PARTICLE SIZE DISTRIBUTION BY SIEVING


TEST METHOD: BS882:1992
LOCATION : Contractor's quarry DATE SAMPLED: 29/Jul/16
OFFSET : DATE TESTED: 29/Jul/16
PURPOSE: Concrete Works REQ. NO.:
MATERIAL DESCPTION:10-25mm Crush Stone REF. NO.:
Weight of before wash(g) 3000.4 Weight of after wash(g 3000.4

Mass of Cumulative
Sieve Size(mm) Retained Sample(g) Passing % Passing Specification limt

37.5 0.0 3000.4 100.0 100.0 100.0

25 222.0 2778.4 92.6 90.0 100.0

20 1092.0 1686.4 56.2 40.0 85.0

14 883.1 803.3 26.8 10.0 40.0

10 684.9 118.4 #N/A 0.0 15.0

5 106.3 12.1 #N/A 0.0 5.0

pan 12.1 0.0 #N/A

Total 3000.4
Total percent passin g (%)

100.0

90.0

80.0

70.0

60.0

50.0

40.0

30.0

20.0

10.0

0.0
0 5 10 15 20 25 30 35 40
Sieve Size (MM)

REMARKS:

Contractor's Repressentative Engineer's Repressentative


MINISTRY OF PUBLIC WORKS, LIBERIA
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper -
Karloken (50km) and Maintenance of Karloken to
Fish Town (80km)

PARTICLE SIZE DISTRIBUTION BY SIEVING


TEST METHOD: BS882:1992
LOCATION : Contractor's quarry DATE SAMPLED: 29/Jul/16
OFFSET : DATE TESTED: 29/Jul/16
PURPOSE: Concrete Works REQ. NO.:
MATERIAL DESCPTION:10-25mm Crush Stone REF. NO.:
Weight of before wash(g) 3000.0 Weight of after wash(g 3000.0

Mass of Cumulative
Sieve Size(mm) Retained Sample(g) Passing % Passing Specification limt

37.5 34.7 2965.3 98.8 100.0 100.0

25 231.7 2733.6 91.1 90.0 100.0

20 1034.5 1699.1 56.6 40.0 85.0

14 901.2 797.9 26.6 10.0 40.0

10 673.4 124.5 4.2 0.0 15.0

5 110.5 14.0 0.5 0.0 5.0

pan 14.0 0.0 0.0

Total 3000.0
Total percent passin g (%)

100.0

90.0

80.0

70.0

60.0

50.0

40.0

30.0

20.0

10.0

0.0
0 5 10 15 20 25 30 35 40
Sieve Size (MM)

REMARKS:

Contractor's Repressentative Engineer's Repressentative


MINISTRY OF PUBLIC WORKS, LIBERIA
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper -
Karloken (50km) and Maintenance of Karloken to
Fish Town (80km)

PARTICLE SIZE DISTRIBUTION BY SIEVING


TEST METHOD: BS882:1992
LOCATION : Contractor's quarry DATE SAMPLED: 29/Jul/16
OFFSET : DATE TESTED: 29/Jul/16
PURPOSE: Concrete Works REQ. NO.:
MATERIAL DESCPTION:5-10mm Crush Stone REF. NO.:
Weight of before wash(g) 2000.3 Weight of after wash(g 2000.3

Mass of Cumulative
Sieve Size(mm) Retained Sample(g) Passing % Passing Specification limt

14 28.4 1971.9 98.6 100.0 100.0

10 73.4 1898.5 94.9 85.0 100.0

5 1787.6 110.9 #N/A 0.0 25.0

2.36 96.2 14.7 #N/A 0.0 5.0

1.18 2.4 12.3 #N/A 0.0 0.0

pan 12.3 0.0 #N/A

Wash loss 0.0

Total 2000.3
Total percent passin g (%)

100.0

90.0

80.0

70.0

60.0

50.0

40.0

30.0

20.0

10.0

0.0
0 2 4 6 8 10 12 14 16
Sieve Size (MM)

REMARKS:

Contractor's Repressentative Engineer's Repressentative


MINISTRY OF PUBLIC WORKS, LIBERIA
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper -
Karloken (50km) and Maintenance of Karloken to
Fish Town (80km)

PARTICLE SIZE DISTRIBUTION BY SIEVING


TEST METHOD: BS882:1992
LOCATION : Contractor's quarry DATE SAMPLED: 29/Jul/16
OFFSET : DATE TESTED: 29/Jul/16
PURPOSE: Concrete Works REQ. NO.:
MATERIAL DESCPTION:5-10mm Crush Stone REF. NO.:
Weight of before wash(g) 2000.1 Weight of after wash(g 2000.1

Mass of Cumulative
Sieve Size(mm) Retained Sample(g) Passing % Passing Specification limt

14 14.1 1986.0 99.3 100.0 100.0

10 51.9 1934.1 96.7 85.0 100.0

5 1779.5 154.6 #N/A 0.0 25.0

2.36 138.5 16.1 #N/A 0.0 5.0

1.18 3.7 12.4 #N/A 0.0 0.0

pan 12.4 0.0 #N/A

Wash loss 0.0

Total 2000.1
Total percent passin g (%)

100.0

90.0

80.0

70.0

60.0

50.0

40.0

30.0

20.0

10.0

0.0
0 2 4 6 8 10 12 14 16
Sieve Size (MM)

REMARKS:

Contractor's Repressentative Engineer's Repressentative


MINISTRY OF PUBLIC WORKS, LIBERIA
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper -
Karloken (50km) and Maintenance of Karloken to
Fish Town (80km)

PARTICLE SIZE DISTRIBUTION BY SIEVING


TEST METHOD: BS882:1992
LOCATION : Contractor's quarry DATE SAMPLED: 29/Jul/16
OFFSET : DATE TESTED: 29/Jul/16
PURPOSE: Concrete Works REQ. NO.:
MATERIAL DESCPTION:0-5mm Crush Stone REF. NO.:
Weight of before wash(g) 1000.0 Weight of after wash(g 1000.0

Mass of Cumulative
Sieve Size(mm) Retained Sample(g) Passing % Passing Specification limt

10 0.0 1000.0 100.0 100.0 100.0

5 0.0 1000.0 100.0 89.0 100.0

2.36 4.2 995.8 #N/A 60.0 100.0

1.18 40.7 955.1 #N/A 30.0 100.0

0.6 307.9 647.2 #N/A 15.0 100.0

0.3 481.0 166.2 #N/A 5.0 70.0

0.15 141.5 24.7 #N/A 0.0 15.0

pan 24.7

Wash loss 0.0

Total 1000.0
Total percent passin g (%)

100.0

90.0

80.0

70.0

60.0

50.0

40.0

30.0

20.0

10.0

0.0
0.1 1 10
Sieve Size (MM)

REMARKS:

Contractor's Repressentative Engineer's Repressentative


MINISTRY OF PUBLIC WORKS, LIBERIA
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper -
Karloken (50km) and Maintenance of Karloken to
Fish Town (80km)

PARTICLE SIZE DISTRIBUTION BY SIEVING


TEST METHOD: BS882:1992
LOCATION : Contractor's quarry DATE SAMPLED: 29/Jul/16
OFFSET : DATE TESTED: 29/Jul/16
PURPOSE: Concrete Works REQ. NO.:
MATERIAL DESCPTION:0-5mm Crush Stone REF. NO.:
Weight of before wash(g) 1000.0 Weight of after wash(g 1000.0

Mass of Cumulative
Sieve Size(mm) Retained Sample(g) Passing % Passing Specification limt

10 0 1000 100 100

5 0.0 1000.0 100.0 89.0 100.0

2.36 5.3 994.7 #N/A 60.0 100.0

1.18 41.0 953.7 #N/A 30.0 100.0

0.6 294.7 659.0 #N/A 15.0 100.0

0.3 489.4 169.6 #N/A 5.0 70.0

0.15 142.2 27.4 #N/A 0.0 15.0

pan 27.4

Wash loss 0.0

Total 1000.0
T otal pe rcent passing (%)

100
90

80
70
60

50
40
30

20
10

0
0.1 1 10
Sieve Size (MM)

REMARKS:

Contractor's Repressentative Engineer's Repressentative


MINISTRY OF PUBLIC WORKS, LIBERIA
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving
of Harper - Karloken (50km) and Maintenance of Karloken to
Fish Town (80km)

PARTICLE SIZE DISTRIBUTION BY SIEVING


TEST METHOD: BS882:1992
LOCATION : Contractor's quarry DATE SAMPLED: 29/Jul/16
OFFSET : DATE TESTED: 29/Jul/16
PURPOSE: Concrete Works REQ. NO.:
MATERIAL DESCPTION: 5-20mm Graded Aggregate Sand: Crush Stone=36:64 REF. NO.:
Concrete & Aggregate

Sieve Size(mm) % Propotion 0.15 0.6 5 20 37.5

10-25mm 40 0.0 0.0 0.5 91.9 100.0

5-10mm 26 0.0 0.0 4.2 100.0 100.0

River Snd 36 2.6 65.3 100.0 100.0 100.0

Total 100 0.9 23.5 37.3 98.8 102.0

Lower Limit 0.0 10.0 35.0 95.0 100.0

Upper Limit 8.0 35.0 55.0 100.0 100.0


Total percent passing (%)

100.0

90.0

80.0

70.0

60.0

50.0

40.0

30.0

20.0

10.0

0.0
0.1 1 10 100
Sieve Size (MM)

REMARKS:

Contractor's Repressentative Engineer's Repressentative


MINISTRY OF PUBLIC WORKS, LIBERIA
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of
Harper - Karloken (50km) and Maintenance of
Karloken to Fish Town (80km)

AGGREGATE CRUSHING VALUE


TEST METHOD : BS:812 Part 110 (1990)

LOCATION : Contractor's Quarry DATE SAMPLED 3/11/2016 DATE TESTED29-Jul-16

OFFSET : PURPOSE: Concrete Works

MATERIAL DESCRIPTION : Crush stone 9.5---14.0mm


Force Applied KN 400
TRIAL No. 1 2 3
Mass of sample
2501 2501 2501
(14mm pass and 10mm Retained)
Mass of sample
1798 1781 1792
retained on B.S Sieve,2.36mm
Mass of sample
703 720 709
passing B.S Sieve,2.36mm

Aggregate Crushing Value (ACV)% 28.1 28.8 28.3

Average ACV% 28.4

REMARKS:

Contractor's Representative Engineer's Representative


MINISTRY OF PUBLIC WORKS, LIBERIA
FISH TOWN - HARPER ROAD PROJECT PHASE 1
Paving of Harper
- Karloken (50km) and Maintenance of Karloken
to Fish Town (80km)

LOS ANGELES ABRASION TEST (LAA)


TEST METHOD : ASTM C 539 89
LOCATION: Contractor's Quarry DATE SAMPLED: 29/Jul/16
PURPOSE: Concrete Works DATE TESTED: 29/Jul/16
MATERIAL
4.75--19mm Crush stone REF.NO.
DESCRIPTION:

Sieve Size Mass of indicated Size(g)


Passing Retained on Grading
A B C D
37.5mm 25.0mm 125025
25.0mm 19.0mm 125025
19.0mm 12.5mm 125010 250010
12.5mm 9.5mm 125010 250010
9.5mm 6.3mm 250010
6.3mm 4.75mm 250010
4.75mm 2.36mm 500010
Total 500010 500010 500010 500010

GRADING SUED
Mass of sample before test M1 g 5000 5000

Mass retained on sieve size 1.70 mmM 2 g 2679 2587

M 1 M 2
Mass passing sieve size 1.70 mm g 2321 2413

M 1M 2
LAA Value
( M1 )
100 % 46.4 48.3

Average LAA Value % 47.0

REMARKS:

Contractor's Repressentative Engineer's Repressentative


MINISTRY OF PUBLIC WORKS, LIBERIA
FISH TOWN - HARPER ROAD PROJECT
Paving of Harper -
Karloken (50km) and Maintenance of Karloken to
Fish Town (80km)

FLAKINESS INDEX FI
TEST METHOD : BS 812:SECTION 105.1:1989
LOCATION: Contractor's Quarry DATE SAMPLED: 29/Jul/16
PURPOSE: Concrete Works DATE TESTED: 29/Jul/16
MATERIAL
Crush stone 5--31.5mm REF.NO.
DESCRIPTION:
Fraction Gauged
Sieve Size
Passing sieve mm 63 50 37.5 28 20 14 10
Retained on sieve mm 50 37.5 28 20 14 10 6.3
Slots width mm 33.9 26.3 19.7 14.4 10.2 7.2 4.9

Mass of aggregate
t 668 730 103 281 208
retained (g)
Mass of aggregate passing
g 184 235 44 89 19
slot (g)
Individual percentage
% 27.5 32.2 42.7 31.7 9.1
M0/M1100
Sum of Aggregate mass
g 1990
M1
Sum of fraction less than
g 571
5% of M1

Remaining sum of
g 1419
Aggregate mass M2

Flakiness Index FI=M3/M2100 % 28.7

REMARKS:

Contractor's
Engineer's Repressentative
Repressentative
CONSULTANT: CLIENT: CONTRACTOR:

Comptran Ministry of Public Works CREC 5


SPECIFIC GRAVITY AND ABSORPTION
SAMPLE DESCRIPTION: 10 - 25 mm CHIPPINGS DATE: 2016/7/16
Name of Quarry: CREC 5 Quarry
Unit (g) 1 2 Avg REMARK
Weigth of Pycnometer g 533.1 535.8
Weight of sample + pycometer + water g 2093.5 2093.9
Weight of pycometer + water g 1501.4 1502.5
Weight of Pycnometer + SSD Sample g 1484.2 1488.3
Weight of SSD Sample in air g 951.1 952.5
Weigth of Container g 175.0 189.1
Weight of Container + oven dry Sample g 1121.8 1137.0
Weigth of oven dry Sample g 946.8 947.9
Bulk Specific Gravity g/cm 3 2.64 2.63 2.63
Specific Gravity on SSD basis g/cm 3 2.65 2.64 2.64
Apparent Specific Gravity g/cm 3 2.67 2.66 2.66
Water Absorption % 0.5 0.5 0.47

CONSULTANT: CLIENT: CONTRACTOR:

Comptran Ministry of Public Works CREC 5


SPECIFIC GRAVITY AND ABSORPTION
SAMPLE DESCRIPTION: 5 - 10 mm CHIPPINGS DATE: 2016/7/10
Name of Quarry: CREC 5 Quarry
Unit (g) 1 2 Avg REMARK
Weigth of Pycnometer g 533.1 535.8
Weight of sample + pycometer + water g 1940.9 1911.6
Weight of pycometer + water g 1501.4 1502.5
Weight of Pycnometer + SSD Sample g 1244.3 1198.7
Weight of SSD Sample in air g 711.2 662.9
Weigth of Container g 171.8 180.1
Weight of Container + oven dry Sample g 875.0 834.9
Weigth of oven dry Sample g 703.2 654.8
Bulk Specific Gravity g/cm3 2.59 2.58 2.58
Specific Gravity on SSD basis g/cm3 2.62 2.61 2.61
Apparent Specific Gravity g/cm3 2.67 2.67 2.67
Water Absorption % 1.1 1.2 1.19
Contractor Representative Engineer's Representative
CONSULTANT: CLIENT: CONTRACTOR:

Comptran Ministry of Public Works CREC 5


TEN PERCENT FINES
REQUIRED LOAD & TIME: 215KN/10 min DATE: 2016/7/29
Name of Quarry: CRWC

SAMPLE Unit (g) 1 2 1 2


Applied Force KN 110.0 110.0 100 100
Wt. of Sample Retained on 2.36mm Sieve g 2317.0 2299.0 2243 2250
Wt. of Sample Passing 2.36mm Sieve g 263.0 281.0 266.0 259.0
Total Weight of Sample g 2580.0 2580.0 2509.0 2509
% Passing 2.36mm Seives % 10.19 10.89 10.60 10.32
Avg. % Passing 2.36mm % 10.54 10.46
10% Fines Value KN 105.90 96.80
Wet/Dry % 91.41

Contractor Representative Engineer's Representative


MINISTRY OF PUBLIC WORKS, LIBERIA

FISH TOWN - HARPER ROAD PROJECT PHASE 1


Paving of Harper - Karloken (50km) and Maintenance of Karloken to Fish Town (80km)

Test Date: 29/Jul/16

Coarse Aggregates Achieved Specification

Ten Percent Fines (kN) 105.90 110kN Min

Ten Percent Fines (Wet/Dry) (%) 91.41 75% Min

ACV (%) 28.42 30% Max

LAA (%) 47.05 35% Max

Flakiness Index (%) 28.69 30% Min

Sand Equivalent (Fine Aggregates)

Airfield 1 Natural Sand 98.8 98.5% Min

Bulk SG (Oven S.G Apparent Absorptio Specification for


Dry) (SSD) S.G n (%) Absorption (%)

5 - 10mm Coarse Aggregates (Coarse Aggregate) 2.584 2.615 2.666 1.19

10 - 25mm Coarse Aggregates (Coarse Aggregate) 2.631 2.644 2.664 0.470 2% Max

Airfield Natural Sand 1 (fine aggregates) 2.669 - - -

0-20mm All-in-Grading Specification , Aggregates (CREC 5 Quarry) Natural Sand (Airfield 1 Sand )
Sieve Size (mm) 0.15 0.6 5 50 37.5

Lower Limit 0 10 35 95 100

Upper Limit 8 35 55 100 100

1 24 37 99 102
Grading obtained(%)

Contractors Material Engineer Materials Engineer