You are on page 1of 16

CONTROL GUIAS DE HORMIGON ESTRUCTURAL

OBRA:
RESPONSABLE INGRESO INFORMACIN:

INFORMACIN GUA DE HORMIGON INFORMACION A COMPLETAR POR OBRA

TIPO HORMIGON DESCRIPCIN DESTINO Hora Salida Hora Llegada


N PROVEEDOR FECHA N GUIA Aditivo M3 PARCIAL M3 ACUMULADO Elemento PISO / NIVEL
(DETALLE GUIA) HORMIGN Planta Obra
1 Planta 2 Besalco 1/8/2017 1757 HN 10 90 40 6 7.0 7.0 Soleras Colocacin soleras eje 9 1 8:25:00 n/a
2 Planta 2 Besalco 1/10/2017 1861 HN 10 90 40 6 7.00 14.0 Soleras Colocacin soleras eje 9 1 11:18:00 n/a
3 Planta 2 Besalco 1/10/2017 1869 HN 10 90 40 6 3.00 17.0 Soleras Colocacin soleras eje 9 1 15:13:00 n/a
4 Planta 2 Besalco 1/19/2017 2213 HN 10 90 40 6 2.00 19.0 Soleras Colocacin soleras eje 9 1 8:31:00
5 Planta 2 Besalco 1/26/2017 2462 HN 10 90 40 6 2.00 21.0 Soleras Colocacin soleras eje 62 1 14:36:00
6 Planta 2 Besalco 1/26/2017 2475 HN 10 90 40 6 2.00 23.0 Soleras Colocacin soleras eje 62 1 16:52:00
7 Planta 2 Besalco 1/27/2017 2530 HN 10 90 40 6 2.00 25.0 Soleras Colocacin soleras eje 9 1 16:26:00
8 Planta 2 Besalco 1/28/2017 2586 HN 10 90 40 6 2.00 27.0 Soleras Colocacin soleras eje 9 1 17:29:00
9 Planta 2 Besalco 2/2/2017 2778 HN 10 90 40 6 2.00 29.0 Soleras Colocacin soleras 1 8:15:00
10 Planta 2 Besalco 2/2/2017 2779 HN 10 90 40 6 2.00 31.0 Soleras Colocacin soleras 1 9:49:00
11 Planta 2 Besalco 2/2/2017 2780 HN 10 90 40 6 2.00 33.0 Soleras Colocacin soleras 1 11:38:00
12 Planta 2 Besalco 2/2/2017 2789 HN 10 90 40 6 2.00 35.0 Soleras Colocacin soleras 1 16:13:00
13 Planta 2 Besalco 2/3/2017 2815 HN 10 90 40 6 2.00 37.0 Soleras Colocacin soleras 1 8:51:00
14 Planta 2 Besalco 2/3/2017 2849 HN 10 90 40 6 2.00 39.0 Soleras Colocacin soleras 1 14:52:00
15 39.0
16 39.0
17 39.0
18 39.0
19 39.0
20 39.0
21 39.0
22 39.0
23 39.0
24 39.0
25 39.0
26 39.0
27 39.0
28 39.0
29 39.0
30 39.0
CONTROL GUIAS DE HORMIGON ESTRUCTURAL

OBRA:
RESPONSABLE INGRESO INFORMACIN:

INFORMACIN GUA DE HORMIGON INFORMACION A COMPLETAR POR OBRA

TIPO HORMIGON DESCRIPCIN DESTINO Hora Salida Hora Llegada Hora Inicio Hora Termino Tiempo Hora Salida de
N PROVEEDOR FECHA N GUIA Aditivo M3 PARCIAL M3 ACUMULADO Elemento PISO / NIVEL
(DETALLE GUIA) HORMIGN Planta Obra Descarga Descarga descarga Obra
1 Meln - Besalco 5-5-16 7058435 HN 50 90 40 06 02 RK 8.0 8.0 Banco ductos Banco ducto km 660 1 16:30:00 17:25:00 0:00:00
2 Planta 2 Besalco 10/13/2016 73 HN 05 90 20 06 5.00 13.0 Banco ductos Dados km 1351 1 15:17:00 0:00:00
3 Planta 2 Besalco 10/12/2016 5632 HN 05 90 40 06 1.50 14.5 Emplantillados Eje 8 Pista 1 0:00:00
4 Planta Besalco 9/26/2016 640445 HN 05 90 20 05 1.00 15.5 Inf no entregada por capataz Km 1330 1 0:00:00
5 Planta 1 Besalco 11/27/2016 6502 HN 05 90 20 06 6.00 21.5 Banco ductos Km 1800 1 9:53:00 0:00:00
6 Planta 2 Besalco 12/4/2016 1214 HN 05 90 20 06 3.00 24.5 Emplantillados Bco ducto cruce alfa 1 15:36:00 0:00:00
7 Planta 2 Besalco 1/30/2017 2676 HN 05 90 40 06 7.00 31.5 Emplantillados Pozo mantencion SSEI 1 8:16:00 0:00:00
8 31.5 0:00:00
9 31.5 0:00:00
10 31.5 0:00:00
11 31.5 0:00:00
12 31.5 0:00:00
13 31.5 0:00:00
14 31.5 0:00:00
15 31.5 0:00:00
16 31.5 0:00:00
17 31.5 0:00:00
18 31.5 0:00:00
19 31.5 0:00:00
20 31.5 0:00:00
21 31.5 0:00:00
22 31.5 0:00:00
23 31.5 0:00:00
24 31.5 0:00:00
25 31.5 0:00:00
26 31.5 0:00:00
27 31.5 0:00:00
28 31.5 0:00:00
29 31.5 0:00:00
30 31.5 0:00:00
CONTROL GUIAS DE HORMIGON ESTRUCTURAL

OBRA:
RESPONSABLE INGRESO INFORMACIN:

INFORMACIN GUA DE HORMIGON INFORMACION A COMPLETAR POR OBRA

TIPO HORMIGON DESCRIPCIN DESTINO Hora Salida Hora Llegada Hora Inicio Hora Termino Hora Salida de
N PROVEEDOR FECHA N GUIA Aditivo M3 PARCIAL M3 ACUMULADO Edificio Elemento PISO / NIVEL
(DETALLE GUIA) HORMIGN Planta Obra Descarga Descarga Obra

1 Besalco 4-10-16 26 250 kg cem/m3 4.0 4.0 Cmaras pista cmaras hormign Poliductos pista 1 10:40:00
2 Besalco 4-10-16 38 250 kg cem/m3 5.0 9.0 Cmaras pista cmaras hormign Poliductos pista 1 16:08:00
3 Besalco 4-10-16 40 250 kg cem/m3 5.0 14.0 Cmaras pista cmaras hormign Poliductos pista 1 18:37:00
4 Besalco 5-10-16 629031 250 kg cem/m3 5.0 19.0 Banco ductos Banco ductos Cruce eje 3, km 103,4 1
5 Besalco planta 1 6-11-16 5258 250 kg cem/m3 5.0 24.0 Cmaras pista Cmaras elctricas 1 17:26:00
CONTROL GUIAS DE HORMIGON ESTRUCTURAL

OBRA: N
RESPONSABLE INGRESO INFORMACIN:
INFORMACIN GUA DE HORMIGON INFORMACION A COMPLETAR POR OBRA M
M3 M3 M3 CARGA U
TIPO HORMIGON M3 CARGA PISO / Hora Salida Hora Llegada Hora Inicio Hora Termino Tiempo
N PROVEEDOR FECHA N GUIA Aditivo M3 PARCIAL M3 ACUM. CAPACHA BOMBEAD INCOMP. Edificio Elemento DESCRIPCIN DESTINO HORMIGN E
(DETALLE GUIA) INCOMP. ACUM. NIVEL Planta Obra Descarga Descarga descarga
DO O PARCIAL S
1 Meln 19-2-16 7049018 HN 25 90 40 6 02 RK 8 8 DGAC Fundaciones Eje 1 entre E y G 1 nivel 7:35:00 8:30:00 8:40:00 9:20:00 0:40:00 T
###
2 Meln 19-2-16 7049020 HN 25 90 40 6 02 RK 8 16.0 DGAC Fundaciones Eje 1 entre C y A 1 nivel 9:00:00 10:00:00 10:05:00 10:30:00 0:25:00 R
###
4 Meln 19-2-16 7049021 HN 25 90 40 6 02 RK 0 16.0 DGAC Fundaciones Eje 1 entre 1 y 2 1 nivel 9:15:00 10:00:00 13 yE14
3 Meln 19-2-16 7049022 HN 25 90 40 6 02 RK 8 24.0 DGAC Fundaciones Eje 3 entre E y D 1 nivel 10:30:00 11:15:00 11:30:00 12:15:00 0:45:00
O
5 Meln 19-2-16 7049023 HN 25 90 40 6 02 RK 8 32.0 DGAC Fundaciones Eje 3 con B; 1 con C 1 nivel 12:10:00 12:50:00 12:55:00 13:40:00 0:45:00
8 Meln 19-2-16 7049024 HN 25 90 40 6 02 RK 8 40.0 DGAC Fundaciones Eje 3 entre A y A; 5 entre E y D 1 nivel 13:30:00 14:25:00 14:30:00 15:10:00 0:40:00
9 Meln 19-2-16 7049025 HN 25 90 40 6 02 RK 8 48.0 DGAC Fundaciones Eje 5 entre A y B; 7 con E 1 nivel 14:40:00 15:30:00 15:35:00 16:20:00 0:45:00
12 Meln 19-2-16 7049026 HN 25 90 40 6 02 RK 8 56.0 DGAC Fundaciones Eje 7 entre C y E: 9 entre A y B 1 nivel 15:20:00 16:15:00 16:20:00 17:00:00 0:40:00
6 Meln 19-2-16 7049027 HN 25 90 40 6 02 RK 8 64.0 DGAC Fundaciones Eje 9 con E; 10 con C; 13 con A; 11 con A 1 nivel 16:30:00 17:20:00 17:25:00 18:20:00 0:55:00
7 Meln 19-2-16 7049028 HN 25 90 40 6 02 RK 8 72.0 DGAC Fundaciones Eje 10 con E; 9 entre A y D 1 nivel 17:30:00 18:30:00 18:35:00 19:00:00 0:25:00
10 Meln 23-2-16 7049045 HN 25 90 40 6 02 RK 8 80.0 DGAC Fundaciones 16 entre E y D 1 nivel 14:00:00 14:50:00 14:55:00 18:30:00 3:35:00
###
11 Meln 19-2-16 7049048 HN 25 90 40 6 02 RK 2 82.0 DGAC Fundaciones Eje 1 entre 1 y 2 1 nivel 9:10:00 10:00:00 10:10:00 10:20:00 0:10:00
13 Meln 23-2-16 7049053 HN 25 90 40 6 02 RK 8 90.0 DGAC Fundaciones Eje 16 entre B y C 1 nivel 17:10:00 18:00:00 18:10:00 18:40:00 0:30:00
###
14 Meln 24-2-16 7049072 HN 25 90 40 6 02 RK 8 98.0 DGAC Fundaciones 16 entre A y B; 16 entre A y B 1 nivel 13:30:00 14:20:00 14:25:00 15:05:00 0:40:00
###
15 Meln 24-2-16 7049075 HN 25 90 40 6 02 RK 8 106.0 DGAC Fundaciones Eje 14 entre A y C 1 nivel 16:00:00 16:55:00 ###
17 Meln 24-2-16 7049076 HN 25 90 40 6 02 RK 8 114.0 DGAC Fundaciones Eje D entre 14 y 13 1 nivel 16:25:00 17:00:00 17:05:00 17:45:00 0:40:00
###
18 Meln 24-2-16 7049077 HN 25 90 40 6 02 RK 8 122.0 DGAC Fundaciones Eje 11 con D; 13 entre y D; 15 con E 1 nivel 16:30:00 17:40:00 17:50:00 ###
19 Meln 24-2-16 7049080 HN 25 90 40 6 02 RK 8 130.0 DGAC Fundaciones Eje 11 con B; 13 entre B y E 1 nivel 18:50:00 19:40:00 19:45:00
16 Meln 25-2-16 7049086 HN 25 90 40 6 02 RK 8 138.0 SEE Fundaciones Eje 1 entre J e I 1 nivel 10:15:00 11:15:00 ###
20 Meln 25-2-16 7049089 HN 25 90 40 6 02 RK 8 146.0 SEE Fundaciones Eje 1 entre J y E 1 nivel 12:30:00 13:20:00 13:25:00 13:45:00 0:20:00
21 Meln 25-2-16 7049091 HN 25 90 40 6 02 RK 8 154.0 SEE Fundaciones Eje 1 entre F y B 1 nivel 14:00:00 14:50:00 14:55:00 ###
22 Meln 25-2-16 7049096 HN 25 90 40 6 02 RK 8 162.0 SEE Fundaciones Entre ejes 1 y 2 1 nivel 15:00:00 15:55:00 16:00:00 ###
23 Meln 25-2-16 7049098 HN 25 90 40 6 02 RK 8 170.0 SEE Fundaciones ???????? 1 nivel 17:00:00 17:50:00 17:55:00 18:55:00 1:00:00
###
24 Meln 25-2-16 7049101 HN 25 90 40 6 02 RK 8 178.0 SEE Fundaciones ???????? 1 nivel 17:45:00 18:30:00 ###
25 Meln 25-2-16 7049103 HN 25 90 40 6 02 RK 8 186.0 SEE Fundaciones Ejes C, D e I entre 1 y 2 1 nivel 18:25:00 18:30:00 19:30:00 1:00:00
26 Meln 25-2-16 7049104 HN 25 90 40 6 02 RK 8 194.0 SEE Fundaciones Eje B entre 3 y 6 1 nivel 18:30:00 19:25:00 19:40:00 20:03:00 0:23:00
27 Meln 26-2-16 7049112 HN 25 90 40 6 02 RK 8 202.0 SEE Fundaciones Eje B entre 5 y 8 1 nivel 12:05:00 13:00:00 13:05:00 ###
28 Meln 26-2-16 7049113 HN 25 90 40 6 02 RK 8 210.0 SEE Fundaciones Eje 8 con C, D y F 1 nivel 12:35:00 13:25:00 13:40:00 ###
29 Meln 26-2-16 7049114 HN 25 90 40 6 02 RK 8 218.0 SEE Fundaciones Ejes C, D y F entre 5 y 8 1 nivel 14:25:00 14:30:00 15:20:00 0:50:00
###
32 Meln 26-2-16 7049119 HN 25 90 40 6 02 RK 8 226.0 SEE Fundaciones Ejes C, D y F entre 5 y 8 1 nivel 15:20:00 16:05:00 16:10:00 ###
31 Meln 26-2-16 7049120 HN 25 90 40 6 02 RK 8 234.0 SEE Fundaciones Eje 6 entre G y H 1 nivel 15:45:00 16:30:00 17:00:00 ###
33 Meln 26-2-16 7049121 HN 25 90 40 6 02 RK 8 242.0 SEE Fundaciones Ejes G y H entre 5 y 8 1 nivel 17:00:00 17:45:00 17:50:00 18:20:00 0:30:00
###
30 Meln 26-2-16 7049122 HN 25 90 40 6 02 RK 8 250.0 SEE Fundaciones ???????? 1 nivel 18:30:00 19:20:00 19:30:00 20:12:00 0:42:00
###
34 Meln 26-2-16 7049123 HN 25 90 40 6 02 RK 8 258.0 SEE Fundaciones ???????? 1 nivel 18:50:00 19:45:00 20:15:00 21:00:00 ###
35 Meln 27-2-16 7049126 HN 25 90 40 6 02 RK 8 266.0 SEE Fundaciones Eje 5 entre F y G 1 nivel 7:30:00 8:20:00 8:30:00 9:10:00 0:40:00
###
36 Meln 27-2-16 7049127 HN 25 90 40 6 02 RK 8 274.0 SEE Fundaciones Eje 5 entre F y G 1 nivel 9:00:00 9:50:00 10:00:00 ###
37 Meln 27-2-16 7049128 HN 25 90 40 6 02 RK 8 282.0 SEE Fundaciones Ejes H, I y J entre 3 y 5 1 nivel 9:20:00 10:15:00 10:30:00 11:40:00 1:10:00
###
38 Meln 27-2-16 7049130 HN 25 90 40 6 02 RK 6 288.0 SEE Fundaciones Ejes H, I y J entre 3 y 5 1 nivel 12:00:00 12:50:00 12:55:00 ###
39 Meln 10-3-16 7049266 HN 25 90 40 6 02 RK 5.5 293.5 SSEI Fundaciones Eje 1 con F6, F5, F5, F2, F1 1 nivel 8:50:00 9:40:00 9:50:00 ###
40 Meln 10-3-16 7049268 HN 25 90 40 6 02 RK 5.5 299.0 SSEI Fundaciones Eje 1 con F6, F2, F5, F2, F1 1 nivel 10:17:00 11:20:00 11:45:00 ###
41 Meln 11-3-16 7049293 HN 25 90 40 6 02 RK 8 307.0 SSEI Fundaciones Eje C entre 1 y 2 1 nivel 13:00:00 14:00:00 15:25:00 ###
42 Meln 11-3-16 7049296 HN 25 90 40 6 02 RK 8 315.0 SSEI Fundaciones Eje C entre 2 y 3 1 nivel 14:56:00 16:15:00 16:18:00 17:20:00 1:02:00
###
43 Meln 11-3-16 7049297 HN 25 90 40 6 02 RK 8 323.0 SSEI Fundaciones Eje C con 3, 4 y 5 1 nivel 16:20:00 17:10:00 17:25:00 18:20:00 0:55:00
###
44 Meln 11-3-16 7049300 HN 25 90 40 6 02 RK 6.5 329.5 SSEI Fundaciones Eje C entre 5 y 6 1 nivel 18:10:00 19:15:00 19:20:00 ###
45 Meln 12-3-16 7049301 HN 25 90 40 6 02 RK 5 334.5 SSEI Fundaciones Eje C con 7 1 nivel 9:20:00 9:30:00 10:20:00 0:50:00
###
46 Meln 12-3-16 7049302 HN 25 90 40 6 02 RK 5 339.5 SSEI Fundaciones Eje C con 8 1 nivel 9:40:00 10:45:00 ###
47 Meln 12-3-16 7049303 HN 25 90 40 6 02 RK 1 340.5 SSEI Fundaciones Eje C con 8 1 nivel 9:40:00 10:45:00 ###
48 Meln 16-3-16 7049361 HN 25 90 40 6 02 RK 8 348.5 SSEI Fundaciones Eje B ( F1 y F2) 1 nivel 14:10:00 15:00:00 15:05:00 16:00:00 0:55:00
###
49 Meln 16-3-16 7049363 HN 25 90 40 6 02 RK 8 356.5 SSEI Fundaciones Eje B (F3, F4 y F5) 1 nivel 14:40:00 15:50:00 16:05:00 16:50:00 0:45:00
###
50 Meln 16-3-16 7049367 HN 25 90 40 6 02 RK 8 364.5 SSEI Fundaciones Eje B (F58, F6 y F7) 1 nivel 16:00:00 16:50:00 16:55:00 18:30:00 1:35:00
###
51 Meln 17-3-16 7049376 HN 25 90 40 6 02 RK 7 371.5 SSEI Fundaciones Eje 8 ( A y B) 1 nivel ###
52 Meln 17-3-16 7049382 HN 25 90 40 6 02 RK 0 371.5 SSEI Fundaciones 0 1 nivel ###
53 Meln - Besalco 18-3-16 7049392 HN 25 90 40 6 02 RK 4.5 376.0 SSEI Fundaciones Eje 7 entre A y B 1 nivel 9:10:00 10:05:00 10:40:00 ###
54 Meln 23-3-16 7049447 HN 25 90 40 6 02 RK 8 384.0 SSEI Fundaciones Eje A entre 9 y 10 1 nivel 10:35:00 11:35:00 11:45:00 ###
55 Meln 23-3-16 7049448 HN 25 90 40 6 02 RK 8 392.0 SSEI Fundaciones Eje 10 entre A y B 1 nivel 11:20:00 12:10:00 12:15:00 12:55:00 0:40:00
###
56 Meln 23-3-16 7049449 HN 25 90 40 6 02 RK 8 400.0 SSEI Fundaciones Eje 10 entre B y C 1 nivel 12:45:00 13:53:00 14:00:00 14:30:00 0:30:00
###
57 Meln 23-3-16 7049450 HN 25 90 40 6 02 RK 8 408.0 SSEI Fundaciones Eje C entre 9 y 10 1 nivel 13:35:00 14:26:00 14:35:00 ###
58 Meln 23-3-16 7049452 HN 25 90 40 6 02 RK 8 416.0 SSEI Fundaciones Eje 9 entre B y C 1 nivel 14:45:00 15:30:00 15:35:00 16:35:00 1:00:00
###
59 Meln - Besalco 23-3-16 7049454 HN 25 90 40 6 02 RK 8 424.0 SSEI Fundaciones Ejes 90, 10 y 10 entre B y C 1 nivel 15:20:00 16:25:00 16:40:00 ###
60 Meln 23-3-16 7049455 HN 25 90 40 6 02 RK 5 429.0 SSEI Fundaciones Eje 9 entre B y C 1 nivel 15:35:00 16:25:00 16:35:00 ###
61 Meln - Besalco 28-3-16 7049476 HN 25 90 40 6 02 RK 7.5 436.5 DGAC Fundaciones Zona ascensor 1 nivel 9:20:00 10:10:00 10:15:00 11:00:00 0:45:00
###
62 Meln 28-3-16 7049480 HN 25 90 40 6 02 RK 3.5 440.0 DGAC Fundaciones Zona ascensor 1 nivel 11:56:00 12:49:00 12:50:00 13:19:00 0:29:00
###
63 Meln - Besalco 5-4-16 7049629 HN 25 90 40 6 02 RK 8 448.0 SSEI Fundaciones Eje C entre 8 y 1 1 nivel 11:03:00 12:15:00 0:00:00
###
64 Meln - Besalco 8-4-16 7049673 HN 25 90 40 6 02 RK 8 456.0 SSEI Fundaciones Eje A entre 2 y 8 1 nivel 11:00:00 12:10:00 12:20:00 15:20:00 3:00:00
###
65 Meln - Besalco 9-4-16 7049693 HN 25 90 40 6 02 RK 8 464.0 SSEI Fundaciones Eje 1 (A y C); A (1 - 2); B (3 - 5) 1 nivel 12:50:00 13:45:00 13:55:00 ###
66 Planta 2 Besalco 7-10-16 5603 HN 25 90 20 07 2 466.0 0:00:00
67 Planta 2 Besalco 14-10-16 5654 HN 25 90 20 07 5 471.0 Pista Banco ductos Dados km 1651 1 0:00:00
68 Planta 2 Besalco 5-10-16 629031 HN 25 5 476.0 Pista Banco ductos Banco ductos km 103,4, cruce eje 3 1 0:00:00
69 Planta 2 Besalco 7-10-16 629050 HN 25 90 20 07 2 478.0 0:00:00
70 Planta 2 Besalco 7-10-16 5601 HN 25 90 20 07 2 480.0 0:00:00
71 Planta 1 Besalco 11-11-16 5296 HN 25 90 20 07 3 483.0 Pista Banco ductos Banco ductos 1 11:15:00 0:00:00
72 Planta 1 Besalco 11-11-16 5295 HN 25 90 20 07 7 490.0 Pista Banco ductos Banco ductos 1 9:50:00 0:00:00
73 Planta 2 Besalco 14-11-16 540 HN 25 90 20 07 8 498.0 Pista Cmaras elctricas Cmaras elctricas 1 9:34:00 0:00:00
74 Planta 2 Besalco 14-11-16 542 HN 25 90 20 07 8 506.0 Pista Cmaras elctricas Cmaras elctricas 1 13:58:00 0:00:00
75 Planta 2 Besalco 14-11-16 543 HN 25 90 20 07 4 510.0 Pista Cmaras elctricas Cmaras elctricas 1 16:44:00 0:00:00
76 Planta Besalco 28-9-16 629685 HN 25 90 20 07 5 515.0 Pista Banco ductos Km 1200 1 12:00:00 0:00:00
77 Planta Besalco 24-11-16 5191 HN 25 90 20 07 5 520.0 Pista Banco ductos Atravieso n3 1 14:05:00 0:00:00
78 Planta 1 Besalco 29-11-16 6520 HN 25 90 20 07 8 528.0 Pista Banco ductos Sin informacin capataz 1 9:15:00 0:00:00
79 Planta 1 Besalco 29-11-16 6525 HN 25 90 20 07 3 531.0 Pista Banco ductos Sin informacin capataz 1 11:40:00 0:00:00
80 Planta 2 Besalco 2-12-16 1125 HN 25 90 20 07 6 537.0 Pista Banco ductos Cruce eje 9 1 15:30:00 0:00:00
81 Planta 2 Besalco 2-12-16 1136 HN 25 90 20 07 4 541.0 Pista Banco ductos Cruce eje 9 1 16:54:00 0:00:00
82 Planta 2 Besalco 2-12-16 1150 HN 25 90 20 07 1.5 542.5 Pista Banco ductos Cruce eje 9 1 11:50:00 0:00:00
83 Planta 2 Besalco 14-12-16 1461 HN 25 90 20 07 7.5 550.0 SEE Banco ductos Cruce SEE 1 15:31:00 0:00:00
84 Planta 2 Besalco 14-12-16 1462 HN 25 90 20 07 6 556.0 SEE Banco ductos Cruce SEE 1 17:02:00 0:00:00
85 Planta 2 Besalco 16-12-16 1539 HN 25 90 20 07 7 563.0 SEE Banco ductos Sector Lan Cargo y dados SEE 1 17:33:00 0:00:00
86 Planta 2 Besalco 20-12-16 1668 HN 25 90 20 07 4 567.0 Pista Banco ductos Banco ducto sector 9 km 660 1 8:10:00 0:00:00
87 Planta 2 Besalco 12-1-17 1953 HN 25 90 20 07 4 571.0 Cmaras Cmaras elctricas Cmaras elctricas costado SEE 1 14:23:00 0:00:00
88 Planta 2 Besalco 14-1-17 2029 HN 25 90 20 07 2 573.0 Cmaras Cmaras elctricas Cmaras elctricas costado SEE 1 10:56:00 0:00:00
89 Planta 2 Besalco 25-1-17 2428 HN 25 90 20 07 2 575.0 SEE Banco ductos Cruce costado SEE 1 10:31:00 0:00:00
90 Planta 2 Besalco 28-1-17 2570 HN 25 90 20 07 2.5 577.5 SEE Banco ductos Cmaras elctricas costado SEE 1 15:14:00 0:00:00
91 Planta 2 Besalco 1-2-17 2755 HN 25 90 20 07 1.5 579.0 Pista Cmaras elctricas Alfa Bravo 1 11:05:00 0:00:00
92 Planta 2 Besalco 4-2-17 2884 HN 25 90 20 07 2.5 581.5 Cmaras Banco ductos Cmara Alfa y dados sector 09 1 8:06:00 0:00:00
93 581.5 0:00:00
94 581.5 0:00:00
95 581.5 0:00:00
96 581.5 0:00:00
97 581.5 0:00:00
98 400.0 0:00:00
99 408.0 0:00:00
100 416.0 0:00:00
0:00:00
CONTROL GUIAS DE HORMIGON ESTRUCTURAL

OBRA:
RESPONSABLE INGRESO INFORMACIN: N

INFORMACIN GUA DE HORMIGON INFORMACION A COMPLETAR POR OBRA
M
U
TIPO HORMIGON (DETALLE Hora Salida Hora Llegada
N PROVEEDOR FECHA N GUIA M3 PARCIAL M3 ACUMULADO Edificio Elemento DESCRIPCIN DESTINO HORMIGN PISO / NIVEL E
GUIA) Planta Obra
S
T
1 Meln - Besalco 24-3-16 7049467 HN 30 90 20 10 02 RK 8.0 8.0 ESTANQUE Losa Fundacin Sala de bombas 1 13:15:00 14:14:00
###
R
2 Meln 24-3-16 7049470 HN 30 90 20 10 02 RK 8.0 16.0 ESTANQUE Losa Fundacin Sala de bombas 1 14:10:00 15:05:00
###
E
3 Meln 24-3-16 7049471 HN 30 90 20 10 02 RK 8.0 24.0 ESTANQUE Losa Fundacin Sala de bombas 1 14:50:00 15:55:00
###
O
4 Meln 24-3-16 7049472 HN 30 90 20 10 02 RK 8.0 32.0 ESTANQUE Losa Fundacin Sala de bombas 1 16:00:00 17:00:00
###
5 Meln - Besalco 24-3-16 7049474 HN 30 90 20 10 02 RK 3.5 35.5 ESTANQUE Losa Fundacin Sala de bombas 1 17:00:00 17:52:00
6 Meln 26-4-16 7058359 HN 30 90 20 10 02 RK 8.0 43.5 ESTANQUE Losa superior Losa sobre sala de bombas 1 13:05:00 13:55:00
###
7 Meln 26-4-16 7058360 HN 30 90 20 10 02 RK 8.0 51.5 ESTANQUE Losa superior Losa sobre sala de bombas 1 13:30:00 14:45:00
###
8 Meln 26-4-16 7058361 HN 30 90 20 10 02 RK 8.0 59.5 ESTANQUE Losa superior Losa sobre sala de bombas 1 15:00:00 15:45:00
###
9 Meln 26-4-16 7058362 HN 30 90 20 10 02 RK 6.0 65.5 ESTANQUE Losa superior Losa sobre sala de bombas 1 16:45:00 17:25:00
###
10 Meln 30-4-16 7058378 HN 30 90 20 10 02 RK 7.5 73.0 ESTANQUE Losa superior Losa sobre estanque 1
11 Meln 2-5-16 7058385 HN 30 90 20 10 02 RK 7.5 80.5 ESTANQUE Losa superior Losa sobre estanque 1 12:20:00 13:20:00
###
12 Meln 2-5-16 7058387 HN 30 90 20 10 02 RK 7.5 88.0 ESTANQUE Losa superior Losa sobre estanque 1 14:10:00 ###
13 Meln 2-5-16 7058391 HN 30 90 20 10 02 RK 7.5 95.5 ESTANQUE Losa superior Losa sobre estanque 1 ###
14 Meln 2-5-16 7058392 HN 30 90 20 10 02 RK 7.5 103.0 ESTANQUE Losa superior Losa sobre estanque 1 16:00:00 16:45:00
###
15 Meln 2-5-16 7058393 HN 30 90 20 10 02 RK 7.5 110.5 ESTANQUE Losa superior Losa sobre estanque 1 16:45:00 17:45:00
###
16 Meln 2-5-16 7058396 HN 30 90 20 10 02 RK 7.5 118.0 ESTANQUE Losa superior Losa sobre estanque 1 18:20:00 19:00:00
###
17 Meln 3-5-16 7058405 HN 30 90 20 10 02 RK 8.0 126.0 DGAC Elevaciones Muro eje 3, eje 1 y eje 1 2 15:30:00 16:25:00
###
18 Meln 5-5-16 7058428 HN 30 90 20 10 02 RK 7.5 133.5 DGAC Losa Eje 7 - 16 entre A y D 1 12:45:00 13:40:00
###
19 Meln 5-5-16 7058430 HN 30 90 20 10 02 RK 7.5 141.0 DGAC Losa Eje 7 - 16 entre A y D 1 13:25:00 14:10:00
###
20 Meln 5-5-16 7058431 HN 30 90 20 10 02 RK 7.5 148.5 DGAC Losa Eje 7 - 16 entre A y D 1 13:45:00 14:30:00
###
21 Meln 5-5-16 7058432 HN 30 90 20 10 02 RK 7.5 156.0 DGAC Losa Eje 7 - 16 entre A y D 1 14:45:00 18:30:00
###
22 Meln 5-5-16 7058434 HN 30 90 20 10 02 RK 7.5 163.5 DGAC Losa Eje 7 - 16 entre A y D 1 16:00:00 17:00:00
###
23 Meln 5-5-16 7058437 HN 30 90 20 10 02 RK 3.0 166.5 DGAC Losa Eje 7 - 16 entre A y D 1 17:00:00 17:50:00
###
24 Meln - Besalco 13-5-16 7058518 HN 30 90 20 10 02 RK 7.5 174.0 Banco ductos Banco ductos 2 corrida 1 13:40:00 14:00:00
###
25 Meln 14-5-16 7058529 HN 30 90 20 10 02 RK 7.5 181.5 Banco ductos Banco ductos 2 corrida 1 11:25:00 12:15:00
###
26 Meln - Besalco 16-5-16 7058535 HN 30 90 20 10 02 RK 7.5 189.0 DGAC Elevaciones Eje D entre 7 y 14; 14 entre C y D 2 10:45:00 11:50:00
###
27 Meln - Besalco 16-5-16 7058541 HN 30 90 20 10 02 RK 7.5 196.5 DGAC Elevaciones Eje 16 entre C y d; B entre 15 y 16 2 14:45:00 15:47:00
###
28 Meln - Besalco 17-5-16 7058554 HN 30 90 20 10 02 RK 7.0 203.5 DGAC Elevaciones Eje A entre 9 y 16; 16 entre A y B 2 13:15:00 14:15:00
###
29 Meln - Besalco 17-5-16 7058563 HN 30 90 20 10 02 RK 4.0 207.5 DGAC Elevaciones Eje 14 2 16:30:00 17:18:00
###
30 Meln - Besalco 20-5-16 7058615 HN 30 90 20 10 02 RK 7.0 214.5 SEE Elevaciones Eje B entre 0.1 y 0.6 1 13:35:00 14:35:00
###
31 Meln - Besalco 20-5-16 7058616 HN 30 90 20 10 02 RK 0.5 215.0 SEE Elevaciones Eje B entre 0.1 y 0.6 1 13:35:00 14:35:00
###
32 Meln - Besalco 23-5-16 7058624 HN 30 90 20 10 02 RK 7.5 222.5 SEE Losa Entre ejes 6 - 8 y G - J 1 13:00:00 14:00:00
###
33 Meln 23-5-16 7058625 HN 30 90 20 10 02 RK 7.5 230.0 SEE Losa Entre ejes 4 - 7 y G - J 1 14:25:00 15:25:00
###
34 Meln 23-5-16 7058628 HN 30 90 20 10 02 RK 7.5 237.5 SEE Losa Entre ejes 3 - 4 y F - J 1 15:05:00 15:55:00
###
35 Meln - Besalco 11-5-16 7058486 HN 30 90 20 10 02 RK 8.0 245.5 SEE Elevaciones Ejes 1 entre I-J; 2 entre J-F; J entre 1-2; I entre 1-2 1 10:20:00 11:00:00
###
36 Meln - Besalco 10-5-16 7058471 HN 30 90 20 10 02 RK 8.0 253.5 Banco ductos Banco ductos Entre cmaras 1 y 2 1 9:20:00 10:50:00
###
37 Meln - Besalco 10-5-16 7058478 HN 30 90 20 10 02 RK 8.0 261.5 Banco ductos Banco ductos Entre cmaras 1 y 2 1 13:10:00 14:10:00
###
38 Meln - Besalco 10-5-16 7058483 HN 30 90 20 10 02 RK 8.0 269.5 Banco ductos Banco ductos Entre cmaras 1 y 2 1 16:55:00 17:50:00
###
39 Meln - Besalco 25-5-16 7058665 HN 30 90 20 10 02 RK 7.5 277.0 SEE Losa 1 11:50:00 12:50:00
###
40 Meln 25-5-16 7058658 HN 30 90 20 10 02 RK 7.5 284.5 SEE Losa 1 12:45:00 13:45:00
###
41 Meln 25-5-16 7058660 HN 30 90 20 10 02 RK 7.5 292.0 SEE Losa 1 14:30:00 15:20:00
###
42 Meln - Besalco 25-5-16 7058661 HN 30 90 20 10 02 RK 7.5 299.5 SEE Losa 1 14:50:00 15:55:00
###
43 Meln 25-5-16 7058662 HN 30 90 20 10 02 RK 5.0 304.5 SEE Losa 1 15:40:00 16:30:00
###
44 Meln - Besalco 27-5-16 7058678 HN 30 90 20 10 02 RK 7.5 312.0 SSEI Losa B2 - C1 y 10-8 1 ###
45 Meln 27-5-16 7058683 HN 30 90 20 10 02 RK 7.5 319.5 SSEI Losa B2 - C1 y 10-8 1 12:45:00 13:40:00
###
46 Meln - Besalco 27-5-16 7058687 HN 30 90 20 10 02 RK 3.5 323.0 SSEI Losa B2 - C1 y 10-8 1 ###
47 Meln - Besalco 31-5-16 7058707 HN 30 90 20 10 02 RK 7.0 330.0 SSEI Losa Ejes B2 - A entre 10 - 7 1 ###
48 Meln 31-5-16 7058710 HN 30 90 20 10 02 RK 7.0 337.0 SSEI Losa Ejes B2 - A entre 10 - 7 1 10:25:00 11:20:00
###
49 Meln 31-5-16 7058711 HN 30 90 20 10 02 RK 7.0 344.0 SSEI Losa Ejes B2 - A entre 10 - 7 1 11:00:00 12:00:00
###
50 Meln - Besalco 31-5-16 7058712 HN 30 90 20 10 02 RK 7.0 351.0 SSEI Losa Ejes B2 - A entre 10 - 7 1 ###
51 Meln 31-5-16 7058714 HN 30 90 20 10 02 RK 6.0 357.0 SSEI Losa Ejes B2 - A entre 10 - 7 1 14:00:00 15:00:00
###
52 Meln 4-6-16 7058753 HN 30 90 20 10 02 RK 7.5 364.5 SEE Coronacin muros Eje 8 entre G y J; F entre 2 y 6; 6 entre F y G; 7 entre G y J; G entre 6 y 8 1 12:50:00 14:00:00
###
53 Meln - Besalco 6-6-16 7058756 HN 30 90 20 10 02 RK 7.5 372.0 SEE Coronacin muros Eje H entre 3 y 2; 2 entre B y H; F entre 1 y 2; G entre 1 y 2 1 9:00:00 10:00:00
###
54 Meln 6-6-16 7058767 HN 30 90 20 10 02 RK 7.5 379.5 SEE Losa Ejes 7 y 8 entre B y G 1 14:30:00 15:20:00
###
55 Meln 6-6-16 7058768 HN 30 90 20 10 02 RK 7.5 387.0 SEE Losa Ejes 7 y 6 entre B y G 1 15:15:00 16:10:00
###
56 Meln 7-6-16 7058785 HN 30 90 20 10 02 RK 7.5 394.5 SEE Losa Ejes B y F entre 6 y 2 1 15:00:00 16:00:00
###
57 Meln - Besalco 7-6-16 7058786 HN 30 90 20 10 02 RK 7.5 402.0 SEE Losa Ejes G y B entre 6 y 8 1 15:35:00 16:55:00
###
58 Meln 8-6-16 7058791 HN 30 90 20 10 02 RK 7.5 409.5 Banco ductos Banco ductos km 1280 eje F entre D y J 1 11:50:00 12:50:00
###
59 Meln 8-6-16 7058794 HN 30 90 20 10 02 RK 7.5 417.0 Banco ductos Banco ductos km 1280 eje F entre D y J 1 15:10:00 16:20:00
###
60 Meln 14-6-16 7058836 HN 30 90 20 10 02 RK 7.5 424.5 Banco ductos Banco ductos km 1280 eje F 1 13:50:00 14:45:00
###
61 Meln - Besalco 15-6-16 7058839 HN 30 90 20 10 02 RK 7.5 432.0 SEE - Bco ductos Coronaciones y cmaras Muros coronacin SEE y cmaras de banco ductos 1 9:50:00 10:50:00
###
62 Meln - Besalco 16-6-16 7058854 HN 30 90 20 10 02 RK 6.0 438.0 SEE - Bco ductos Cmaras para baja tensin Banco ductos 1 9:30:00 10:20:00
###
63 Meln 17-6-16 7058871 HN 30 90 20 10 02 RK 7.5 445.5 SSEI Muros Muros eje B con 10 2 12:05:00 13:15:00
###
64 Meln 17-6-16 7058877 HN 30 90 20 10 02 RK 7.5 453.0 SSEI Muros Eje 10 entre B1 y B2 2 14:50:00 15:50:00
###
65 Meln - Besalco 21-6-16 7058892 HN 30 90 20 10 02 RK 6.5 459.5 SSEI Muros Eje 9 entre 10 y 10: 9 entre B1 y C 2 12:00:00 13:00:00
###
66 Meln 21-6-16 7058896 HN 30 90 20 10 02 RK 6.0 465.5 SSEI Muros Eje B1 entre 9 y 10; C entre 9 y 10 2 12:40:00 13:55:00
###
67 Meln 7-7-16 7293731 HN 30 90 20 10 02 RK 7.5 473.0 Galpn Radier Planta hormigones 1 13:00:00 13:55:00
68 Meln 4-7-16 7293707 HN 30 90 20 10 02 RK 7.5 480.5 SSEI Losa Eje A - B entre 8 - 10 2 12:40:00 13:40:00
###
69 Meln 4-7-16 7293709 HN 30 90 20 10 02 RK 7.5 488.0 SSEI Losa Eje B - B1 entre 8 - 9 2 13:30:00 14:30:00
###
70 Meln 4-7-16 7293711 HN 30 90 20 10 02 RK 5.5 493.5 SSEI Losa Eje B1 - B3 entre 8 - 10 2 16:10:00 17:10:00
###
71 Meln 7-7-16 7293730 HN 30 90 20 10 02 RK 7.5 501.0 Galpn Radier Planta hormigones 1 12:10:00 13:10:00
72 Besalco-Guzmn 16-9-16 640368 HN 30 90 20 10 7.5 508.5 TWR Losa fundacin Losa fundacin 1 9:30:00
73 Besalco-Guzmn 16-9-16 640369 HN 30 90 20 10 7.5 516.0 TWR Losa fundacin Losa fundacin 1 11:15:00
74 Besalco-Guzmn 16-9-16 640374 HN 30 90 20 10 7.5 523.5 TWR Losa fundacin Losa fundacin 1 12:45:00
75 Besalco-Guzmn 16-9-16 640381 HN 30 90 20 10 7.5 531.0 TWR Losa fundacin Losa fundacin 1 14:00:00
76 Besalco-Guzmn 16-9-16 640388 HN 30 90 20 10 7.5 538.5 TWR Losa fundacin Losa fundacin 1 15:15:00
77 Besalco-Guzmn 16-9-16 640389 HN 30 90 20 10 7.5 546.0 TWR Losa fundacin Losa fundacin 1 16:30:00
78 Besalco-Guzmn 16-9-16 640391 HN 30 90 20 10 7.5 553.5 TWR Losa fundacin Losa fundacin 1 17:30:00
79 Besalco-Guzmn 16-9-16 640392 HN 30 90 20 10 7.5 561.0 TWR Losa fundacin Losa fundacin 1 18:35:00
80 Besalco-Guzmn 16-9-16 640393 HN 30 90 20 10 1.5 562.5 TWR Losa fundacin Losa fundacin 1 19:00:00
81 Planta 1 Besalco 15-10-16 5518 HN 30 90 20 10 6.0 568.5 TWR Losa Losa piso 1 1
82 Planta Besalco 16-10-16 5552 HN 30 90 20 10 3.0 571.5 TWR Escala Escala piso 1 1 14:35:00
83 Planta Besalco 6-11-16 5250 HN 30 90 20 10 5.0 576.5 TWR Losa Losa 2 piso 2 15:05:00
84 Planta Besalco 7-11-16 5271 HN 30 90 20 10 3.0 579.5 SEE Sobrelosa Sobrelosa 1 14:50:00
85 Planta 2 Besalco 9-11-16 459 HN 30 90 20 10 3.0 582.5 SEE Sobrelosa Sobrelosa 1 11:57:00
CONTROL GUIAS DE HORMIGON ESTRUCTURAL

OBRA:
RESPONSABLE INGRESO INFORMACIN: N

INFORMACIN GUA DE HORMIGON INFORMACION A COMPLETAR POR OBRA
M
U
TIPO HORMIGON (DETALLE Hora Salida Hora Llegada
N PROVEEDOR FECHA N GUIA M3 PARCIAL M3 ACUMULADO Edificio Elemento DESCRIPCIN DESTINO HORMIGN PISO / NIVEL E
GUIA) Planta Obra
S
T
86 Planta 2 Besalco 9-11-16 465 HN 30 90 20 10 1.0 583.5 SEE Sobrelosa Sobrelosa 1 14:37:00 R
87 Planta 2 Besalco 10-11-16 5328 HN 30 90 20 10 2.5 586.0 SEE Sobrelosa Sobrelosa 1 E
88 Planta 1 Besalco 8-11-16 5272 HN 30 90 20 10 3.0 589.0 TWR Escala Escala tramo 2 a 3 piso 2 14:30:00 O
89 Planta 2 Besalco 12-11-16 517 HN 30 90 20 10 6.0 595.0 SEE Sobrelosa Sobrelosa 1 9:26:00
90 Planta 1 Besalco 26-11-16 66501 HN 30 90 20 10 3.0 598.0 TWR Escala Escala 3 a 4 piso 2 17:30:00
91 Planta 2 Besalco 5-12-16 1247 HN 30 90 20 10 4.5 602.5 TWR Losa Losa 4 piso 4 16:14:00
92 Planta 2 Besalco 6-12-16 1253 HN 30 90 20 10 3.0 605.5 TWR Escala Escala 4 a 5 piso 3 9:54:00
93 Planta 2 Besalco 17-12-16 1568 HN 30 90 20 10 3.0 608.5 DGAC Sobrelosa Sobrelosas radieres 1 14:23:00
94 Planta 2 Besalco 20-12-16 1674 HN 30 90 20 10 7.0 615.5 DGAC Sobrelosa Sobrelosas 1 10:13:00
95 Planta 2 Besalco 23-12-16 1720 HN 30 90 20 10 7.5 623.0 TWR Losa y escala Losa 5 piso 5 9:44:00
96 Planta 2 Besalco 9-1-17 1820 HN 30 90 20 10 4.0 627.0 DGAC Sobrelosa Sobrelosas 1 8:20:00
97 Planta 2 Besalco 9-1-17 1816 HN 30 90 20 10 4.0 631.0 DGAC Sobrelosa Sobrelosas 1 14:10:00
98 Planta 2 Besalco 10-1-17 1853 HN 30 90 20 10 5.0 636.0 DGAC Sobrelosa Sobrelosas 2 8:57:00
99 Planta 2 Besalco 15-1-17 2068 HN 30 90 20 10 7.5 643.5 TWR Losa Losa 6 piso 6 10:55:00
100 Planta 2 Besalco 27-1-17 2496 HN 30 90 20 10 6.0 649.5 SSEI Sobrelosa Sobrelosa 1er piso 1 11:03:00
101 Planta 2 Besalco 3-2-17 2823 HN 30 90 20 10 6.0 655.5 Estanque Sobrelosa Sobrelosas 1 10:09:00
102 Planta 2 Besalco 3-2-17 2863 HN 30 90 20 10 4.0 659.5 Estanque Sobrelosa Sobrelosas 1 17:53:00
103 Planta 2 Besalco 3-2-17 2881 HN 30 90 20 10 2.5 662.0 Estanque Sobrelosa Sobrelosas 1 19:49:00
104 Planta 2 Besalco 6-2-17 2917 HN 30 90 20 10 7.0 669.0 TWR Losa Losa piso 7 7 8:38:00
105 Planta 2 Besalco 6-2-17 2918 HN 30 90 20 10 7.0 676.0 TWR Losa Losa piso 7 7 10:58:00
106 Planta 2 Besalco 6-2-17 2919 HN 30 90 20 10 5.0 681.0 TWR Losa Losa piso 7 7 12:20:00
107 681.0
108 681.0
CONTROL GUIAS DE HORMIGON ESTRUCTURAL

OBRA:
RESPONSABLE INGRESO INFORMACIN: N

INFORMACIN GUA DE HORMIGON INFORMACION A COMPLETAR POR OBRA
M
U
Hora Salida
N PROVEEDOR FECHA N GUIA TIPO HORMIGON (DETALLE GUIA) Aditivo M3 PARCIAL M3 ACUMULADO Edificio Elemento DESCRIPCIN DESTINO HORMIGN PISO / NIVEL E
Planta
S
T
1 Besalco-Guzmn 2-10-16 629097 HN 30 90 20 12 5.0 5.0 TWR Muros Muros 1 piso torre 1 R
2 Besalco-Guzmn 2-10-16 629098 HN 30 90 20 12 5.0 10.0 TWR Muros Muros 1 piso torre 1 E
3 Besalco 2-10-16 2 HN 30/12 5.0 15.0 TWR Muros Muros 1 piso torre 1 O
4 Besalco 2-10-16 9 HN 30/12 5.0 20.0 TWR Muros Muros 1 piso torre 1
5 Besalco planta 2 4-11-16 355 HN 30 20 12 1.0 21.0 SEE Trincheras Trincheras exteriores 1
6 Besalco planta 2 4-11-16 353 HN 30 20 12 2.0 23.0 SEE Trincheras Trincheras exteriores 1
7 Besalco planta 2 8-11-16 428 HN 30 90 20 12 2.5 25.5 SEE Trincheras Trincheras interiores 1
8 Besalco planta 2 28-1-17 2532 HN 30 90 20 12 7.5 33.0 TWR Muros Muros 7 piso torre 7 8:09:00
9 Besalco planta 2 28-1-17 2546 HN 30 90 20 12 7.5 40.5 TWR Muros Muros 7 piso torre 7 10:18:00
10 Besalco planta 2 28-1-17 2567 HN 30 90 20 12 1.0 41.5 TWR Losa Losa puente DGAC - Torre 1 13:11:00
11 Besalco planta 2 29-1-17 2640 HN 30 90 20 12 6.0 47.5 SSEI Pozo mantencin Pozo mantencin carros 1 14:25:00
12 Besalco planta 2 30-1-17 2680 HN 30 90 20 12 6.0 53.5 SSEI Sobrelosa Sobrelosas 2 piso 2 14:51:00
13 Besalco planta 2 1-2-17 2777 HN 30 20 12 8.0 61.5 SSEI Sobrelosa Sobrelosas 3 piso 3 15:05:00
14 61.5
15 61.5
16 61.5
17 61.5
18 61.5
CONTROL GUIAS DE HORMIGON ESTRUCTURAL

OBRA:
RESPONSABLE INGRESO INFORMACIN:

INFORMACIN GUA DE HORMIGON INFORMACION A COMPLETAR POR OBRA

Hora Salida Hora Llegada Hora Inicio Hora Termino Hora Salida de
N PROVEEDOR FECHA N GUIA TIPO HORMIGON (DETALLE GUIA) Aditivo M3 PARCIAL M3 ACUMULADO Edificio Elemento DESCRIPCIN DESTINO HORMIGN PISO / NIVEL
Planta Obra Descarga Descarga Obra

1 Planta Besalco 21-10-16 5442 HN 30 90 20 16 7.0 7.0 TWR Muros Muros 2 piso torre 2 9:05:00
2 Planta Besalco 21-10-16 5443 HN 30 90 20 16 6.0 13.0 TWR Muros Muros 2 piso torre 2 11:10:00
3 Planta 2 Besalco 21-10-16 119 HN 30 90 20 16 6.0 19.0 TWR Muros Muros 2 piso torre 2 15:48:00
4 Planta 2 Besalco 21-10-16 125 HN 30 90 20 16 4.0 23.0 TWR Muros Muros 2 piso torre 2 18:11:00
5 Planta 2 Besalco 13-11-16 536 HN 30 90 20 16 7.0 30.0 TWR Muros Muros 3 piso torre 3 13:05:00
6 Planta 2 Besalco 13-11-16 539 HN 30 90 20 16 3.5 33.5 TWR Muros Muros 3 piso torre 3 14:47:00
7 Planta 1 Besalco 13-11-16 5694 HN 30 90 20 16 7.0 40.5 TWR Muros Muros 3 piso torre 3
8 Planta 1 Besalco 13-11-16 5695 HN 30 90 20 16 7.0 47.5 TWR Muros Muros 3 piso torre 3
9 Planta 1 Besalco 29-11-16 6533 HN 30 90 20 16 5.0 52.5 TWR Muros Muros 4 piso torre 4 14:20:00
10 Planta 1 Besalco 29-11-16 6534 HN 30 90 20 16 5.0 57.5 TWR Muros Muros 4 piso torre 4 15:56:00
11 Planta 1 Besalco 29-11-16 6536 HN 30 90 20 16 5.0 62.5 TWR Muros Muros 4 piso torre 4 17:30:00
12 Planta 1 Besalco 29-11-16 6538 HN 30 90 20 16 5.0 67.5 TWR Muros Muros 4 piso torre 4 19:00:00
13 Planta 2 Besalco 15-12-16 1463 HN 30 90 20 16 5.0 72.5 TWR Muros Muros 5 piso torre 5 9:59:00
14 Planta 2 Besalco 15-12-16 1464 HN 30 90 20 16 5.0 77.5 TWR Muros Muros 5 piso torre 5 11:30:00
15 Planta 2 Besalco 15-12-16 1473 HN 30 90 20 16 5.0 82.5 TWR Muros Muros 5 piso torre 5 13:08:00
16 Planta 2 Besalco 15-12-16 1478 HN 30 90 20 16 5.0 87.5 TWR Muros Muros 5 piso torre 5 14:21:00
17 Planta 2 Besalco 15-12-16 1490 HN 30 90 20 16 1.0 88.5 TWR Muros Muros 5 piso torre 5 16:06:00
18 Planta 2 Besalco 16-12-16 1533 HN 30 90 20 16 5.0 93.5 DGAC Radier Radier bajo escala 1 15:12:00
19 Planta 2 Besalco 7-1-17 5351 HN 30 90 20 16 7.0 100.5 TWR Muros Muros 6 piso torre 6
20 Planta 2 Besalco 7-1-17 1724 HN 30 90 20 16 5.0 105.5 TWR Muros Muros 6 piso torre 6 14:50:00
21 Planta 2 Besalco 7-1-17 1733 HN 30 90 20 16 5.0 110.5 TWR Muros Muros 6 piso torre 6 16:39:00
22 Planta 2 Besalco 7-1-17 1745 HN 30 90 20 16 5.0 115.5 TWR Muros Muros 6 piso torre 6 18:27:00
23 115.5
24 115.5
25 115.5
26 115.5
27 115.5
28 115.5
29 115.5
30 115.5
CONTROL GUIAS DE HORMIGON ESTRUCTURAL

OBRA:
RESPONSABLE INGRESO INFORMACIN:

INFORMACIN GUA DE HORMIGON INFORMACION A COMPLETAR POR OBRA

Hora Salida Hora Llegada Hora Inicio Hora Termino Hora Salida de
N PROVEEDOR FECHA N GUIA TIPO HORMIGON (DETALLE GUIA) Aditivo M3 PARCIAL M3 ACUMULADO Edificio Elemento DESCRIPCIN DESTINO HORMIGN PISO / NIVEL
Planta Obra Descarga Descarga Obra

1 Meln 3-3-16 7049186 HN 30 90 20 8 02 RK 8.0 8.0 DGAC Elevaciones Eje 1 entre D y E 1 8:05:00 9:00:00 9:10:00 10:50:00
2 Meln 3-3-16 7049187 HN 30 90 20 8 02 RK 8.0 16.0 DGAC Elevaciones ---0--- 1
3 Meln 3-3-16 7049188 HN 30 90 20 8 02 RK 8.0 24.0 DGAC Elevaciones Eje C entre 1 y 3; Eje C -D entre 1 y 3 1 9:30:00 10:20:00 12:10:00 12:55:00
4 Meln 3-3-16 7049191 HN 30 90 20 8 02 RK 8.0 32.0 DGAC Elevaciones Eje E entre 1 y 3 1 14:00:00 15:50:00 15:55:00
5 Meln 7-3-16 7049225 HN 30 90 20 8 02 RK 8.0 40.0 DGAC Elevaciones Eje A entre 3 y 7 1 14:00:00 14:45:00 14:50:00
6 Meln 7-3-16 7049228 HN 30 90 20 8 02 RK 8.0 48.0 DGAC Elevaciones Eje 1 1 15:25:00 16:15:00 16:20:00
7 Meln 7-3-16 7049230 HN 30 90 20 8 02 RK 8.0 56.0 DGAC Elevaciones Eje A entre 9 y 14 1 16:45:00 17:46:00
8 Meln 8-3-16 7049242 HN 30 90 20 8 02 RK 8.0 64.0 DGAC Elevaciones Eje E 1 13:00:00 13:50:00 14:00:00
9 Meln 8-3-16 7049245 HN 30 90 20 8 02 RK 8.0 72.0 DGAC Elevaciones Eje E 1 14:20:00 15:20:00
10 Meln 8-3-16 7049248 HN 30 90 20 8 02 RK 8.0 80.0 DGAC Elevaciones Eje 10 entre C y E 1 16:00:00 17:00:00 17:10:00
11 Meln 20-4-16 7058304 HN 30 90 20 8 02 RK 7.5 87.5 11:15:00 12:25:00 12:30:00
12 Meln 20-4-16 7058309 HN 30 90 20 8 02 RK 7.5 95.0 DGAC Elevaciones A entre 1 y 7 2 15:10:00 16:00:00 16:10:00
13 Meln 20-4-16 7058310 HN 30 90 20 8 02 RK 7.5 102.5 DGAC Elevaciones A entre 1 y 7 2 16:00:00 17:00:00 17:25:00 18:35:00
14 Meln 20-4-16 7058311 HN 30 90 20 8 02 RK 5.0 107.5 DGAC Elevaciones D entre 1 y 7 2 16:55:00 17:50:00 18:40:00
15 Meln - Besalco 14-5-16 7058527 HN 30 90 20 8 02 RK 7.5 115.0 Banco ductos Banco ductos 2 corrida 1 10:20:00 11:28:00
16
17 0.0
18 0.0
19 0.0
20 0.0
CONTROL GUIAS DE HORMIGON ESTRUCTURAL

OBRA:
RESPONSABLE INGRESO INFORMACIN:

INFORMACIN GUA DE HORMIGON INFORMACION A COMPLETAR POR OBRA

Hora Salida Hora Llegada Hora Inicio Hora Termino Hora Salida de
N PROVEEDOR FECHA N GUIA TIPO HORMIGON (DETALLE GUIA) Aditivo M3 PARCIAL M3 ACUMULADO Edificio Elemento DESCRIPCIN DESTINO HORMIGN PISO / NIVEL
Planta Obra Descarga Descarga Obra

1 Meln 14-3-16 7049323 HB 30 90 20 10 02 RK 8.0 8.0 DGAC Elevaciones Eje 16 entre A y E 1 15:16:00 16:23:00 16:25:00 17:20:00
2 Meln 14-3-16 7049324 HB 30 90 20 10 02 RK 8.0 16.0 DGAC Elevaciones Eje 16 entre A y E 1 16:15:00 17:15:00 17:25:00 18:05:00 18:10
3 Meln 14-3-16 7049325 HB 30 90 20 10 02 RK 8.0 24.0 DGAC Elevaciones Eje E entre 10 y 16 1 17:15:00 18:05:00 18:10:00 18:55:00
4 Meln 14-3-16 7049326 HB 30 90 20 10 02 RK 7.0 31.0 DGAC Elevaciones Eje E entre 14 y 16 1 19:20:00 20:10:00 20:15:00 20:55:00
5 Meln 15-3-16 7049340 HB 30 90 20 10 02 RK 8.0 39.0 SEE Elevaciones 1 14:05:00 15:00:00 15:05:00 15:50:00
6 Meln 15-3-16 7049342 HB 30 90 20 10 02 RK 8.0 47.0 SEE Elevaciones 1 15:00:00 16:00:00 16:05:00
7 Meln 15-3-16 7049344 HB 30 90 20 10 02 RK 8.0 55.0 SEE Elevaciones Eje 2 entre B y E; C (2 y1); D (1 y 2); 8 (GyJ); J (8 y 5) 1 16:40:00 17:26:00 17:30:00 18:30:00
8 Meln 15-3-16 7049345 HB 30 90 20 10 02 RK 8.0 63.0 SEE Elevaciones Eje J (5 y 1); 2 (E y J); H (1 y 2) 1 17:10:00 18:10:00 18:33:00
9 Meln 15-3-16 7049346 HB 30 90 20 10 02 RK 8.0 71.0 SEE Elevaciones Eje G (7 y 6); 6 (J y B); 5 (F y J) 1 17:56:00 19:00:00 19:15:00 20:56:00
10 Meln 16-3-16 7049364 HB 30 90 20 10 02 RK 5.0 76.0 SEE Elevaciones Eje 2 (F y H); G (2 y 4); 3 (F y G); 5 (E y H) 1 15:13:00 16:10:00 16:15:00 17:20:00
11 Meln - Besalco 21-3-16 7049419 HB 30 90 20 10 02 RK 8.0 84.0 DGAC Elevaciones Eje 9 - 10 - 13 - 14; eje 16 entre A y D 1 13:45:00 14:42:00 14:50:00 15:20:00
12 Meln 21-3-16 7049420 HB 30 90 20 10 02 RK 8.0 92.0 DGAC Elevaciones Eje 9 - 10 - 13 - 14; eje 16 entre A y D 1 14:30:00 15:25:00 15:27:00 15:50:00
13 Meln 21-3-16 7049421 HB 30 90 20 10 02 RK 8.0 100.0 SEE Elevaciones Ejes 1 y 2 entre J y F 1 15:45:00 16:45:00 16:47:00 17:10:00 17:15
14 Meln 21-3-16 7049422 HB 30 90 20 10 02 RK 8.0 108.0 SEE Elevaciones Ejes 1 y 2 entre J y F 1 16:40:00 17:30:00 17:40:00 18:00:00 18:10
15 Meln - Besalco 21-3-16 7049423 HB 30 90 20 10 02 RK 8.0 116.0 SEE Elevaciones Ejes 1 y 2 entre J y F 1 17:10:00 18:15:00 18:20:00 19:00:00
16 Meln - Besalco 28-3-16 7049485 HB 30 90 20 10 02 RK 8.0 124.0 SEE Elevaciones Eje 8 entre B y J 1 14:25:00 15:20:00 15:25:00 16:40:00
17 Meln 28-3-16 7049487 HB 30 90 20 10 02 RK 7.0 131.0 SEE Elevaciones Eje ___ entre 6 y 8 1 15:40:00 16:30:00 16:45:00 18:00:00
18 Meln 28-3-16 7049489 HB 30 90 20 10 02 RK 8.5 139.5 SEE Elevaciones Eje 6 entre B y J 1 16:15:00 17:10:00 18:40:00
19 Meln - Besalco 29-3-16 7049527 HB 30 90 20 10 02 RK 8.0 147.5 SEE Elevaciones Edje G entre 3 y 5 1 12:35:00 13:30:00 13:40:00 14:30:00
20 Meln 29-3-16 7049532 HB 30 90 20 10 02 RK 7.0 154.5 SEE Elevaciones Ejes J, A y G entre G y J; 1 y 2; 3 y 5 1 17:20:00 18:15:00 18:20:00 18:54:00
21 Meln 29-3-16 7049537 HB 30 90 20 10 02 RK 7.0 161.5 SEE Elevaciones Ejes 8 y 9 entre J y H; 6 y 8 1 16:00:00 16:50:00 17:00:00 17:54:00
22 Meln - Besalco 31-3-16 7049552 HB 30 90 20 10 02 RK 8.0 169.5 ESTANQUE Elevaciones Muros exteriores sala de bombas 1 8:30:00 9:30:00
23 Meln 31-3-16 7049559 HB 30 90 20 10 02 RK 7.0 176.5 ESTANQUE Elevaciones Muros exteriores sala de bombas 1 10:00:00 11:00:00 11:05:00 11:30:00
24 Meln 31-3-16 7049562 HB 30 90 20 10 02 RK 7.0 183.5 ESTANQUE Elevaciones Muros exteriores sala de bombas 1 11:20:00 16:10:00 12:15:00
25 Meln - Besalco 2-4-16 7049598 HB 30 90 20 10 02 RK 8.0 191.5 DGAC Elevaciones Eje 7 con B (ascensor) 1 9:17:00 10:23:00 10:28:00
26 Meln 2-4-16 7049601 HB 30 90 20 10 02 RK 8.0 199.5 DGAC Elevaciones Eje 7 con B (ascensor) 1 10:15:00 11:05:00 11:35:00
27 Meln - Besalco 12-4-16 7058215 HB 30 90 20 10 02 RK 8.0 207.5 DGAC Losa cielo Ejes 1 y 7 entre A y D 1 11:25:00 12:20:00 12:25:00 13:15:00
28 Meln 12-4-16 7058219 HB 30 90 20 10 02 RK 8.0 215.5 DGAC Losa cielo Ejes 1 y 7 entre A y D 1 13:00:00 14:00:00
29 Meln - Besalco 12-4-16 7058223 HB 30 90 20 10 02 RK 8.0 223.5 DGAC Losa cielo Ejes 1 y 7 entre A y D 1 15:00:00
30 Meln 12-4-16 7058225 HB 30 90 20 10 02 RK 8.0 231.5 DGAC Losa cielo Ejes 1 y 7 entre A y D 1 16:00:00 17:10:00
31 Meln 12-4-16 7058227 HB 30 90 20 10 02 RK 8.0 239.5 DGAC Losa cielo Ejes 1 y 7 entre A y D 1 17:00:00 18:20:00 18:25:00
32 Meln 12-4-16 7058228 HB 30 90 20 10 02 RK 5.0 244.5 DGAC Losa cielo Ejes 1 y 7 entre A y D 1 18:00:00 18:55:00 19:15:00
33 Meln - Besalco 13-4-16 7058236 HB 30 90 20 10 02 RK 8.0 252.5 SSEI Elevaciones Eje 9 entre A y C 1 11:30:00 12:30:00 12:35:00 13:00:00
34 Meln 13-4-16 7058239 HB 30 90 20 10 02 RK 8.0 260.5 SSEI Elevaciones Eje C entre 9 y 10 1 13:20:00 14:30:00 15:00:00 15:30:00
35 Meln 13-4-16 7058242 HB 30 90 20 10 02 RK 8.0 268.5 SSEI Elevaciones Eje 10 entre B y C; B entre 9 y 10 1 14:10:00 15:15:00 15:20:00 15:45:00
36 Meln - Besalco 13-4-16 7058243 HB 30 90 20 10 02 RK 8.0 276.5 SSEI Elevaciones Eje 10 entre A y B; B entre 9 y 10 1 15:00:00 16:00:00 16:10:00 16:55:00
37 Meln 13-4-16 7058245 HB 30 90 20 10 02 RK 7.0 283.5 SSEI Elevaciones Eje 10 entre B y c; A entre 9 y 10 1 16:40:00 17:35:00 17:45:00 18:15:00
38 Meln - Besalco 13-4-16 7058246 HB 30 90 20 10 02 RK 8.0 291.5 SSEI Elevaciones Eje A entre 9 y 10 1 18:40:00 19:40:00 19:50:00 20:15:00
39 Meln - Besalco 5-5-16 7058426 HB 30 90 20 10 02 RK 8.0 299.5 DGAC Losa Eje 7 - 16 entre A y D 1 12:00:00 13:00:00
40 Meln - Besalco 6-5-16 7058446 HB 30 90 20 10 02 RK 8.0 307.5 SEE Elevaciones Eje 8 entre B y J; eje G entre 8 y 6 (2 elevacin) 1 11:30:00 12:36:00 12:44:00 14:30:00
41 Meln 6-5-16 7058451 HB 30 90 20 10 02 RK 7.5 315.0 SEE Elevaciones Eje 6 entre G y B; eje B entre 6 y 8 (2 elevacin) 1 16:30:00 17:35:00 17:50:00 19:10:00
42 Meln - Besalco 7-5-16 7058461 HB 30 90 20 10 02 RK 8.0 323.0 SEE Elevaciones Eje 4 entre C y J; 8 entre C y J; J entre 4 y 8 1 11:45:00 12:50:00 13:00:00 14:55:00
43 Meln - Besalco 9-5-16 7058468 HB 30 90 20 10 02 RK 8.0 331.0 SEE Elevaciones Eje J entre 1 y 4 1 15:40:00 16:30:00 16:40:00 18:40:00
44 Meln 8-7-16 7293736 HB 30 90 20 10 02 RK 8.0 339.0 SSEI Losa Losa 2 piso 2 13:50:00 14:40:00 15:00:00
45 Meln 8-7-16 7293737 HB 30 90 20 10 02 RK 8.0 347.0 SSEI Losa Losa 2 piso 2 14:47:00 15:40:00 15:55:00
46 Meln - Besalco 17-6-16 7058875 HB 30 90 20 10 02 RK 7.5 354.5 SSEI Elevaciones Ejes B y 10 2 12:05:00 13:15:00
47 Meln 23-7-16 7293783 HB 30 90 20 10 02 RK 7.5 362.0 SSEI Elevaciones Eje 9 entre B1 - B3; Eje B1 entre 9 - 10 3 15:55:00 16:50:00 17:00:00 18:05:00
48 Meln 22-7-16 7293778 HB 30 90 20 10 02 RK 7.5 369.5 Banco ductos Banco ductos Eje 2 1 12:50:00 13:55:00 13:55:00
49 Meln 22-7-16 7293779 HB 30 90 20 10 02 RK 7.5 377.0 14:20:00 15:15:00 15:20:00
50 Meln 23-7-16 7293782 HB 30 90 20 10 02 RK 7.5 384.5 Calle bravo Calle bravo Emplantillado cajones 1 11:52:00 12:40:00 13:15:00
51 Meln 23-7-16 7293783 HB 30 90 20 10 02 RK 7.5 392.0 SSEI Elevaciones Eje 9 entre B1 - B3; eje B1 entre 9 -10 3 15:55:00 16:50:00 17:00:00 18:05:00
52 Meln 3-8-16 7293809 HB 30 90 20 10 02 RK 7.5 399.5 SSEI Elevaciones Muros varios ejes 3 12:30:00 13:30:00 13:40:00
53 Meln 3-8-16 7293810 HB 30 90 20 10 02 RK 7.5 407.0 SSEI Elevaciones Muros varios ejes 3
54 Meln 4-8-16 7293812 HB 30 90 20 10 02 RK 7.5 414.5 Banco ductos Calle bravo Banco ductos 1 10:30:00 11:30:00 12:10:00 12:45:00 13:00
55 Meln 4-8-16 7293813 HB 30 90 20 10 02 RK 7.5 422.0 Banco ductos Calle bravo Banco ductos 1 12:10:00 13:10:00 13:30:00
56 Meln 4-8-16 7293815 HB 30 90 20 10 02 RK 3.0 425.0 Banco ductos Calle bravo Banco ductos 1 15:00:00 15:55:00 16:00:00 16:40:00 16:50
57 Meln 10-8-16 7293839 HB 30 90 20 10 02 RK 8.0 433.0 Torre control Fundaciones Vigas fundaciones ejes A y B entre 1 y 3 1 8:40:00 9:35:00
58 433.0
59 433.0
60 433.0
61 433.0
62 433.0
63 433.0
64 433.0
65 407.0
66 407.0
CONTROL GUIAS DE HORMIGON ESTRUCTURAL

OBRA:
RESPONSABLE INGRESO INFORMACIN:

INFORMACIN GUA DE HORMIGON INFORMACION A COMPLETAR POR OBRA

Hora Salida Hora Llegada Hora Inicio Hora Termino Hora Salida de
N PROVEEDOR FECHA N GUIA TIPO HORMIGON (DETALLE GUIA) Aditivo M3 PARCIAL M3 ACUMULADO Edificio Elemento DESCRIPCIN DESTINO HORMIGN PISO / NIVEL
Planta Obra Descarga Descarga Obra

1 Meln - Besalco 1-4-16 7049576 HB 30 90 210 10 Hidro 02RK Inc. Aire 8.0 8.0 ESTANQUE Losa fundacin Estanques de agua 1 10:20:00 11:19:00 11:25:00 12:20:00
2 Meln 1-4-16 7049582 HB 30 90 210 10 Hidro 02RK Inc. Aire 8.0 16.0 ESTANQUE Losa fundacin Estanques de agua 1 12:16:00 13:19:00 13:25:00 14:00:00
3 Meln 1-4-16 7049585 HB 30 90 210 10 Hidro 02RK Inc. Aire 8.0 24.0 ESTANQUE Losa fundacin Estanques de agua 1 13:00:00 13:50:00 14:05:00 15:00:00
4 Meln 1-4-16 7049586 HB 30 90 210 10 Hidro 02RK Inc. Aire 8.0 32.0 ESTANQUE Losa fundacin Estanques de agua 1 13:30:00 14:35:00 15:05:00 15:40:00
5 Meln 1-4-16 7049587 HB 30 90 210 10 Hidro 02RK Inc. Aire 8.0 40.0 ESTANQUE Losa fundacin Estanques de agua 1 14:00:00 15:00:00 15:45:00 16:40:00
6 Meln - Besalco 1-4-16 7049588 HB 30 90 210 10 Hidro 02RK Inc. Aire 8.0 48.0 ESTANQUE Losa fundacin Estanques de agua 1 14:34:00 15:35:00 16:42:00 17:40:00
7 Meln 1-4-16 7049592 HB 30 90 210 10 Hidro 02RK Inc. Aire 8.0 56.0 ESTANQUE Losa fundacin Estanques de agua 1 16:45:00 17:40:00 17:45:00 18:50:00
8 Meln 1-4-16 7049593 HB 30 90 210 10 Hidro 02RK Inc. Aire 8.0 64.0 ESTANQUE Losa fundacin Estanques de agua 1 17:45:00 18:50:00 18:55:00 19:50:00
9 Meln - Besalco 4-4-16 7049612 HB 30 90 210 10 Hidro 02RK Inc. Aire 8.0 72.0 ESTANQUE Muros estanques Estanques de agua 1 11:17:00 12:20:00
10 Meln 4-4-16 7049613 HB 30 90 210 10 Hidro 02RK Inc. Aire 8.0 80.0 ESTANQUE Muros estanques Estanques de agua 1 12:40:00 13:35:00 13:55:00
11 Meln 4-4-16 7049618 HB 30 90 210 10 Hidro 02RK Inc. Aire 8.0 88.0 ESTANQUE Muros estanques Estanques de agua 1 14:30:00 15:30:00 15:35:00 16:35:00 16:50
12 Meln 4-4-16 7049619 HB 30 90 210 10 Hidro 02RK Inc. Aire 8.0 96.0 ESTANQUE Muros estanques Estanques de agua 1 15:55:00 16:50:00 11:05:00
13 Meln 4-4-16 7049621 HB 30 90 210 10 Hidro 02RK Inc. Aire 8.0 104.0 ESTANQUE Muros estanques Estanques de agua 1 16:20:00 17:10:00 18:30:00
14 Meln - Besalco 7-4-16 7049655 HB 30 90 210 10 Hidro 02RK Inc. Aire 8.0 112.0 ESTANQUE Muros interiores Estanques de agua 1 8:40:00 9:50:00 9:55:00 11:40:00
15 Meln 7-4-16 7049660 HB 30 90 210 10 Hidro 02RK Inc. Aire 6.0 118.0 ESTANQUE Muros interiores Estanques de agua 1 12:55:00 13:50:00 14:00:00 14:50:00
16 Meln 7-4-16 7049659 HB 30 90 210 10 Hidro 02RK Inc. Aire 8.0 126.0 ESTANQUE Muros interiores Estanques de agua 1 10:00:00 10:45:00 11:45:00 12:50:00
17 Meln 10-8-16 7293841 HB 30 90 210 10 Hidro 02RK Inc. Aire 8.0 134.0 Torrede Control Fundaciones Ejes A y B entre 1 y 3; eje A entre 1 y 3 1 9:40:00 10:30:00 10:40:00
18 Meln 10-8-16 7293843 HB 30 90 210 10 Hidro 02RK Inc. Aire 8.0 142.0 Torrede Control Fundaciones Ejes A y B entre 1 y 3; eje A entre 1 y 3 1 12:30:00 13:37:00
19 Meln 10-8-16 7293846 HB 30 90 210 10 Hidro 02RK Inc. Aire 8.0 150.0 Torrede Control Fundaciones Ejes A y B entre 1 y 3; eje A entre 1 y 3 1 15:40:00 16:35:00
20 Meln 10-8-16 7293847 HB 30 90 210 10 Hidro 02RK Inc. Aire 6.0 156.0 Torrede Control Fundaciones Ejes A y B entre 1 y 3; eje A entre 1 y 3; escala DGAC 1 16:30:00 17:30:00 17:35:00 18:35:00
21 156.0
22 156.0
23 156.0
24 156.0
25 156.0
26 156.0
27 156.0
28 156.0
CONTROL GUIAS DE HORMIGON ESTRUCTURAL

OBRA:
RESPONSABLE INGRESO INFORMACIN:

INFORMACIN GUA DE HORMIGON INFORMACION A COMPLETAR POR OBRA

Hora Salida Hora Llegada Hora Inicio Hora Termino Hora Salida de
N PROVEEDOR FECHA N GUIA TIPO HORMIGON (DETALLE GUIA) Aditivo M3 PARCIAL M3 ACUMULADO Edificio Elemento DESCRIPCIN DESTINO HORMIGN PISO / NIVEL
Planta Obra Descarga Descarga Obra

1 Meln - Besalco 3-6-16 7058743 HB30 90 20F+04 SSP 7.5 7.5 TWR Fundaciones Pilotes 1 11:30:00 12:51:00
2 Meln - Besalco 3-6-16 7058748 HB30 90 20F+04 SSP 2.0 9.5 TWR Fundaciones Pilotes 1 16:30:00
3 Meln - Besalco 4-6-16 7058755 HB30 90 20F+04 SSP 7.5 17.0 TWR Fundaciones Pilotes 1 13:10:00 14:20:00
4 Meln - Besalco 6-6-16 7058764 HB30 90 20F+04 SSP 7.5 24.5 TWR Fundaciones Pilotes 1-A 1 13:30:00 14:30:00 14:35:00 16:35:00
5 Meln - Besalco 7-6-16 7058779 HB30 90 20F+04 SSP 7.5 32.0 TWR Fundaciones Pilotes 1-A 1 11:00:00 12:10:00 12:10:00 14:10:00
6 Meln - Besalco 8-6-16 7058793 HB30 90 20F+04 SSP 7.5 39.5 TWR Fundaciones Pilotes 3-B 1 13:00:00 14:00:00 14:05:00 15:30:00
7 Meln - Besalco 9-6-16 7058800 HB30 90 20F+04 SSP 7.5 47.0 TWR Fundaciones Pilote 1 13:00:00 14:00:00 14:05:00
8 Meln - Besalco 10-6-16 7058810 HB30 90 20F+04 SSP 7.5 54.5 TWR Fundaciones Pilote 3 con A 1 13:15:00 14:20:00
9 Meln - Besalco 13-6-16 7058822 HB30 90 20F+04 SSP 7.5 62.0 TWR Fundaciones Pilote 1 con A 1 10:40:00 11:50:00
10 Meln - Besalco 14-6-16 7058829 HB30 90 20F+04 SSP 7.5 69.5 TWR Fundaciones Pilote 1 con B 1 9:45:00 10:50:00
11 Meln - Besalco 14-6-16 7058837 HB30 90 20F+04 SSP 7.5 77.0 TWR Fundaciones Pilote 3 con B 1 16:08:00 17:05:00
12 Meln - Besalco 15-6-16 7058851 HB30 90 20F+04 SSP 7.5 84.5 TWR Fundaciones Pilote 3 con B 1 15:25:00 16:30:00 16:35:00
13 Meln - Besalco 16-6-16 7058866 HB30 90 20F+04 SSP 7.5 92.0 TWR Fundaciones Pilote 1 con B 1 15:05:00 16:10:00
14 92.0
15 92.0
16 92.0
17 92.0
18 92.0
CONTROL GUIAS DE HORMIGON ESTRUCTURAL

OBRA:
RESPONSABLE INGRESO INFORMACIN:

INFORMACIN GUA DE HORMIGON INFORMACION A COMPLETAR POR OBRA

Hora Salida Hora Llegada Hora Inicio Hora Termino Hora Salida de
N PROVEEDOR FECHA N GUIA TIPO HORMIGON (DETALLE GUIA) Aditivo M3 PARCIAL M3 ACUMULADO Edificio Elemento DESCRIPCIN DESTINO HORMIGN PISO / NIVEL
Planta Obra Descarga Descarga Obra

1 Meln 5-8-16 7293821 HN 15 90 20 10 02 RK 7.5 7.5 DGAC Radier Radier entre ejes 5 - 7 y B - E 1 13:21:00 14:20:00 14:30:00 15:30:00
2 Meln 6-8-16 7293824 HN 15 90 20 10 02 RK 8.0 15.5 DGAC Radier Radier entre ejes D - E y 1 - 3; A - B y 4 - 7 1
3 Meln 6-8-16 7293826 HN 15 90 20 10 02 RK 8.0 23.5 DGAC Radier Radier entre ejes A - D y 1 - 4 1
4 Meln 9-8-16 7293835 HN 15 90 20 10 02 RK 7.5 31.0 DGAC Radier Radier entre ejes A - D y 7 - 10 1 11:13:00 12:19:00
5 Meln 9-8-16 7293836 HN 15 90 20 10 02 RK 7.5 38.5 DGAC Radier Radier entre ejes D - E y 7 - 9; A - C y 10 - 12 1 13:05:00 14:00:00 14:05:00 14:25:00 14:30
6 Meln 9-8-16 7293837 HN 15 90 20 10 02 RK 7.5 46.0 DGAC Radier Radier entre ejes C - E y 10 - 12; A - C y 12 - 13 1 14:54:00 15:53:00
7 Meln 9-8-16 7293838 HN 15 90 20 10 02 RK 7.5 53.5 DGAC Radier Radier entre ejes D - E y 13 - 16; C - E y 12 - 13 1 16:00:00 17:00:00 17:08:00 18:35:00 18:40
8 Meln 5-9-16 7293942 HN 15 90 20 10 02 RK 8.0 61.5 SSEI Radier Radier ejes C y B2 entre 9 y 10; ejes 7 y 8 entre A y B 1 10:30:00 11:30:00 11:35:00 13:45:00
9 Meln 5-9-16 7293944 HN 15 90 20 10 02 RK 8.0 69.5 SSEI Radier Radier ejes B y A entre 9 y 10 1 14:15:00 15:10:00 15:20:00 17:20:00
10 Planta 1 Besalco 27-11-16 6504 HN 15 90 20 07 1.0 70.5 Inst faena Bodega residuos peligrosos Radier 1 16:00:00
11 Planta 1 Besalco 27-11-16 6503 HN 15 90 20 07 3.5 74.0 Inst faena Bodega residuos peligrosos Radier 1 14:50:00
12 74.0
13 74.0
CONTROL GUIAS DE HORMIGON ESTRUCTURAL

OBRA:
RESPONSABLE INGRESO INFORMACIN:

INFORMACIN GUA DE HORMIGON INFORMACION A COMPLETAR POR OBRA

TIPO HORMIGON Hora Salida Hora Llegada Hora Inicio Hora Termino Hora Salida de
N PROVEEDOR FECHA N GUIA Aditivo M3 PARCIAL M3 ACUMULADO Edificio Elemento DESCRIPCIN DESTINO HORMIGN PISO / NIVEL
(DETALLE GUIA) Planta Obra Descarga Descarga Obra

1 Planta Besalco 24-9-16 640428 HN 15 90 20 7 1.0 1.0 Pista Inf. no entregada por capataz Inf. no entregada por capataz 1 11:35:00
2 Planta Besalco 25-9-16 640441 HN 15 90 20 7 1.0 2.0 Pista Inf. no entregada por capataz Inf. no entregada por capataz 1 15:25:00
3 2.0
4 2.0
5 2.0
6 2.0
7 2.0
8 2.0
9 2.0
10 2.0
11
12 0.0
13 0.0
CONTROL GUIAS DE HORMIGON ESTRUCTURAL

OBRA:
RESPONSABLE INGRESO INFORMACIN:

INFORMACIN GUA DE HORMIGON INFORMACION A COMPLETAR POR OBRA

Hora Salida Hora Llegada Hora Inicio Hora Termino Hora Salida de
N PROVEEDOR FECHA N GUIA TIPO HORMIGON (DETALLE GUIA) Aditivo M3 PARCIAL M3 ACUMULADO Edificio Elemento DESCRIPCIN DESTINO HORMIGN PISO / NIVEL
Planta Obra Descarga Descarga Obra

1 Planta 1 Besalco 19-10-16 5404 HF 480 80 40 5 6.0 6.0 Pista Banco ducto KM 1700 Emplantillado banco ducto 1 15:10:00
2 Planta 2 Besalco 18-12-16 1601 HF 480 80 40 5 3.0 9.0 SSEI Radier carros bomberos Radier entre ejes 6 - 7 con B - C 1 9:29:00
3 Planta 2 Besalco 18-12-16 1602 HF 480 80 40 5 3.0 12.0 SSEI Radier carros bomberos Radier entre ejes 6 - 7 con B - C 1 10:42:00
4 Planta 2 Besalco 18-12-16 1603 HF 480 80 40 5 3.0 15.0 SSEI Radier carros bomberos Radier entre ejes 6 - 7 con B - C 1 12:03:00
5 Planta 2 Besalco 18-12-16 1605 HF 480 80 40 5 3.0 18.0 SSEI Radier carros bomberos Radier entre ejes 6 - 7 con B - C 1 13:17:00
6 Planta 2 Besalco 18-12-16 1615 HF 480 80 40 5 3.0 21.0 SSEI Radier carros bomberos Radier entre ejes 6 - 7 con B - C 1 14:32:00
7 Planta 2 Besalco 18-12-16 1620 HF 480 80 40 5 3.5 24.5 SSEI Radier carros bomberos Radier entre ejes 6 - 7 con B - C 1 15:38:00
8 Planta 2 Besalco 19-12-16 1646 HF 480 80 40 5 6.0 30.5 SSEI Radier carros bomberos Radier entre ejes 4 - 5 con B - C 1 9:28:00
9 Planta 2 Besalco 19-12-16 1647 HF 480 80 40 5 6.0 36.5 SSEI Radier carros bomberos Radier entre ejes 4 - 5 con B - C 1 11:04:00
10 Planta 2 Besalco 19-12-16 1648 HF 480 80 40 5 6.0 42.5 SSEI Radier carros bomberos Radier entre ejes 4 - 5 con B - C 1 13:06:00
11 Planta 2 Besalco 19-12-16 1649 HF 480 80 40 5 7.0 49.5 SSEI Radier carros bomberos Radier entre ejes 2 - 3 con B - C 1 13:13:00
12 Planta 2 Besalco 19-12-16 1651 HF 480 80 40 5 6.0 55.5 SSEI Radier carros bomberos Radier entre ejes 2 - 3 con B - C 1 15:36:00
13 Planta 2 Besalco 19-12-16 1652 HF 480 80 40 5 7.0 62.5 SSEI Radier carros bomberos Radier entre ejes 2 - 3 con B - C 1 16:47:00
14 Planta 2 Besalco 19-12-16 1655 HF 480 80 40 5 4.0 66.5 SSEI Radier carros bomberos Radier entre ejes 2 - 3 con B - C 1 18:00:00
15 Planta 2 Besalco 20-12-16 1678 HF 480 80 40 5 8.0 74.5 SSEI Radier carros bomberos Radier entre ejes 7 - 8 con B - C 1 14:29:00
16 Planta 2 Besalco 8-1-17 1765 HF 480 80 40 5 7.0 81.5 SSEI Radier carros bomberos Radier entre ejes 7 - 8 con B2 - C 1 10:02:00
17 Planta 2 Besalco 8-1-17 1782 HF 480 80 40 5 7.0 88.5 SSEI Radier carros bomberos Radier entre ejes 7 - 8 con B - C / 1 - 2 con B1 - C 1 11:48:00
18 Planta 2 Besalco 8-1-17 1790 HF 480 80 40 5 7.0 95.5 SSEI Radier carros bomberos Radier entre ejes 1 - 2 con B2 - B3 1 13:17:00
19 Planta 2 Besalco 8-1-17 1792 HF 480 80 40 5 5.5 101.0 SSEI Radier carros bomberos Radier entre ejes 1 - 2 con B3 - C 1 15:42:00
20 Planta 2 Besalco 9-1-17 1817 HF 480 80 40 5 7.0 108.0 SSEI Radier carros bomberos Radier entre ejes 3 - 4 con B - B2 1 10:01:00
21 Planta 2 Besalco 9-1-17 1818 HF 480 80 40 5 1.0 109.0 SSEI Radier carros bomberos Radier entre ejes 3 - 4 con B - B2 1 10:15:00
22 Planta 2 Besalco 9-1-17 1819 HF 480 80 40 5 8.0 117.0 SSEI Radier carros bomberos Radier entre ejes 3 - 4 con B2 - C 1 12:05:00
23 Planta 2 Besalco 9-1-17 1826 HF 480 80 40 5 8.0 125.0 SSEI Radier carros bomberos Radier entre ejes 3 - 4 con B2 - C / 5 - 6 con B - B2 1 16:13:00
24 Planta 2 Besalco 9-1-17 1836 HF 480 80 40 5 8.0 133.0 SSEI Radier carros bomberos Radier entre ejes 5 - 6 con B - B3 1 17:22:00
25 Planta 2 Besalco 9-1-17 1848 HF 480 80 40 5 4.0 137.0 SSEI Radier carros bomberos Radier entre ejes 5 - 6 con B3 - C 1 18:53:00
26 Planta 2 Besalco 30-1-17 2678 HF 480 80 40 5 1.5 138.5 SSEI Pozo carro bomberos Pozo carro bomberos 1 11:03:00
27 138.5
28 138.5
CONTROL GUIAS DE HORMIGON ESTRUCTURAL

OBRA:
RESPONSABLE INGRESO INFORMACIN:

INFORMACIN GUA DE HORMIGON INFORMACION A COMPLETAR POR OBRA

DESCRIPCIN DESTINO Hora Salida Hora Llegada Hora Inicio Hora Termino Hora Salida de
N PROVEEDOR FECHA N GUIA TIPO HORMIGON (DETALLE GUIA) Aditivo M3 PARCIAL M3 ACUMULADO Edificio Elemento PISO / NIVEL
HORMIGN Planta Obra Descarga Descarga Obra

1 Planta 2 Besalco 5-11-16 356 Mortero 1:2 3.0 3.0 SEE Sobrelosa Sobrelosa 1 9:16:00
2 Planta 2 Besalco 5-11-16 365 Mortero 1:2 1.5 4.5 SEE Sobrelosa Sobrelosa 1 15:54:00
3 4.5
4 4.5
5 4.5
6 4.5
7 4.5
8 4.5
9 4.5
10 4.5
11
12 0.0
13 0.0