Maintenance

Work Instructions
Activity 20.02.20
Rev. C Date Page 1 of 3
No. 15
Asset
ELPRT Power Transformer
Group
Exec. Est. Duration
Electrical 2 Activity Type Routine PM
Dept. (Hrs.)
Coordinate
Interval Monthly Stop (Y/N) N Operation
With
Applied on the following Assets Numbers:
Asset No. Description
FH01E10+PTR01 2000 KVA, 11/0.42 KV
FH01E10+PTR02 2000 KVA, 11/0.42 KV
FA00E10+PTR03 2000 KVA, 11/0.42 KV
FA00E10+PTR04 2000 KVA, 11/0.42 KV
FW11E10+PTR01 3150 KVA, 11/0.42 KV
FW11E10+PTR02 3150 KVA, 11/0.42 KV
Safety & Work Preparation
Comply with EZZ STEEL permit to work system and all relevant safety precautions.
Check whether it is necessary to include instructions regarding stopping of running
equipment and reinstating of same.
Coordinate with other disciplines, i.e. operations shift supervisor, control room, etc.
Inform the control room before starting any activity.
Prepare required documentation (sketches, material requisition, etc.)
Refer to EZZ STEEL Safety Procedure for more specific safety instructions.
References
O&M Manual.
Data sheets.
Standards.
FIRST / EZZ experience.
Attachments

OFF CURCUIT TAP Electrical Check List Test Report for TRANFORMER Operating &
CHANGER.pdf Monthly.pdf Power Transformer.zip OIL.pdf Maintenance Instrution.pdf

TEHNICAL
INFORMATION.pdf

Maintenance Work Instructions

MWI Originator Date EZZ STEEL Approval Date


FIRST Info. & Technology
20.02.2015
Solutions

/var/www/apps/conversion/tmp/scratch_6/346040017.docx 1/3
Maintenance
Work Instructions
Activity 20.02.20
Rev. C Date Page 2 of 3
No. 15
Durati
Seq Manpo
Instructions on Spares Tools*
. (min) wer
While the Unit is running carry out the following
Visual Inspection:
10 1. Check oil level the accepted level between Max. 15 Elec. Tech.
& Min and top up if required (same type of
oil) (when the unit Stopped).
20 2. Check the transformer body for Paint, 15 Elec.
corrosion or rust and painting if need Tech.
(when the unit Stopped).
30 3. Check breather Silica Gel color change if need. 15 Elec. Tech.
40 4. Listen for unusual noises 15 Elec.
Tech.
:Measurement
50 5. Record the three phase current for LV & HV. 20 Elec. Tech.
60 6. Record the temperature oil. 20 Elec. Tech.
7. Check and record the earthing connection, 20 Elec.
the minimum accepted resistance should Tech.
Earth
70
be from 1-5 according to IEEE 142-2007 tester
as per attached.
Report for a follow up work order/request in Oracle eAM for any observations
Remarks & Conclusion:




















Work Completion

** Hand Tools set is a must for all operations.


MWI Originator Date EZZ STEEL Approval Date
FIRST Info. & Technology
20.02.2015
Solutions

/var/www/apps/conversion/tmp/scratch_6/346040017.docx 2/3
Maintenance
Work Instructions
Activity 20.02.20
Rev. C Date Page 3 of 3
No. 15
Ensure work place is clean, all tools and test equipment is withdrawn.
Visually check the nearby piping, tubes, valves and other equipment in the
area, inform the control room & foreman about any abnormalities.
Ensure that the work permit is signed off, that maintenance supervisors are
informed about all observations, that test results are recorded on the
appropriate check sheets and that maintenance history is recorded on the
work history section of the work order for input in Oracle eAM.

MWI Originator Date EZZ STEEL Approval Date


FIRST Info. & Technology
20.02.2015
Solutions

/var/www/apps/conversion/tmp/scratch_6/346040017.docx 3/3