BI-10-02186, KH-TAN Sour Gas Handling & Compression

TECHNICAL QUERY LOG


S/N Date Receive Document date Control No Document No. Rev. No. Subject From File # TO Required Reponse Yes/No Action Status Remarks Reference
1 14-Oct-05 14-Oct-05 BI-10-02186-DTF-005 TQ-001 0 TQ-001 Change on PIB Layout Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed KTPPU/BI/02186/T-019/15
2 14-Oct-05 14-Oct-05 BI-10-02186-DTF-005 TQ-002 0 TQ-002 Changes on Substation Layout Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed KTPPU/BI/02186/T-014/15
3 14-Oct-05 14-Oct-05 BI-10-02186-DTF-005 TQ-003 0 TQ-003 TCF Land use permit (PUP) and TCF Requirements Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed KTPPU/BI/02186/T-011/15
4 14-Oct-05 14-Oct-05 BI-10-02186-DTF-005 TQ-004 0 TQ-004 P&CSDD Approval for Microprocessor Based Control System for Instrument Air Compressor Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed KTPPU/BI/02186/T-015/15
5 15-Oct-05 15-Oct-05 BI-10-02186-DTF-007 TQ-005 0 TQ-005 Utilization of DCS as logic system for H2S & LEL gas detectors Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed KTPPU/BI/02186/T-027/15
6 15-Oct-05 15-Oct-05 BI-10-02186-DTF-008 TQ-006 0 TQ-006 Availablity of existing Instrument Asset Management System (IAMS) in Tanajib Plant Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed KTPPU/BI/02186/T-028/15
7 27-Oct-15 27-Oct-15 BI-10-02186-DTF-018 TQ-007 N/A TQ-007 Output Voltage of UPS System (M34-UPS-0X1 A/B & M34-UPS-0X2 AB/B) Target No. 1 Ali A. Damergi-AAD Yes For Approval / Comments Closed KTPPU/BI/02186/T-022/15
8 27-Oct-15 27-Oct-15 BI-10-02186-DTF-017 TQ-008 0 TQ-008 Auto Transfer Scheme for Gas Compressor Motor (M34-KM-X001A) Target No. 1 Ali A. Damergi-AAD Yes For Approval / Comments Closed KTPPU/BI/02186/T-023/15
9 TQ-009 TQ-009 Location of Switchrack No Cancelled Cancelled
10 TQ-010 TQ-010 Requirement of Preliminary Grounding for New Substation No Cancelled Cancelled
11 TQ-011 TTQ-011 Requirement of Preliminary Cable tray Sizing Calculation No Cancelled Cancelled
12 23-Dec-15 23-Dec-15 BI-10-02186-DTF-0102 TQ-012 2 TQ-012 Fire Water Network Layout / System Piping Layout Target No. 1 Ali A. Damergi-AAD Yes For Approval / Comments Closed KTPPU/BI/02186/T-0121/15
13 TQ-013 N/A TQ-013 Equipment Location Plan Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed Transmittal Not Received
14 9-Nov-15 9-Nov-15 BI-10-02186-DTF-030 TQ-014 N/A TQ-014 (Nitrogen Consumption) Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed KTPPU/BI/02186/T-038/15
15 9-Nov-15 9-Nov-15 BI-10-02186-DTF-030 TQ-015 N/A TQ-015 (Pipeline Pressure Rating) Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed KTPPU/BI/02186/T-071/15
16 9-Nov-15 9-Nov-15 BI-10-02186-DTF-030 TQ-016 N/A TQ-016 (Outlet Gas Specification) Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed KTPPU/BI/02186/T-071/15
17 9-Nov-15 9-Nov-15 BI-10-02186-DTF-030 TQ-017 N/A TQ-017 (Requirement af SPARE & SPACE for Switchgears) Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed KTPPU/BI/02186/T-039/15
18 9-Nov-15 9-Nov-15 BI-10-02186-DTF-030 TQ-018 N/A TQ-018 (Requirement of Load Tap Changer (LTC) Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed KTPPU/BI/02186/T-040/15
19 10-Nov-15 10-Nov-15 BI-10-02186-DTF-041 TQ-019 N/A TQ-019 (Site Non-Electric Utilities -EWS) Target No. 1 Ali A. Damergi-AAD Yes For Approval / Comments Closed KTPPU/BI/02186/T-041/15
20 10-Nov-15 10-Nov-15 BI-10-02186-DTF-041 TQ-020 N/A TQ-020 (Ratawi Winter Feed Gas Details Target No. 1 Ali A. Damergi-AAD Yes For Approval / Comments Closed KTPPU/BI/02186/T-094/15
21 12-Nov-15 12-Nov-15 BI-10-02186-DTF-050 TQ-021 N/A TQ-021 (Communication between Relay) Target No. 1 Ali A. Damergi-AAD Yes For Approval / Comments Closed Cancelled KTPPU/BI/02186/T-063/15
22 TQ-022 TQ-022 Flaring at Khafji No Closed Cancelled
23 TQ-023 TQ-023 Khafji to Tanajib Pipiline Sizing No Closed Cancelled
24 30-Nov-15 30-Nov-15 BI-10-02186-DTF-067 TQ-024 C TQ-024 Tanajib to Tanajib -Berri Pipeline Sizing Target No. 1 Ali A. Damergi-AAD Yes For Approval / Comments Closed Cancelled KTPPU/BI-02186/T-129-16
25 13-Dec-15 13-Dec-15 BI-10-02186-DTF-083 TQ-025 1 TQ-025 (Requirement of internal FBE coating Flare Lines Target No. 1 Ali A. Damergi-AAD Yes For Approval / Comments Closed KTPPU/BI/02186/T-044/16
26 25-Nov-15 25-Nov-15 BI-10-02186-DTF-061 TQ-026 N/A TQ-026 Equipment Heat Dissipation Target No. 1 Ali A. Damergi-AAD Yes For Approval / Comments Cancelled Cancelled KTPPU/BI-02186/T-129-16
27 17-Dec-15 17-Dec-15 BI-10-02186-DTF-087 TQ-027 0 TQ-027 Catch Basin for Gas Compression Area Target No. 1 Ali A. Damergi-AAD Yes For Approval / Comments Cancelled/ Put in Change Order Cancelled/ Put in Change Order
28 31-Dec-15 31-Dec-15 BI-10-02186-DTF-0114 TQ-028 N/A TQ-028 PIB HVAC Cooling Load Increase Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed KTPPU/BI-02186/T-049-16
29 30-Dec-15 30-Dec-15 BI-10-02186-DTF-0112 TQ-029 N/A TQ-029 Air Compressor Package Design Change Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed KTPPU/BI-02186/T-050-16
30 31-Dec-15 31-Dec-15 BI-10-02186-DTF-0114 TQ-030 N/A TQ-030 Pump type Change Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed KTPPU/BI-02186/T-049-16
31 30-Dec-15 30-Dec-15 BI-10-02186-DTF-0112 TQ-031 N/A TQ-031 Selected Pipe wall Thickness Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed KTPPU/BI-02186/T-050-16
32 31-Dec-15 31-Dec-15 BI-10-02186-DTF-0114 TQ-032 N/A TQ-032 Ineterstage Air Coooler Duty Increase Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed KTPPU/BI-02186/T-049-16
33 11-Jan-16 11-Jan-16 BI-10-02186-DTF-0132 TQ-033 N/A TQ-033 Provision of Level Transmitter and level indicator on Vessel as per SAES-J-300 Target No. 1 Ali A. Damergi-AAD Yes For Approval / Comments Closed KTPPU/BI/02186/T-051/16
34 17-Jan-16 17-Jan-16 BI-10-02186-DTF-0138 TQ-034 1 TQ-034 Requirement 87L relay for Incomer Feeder Protection Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed KTPPU/BI/02186/T-053/16
35 TQ-035 TQ-035 Change in capacity of on 1st and 2nd stage after cooler (M34-E-0001 & 0002) Not yet submitted to SAPMT by TARGET/KBR
36 20-Mar-16 20-Mar-16 BI-10-02186-DTF-0245 TQ-036 1 TQ-036 Rev.1 Battery Limit Condition (Operation and Design) For All Ulitlity Lines (Coming From Existing Line List) No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed KTPPU/BI-02186/T-299-16
37 3-Feb-16 3-Feb-16 BI-10-02186-DTF-0171 TQ-037 N/A TQ-037 Request to Arrange KWhr price Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed KTPPU/BI/02186/T-058/16
38 TQ-038 TQ-038 Check Valve Quantity (MR-043) Not yet submitted to SAPMT by TARGET/KBR
39 TQ-039 TQ-039 Increase in booster Skid Instrument Air Capacity Not yet submitted to SAPMT by TARGET/KBR
40 8-Feb-16 8-Feb-16 BI-10-02186-DTF-0177 TQ-040 N/A TQ-040 Ball Valve (MR-042) Quantity Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Not yet submitted to SAPMT by TARGET/KBR
41 8-Feb-16 8-Feb-16 BI-10-02186-DTF-0177 TQ-041 N/A TQ-041 Instrumentation Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed KTPPU/BI-02186/T-125-16
42 TQ-042 TQ-042 Installation of an Ultrasonic flow meter with Temp and Pressure in Piping (16'' NG-0002-3CS2P06) TO THE Slug Catcher Not yet submitted to SAPMT by TARGET/KBR
43 TQ-043 TQ-043 Pipes MR-038 Quantity Not yet submitted to SAPMT by TARGET/KBR
44 16-Feb-16 16-Feb-16 BI-10-02186-DTF-0188 TQ-044 N/A TQ-044 Use of strainer instead of Filters for Fuel Gas Line Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed KTPPU/BI-02186/T-334-16
45 18-Feb-16 18-Feb-16 BI-10-02186-DTF-0193 TQ-045 N/A TQ-045 (Piping) for Gas Skids arrangement and interconnecting piping Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed Between TARGET & KBR only
46 TQ-046 TQ-046 Globe Valve (MR-073) Quantity Not yet submitted to SAPMT by TARGET/KBR
47 TQ-047 TQ-047 Flanges (MR-040) Quantity Not yet submitted to SAPMT by TARGET/KBR
48 TQ-048 TQ-048 Strainer (MR-047) Quantity Not yet submitted to SAPMT by TARGET/KBR
49 21-Feb-16 21-Feb-16 BI-10-02186-DTF-0195 TQ-049 N/A TQ-049 Reqirements of PSA Server and Dharan PCC (Power Control Center) Gateway Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed KBR request to withdraw for revise and resubmission KTPPU/BI-02186/L-014/16
50 23-Feb-16 23-Feb-16 BI-10-02186-DTF-0201 TQ-050 N/A TQ-050 Communication of Non EIC-61850 Bus Differential Relay (SEL 587Z) with PSA Target No. 1 Ali A. Damergi-AAD Yes For Approval / Comments Closed KTPPU/BI-02186/T-124-16
51 TQ-051 TQ-051 RTR and Fitting (MR-011) Quantity Not yet submitted to SAPMT by TARGET/KBR
52 TQ-052 Not yet submitted to SAPMT by TARGET/KBR
53 6-Mar-16 6-Mar-16 BI-10-02186-DTF-0222 TQ-053 N/A TQ-053 ZV Change in Material & Size (MR-015) Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed Between TARGET & KBR only
54 13-Mar-16 13-Mar-16 BI-10-02186-DTF-0231 TQ-054 N/A TQ-054 Removal of Sour Condensate Pump Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed KTPPU/BI-02186/T-313-16
55 21-Mar-16 21-Mar-16 BI-10-02186-DTF-0248 TQ-055 N/A TQ-055 Requirement of Aviation Obstruction Light for Flare Stack M34-F-0001 Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed KTPPU/BI/02186/T-122/16
56 26-Apr-16 26-Apr-16 BI-10-02186-DTF-0313 TQ-064 N/A TQ-064 Hot Tap Material Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed KTPPU/BI/02186/T-187/16
57 26-Apr-16 26-Apr-16 BI-10-02186-DTF-0315 TQ-065 N/A TQ-065 (Mechanical) Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed KTPPU/BI/02186/T-187/16
58 27-Apr-16 27-Apr-16 BI-10-02186-DTF-0320 TQ-066 N/A TQ-066 (Electrical) Requirement of Optional Water Protection for Buried Voltage Cables Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed KTPPU/BI-02186/T-339-16
59 27-Apr-16 27-Apr-16 BI-10-02186-DTF-0320 TQ-067 N/A TQ-067 (Electrical) Color Codes for Power Cables Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed KTPPU/BI-02186/T-339-16
60 5-May-16 5-May-16 BI-10-02186-DTF-0334 TQ-069 0 TQ-069 Mechanical Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed KTPPU/BI/02186/T-187/16
61 19-May-16 19-May-16 BI-10-02186-DTF-0365 TQ-069 1 TQ-069 IA Compressor Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed KTPPU/BI/02186/T-243/16
62 5-May-16 5-May-16 BI-10-02186-DTF-0334 TQ-070 N/A TQ-070 Process (Smart P & ID Database) Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Open
63 29-May-16 29-May-16 BI-10-02186-DTF-0377 TQ-071 N/A TQ-071 34.5K Switchgear No. G80-P002 Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed KTPPU/BI-02186/T-291-16
64 6-Jun-16 6-Jun-16 BI-10-02186-DTF-0389 TQ-072 N/A TQ-072 Wireless connectivity requirement (Telecom) Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed KTPPU/BI-02186/T-274-16
65 6-Jun-16 6-Jun-16 BI-10-02186-DTF-0389 TQ-073 N/A TQ-073 HP switch End-of -Sales notice (Telecom) Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed KTPPU/BI-02186/T-274-16
66 27-Jun-16 27-Jun-16 BI-10-02186-DTF-0429 TQ-075 2 TQ-075 HVAC on UPS Building Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed KTPPU/BI-02186/T-341-16
67 5-Jun-16 5-Jun-16 BI-10-02186-DTF-0386 TQ-076 N/A TQ-076 Pump Seal Type (Mechanical) Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed KTPPU/BI-02186/T-328-16
68 8-Jun-16 8-Jun-16 BI-10-02186-DTF-0386 TQ-077 N/A TQ-077 Manufacture Standard for Air Compressor Package Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed KTPPU/BI-02186/T-321-16
69 14-Jun-16 14-Jun-16 BI-10-02186-DTF-0406 TQ-078 N/A TQ-078 for Welding Query on Vessels Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed KTPPU/BI-02186/T-322-16
70 19-Jun-16 19-Jun-16 BI-10-02186-DTF-0412 TQ-079 N/A TQ-079 Existing Relay Settings received from Saudi Aramco against TQ-071 Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Closed (KTPPU/BI-02186/T-291-16)(BI-10-02186-DTF-0377)(BI-10-02186-DTF-0412)
71 18-Aug-16 18-Aug-16 BI-10-02186-DTF-0531 TQ-084 0 Waiving for the fill Placement Lifts in Depth as per Saudi Aramco SAES-A-114 Target No. 1 Ali A. Damergi-AAD Yes Necessary Action Open
LEGEND

Closed 58
Open 2 As of 18-August-16
Not yet submitted to SAPMT by TARGET/KBR 11
TOTAL 71
S/N TQ- Number Rev. No. Issued Date

9 TQ-009 0 12-Oct-16
22 TQ-Con-022 0 26-Oct-16
66 TQ- Con-066 0 16-Nov-16
84 TQ- Con-084 0 23-Nov-16
87 TQ- Con-087 0 24-Nov-16
95 TQ- Con-095 0 28-Nov-16
96 TQ- Con-096 0 28-Nov-16
97 TQ- Con-097 0 28-Nov-16
103 TQ- Con-103 0 30-Nov-16
111 TQ- Con-111 0 7-Dec-16
118 TQ- Con-118
124 TQ- Con-124 0 27-Dec-16
130 TQ- Con-130 0 31-Dec-16
131 TQ- Con-131 0 31-Dec-16
136 TQ- Con-136 0 15-Jan-17
147 TQ- Con-147 0 15-Jan-17
148 TQ- Con-148 0 15-Jan-17
150 TQ- Con-150 0 16-Jan-17
153 TQ- Con-153 0 22-Jan-17
154 TQ- Con-154 0 22-Jan-17
156 TQ-CON-156 0 23-Jan-17
157 TQ-CON-157 0 25-Jan-17
159 TQ-CON-159 0 31-Jan-17
160 TQ-CON-160 0 31-Jan-17
161 TQ-CON-161 0 31-Jan-17
162 TQ-CON-162 0 31-Jan-17
163 TQ-CON-163 0 4-Feb-17
164 TQ-CON-164 0 4-Feb-17
169 TQ-Con-168 0 8-Feb-17
170 TQ-Con-169 0 8-Feb-17
S/N TQ- Number Rev. No. Issued Date

Closed 140
Open 29
TOTAL 169
BI-10-02186, KH-TAN Sour Gas Hand
TECHNICAL QUERY
Subject ORIGINATOR

Anchor Bolt Pads for AHU-1, AHU-2,AHU3 and AHU-4. NEIL


PIB-ACCU-3 & ACCU-4 Anchor bolt NEIL
Foundation to Foundation Gap NEIL
Approval of material stockiest Monawer
Cabinet Arrangement and separation plate for RMPS System. (PIC)Fawaz
Structural Typical Connection details for PG-1607-34-M34-02-206 REV. A PG-1607-34-M34-02-202 REV. A Garry
Structural Typical Connection details for PG-1607-34-M34-02-207 & 209 REV. A Garry
Structural Typical Connection details for PG-1607-34-M34-02-211 REV. A &PG-1607-34-M34-02-202 to 205 REV. A Garry
Gas Compressor Anchor bolt NEIL

For UPS building floor drain NEIL

Concrete Slab on South Compression NEIL

Size & Elevation of existing beam Adel

Oily Water System VP & C.O. NEIL

Primer and finish coating on Girth weld joint prior to Hydro Test Hari V.

Duct Bank D10 Size and Location NEIL

Cables on Asphalted Areas NEIL

Flare Area Lighting Poles NEIL

Cable Tray Support NEIL

Slug Catcher Anchor Bolt NEIL

Lighting pole TLP for F8C & F8D NEIL

Crossing point clashing - OWS to FWL NEIL

Transformer foundation PVC Conduits NEIL

Crossing Telecom Ductbanks NEIL

Duct bank 09 to Remove NEIL

Fire water line crossing foundation NEIL

Air compressor plans and details NEIL

Knock out drum pump NEIL

TQ-Con-168 - Oily Water System to Tie-in NEIL

TQ-Con-169 -Flare area Cable Trench NEIL


BI-10-02186, KH-TAN Sour Gas Hand
TECHNICAL QUERY
Subject ORIGINATOR
H-TAN Sour Gas Handling & Compression
TECHNICAL QUERY LOG
ARAMCO/KBR/ Sendan/Pan TQ Sent TQ Response
Gulf Transmittal No. Date Transmittal No.

KBR BI-2186-DTF-SC-0423 12-Oct-16 J50239-T-586-016

KBR BI-2186-DTF-SC-0436 26-Oct-16 J50239-T-602-016

KBR BI-2186-DTF-SC-0456 16-Nov-16

SA BI-10-02186-DTF-0798 23-Nov-16

SA BI-10-02186-DTF-0807 24-Nov-16
Pan Gulf KSA-M-0048-DTF-026 28-Nov-16
Pan Gulf KSA-M-0048-DTF-026 28-Nov-16
Pan Gulf KSA-M-0048-DTF-026 28-Nov-16

KBR BI-2186-DTF-SC-0462 30-Nov-16

KBR BI-2186-DTF-SC-0469 7-Dec-16

KBR BI-2186-DTF-SC-0478 27-Dec-16

KBR BI-2186-DTF-SC-0484 31-Dec-16

KBR BI-2186-DTF-SC-0484 31-Dec-16

SA BI-10-02186-DTF-0997 15-Jan-17

KBR BI-2186-DTF-SC-0487 15-Jan-17

KBR BI-2186-DTF-SC-0487 15-Jan-17

KBR BI-2186-DTF-SC-0488 16-Jan-17

KBR BI-2186-DTF-SC-0491 22-Jan-17

KBR BI-2186-DTF-SC-0491 22-Jan-17

KBR BI-2186-DTF-SC-0492 23-Jan-17

KBR BI-2186-DTF-SC-0494 25-Jan-17

KBR BI-2186-DTF-SC-0497 31-Jan-17

KBR BI-2186-DTF-SC-0497 31-Jan-17

KBR BI-2186-DTF-SC-0497 31-Jan-17

KBR BI-2186-DTF-SC-0497 31-Jan-17

KBR BI-2186-DTF-SC-0498 4-Feb-17

KBR BI-2186-DTF-SC-0498 4-Feb-17

KBR BI-2186-DTF-SC-0500 8-Feb-17

KBR BI-2186-DTF-SC-0500 8-Feb-17


H-TAN Sour Gas Handling & Compression
TECHNICAL QUERY LOG
ARAMCO/KBR/ Sendan/Pan TQ Sent TQ Response
Gulf Transmittal No. Date Transmittal No.
TQ Response
Status
Date
18-Oct-16 Open (Waiting for Vendor)
2-Nov-16 Open (Waiting for Vendor)
Open
Open
Open
Open
Open
Open
Open
Open

Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open

Open
Open
TQ Response
Status
Date
S/N TQ- Number Rev. No. Issued Date

1 SAES-J-902 0 19-Dec-16
2
3
4
5
6
7
8
9
10

1 TQ-001 28-Dec-16 25-Dec-16


2 TQ-002 28-Dec-16 25-Dec-16
3
4
5
6
7
8
9
10

23
24
25
26
27
28
29
30
S/N TQ- Number Rev. No. Issued Date

31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
S/N TQ- Number Rev. No. Issued Date

63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
S/N TQ- Number Rev. No. Issued Date

95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
S/N TQ- Number Rev. No. Issued Date

127
128
129
130
131
132
133
134
135
136
137

Closed 1
Open 0
TOTAL 1
BI-10-02186, KH-TAN Sour Gas Hand
VENDOR / Subcontractor TECHNI
Subject ORIGINATOR

DRESSER RAND

Dresser Rand TECHNICAL QUERY for Single pair cable conduit protection as per SAES-J-902 DRESSER RAND

PAN GULF
Percentage of RT Faizan Ahmed
FBE Line Coating Faizan Ahmed
BI-10-02186, KH-TAN Sour Gas Hand
VENDOR / Subcontractor TECHNI
Subject ORIGINATOR
BI-10-02186, KH-TAN Sour Gas Hand
VENDOR / Subcontractor TECHNI
Subject ORIGINATOR
BI-10-02186, KH-TAN Sour Gas Hand
VENDOR / Subcontractor TECHNI
Subject ORIGINATOR
BI-10-02186, KH-TAN Sour Gas Hand
VENDOR / Subcontractor TECHNI
Subject ORIGINATOR
H-TAN Sour Gas Handling & Compression
Subcontractor TECHNICAL QUERY LOG
ARAMCO/KBR/ Sendan/Pan TQ Sent TQ Response
Gulf Transmittal No. Date Transmittal No.
DRESSER RAND

SA BI-10-02186-DTF-0897 19-Dec-16 KTPPU-BI-02186-T-837-16

PAN GULF

KBR BI-2186-DTF-SC-0484 31-Dec-16

KBR BI-2186-DTF-SC-0484 31-Dec-16


H-TAN Sour Gas Handling & Compression
Subcontractor TECHNICAL QUERY LOG
ARAMCO/KBR/ Sendan/Pan TQ Sent TQ Response
Gulf Transmittal No. Date Transmittal No.
H-TAN Sour Gas Handling & Compression
Subcontractor TECHNICAL QUERY LOG
ARAMCO/KBR/ Sendan/Pan TQ Sent TQ Response
Gulf Transmittal No. Date Transmittal No.
H-TAN Sour Gas Handling & Compression
Subcontractor TECHNICAL QUERY LOG
ARAMCO/KBR/ Sendan/Pan TQ Sent TQ Response
Gulf Transmittal No. Date Transmittal No.
H-TAN Sour Gas Handling & Compression
Subcontractor TECHNICAL QUERY LOG
ARAMCO/KBR/ Sendan/Pan TQ Sent TQ Response
Gulf Transmittal No. Date Transmittal No.
TQ Response
Status
Date

26-Dec-16 Closed
TQ Response
Status
Date
TQ Response
Status
Date
TQ Response
Status
Date
TQ Response
Status
Date