Professional Documents
Culture Documents
Berthing
g Facilities
1
Objective
Engineers and Drafters have basic knowledge of berthing facilities
terminology
2
Reference
PIANC ( Permanent International Association of Navigation
Congress): Guidelines for the Design of Fender System: 2002
Pelabuhan Prof.
Pelabuhan, Prof Dr.
Dr Ir
Ir. Bambang Trihatmodjo,
Trihatmodjo CES,
CES DEA
3
Marine Facilities
Wharf
Jettyy
Dolphin
Accessories/Supporting Facilities
4
Wharf, Jetty, & Dolphin
Wharf: continuous marine structure that is parallel to the shore line
Berthing Wharf: continuous marine structure that is parallel to the shore line, completed
with berthing facility
Berthing Jetty: continuous marine structure that is perpendicular to the shore line,
completed
l t d with
ith b
berthing
thi ffacility
ilit
Dolphin: marine structure that is constructed from a group of piles, separated each other
and connected by walkways
Berthing Dolphin: marine structure that is constructed from a group of piles, separated
each other and connected by walkways, completed with berthing facility
Mooring Dolphin: marine structure that is constructed from a group of piles, connected to
berthing facilities by walkways, and functioned as a mooring facility
5
Accessories/Supporting Facilities & Others
Fender System:padding protecting a ship against direct impact, usually consist of:
Fender Rubber
Mooring Bollard: short post on a marine structure or ship for securing a mooring rope
Shi large
Ship: l floating
fl ti vessell
Quay Line:
e imaginary
ag a y line
eaat be
berthing
g facilities
ac es su surface
ace (usua
(usually
yddrawn
a a
at be
berthing
g su
surface
ace o
of
fender pad)
Head Stock: concrete/steel beam that is functioned to connect piles, usually massive in
size
6
Accessories/Supporting Facilities & Others
Water Level Terminology:
MHSW MHWS: Mean High Water Spring (mean high tide level when there is the greatest
MLWN
between high and low water)
MLWS
MSL: Mean Sea Level
LAT MLWN: Mean Low Water Neap (mean low tide level when there is the greatest
difference between high and low water
LRT
MLWS: Mean Low Water Spring (mean low tide level when there is the greatest
difference between high and low water
7
Accessories/Supporting Facilities & Others
Navigation Aids: Equipment or tools to support the planning, recording, controlling, and
cruising process of a ship/boat from one place to another place
8
Wh f J
Wharf, Jetty,
tt & D
Dolphin
l hi
9
Wharf, Jetty, & Dolphin
Drawings - Paiton Wharf Crane Project
Walkway
Jetty
Sea Side
Shore Line
Land Side
Quay Line
Concrete Deck
Fender Chain
Headstock
Fender Rubber
Fender Pad
Wharf Elevation
11
Wharf, Jetty, & Dolphin
As Constructed
Hopper
Fender System
Wharf
12
Wharf, Jetty, & Dolphin
As Constructed
Unloading Grab
Crane
Hopper
Walkway
13
Wharf, Jetty, & Dolphin
As Constructed
Mobile Hopper
Walkway
Mooring
Dolphin
Fender System
14
Wharf, Jetty, & Dolphin
Drawings - Pulau Laut Coal Terminal
Sea Side
Land Side
Fender System
Access Jetty
Vessel
Quay Line
Mooring Dolphin
Mooring Dolphin
Berthing Dolphin
Barge
Walkway
Shore Line
Ship Loading and Barge Unloading Facilities Plan
15
Wharf, Jetty, & Dolphin
Drawings - Pulau Laut Coal Terminal
Fender Frame +
Fender Frame + Fender Pad
Fender Pad
Quay Line
Fender Rubber
Steel Headstock
Quay Line
Fender Rubber Bollard
Steel Headstock
Steel Pile
PLAN SECTION
16
Wharf, Jetty, & Dolphin
Drawings - Pulau Laut Coal Terminal
Fender Frame +
Fender Frame +
Fender Pad
Fender Pad
Quay Line
Fender Rubber
Quayy Line
Steel Fender Rubber
Headstock Bollard
Steel Headstock
Steel Head Stock
Steel Pile
PLAN SECTION
17
Wharf, Jetty, & Dolphin
As Constructed
Barge Unloading
Facility (Wharf)
Transfer Tower
Jetty
Berthing
B hi
Dolphin
Jetty
T Boats
Tug B t Walkway
Vessel
Shiploading Facilities
18
Wharf, Jetty, & Dolphin
Drawings - KPC Interim Barge Loading Facility Project
Land Side
Shore Line
Sea Side
Berthing Dolphin
Walkway
Quay Line
Fender
System
Barge
19
Wharf, Jetty, & Dolphin
Drawings - KPC Interim Barge Loading Facility Project
Barge
LAT LAT
Fender Pile
SIDE ELEVATION
FRONT ELEVATION
20
Wharf, Jetty, & Dolphin
As Constructed
Loading Conveyor
Barge
Walkway
21
Wharf, Jetty, & Dolphin
Drawings - DBCT Project
Wharf and
Berthing Dolphin
Trasnsfer Tower
Quay Line
Vessell Vessell Vessell
Shi L
Ship Loading/Unloading
di /U l di Facilities
F iliti Plan
Pl
22
Wharf, Jetty, & Dolphin
Drawings - DBCT Project
Conveyor Support
Wharf Frames
Access Stairs
Quay Line
T i l Wharf
Typical Wh f
23
Wharf, Jetty, & Dolphin
Drawings - DBCT Project
Berthing Dolphin
Connection
Struts
Berthing Head Platform
Rope Guard
Fender Pad
Rear Fender
Frame
Front Fender
Frame
24
Wharf, Jetty, & Dolphin
As Constructed
Approach
Jetty
Wharf
Berthing Dolphin
Vessel
Mooring Dolphin
25
Wharf, Jetty, & Dolphin
As Constructed
Conveyor
Support
Wharf
26
Wharf, Jetty, & Dolphin
Drawings - Sabah Submarine Base Jetty
Rock Fill
Quay Line
Quay Line
Concrete Jetty
Fender Rubber
(Hydro Pneumatic Type)
Scorpene Class
Submarine
27
Wharf, Jetty, & Dolphin
As Constructed
Scorpene Class
Submarine
28
Wharf, Jetty, & Dolphin
As Constructed
Hydro Pneumatic
Fender Rubber
29
Wharf, Jetty, & Dolphin
As Constructed
Scorpene Class
Submarine
30
Accessories and Supporting Facilities
31
Fenders
Fender Rubber
(Installed Vertically)
Bracket
HORISONTAL VERTICAL
INSTALLATION INSTALLATION
Fender Rubber
Fender Frame
TYPICAL
INSTALLATION
Fender Pad
Fender Frame
Supercone Fender 33
Fenders
HEADSTOCK
Concrete Deck
Timber Pad Bollard
Concrete Deck
Fender Rubber
Bollard
Timber Pad with
Stainless Steel Bolt
F d R
Fender Rubber
bb
Connections
Fender Chain
Fender Pile
Fender Pile
Open Link
D Type
T Shackle
Sh kl B Type
Bow T Shackle
Sh kl
Stud Link
Chain Tensioner
RANGE LIGHT
(Installed at the end of channel)
43
Barges
LCT
44
Large Vessel / Ship
45
46