1.1
1.1.1
1.1.2
1.1.3
1.2
1.2.1
1.2.2
1.2.3
1.3
1.3.1
1.3.2
1.3.3
1.3.4
1.3.5
1.3.6
1.3.7
1.4
1.4.1
1.4.1.1
1.4.1.2
1.5
1.5.1
1.5.1.1
1.5.1.2
1.5.2
1.5.2.1
1.5.2.2
1.5.3
1.5.3.1
1.5.3.2
1.5.3.3
1.6
1.6.1
1.7
1.7.1
1.7.2
2
2.1
2.1.1
2.1.2
2.1.3
2.1.4
2.2
2.2.1
2.2.2
2.2.3
2.2.4
2.2.5
2.2.6
2.2.7
2.2.8
2.2.9
2.2.10
2.2.11
2.2.12
2.2.13
2.2.14
2.3
2.3.1
2.3.2
2.3.3
2.3.4
2.4
2.4.1
2.5
2.5.1
2.6
2.6.1
2.6.2
3
3.1
3.1.1
3.2
3.2.1
3.2.2
3.2.3
3.2.4
3.2.5
3.3
3.3.1
3.4
3.4.1
3.4.2
3.4.3
3.4.4
3.4.5
3.4.6
3.4.7
3.4.8
3.5
3.5.1
3.6
3.6.1
3.6.2
4
4.1
4.1.1
4.2
4.2.1
4.2.2
4.2.3
4.2.4
4.2.5
4.2.6
4.3
4.3.1
4.3.2
4.3.3
4.3.4
4.3.5
4.4
4.4.1
4.4.2
4.5
4.5.1
4.5.2
Descripcin
PAVIMENTOS
OBRAS PRELIMINARES
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m
ALQUILER DE ALMACEN PARA LA OBRA
MOVILIZACION Y DESMOVILIZACION DE EQUIPO
TRABAJOS AUXILIARES
TRAZO, NIVEL Y REPLANTEO
SEALIZACIONES DESVIOS EN VIA DE GRAN TRANSITO
TALA Y RETIRO DE ARBOLES
MOVIMIENTO DE TIERRAS
CORTE DE MATERIAL SUELTO
CONFORMACION DE SUB RASANTE
SUB BASE DE AFIRMADO E= 0.15 m
BASE GRANULAR E=0.20 m
EXCAVACION MANUAL PARA SARDINELES H=0.30M A=0.15M
EXCAVACION MANUAL PARA BORDILLOS H=0.15M A=0.30M
ELIMINACION DE MATERIAL EXCEDENTE DP=5KM
VIAS CON BLOQUETAS
PAVIMENTO CON BLOQUETA
CAMA DE ARENA E=0.05M
COLOCACION DE ADOQUINES DE CONCRETO 6X10X20CM FC=420KG/CM2
CONCRETO SIMPLE
SARDINEL SUMERGIDO
ENCOFRADO Y DESENCOFRADO DE SARDINELES H=0.125M
CONCRETO f'c=175 kg/cm2 PARA SARDINEL SUMERGIDO
SARDINEL PERALTADO
CONCRETO f'c= 175 kg/cm2 PARA ANCLAJES DE BORDILLOS
SARDINEL CON BORDILLOS DE CONCRETO 44x15x25CM fc=280Kg/cm2
LOSAS DE CONCRETO SIMPLE
ENCOFRADO Y DESENCOFRADO PARA LOSA E=0.20M
CONCRETO f'c= 210 kg/cm2 EN LOSAS
CURADO DE CONCRETO
SEALIZACION
MARCAS EN EL PAVIMENTO
VARIOS
JUNTAS DE DILATACION E=1"
LIMPIEZA GENERAL DE LA OBRA
DESAGE
TRABAJOS AUXILIARES
TRAZO, NIVELACION Y REPLANTEO
BOMBEO DE AGUAS SERVIDAS
RETIRO DE BLEOQUETA EXISTENTE 10x20x6mm
COLOCACION DE ADOQUINES DE CONCRETO 6X10X20CM FC=420KG/CM2
MOVIMIENTO DE TIERRAS
DEMOLICION DE BUZON EXISTENTE HASTA H=1.50m
DEMOLICION DE BUZON EXISTENTE HASTA H=2.00m
DEMOLICION DE BUZON EXISTENTE HASTA H=2.50m
EXCAVACION EN TERRENO NATURAL PARA CAJA DE REGISTRO DE DESAGE Y/O DESAGUE
EXCAVACION MANUAL DE DE ZANJA EN TERRENO NORMAL HASTA H=1.20M PARA CONEXIONES DO
EXCAVACION DE ZANJA EN TERRENO NORMAL C/MAQUINA HASTA H=1.50M
EXCAVACION DE ZANJA EN TERRENO NORMAL C/MAQUINA HASTA H=2.00M
EXCAVACION DE ZANJA EN TERRENO NORMAL C/MAQUINA HASTA H=2.50M
REFINE Y NIVELACION ZANJA EN TERRENO NORMAL
RELLENO Y COMPACTACION DE ZANJA C/MATERIAL PROPIO HASTA H=1.20M
RELLENO Y COMPACTACION DE ZANJA C/MATERIAL PROPIO HASTA H=1.50M
RELLENO Y COMPACTACION DE ZANJA C/MATERIAL PROPIO HASTA H=2.00M
RELLENO Y COMPACTACION DE ZANJA C/MATERIAL PROPIO HASTA H=2.50M
ELIMINACION DE MATERIAL EXCEDENTE DP=5KM
BUZONES
BUZON =1.20M, HASTA H=1.50M
BUZON =1.20M, HASTA H=2.00M
BUZON =1.20M, HASTA H=2.50M
DADO DE CONCRETO 0.40X0.40X0.40 FC=140KG/CM2
TUBERIA DESAGUE
SUMINISTRO E INSTALACION DE TUBERIA PVC SAL UF De=200mm S-20
CONEXIONES DOMICILIARIAS
CONEXION DOMICILIARIA DE DESAGE LPROM=6.00M 6" A RED DE 8"
VARIOS
PRUEBA HIDRAULICA + ESCORRENTIA DE TUBO 8" (200 mm) A ZANJA TAPADA
LIMPIEZA GENERAL DE LA OBRA
AGUA
TRABAJOS AUXILIARES
TRAZO, NIVELACION Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL HASTA H=1.00mpp
EXCAVACION EN TERRENO NATURAL PARA CAJA DE REGISTRO DE DESAGE Y/O DESAGUE
REFINE Y NIVELACION ZANJA EN TERRENO NORMAL
RELLENO Y COMPACTACION DE ZANJA C/MATERIAL PROPIO HASTA H=1.00M
ELIMINACION DE MATERIAL EXCEDENTE DP=5KM
TUBERIAS
SUMINISTRO E INSTALACION DE TUBERIA PVC SAP UF C-7.5 De=110mm
ACCESORIOS PARA REDES DE AGUA POTABLE
SUMINISTRO E INSTALACION DE TEE PVC 110MM
SUMINISTRO E INSTALACION DE CRUZ PVC 110mm x 110mm UF C-7.5
SUMINISTRO E INSTALACION DE TEE PVC UF 160mmX110mm
VALVULA COMPUERTA DE FIERRO FUNDIDO DE 4" TIPO MAZZA
UNION DE REPARACION 110mm
UNION DE REPARACION 160mm
SUMINISTRO E INSTALACION DE GRIFO CONTRA INCENDIO POSTE DE 2 BOCAS
DADO DE CONCRETO 0.40X0.40X0.40 FC=140KG/CM2
CONEXIONES DOMICILIARIAS
CONEXION AGUA D=1/2" Lprom=6.00m
VARIOS
PRUEBA HIDRAULICA + DESINFECCION TUBERIA 4" (110 mm) A ZANJA TAPADA
LIMPIEZA GENERAL DE LA OBRA
VEREDAS
TRABAJOS AUXILIARES
TRAZO, NIVEL Y REPLANTEO
MOVIMIENTO DE TIERRAS
DEMOLICION DE VEREDAS DE 0.10 m
EXCAVACION MANUAL PARA VEREDAS
EXCAVACION MANUAL PARA UAS H=0.20M A=0.10M
CONFORMACION DE SUB RASANTE CON EQUIPO LIVIANO
COLOCACION DE BASE DE AFIRMADO E=0.15 m CON EQUIPO LIVIANO
ELIMINACION DE MATERIAL EXCEDENTE DP=5KM
VEREDAS DE CONCRETO
CONCRETO SIMPLE
ENCOFRADO Y DESENCOFRADO DE VEREDAS H=0.10M
CONCRETO f'c=175 Kg/cm2 PARA VEREDAS DE CONCRETO H=0.10M
CONCRETO f'c=175 Kg/cm2 PARA UAS
CURADO DE CONCRETO
RAMPAS DE CONCRETO
ENCOFRADO Y DESENCOFRADO DE VEREDAS H=0.10M
RAMPA DE CONCRETO fc=140kg/cm2 PARA DISCAPACITADOS
VARIOS
JUNTAS DE DILATACION E=1"
LIMPIEZA GENERAL DE LA OBRA
MES 1 MES 2 MES 3 MES 4
100%
20% 20% 20% 20%
50%
100%
20% 20% 20% 20%
100%
100%
60%
50%
30%
100%
100%
100%
100%
100%
100%
100%
E Y/O DESAGUE 100%
M PARA CONEXIONES DOMICIL 100%
100%
100%
100%
100%
30% 70%
80% 20%
100%
100%
100%
100%
100%
100%
50% 50%
50% 50%
30% 70%
100%
100%
100%
20% 80%
E Y/O DESAGUE 50% 50%
20% 80%
100%
100%
20% 80%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
20%
80%
MES 5 TOTAL
100%
20% 100%
50% 100%
100%
20% 100%
100%
100%
40% 100%
50% 100%
70% 100%
100% 100%
100% 100%
100% 100%
100% 100%
100% 100%
100% 100%
100% 100%
100% 100%
100% 100%
100% 100%
100% 100%
100% 100%
100% 100%
100% 100%
100% 100%
100% 100%
100% 100%
100% 100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
80% 100%
20% 100%
100% 100%
100% 100%
100% 100%
100% 100%
100% 100%
100% 100%
100% 100%
100% 100%
100% 100%
100% 100%
100% 100%
CRONOGRAMA VALORIZADO DE OBRA
Descripcin MES 1 MES 2 MES 3 MES 4 MES 5 TOTAL
759,198.73
1 PAVIMENTOS
3,578.60
1.1 OBRAS PRELIMINARES
578.60
1.1.1 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m 578.60 - - - - 578.60
2,000.00
1.1.2 ALQUILER DE ALMACEN PARA LA OBRA 400.00 400.00 400.00 400.00 400.00 2,000.00
1,000.00
1.1.3 MOVILIZACION Y DESMOVILIZACION DE EQUIPO 500.00 - - - 500.00 1,000.00
11,503.83
1.2 TRABAJOS AUXILIARES - - - - -
7,592.63
1.2.1 TRAZO, NIVEL Y REPLANTEO 7,592.63 - - - - 7,592.63
3,504.30
1.2.2 SEALIZACIONES DESVIOS EN VIA DE GRAN TRANSITO 700.86 700.86 700.86 700.86 700.86 3,504.30
406.90
1.2.3 TALA Y RETIRO DE ARBOLES 406.90 - - - - 406.90
207,281.63
1.3 MOVIMIENTO DE TIERRAS - - - - -
15,237.83
1.3.1 CORTE DE MATERIAL SUELTO 15,237.83 - - - - 15,237.83
8,481.13
1.3.2 CONFORMACION DE SUB RASANTE - - - 5,088.68 3,392.45 8,481.13
56,783.21
1.3.3 SUB BASE DE AFIRMADO E= 0.15 m - - - 28,391.61 28,391.61 56,783.21
83,599.74
1.3.4 BASE GRANULAR E=0.20 m - - - 25,079.92 58,519.82 83,599.74
268.26
1.3.5 EXCAVACION MANUAL PARA SARDINELES H=0.30M A=0.15M - - - - 268.26 268.26
3,504.40
1.3.6 EXCAVACION MANUAL PARA BORDILLOS H=0.15M A=0.30M - - - - 3,504.40 3,504.40
39,407.06
1.3.7 ELIMINACION DE MATERIAL EXCEDENTE DP=5KM - - - - 39,407.06 39,407.06
438,434.21
1.4 VIAS CON BLOQUETAS - - - - -
438,434.21
1.4.1 PAVIMENTO CON BLOQUETA - - - - -
27,301.17
1.4.1.1 CAMA DE ARENA E=0.05M - - - - 27,301.17 27,301.17
411,133.04
1.4.1.2 COLOCACION DE ADOQUINES DE CONCRETO 6X10X20CM FC=420KG/CM2 - - - - 411,133.04 411,133.04
89,887.55
1.5 CONCRETO SIMPLE - - - - -
4,745.46
1.5.1 SARDINEL SUMERGIDO
1,853.02
1.5.1.1 ENCOFRADO Y DESENCOFRADO DE SARDINELES H=0.125M - - - - 1,853.02 1,853.02
2,892.44
1.5.1.2 CONCRETO f'c=175 kg/cm2 PARA SARDINEL SUMERGIDO - - - - 2,892.44 2,892.44
80,349.59
1.5.2 SARDINEL PERALTADO
21,276.70
1.5.2.1 CONCRETO f'c= 175 kg/cm2 PARA ANCLAJES DE BORDILLOS - - - - 21,276.70 21,276.70
59,072.89
1.5.2.2 SARDINEL CON BORDILLOS DE CONCRETO 44x15x25CM fc=280Kg/cm2 - - - - 59,072.89 59,072.89
4,792.50
1.5.3 LOSAS DE CONCRETO SIMPLE
573.92
1.5.3.1 ENCOFRADO Y DESENCOFRADO PARA LOSA E=0.20M - - - - 573.92 573.92
4,139.95
1.5.3.2 CONCRETO f'c= 210 kg/cm2 EN LOSAS - - - - 4,139.95 4,139.95
78.63
1.5.3.3 CURADO DE CONCRETO - - - - 78.63 78.63
5,798.69
1.6 SEALIZACION - - - - -
5,798.69
1.6.1 MARCAS EN EL PAVIMENTO - - - - 5,798.69 5,798.69
2,714.22
1.7 VARIOS - - - - -
48.72
1.7.1 JUNTAS DE DILATACION E=1" - - - - 48.72 48.72
2,665.50
1.7.2 LIMPIEZA GENERAL DE LA OBRA - - - - 2,665.50 2,665.50
303,988.52
2 DESAGE - - - - -
7,235.30
2.1 TRABAJOS AUXILIARES - - - - -
2,769.50
2.1.1 TRAZO, NIVELACION Y REPLANTEO 2,769.50 - - - - 2,769.50
3,876.66
2.1.2 BOMBEO DE AGUAS SERVIDAS 3,876.66 - - - - 3,876.66
53.46
2.1.3 RETIRO DE BLEOQUETA EXISTENTE 10x20x6mm 53.46 - - - - 53.46
535.68
2.1.4 COLOCACION DE ADOQUINES DE CONCRETO 6X10X20CM FC=420KG/CM2 - - 535.68 - - 535.68
112,064.87
2.2 MOVIMIENTO DE TIERRAS - - - - -
3,592.26
2.2.1 DEMOLICION DE BUZON EXISTENTE HASTA H=1.50m - 3,592.26 - - - 3,592.26
2,128.80
2.2.2 DEMOLICION DE BUZON EXISTENTE HASTA H=2.00m - 2,128.80 - - - 2,128.80
532.20
2.2.3 DEMOLICION DE BUZON EXISTENTE HASTA H=2.50m - 532.20 - - - 532.20
1,039.19
2.2.4 EXCAVACION EN TERRENO NATURAL PARA CAJA DE REGISTRO DE DESAGE Y/O DE - 1,039.19 - - - 1,039.19
33,971.40
2.2.5 EXCAVACION MANUAL DE DE ZANJA EN TERRENO NORMAL HASTA H=1.20M PARA CO - 33,971.40 - - - 33,971.40
3,349.04
2.2.6 EXCAVACION DE ZANJA EN TERRENO NORMAL C/MAQUINA HASTA H=1.50M - 3,349.04 - - - 3,349.04
2,272.32
2.2.7 EXCAVACION DE ZANJA EN TERRENO NORMAL C/MAQUINA HASTA H=2.00M - 2,272.32 - - - 2,272.32
1,141.92
2.2.8 EXCAVACION DE ZANJA EN TERRENO NORMAL C/MAQUINA HASTA H=2.50M - 1,141.92 - - - 1,141.92
2,827.20
2.2.9 REFINE Y NIVELACION ZANJA EN TERRENO NORMAL - 2,827.20 - - - 2,827.20
37,237.32
2.2.10 RELLENO Y COMPACTACION DE ZANJA C/MATERIAL PROPIO HASTA H=1.20M - 11,171.20 26,066.12 - - 37,237.32
13,577.70
2.2.11 RELLENO Y COMPACTACION DE ZANJA C/MATERIAL PROPIO HASTA H=1.50M - 10,862.16 2,715.54 - - 13,577.70
7,029.99
2.2.12 RELLENO Y COMPACTACION DE ZANJA C/MATERIAL PROPIO HASTA H=2.00M - - 7,029.99 - - 7,029.99
2,733.12
2.2.13 RELLENO Y COMPACTACION DE ZANJA C/MATERIAL PROPIO HASTA H=2.50M - - 2,733.12 - - 2,733.12
632.41
2.2.14 ELIMINACION DE MATERIAL EXCEDENTE DP=5KM - - 632.41 - - 632.41
55,778.72
2.3 BUZONES - - - - -
32,020.02
2.3.1 BUZON =1.20M, HASTA H=1.50M - 32,020.02 - - - 32,020.02
16,353.68
2.3.2 BUZON =1.20M, HASTA H=2.00M - 16,353.68 - - - 16,353.68
4,928.86
2.3.3 BUZON =1.20M, HASTA H=2.50M - 4,928.86 - - - 4,928.86
2,476.16
2.3.4 DADO DE CONCRETO 0.40X0.40X0.40 FC=140KG/CM2 - 1,238.08 1,238.08 - - 2,476.16
48,200.68
2.4 TUBERIA DESAGUE - - - - -
48,200.68
2.4.1 SUMINISTRO E INSTALACION DE TUBERIA PVC SAL UF De=200mm S-20 - 24,100.34 24,100.34 - - 48,200.68
74,110.14
2.5 CONEXIONES DOMICILIARIAS - - - - -
74,110.14
2.5.1 CONEXION DOMICILIARIA DE DESAGE LPROM=6.00M 6" A RED DE 8" - 22,233.04 51,877.10 - - 74,110.14
7,616.13
2.6 VARIOS - - - - -
5,712.10
2.6.1 PRUEBA HIDRAULICA + ESCORRENTIA DE TUBO 8" (200 mm) A ZANJA TAPADA - - 5,712.10 - - 5,712.10
1,904.03
2.6.2 LIMPIEZA GENERAL DE LA OBRA - - 1,904.03 - - 1,904.03
3 AGUA 213,475.62 - - - - -
3.1 TRABAJOS AUXILIARES 2,820.67 - - - - -
3.1.1 TRAZO, NIVELACION Y REPLANTEO 2,820.67 - 2,820.67 - - - 2,820.67
3.2 MOVIMIENTO DE TIERRAS 106,422.70 - - - - -
3.2.1 EXCAVACION MANUAL HASTA H=1.00mpp 42,897.72 - - 8,579.54 34,318.18 - 42,897.72
3.2.2 EXCAVACION EN TERRENO NATURAL PARA CAJA DE REGISTRO DE DESAGE Y/O DE 72.50 - - 36.25 36.25 - 72.50
3.2.3 REFINE Y NIVELACION ZANJA EN TERRENO NORMAL 435.18 - - 87.04 348.14 - 435.18
3.2.4 RELLENO Y COMPACTACION DE ZANJA C/MATERIAL PROPIO HASTA H=1.00M 62,818.72 - - - 62,818.72 - 62,818.72
3.2.5 ELIMINACION DE MATERIAL EXCEDENTE DP=5KM 198.58 - - - 198.58 - 198.58
3.3 TUBERIAS 36,294.50 - - - - -
3.3.1 SUMINISTRO E INSTALACION DE TUBERIA PVC SAP UF C-7.5 De=110mm 36,294.50 - - 7,258.90 29,035.60 - 36,294.50
3.4 ACCESORIOS PARA REDES DE AGUA POTABLE 9,475.26 - - - - -
3.4.1 SUMINISTRO E INSTALACION DE TEE PVC 110MM 1,036.10 - - - 1,036.10 - 1,036.10
3.4.2 SUMINISTRO E INSTALACION DE CRUZ PVC 110mm x 110mm UF C-7.5 194.92 - - - 194.92 - 194.92
3.4.3 SUMINISTRO E INSTALACION DE TEE PVC UF 160mmX110mm 221.40 - - - 221.40 - 221.40
3.4.4 VALVULA COMPUERTA DE FIERRO FUNDIDO DE 4" TIPO MAZZA 2,767.73 - - - 2,767.73 - 2,767.73
3.4.5 UNION DE REPARACION 110mm 1,035.97 - - - 1,035.97 - 1,035.97
3.4.6 UNION DE REPARACION 160mm 725.28 - - - 725.28 - 725.28
3.4.7 SUMINISTRO E INSTALACION DE GRIFO CONTRA INCENDIO POSTE DE 2 BOCAS 2,314.36 - - - 2,314.36 - 2,314.36
3.4.8 DADO DE CONCRETO 0.40X0.40X0.40 FC=140KG/CM2 1,179.50 - - - 1,179.50 - 1,179.50
3.5 CONEXIONES DOMICILIARIAS 52,468.56 - - - - -
3.5.1 CONEXION AGUA D=1/2" Lprom=6.00m 52,468.56 - - - 52,468.56 - 52,468.56
3.6 VARIOS 5,993.93
3.6.1 PRUEBA HIDRAULICA + DESINFECCION TUBERIA 4" (110 mm) A ZANJA TAPADA 4,054.72 - - - 4,054.72 - 4,054.72
3.6.2 LIMPIEZA GENERAL DE LA OBRA 1,939.21 - - - 1,939.21 - 1,939.21
4 VEREDAS 285,909.06 - - - - -
4.1 TRABAJOS AUXILIARES 3,585.56