Mechanical.............................................................................................................................................2
Electrical................................................................................................................................................3
Civil.......................................................................................................................................................4
Other......................................................................................................................................................4
For Protection:.......................................................................................................................................7
6. Please provide the makeup water quality of demineralized water treatment system
for BQPS1 and be requested to confirm whether the makeup water will be used for
BQPS3 or not.
DATA from BQ Team
7.Please provide parameters and documents of auxiliary cooling water pump for Unit
3&4 Including headcapacityCharacteristic Curve.
DATA from BQ Team
8. Please provide parameters of Circulating water drainage facilities of the old plant.
DATA from BQ Team
9. Please provide the parameters of the old plant of domestic water and sewage water
treatment system.
DATA from BQ Team
10. Please provide the parameters of the old plant of Fire-fighting equipment, piping
layout.
DATA from BQ Team
Electrical
1. Please provide the construction and civil work diagram of 220kV
GIS room, including the whole GIS room. We only have the
construction and civil work diagram of the extension part.
3. Please provide the cable duct pipe and electrical trench of the
whole GIS room.
Civil
1. Please provide underground pipeline layout and integrated pipe rack layout.
CAD Version
2. Please provide the plant 1: 1000 topographic map, the corresponding elevation
system and coordinate system.
3. Please supply the GIS Building civil drawings and calculation files (if there are).
4. Please provide the detail information about the coordinate system (horizontal &
elevation system) of the existing topographic survey map of Bin Qasim Thermal
Power Station.
Other
1. Please provide underground pipeline layout and integrated pipe rack layout.
CAD Version
2. Please collect historic tide level data of Bin QasimPIPRIand Karachi port (see
table1table2).
Table 1 historic tide level data of Bin QasimPIPRIelevation datum of the
data
Year Water Level Max. Tide Range
Highest Sea Level Mean Sea Level Lowest Sea Level
199
5
199
4
201
6
Table 2 historic tide level data of Karachi portelevation datum of the data
Year Water Level Max. Tide
Range
Highest Sea Highest Sea Highest Sea
Level Level Level
199
5
199
4
201
6
3.Please provide the elevation datum of the main tidal characteristics (offer by owner)
shown as below:
Highest astronomical tide: 4.01m
Mean higher high water level: 3.4m
Mean lower high water level: 2.7m
Mean sea level: 2.03m
Mean higher low water level: 1.4m
Lowest astronomical tide: -0.6m
4. Please provide the elevation datum of coastal installation design water level
adopted for recent Port installation (China Harbor) (offer by owner) given below:
Extreme high water level: 4.5m
Design high water level: 3.57m
Design low water level: 0.2m
Extreme low water level: -0.9m
Please provide the location (longitude and latitude) of the recent Port installation
(China Harbor) (offer by owner)
For Protection:
1. The current situation of protection and automation configuration of power plants and substations.
All bays Relay settings
2. The protection channel of telecommunication.
Telecommunication equipment and panels installed on the lines.
3. The equipment configuration of the dispatching side.
SCADA panel layout and signals
4. The code and requirements which are utilized right now.
IEEE and IEC.
Ment
a. Runn of Kuch
The area under consideration in this zone belongs mostly to India (Runn of Kuch). The zone
contains a reasonable number of earthquakes having M 4.5 as reported in the PDE
catalogue. In the historical data from PMD, there are two major earthquakes in this zone.
The seismic activity in this area has always affected also Pakistan.
b. Makran coast
An active subduction zone exists off the Makran coast and the 1945 earthquake originated in
this region. The magnitude of this earthquake was 8.2 Ms according to the PMD catalogue
and a tsunami was generated by this huge earthquake which struck the Makran coast. As
discussed earlier in this report a wave height of 12 m was reported during this tsunami.
From the PMD historical database, only two considerable events in 1851 and 1864 are
reported in the Gwadar area. The intensities of these earthquakes were VII.
As per Pakistan building code Karachi lies in zone 2B for which ground acceleration
values lies between 0.16 g to 0.24g
2. The stratigraphic section of the site
Please refer to II.1.2 BQPS I - Soil Investigation Geotechnical Report (Page 37 92)
3.the foundation bearing capacity of rock and soil layer.
Pile foundation having diameter 0.76 m and length 25 m capacity varies from 1560
KN to 4977 kN
Please refer to
1. II.1.1 Appendix 6 Topographic Survey
2.