Contents

Questionnaires and data requirement list of BQPS-III..............................................................................2

Mechanical.............................................................................................................................................2

Electrical................................................................................................................................................3

Civil.......................................................................................................................................................4

Other......................................................................................................................................................4

For CCPP power plant,..............................................................................................................................7

For General Layout of CCPP:................................................................................................................7

For Protection:.......................................................................................................................................7

Email Dated 6th Feb 2017...........................................................................................................................8

1.The regional geological data, fault zone near the factory...................................................................8


Questionnaires and data requirement list of BQPS-
III
Mechanical
1. Please clarify the LHV of Gas.
SEP to respond

2. Please indentify natural gas source and the pipeline interface.


SEP to respond
Following Data is for existing systems at BQPS I
XIII 01.16 GAS Metering Station Diagram
XIII 01.15 SSGC Gas Station

3. Please clarify the annual utility hours of BQPS-III.


As per Business Plan

4. Request for information: the treatment of RO concentrated water for BQPS2.


DATA from BQ Team

5. Request for information: hydrogen pressure MPathe design capacity(Nm3/h)


and maximum storage(Nm3) of hydrogen supply system for BQPS1.
DATA from BQ Team

6. Please provide the makeup water quality of demineralized water treatment system
for BQPS1 and be requested to confirm whether the makeup water will be used for
BQPS3 or not.
DATA from BQ Team

7.Please provide parameters and documents of auxiliary cooling water pump for Unit
3&4 Including headcapacityCharacteristic Curve.
DATA from BQ Team
8. Please provide parameters of Circulating water drainage facilities of the old plant.
DATA from BQ Team

9. Please provide the parameters of the old plant of domestic water and sewage water
treatment system.
DATA from BQ Team

10. Please provide the parameters of the old plant of Fire-fighting equipment, piping
layout.
DATA from BQ Team

Electrical
1. Please provide the construction and civil work diagram of 220kV
GIS room, including the whole GIS room. We only have the
construction and civil work diagram of the extension part.

220 KV SF6 Switch Gera Building ( Plan, elevation, section ,schedule


) Drawing no. 1481-61/03-B1540 -001

2. Please provide the foundation diagram of the whole 220kV GIS


room. We only have the extension part now.

220 KV SF6 Switch Gear Building ( Foundation , Plan & detail )


Drawing no. 1481-61/03 -G1540 -001

Instruction Manual for 220KV SF6 Gas Insulated Switchgear


DWG No: 311-1BA02958
DWG No: 311-1DA02959
DWG No: 311-1VO5894

220KV GAS Insulated Switchgear


DWG No: 311-1BA30116 Rev. 3
DWG No.: 311-1BA30117 Rev.1

3. Please provide the cable duct pipe and electrical trench of the
whole GIS room.

220 KV SF6 Switch Gear building ( Detail of cable 1481-61/03-G1540-


1 trench) 002
1481-61/03-G1430-
2 cable duct pipe & Electrical trench( General lay out ) 002
cable duct pipe & Electrical trench ( General lay 1481-61/03-G1430-
3 out ) 002
1481-61/03-G1540-
4 220 KV Switch Gear building ( Detail of cable Duct) 004
220 KV Switch Gear building ( Detail of cable Duct 880-A09-10-05-9-07-
5 1) 04B
220 KV Switch Gear building ( Detail of cable Duct 880-A09-10-05-9-07-
6 2) 13 C

4. Please provide the layout of 220kV cable for all unitsconnection


lines and startup-transformersespecially inside GIS room.

DWG No: 311-1BA30115 Rev.3


Title: Layout of 220KV Gas Insulated Switchgear

5. Please provide the electrical protect diagram of GIS.


220KV Overhead Line -1 (PIPRI West Line-1)
Reference: Lot-5; Volume-2; Instruction Manual for 220KV Network
Protection
DWG No: 331DF40447
DWG Title: 220KV O.H. Line Protection <ARA01, ARA02>

220KV Overhead Line -2 (PIPRI West Line-2)


Same as for 220KV Overhead Line -1 (PIPRI West Line-1)

Start-up Transformer ABCT


Reference: Lot-5; Volume-2; Instruction Manual for 220KV Network
Protection
DWG No: 331DF40448
DWG Title: Start-up Transformer Protection <ARA03, ARA04>

220KV Bus Bar Coupler Protection


Reference: Lot-5; Volume-2; Instruction Manual for 220KV Network
Protection
DWG No: 331DF40449
DWG Title: 220KV Bus bar Coupler Protection <ARA07>

Unit#01 & 02 Generator & Transformer Complete Protection


Diagrams
DWG No: HNLP 005 264 Sheet # 1
DWG No: HNLP 005 237 Sheet # 2
DWG No: 006Q-P75-065

220KV Overhead Line -3 (PIPRI West Line-3)


220KV Overhead Line -4 (ICI Line)
Start-up Transformer A2BCT
Unit#03 Generator Transformer 31BAT
Unit#04 Generator Transformer 41BAT
Reference for Drawings for above Serial no. from E to I
Reference: Lot-D; Volume-2A; Operating and Maintenance
Instruction Manual for 220KV Network Protection
DWG No: 592.00/08.ad/001 Rev. C
DWG Title: 220KV Gas Insulated Switchgear One Line Diagram for
Protection and Metering
Other Drawings related to U#03 & 04 Generator & Transformer
Complete Protection Diagrams
DWG No. : HESP 005 449 Sheet#1
DWG No. : HESP 005 449 Sheet#2

Unit#05 Generator & Transformer Complete Protection Diagrams


DWG No: HESP 005 456 Sheet # 1
DWG No: HESP 005 456 Sheet # 2

Unit#06 Generator & Transformer Complete Protection Diagrams


DWG No: HESP311237 Sheet No. B01, B02, B03 & B04
DWG No.: 1263-LR-T-046

Start-up Transformer#03 Protection Drawing


DWG NO: 394771-AC3

Overhead Line#05 & 06 Protection Drawings


Updated drawing to be provided by BQPS-II, as these lines now
modified as Short Lines to BQPS-II

6. Please provide the layout of 220kV GIS protection panels. Where


is the 220kV GIS protection panel?

Layout of 220kV GIS protection panels


ARA-01 Overhead Line -1 (PIPRI West Line-1) (Main)
Reference: Lot-5; Volume-2; Instruction Manual for 220KV Network
Protection
DWG No: 311-2E01037
DWG Title: 220KV O.H. Line Protection Relay Panel ARA01-ARA-02
(ARA05-ARA06)

ARA-02 Overhead Line -1 (PIPRI West Line-1) (Main-2/Back-up)


Reference: Lot-5; Volume-2; Instruction Manual for 220KV Network
Protection
DWG No: 311-2E01037
DWG Title: 220KV O.H. Line Protection Relay Panel ARA01-ARA-02
(ARA05-ARA06)
ARA-03 Start-up Transformer ABCT (Main)
Reference: Lot-5; Volume-2; Instruction Manual for 220KV Network
Protection
DWG No: 311-2E01038
DWG Title: Start-up Transformer Protection Relay Panel ARA03-ARA-
04

ARA-04 Start-up Transformer ABCT (Stand-by)


Reference: Lot-5; Volume-2; Instruction Manual for 220KV Network
Protection
DWG No: 311-2E01038
DWG Title: Start-up Transformer Protection Relay Panel ARA03-ARA-
04

ARA-05 Overhead Line -2 (PIPRI West Line-2) (Main)


Reference: Lot-5; Volume-2; Instruction Manual for 220KV Network
Protection
DWG No: 311-2E01037
DWG Title: 220KV O.H. Line Protection Relay Panel ARA01-ARA-02
(ARA05-ARA06)

ARA-06 Overhead Line -2 (PIPRI West Line-2) (Main-2/Back-up)


Reference: Lot-5; Volume-2; Instruction Manual for 220KV Network
Protection
DWG No: 311-2E01037
DWG Title: 220KV O.H. Line Protection Relay Panel ARA01-ARA-02
(ARA05-ARA06)

ARA-07 Bus Coupler Protection


Reference: Lot-5; Volume-2; Instruction Manual for 220KV Network
Protection
DWG No: 311-2E01036
DWG Title: 220KV Bus Coupler Protection, Breaker Failure Protection
Relay Panel ARA07, ARA-08

ARA-08 Breaker Failure


Reference: Lot-5; Volume-2; Instruction Manual for 220KV Network
Protection
DWG No: 311-2E01036
DWG Title: 220KV Bus Coupler Protection, Breaker Failure Protection
Relay Panel ARA07, ARA-08

ARA-09 220KV bus bar Protection Panel (Bus A1/B1)


Reference: Lot II; Section 4.2 (B): 220KV Bus bar Protection System
DWG No: 311-1PA06554 Rev.1
DWG Title: Front View for Bus bar Protection Panel (Bus A1/B1)
ARA-10 220KV bus bar Protection Panel (Bus A1/B1)
Reference: Lot II; Section 4.2 (B): 220KV Bus bar Protection System
DWG No: 311-1PA06554 Rev.1
DWG Title: Front View for Bus bar Protection Panel (Bus A1/B1)

ARA-11 Interposing for Generator Transformer Circuit


Reference: Lot-5; Volume-2; Instruction Manual for 220KV Network
Protection
DWG No: 311-2E01039
DWG Title: 220KV Protection Common Panel ARA11, ARA12

ARA-12 DC- AC Supply Monitoring


Reference: Lot-5; Volume-2; Instruction Manual for 220KV Network
Protection
DWG No: 311-2E01039
DWG Title: 220KV Protection Common Panel ARA11, ARA12

ARA-13 Breaker Failure Protection Panel (Missing)


ARA-13A Breaker Failure Protection Panel
Reference: Lot II; Section 4.2 (B): 220KV Bus bar Protection System
DWG No: 311-2PA17690 Rev. 3
DWG Title: Front View for Breaker Failure Protection Panel
DWG No: 311-2PA17691 Rev. 3
DWG Title: Rear View for Breaker Failure Protection Panel
ARA-14 220KV bus bar Protection Panel (Bus A2/B2)
Reference: Lot II; Section 4.2 (B): 220KV Bus bar Protection System
DWG No: 311-1PA06555 Rev.1
DWG Title: Front View for Bus bar Protection Panel (Bus A2/B2)

ARA-15 220KV bus bar Protection Panel (Bus A2/B2)


Reference: Lot II; Section 4.2 (B): 220KV Bus bar Protection System
DWG No: 311-1PA06555 Rev.1
DWG Title: Front View for Bus bar Protection Panel (Bus A2/B2)

ARA-15A 220KV bus bar Protection Panel


Reference: Lot II; Section 4.2 (B): 220KV Bus bar Protection System
DWG No: 311-2PA17692 Rev.3
DWG Title: Front View for Bus bar Protection Panel
DWG No: 311-2PA17693 Rev.3
DWG Title: Rear View for Bus bar Protection Panel

A2-ARA16 PIPRI WEST O/H LINE 3 (MAIN-1)


DWG No: HESP307 501 Sheet 100

A2-ARA17 PIPRI WEST O/H LINE 3 (MAIN-2)


DWG No: HESP307 501 Sheet 100

A2-ARA18 ICI (MAIN-1)


DWG No: UE 300431 Sheet 100

A2-ARA19 ICI (MAIN-2)


DWG No: UE 300431 Sheet 100
A2-ARA20 Start-up Transformer A2BCT
DWG No: UE 300430 Sheet B01, C01

U#01 & 02 Generator & Transformer Protection Panels


DWG No: HNLP 303 400 Sheet G1, Sheet G2
DWG No.: HNLP 303 175

U#03 & 04 Generator & Transformer Protection Panels


DWG No: HESP 308325 Sheet G1, Sheet G2
DWG No.: UE300432 Sheet No.: B01, C01

Start-up Transformer Protection Panel A3BCT03


DWG No: 394771-AR3

U#05Generator & Transformer Protection Panels MKY09 & MKY10


DWG No: HESP 308539 Sheet G1, Sheet G2 & G3

U#06 Generator & Transformer Protection Panels MKY09 & MKY10


DWG No: HESP 311237 Sheets E01-E07

Location of 220kV GIS protection panels

Following 220KV GIS protection panels are installed in the room


located at the back side of NCR.
Pipri West O/H lines 1,2 & 3
Start-up transformers 1 and 2
Bus-bar Coupler
Breaker Failure
220KV bus-bar Protection
O/H line 4 (ICI line)
Following 220KV GIS protection panels are installed in the room,
located at the back side of Unit#06 Control Room.
Start-up Transformer A3BCT
O/H Line 5 (Short Line#01)
O/H Line 6 (Short Line#02)
Unit Transformer and its turbo generator protection panels are
installed in the room, located at the back side of their respective
Control Rooms.

Civil
1. Please provide underground pipeline layout and integrated pipe rack layout.
CAD Version

2. Please provide the plant 1: 1000 topographic map, the corresponding elevation
system and coordinate system.
3. Please supply the GIS Building civil drawings and calculation files (if there are).

4. Please provide the detail information about the coordinate system (horizontal &
elevation system) of the existing topographic survey map of Bin Qasim Thermal
Power Station.

5. According to construction requirement,the Project needs 5hm2 construction


sitethe production site is 4 hm2 and the living site is 1 hm2.. Please consider to
rent construction site.

Other
1. Please provide underground pipeline layout and integrated pipe rack layout.
CAD Version

2. Please collect historic tide level data of Bin QasimPIPRIand Karachi port (see
table1table2).
Table 1 historic tide level data of Bin QasimPIPRIelevation datum of the
data
Year Water Level Max. Tide Range
Highest Sea Level Mean Sea Level Lowest Sea Level
199
5
199
4

201
6
Table 2 historic tide level data of Karachi portelevation datum of the data
Year Water Level Max. Tide
Range
Highest Sea Highest Sea Highest Sea
Level Level Level
199
5
199
4

201
6

3.Please provide the elevation datum of the main tidal characteristics (offer by owner)
shown as below:
Highest astronomical tide: 4.01m
Mean higher high water level: 3.4m
Mean lower high water level: 2.7m
Mean sea level: 2.03m
Mean higher low water level: 1.4m
Lowest astronomical tide: -0.6m
4. Please provide the elevation datum of coastal installation design water level
adopted for recent Port installation (China Harbor) (offer by owner) given below:
Extreme high water level: 4.5m
Design high water level: 3.57m
Design low water level: 0.2m
Extreme low water level: -0.9m
Please provide the location (longitude and latitude) of the recent Port installation
(China Harbor) (offer by owner)

5. Please provide data in attachment which is used for investment estimation


For CCPP power plant,
The following information shall be provided by KE:
1. Generator and transformer detail parameters, especial the reactance used in short circuit calculation.
name plate data available.
Equipment specification from unit 01 to 6.
2. Generator circuit breaker detail parametersincluding rated current and rated short circuit current.
GIS Equipment specification from unit 01 to 6.

For General Layout of CCPP:


1. Design description of general layout (including site location and natural condition description)
2. 1:10000 and 1:50000 topographic maps around the site.
3. General layout drawing (including every building and structure coordinates and elevation of plant
area).
4. General arrangement of underground pipes and trenches of plant area.
5. Trenches detail drawing of plant area (final edition).
6. Overhead pipes and cable tray arrangement of plant area.
7. Road and square detail drawing of plant area

For Protection:
1. The current situation of protection and automation configuration of power plants and substations.
All bays Relay settings
2. The protection channel of telecommunication.
Telecommunication equipment and panels installed on the lines.
3. The equipment configuration of the dispatching side.
SCADA panel layout and signals
4. The code and requirements which are utilized right now.
IEEE and IEC.
Ment

Email Dated 6th Feb 2017


1.The regional geological data, fault zone near the factory.
Pakistan geologically overlaps both with the Indian and the Eurasian plates where
its Sindh and Punjab provinces lie on the north-western corner of the Indian plate
while Baluchistan and most of the Khyber-Pakhtunkhwa lie within the Eurasian plate
which mainly comprises the Iranian plateau, some parts of the Middle East and Central
Asia. The Northern Areas and Azad Kashmir lie mainly in Central Asia along the edge of
the Indian plate and hence are prone to violent earthquakes where the two tectonic plates
collide.
Sindh provice is effected by two fault line passing adjacent to sindh
a. Run of kuch fault line
b. Makran fault line

a. Runn of Kuch
The area under consideration in this zone belongs mostly to India (Runn of Kuch). The zone
contains a reasonable number of earthquakes having M 4.5 as reported in the PDE
catalogue. In the historical data from PMD, there are two major earthquakes in this zone.
The seismic activity in this area has always affected also Pakistan.

b. Makran coast
An active subduction zone exists off the Makran coast and the 1945 earthquake originated in
this region. The magnitude of this earthquake was 8.2 Ms according to the PMD catalogue
and a tsunami was generated by this huge earthquake which struck the Makran coast. As
discussed earlier in this report a wave height of 12 m was reported during this tsunami.
From the PMD historical database, only two considerable events in 1851 and 1864 are
reported in the Gwadar area. The intensities of these earthquakes were VII.
As per Pakistan building code Karachi lies in zone 2B for which ground acceleration
values lies between 0.16 g to 0.24g
2. The stratigraphic section of the site

Please refer to II.1.2 BQPS I - Soil Investigation Geotechnical Report (Page 37 92)
3.the foundation bearing capacity of rock and soil layer.
Pile foundation having diameter 0.76 m and length 25 m capacity varies from 1560
KN to 4977 kN

4. The geological prospecting data, and ground treatment


scheme of BQPS2for reference
All major structure of BQPS II, rest on pile foundation. Pile diameter was 600mm
with length 20 ~22 meter, depending upon availability of rocky strata.

5. The total layout includes three periodsBQPS1BQPS2 and


site for BQPS3 scale 1:1000 ,which include drilled well
location on it.

Please refer to
1. II.1.1 Appendix 6 Topographic Survey
2.