RESUMEN DE PRESUPUESTO

LINEA DE TRANSMISION EN 138 KV SOCABAYA - PARQUE INDUSTRIAL

TRAMO
TRAMO AREO
ITEM DESCRIPCION SUBTERRNEO
(S/.)
(S/.)

1.1 SUMINISTRO DE MATERIALES 3,612,658.75 1,009,841.25


1.2 TRANSPORTE DE SUMINISTROS (7.5% de 1.1.) 270,949.41 75,738.09
1.3 OBRAS CIVILES 453,000.25 995,305.63
1.4 MONTAJE ELECTROMECANICO 416,036.47 28,536.29

A COSTO DIRECTO 4,752,644.88 2,109,421.26

RESUMEN DE PRESUPUESTO
LINEA DE TRANSMISION EN 138 KV SOCABAYA - PARQUE INDUSTRIAL
TRAMO AREO DE 9,0 km

COSTO TOTAL
ITEM DESCRIPCION
(S/.)

1.1 SUMINISTRO DE MATERIALES 3,612,658.75


1.2 TRANSPORTE DE SUMINISTROS (7.5% de 1.1.) 270,949.41
1.3 OBRAS CIVILES 453,000.25
1.4 MONTAJE ELECTROMECANICO 416,036.47

A COSTO DIRECTO 4,752,644.88

RESUMEN DE PRESUPUESTO
LINEA DE TRANSMISION EN 138 KV SOCABAYA - PARQUE INDUSTRIAL
TRAMO SUBTERRNEO DE 0,92 km

COSTO TOTAL
ITEM DESCRIPCION
(S/.)

1.1 SUMINISTRO DE MATERIALES 1,009,841.25


1.2 TRANSPORTE DE SUMINISTROS (7.5% de 1.1.) 75,738.09
1.3 OBRAS CIVILES 995,305.63
1.4 MONTAJE ELECTROMECANICO 28,536.29

A COSTO DIRECTO 2,109,421.26


LINEA DE TRANSMISION EN 138 kV SOCABAYA - PARQUE INDUSTRIAL
TRAMO AREO DE 9,0 km
SUMINISTRO DE MATERIALES

CANTIDAD CANTIDAD COSTO


COSTO PARCIAL COSTO TOTAL
ITEM DESCRIPCION UNIDAD DEL DE UNITARIO
(S/.) (S/.)
METRADO REPUESTO (S/.)

1.0 Estructuras metlicas en celosa 154,285.22


1.1 Torre metlica tipo TR de 30 m u 2 31,200.00 62,400.00 6 12
1.1.1 Patas+/- 0 u 8 1,156.68 9,253.44
1.2 Torre metlica tipo TR de 33 m u 2 36,400.00 72,800.00 7 14
1.2.1 Patas +1 u 2 1,445.85 2,891.70
1.2.2 Patas+/- 0 u 6 1,156.68 6,940.08
2.0 Estructuras de postes metlicos 2,355,836.69
2.1 Postes de Acero para Armado SM de 80' u 5 2 24,045.86 168,321.02
2.2 Postes de Acero para Armado SM de 85' u 20 26,096.92 521,938.40
2.3 Postes de Acero para Armado SM de 90' u 2 28,147.98 56,295.96
2.4 Postes de Acero para Armado SM de 110' u 1 34,301.17 34,301.17
2.5 Postes de Acero para Armado SMD de 80' u 4 28,855.04 115,420.16
2.6 Postes de Acero para Armado SMD de 85' u 1 33,777.58 33,777.58
2.7 Postes de Acero para Armado SMD de 100' u 3 34,301.17 102,903.51
2.8 Postes de Acero para Armado A1M de 80' u 2 2 26,450.45 105,801.80 6 12
2.9 Postes de Acero para Armado A1M de 85' u 3 28,706.62 86,119.86 6 18
2.10 Postes de Acero para Armado A1M de 90' u 4 30,962.78 123,851.12 6 24
2.11 Postes de Acero para Armado A1M de 100' u 4 34,301.17 137,204.68 6 24
2.12 Postes de Acero para Armado A1M de 110' u 3 37,731.28 113,193.84 6 18
2.13 Postes de Acero para Armado A1M de 120' u 4 41,504.41 166,017.64 6 24
2.14 Postes de Acero para Armado A2M de 85' u 2 31,577.28 63,154.56 6 12
2.15 Postes de Acero para Armado A2M de 90' u 1 37,731.28 37,731.28 6 6
2.16 Postes de Acero para Armado A2M de 100' u 2 41,161.40 82,322.80 6 12
2.17 Postes de Acero para Armado A2M de 110' u 2 45,277.54 90,555.08 6 12
2.18 Postes de Acero para Armado A2M de 120' u 1 49,805.29 49,805.29 6 6
2.19 Postes de Acero para Armado A3M de 85' u 1 35,230.85 35,230.85 6 6
2.20 Postes de Acero para Armado A3M de 100' u 1 41,161.40 41,161.40 6 6
2.21 Postes de Acero para Armado A3M de 120' u 1 49,805.29 49,805.29 6 6
2.22 Postes de Acero para Armado PTM de 85' u 4 35,230.85 140,923.40 3 12
3.0 Aisladores 257,664.30 224
3.1 Aislador polimerico tipo line post u 192 9 351.50 70,651.50
3.2 Aislador Polimerico tipo Tensin u 224 10 799.20 187,012.80
4.0 Conductor y cables de guarda 294,380.45
4.1 Conductor de fase desnudo 240 mm AAAC km 28.35 8,133.79 230,592.95
4.2 Cable OPGW de 70mm y 24 fibras km 9.45 6,750.00 63,787.50
5.0 Accesorios de conductor y cables de guarda 12,848.30
5.1 Amortiguadores para conductor AAAC 240 mm2 u 84 8 72.40 6,660.80 73.74074074
5.2 Amortiguadores para cable OPGW u 28 2 68.75 2,062.50 70.02314815
5.3 Caja de empalme para cable de fibra ptica un 6 687.50 4,125.00 700.2314815
6.0 Ferreteria de Estructuras 95,337.81
6.1 Horquilla ojo u 192 10 19.25 3,888.50 19.60648148
6.2 Grapa de suspensin para conductor 240 mm AAAC u 192 10 85.00 17,170.00 86.57407407
6.3 Grapa de suspensin con accesorio de conexin de pararrayos a cond. u 12 100.00 1,200.00 101.8518519
6.4 Grapa tipo pistola para conductor de 240 mm AAAC u 222 10 85.00 19,720.00 86.57407407
6.5 Varilla de armar para conductor 240 mm2 AAAC u 192 10 45.00 9,090.00 45.83333333
6.6 Suple metalico de 0.50 m de longitud u 192 10 82.50 16,665.00 84.02777778
6.7 Grillete de ''A'' G'' u 332 15 11.65 4,042.55 11.86574074
6.8 Anillo bola u 222 10 22.00 5,104.00 22.40740741
6.9 Eslabn Revirado u 106 5 19.25 2,136.75 19.60648148
6.10 Grapa de suspensin para cable de fibra ptica OPGW. u 36 2 41.25 1,567.50 42.01388889
6.11 Rotula ojal u 24 2 19.25 500.50 19.60648148
6.12 Conector de AG de 2 vias para tierra del OPGW u 39 2 19.25 789.25 19.60648148
6.13 Abrazadera Metlica de 1 hueco para poste terminal u 4 60.00 240.00 61.11111111
6.14 Abrazadera Metlica de 3 hueco para poste terminal u 12 75.00 900.00 76.38888889
6.15 Soporte para Terminal u 12 180.00 2,160.00 183.3333333
6.16 Tensor de Corredera u 74 5 33.00 2,607.00 33.61111111
6.17 Guarda cabo para cable tipo OPGW u 74 5 20.63 1,629.77 21.01203704
6.18 Retensiones Preformadas para cable de guarda u 74 5 56.56 4,468.24 57.60740741
6.19 Conector de una via de AG para conexin de cable PAT a poste u 39 19.25 750.75 19.60648148
6.20 Manguito de empalme para conductor de 240mm u 12 59.00 708.00 60.09259259
7.0 Sistema de Puesta a tierra 41,385.98 0
7.1 Conductor de cobre de 85 mm para puesta a tierra m 1,200 28.67 34,404.00 29.20092593
7.2 Varilla de copperweld de 2,4m y 16 mm de diametro u 27 2 220.00 6,380.00 224.0740741
7.3 Conector tipo perno partido para conductor de cobre de 85 mm u 2 6.99 13.98 7.119444444
7.4 Conector bimetlico tipo Estructura-Conductor u 76 8 7.00 588.00 7.12962963
7.5 Conector terminal de cobre para pararrayos u 12 2 5.00 70.00 5.092592593
8.0 Terminales, Pararrayos y caja tripolar 400,920.00
8.1 Terminal de conexin areo subterraneo para 170 kV u 12 13,000.00 156,000.00
8.2 Parrarayos tipo TLA para 138 kV u 12 15,860.00 190,320.00
8.3 Caja tripolar de conexin de pantalla a tierra con limitador de tension (SVL) u 6 9,100.00 54,600.00

COSTO TOTAL SUMINISTROS (S/.) 3,612,658.75


LINEA DE TRANSMISION EN 138KV SOCABAYA - PARQUE INDUSTRIAL
TRAMO AREO DE 9,0 km
MONTAJE ELECTROMECANICO

COSTO
COSTO PARCIAL COSTO TOTAL
ITEM DESCRIPCION UNIDAD CANTIDAD UNITARIO
(S/.) (S/.)
(S/.)

I MONTAJE ELECTROMECANICO

1.0 Replanteo topogrfico de la lnea de 138KV(Socabaya-Parque Industrial) 4,191.82


1.1 Replanteo topogrfico de la lnea de 138KV km 9.77 429.05 4,191.82
2.0 Instalacin de estructuras metlicas de celosa (torres) 13,493.54
2.1 Estructura de celosia tipo TR de 30m u 2 3,370.65 6,741.30
2.2 Estructura de celosia de anclaje tipo TR de 33m u 2 3,376.12 6,752.24
3.0 Instalacion de estructuras metlicas (postes) 176,338.69
3.1 Postes de Acero para Armado SM de 80' u 5 2,029.17 10,145.85
3.2 Postes de Acero para Armado SM de 85' u 20 2,029.17 40,583.40
3.3 Postes de Acero para Armado SM de 90' u 2 2,233.24 4,466.48
3.4 Postes de Acero para Armado SM de 110' u 1 3,253.61 3,253.61
3.5 Postes de Acero para Armado SMD de 80' u 4 2,396.50 9,586.00
3.6 Postes de Acero para Armado SMD de 85' u 1 2,396.50 2,396.50
3.7 Postes de Acero para Armado SMD de 100' u 3 2,996.02 8,988.06
3.8 Postes de Acero para Armado A1M de 80' u 2 2,396.50 4,793.00
3.9 Postes de Acero para Armado A1M de 85' u 3 2,396.50 7,189.50
3.10 Postes de Acero para Armado A1M de 90' u 4 2,233.24 8,932.96
3.11 Postes de Acero para Armado A1M de 100' u 4 2,996.02 11,984.08
3.12 Postes de Acero para Armado A1M de 110' u 3 3,253.61 9,760.83
3.13 Postes de Acero para Armado A1M de 120' u 4 3,253.61 13,014.44
3.14 Postes de Acero para Armado A2M de 85' u 2 2,029.17 4,058.34
3.15 Postes de Acero para Armado A2M de 90' u 1 2,233.24 2,233.24
3.16 Postes de Acero para Armado A2M de 100' u 2 2,996.02 5,992.04
3.17 Postes de Acero para Armado A2M de 110' u 2 3,253.61 6,507.22
3.18 Postes de Acero para Armado A2M de 120' u 1 3,416.29 3,416.29
3.19 Postes de Acero para Armado A3M de 85' u 1 2,396.50 2,396.50
3.20 Postes de Acero para Armado A3M de 100' u 1 2,996.02 2,996.02
3.21 Postes de Acero para Armado A3M de 120' u 1 3,904.33 3,904.33
3.22 Postes de Acero para Armado PTM de 85' u 4 2,435.00 9,740.00
4.0 Instalacin de conductor 74,483.96
4.1 Instalacin de conductor de tipo 240 mm2 AAAC , por fase km 28.35 2,627.30 74,483.96
5.0 Instalacin de cables de guarda 30,105.72
5.1 Instalacion de Cable OPGW de 70mm y 24 fibras km 9.45 3,185.79 30,105.72
6.0 Instalacin de aisladores 44,583.36
6.1 Aislador polimerico tipo line post u 192 126.82 24,349.44
6.2 Aislador Polimerico tipo Tensin u 224 90.33 20,233.92
7.0 Instalacin de terminales 145 kV 9,202.69
7.1 Instalacin de terminales 145 kV u 28 324.61 9,202.69
8.0 Instalacin de Pararrayos 6,615.00
8.1 Instalacin de Parrarayos tipo TLA para 138 kV u 12 551.25 6,615.00
9.0 Instalacin de Caja tripolar 2,624.16
9.1 Caja tripolar de conexin de pantalla a tierra con limitador de tension (SVL) u 6 437.36 2,624.16
10.0 Instalacin de cajas de empalmes 2,624.16
10.1 Instalacin de cajas de empalmes para cable de fibra ptica u 6 437.36 2,624.16
11.0 Instalacion de Accesorios de conductor y cables de guarda 7,153.72
11.1 Amortiguadores para conductor AAAC 240 mm2 u 84 61.14 5,135.76
11.2 Amortiguadores para cable OPGW u 28 72.07 2,017.96
12.0 Instalacin de Sistemas de Puesta a Tierra 19,174.20
Puesta a tierra tipo "PAT-1 " , incluye excavacin, instalacin, relleno y rotura de vereda,
12.1 desalojo de desmonte , resane y todo trabajo no especificado pero requerido para el
montaje
12.1.1 Electrodo vertical u 27 269.85 7,285.95
Puesta a tierra tipo "PAT-C " , incluye excavacin, instalacin, relleno y rotura de vereda,
12.2 desalojo de desmonte , resane y todo trabajo no especificado pero requerido para el
montaje
12.2.1 Con contrapeso de 10 m u 23 214.36 4,930.28
12.2.2 Con contrapeso de 20 m u 17 263.13 4,473.21
12.2.3 Con contrapeso de 25 m u 1 275.49 275.49
Puesta a tierra tipo "PAT-D y PAT-E" , incluye excavacin, instalacin, relleno y rotura de
12.3 vereda, desalojo de desmonte , resane y todo trabajo no especificado pero requerido para
el montaje
12.3.1 Con contrapeso en oposicin de 10 m u 3 231.21 693.63
12.3.2 Con contrapeso en oposicin de 40 m u 2 353.19 706.38
12.3.3 Con contrapeso en oposicin de 50 m u 2 404.63 809.26
13.0 Varios 25,445.45
13.1 Ingenera de Detalle gbl 1 20,363.85 20,363.85
13.2 Pruebas y Puesta en Servicio gbl 1 5,081.60 5,081.60

COSTO TOTAL DE MONTAJE ELECTROMECANICO (S/.) 416,036.47

LINEA DE TRANSMISION EN 138KV SOCABAYA - PARQUE INDUSTRIAL


TRAMO AREO DE 9,0 km
OBRAS CIVILES

COSTO
COSTO PARCIAL COSTO TOTAL
ITEM DESCRIPCION UNIDAD CANTIDAD UNITARIO
(S/.) (S/.)
(S/.)

II OBRAS CIVILES

1.0 Movilizacin y Desmovilizacin 3,328.73


1.1 Movilizacin y desmovilizacin U 1.00 3,328.73 3,328.73

2.0 Obras Provisionales 4,279.01


LINEA DE TRANSMISION EN 138KV SOCABAYA - PARQUE INDUSTRIAL
TRAMO AREO DE 9,0 km
MONTAJE ELECTROMECANICO

COSTO
COSTO PARCIAL COSTO TOTAL
ITEM DESCRIPCION UNIDAD CANTIDAD UNITARIO
(S/.) (S/.)
(S/.)

2.1 Instalacin de Campamentos y Almacenes Global 1.00 3,043.09 3,043.09


2.2 Mantenimiento y operacin de campamentos Global 1.00 1,235.92 1,235.92

3.0 Cimentacin de las Estructuras 445,392.51


3.1 Demolicion de pavimento m2 124.39 9.07 1,128.22
3.2 Reposicin de pavimento m2 124.39 23.16 2,880.87
3.3 Excavacin manual en material suelto m3 1,063.39 44.55 47,374.02
3.4 Relleno compactado manual con material propio m3 352.62 33.60 11,848.03
3.5 Encofrado y desencofrado recto m2 1,208.42 74.32 89,809.77
3.6 Concreto fc=100 para fundaciones m3 26.29 34.63 910.42
3.7 Concreto fc=210 para fundaciones m3 597.76 323.79 193,548.71
3.8 Acero de Refuerzo fy=4200 kg/cm2 kg 15,061.35 5.82 87,657.06
3.9 Eliminacin de material excedente m3 941.62 10.87 10,235.41

COSTO TOTAL DE OBRAS CIVILES (S/.) 453,000.25

710.77
ANALISIS DE COSTOS UNITARIOS DE OBRAS ELECTROMECANICAS DE LINEAS DE TRANSMISION

PROYECTO:
LINEA 138 kV SOCABAYA - PARQUE INDUSTRIAL

PARTIDA : 1.1 Replanteo topogrfico de la lnea de 138KV

RENDIMIENTO : 2.5 km/dia

DESIGNACIN CUAD. UNID. APORTE COSTO U.


MATERIALES
Fierro kg 1.00 2.13
Cemento Portland tipo I en bolsa de 42,5 kg bls 0.66 14.29
Material consumible EST 0.50 192.50
Pintura esmalte sinttico gln 0.13 56.44

MANO DE OBRA
Topgrafo 1.00 h-h 3.20 17.24
Oficial 1.00 h-h 3.20 12.61
Pen 2.00 h-h 6.40 11.40

MAQUINARIAS Y EQUIPOS
Camioneta pick up 4 x 2 d.cab. 1.00 h-m 2.42 45.42
Rachet 3.00 h-m 7.27 3.50
Espintermetro 1.00 h-m 2.42 38.50
Herramientas manuales y equipos de proteccin % m-o 7.00 168.49

COSTO DIRECTO TOTAL

ANALISIS DE COSTOS UNITARIOS DE OBRAS ELECTROMECANICAS DE LINEAS DE TRANSMISION

PROYECTO:
LINEA 138 kV SOCABAYA - PARQUE INDUSTRIAL

PARTIDA : 2.1 Estructura de celosia tipo TR de 30m

RENDIMIENTO : 1.2 Un/dia

DESIGNACIN CUAD. UNID. APORTE COSTO U.


MATERIALES
Material consumible EST 0.50 192.50

MANO DE OBRA
Ingeniero de seguridad 0.10 h-h 0.67 52.50
Capataz en trabajos elctricos 1.00 h-h 6.67 20.45
Operario en trabajos elctricos 2.00 h-h 13.33 17.24
Oficial en trabajos elctricos 2.00 h-h 13.33 15.13
Pen 10.00 h-h 66.67 11.40

MAQUINARIAS Y EQUIPOS
Camin plataforma 4x2, 122 HP, 8 TON 1.00 h-m 6.67 125.25
Camin gra de 5 TON 0.50 h-m 3.33 173.25
Pluma de izaje 1.00 h-m 6.67 18.36
Tirfor 3 Ton 2.00 h-m 13.33 2.88
Winche de 3 Ton 1.00 h-m 6.67 36.40
Equipo de topografa (Teod,Nivel,etc) 1.00 h-m 6.67
Herramientas manuales y equipos de proteccin % m-o 7.00 1363.00

COSTO DIRECTO TOTAL


ANALISIS DE COSTOS UNITARIOS DE OBRAS ELECTROMECANICAS DE LINEAS DE TRANSMISION

PROYECTO:
LINEA 138 kV SOCABAYA - PARQUE INDUSTRIAL

PARTIDA : 2.2 Estructura de celosia de anclaje tipo TR de 33m

RENDIMIENTO : 1.198 Un/dia

DESIGNACIN CUAD. UNID. APORTE COSTO U.


MATERIALES
Material consumible EST 0.50 192.50

MANO DE OBRA
Ingeniero de seguridad 0.10 h-h 0.67 52.50
Capataz en trabajos elctricos 1.00 h-h 6.68 20.45
Operario en trabajos elctricos 2.00 h-h 13.36 17.24
Oficial en trabajos elctricos 2.00 h-h 13.36 15.13
Pen 10.00 h-h 66.78 11.40

MAQUINARIAS Y EQUIPOS
Camin plataforma 4x2, 122 HP, 8 TON 1.00 h-m 6.68 125.25
Camin gra de 5 TON 0.50 h-m 3.34 173.25
Pluma de izaje 1.00 h-m 6.68 18.36
Tirfor 3 Ton 2.00 h-m 13.36 2.88
Winche de 3 Ton 1.00 h-m 6.68 36.40
Equipo de topografa (Teod,Nivel,etc) 1.00 h-m 6.68
Herramientas manuales y equipos de proteccin % m-o 7.00 1365.28

COSTO DIRECTO TOTAL

ANALISIS DE COSTOS UNITARIOS DE OBRAS ELECTROMECANICAS DE LINEAS DE TRANSMISION

PROYECTO:
LINEA 138 kV SOCABAYA - PARQUE INDUSTRIAL

PARTIDA : 3.1 Postes de Acero para Armado SM de 80'

RENDIMIENTO : 3 Un/dia

DESIGNACIN CUAD. UNID. APORTE COSTO U.


MATERIALES
Material consumible EST 1.00 192.50

MANO DE OBRA
Ingeniero de seguridad 0.10 h-h 0.27 52.50
Capataz en trabajos elctricos 1.00 h-h 2.67 20.45
Operario en trabajos elctricos 8.00 h-h 21.33 17.24
Oficial en trabajos elctricos 6.00 h-h 16.00 15.13
Pen 8.00 h-h 21.33 11.40

MAQUINARIAS Y EQUIPOS
Camin plataforma 4x2, 122 HP, 8 TON 1.00 h-m 2.67 125.25
Camin gra de 5 TON 0.50 h-m 1.33 173.25
Camioneta pick up 4 x 2 d.cab. 0.50 h-m 1.33 45.42
Tirfor 3 Ton 4.00 h-m 10.67 2.88
Winche de 3 Ton 2.00 h-m 5.33 36.40
Equipo de topografa (Teod,Nivel,etc) 1.00 h-m 2.67
Herramientas manuales y equipos de proteccin % m-o 7.00 921.71

COSTO DIRECTO TOTAL

ANALISIS DE COSTOS UNITARIOS DE OBRAS ELECTROMECANICAS DE LINEAS DE TRANSMISION


AS DE TRANSMISION

PARQUE INDUSTRIAL

UNIDAD: km

C. PARCIAL SUB TOTAL


19.86
2.13
9.43
0.96
7.34

168.49
55.18
40.35
72.96

240.70
110.11
25.46
93.34
11.79

S/. 429.05

AS DE TRANSMISION

PARQUE INDUSTRIAL

UNIDAD: Un.

C. PARCIAL SUB TOTAL


96.25
96.25

1363.00
35.00
136.32
229.92
201.76
760.00

1911.40
835.00
577.50
122.40
38.43
242.67
0.00
95.41

S/. 3370.65
AS DE TRANSMISION

PARQUE INDUSTRIAL

3m

UNIDAD: Un.

C. PARCIAL SUB TOTAL


96.25
96.25

1365.28
35.06
136.55
230.30
202.10
761.27

1914.59
836.39
578.46
122.60
38.49
243.07
0.00
95.57

S/. 3376.12

AS DE TRANSMISION

PARQUE INDUSTRIAL

UNIDAD: Un.

C. PARCIAL SUB TOTAL


192.50
192.50

921.71
14.00
54.53
367.87
242.11
243.20

914.95
334.00
231.00
60.56
30.74
194.13
0.00
64.52

S/. 2029.17

AS DE TRANSMISION
ANALISIS DE COSTOS UNITARIOS
OBRAS CIVILES LNEA AREA 138 KV SOCABAYA - PARQUE INDUSTRIAL

Partida 1.1 Movilizacin y desmovilizacin

Rendimiento Glb/DIA 0.5500 EQ. 0.2208 Costo unitario directo por : Glb

Cdigo Descripcin Recurso Unidad Cuadrilla


Mano de Obra
INGENIERO DE SEGURIDAD hh 0.1000
INGENIERO ELECTRICISTA hh 0.2000
CHOFER hh 0.8000
OPERARIO hh 1.0000
PEON hh 4.0000

Equipos
CAMIONETA PICK UP 4 X 4 DOBLE CABINA hh 0.2000
CAMIN PLATAFORMA 4X2, 122 HP, 8 TON hh 1.0000
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN %MO

Partida 2.1 Instalacin de Campamentos y Almacenes

Rendimiento Glb/DIA 0.6500 EQ. 0.6800 Costo unitario directo por : Glb

Cdigo Descripcin Recurso Unidad Cuadrilla


Mano de Obra
INGENIERO DE SEGURIDAD hh 0.1000
INGENIERO ESPECIALISTA EN LINEAS DE TRANSMISIN hh 0.8000
CHOFER hh 0.8000
PEON hh 4.0000

Equipos
ESTUCHE DE HERRAMIENTAS PARA MECANICO hh 0.5000
CAMIONETA PICK UP 4 X 4 DOBLE CABINA hh 0.2000
CAMIN PLATAFORMA 4X2, 122 HP, 8 TON hh 1.0000
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN %MO

Partida 2.2 Mantenimiento y operacin de campamentos

Rendimiento Glb/DIA 0.6500 EQ. 0.6800 Costo unitario directo por : Glb

Cdigo Descripcin Recurso Unidad Cuadrilla


Mano de Obra
INGENIERO DE SEGURIDAD hh 0.1000
ALMACENERO hh 1.0000
CHOFER hh 0.5000
PEON hh 4.0000

Equipos
ESTUCHE DE HERRAMIENTAS PARA MECANICO hh 0.5000
CAMIONETA PICK UP 4 X 4 DOBLE CABINA hh 0.5000
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN %MO

Partida 3.1 DEMOLICIN DE PAVIMENTO

Rendimiento m2/DIA 50.0000 EQ. 50.0000 Costo unitario directo por : m2

Cdigo Descripcin Recurso Unidad Cuadrilla


Mano de Obra
INGENIERO DE SEGURIDAD hh 0.1000
CAPATAZ hh 0.1000
PEON hh 1.0000

Equipos
COMPRESORA NEUMATICA 76 HP 125-175 PCM hh 0.5000
MARTILLO NEUMATICO 21-24 KG hh 1.0000
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN %MO

Partida 3.2 REPOSICIN DE PAVIMENTO

Rendimiento M2/DIA 50.0000 EQ. Costo unitario directo por : M2

Cdigo Descripcin Recurso Unidad Cuadrilla

INGENIERO DE SEGURIDAD hh 0.1000


COLOCACIN DE CARPETA ASFLTICA 2" m2
COLOCACIN DE RIEGO ASFLTICO m2

Partida 3.3 Excavacin en suelo normal para cimentacin

Rendimiento m3/DIA 10.0000 EQ. 10.0000 Costo unitario directo por : m3

Cdigo Descripcin Recurso Unidad Cuadrilla


Mano de Obra
INGENIERO DE SEGURIDAD 0.1000
PEON hh 4.0000

Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN %MO
Partida 3.4 RELLENO CON MATERIAL PROPIO

Rendimiento ml/DIA 45.0000 EQ. 45.0000 Costo unitario directo por : ml

Cdigo Descripcin Recurso Unidad Cuadrilla


Mano de Obra
INGENIERO DE SEGURIDAD hh 0.1000
CAPATAZ hh 0.2500
OPERARIO hh 1.0000
PEON hh 2.0000

Equipos
Camin plataforma 4x2, 122 HP, 8 TON hm 1.0000
Compactadora vibrador tipo plancha 7 HP hm 0.2000
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN %MO

Partida 3.5 ENCOFRADO Y DESENCOFRADO RECTO

Rendimiento m2/DIA 18.0000 EQ. 18.0000 Costo unitario directo por : m2

Cdigo Descripcin Recurso Unidad Cuadrilla


Mano de Obra
INGENIERO DE SEGURIDAD 0.1000
CAPATAZ hh 1.0000
OPERARIO hh 1.0000
OFICIAL hh 2.0000
PEON hh 2.0000

Materiales
ALAMBRE kg
CLAVOS PARA MADERA kg
DESMOLDADOR PARA ENCOFRADO gal
MATERIALES DIVERSOS %MT
MADERA NACIONAL p2

Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN %MO

Partida 3.6 CONCRETO fc=100 kg/cm2 (solado)

Rendimiento m2/DIA 50.0000 EQ. 50.0000 Costo unitario directo por : m2


Cdigo Descripcin Recurso Unidad Cuadrilla
Mano de Obra
INGENIERO DE SEGURIDAD 0.1000
CAPATAZ hh 0.1000
OPERARIO hh 1.0000
OFICIAL hh 2.0000
PEON hh 6.0000

Materiales
CEMENTO PORTLAND TIPO I bls
ADITIVO gal
ACEITE MOTOR GASOLINERO MULTIGRADO gal
GASOLINA 84 OCTANOS gal
AGUA m3
AGREGADO m3

Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN %MO
MEZC. DE CONCRETO TIPO TAMBOR 18 HP 7 Pie 3 hm 1.0000

Partida 3.7 CONCRETO f'c=210 kg/cm2

Rendimiento m3/DIA 15.0000 EQ. 15.0000 Costo unitario directo por : m3

Cdigo Descripcin Recurso Unidad Cuadrilla


Mano de Obra
INGENIERO DE SEGURIDAD 0.1000
CAPATAZ hh 0.5000
OPERARIO hh 1.0000
OFICIAL hh 1.0000
PEON hh 10.0000

Materiales
CEMENTO PORTLAND TIPO I bls
ADITIVO gal
ACEITE MOTOR GASOLINERO MULTIGRADO gal
GASOLINA 84 OCTANOS gal
AGUA m3
AGREGADO m3

Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN %MO
VIBRADOR DE CONCRETO 4 HP 1.50" hm 1
MEZC. DE CONCRETO TIPO TAMBOR 18 HP 7 11-13 Pie 3 hm 1
Partida 3.8 ACERO DE REFUERZO fy=4200 kg/cm2

Rendimiento kg/DIA 200.0000 EQ. 200.0000 Costo unitario directo por : kg

Cdigo Descripcin Recurso Unidad Cuadrilla


Mano de Obra
INGENIERO DE SEGURIDAD 0.1000
CAPATAZ hh 0.2000
OPERARIO hh 1.0000
OFICIAL hh 2.0000

Materiales
ALAMBRE kg
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg

Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN %MO

Partida 3.9 ELIMINACIN DE MATERIAL EXCEDENTE

Rendimiento m3/DIA 350.0000 EQ. 350.0000 Costo unitario directo por : m3

Cdigo Descripcin Recurso Unidad Cuadrilla


Mano de Obra
INGENIERO DE SEGURIDAD hh 0.1000
CAPATAZ hh 0.2000
PEON hh 2.0000

Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN %MO
CAMION VOLQUETE 10 m3 hm 2.0000
QUE INDUSTRIAL

Costo unitario directo por : Glb 3,328.73

Cantidad Precio S/. Parcial S/.

1.4545 52.50 76.36


2.9091 52.50 152.73
11.6364 12.60 146.62
14.5455 14.92 217.02
58.1818 11.70 680.73
1,273.45

2.9091 49.61 144.32


14.5455 125.25 1,821.82
7.0000 1,273.45 89.14
2,055.28

Costo unitario directo por : Glb 3,043.09

Cantidad Precio S/. Parcial S/.

1.2308 52.50 64.62


9.8462 52.50 516.92
9.8462 12.60 124.06
49.2308 11.70 576.00
1,281.60

6.1538 1.32 8.12


2.4615 49.61 122.12
12.3077 125.25 1,541.54
7.0000 1,281.60 89.71
1,761.49

Costo unitario directo por : Glb 1,235.92

Cantidad Precio S/. Parcial S/.

1.2308 52.50 64.62


12.3077 11.70 144.00
6.1538 12.60 77.54
49.2308 11.70 576.00
862.15

6.1538 1.32 8.12


6.1538 49.61 305.29
7.0000 862.15 60.35
373.77

Costo unitario directo por : m2 9.07

Cantidad Precio S/. Parcial S/.

0.0160 52.50 0.84


0.0160 17.37 0.28
0.1600 11.70 1.87
2.99

0.0800 64.18 5.13


0.1600 4.61 0.74
7.0000 2.99 0.21
6.08

Costo unitario directo por : M2 23.16

Cantidad Precio S/. Parcial S/.

0.0160 52.50 0.84


1.0000 17.60 17.60
1.0000 4.72 4.72
23.16

Costo unitario directo por : m3 44.55

Cantidad Precio S/. Parcial S/.

0.0800 52.50 4.20


3.2000 11.70 37.44
41.64

7.0000 41.64 2.91


2.91
Costo unitario directo por : ml 33.60

Cantidad Precio S/. Parcial S/.

0.0178 52.50 0.93


0.0444 17.37 0.77
0.1778 14.92 2.65
0.3556 11.70 4.16
8.52

0.1778 125.25 22.27


0.0356 21.10 0.75
7.0000 8.52 2.06
25.08

Costo unitario directo por : m2 74.32

Cantidad Precio S/. Parcial S/.

0.0444 52.50 2.33


0.4444 17.37 7.72
0.4444 14.92 6.63
0.8889 12.97 11.53
0.8889 11.70 10.40
38.61

0.3000 4.15 1.25


0.3000 4.15 1.25
0.0500 81.13 4.06
8.0000 46.86 3.75
6.0000 3.63 21.78
32.08

10.0000 38.61 3.86


3.63

Costo unitario directo por : m2 34.63


Cantidad Precio S/. Parcial S/.

0.0160 52.50 0.84


0.0160 17.37 0.28
0.1600 14.92 2.39
0.3200 12.97 4.15
0.9600 11.70 11.23
18.89

0.3600 17.10 6.16


0.0050 35.10 0.18
0.0040 50.20 0.20
0.2400 9.82 2.36
0.0200 9.00 0.18
0.1300 32.00 4.16
13.23

7.0000 18.89 1.32


0.1600 7.44 1.19
2.51

Costo unitario directo por : m3 323.79

Cantidad Precio S/. Parcial S/.

0.0533 52.50 2.80


0.2667 17.37 4.63
0.5333 14.92 7.96
0.5333 12.97 6.92
5.3333 11.70 62.40
84.71

10.0000 17.10 171.00


0.1230 35.10 4.32
0.0067 50.20 0.34
0.5000 9.82 4.91
0.2500 9.00 2.25
1.3250 32.00 42.40
225.21

7.0000 84.71 5.93


0.5333 5.30 2.83
0.5333 9.58 5.11
13.87

Costo unitario directo por : kg 5.82

Cantidad Precio S/. Parcial S/.

0.0040 52.50 0.21


0.0080 17.37 0.14
0.0400 14.92 0.60
0.0800 12.97 1.04
1.98

0.0900 4.15 0.37


1.0500 3.17 3.33
3.70

7.0000 1.98 0.14


0.14

Costo unitario directo por : m3 10.87

Cantidad Precio S/. Parcial S/.

0.0023 52.50 0.12


0.0046 18.37 0.08
0.0457 12.37 0.57
0.77

5.0000 0.77 0.04


0.0457 220.00 10.06
10.10
LINEA DE TRANSMISION EN 138KV SOCABAYA - PARQUE INDUSTRIAL
TRAMO SUBTERRNEO DE 0,766 km
SUMINISTROS DE MATERIALES

COSTO
CANTIDAD COSTO TOTAL
ITEM DESCRIPCION UNIDAD UNITARIO
TOTAL (S/.)
(S/.)

Cable de energia unipolar para una tensin nominal de 138 kV entre fases y mxima de servicio de 145
1 m 2412.90 412.50 995,321.25
kV, seccin de 240 mm Cu con aislamiento XLPE,.
Cable de Fibra Optica tipo ADSS para 24 fibras
2 m 880.00 16.50 14,520.00

COSTO TOTAL DE SUMINISTROS S/. 1,009,841.25

LINEA DE TRANSMISION EN 138KV SOCABAYA - PARQUE INDUSTRIAL


TRAMO SUBTERRNEO DE 0,766 km
MONTAJE ELECTROMECNICO

COSTO
CANTIDAD COSTO TOTAL
ITEM DESCRIPCION UNIDAD UNITARIO
TOTAL (S/.)
(S/.)

I. MONTAJE ELECTROMECANICO
1.0 TENDIDO DE CABLE SUBTERRNEO
1.1 Cable XLPE de 138 kV 1x240 mm2 Cu, incluye la preapracin para el tendido, el transporte de las bobinas m 2,412.90 8.28 19,978.81
del cable, la instalacin del winche del jalado, el tendiod del cable guia de acero, y la colocacin de los
respectivos polines de fibra y de metal

1.2 Cable de Fibra Optica tipo ADSS para 24 fibras,ncluye la preapracin para el tendido, el transporte de las m 880.00 7.87 6,925.60
bobinas del cable, la instalacin del winche del jalado, el tendiod del cable guia de acero, y la colocacin
de los respectivos polines de fibra y de metal

2.0 OBRAS EN POSTE TERMINAL


2.1 muro de proteccin u 4.00 407.97 1,631.88

COSTO TOTAL MONTAJE ELECTROMECANICO (S/.) 28,536.29

LINEA DE TRANSMISION EN 138KV SOCABAYA - PARQUE INDUSTRIAL


TRAMO SUBTERRNEO DE 0,766 km
OBRAS CIVILES

COSTO
CANTIDAD COSTO TOTAL
ITEM DESCRIPCION UNIDAD UNITARIO
TOTAL (S/.)
(S/.)

II. OBRAS CIVILES


1.0 OBRAS PRELIMINARES Y PROVISIONALES
1.1 Traslado de Equipos y Maquinas Glb 1.00 3,678.11 3,678.11
1.2 Guardiana Glb 1.00 5,500.00 5,500.00
1.3 Alquiler local Glb 1.00 13,750.10 13,750.10
1.4 Comunicaciones propias (RPM; radios , celulares) Glb 1.00 2,800.00 2,800.00
1.5 Sealizacin y elementos de seguridad (Vallado de proteccin) Glb 1.00 3,240.00 3,240.00
SUB-TOTAL 1 : 28,968.21
2.0 ZANJA
2.1 Demolicin de pavimento m2 733.11 9.07 6,649.31
2.2 Reposicin de Pavimento m2 733.11 23.16 16,978.83
2.3 Excavacin en material suelto m3 2,038.27 44.55 90,804.93
2.4 Eliminacin de material excedente m3 1,880.01 10.87 20,435.71
2.5 Compactacin y nivelacin de fondo de zanja de 1,85 m de profundidad y 1,3 m de ancho ml 706.26 56.30 39,762.44
2.6 Encofrado y desencofrado m2 2,445.92 74.55 182,343.34
2.7 Concreto f'c=100 kg/cm2 solado e=0,10m m2 1,045.26 34.63 36,197.35
2.8 concreto (f'c = 210 kg/cm2) m3 574.89 323.79 186,143.63
2.9 Relleno con material de prestamo m3 418.66 42.13 17,638.15
2.10 Relleno con material propio m3 627.99 33.60 21,100.46
2.11 Reposicin de jardines m2 15.00 121.11 1,816.65
2.12 Cinta de sealizacin, comprende el suministro e instalacin m 952.83 8.23 7,841.79
2.13 Tubo PVC 6" Clase 5. incluye suministro e instalacin m 3,390.05 26.27 89,056.61
2.14 Tubo PVC 3" Clase 5. incluye suministro e instalacin m 1,130.02 16.80 18,984.34

SUB-TOTAL 2 : 735,753.54
3.0 CAMARAS DE PASO
3.1 Demolicin de pavimento m2 155.00 9.07 1,405.85
3.2 Reposicin de Pavimento m2 155.00 23.16 3,589.80
3.3 Excavacin en material suelto m3 385.00 44.55 17,151.75
3.4 Eliminacin de material excedente m3 515.00 10.87 5,598.05
3.5 Encofrado y desencofrado m2 470.00 74.55 35,038.50
3.6 Concreto f'c=100 kg/cm2 solado e=0,10m m2 155.00 34.63 5,367.65
3.7 Concreto fc=210 kg/cm2 m3 165.00 323.79 53,425.35
3.8 Armadura de refuerzo de fy = 4200 Kg/cm2. kg 15,600.00 5.82 90,792.00
3.9 Tapa de fg D=0,80m und 16.00 120.00 1,920.00
SUB-TOTAL 3 : 214,288.95
4.0 Varios
4.1 Ingenieria de Detalle (Cmaras de paso y recorrido subterrneo) Glb 1.00 16294.93 16,294.93

COSTO TOTAL OBRAS CIVILES (S/.) 995,305.63


LINEA SUBTERRANEA:OBRAS ELECTROMECANICAS

ANALISIS DE COSTOS UNITARIOS DE OBRAS ELECTROMECANICAS DE LINEAS DE TRANSMISION

PROYECTO: LINEA 138 kV SOCABAYA - PARQUE INDUSTRIAL

PARTIDA : 1.1 Tendido del Cable XLPE de 138 kV 1x400mm2 Cu

RENDIMIENTO : 0.7 km/dia UNIDAD:

DESIGNACIN CUAD. UNID. APORTE COSTO U. C. PARCIAL


MATERIALES
Material consumible EST 1.00 192.50 192.50

MANO DE OBRA
Ingeniero de seguridad 0.10 h-h 0.32 52.50 16.80
Capataz en trabajos elctricos 1.00 h-h 11.43 20.45 233.69
Operario en trabajos elctricos 8.00 h-h 91.43 17.24 1576.59
Oficial en trabajos elctricos 6.00 h-h 68.57 15.13 1037.62
Pen 10.00 h-h 114.29 11.40 1302.86
Chofer 1.00 h-h 11.43 17.00 194.29

MAQUINARIAS Y EQUIPOS
Estuche de herramientas para mecnico 1.00 h-m 11.43 1.32 15.09
Camin plataforma 4x2, 122 HP, 8 TON 0.75 h-m 8.57 125.25 1073.57
Camin volquete 4x2 120-140 HP 4m3 1.00 h-m 11.43 112.37 1284.23
Camioneta pick up 4 x 2 d.cab. 0.50 h-m 5.71 45.42 259.54
Tirfor 3 Ton 1.00 h-m 11.43 2.88 32.94
Winche de 3 Ton 1.00 h-m 11.43 36.40 416.00
Tecle 2 Ton 0.50 h-m 5.71 0.00
Polines 0.50 h-m 5.71 0.35 2.00
Caballete alzabobina 1.00 h-m 11.43 1.32 15.09
Equipo de tendido 1.00 h-m 11.43 0.00
Equipo de topografa (Teod,Nivel,etc) 0.50 h-m 5.71 0.00
Radio Walkie Talkie 8.00 h-m 91.43 3.50 320.00
Herramientas manuales y equipos de proteccin % m-o 7.00 4361.85 305.33

COSTO DIRECTO TOTAL S/.

ANALISIS DE COSTOS UNITARIOS DE OBRAS ELECTROMECANICAS DE LINEAS DE TRANSMISION

PROYECTO: LINEA 138 kV SOCABAYA - PARQUE INDUSTRIAL


tendido, el transporte de las bobinas del cable, la instalacin del winche del
PARTIDA : 1.2 jalado, el tendiod del cable guia de acero, y la colocacin de los respectivos
polines de fibra y de metal
RENDIMIENTO : 0.78 km/dia UNIDAD:
DESIGNACIN CUAD. UNID. APORTE COSTO U. C. PARCIAL
MATERIALES
Material consumible EST 1.00 192.50 192.50

MANO DE OBRA
Ingeniero de seguridad 0.10 h-h 1.03 52.50 53.85
Capataz en trabajos elctricos 1.00 h-h 10.26 20.45 209.72
Operario en trabajos elctricos 8.00 h-h 82.05 17.24 1414.89
Oficial en trabajos elctricos 6.00 h-h 61.54 15.13 931.20
Pen 10.00 h-h 102.56 11.40 1169.23
Chofer 1.00 h-h 10.26 17.00 174.36

MAQUINARIAS Y EQUIPOS
Estuche de herramientas para mecnico 1.00 h-m 11.43 1.32 15.09
Camin plataforma 4x2, 122 HP, 8 TON 0.75 h-m 8.57 125.25 1073.57
Camin volquete 4x2 120-140 HP 4m3 1.00 h-m 11.43 112.37 1284.23
Camioneta pick up 4 x 2 d.cab. 0.50 h-m 5.71 45.42 259.54
Tirfor 3 Ton 1.00 h-m 11.43 2.88 32.94
Winche de 3 Ton 1.00 h-m 11.43 36.40 416.00
Tecle 2 Ton 0.50 h-m 5.71 0.00 0.00
Polines 0.50 h-m 5.71 0.35 2.00
Caballete alzabobina 1.00 h-m 11.43 1.32 15.09
Equipo de tendido 1.00 h-m 11.43 0.00 0.00
Equipo de topografa (Teod,Nivel,etc) 0.50 h-m 5.71 0.00 0.00
Radio Walkie Talkie 8.00 h-m 91.43 3.50 320.00
Herramientas manuales y equipos de proteccin % m-o 7.00 4361.85 305.33

COSTO DIRECTO TOTAL S/.

ANALISIS DE COSTOS UNITARIOS DE OBRAS ELECTROMECANICAS DE LINEAS DE TRANSMISION

PROYECTO: LINEA 138 kV SOCABAYA - PARQUE INDUSTRIAL

PARTIDA : 2.1 muro de proteccin

RENDIMIENTO : 4.00 u/da UNIDAD:

DESIGNACIN CUAD. UNID. APORTE COSTO U. C. PARCIAL


MATERIALES
Material consumible EST 0.10 192.50 19.25
Concreto F'c = 210 kg/cm2 m3 0.90 227.15 204.44
Pintura esmalte sinttico gln 1.00 56.44 56.44

MANO DE OBRA
Ingeniero de seguridad 0.10 h-h 0.20 52.50 10.50
Capataz 0.10 h-h 0.20 17.04 3.41
Operario 0.50 h-h 1.00 14.37 14.37
Pen 4.00 h-h 8.00 11.40 91.20

MAQUINARIAS Y EQUIPOS
Herramientas manuales y equipos de proteccin % m-o 7.00 119.48 8.36

COSTO DIRECTO TOTAL S/.

ANALISIS DE COSTOS UNITARIOS DE OBRAS ELECTROMECANICAS DE LINEAS DE TRANSMISION

PROYECTO: LINEA 138 kV SOCABAYA - PARQUE INDUSTRIAL

PARTIDA : 3.2 #REF!

RENDIMIENTO : 1.3 Glb/dia UNIDAD:

DESIGNACIN CUAD. UNID. APORTE COSTO U. C. PARCIAL


MATERIALES
Material consumible EST 0.10 192.50 19.25

MANO DE OBRA
Ingeniero de seguridad 0.10 h-h 0.62 52.50 32.31
Ing. Especialista en Lineas de transmisin 1.00 h-h 6.15 80.00 492.31
Capataz en trabajos elctricos 1.00 h-h 6.15 20.45 125.83
Operario en trabajos elctricos 1.00 h-h 6.15 17.24 106.12
Pen 6.00 h-h 36.92 11.40 420.92

MAQUINARIAS Y EQUIPOS
Estuche de herramientas para mecnico 1.00 h-m 6.15 1.32 8.12
Camioneta pick up 4 x 4 Doble Cabina 0.20 h-m 1.23 49.61 61.06
Megger 1.00 h-m 6.15 5.50 33.85
Herramientas manuales y equipos de proteccin % m-o 7.00 1177.49 82.42

COSTO DIRECTO TOTAL S/.

ANALISIS DE COSTOS UNITARIOS DE OBRAS ELECTROMECANICAS DE LINEAS DE TRANSMISION

PROYECTO: LINEA 138 kV SOCABAYA - PARQUE INDUSTRIAL

PARTIDA : 4.1 Ingenieria de Detalle (Cmaras de paso y recorrido subterrneo)

RENDIMIENTO : 0.025 Glb/dia UNIDAD:

DESIGNACIN CUAD. UNID. APORTE COSTO U. C. PARCIAL


MATERIALES
Material consumible EST 0.10 192.50 19.25

MANO DE OBRA
Ing. Especialista en Lineas de transmisin 0.50 h-h 160.00 80.00 12800.00
Dibujante 0.30 h-h 96.00 11.40 1094.40

MAQUINARIAS Y EQUIPOS
Camioneta pick up 4 x 4 Doble Cabina 0.15 h-m 48.00 49.61 2381.28

COSTO DIRECTO TOTAL S/.


DE TRANSMISION

NDUSTRIAL

km

SUB TOTAL
192.50

4361.85

3723.78

8278.13

DE TRANSMISION

NDUSTRIAL
cin del winche del
de los respectivos

km
SUB TOTAL
192.50

3953.25

3723.78

7869.53

DE TRANSMISION

NDUSTRIAL

SUB TOTAL
280.13

119.48

8.36
407.97

DE TRANSMISION

NDUSTRIAL

Glb

SUB TOTAL
19.25

1177.49

185.45
1382.19

DE TRANSMISION

NDUSTRIAL

Glb

SUB TOTAL
19.25

13894.40

2381.28

16294.93
ANALISIS DE COSTOS UNITARIOS
OBRAS CIVILES LNEA SUBTERRANEA 138 KV SOCABAYA - PARQUE INDUSTRIAL

Partida 1.1 TRASLADO DE EQUIPOS Y MAQUINAS

Rendimiento Glb/DIA 0.2000 EQ. 0.2000 Costo unitario directo por : Glb 3,678.11

Cdigo Descripcin Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
INGENIERO DE SEGURIDAD hh 0.1000 4.0000 52.50 210.00
INGENIERO ELECTRICISTA hh 0.2000 8.0000 52.50 420.00
CHOFER hh 0.8000 32.0000 12.60 403.20
OPERARIO hh 1.0000 40.0000 14.37 574.80
PEON hh 4.0000 160.0000 11.40 1,824.00
3,432.00
Equipos
CAMIONETA PICK UP 4 X 4 DOBLE CABINA hh 0.2000 8.0000 49.61 5.13
CAMIN PLATAFORMA 4X2, 122 HP, 8 TON hh 1.0000 40.0000 125.25 0.74
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN %MO 7.0000 3,432.00 240.24
246.11

Partida 1.2 GUARDIANA

Rendimiento Glb/DIA EQ. Costo unitario directo por : Glb 5,500.00

Cdigo Descripcin Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.

Mano de Obra
GUARDIAN Glb 1.0000 5,500.00 5,500.00
5,500.00

Partida 1.3 ALQUILER LOCAL

Rendimiento Glb/DIA EQ. Costo unitario directo por : Glb 13,750.10

Cdigo Descripcin Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.

Materiales
ALQUILER DE LOCAL Glb 1.0000 13,750.10 13,750.10
13,750.10

Partida 1.4 COMUNICACIONES PROPIAS (RPM; RADIOS , CELULARES)

Rendimiento Glb/DIA EQ. Costo unitario directo por : Glb 2,800.00

Cdigo Descripcin Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.

Materiales
RPM,RADIOS Y CELULARES Glb 1.0000 2,800.00 2,800.00
2,800.00

Partida 1.5 SEALIZACIN Y ELEMENTOS DE SEGURIDAD (VALLADO DE PROTECCIN)

Rendimiento Glb/DIA EQ. Costo unitario directo por : Glb 3,240.00

Cdigo Descripcin Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.

Materiales
CERCO CALADO DE SEALIZACIN Y RESTRICCIN AL TRNSITOGlb 1.0000 1,200.00 1,200.00
CARTELES SEALIZADORES DE OBRA Glb 2.0000 1,020.00 2,040.00
3,240.00

Partida 2.1, 3.1 DEMOLICIN DE PAVIMENTO

Rendimiento m2/DIA 50.0000 EQ. 50.0000 Costo unitario directo por : m2 9.07

SZ-11-327 28 de 43
ANALISIS DE COSTOS UNITARIOS
OBRAS CIVILES LNEA SUBTERRANEA 138 KV SOCABAYA - PARQUE INDUSTRIAL

Cdigo Descripcin Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
INGENIERO DE SEGURIDAD hh 0.1000 0.0160 52.50 0.84
CAPATAZ hh 0.1000 0.0160 17.37 0.28
PEON hh 1.0000 0.1600 11.70 1.87
2.99
Equipos
COMPRESORA NEUMATICA 76 HP 125-175 PCM hh 0.5000 0.0800 64.18 5.13
MARTILLO NEUMATICO 21-24 KG hh 1.0000 0.1600 4.61 0.74
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN %MO 7.0000 2.99 0.21
6.08

Partida 2.2, 3.2 REPOSICIN DE PAVIMENTO

Rendimiento M2/DIA 50.0000 EQ. Costo unitario directo por : M2 23.16

Cdigo Descripcin Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.

INGENIERO DE SEGURIDAD hh 0.1000 0.0160 52.50 0.84


COLOCACIN DE CARPETA ASFLTICA 2" m2 1.0000 17.60 17.60
COLOCACIN DE RIEGO ASFLTICO m2 1.0000 4.72 4.72
23.16

Partida 2.3,3.3 EXCAVACION MANUAL EN MATERIAL SUELTO

Rendimiento m3/DIA 10.0000 EQ. 10.0000 Costo unitario directo por : m3 44.55

Cdigo Descripcin Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
INGENIERO DE SEGURIDAD 0.1000 0.0800 52.50 4.20
PEON hh 4.0000 3.2000 11.70 37.44
41.64
Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN %MO 7.0000 41.64 2.91
2.91

Partida 2.4,3.4 ELIMINACIN DE MATERIAL EXCEDENTE

Rendimiento m3/DIA 350.0000 EQ. 350.0000 Costo unitario directo por : m3 10.87

Cdigo Descripcin Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
INGENIERO DE SEGURIDAD hh 0.1000 0.0023 52.50 0.12
CAPATAZ hh 0.2000 0.0046 18.37 0.08
PEON hh 2.0000 0.0457 12.37 0.57
0.77
Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN %MO 5.0000 0.77 0.04
CAMION VOLQUETE 10 m3 hm 2.0000 0.0457 220.00 10.06
10.10

Partida 2.5 COMPACTACIN Y NIVELACIN DE FONDO DE ZANJA

Rendimiento ml/DIA 10.0000 EQ. 10.0000 Costo unitario directo por : ml 56.30

Cdigo Descripcin Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
INGENIERO DE SEGURIDAD 0.1000 0.0800 52.50 4.20
CAPATAZ hh 0.1000 0.0800 17.37 1.39
OPERARIO hh 0.2000 0.1600 14.92 2.39

SZ-11-327 29 de 43
ANALISIS DE COSTOS UNITARIOS
OBRAS CIVILES LNEA SUBTERRANEA 138 KV SOCABAYA - PARQUE INDUSTRIAL
PEON 2.0000 1.6000 11.70 18.72
26.70
Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN %MO 5.0000 26.70 1.33
CAMION VOLQUETE 10 m3 hm 1.0000 0.1333 212.00 28.27
29.60

Partida 2.6,3.5 ENCOFRADO Y DESENCOFRADO RECTO

Rendimiento m2/DIA 18.0000 EQ. 18.0000 Costo unitario directo por : m2 74.55

Cdigo Descripcin Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
INGENIERO DE SEGURIDAD 0.1000 0.0444 52.50 2.33
CAPATAZ hh 1.0000 0.4444 17.37 7.72
OPERARIO hh 1.0000 0.4444 14.92 6.63
OFICIAL hh 2.0000 0.8889 12.97 11.53
PEON hh 2.0000 0.8889 11.70 10.40
38.61
Materiales
ALAMBRE kg 0.3000 4.15 1.25
CLAVOS PARA MADERA kg 0.3000 4.15 1.25
DESMOLDADOR PARA ENCOFRADO gal 0.0500 81.13 4.06
MATERIALES DIVERSOS %MT 8.0000 46.86 3.75
MADERA NACIONAL p2 6.0000 3.63 21.78
32.08
Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN %MO 10.0000 38.61 3.86
3.86

Partida 2.7, 3.6 CONCRETO fc=100 kg/cm2 (solado)

Rendimiento m2/DIA 50.0000 EQ. 50.0000 Costo unitario directo por : m2 34.63

Cdigo Descripcin Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
INGENIERO DE SEGURIDAD 0.1000 0.0160 52.50 0.84
CAPATAZ hh 0.1000 0.0160 17.37 0.28
OPERARIO hh 1.0000 0.1600 14.92 2.39
OFICIAL hh 2.0000 0.3200 12.97 4.15
PEON hh 6.0000 0.9600 11.70 11.23
18.89
Materiales
CEMENTO PORTLAND TIPO I bls 0.3600 17.10 6.16
ADITIVO gal 0.0050 35.10 0.18
ACEITE MOTOR GASOLINERO MULTIGRADO gal 0.0040 50.20 0.20
GASOLINA 84 OCTANOS gal 0.2400 9.82 2.36
AGUA m3 0.0200 9.00 0.18
AGREGADO m3 0.1300 32.00 4.16
13.23
Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN %MO 7.0000 18.89 1.32
MEZC. DE CONCRETO TIPO TAMBOR 18 HP 7 Pie 3 hm 1.0000 0.1600 7.44 1.19
2.51

Partida 2.8,3.7 CONCRETO f'c=210 kg/cm2

SZ-11-327 30 de 43
ANALISIS DE COSTOS UNITARIOS
OBRAS CIVILES LNEA SUBTERRANEA 138 KV SOCABAYA - PARQUE INDUSTRIAL
Rendimiento m3/DIA 15.0000 EQ. 15.0000 Costo unitario directo por : m3 323.79

Cdigo Descripcin Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
INGENIERO DE SEGURIDAD 0.1000 0.0533 52.5000 2.8000
CAPATAZ hh 0.5000 0.2667 17.3700 4.6320
OPERARIO hh 1.0000 0.5333 14.9200 7.9573
OFICIAL hh 1.0000 0.5333 12.9700 6.9173
PEON hh 10.0000 5.3333 11.7000 62.4000
84.71
Materiales
CEMENTO PORTLAND TIPO I bls 10.0000 17.10 171.00
ADITIVO gal 0.1230 35.10 4.32
ACEITE MOTOR GASOLINERO MULTIGRADO gal 0.0067 50.20 0.34
GASOLINA 84 OCTANOS gal 0.5000 9.82 4.91
AGUA m3 0.2500 9.00 2.25
AGREGADO m3 1.3250 32.00 42.40
225.21
Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN %MO 7.0000 84.71 5.93
VIBRADOR DE CONCRETO 4 HP 1.50" hm 1.0000 0.5333 5.30 2.83
MEZC. DE CONCRETO TIPO TAMBOR 18 HP 7 11-13 Pie 3 hm 1.0000 0.5333 9.58 5.11
13.87

Partida 2.9 RELLENO CON MATERIAL DE PRESTAMO

Rendimiento ml/DIA 45.0000 EQ. 45.0000 Costo unitario directo por : ml 42.13

Cdigo Descripcin Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
INGENIERO DE SEGURIDAD hh 0.1000 0.0178 52.50 0.93
CAPATAZ hh 0.2500 0.0444 17.37 0.77
OPERARIO hh 1.0000 0.1778 14.92 2.65
PEON hh 2.0000 0.3556 11.70 4.16
8.52
Materiales
RELLENO COMPACTADO PROPIO PARA ZANJA m3 1.0000 10.00 10.00
10.00
Equipos
CAMIN PLATAFORMA 4X2, 122 HP, 8 TON hm 1.0000 0.1778 125.25 22.27
COMPACTADORA VIBRADOR TIPO PLANCHA 7 HP hm 0.2000 0.0356 21.10 0.75
HERRAMIENTAS MANUALES Y EQUIPOS DE PROTECCIN %MO 7.0000 8.52 0.60
23.61

Partida 2.10 RELLENO CON MATERIAL PROPIO

Rendimiento ml/DIA 45.0000 EQ. 45.0000 Costo unitario directo por : ml 33.60

Cdigo Descripcin Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
INGENIERO DE SEGURIDAD hh 0.1000 0.0178 52.50 0.93
CAPATAZ hh 0.2500 0.0444 17.37 0.77
OPERARIO hh 1.0000 0.1778 14.92 2.65
PEON hh 2.0000 0.3556 11.70 4.16
8.52
Equipos
Camin plataforma 4x2, 122 HP, 8 TON hm 1.0000 0.1778 125.25 22.27
Compactadora vibrador tipo plancha 7 HP hm 0.2000 0.0356 21.10 0.75

SZ-11-327 31 de 43
ANALISIS DE COSTOS UNITARIOS
OBRAS CIVILES LNEA SUBTERRANEA 138 KV SOCABAYA - PARQUE INDUSTRIAL
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN %MO 7.0000 8.52 2.06
25.08

Partida 2.11 REPOSICIN DE JARDINES

Rendimiento m2/DIA 30.0000 EQ. 30.0000 Costo unitario directo por : m2 121.11

Cdigo Descripcin Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
INGENIERO DE SEGURIDAD hh 0.1000 0.0178 52.50 0.93
CAPATAZ hh 0.2500 0.0444 17.37 0.77
OPERARIO hh 1.0000 0.1778 14.92 2.65
PEON hh 2.0000 0.3556 11.70 4.16
8.52
Materiales
GRASS BLOCK MODELO TIPO MICHI O TIPO 8 m3 1.0000 112.00 112.00
112.00
Equipos
HERRAMIENTAS MANUALES Y EQUIPOS DE PROTECCIN %MO 7.0000 8.52 0.60
0.60

Partida 2.12 CINTA DE SEALIZACIN, COMPRENDE EL SUMINISTRO E INSTALACIN

Rendimiento m/DIA 36.0000 EQ. 36.0000 Costo unitario directo por : m 8.23

Cdigo Descripcin Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
INGENIERO DE SEGURIDAD hh 0.1000 0.0222 52.50 1.17
CAPATAZ hh 0.1000 0.0222 17.37 0.39
OPERARIO hh 0.1000 0.0222 14.92 0.33
PEON hh 2.0000 0.4444 11.70 5.20
7.08
Materiales
CINTA SEALIZADORA m3 1.0000 0.65 0.65
0.65
Equipos
HERRAMIENTAS MANUALES Y EQUIPOS DE PROTECCIN %MO 7.0000 7.08 0.50
0.50

Partida 2.13 TUBO PVC 6" CLASE 5. INCLUYE SUMINISTRO E INSTALACIN

Rendimiento m/DIA 33.0000 EQ. 33.0000 Costo unitario directo por : m 26.27

Cdigo Descripcin Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
INGENIERO DE SEGURIDAD hh 0.1000 0.0242 52.50 1.27
CAPATAZ hh 0.1000 0.0242 17.37 0.42
OPERARIO hh 0.1000 0.0242 14.92 0.36
PEON hh 2.0000 0.4848 11.70 5.67
7.73
Materiales
TUBO PVC 6"CLASE5 m3 1.0000 18.00 18.00
18.00
Equipos
HERRAMIENTAS MANUALES Y EQUIPOS DE PROTECCIN %MO 7.0000 7.73 0.54
0.54

Partida 2.14 TUBO PVC 3" CLASE 5. INCLUYE SUMINISTRO E INSTALACIN

SZ-11-327 32 de 43
ANALISIS DE COSTOS UNITARIOS
OBRAS CIVILES LNEA SUBTERRANEA 138 KV SOCABAYA - PARQUE INDUSTRIAL

Rendimiento m/DIA 33.0000 EQ. 33.0000 Costo unitario directo por : m 16.80

Cdigo Descripcin Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
INGENIERO DE SEGURIDAD hh 0.1000 0.0242 52.50 1.27
CAPATAZ hh 0.1000 0.0242 17.37 0.42
OPERARIO hh 0.1000 0.0242 14.92 0.36
PEON hh 2.0000 0.4848 11.70 5.67
7.73
Materiales
TUBO PVC 3"CLASE5 m3 1.0000 8.53 8.53
8.53
Equipos
HERRAMIENTAS MANUALES Y EQUIPOS DE PROTECCIN %MO 7.0000 7.73 0.54
0.54

Partida 3.8 ACERO DE REFUERZO fy=4200 kg/cm2

Rendimiento kg/DIA 200.0000 EQ. 200.0000 Costo unitario directo por : kg 5.82

Cdigo Descripcin Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.
Mano de Obra
INGENIERO DE SEGURIDAD 0.1000 0.0040 52.50 0.21
CAPATAZ hh 0.2000 0.0080 17.37 0.14
OPERARIO hh 1.0000 0.0400 14.92 0.60
OFICIAL hh 2.0000 0.0800 12.97 1.04
1.98
Materiales
ALAMBRE kg 0.0900 4.15 0.37
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 1.0500 3.17 3.33
3.70
Equipos
HERRAMIENTAS MANUALES y EQUIPOS DE PROTECCIN %MO 7.0000 1.98 0.14
0.14

Partida 3.9 TAPA DE F G D=0,80 m

Rendimiento und/DIA EQ. Costo unitario directo por : und 120.00

Cdigo Descripcin Recurso Unidad Cuadrilla Cantidad Precio S/. Parcial S/.

TAPA DE F G DIAMETRO =0,80M und 1.0000 120.00 120.00


120.00

SZ-11-327 33 de 43
PLANILLA DE ESTRUCTURAS (LINEA AEREA)
PROYECTO : LINEA 138KV SOCABAYA - PARQUE INDUSTRIAL
Hipotesis : MAXIMA TEMPERATURA

Tipo Tipo Cable de Progresiva Cota Vrtice Angulo Vano Altura de Vano Vano Amortig. Amortig. Resist. Puesta a tierra Volumen de
Tipo de
N Comunicaci Viento(m prom (ohm- long. N Cimentacin
Armado N estruc. Conductor (m) (m) Deflexin Adelante(m soporte CP CG Tipo suelo
n Peso(m) ) m) Cont varillas (m3)
)
0 PORTICO 1 AAAC-240 OPGW-70 0.00 2382.65 50.00 12 m -11.08 25.00 0 0 - - - I -
1 TR 1 AAAC-240 OPGW-70 50.00 2382.65 V0 -4050'16.02" 124.07 30 m 116.86 87.04 0 0 600 PAT-E 50 - I 18.07
2 TR 1 AAAC-240 OPGW-70 174.07 2384.15 V1 1543'23.98" 127.96 30 m 156.07 126.01 6 2 600 PAT-E 50 - I 18.07
3 SMD 1 AAAC-240 OPGW-70 302.03 2389.30 151.13 80 pies 76.13 139.54 0 0 500 PAT-D 40 - I 7.75
4 SMD 1 AAAC-240 OPGW-70 453.16 2394.00 123.10 85 pies 183.23 137.12 6 2 300 PAT-C 20 - I 8.41
5 SMD 1 AAAC-240 OPGW-70 576.26 2395.00 231.08 80 pies 255.32 177.09 0 0 160 PAT-C 10 - I 7.75
6 SMD 1 AAAC-240 OPGW-70 807.34 2377.14 99.36 80 pies 91.07 165.22 0 0 75 PAT-C 10 - I 7.75
7 SMD 1 AAAC-240 OPGW-70 906.70 2376.17 85.18 80 pies 59.04 92.27 0 0 50 PAT-1 - 1 I 7.75
8 A3M 1 AAAC-240 OPGW-70 991.88 2369.10 V2 904'34.99" 82.12 120 pies 201.00 83.65 0 0 50 PAT-1 - 1 I 14.99
9 A2M 1 AAAC-240 OPGW-70 1074.00 2364.00 V3 -4645'15.00" 97.36 100 pies 1.31 89.74 0 0 50 PAT-1 - 1 I 10.78
10 SMD 1 AAAC-240 OPGW-70 1171.37 2362.45 137.75 100 pies 442.86 117.56 6 2 50 PAT-1 - 1 I 10.78
11 A2M 1 AAAC-240 OPGW-70 1309.12 2310.00 V4 4642'38.99" 369.16 120 pies -41.64 253.46 6 2 20 PAT-1 - 1 I 14.99
12 A1M 1 AAAC-240 OPGW-70 1678.28 2302.15 V5 729'50.00" 382.69 120 pies 379.68 375.92 0 0 125 PAT-C 10 - I 14.99
13 A1M 1 AAAC-240 OPGW-70 2060.97 2293.40 V6 -1647'10.02" 144.37 120 pies 283.98 263.53 6 2 500 PAT-D 40 - I 14.99
14 A1M 1 AAAC-240 OPGW-70 2205.34 2292.14 V7 1020'1.03" 179.91 100 pies 150.52 162.14 6 2 350 PAT-C 25 - I 10.78
15 A1M 1 AAAC-240 OPGW-70 2385.25 2289.10 V8 -140'56.98" 194.76 90 pies 200.53 187.34 6 2 220 PAT-C 20 - I 9.14
16 A1M 1 AAAC-240 OPGW-70 2580.01 2283.60 V9 -1344'55.00" 187.97 80 pies 132.94 191.36 6 2 110 PAT-C 10 - I 7.75
17 SMD 1 AAAC-240 OPGW-70 2767.98 2279.00 V10 -055'47.97" 288.95 100 pies 291.34 238.46 6 2 80 PAT-C 10 - I 10.78
18 SMD 1 AAAC-240 OPGW-70 3056.93 2268.70 V11 -023'35.97" 211.52 100 pies 198.33 250.23 6 2 70 PAT-C 10 - I 10.78
19 TR 1 AAAC-240 OPGW-70 3268.45 2265.90 V12 244'9.99" 384.35 33 m 348.87 297.93 6 2 72 PAT-E 10 - I 22.20
20 TR 1 AAAC-240 OPGW-70 3652.80 2255.81 V12A -8314'1.00" 225.76 33 m 291.14 305.06 0 0 38 PAT-E 10 - I 22.20
21 A2M 1 AAAC-240 OPGW-70 3878.56 2254.00 V13 -3340'22.98" 28.83 110 pies 145.24 127.30 0 0 30 PAT-E 10 - I 12.68
22 A1M 1 AAAC-240 OPGW-70 3907.39 2255.90 V14 1322'10.00" 128.53 110 pies 33.89 78.68 6 2 20 PAT-1 - 1 I 12.68
23 A1M 1 AAAC-240 OPGW-70 4035.92 2257.31 178.77 90 pies 125.58 153.65 0 0 20 PAT-1 - 1 I 9.14
24 A1M 1 AAAC-240 OPGW-70 4214.69 2259.50 V15 67'50.98" 107.18 120 pies 168.50 142.98 0 0 25 PAT-1 - 1 I 12.68
25 A1M 1 AAAC-240 OPGW-70 4321.87 2261.50 V16 -1415'29.00" 104.58 120 pies 130.33 105.88 0 0 25 PAT-1 - 1 I 12.68
26 A1M 1 AAAC-240 OPGW-70 4426.45 2264.13 V17 -624'36.01" 113.39 100 pies 69.22 108.98 0 0 80 PAT-C 10 - I 10.78
27 SM 1 AAAC-240 OPGW-70 4539.84 2265.56 124.97 110 pies 155.48 119.18 0 0 95 PAT-C 10 - I 12.68
28 A1M 1 AAAC-240 OPGW-70 4664.81 2271.32 V18 636'21.01" 91.28 85 pies 86.80 108.12 0 0 110 PAT-C 10 - I 8.41
29 SM 1 AAAC-240 OPGW-70 4756.09 2272.13 110.00 85 pies 105.70 100.64 0 0 150 PAT-C 10 - I 8.41
30 SM 1 AAAC-240 OPGW-70 4866.09 2273.44 100.64 85 pies 101.82 105.32 0 0 175 PAT-C 10 - I 8.41
31 SM 1 AAAC-240 OPGW-70 4966.73 2275.39 100.64 85 pies 117.55 100.64 0 0 225 PAT-C 20 - I 8.41
32 SM 1 AAAC-240 OPGW-70 5067.37 2275.77 100.64 80 pies 79.84 100.64 0 0 240 PAT-C 20 - I 7.75
33 SM 1 AAAC-240 OPGW-70 5168.01 2276.87 100.64 85 pies 105.80 100.64 0 0 250 PAT-C 20 - I 8.41
34 SM 1 AAAC-240 OPGW-70 5268.65 2278.67 100.68 85 pies 107.46 100.66 0 0 255 PAT-C 20 - I 8.41
35 SM 1 AAAC-240 OPGW-70 5369.33 2280.87 76.44 80 pies 83.46 88.56 0 0 260 PAT-C 20 - I 7.75
36 SM 1 AAAC-240 OPGW-70 5445.77 2282.16 99.37 80 pies 73.93 87.91 0 0 270 PAT-C 20 - I 7.75
37 SM 1 AAAC-240 OPGW-70 5545.14 2284.72 99.37 85 pies 114.52 99.37 0 0 270 PAT-C 20 - I 8.41
38 SM 1 AAAC-240 OPGW-70 5644.51 2286.09 99.37 85 pies 97.77 99.37 0 0 260 PAT-C 20 - I 8.41
SM SDM A1M
0-5 6-30
CANTIDAD 28 8 20

1 Aislador polimerico tipo line post 3 3 3


2 Aislador polimerico tipo Suspensin 6
3 Horquilla ojo 3 3 3
4 Grapa de suspensin tipo perno para conductor 375 mm2 AAAC 3 3 3
5 Grapa de Anclaje tipo comprensin para conductor de 375 mm2 AAAC 0 0 6
6 Varilla de armar para conductor 375 mm2 AAAC 3 3 3
7 Suple metalico de 0.50 m de longitud 3 3 3
8 Grillete de ''A'' G'' 1 1 8
9 Anillo bola 0 0 6
10 horquilla bola 0 0 0
11 Alargaderas Horquilla 0 0 0
12 Horquillas bola paralela 0 0 0
13 Abrazadera Metlica 0 0 0
14 Eslabn revirado 1 1 2
15 Grapa de suspensin para cable de fibra ptica OPGW. 1 1 0
16 Extensin Metlica para cable de Guarda. 0 0 0
17 Perno Ojo 0 0 0
18 Plancha de ''A'' G'' 0 0 0
19 Bola Ojo 0 0 0
20 Rotula ojal
21 Aislador Polimerico tipo Tension 0 0 0
22 Conector a Tierra
23 Sujetador y Guardacabo
24 Conector de 2 vias 0 0 1
25 Amarre preformado de retencion
26 Alargador ojo Horquilla
27 Terminal 138KV
28 Abrazadera Metlica de 1 hueco
29 Abrazadera Metlica de 3 hueco
30 Oreja para conexin
31 Tensor de Corredera 0 0 2
32 Guarda cabo para OPGW 2
33 Retensiones Preformadas 2
34 Conector de una via de AG para conexin de cable de puesta a tierra a poste 0 0 1
35 Conector bimetlico de puesta a tierra
36 Manguito
TOTAL POR ARMADO SM SDM A1M
1 Aislador polimerico tipo line post 84 24 60
2 Aislador polimerico tipo Suspensin 0 0 120
3 Horquilla ojo 84 24 60
4 Grapa de suspensin tipo perno para conductor 375 mm2 AAAC 84 24 60
5 Grapa de Anclaje tipo comprensin para conductor de 375 mm2 AAAC 0 0 120
6 Varilla de armar para conductor 375 mm2 AAAC 84 24 60
7 Suple metalico de 0.50 m de longitud 84 24 60
8 Grillete de ''A'' G'' 28 8 160
9 Anillo bola 0 0 120
10 horquilla bola 0 0 0
11 Alargaderas Horquilla 0 0 0
12 Horquillas bola paralela 0 0 0
13 Abrazadera Metlica 0 0 0
14 Eslabn revirado 28 8 40
15 Grapa de suspensin para cable de fibra ptica OPGW. 28 8 0
16 Extensin Metlica para cable de Guarda. 0 0 0
17 Perno Ojo 0 0 0
18 Plancha de ''A'' G'' 0 0 0
19 Bola Ojo 0 0 0
20 Rotula ojal 0 0 0
21 Aislador Polimerico tipo Tension 0 0 0
22 Conector a Tierra 0 0 0
23 Sujetador y Guardacabo 0 0 0
24 Conector de 2 vias 0 0 20
25 Amarre preformado de retencion 0 0 0
26 Alargador ojo Horquilla 0 0 0
27 Terminal 138KV 0 0 0
28 Abrazadera Metlica de 1 hueco 0 0 0
29 Abrazadera Metlica de 3 hueco 0 0 0
30 Oreja para conexin 0 0 0
31 Tensor de Corredera 0 0 40
32 Guarda cabo para OPGW 0 0 40
33 Retensiones Preformadas 0 0 40
34 Conector de una via de AG para conexin de cable de puesta a tierra a poste 0 0 20
35 Conector bimetlico de puesta a tierra 0 0 0
36 Manguito 0 0 0
#VALUE!
A2M A3M PTM TR
PORTICO
31-60 61-90 T. TENS Unid TOTAL TOTAL TOTAL
8 3 4 4 0 P.Metal P.concreto TR

3 0 0 0 192 #REF! 0
6 6 3 6 0 198 #REF! 24
3 0 0 3 192 #REF! 0
3 0 0 3 192 #REF! 0
6 6 3 6 6 198 #REF! 24
3 0 0 0 3 192 #REF! 0
3 0 0 0 3 192 #REF! 0
8 8 4 8 7 300 #REF! 32
6 6 3 6 0 198 #REF! 24
0 0 0 0 6 0 #REF! 0
0 0 0 0 0 0 #REF! 0
0 0 0 0 0 0 #REF! 0
0 0 0 0 0 0 #REF! 0
2 2 2 0 1 106 #REF! 0
0 0 0 0 1 36 #REF! 0
0 0 0 0 1 0 #REF! 0
0 0 0 0 1 0 #REF! 0
0 0 0 0 1 0 #REF! 0
0 0 0 0 0 0 #REF! 0
6 0 0 #REF! 24
0 0 0 0 3 0 #REF! 0
0 0
0 0
1 1 1 1 0
0 0
0 0
3 0
1 0
3 0
0 0
2 2 1 2 0
2 2 1 2 0
2 2 1 2 2
1 1 1 1 0
0 0

A2M A3M PTM TR. TENS


24 0 0 0 0 PARTE SUBTERRANEA
48 18 12 24 0
24 0 0 0 0 FASE C.GUARDA
24 0 0 0 0 8.51 8.56
48 18 12 24 0 32.45 30.37
24 0 0 0 0 56.61 56.52
24 0 0 0 0 143.37 143.19
64 24 16 32 0 15.2 12.23
48 18 12 24 0 27.71 26.48
0 0 0 0 0 71.65 71.54
0 0 0 0 0 69.58 69.47
0 0 0 0 0 170.14 169.93
0 0 0 0 0 42.77 42.7
16 6 8 0 0 36.18 36.11
0 0 0 0 0 28.68 28.63
0 0 0 0 0 23.12 23.08
0 0 0 0 0 23.91 23.86
0 0 0 0 0 23.37 17.97
0 0 0 0 0 TOTAL 719.95 760.64
0 0 0 24 0
0 0 0 0 0
0 0 0 0 0 2267.8425
0 0 0 0 0
8 3 4 4 0
0 0 0 0 0
0 0 0 0 0
0 0 12 0 0
0 0 4 0 0
0 0 12 0 0
0 0 0 0 0
16 6 4 8 0
16 6 4 8 0
16 6 4 8 0
8 3 4 4 0
0 0 0 0 0
0 0 0 0 0
CONDUCTORES
Descripci Cantidad(m)
AAAC-375 9530.63
OPGW-76 9650.758
TOTAL : 19310.13

2387.8425
AAAC-375 8810.68 8.811
OPGW-76 8810.68 8.811