BILL OF QUANTITY PREPARATION & TOTAL COST
ESTIMATION
The cost will be estimated in order to compare with the cost of Addis Abeba
safe living environment for the residents. The cost of each material, labor and
From the case study it is obtained that the condominium buildings have some
design problems like insufficient area allocation for rooms, kitchens, corridors
etc. The position of the stair case is also not in appropriate position especially
values. Since we used common walls, common stairs, agro stone partition wall,
energy saving lamps such as fluorescent and compacted lamps the designs are
From this project the lesson we learnt are the following: it improve the
more lesson which are most useful. It helps us to acquire knowledge through
The project covers the majority of the courses which are in the curriculum. It
helps the students to revise the previous courses. So, the project should
continue.