AMONA INTERNATIONAL

transportation buildings

PROPERTY AND HOUSING DEVELOPMENT


ENGINEERING, PROCUMENT, CONSTRUCTION MANAGEMENT
OIL AND GAS DIVISION
PLANNING, DESIGN AND PROJECT MANAGEMENT
POWER AND COGENERATION
All drawings, plans, information, perspectives and specifications contained herein are subject to change or
amendments without notification as may be required by the relevant Approving Authorities or the
Developers consultants, engineers and/or architects, and shall not be deemed or constitute or form part of
an offer or contract. All illustrations and pictures herein are purely artists impression and hence shall not
be regarded or interpreted as the representation or warranty of facts or binding. While every reasonable
care has been taken in providing this information, the Developer, its managers and/or its agents, shall not
be held liable or accountable for any errors, misrepresentations, changes, discrepancies or inaccuracies in
the information. The items contained herein are subject to variations, modifications and substitutions as
may be recommended by the Companys consultants, engineers, architects and/or relevant Approving
Authorities. The floor areas are purely an estimate which will be subject to the final land survey.
transportation buildings

AMONA INTERNATIONAL
OVERSEAS VENTURES AND ACTIVITIES
LIBYA
ISLAMIC REPUBLIC OF IRAN
QATAR
SYRIA
ALGERIA
EGYPT
BRUNEI
PAKISTAN

Express Rail Link (ERL) Stations - Salak Tinggi Station


EXCHANGE OF DOCUMENT CEREMONY
IN KUALA LUMPUR
SIGNING CEREMONY
PARAND NEW TOWN
GROUND BREAKING CEREMONY
OVERALL PERSPECTIVE VIEW
PROPOSED MASTER LAYOUT PLAN (PARAND NEW TOWN)
CONCEPT EXPRESSION
CONCEPT
In any design for man s habitat Allah Almighty mentioned in the Quran for us to
look into his creation to ponder how life evolved surrounding us &
value the detail & interaction between Him, nature & us
Green
Living
A New Way of
Life
for a
progressive
lifestyle
GREEN LAND SCAPING
ADVANTAGES OF PARAND PUTRA PROJECT
Destruction of the 2000 year-old
Fotress of Bam, 26th December 2003
The First Rubber Bearing Installed by
Excellency Saeedi Kia
Chi-Chi Taiwan Earthquake on the 21/9/1999
Effect on reinforced concrete buildings

No of buildings

9,909 completely collapsed


7575 partially collapsed

1-3 4-6 7-11 12-14


Building height (storey)
Conventional Structure Base-Isolated Structure
Amplification of forces No amplification of forces
Large interstory drift Contents are protected
Contents destroyed No interstory drift
Buildings Requires costly repair No costly repair
response

ground
motion
A BEARING SHOWING UNIFORM
THICKNESS OF RUBBER LAYERS
INSTALLED BEARINGS UNDERNEATH
THE BUILDING
A SEISMIC BEARING BEING SHEARED AND
COMPRESSED TO SIMULATE EARTHQUAKE
INSTALLED SIESMIC RUBBER BEARINGS
Schematic diagram of FCLSC, California

Building Seismic gap


380mm
Rubber bearing

Raft foundation
Installation of reinforcements for the foundation
Mould top plate being fixed before curing
FIXING THERMOCOUPLES FOR TEMPERATURE
CONTROL DURING CURING
Bearing installation workers need
not have to be skillful
Installation of a bearing on a
concrete pedestal
TWO BEARINGS BEING TESTED UNDER
COMBINED SHEAR AND VERTICAL LOADS
Base plates being installed on
foundation pedestals
Bearings installed on piles
Bearings under tank
Proposed Perspective View Parand putra
Mosque in Parand Putra
High School in Parand Putra
Primary School in Parand Putra
Shopping Complex in Parand Putra
PARAND OVERALL PHASE
PHASE 1A
12 STOREY APARTMENT
PHASE 1B
PHASE 1C
PHASE 1D
PHASE 1E
Thank You