S#. DESCRIPTION NO.

L
1 EXCAVATIO
EXCAV. 1 16.3
EXCAV. 1 5.4

2 BACK FILLIN
BACK FILL. 1 16.3
BACK FILL. 1 5.4
BACK FILL. 1 16.3
BACK FILL. 1 5.4

3 ORDINARY CONCRET
FOOTINGS
F0 1 1.2
Fc 2 1.4
F1 7 1.4
F2 9 2.2
TIE BEAMS
TBs 1 60

4 FOOTING CONC
F0 1 1
Fc 2 1.2
F1 7 1.2
F2 9 2

5 CONCRETE FLOO
BRC 2 7
BRC 1 7
BRC 1 7
BRC 1 7
BRC 1 6.6
BRC 1 4

6 NECK COLUMNS/ COLUMNS UP


NC 1 0.25
Cc 2 DIA
C1 7 0.5
C2 9 0.5
7 TIE BEAMS
TBs 1 103

Concrete Work of Ground


8 COLUMNS
Cc 2 DIA
C1 7 0.5
C2 9 0.5

9 BEAMS
B1 20X60 1 47
B2 20X70 1 27
B3 20X80 1 13

10 SOLID SLAB
S. SLAB 1 7.2
S. SLAB 1 4.4

11 HOURDI SLAB
HOURDI 1 7.4
HOURDI 1 7.2

12 STAIRS
STAIR 1 5
STAIR 1 1.15
STEPS 3 5
STEPS 2 1.15

13 DECORE CONCRETE/PARAPET WALL


PARAP. WALL 1 60

14 ACTS OF BLOCK
SOLID BLOCKS 1 55
HOLL. BLOCKS 1 25
INS. BLOCKS 1 49

15 INSULATION W
FOUNDATION 1
WASH/BATH 1 3.8
SURFACE/ROOF 1 14.4
SURFACE/ROOF 1 4.6
SURFACE/WALL 2 14.6
SURFACE/WALL 2 18.15

FINISHING WO
INTERIOR WORK
16 FLOORING
F1-TYPE (CER. TILES) 1 7
F1-TYPE (CER. TILES) 1 7
F2-TYPE (MARBLE) 1 3
F2-TYPE (MARBLE) 1 6.5
F2-TYPE (MARBLE) 1 2
F4-TYPE(CEM. TILES) 1 14.6
F4-TYPE(CEM. TILES) 1 4
F5-TYPE( CER. TIL KIT.) 1 3.8

17 SKIRTING
S1-TYPE(CER. SKIRTING) 2 7
S1-TYPE(CER. SKIRTING) 2 7
S2-TYPE(MARBLE SKIR.) 2 3
S3-TYPE (CEM. SKIRTING) 2 14.2

18 WALLS
W1-TYPE (PLASTER) 4 7
W1-TYPE (PLASTER) 2 13
W1-TYPE (PLASTER) 2 10
W1-TYPE (PLASTER) 2 2.8
W1-TYPE (PLASTER) 2 3
W3-TYPE(PLASTER) 2 14.8
W3-TYPE(PLASTER) 2 14.2
W2-TYPE (CER. TILES) 4 1.8
W2-TYPE (CER. TILES) 4 2.8

19 CEILING
C1-TYPE( Plaster) 1 7
C1-TYPE( Plaster) 1 7
C1-TYPE( Plaster) 1 3
C2-TYPE( Plaster) 2 1.8
C3-TYPE(Plaster) 1 5

20 EXTERIOR FINIS
W4-TYPE (STONE) 2 14.6
W4-TYPE (STONE) 2 18.2

21 CARPENTARY AND ALUM


DOOR TYPE-D1 1
DOOR TYPE-D2 2
DOOR TYPE-D3 1
DOOR TYPE-AD1 1
WINDOWS W1-TYPE 8
WINDOWS W2-TYPE 1
STEEL LADDER 1
22 HEALTH WOR
PIPES ETC. (INT. &EXT.) 1
BATHROOM ACC. & TOIL. 1
23 DRAINAGE
PIPES ETC. (INT. &EXT.) 1
24 ELECTRICAL W
PIPES ETC. 1
WIRE 1
Exhaust fans 8
WORK OF AIR COND
1
1

TOTAL
B H UNIT QUANTITY TOTAL
EXCAVATION
15.1 2 m3 492.26
1.55 2 m3
16.74 509

BACK FILLING
15.1 2 m3 492.26
1.55 2 m3 16.74
15.1 0.45 m 3
110.7585
1.55 0.45 m3 3.7665 579.39982

DINARY CONCRETE/BLINDING

1.2 0.1 m3 0.144


1.4 0.1 m3 0.392
1.7 0.1 m 3
1.666
1.9 0.1 m3 3.762

0.4 0.1 m3 2.4 8.364

FOOTING CONCRETE
1 0.3 m3 0.3
1.2 0.3 m3 0.864
1.5 0.3 m3
3.78
1.7 0.35 m3 10.71 15.654

CONCRETE FLOOR/BRC
4.35 0.1 m3 6.09
5.45 0.1 m3 3.815
3.9 0.1 m3 2.73
4.35 0.1 m3 3.045
2.8 0.1 m3 1.848
1.6 0.1 m 3
0.64 18.168

MNS/ COLUMNS UPTO TIE BEAM LEVEL


0.25 1.1 m3 0.06875
0.3 1.1 m3 0.15543
0.2 1.1 m3 0.77
0.2 1.05 m 3
0.945 1.93918
TIE BEAMS
0.2 0.6 m3 12.36 12.36

te Work of Ground Floor and Above

0.3 3 m3 0.4239
0.2 3 m3 2.1
0.2 3 m3 2.7 5.2239

0.2 0.6 m3 5.64


0.2 0.7 m3 3.78
0.2 0.8 m3 2.08 11.5

3 0.16 m3 3.456
1.8 0.16 m3 1.2672 4.7232

13.4 m2 99.16
10.4 m2
74.88 174.04

1.1 0.16 m3 0.88


0.7 0.16 m3 0.1288
0.3 0.15 m3 0.3375
0.3 0.15 m3
0.05175 1.39805

0.28 1 m3 16.8 16.8

ACTS OF BLOCK WORK


1.35 m2 74.25 74.25
3 m2 75 75
3 m2 147 147

INSULATION WORK
Lump sum 1 1
2.8 m2 10.64 10.64
13.2 m 2
190.08
2.1 m2 9.66
5.5 m2 160.6
5.5 m2 199.65 559.99

FINISHING WORK

10 m2 70
13 m2 91 161
2.8 m2 8.4
2.85 m2
18.525
0.9 m2 1.8 28.725
13 m2 189.8
1.8 m 2
7.2 197
2.8 m2 10.64 10.64

13 m 40
10 m 34 74
2.8 m 11.6 11.6
14.8 m 58 58

3.5 m2 98
3.5 m 2
91
3.5 m2 70
3.5 m2 19.6
3.5 m 2
21
1.2 m2 35.52
1.2 m2 34.08 369.2
3.5 m2 25.2
3.5 m2 39.2 64.4

13 m2 91
10 m2 70
2.8 m2 8.4
2.8 m2 10.08
2 m2 10 189.48

EXTERIOR FINISHINGS
-10% 5.5 m2 160.6
-10% 5.5 m2 200.2 324.72

ENTARY AND ALUMINUM WORKS


NOS 1 1
NOS 2 2
NOS 1 1
NOS 1 1
NOS 8 8
NOS 1 1
NOS 1 1
HEALTH WORK
Lump Sum 1 1
Lump Sum 1 1
DRAINAGE
Lump Sum 1 1
ELECTRICAL WORK
Lump Sum 1 1
Lump Sum 1 1
Lump Sum 1 1
WORK OF AIR CONDITIONING
Lump Sum 1 1
Lump Sum 1 1

TOTAL
ALI ALNYADY

S#. DESCRIPTION NO.


1 EXC
EXCAV. 1
EXCAV. 1

2 BAC
BACK FILL. 1
BACK FILL. 1
BACK FILL. 1
BACK FILL. 1

3 ORDINARY CO
FOOTINGS
F0 1
Fc 2
F1 7
F2 9
TIE BEAMS
TBs 1

4 FOOTIN
F0 1
Fc 2
F1 7
F2 9

5 CONCRET
BRC 2
BRC 1
BRC 1
BRC 1
BRC 1
BRC 1

6 NECK COLUMNS/ COLU


NC 1
Cc 2
C1 7
C2 9

7 TIE
TBs 1

Concrete Work of
8 COLUMNS
Cc 2
C1 7
C2 9

9 BEAMS
B1 20X60 1
B2 20X70 1
B3 20X80 1

10 SOLID SLAB
S. SLAB 1
S. SLAB 1

11 HOURDI SLAB
HOURDI 1
HOURDI 1

12 STAIRS
STAIR 1
STAIR 1
STEPS 3
STEPS 2

13 DECORE CONCRETE/PARAPET WALL


PARAP. WALL 1

14 ACTS OF
SOLID BLOCKS 1
HOLL. BLOCKS 1
INS. BLOCKS 1

15 INSULA
FOUNDATION 1
WASH/BATH 1
SURFACE/ROOF 1
SURFACE/ROOF 1
SURFACE/WALL 2
SURFACE/WALL 2

FINISH
INTERIOR WORK
16 FLOORING
F1-TYPE (CER. TILES) 1
F1-TYPE (CER. TILES) 1
F2-TYPE (MARBLE) 1
F2-TYPE (MARBLE) 1
F2-TYPE (MARBLE) 1
F4-TYPE(CEM. TILES) 1
F4-TYPE(CEM. TILES) 1
F5-TYPE( CER. TIL KIT.) 1

17 SKIRTING
S1-TYPE(CER. SKIRTING) 2
S1-TYPE(CER. SKIRTING) 2
S2-TYPE(MARBLE SKIR.) 2
S3-TYPE (CEM. SKIRTING) 2

18 WALLS
W1-TYPE (PLASTER) 4
W1-TYPE (PLASTER) 2
W1-TYPE (PLASTER) 2
W1-TYPE (PLASTER) 2
W1-TYPE (PLASTER) 2
W3-TYPE(PLASTER) 2
W3-TYPE(PLASTER) 2
W2-TYPE (CER. TILES) 4
W2-TYPE (CER. TILES) 4

19 CEILING
C1-TYPE( Plaster) 1
C1-TYPE( Plaster) 1
C1-TYPE( Plaster) 1
C2-TYPE( Plaster) 2
C3-TYPE(Plaster) 1
20 EXTERIO
W4-TYPE (STONE) 2
W4-TYPE (STONE) 2

21 CARPENTARY AN
DOOR TYPE-D1 1
DOOR TYPE-D2 2
DOOR TYPE-D3 1
DOOR TYPE-AD1 1
WINDOWS W1-TYPE 8
WINDOWS W2-TYPE 1
STEEL LADDER 1
22 HEA
PIPES ETC. (INT. &EXT.) 1
BATHROOM ACC. & TOIL. 1
23 DR
PIPES ETC. (INT. &EXT.) 1
24 ELECT
PIPES ETC. 1
WIRE 1
Exhaust fans 8
WORK OF A
1
1

TOTA
ALI ALNYADY MAJLIS BLOCK QUANTITIES

L B H UNIT QUANTITY TOTAL Rate


EXCAVATION
16.3 15.1 2 m3 492.26
5.4 1.55 2 m3 16.74 509

BACK FILLING
16.3 15.1 2 m3 492.26
5.4 1.55 2 m3 16.74
16.3 15.1 0.45 m3 110.7585
5.4 1.55 0.45 m3 3.7665 579.3998

ORDINARY CONCRETE/BLINDING

1.2 1.2 0.1 m3 0.144


1.4 1.4 0.1 m3
0.392
1.4 1.7 0.1 m3 1.666
2.2 1.9 0.1 m3 3.762

60 0.4 0.1 m3 2.4 8.364

FOOTING CONCRETE
1 1 0.3 m3 0.3
1.2 1.2 0.3 m3 0.864
1.2 1.5 0.3 m3 3.78
2 1.7 0.35 m3 10.71 15.654

CONCRETE FLOOR/BRC
7 4.35 0.1 m3 6.09
7 5.45 0.1 m3 3.815
7 3.9 0.1 m3 2.73
7 4.35 0.1 m3
3.045
6.6 2.8 0.1 m3 1.848
4 1.6 0.1 m3 0.64 18.168

ECK COLUMNS/ COLUMNS UPTO TIE BEAM LEVEL


0.25 0.25 1.1 m3 0.06875
DIA 0.3 1.1 m3
0.15543
0.5 0.2 1.1 m3 0.77
0.5 0.2 1.05 m3 0.945 1.93918

TIE BEAMS
103 0.2 0.6 m3 12.36 12.36

Concrete Work of Ground Floor and Above

DIA 0.3 3 m3 0.4239


0.5 0.2 3 m3 2.1
0.5 0.2 3 m3 2.7 5.2239

47 0.2 0.6 m3 5.64


27 0.2 0.7 m3 3.78
13 0.2 0.8 m3 2.08 11.5

7.2 3 0.16 m3 3.456


4.4 1.8 0.16 m3 1.2672 4.7232

7.4 13.4 m2 99.16


7.2 10.4 m2 74.88 174.04

5 1.1 0.16 m3 0.88


1.15 0.7 0.16 m 3
0.1288
5 0.3 0.15 m3 0.3375
1.15 0.3 0.15 m3 0.05175 1.39805

60 0.28 1 m3 16.8 16.8

ACTS OF BLOCK WORK


55 1.35 m2 74.25 74.25
25 3 m 2
75 75
49 3 m2 147 147

INSULATION WORK
Lump sum 1 1
3.8 2.8 m2 10.64 10.64
14.4 13.2 m2 190.08
4.6 2.1 m2 9.66
14.6 5.5 m2 160.6
18.15 5.5 m2 199.65 559.99

FINISHING WORK

7 10 m2 70
7 13 m2 91 161
3 2.8 m2
8.4
6.5 2.85 m2 18.525
2 0.9 m2 1.8 28.725
14.6 13 m2 189.8
4 1.8 m2 7.2 197
3.8 2.8 m2 10.64 10.64

7 13 m 40
7 10 m 34 74
3 2.8 m 11.6 11.6
14.2 14.8 m 58 58

7 3.5 m2 98
13 3.5 m 2
91
10 3.5 m2 70
2.8 3.5 m2 19.6
3 3.5 m 2
21
14.8 1.2 m2 35.52
14.2 1.2 m2 34.08 369.2
1.8 3.5 m 2
25.2
2.8 3.5 m2 39.2 64.4

7 13 m2 91
7 10 m2 70
3 2.8 m 2
8.4
1.8 2.8 m2 10.08
5 2 m2 10 189.48
EXTERIOR FINISHINGS
14.6 -10% 5.5 m2 160.6
18.2 -10% 5.5 m2 200.2 324.72

CARPENTARY AND ALUMINUM WORKS


NOS 1 1
NOS 2 2
NOS 1 1
NOS 1 1
NOS 8 8
NOS 1 1
NOS 1 1
HEALTH WORK
Lump Sum 1 1
Lump Sum 1 1
DRAINAGE
Lump Sum 1 1
ELECTRICAL WORK
Lump Sum 1 1
Lump Sum 1 1
Lump Sum 1 1
WORK OF AIR CONDITIONING
Lump Sum 1 1
Lump Sum 1 1

TOTAL 0
Amount

0
0

0
0
0

0
0
0

0
0

0
0
0

0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

You might also like