Material Required Date:- 2/14/2017 18:10

Engr.Muhammad Akhtar Khan MCSE,DAE (Civil) Total Material


P.C.C
1 P.C.C 1:4:8 Unit:- 0 Cft Items Total Unit
CEMENT 0.00 Bags Bitumen 10/20 0.00 Kgs.
SAND 0.00 CFT Bitumen 80/100 0.00 Kgs.
CRUSH 0.00 CFT Brick 0.00 Nos.
2 P.C.C 1:3:6 Unit:- 0 Cft Brick Tiles 0.00 Nos.
CEMENT 0.00 Bags Cement 0.00 Bags
SAND CHENAB 0.00 CFT Cement "W" 0.00 Bags
SAND L.PUR 0.00 CFT Ceramic Tile 0.00 Sq.m
CRUSH 0.00 CFT Chips 0.00 Bags
R.C.C Crush 0.00 Cft
1 R.C.C 1:2:4 Unit:- 0 Cft Earth "Mud" 0.00 Cft
CEMENT 0.00 Bags Felt paper 0.00 Sft
SAND CHENAB 0.00 CFT Hessian Cloth 0.00 Sft
SAND L.PUR 0.00 CFT Kerosens Oil 0.00 Lit
CRUSH 0.00 CFT Khapprial 0.00 Nos.
2 R.C.C 1:1-1/2:3 Unit:- 0 Cft M.S.Sheet.16swg 0.00 Kgs.
CEMENT 0.00 Bags M.Strip 0.00 Rft
SAND CHENAB 0.00 CFT Pigment 0.00 Gms.
SAND L.PUR 0.00 CFT Polish 0.00 *
CRUSH 0.00 CFT Polythene Sheet. 0.00 Kgs.
Brick Work Red Oxid Paint 0.00 Lit
1 Brick Work 1:4 CSM Unit:- 0 Cft Sand Chn. 0.00 Cft
BRICK 0.00 Nos. Sand L.P 0.00 Cft
CEMENT 0.00 Bags Thermopore 0.00 Sq.m
SAND 0.00 CFT Turi 0.00 Kgs.
2 Brick Work 1:6 CSM Unit:- 0 Cft Wood for Heat 0.00 Kgs.
BRICK 0.00 Nos. Brick Cyrri 0.00 Kgs.
CEMENT 0.00 Bags Brick Ballast 0.00 Cft
SAND 0.00 CFT
CEMENT PLASTER 1:4
1 Cement Plaste 1:4 20 mm Thick Unit:- 0 Sft
CEMNET 0.00 Bags
SAND 0.00 CFT
2 Cement Plaste 1:4 13 mm Thick Unit:- 0 Sft
CEMNET 0.00 Bags
SAND 0.00 CFT
3 Cement Plaster 1:6 Unit:- 0 Sft
CEMNET 0.00 Nos.
SAND 0.00 CFT
4 Neeru Cement Plaster / V-DPC Unit:- 0 Sft
CEMNET 0.00 Nos.
SAND 0.00 CFT
Material Required 2/14/2017 18:10
Engr.Muhammad Akhtar Khan MCSE,DAE (Civil)
FLOORING
1 50 mm Thick 1:1:3 Unit:- 0 Sft
CEMENT 0.00 Bags
SAND 0.00 CFT
CRUSH 0.00 CFT
2 50 mm Thick 1:2:4 Unit:- 0 Sft
CEMENT 0.00 Bags
SAND 0.00 CFT
CRUSH 0.00 CFT
3 75 mm Thick 1:2:4 Unit:- 0 Sft
CEMENT 0.00 Bags
SAND 0.00 CFT
CRUSH 0.00 CFT
4 100 mm Thick 1:2:4 Unit:- 0 Sft
CEMENT 0.00 Bags
SAND 0.00 CFT
CRUSH 0.00 CFT
5 TERRAZO 20 mm Unit:- 0 Sft
CEMENT 0.00 Bags
CHIPS 0.00 Bags
MARBLE STRIP 0.00 Rft
POLISH 0.00 Rs. LS
6 25 mm Thick 1:2 G.Topping Unit:- 0 Sft
CEMENT 0.00 Bags
M.Cruch 0.00 CFT
M.Strip 0.00 Rft
FLOORING (CERAMIC TILES)
1 C.Tile on 50 mm Thick 1:2:4 Unit:- 0 Sft
CEMENT 0.00 Bags
SAND 0.00 CFT
CRUSH 0.00 CFT
Ceramic Tiles 0.00 Sq.m
White Cement 0.00 Bags
Pigment (Shabir) 0.00 Gm.
2 C.Tile on Wall Unit:- 0 Sft
CEMENT 0.00 Bags
SAND 0.00 CFT
Ceramic Tiles 0.00 Sq.m
White Cement 0.00 Bags
Pigment 0.00 Gm.
Material Required 2/14/2017 18:10
Engr.Muhammad Akhtar Khan MCSE,DAE (Civil)
Brick Soling
1 Flate Brick Unit:- 0 Sft
Brick 0.00 Nos.
Sand for Grouting 0.00 CFT
2 On Edge Unit:- 0 Sft
Brick 0.00 Nos.
Sand for Grouting 0.00 CFT
WATER PROOFING
1 Ordinary Unit:- 0 Sft
Bitumen 80/100 0.00 Kgs.
Bitumen 10/20 0.00 Kgs.
Hessian Cloth 0.00 Sft
Polythene Sheet 0.00 Kgs.
Earth 0.00 CFT
Turi 0.00 Cft
Wood 0.00 Kgs.
Kerosene Oil 0.00 Lit
Cement 0.00 Bags
Sand 0.00 CFT
Brick Tiles 0.00 Nos.
2 With Insulation Unit:- 0 Sft
Bitumen 80/100 0.00 Kgs.
Bitumen 10/20 0.00 Kgs.
Hessian Cloth 0.00 Sft
Felt Paper 0.00 Sft
Polythene Sheet (2-Lay 0.00 Kgs.
Thermopore 0.00 Sq.m
Earth 0.00 CFT
Wood 0.00 Kgs.
Kerosene Oil 0.00 Lit
Cement 0.00 Bags
Sand 0.00 CFT
Brick Tiles 0.00 Nos.
Bitumen Coating
1 On DPC with P-Sheet Unit:- 0 SFT
Bitumen 10/20 0.00 Kgs.
Polythene Sheet 0.00 Kgs.
Wood 0.00 Kgs.
Kerosene Oil 0.00 Lit
2 DPC 1:2:4, 2" Thick Unit:- 0 Sft
CEMENT 0.00 Bags
SAND 0.00 CFT
CRUSH 0.00 CFT

Material Required 2/14/2017 18:10


Engr.Muhammad Akhtar Khan MCSE,DAE (Civil)
M.S. DOOR FRAM
1 Door Fram 7'x3' (6"x2") Unit:- 0 Nos.
6"x2" 16 SWG. 0.00 Kgs.
Red Oxide 0.00 Lit
Bitumen Coationg 0.00 Kgs.
Couerete 0.00 Rs.
KHAPPRALE
1 Khapprale 6"x 6" Unit:- 0 Sft
Cement for Base Plaste 0.00 Bags
Sand for Base Plaster 0.00 CFT
Cement for Ioint Filling 0.00 Bags
Khappral 6"x 6" 0.00 Nos.
1 Cement Pointing with Red Oxied Unit:- 0 Sft
CEMENT 0.00 Bags
SAND 0.00 CFT
Red Oxied- 222 CFT
Brick Cyrri 0.00 Kgs
Plinth Protection 1x1 m
1 B=1 m , H=1m Unit:- 0 Sft
BRICK 0.00 Nos.
CEMENT 0.00 Bags
SAND 0.00 CFT
CRUCH 0.00 CFT
Brick Ballast 0.00 CFT
Material Required Date. 2/14/2017 18:10
Engr.Muhammad Akhtar Khan MCSE,DAE (Civil) Total Material
P.C.C
1 P.C.C 1:4:8 Unit:- 0 Cu.m Items Total Unit
CEMENT 0 Bags Bitumen 10/20 0.00 Kgs.
SAND 0 CFT Bitumen 80/100 0.00 Kgs.
CRUSH 0 CFT Brick 0.00 Nos.
2 P.C.C 1:3:6 Unit:- 0 Cu.m Brick Tiles 0.00 Nos.
CEMENT 0 Bags Cement 0.00 Bags
SAND CHENAB 0 CFT Cement "W" 0.00 Bags
SAND L.PUR 0 CFT Ceramic Tile 0.00 Sq.m
CRUSH 0 CFT Chips 0.00 Bags
R.C.C Crush 0.00 Cft
1 R.C.C 1:2:4 Unit:- 0 Cu.m Earth "Mud" 0.00 Cft
CEMENT 0 Bags Felt paper 0.00 Sft
SAND CHENAB 0 CFT Hessian Cloth 0.00 Sft
SAND L.PUR 0 CFT Kerosens Oil 0.00 Lit
CRUSH 0 CFT Khappral 0.00 Nos.
2 R.C.C 1:1-1/2:3 Unit:- 0 Cu.m M.S.Sheet.16swg 0.00 Kgs.
CEMENT 0 Bags M.Strip 0.00 Rft
SAND CHENAB 0 CFT Pigment 0.00 Gms.
SAND L.PUR 0 CFT Polish 0.00 *
CRUSH 0 CFT Polythene Sheet. 0.00 Kgs.
Brick Work Red Oxid Paint 0.00 Lit
1 Brick Work 1:4 CSM Unit:- 0 Cu.m Sand Chn. 0.00 Cft
BRICK 0 Nos. Sand L.P 0.00 Cft
CEMENT 0 Bags Thermopore 0.00 Sq.m
SAND 0 CFT Turi 0.00 Kgs.
2 Brick Work 1:6 CSM Unit:- 0 Cu.m Wood for Heat 0.00 Kgs.
BRICK 0 Nos. Brick Cyrri 0.00 Kgs.
CEMENT 0 Bags Brick Ballast 0.00 Cft
SAND 0 CFT
CEMENT PLASTER 1:4
1 Cement Plaste 1:4, 20 mm Thick Unit:- 0 Sq.m
CEMNET 0 Bags
SAND 0 CFT
2 Cement Plaste 1:4, 13 mm Thick Unit:- 0 Sq.m
CEMNET 0 Bags
SAND 0 CFT
3 Cement Plaster 1:6 Unit:- 0 Sq.m
CEMNET 0 Nos.
SAND 0 CFT
4 Neeru Cement Plaster / V. DPC Unit:- 0 Sq.m
CEMNET 0 Nos.
SAND 0 CFT
Material Required 2/14/2017 18:10
Engr.Muhammad Akhtar Khan MCSE,DAE (Civil)
FLOORING
1 50 mm Thick 1:1:3 Unit:- 0 Sq.m
CEMENT 0 Bags
SAND 0 CFT
CRUSH 0 CFT
2 75 mm Thick 1:1:3 Unit:- 0 Sq.m
CEMENT 0 Bags
SAND 0 CFT
CRUSH 0 CFT
3 50 mm Thick 1:2:4 Unit:- 0 Sq.m
CEMENT 0 Bags
SAND 0 CFT
CRUSH 0 CFT
4 75 mm Thick 1:2:4 Unit:- 0 Sq.m
CEMENT 0 Bags
SAND 0 CFT
CRUSH 0 CFT
5 100 mm Thick 1:2:4 Unit:- 0 Sq.m
CEMENT 0 Bags
SAND 0 CFT
CRUSH 0 CFT
6 TERRAZO 20 mm Unit:- 0 Sq.m
CEMENT 0 Bags
CHIPS 0 Bags
MARBLE STRIP 0 Rft
POLISH 0 Rs. LS
7 25 mm Thick 1:2 G.Topping Unit:- 0 Sq.m
CEMENT 0 Bags
M.Cruch 0 CFT
M.Strip 0 Rft
FLOORING (CERAMIC TILES)
1 C.Tile on 50 mm Thick 1:2:4 Unit:- 0 Sq.m
CEMENT 0 Bags
SAND 0 CFT
CRUSH 0 CFT
Ceramic Tiles 0 Sq.m
White Cement 0 Bags
Pigment (Shabir) 0 Gm.
2 C.Tile on Wall Unit:- 0 Sq.m
CEMENT 0 Bags
SAND 0 CFT
Ceramic Tiles 0 Sq.m
White Cement 0 Bags
Pigment 0 Gm.

Material Required 2/14/2017 18:10


Engr.Muhammad Akhtar Khan MCSE,DAE (Civil)
Brick Soling
1 Flate Brick Unit:- 0 Sq.m
Brick 0 Nos.
Sand for Grouting 0 CFT
2 On Edge Unit:- 0 Sq.m
Brick 0 Nos.
Sand for Grouting 0 CFT
WATER PROOFING
1 Ordinary Unit:- 0 Sq.m
Bitumen 80/100 0 Kgs.
Bitumen 10/20 0 Kgs.
Hessian Cloth 0 Sft
Polythene Sheet 0 Kgs.
Earth 0 CFT
Turi 0 Cft
Wood 0 Kgs.
Kerosene Oil 0 Lit
Cement 0 Bags
Sand 0 CFT
Brick Tiles 0 Nos.
2 With Insulation Unit:- 0 Sq.m
Bitumen 80/100 0 Kgs.
Bitumen 10/20 0 Kgs.
Hessian Cloth 0 Sft
Felt Paper 0 Sft
Polythene Sheet (2-Lay 0 Kgs.
Thermopore 0 Sq.m
Earth 0 CFT
Wood 0 Kgs.
Kerosene Oil 0 Lit
Cement 0 Bags
Sand 0 CFT
Brick Tiles 0 Nos.
Bitumen Coating
1 On V-DPC with P-Sheet Unit:- 0 Sq.m
Bitumen 10/20 0 Kgs.
Polythene Sheet 0 Kgs.
Wood 0 Kgs.
Kerosene Oil 0 Lit
2 DPC 1:2:4, 2" Thick Unit:- 0 Sq.m
CEMENT 0 Bags
SAND 0 CFT
CRUSH 0 CFT

Material Required 2/14/2017 18:10


Engr.Muhammad Akhtar Khan MCSE,DAE (Civil)
M.S. DOOR FRAM
1 Door Fram 7'x3' (6"x2") Unit:- 0 Nos.
6"x2" 16 SWG. 0 Kgs.
Red Oxide 0 Lit
Bitumen Coationg 0 Kgs.
Couerete 0 Rs.
KHAPPRALE
1 Khapprale 6"x 6" Unit:- 0 Sq.m
Cement for Base Plaste 0 Bags
Sand for Base Plaster 0 CFT
Cement for Ioint Filling 0 Bags
Khappral 6"x 6" 0 Nos.
1 Cement Pionting with Red Oxied Unit:- 0 Sq.m
CEMENT 0 Bags
SAND 0 CFT
Red Oxied- 222 CFT
Brick Cyrri 0 Kgs
Plinth Protection 1x1 m
1 B=1 m , H=1m Unit:- 0 Sq.m
BRICK 0 Nos.
CEMENT 0 Bags
SAND 0 CFT
CRUCH 0 CFT
Brick Ballast 0 CFT