-012 11-Dec-16 QL-012/008 11-Dec-16 QL-012/008 Completed
59 300-1W836007-17012Q3-N 390 DN 300 11-Dec-16 QL-013 248 11-Dec-16 QL-012 11-Dec-16 QL-012/008 11-Dec-16 QL-012/008 Completed
60 300-1W836007-17012Q3-N 400A DN 300 13-Dec-16 QL-013 248 13-Dec-16 QL-008 13-Dec-16 QL-018/008 13-Dec-16 QL-018/008 Completed
61 300-1W836007-17012Q3-N 400B DN 300 12-Dec-16 QL-013 248 12-Dec-16 QL-012 12-Dec-16 QL-012/013 12-Dec-16 QL-012/013 Completed
62 300-1W836007-17012Q3-N 383A DN 300 15-Dec-16 QL-013 248 15-Dec-16 QL-008 17-Dec-16 QL-018/008 17-Dec-16 QL-018/008 Completed
63 150-1W836008-17012Q3-N 441 DN 150 26-Oct-16 QL-013 165 27-Oct-16 QL-017 27-Oct-16 QL-007/017 27-Oct-16 QL-007/017 Complete
64 150-1W836008-17012Q3-N 436 DN 150 27-Oct-16 QL-013 165 27-Oct-16 QL-007 27-Oct-16 QL-007 29-Oct-16 QL-007/017 Complete
65 150-1W836008-17012Q3-N 418 DN 150 27-Oct-16 QL-013 165 27-Oct-16 QL-007 29-Oct-16 QL-007/017 29-Oct-16 QL-007/017 Complete
66 150-1W836008-17012Q3-N 415 DN 150 29-Oct-16 QL-013 165 29-Oct-16 QL-017 30-Oct-16 QL-007 30-Oct-16 QL-009/007 Complete
67 150-1W836008-17012Q3-N 409 DN 150 30-Oct-16 QL-013 165 30-Oct-16 QL-017 31-Oct-16 QL-007/017 31-Oct-16 QL-007/017 Complete
68 150-1W836008-17012Q3-N 405 DN 150 1-Nov-16 QL-008 165 1-Nov-16 QL-017 1-Nov-16 QL-009/007 1-Nov-16 QL-009/007 Complete

Prepared by: Approved by:

(Signature over printed name) (Signature over printed name)


GRVE Lamination - ETP Cluster NON TA scope
Black Cat Engineering & Construction
Barcol
Lamination
RFI No. Hardness Result RFI No. RFI No. Remark(s)
Size
Test

198 24-Nov-16 42.5 218 10.5 217 Hydrotest done FIELD JOINT 0
198 24-Nov-16 46.1 218 10.4 217 Hydrotest done FIELD JOINT
198 24-Nov-16 46.3 218 10.5 217 Hydrotest done FIELD JOINT 0
198 24-Nov-16 42.6 218 10.5 217 Hydrotest done FIELD JOINT 0
198 22-Nov-16 41.9 218 10.4 217 Hydrotest done FIELD JOINT 1
198 22-Nov-16 43.3 218 10.4 217 Hydrotest done ADDITIONAL FIELD JOINT 1
198 22-Nov-16 43 218 10.5 217 Hydrotest done FIELD JOINT 1
198 22-Nov-16 42 218 10.4 217 Hydrotest done FIELD JOINT 1
198 22-Nov-16 43.1 218 10.5 217 Hydrotest done FIELD JOINT 1
198 22-Nov-16 45.1 218 10.5 217 Hydrotest done FIELD JOINT 1
198 22-Nov-16 45.5 218 10.4 217 Hydrotest done FIELD JOINT 1
198 22-Nov-16 47.8 218 10.4 217 Hydrotest done FIELD JOINT 1
198 22-Nov-16 49.3 218 10.4 217 Hydrotest done FIELD JOINT 1
198 22-Nov-16 47.9 218 10.5 217 Hydrotest done FIELD JOINT 1
198 22-Nov-16 46.5 218 10.5 217 Hydrotest done FIELD JOINT 1
198 22-Nov-16 46 218 10.5 217 Hydrotest done FIELD JOINT 1
198 22-Nov-16 44.8 218 10.5 217 Hydrotest done FIELD JOINT 1
198 22-Nov-16 43 218 10.5 217 Hydrotest done FIELD JOINT 1
198 22-Nov-16 44.8 218 10.5 217 Hydrotest done FIELD JOINT 1
198 22-Nov-16 45.4 218 10.5 217 Hydrotest done FIELD JOINT 1
210 22-Nov-16 44 218 10.5 217 Hydrotest done FIELD JOINT 1
210 22-Nov-16 44.5 218 10.5 217 Hydrotest done FIELD JOINT 1
210 22-Nov-16 45.3 218 10.5 217 Hydrotest done FIELD JOINT 1
210 22-Nov-16 46.6 218 10.5 217 Hydrotest done ADDITIONAL FIELD JOINT 1
210 22-Nov-16 47.4 218 10.5 217 Hydrotest done FIELD JOINT 1
210 22-Nov-16 46.9 218 10.5 217 Hydrotest done FIELD JOINT 1
210 22-Nov-16 45.6 218 10.5 217 Hydrotest done ADDITIONAL FIELD JOINT 1
210 22-Nov-16 46.5 218 10.5 217 Hydrotest done ADDITIONAL FIELD JOINT 1
210 22-Nov-16 44.5 218 10.5 217 Hydrotest done FIELD JOINT 1
159 24-Nov-16 42.6 218 7.2 217 Hydrotest done FIELD JOINT 1
159 24-Nov-16 44 218 7.3 217 Hydrotest done FIELD JOINT 1
159 24-Nov-16 45.8 218 7.2 217 Hydrotest done FIELD JOINT 1
159 24-Nov-16 42.8 218 7.2 217 Hydrotest done FIELD JOINT 1
210 24-Nov-16 43.9 218 7.3 217 Hydrotest done ADDITIONAL FIELD JOINT 1
210 24-Nov-16 42.8 218 7.2 217 Hydrotest done FIELD JOINT 1
210 24-Nov-16 44.1 218 7.3 217 Hydrotest done FIELD JOINT 1
210 24-Nov-16 43.4 218 7.2 217 Hydrotest done ADDITIONAL FIELD JOINT
210 24-Nov-16 43 218 7.2 217 Hydrotest done ADDITIONAL FIELD JOINT
210 24-Nov-16 43.5 218 7.2 217 Hydrotest done FIELD JOINT 1
210 24-Nov-16 44.8 218 7.3 217 Hydrotest done FIELD JOINT 1
210 24-Nov-16 47.8 218 7.2 217 Hydrotest done FIELD JOINT 1
210 24-Nov-16 42.5 218 7.2 217 Hydrotest done FIELD JOINT 1
210 24-Nov-16 44.4 218 7.3 217 Hydrotest done FIELD JOINT 1
245 24-Dec-16 44 286 12 285 Hydrotest done ADDITIONAL FIELD JOINT 0
245 24-Dec-16 44 286 12 285 Hydrotest done ADDITIONAL FIELD JOINT 0
245 24-Dec-16 45 286 12 285 Hydrotest done ADDITIONAL FIELD JOINT
245 24-Dec-16 44 286 12 285 Hydrotest done ADDITIONAL FIELD JOINT 0
245 24-Dec-16 45 286 12 285 Hydrotest done FIELD JOINT
231 15-Dec-16 43 258 10.4 257 Hydrotest done FIELD JOINT 0
231 15-Dec-16 43 258 4.2 257 Hydrotest done FIELD JOINT 0
231 15-Dec-16 43 258 4.2 257 Hydrotest done FIELD JOINT 0
231 15-Dec-16 44 258 4.2 257 Hydrotest done FIELD JOINT 0
231 15-Dec-16 44 258 10.5 257 Hydrotest done FIELD JOINT 0
231 15-Dec-16 44 258 10.5 257 Hydrotest done FIELD JOINT 0
231 15-Dec-16 44 258 4.2 257 Hydrotest done ADDITIONAL FIELD JOINT
231 15-Dec-16 43 258 4.1 257 Hydrotest done ADDITIONAL FIELD JOINT
231 15-Dec-16 45 258 10.5 257 Hydrotest done ADDITIONAL FIELD JOINT
249 22-Dec-16 42 274 10.4 273 Hydrotest done FIELD JOINT 0
249 22-Dec-16 46 274 10.5 273 Hydrotest done FIELD JOINT 0
249 22-Dec-16 46 274 10.5 273 Hydrotest done ADDITIONAL FIELD JOINT
249 22-Dec-16 45 274 10.4 273 Hydrotest done ADDITIONAL FIELD JOINT
249 22-Dec-16 45 274 10.5 273 Hydrotest done ADDITIONAL FIELD JOINT
166 9-Nov-16 46 177 5.54 176 Hydrotest done @ 12-Nov-2016 FIELD JOINT 1
166 9-Nov-16 42 177 5.41 176 Hydrotest done @ 12-Nov-2016 FIELD JOINT 1
166 9-Nov-16 46 177 5.38 176 Hydrotest done @ 12-Nov-2016 FIELD JOINT 1
166 9-Nov-16 42 177 5.44 176 Hydrotest done @ 12-Nov-2016 FIELD JOINT 1
166 9-Nov-16 45 177 5.35 176 Hydrotest done @ 12-Nov-2016 FIELD JOINT 1
166 9-Nov-16 46 177 5.41 176 Hydrotest done @ 12-Nov-2016 FIELD JOINT 1